{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"AE","country":"United Arab Emirates","slug":"ae","site_count":2,"project_count":2,"statuses":{"under_construction":2},"site_ids":["vcc-site-284562d636d49db446ea","vcc-site-401adc8a0db451b1d581"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/ae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AE.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AE.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AE.csv"},"sites":[{"site_id":"vcc-site-284562d636d49db446ea","name":"Khazna QAJ1 AI data center (Ajman)","country":"United Arab Emirates","country_iso_a2":"AE","latitude":25.41361,"longitude":55.44556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-10-14","oldest_status_as_of":"2025-10-14","project_count":1,"projects":[{"project_id":"384a401d-cc7f-52e4-9ae3-218a378995b9","name":"Khazna QAJ1 AI data center (Ajman)","status":"under_construction","status_as_of":"2025-10-14","search_terms":"AI-optimised, liquid-cooled data center being built by Khazna Data Centers in Ajman, United Arab Emirates, with 20 data halls of 5 MW each for 100 MW of IT load, the largest facility in Khazna's portfolio. Construction by Laing O'Rourke began in October 2024 with a 15-month target, and power is to come from Etihad Water and Electricity. By April 2025 the steel structure was complete and the first phase was rescheduled to December 2026 from an earlier 3Q 2025 date. In February 2026 the Uptime Institute awarded the design documents Tier III certification. QAJ1 QAJ01 Khazna Data Centers Laing O'Rourke Etihad Water and Electricity"}],"status_publishers":["MEED"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-284562d636d49db446ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-284562d636d49db446ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-401adc8a0db451b1d581","name":"Stargate UAE / UAE-US AI Campus","country":"United Arab Emirates","country_iso_a2":"AE","latitude":24.3438,"longitude":55.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"4278fea3-2c31-5512-87d1-d713170569e2","name":"Stargate UAE / UAE-US AI Campus","status":"under_construction","status_as_of":"2026-08-13","search_terms":"A planned 5 GW AI data centre campus in Abu Dhabi, unveiled in May 2025 under a US-UAE technology partnership and led by G42. Its first 1 GW block, branded Stargate UAE, is being developed by G42 unit Khazna Data Centers, with OpenAI and Oracle named as operators and NVIDIA supplying GB300 systems. Construction of an initial 200 MW (two 100 MW buildings) was under way in 2026, with handover targeted for 2026; no completion dates have been given for the rest of the 1 GW cluster or the wider campus. A UAE minister put the cost at more than USD 30 billion in January 2026. Stargate UAE UAE-US AI Campus UAE–U.S. AI Campus G42 Khazna Data Centers OpenAI Oracle NVIDIA Cisco"}],"status_publishers":["G42 via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-401adc8a0db451b1d581/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-401adc8a0db451b1d581.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["G42"]}]}
