{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"AU","country":"Australia","slug":"au","site_count":35,"project_count":37,"statuses":{"announced":14,"under_construction":8,"permitted":5,"operational":4,"mep_electrical":3,"site_preparation":2,"shell":1},"site_ids":["vcc-site-055591aa5753867f8b62","vcc-site-05e278850debfc60136a","vcc-site-0f9ffed73b02dd75c9a5","vcc-site-1074a3cbe86088ab582e","vcc-site-23e1a428ab99ad167ba5","vcc-site-31d24c0327d82421d62e","vcc-site-37497f8175db87d92ef8","vcc-site-37ddc3b143bf9ea08d1c","vcc-site-3a757661d07d9458528e","vcc-site-3c1f872aa59b74b065ea","vcc-site-4dfdae431e210f2e2b91","vcc-site-58a51785d405efc9c68d","vcc-site-5f2c7f39622c2ec2ea03","vcc-site-61f9e739f63e5c96092e","vcc-site-631125c7d95912c8b038","vcc-site-63d7eb757cdf71a1ae84","vcc-site-6c4336501258c6139275","vcc-site-6ec62bca94b5d5e1db03","vcc-site-78289e1b65e2284a986f","vcc-site-8d8b8d427f99ad4fa5a1","vcc-site-92245ead9744ae6657fb","vcc-site-a0ad300d0d3c4988033b","vcc-site-a54941d2855e5bc71a3b","vcc-site-a86bdb2178dda261ca13","vcc-site-bae4ad7e597cccb0da1d","vcc-site-bf97558b9c05a083995c","vcc-site-d422e986fc30a6bcfc84","vcc-site-d59b502f505d71569c10","vcc-site-d7089d81dd52f365db5b","vcc-site-dd0f231b23c8dd96495b","vcc-site-dec24d7a34a6a816e35b","vcc-site-df72e462db6b0d2932e6","vcc-site-e7cbc915d8b179b3017f","vcc-site-f1cbd1f29eadc1834f1d","vcc-site-f42482b7bf49d6ccbeda"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/au/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AU.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AU.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/AU.csv"},"sites":[{"site_id":"vcc-site-63d7eb757cdf71a1ae84","name":"AirTrunk Kurri Kurri Data Centre","country":"Australia","country_iso_a2":"AU","latitude":-32.8167,"longitude":151.4833,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"33a0110e-c5fb-58d0-8913-81aef5fdd9d3","name":"AirTrunk Kurri Kurri Data Centre","status":"announced","status_as_of":"2026-10-14","search_terms":"AirTrunk proposes a 540 MW data center on the former Hydro Aluminium smelter site on Hart Road, Loxford, near Kurri Kurri in the Hunter region of New South Wales. It is being assessed as state significant development; the NSW planning department issued assessment requirements by July 2026 and AirTrunk said it lodged an environmental impact statement in September 2026. Plans show a two-storey building of about 44,220 square metres with air-based cooling and a 132 kV grid connection with a new substation. Coverage puts the investment at about A$3.7 billion, and AirTrunk told local press it targets opening in 2028. Kurri Kurri Data Centre SSD-128819490 AirTrunk McCloy Group NSW Department of Planning, Housing and Infrastructure"}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-63d7eb757cdf71a1ae84/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-63d7eb757cdf71a1ae84.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-631125c7d95912c8b038","name":"AirTrunk SYD2 Sydney North Campus (Lane Cove West)","country":"Australia","country_iso_a2":"AU","latitude":-33.8077875,"longitude":151.1447176,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"11f191bc-3432-5b11-aee1-31eb6121fd19","name":"AirTrunk SYD2 Sydney North — existing hyperscale campus operations (1 Sirius Road)","status":"operational","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["AirTrunk Operating Pty Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-631125c7d95912c8b038/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-631125c7d95912c8b038.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-61f9e739f63e5c96092e","name":"CDC Beard Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-35.34021820343456,"longitude":149.20923007524493,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"9c34c305-5149-5961-b88f-648da82351f7","name":"CDC Beard BE1 Current Data Center Build","status":"operational","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-61f9e739f63e5c96092e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-61f9e739f63e5c96092e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Australian Capital Territory cadastral data, licensed under CC BY 4.0; retrieved 2026-08-23."]},{"site_id":"vcc-site-6ec62bca94b5d5e1db03","name":"CDC Brooklyn Melbourne Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.817378,"longitude":144.843826,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"83efe2e8-3b4b-5260-b4ca-d1dbc653b792","name":"CDC Brooklyn Remaining Facilities Current Build","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["CDC Data Centres"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6ec62bca94b5d5e1db03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6ec62bca94b5d5e1db03.json","geometry_licenses":["ACMA-radiocomms-licence-data-terms"],"geometry_attributions":["Australian Communications and Media Authority"]},{"site_id":"vcc-site-3c1f872aa59b74b065ea","name":"CDC Eastern Creek Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.818072,"longitude":150.837668,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":2,"projects":[{"project_id":"2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16","name":"CDC Eastern Creek EC5 Current Build","status":"operational","status_as_of":"2026-09-16","search_terms":""},{"project_id":"5c366d64-4bb5-5c28-ab62-ec20d60fb31a","name":"CDC Eastern Creek EC6 Current Build","status":"operational","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3c1f872aa59b74b065ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3c1f872aa59b74b065ea.json","geometry_licenses":["no-license-stated-for-compact-factual-extraction"],"geometry_attributions":["NSW Department of Planning, Housing and Infrastructure"]},{"site_id":"vcc-site-d422e986fc30a6bcfc84","name":"CDC Gregadoo Campus, Wagga Wagga","country":"Australia","country_iso_a2":"AU","latitude":-35.2174025,"longitude":147.3862916,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"de970e8d-14a1-5293-80af-73b947790609","name":"CDC Gregadoo (Ashfords Road Data Centre) — proposed four-building campus","status":"announced","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["CDC Data Centres"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d422e986fc30a6bcfc84/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d422e986fc30a6bcfc84.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-a0ad300d0d3c4988033b","name":"CDC KC1 Data Centre, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.84775,"longitude":150.78215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"d2fce530-ae85-5e1d-bcb8-60df813b8a95","name":"KC1 Data Centre, Kemps Creek — proposed 144 MW CDC data centre","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a0ad300d0d3c4988033b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a0ad300d0d3c4988033b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-0f9ffed73b02dd75c9a5","name":"CDC Laverton Melbourne Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.8415726,"longitude":144.7753871,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"9cceddca-71bc-52f2-a417-e9fdf0d7faa3","name":"CDC Laverton Current Build","status":"under_construction","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0f9ffed73b02dd75c9a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0f9ffed73b02dd75c9a5.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-e7cbc915d8b179b3017f","name":"CDC Maddington Perth Campus","country":"Australia","country_iso_a2":"AU","latitude":-32.034181245,"longitude":116.0051610444321,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"bb8ba3ad-d563-5f84-a543-079a10264640","name":"CDC Maddington Current Build","status":"shell","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7cbc915d8b179b3017f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e7cbc915d8b179b3017f.json","geometry_licenses":["rights-status-uncertain-fact-extraction-only"],"geometry_attributions":["City of Gosnells"]},{"site_id":"vcc-site-37ddc3b143bf9ea08d1c","name":"CDC Marsden Park Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.72368555,"longitude":150.8363658,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"164033cb-411d-5ffb-ab5d-b04bdecfa1ac","name":"CDC Marsden Park Early Construction","status":"under_construction","status_as_of":"2026-09-16","search_terms":"CDC Data Centres is building a campus of six four-storey data center buildings on about 20 hectares in the Marsden Park Industrial Precinct in Sydney's north-west, within the City of Blacktown. CDC turned the first sod in October 2024 and plans 504 MW of ICT capacity, scalable toward 1 GW, with a dedicated substation of about 720 MVA. The NSW government approved it as state significant development on 27 November 2025 despite objections from Blacktown City Council; press coverage put the investment at A$3.1 billion. CDC describes the campus as in the early stages of construction. Marsden Park Data Centre SSD-70889211 CDC Data Centres CDC Data Centres CDC Data Centres NSW Department of Planning"}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37ddc3b143bf9ea08d1c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-23e1a428ab99ad167ba5","name":"DigiCo SYD1 Ultimo Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.875,"longitude":151.197,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"14a67880-da37-5f59-a2cf-2322bbf778d7","name":"DigiCo SYD1 Ultimo Expansion Early Works","status":"site_preparation","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["EarningsAPI / DREAVERR Digital Solutions LLP; statements attributed to SHAPE CEO Peter Marix-Evans"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23e1a428ab99ad167ba5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23e1a428ab99ad167ba5.json","geometry_licenses":["CC-BY-4.0","CC-BY-4.0-Department-material-scope"],"geometry_attributions":["Google","NSW Department of Planning, Housing and Infrastructure"]},{"site_id":"vcc-site-1074a3cbe86088ab582e","name":"Firmus Bell Bay (Long Reach) AI Factory","country":"Australia","country_iso_a2":"AU","latitude":-41.15652,"longitude":146.92765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"377ed501-7a18-5e42-9569-189cdf086ce8","name":"Firmus Bell Bay (Long Reach) AI Factory - DA 2026/29 data centre","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["George Town Council"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1074a3cbe86088ab582e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1074a3cbe86088ab582e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["George Town Council"]},{"site_id":"vcc-site-d7089d81dd52f365db5b","name":"Firmus St Leonards Launceston Campus","country":"Australia","country_iso_a2":"AU","latitude":-41.4408613,"longitude":147.176554,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-02","oldest_status_as_of":"2026-07-02","project_count":1,"projects":[{"project_id":"e8a1add0-19fb-5196-ae75-34353e7d580b","name":"Firmus St Leonards AI Factory Current Construction","status":"under_construction","status_as_of":"2026-07-02","search_terms":""}],"status_publishers":["Australian Broadcasting Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d7089d81dd52f365db5b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d7089d81dd52f365db5b.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim contributors","OpenStreetMap Foundation and contributors","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-f42482b7bf49d6ccbeda","name":"Frederick Street Data Centre, St Leonards","country":"Australia","country_iso_a2":"AU","latitude":-33.819089,"longitude":151.189578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"d6050627-fe95-5732-99c2-d1c646526f05","name":"Frederick Street Data Centre — proposed 81 MW data centre","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f42482b7bf49d6ccbeda/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f42482b7bf49d6ccbeda.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-4dfdae431e210f2e2b91","name":"Glendenning Road Data Centre, Glendenning","country":"Australia","country_iso_a2":"AU","latitude":-33.75991,"longitude":150.85192,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"382aa8ea-3bd0-5f14-8138-1b002d2166af","name":"Glendenning Road Data Centre — approved three-building 235 MW campus","status":"permitted","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4dfdae431e210f2e2b91/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4dfdae431e210f2e2b91.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-055591aa5753867f8b62","name":"Goodman Project Apollo Data Centre, 4-10 Talavera Road, Macquarie Park","country":"Australia","country_iso_a2":"AU","latitude":-33.781279,"longitude":151.130674,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"4e3f10ad-6985-5bdd-9829-17cc67d19f53","name":"Project Apollo Data Centre Macquarie Park — approved 135 MW data centre","status":"permitted","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-055591aa5753867f8b62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-055591aa5753867f8b62.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-a86bdb2178dda261ca13","name":"Goodman Project Pluto Data Centre, Guildford West","country":"Australia","country_iso_a2":"AU","latitude":-33.851132,"longitude":150.955072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-07-23","oldest_status_as_of":"2026-07-23","project_count":1,"projects":[{"project_id":"70a1552d-880b-56ea-963d-ce5427afd1dc","name":"Project Pluto Data Centre — approved 100 MW data centre","status":"permitted","status_as_of":"2026-07-23","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a86bdb2178dda261ca13/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a86bdb2178dda261ca13.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-37497f8175db87d92ef8","name":"Goodman SYD01 Artarmon Data Centre","country":"Australia","country_iso_a2":"AU","latitude":-33.818441,"longitude":151.19,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"99fa93f5-9f63-5576-b036-2ee8086032a3","name":"Goodman SYD01 Current Single-Building Development","status":"under_construction","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37497f8175db87d92ef8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37497f8175db87d92ef8.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Goodman Property Services (Aust) Pty Limited; NSW Planning Portal"]},{"site_id":"vcc-site-05e278850debfc60136a","name":"GreenSquareDC SYD1 Norwest (3 Brookhollow Avenue)","country":"Australia","country_iso_a2":"AU","latitude":-33.732527,"longitude":150.9680221,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"c220cc67-d17d-507d-831f-65fc789cf9ff","name":"Brookhollow Avenue Data Centre Expansion — proposed 118.3 MW building","status":"announced","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-05e278850debfc60136a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-05e278850debfc60136a.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-f1cbd1f29eadc1834f1d","name":"Julius Avenue Data Centre, North Ryde","country":"Australia","country_iso_a2":"AU","latitude":-33.798462,"longitude":151.143104,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"d753c323-44e4-5720-a8cb-38a2fcca2ed8","name":"Julius Avenue Data Centre — proposed 120 MW data centre (IPC referral)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1cbd1f29eadc1834f1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f1cbd1f29eadc1834f1d.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-bae4ad7e597cccb0da1d","name":"Macquarie IC3 Super West Facility","country":"Australia","country_iso_a2":"AU","latitude":-33.780962349999996,"longitude":151.12696035,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-17","oldest_status_as_of":"2026-07-17","project_count":1,"projects":[{"project_id":"ea4a0cc5-bb09-5a81-b385-38ae79baf22a","name":"Macquarie IC3 Super West Phase 1 Build","status":"under_construction","status_as_of":"2026-07-17","search_terms":""}],"status_publishers":["Macquarie Data Centres"],"power_observations":[{"project_id":"ea4a0cc5-bb09-5a81-b385-38ae79baf22a","metric":"critical_it_mw","stage":"planned","low":6.0,"base":6.0,"high":6.0,"unit":"MW","as_of_date":"2025-12-03"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bae4ad7e597cccb0da1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bae4ad7e597cccb0da1d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-31d24c0327d82421d62e","name":"Mamre Road Data Centre Campus, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.833794,"longitude":150.784825,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"a4e3a711-2777-56a1-879e-a0c0542bbf3d","name":"Mamre Road Data Centre Campus — proposed 1.2 GW three-building campus","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-31d24c0327d82421d62e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-31d24c0327d82421d62e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-3a757661d07d9458528e","name":"Mars Road Data Centre, 3-4 Apollo Place and 87-91 Mars Road, Lane Cove West","country":"Australia","country_iso_a2":"AU","latitude":-33.8093435,"longitude":151.1446024,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"b3e54564-1d4b-53da-ae65-0eaa65446581","name":"Mars Road Data Centre — proposed 140 MW data centre (SSD-108835458)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3a757661d07d9458528e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3a757661d07d9458528e.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-d59b502f505d71569c10","name":"Microsoft SYD01 Huntingwood (Honeman Close Data Centre)","country":"Australia","country_iso_a2":"AU","latitude":-33.799976,"longitude":150.896042,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"26667c0d-56e3-5cf9-b17f-586d2e24f596","name":"Honeman Close Data Centre — approved 140 MW Microsoft data centre","status":"permitted","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d59b502f505d71569c10/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d59b502f505d71569c10.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-a54941d2855e5bc71a3b","name":"NEXTDC GE1 Geelong Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-38.05612850278812,"longitude":144.37274245303243,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e39b5191-4a78-5781-8944-24efaf944aa9","name":"NEXTDC GE1 Incremental In-Progress Fit-Out","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a54941d2855e5bc71a3b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a54941d2855e5bc71a3b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of Victoria, Department of Transport and Planning, Vicmap"]},{"site_id":"vcc-site-6c4336501258c6139275","name":"NEXTDC M2 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.7080294,"longitude":144.8756939,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"ad5f9b2b-80bf-5580-92f2-0f53473c882d","name":"NEXTDC M2 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6c4336501258c6139275/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6c4336501258c6139275.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["NEXTDC Limited"]},{"site_id":"vcc-site-dec24d7a34a6a816e35b","name":"NEXTDC M3 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.8048639,"longitude":144.8638438,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"c789668b-ecf3-53b2-b23c-44151e199317","name":"NEXTDC M3 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dec24d7a34a6a816e35b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dec24d7a34a6a816e35b.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-78289e1b65e2284a986f","name":"NEXTDC M4 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.82870623280992,"longitude":144.91146374858133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","site_preparation"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-01-19","project_count":2,"projects":[{"project_id":"8715738f-39ac-5058-a01a-b62758b49831","name":"NEXTDC M4 Initial Early Works","status":"site_preparation","status_as_of":"2026-06-30","search_terms":""},{"project_id":"869dffc7-22ea-5f40-8810-13d87c696908","name":"NEXTDC M4 Melbourne","status":"announced","status_as_of":"2026-01-19","search_terms":"NEXTDC plans an AI factory and technology campus, called M4, on the former Westgate Park printing complex at 127 Todd Road in Port Melbourne's Fishermans Bend precinct. Announced in June 2025 as an A$2 billion project of up to 150 MW, designed for very high-density Nvidia-class AI racks and linked with university, defence and research partners, it received development approval from the Victorian Government by January 2026, when NEXTDC cited 162 MW. Construction timing has not been published. M4 Technology Campus Fishermans Bend AI Factory and Technology Campus NEXTDC Victorian Government"}],"status_publishers":["NEXTDC","NEXTDC Limited"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78289e1b65e2284a986f.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of Victoria, Department of Transport and Planning, Vicmap"]},{"site_id":"vcc-site-bf97558b9c05a083995c","name":"NEXTDC S3 Sydney Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.8190826,"longitude":151.1845739,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"8a5fbd17-48b6-5484-8c37-ce406068bf3e","name":"NEXTDC S3 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf97558b9c05a083995c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf97558b9c05a083995c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-8d8b8d427f99ad4fa5a1","name":"NEXTDC S4 Sydney Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.82784,"longitude":150.82457,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"3761e59a-fe39-523d-83a6-9fbfa9feec85","name":"NEXTDC S4 Initial Development","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d8b8d427f99ad4fa5a1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8d8b8d427f99ad4fa5a1.json","geometry_licenses":["CC-BY-4.0-Department-material-scope"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-dd0f231b23c8dd96495b","name":"NEXTDC S7 Sydney","country":"Australia","country_iso_a2":"AU","latitude":-33.8059,"longitude":150.85,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"688df4a2-dc56-5cde-901a-87c87a08137e","name":"NEXTDC S7 Sydney","status":"announced","status_as_of":"2026-08-31","search_terms":"NEXTDC plans a hyperscale data center campus of about 550 MW on roughly 258,000 square meters of land it agreed to buy in Eastern Creek, western Sydney, in October 2024, subject to development approval. In December 2025 NEXTDC signed a memorandum of understanding with OpenAI to collaborate on planning, developing and operating the S7 campus and a large GPU supercluster as part of OpenAI's program for countries, with a first phase expected in the second half of 2027 if approvals are secured. NEXTDC's site still lists S7 as in planning. S7 Sydney S7 Eastern Creek NEXTDC NEXTDC OpenAI"}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd0f231b23c8dd96495b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd0f231b23c8dd96495b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NEXTDC"]},{"site_id":"vcc-site-df72e462db6b0d2932e6","name":"Project Genesis Data Centre, 192 Narellan Road, Campbelltown","country":"Australia","country_iso_a2":"AU","latitude":-34.0630528,"longitude":150.7937945,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"90d1ea25-305f-5c61-b9ec-053112e6e910","name":"192 Narellan Road Data Centre (Project Genesis) — proposed 100 MW two-building data centre (SSD-150514738)","status":"announced","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Patch Planning for MoreHuman Property Group (filed with and published by the NSW Department of Planning, Housing and Infrastructure)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df72e462db6b0d2932e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df72e462db6b0d2932e6.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-58a51785d405efc9c68d","name":"Road 1 Data Centre, 1-5 Khartoum Road, Macquarie Park","country":"Australia","country_iso_a2":"AU","latitude":-33.781037,"longitude":151.1251473,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"31ea7156-0696-5613-b0cd-73f15fa23a57","name":"Road 1 Data Centre — approved 49 MW data centre (SSD-80814238)","status":"permitted","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-58a51785d405efc9c68d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-58a51785d405efc9c68d.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-92245ead9744ae6657fb","name":"STACK SYD01 Data Centre, Erskine Park","country":"Australia","country_iso_a2":"AU","latitude":-33.815188,"longitude":150.811826,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"c29f92cc-a75e-501c-b0b4-3d70713762a7","name":"STACK SYD01 Erskine Park — proposed two-building 450 MW data centre","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-92245ead9744ae6657fb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-92245ead9744ae6657fb.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-5f2c7f39622c2ec2ea03","name":"Stockland Aldington Road Data Centre, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.8375573,"longitude":150.8028279,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"9cd872c6-3a81-5ec9-9411-22f5c23204b8","name":"Aldington Road Data Centre — proposed two-building 360 MW IT campus","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5f2c7f39622c2ec2ea03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5f2c7f39622c2ec2ea03.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]}]}
