{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"BR","country":"Brazil","slug":"br","site_count":16,"project_count":18,"statuses":{"under_construction":6,"operational":5,"announced":3,"partially_operational":2,"mep_electrical":1,"proposed":1},"site_ids":["vcc-site-1369d4f518dab01e8e86","vcc-site-15555df7c6a759e5dc6a","vcc-site-29c7aa69cf49aaa11516","vcc-site-36fd6f2f441272102aa1","vcc-site-3a91e1c2ee3ef8dbd116","vcc-site-68fa7b1f6e39bd438e45","vcc-site-72339650a9d5c93e8286","vcc-site-74bd4d30e1805ec36812","vcc-site-900b1508d570a2f4253f","vcc-site-98743408bd3d8ca8997d","vcc-site-99459620c3cd48c8a82f","vcc-site-a1239f397b785f28fd31","vcc-site-b12dddd73cb490c6bb64","vcc-site-becc8a051b59740dbb4b","vcc-site-c2bcc9c77043eec23331","vcc-site-c2fa5b54c32ada55d1e4"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/br/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/BR.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/BR.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/BR.csv"},"sites":[{"site_id":"vcc-site-74bd4d30e1805ec36812","name":"Ascenty Sumaré Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.812328,"longitude":-47.212871,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-28","oldest_status_as_of":"2026-05-28","project_count":1,"projects":[{"project_id":"5b52a118-2f46-5f43-b308-a3237e99e065","name":"Ascenty Sumaré 3","status":"under_construction","status_as_of":"2026-05-28","search_terms":""}],"status_publishers":["Christopher Torto, Ascenty CEO via LinkedIn"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-74bd4d30e1805ec36812/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-74bd4d30e1805ec36812.json","geometry_licenses":["CC-BY-4.0","all-rights-reserved"],"geometry_attributions":["Digital Realty","Google"]},{"site_id":"vcc-site-29c7aa69cf49aaa11516","name":"Ascenty Vinhedo Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.070216,"longitude":-47.012995,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-28","oldest_status_as_of":"2026-05-28","project_count":1,"projects":[{"project_id":"2cac8eb7-dff6-50bc-be49-b45f6e353982","name":"Ascenty Vinhedo 3","status":"under_construction","status_as_of":"2026-05-28","search_terms":""}],"status_publishers":["Ascenty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-29c7aa69cf49aaa11516/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-29c7aa69cf49aaa11516.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Ascenty"]},{"site_id":"vcc-site-68fa7b1f6e39bd438e45","name":"CloudHQ GRU Campus (Paulínia)","country":"Brazil","country_iso_a2":"BR","latitude":-22.77089,"longitude":-47.10425,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-08","oldest_status_as_of":"2026-04-08","project_count":1,"projects":[{"project_id":"8efbf742-c042-5872-9bbe-82d576865125","name":"CloudHQ GRU Campus (Paulínia)","status":"under_construction","status_as_of":"2026-04-08","search_terms":"CloudHQ's first campus in Brazil, in Paulínia in the Campinas region of São Paulo state, was launched with a groundbreaking in March 2023 as a USD 3 billion project of six buildings and up to 288 MW of IT load, in two phases of three 48 MW buildings. Its on-site high-voltage substation, of about 225 to 250 MW, was energised and connected to Brazil's grid by early 2026, well after the original 2024 opening target. 2026 trade reports describe the campus as ready for tenants, with phased commissioning and first operations expected through 2027; one report gives a larger first phase of three 120 MW buildings. GRU Campus GRU Technology Campus CloudHQ Paulínia CloudHQ Afonso França Engenharia LZA Engenharia WEG"}],"status_publishers":["Switchgear Magazine"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-68fa7b1f6e39bd438e45/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-68fa7b1f6e39bd438e45.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CloudHQ"]},{"site_id":"vcc-site-1369d4f518dab01e8e86","name":"ODATA DC RJ01 São João de Meriti Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.7970056,"longitude":-43.3575801,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"2fc00b79-2977-51c1-91f7-9f172d83d684","name":"ODATA DC RJ01 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1369d4f518dab01e8e86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1369d4f518dab01e8e86.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-98743408bd3d8ca8997d","name":"ODATA DC SP01 Santana de Parnaíba Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4550259,"longitude":-46.9151172,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"f37ee081-c590-5df2-98b5-c0529f72d5bd","name":"ODATA DC SP01 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98743408bd3d8ca8997d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98743408bd3d8ca8997d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-15555df7c6a759e5dc6a","name":"ODATA DC SP02 Hortolândia Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.8995184,"longitude":-47.1952378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"f6d50d98-b1a0-5d80-94b0-efe426691744","name":"ODATA DC SP02 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-15555df7c6a759e5dc6a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-15555df7c6a759e5dc6a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-becc8a051b59740dbb4b","name":"ODATA DC SP03 Barueri Campus (Tamboré)","country":"Brazil","country_iso_a2":"BR","latitude":-23.501657,"longitude":-46.8248305,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"9fb2a0b5-cd7e-5dc2-a906-113740c5af5b","name":"ODATA DC SP03 — existing dedicated data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-becc8a051b59740dbb4b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-becc8a051b59740dbb4b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (an Aligned Data Centers company)"]},{"site_id":"vcc-site-c2fa5b54c32ada55d1e4","name":"ODATA DC SP04 Osasco Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4832219,"longitude":-46.7760035,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-06-18","project_count":2,"projects":[{"project_id":"c160d8d5-7572-53c2-8051-cd7990b1f771","name":"ODATA DC SP04 Phase 2 Expansion","status":"under_construction","status_as_of":"2026-06-18","search_terms":""},{"project_id":"cf3dcf6a-01ed-5b8a-9258-3ba2ed2e85bb","name":"ODATA DC SP04 — existing data-centre operations (excluding the Phase 2 expansion)","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)","ODATA - An Aligned Data Centers Company"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c2fa5b54c32ada55d1e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c2fa5b54c32ada55d1e4.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["ODATA"]},{"site_id":"vcc-site-99459620c3cd48c8a82f","name":"OMNIA Pecém Data Center Campus","country":"Brazil","country_iso_a2":"BR","latitude":-3.65423321723938,"longitude":-38.82234191894531,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","under_construction"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-05-18","project_count":2,"projects":[{"project_id":"ebd0b7e7-0ca5-501e-89ff-74f8bf30f59b","name":"Omnia Data Center Pecém","status":"announced","status_as_of":"2026-05-18","search_terms":"Omnia, a hyperscale data centre platform backed by funds managed by Pátria Investimentos, is developing Data Center Pecém at the Pecém industrial and port complex in Ceará, Brazil, as its first project. In May 2026 Omnia and Casa dos Ventos announced a power purchase agreement valued at about USD 2 billion for an estimated up to 300 average MW of wind energy from projects in Ceará and Piauí, under which Omnia becomes a self-producer with equity in the generation assets. Portuguese Wikipedia, citing Reuters, reports that the facility is intended for ByteDance; the companies' announcement names no tenant, so the link is unconfirmed. No data centre IT capacity or schedule was found. Data Center Pecém Omnia Pátria Investimentos Casa dos Ventos ByteDance"},{"project_id":"0fd5e6a4-6421-5a23-b51c-e490e4a79cd9","name":"OMNIA Pecém Initial Data Center Construction","status":"under_construction","status_as_of":"2026-06-16","search_terms":""}],"status_publishers":["Casa dos Ventos","Complexo do Pecém / ASCOM–Casa Civil"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-99459620c3cd48c8a82f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-99459620c3cd48c8a82f.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Google for Developers","Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)"]},{"site_id":"vcc-site-900b1508d570a2f4253f","name":"Procergs Porto Alegre Data Center Campus","country":"Brazil","country_iso_a2":"BR","latitude":-30.038629,"longitude":-51.2308141,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-09-13","oldest_status_as_of":"2026-09-13","project_count":1,"projects":[{"project_id":"b91d994d-0f59-5ed8-ad74-20e4ba2251f3","name":"Procergs Porto Alegre New Substation 6033-00","status":"mep_electrical","status_as_of":"2026-09-13","search_terms":""}],"status_publishers":["PROCERGS – Centro de Tecnologia da Informação e Comunicação do Estado do Rio Grande do Sul S.A."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-900b1508d570a2f4253f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-900b1508d570a2f4253f.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap Wiki contributors","OpenStreetMap contributors","OpenStreetMap contributors / Nominatim"]},{"site_id":"vcc-site-72339650a9d5c93e8286","name":"Rio AI City (Elea Data Centers)","country":"Brazil","country_iso_a2":"BR","latitude":-22.977,"longitude":-43.394,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"51f3ec57-401e-5060-9d04-c2dfdfee6b1f","name":"Rio AI City (Elea Data Centers)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Elea Data Centers is developing Rio AI City, a data centre hub in the Olympic Park area of Rio de Janeiro with institutional support from the city government. Announced in May 2025 with an initial 1.5 GW of energy capacity and potential growth to 3.2 GW, it was later targeted to reach 1.5 GW by 2027 and 3.2 GW by 2032. Elea counts its operating RJO1 facility in the first phase; RJO2 (about 80 MW) was under construction for initial delivery in 2026, and RJO3 and RJO4 would add 120 MW. Elea signed memoranda with the city and Oracle in August 2025 and with the city, energy companies and Tapestry in November 2025. I Squared Capital had completed its acquisition of Elea by June 2026. Rio AI City Elea Data Centers Elea Data Centers I Squared Capital City of Rio de Janeiro"}],"status_publishers":["Elea Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72339650a9d5c93e8286/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72339650a9d5c93e8286.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Elea Data Centers via PR Newswire"]},{"site_id":"vcc-site-a1239f397b785f28fd31","name":"Scala AI City (Eldorado do Sul)","country":"Brazil","country_iso_a2":"BR","latitude":-30.0839,"longitude":-51.6158,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-05-14","oldest_status_as_of":"2025-05-14","project_count":1,"projects":[{"project_id":"d461c464-bedc-555a-a582-c6f96a0a2acc","name":"Scala AI City (Eldorado do Sul)","status":"announced","status_as_of":"2025-05-14","search_terms":"Scala Data Centers plans a data centre city in Eldorado do Sul, in the Porto Alegre metropolitan region of Rio Grande do Sul, Brazil. It signed an agreement with the state government in September 2024 for a first phase of 54 MW of IT capacity, about BRL 3 billion, with potential growth to 4,750 MW and total investment the company puts as high as BRL 500 billion. Eldorado do Sul passed a law in December 2024 adding the site to the urban perimeter, and in May 2025 Brazil's Ministry of Mines and Energy authorized a phased grid connection of up to 5 GW. No construction start had been reported in the sources reviewed. Scala AI City Scala Data Centers Government of Rio Grande do Sul Municipality of Eldorado do Sul Brazil Ministry of Mines and Energy"}],"status_publishers":["Scala Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a1239f397b785f28fd31/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a1239f397b785f28fd31.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Scala Data Centers via PR Newswire"]},{"site_id":"vcc-site-36fd6f2f441272102aa1","name":"Scala Data Centers Tamboré Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4656,"longitude":-46.8419,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2025-10-30","oldest_status_as_of":"2025-10-30","project_count":1,"projects":[{"project_id":"4ea35229-9824-5086-8441-310876ea8911","name":"Scala Data Centers Tamboré Campus","status":"partially_operational","status_as_of":"2025-10-30","search_terms":"Scala Data Centers' Tamboré Campus in Barueri, Greater São Paulo, sits beside the Rodoanel ring road and is planned to reach 600 MW across 17 data centre buildings and three substations. Scala inaugurated Phase 2 (158 MW of IT capacity, BRL 6.2 billion) in August 2024 with two hyperscale buildings in service and more under construction. By October 2025 the company reported seven buildings operating, more than BRL 10 billion invested, and a memorandum with the Municipality of Barueri for approval of the campus master plan. Tamboré Campus Campus Tamboré Scala Data Centers Scala Data Centers Municipality of Barueri"}],"status_publishers":["Scala Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-36fd6f2f441272102aa1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-36fd6f2f441272102aa1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Scala Data Centers via PR Newswire"]},{"site_id":"vcc-site-b12dddd73cb490c6bb64","name":"Scala Praia do Futuro Campus","country":"Brazil","country_iso_a2":"BR","latitude":-3.7515085,"longitude":-38.4580015,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":1,"projects":[{"project_id":"b5625b8f-5e00-5fbe-b313-ba7adb980583","name":"Scala SFORPF01","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["AZ Quest Panorama Data Centers"],"power_observations":[{"project_id":"b5625b8f-5e00-5fbe-b313-ba7adb980583","metric":"critical_it_mw","stage":"design","low":7.2,"base":7.2,"high":7.2,"unit":"MW","as_of_date":"2026-07-21"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b12dddd73cb490c6bb64/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b12dddd73cb490c6bb64.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Prefeitura de Fortaleza - SEUMA; Scala Data Centers"]},{"site_id":"vcc-site-c2bcc9c77043eec23331","name":"Terranova Campinas data centre campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.82778,"longitude":-47.07972,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"f533639a-f574-566d-a780-db81daa4b78c","name":"Terranova Campinas data centre campus","status":"announced","status_as_of":"2026-08-26","search_terms":"Terranova, a Latin American hyperscale platform backed by investor Actis, plans an AI and cloud data centre campus on about 944,000 square metres at Fazenda Pau D'Alho in Barão Geraldo, Campinas, inside the city's PIDS innovation zone. Phase 1 is planned at 216 MW of IT load, expandable to 386 MW, with an initial investment reported locally at about BRL 5 billion that could reach BRL 20 billion. Grid access for 300 MW was authorised in December 2025 and a substation is due to be energised in December 2027. Trade press reported construction starting in August 2026, but the city said the permits issued covered only a substation; local politicians asked prosecutors to review the licensing. Terranova Campus Campinas Campus Campinas Terranova Actis Prefeitura de Campinas"}],"status_publishers":["Correio da Manhã"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c2bcc9c77043eec23331/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c2bcc9c77043eec23331.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Construction Review Online"]},{"site_id":"vcc-site-3a91e1c2ee3ef8dbd116","name":"Terranova Praia Grande data center campus (proposed)","country":"Brazil","country_iso_a2":"BR","latitude":-24.00611,"longitude":-46.40278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"3fc18374-cbc2-5a11-9356-ab751ac3820c","name":"Terranova Praia Grande data center campus (proposed)","status":"proposed","status_as_of":"2026-08-25","search_terms":"Terranova, an Actis-backed Latin American hyperscale data center platform, has proposed a campus on a site of about one million square metres in Praia Grande on the São Paulo coast, close to the city's submarine cable landing point. It holds a land-control contract and has asked Brazil's grid operator ONS for 450 MW of grid access; the land purchase will close only if ONS approves. In February 2026 Terranova's chief executive estimated a first phase of roughly 350 MW of IT capacity. No investment figure or construction timeline has been disclosed, and an August 2026 report still described the purchase as awaiting ONS approval. Terranova Actis"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3a91e1c2ee3ef8dbd116/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3a91e1c2ee3ef8dbd116.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TELETIME"]}]}
