{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"CA","country":"Canada","slug":"ca","site_count":24,"project_count":26,"statuses":{"operational":8,"under_construction":8,"announced":4,"proposed":4,"completed":1,"partially_operational":1},"site_ids":["vcc-site-0660c8cc500011957a7b","vcc-site-0834945607ed54e349ce","vcc-site-0a62731022d2820e105f","vcc-site-0c4425440869e26c13cb","vcc-site-0ecf05307f91c1e40479","vcc-site-12d6215837c6451ab8a3","vcc-site-1b88f16ebcce9a59f8d9","vcc-site-3cd7dd9c786c855c1820","vcc-site-495790bb0eec99f8d10f","vcc-site-499a1602728034c6a587","vcc-site-50ba6e2d0f69faaff629","vcc-site-5376b585718a989c8dc5","vcc-site-540736a0838fdf01dd20","vcc-site-63cd8442296ed3e4fc36","vcc-site-7a7046b12f3789bb93a5","vcc-site-7e0aadb2cd0ce2755f0d","vcc-site-9994cc5f492fff6c4bd7","vcc-site-b8522efc1a60fe3072e4","vcc-site-bea6bf727e581e987a62","vcc-site-e6e875877584af9248c3","vcc-site-e70b4a3b034963bb17b1","vcc-site-ef8be5d9da9f69e72683","vcc-site-f1711beb19eaf65e19e2","vcc-site-ff75268d33af60aab707"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/ca/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/CA.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/CA.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/CA.csv"},"sites":[{"site_id":"vcc-site-7e0aadb2cd0ce2755f0d","name":"151 Front Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6446834278069,"longitude":-79.383946611135,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"b2d66094-8af2-56ec-973b-06672cba38f8","name":"Telehouse 151 Front Street West — existing carrier-hotel data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7e0aadb2cd0ce2755f0d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7e0aadb2cd0ce2755f0d.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-0c4425440869e26c13cb","name":"250 Front Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6444179127846,"longitude":-79.3877032025565,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"51f99dfe-c2e9-521b-8c22-9b9e9b775ed4","name":"Telehouse 250 Front Street West — existing data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0c4425440869e26c13cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0c4425440869e26c13cb.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-1b88f16ebcce9a59f8d9","name":"905 King Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6416749107656,"longitude":-79.4122314417539,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"f77d1fd9-8637-58b5-8f5e-2ce4347facc9","name":"Telehouse 905 King Street West — existing data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1b88f16ebcce9a59f8d9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1b88f16ebcce9a59f8d9.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-5376b585718a989c8dc5","name":"Beacon AI Centers Heartland campus (Sturgeon County)","country":"Canada","country_iso_a2":"CA","latitude":53.84032,"longitude":-113.192246,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-03-10","oldest_status_as_of":"2026-03-10","project_count":1,"projects":[{"project_id":"9a4afe64-8789-5cee-8947-61a12f8966a8","name":"Beacon AI Centers Heartland campus (Sturgeon County)","status":"proposed","status_as_of":"2026-03-10","search_terms":"Beacon AI Centers proposes a 317-acre AI data centre campus about 7 km east of Gibbons in Sturgeon County, Alberta, inside the Alberta Industrial Heartland heavy industrial zone. Filings describe four data halls rated at 200 MW each, supplied by an on-site plant of 200 gas engines totalling about 920 MW, built by the project entity Heartland Power. The federal agency decided in March 2026 that no further federal assessment was needed; the plant application filed with the Alberta Utilities Commission in December 2025 had no decision found. The proponent targeted commercial operation in Q3 2027. Beacon AI Centers Heartland Project Beacon Data Centers Heartland Project Beacon Heartland AI Hub Beacon AI Centers Heartland Power Generation LP AltaLink Sturgeon County"}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5376b585718a989c8dc5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5376b585718a989c8dc5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Heartland Power Generation LP (filed with the Impact Assessment Agency of Canada)"]},{"site_id":"vcc-site-ef8be5d9da9f69e72683","name":"Beacon AI Centers Indus campus","country":"Canada","country_iso_a2":"CA","latitude":50.9434,"longitude":-113.8072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"fbbfee97-55a0-5a4e-b000-282ff02a8a39","name":"Beacon AI Centers Indus campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Beacon AI Centers plans an AI data centre campus about 3 km east of Calgary and 2 km northwest of the hamlet of Indus in Rocky View County, Alberta. Federal filings describe four data halls needing 300 MW each, supplied by an on-site gas-fired plant of about 1,494 MW built by the project entity Indus Power. The county approved the area structure plan in June 2025; the plant application is before the Alberta Utilities Commission, and the federal agency decided in March 2026 that no further federal assessment was needed. The proponent targeted commercial operation in Q3 2027. Beacon AI Hub Beacon AI Centers Indus Project Beacon AI Centers Indus Beacon AI Centers Indus Power Generation LP Rocky View County AltaLink"}],"status_publishers":["Rocky View County"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ef8be5d9da9f69e72683/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ef8be5d9da9f69e72683.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indus Power Generation LP via Impact Assessment Agency of Canada registry"]},{"site_id":"vcc-site-0834945607ed54e349ce","name":"Bell AI Fabric Sherwood campus (Regina area)","country":"Canada","country_iso_a2":"CA","latitude":50.473,"longitude":-104.627,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"0b37ac4d-93f2-559b-a6ec-f5a12938681a","name":"Bell AI Fabric Sherwood campus (Regina area)","status":"under_construction","status_as_of":"2026-10-01","search_terms":"Bell Canada is building a 300 MW Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, which surrounds Regina, Saskatchewan. In October 2026 Bell reported structural steel rising on all four first-phase buildings, more than 500 workers on site and the first data hall on track to operate in the first half of 2027. In September 2026 Bell and the Government of Saskatchewan signed a non-binding memorandum for up to 900 MW more, which would make the Sherwood campus the first phase of a potential 1.2 GW provincial AI hub. Bell AI Fabric Saskatchewan Bell Canada Government of Saskatchewan Dynamo Electric"}],"status_publishers":["BCE Inc."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0834945607ed54e349ce/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0834945607ed54e349ce.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["BCE Inc."]},{"site_id":"vcc-site-63cd8442296ed3e4fc36","name":"Bitdeer Fox Creek energy and computing facility","country":"Canada","country_iso_a2":"CA","latitude":54.395,"longitude":-116.80917,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"602d4e58-abef-54a7-b8f6-894a714e7174","name":"Bitdeer Fox Creek energy and computing facility","status":"under_construction","status_as_of":"2026-08-10","search_terms":"Bitdeer is building a 101 MW natural gas power plant and a data centre of about 100 MW of computing capacity on a 19-acre site about 1.5 km from Fox Creek, Alberta, in the Municipal District of Greenview. Bitdeer bought the permitted site, with a 99 MW grid interconnection approval, in an all-cash deal in February 2025 and broke ground in June 2026 on a USD 155 million project. It will start with bitcoin mining while the data centre is designed to also suit AI workloads. Energization slipped from Q4 2026 to Q2 2027 and then to Q4 2027. Bitdeer Fox Creek Bitdeer Technologies Group Bitdeer Technologies Group Kiwetinohk Energy Corp."}],"status_publishers":["Bitdeer Technologies Group (press release via BNN Bloomberg)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-63cd8442296ed3e4fc36/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-63cd8442296ed3e4fc36.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group (press release via BNN Bloomberg)"]},{"site_id":"vcc-site-540736a0838fdf01dd20","name":"Cologix Markham Campus (TOR4 and TOR5), 105 Clegg Road","country":"Canada","country_iso_a2":"CA","latitude":43.8506128,"longitude":-79.3423601,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"28cf6aed-9dc8-582a-8d1b-a20668d2464f","name":"Cologix TOR4 (Building B) — existing data-centre operations","status":"operational","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-540736a0838fdf01dd20/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-540736a0838fdf01dd20.json","geometry_licenses":["York Region Open Data Licence v1.0"],"geometry_attributions":["Contains public sector information made available under The Regional Municipality of York's Open Data Licence"]},{"site_id":"vcc-site-e6e875877584af9248c3","name":"Cologix MTL10 Data Centre, Longueuil (530 rue Bériault)","country":"Canada","country_iso_a2":"CA","latitude":45.565580776655146,"longitude":-73.47536649043357,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"2e99ea7a-e430-5e58-bfea-13213f5925d7","name":"Cologix MTL10 — existing data-centre operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6e875877584af9248c3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6e875877584af9248c3.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ministère des Ressources naturelles et des Forêts, Adresses Québec (Données Québec, CC BY 4.0)"]},{"site_id":"vcc-site-e70b4a3b034963bb17b1","name":"Cologix MTL8 Data Centre, Technoparc Montréal (7350 rue Frederick-Banting)","country":"Canada","country_iso_a2":"CA","latitude":45.481549,"longitude":-73.767768,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"2570a323-6f62-5fbe-8b27-5f70b68c6ea5","name":"Cologix MTL8 — existing data-centre operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e70b4a3b034963bb17b1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e70b4a3b034963bb17b1.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ville de Montreal, donnees ouvertes (Creative Commons Attribution 4.0 International)"]},{"site_id":"vcc-site-9994cc5f492fff6c4bd7","name":"Cologix MTL9 Data Centre, Drummondville (2525 rue Canadien)","country":"Canada","country_iso_a2":"CA","latitude":45.879727240119685,"longitude":-72.54484752298539,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"41a8354d-1e09-54bc-bec7-2bf530bfd73c","name":"Cologix MTL9 — existing data-centre operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9994cc5f492fff6c4bd7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9994cc5f492fff6c4bd7.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ministère des Ressources naturelles et des Forêts, Adresses Québec (Données Québec, CC BY 4.0)"]},{"site_id":"vcc-site-ff75268d33af60aab707","name":"Cologix VAN4 Data Centre, Vancouver (175 West Cordova Street)","country":"Canada","country_iso_a2":"CA","latitude":49.2835679,"longitude":-123.1086748,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"4f184eb0-233a-5360-84b7-ea21a6ab8409","name":"Cologix VAN4 — existing data-centre operations","status":"operational","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff75268d33af60aab707/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff75268d33af60aab707.json","geometry_licenses":["No licence stated on the service; used for identifiers and a computed point only"],"geometry_attributions":["City of Vancouver"]},{"site_id":"vcc-site-0660c8cc500011957a7b","name":"eStruxture CAL-3 Rocky View Campus","country":"Canada","country_iso_a2":"CA","latitude":51.21083654630298,"longitude":-113.91467685853051,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"a225d046-5d72-5a1f-bf4b-ba454f713a49","name":"eStruxture CAL-3 Initial Build","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["eStruxture"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0660c8cc500011957a7b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0660c8cc500011957a7b.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["eStruxture"]},{"site_id":"vcc-site-b8522efc1a60fe3072e4","name":"Meta Sturgeon County Alberta Data Center","country":"Canada","country_iso_a2":"CA","latitude":53.8180670512532,"longitude":-113.18668173255557,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-08","oldest_status_as_of":"2026-07-08","project_count":1,"projects":[{"project_id":"d1538d73-e301-5203-9e49-924b20051374","name":"Meta Sturgeon County Alberta Current Campus Build","status":"under_construction","status_as_of":"2026-07-08","search_terms":"Meta's first data centre in Canada, a 1 GW campus optimized for its AI workloads in Sturgeon County, Alberta, in the Edmonton region, with more than CA$13 billion of planned investment. Meta announced the groundbreaking in July 2026. Meta says it is fully funding new generation and grid infrastructure in Alberta and names Greenlight Limited Partnership, AltaLink, Capital Power and the Alberta Electric System Operator as energy-planning partners. Frost Collective, a joint venture of Clark Builders and PCL Construction, is the general contractor. The project website's page description cites 1.6 GW, which differs from Meta's 1 GW figure. Sturgeon Data Centre Meta Platforms Frost Collective Clark Builders PCL Construction AltaLink Greenlight Limited Partnership Capital Power Sturgeon County"}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b8522efc1a60fe3072e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b8522efc1a60fe3072e4.json","geometry_licenses":["Open-Government-Licence-Alberta"],"geometry_attributions":["Government of Alberta"]},{"site_id":"vcc-site-12d6215837c6451ab8a3","name":"Microsoft Etobicoke Ontario Datacenter Campus","country":"Canada","country_iso_a2":"CA","latitude":43.7087107176944,"longitude":-79.5482231836428,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"c4ffa53e-bb43-5af1-9e07-aa5045ea480b","name":"Microsoft Etobicoke First Building Current Build","status":"under_construction","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-12d6215837c6451ab8a3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-12d6215837c6451ab8a3.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["City of Toronto","City of Toronto, Geospatial Competency Centre"]},{"site_id":"vcc-site-3cd7dd9c786c855c1820","name":"Microsoft Lévis Charny Data Center","country":"Canada","country_iso_a2":"CA","latitude":46.7079338,"longitude":-71.2587356420411,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-08","oldest_status_as_of":"2026-06-08","project_count":1,"projects":[{"project_id":"b3656b35-f3ad-5119-8918-ac5237bf2a7f","name":"Microsoft Lévis Charny Development Project","status":"under_construction","status_as_of":"2026-06-08","search_terms":""}],"status_publishers":["Commission de la construction du Québec"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3cd7dd9c786c855c1820/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3cd7dd9c786c855c1820.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation","OpenStreetMap Wiki contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-495790bb0eec99f8d10f","name":"Microsoft L’Ancienne-Lorette Data Center","country":"Canada","country_iso_a2":"CA","latitude":46.79188968009724,"longitude":-71.34675196270454,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-08","oldest_status_as_of":"2026-06-08","project_count":1,"projects":[{"project_id":"867d91cb-7a17-59db-a92e-4a50a499f54f","name":"Microsoft L’Ancienne-Lorette Development Project","status":"under_construction","status_as_of":"2026-06-08","search_terms":""}],"status_publishers":["Commission de la construction du Québec"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-495790bb0eec99f8d10f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-495790bb0eec99f8d10f.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Québec Ministère des Ressources naturelles et des Forêts"]},{"site_id":"vcc-site-f1711beb19eaf65e19e2","name":"Microsoft Vaughan Datacentre Campus (YTO11)","country":"Canada","country_iso_a2":"CA","latitude":43.792644152673475,"longitude":-79.62864671042952,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","completed"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"288845bc-d2e7-566b-8a48-3a6c6b2892fb","name":"Microsoft Vaughan YTO11 — first building construction","status":"completed","status_as_of":"2026-08-05","search_terms":""},{"project_id":"2325d27c-df20-5307-9f96-2ac81a7af81c","name":"Microsoft Vaughan — second phase (second datacentre building)","status":"announced","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Microsoft Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1711beb19eaf65e19e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f1711beb19eaf65e19e2.json","geometry_licenses":["York Region Open Data Licence v1.0"],"geometry_attributions":["Contains public sector information made available under The Regional Municipality of York's Open Data Licence"]},{"site_id":"vcc-site-499a1602728034c6a587","name":"Mihta Askiy Data Centre","country":"Canada","country_iso_a2":"CA","latitude":56.3814,"longitude":-116.7479,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a2de1edb-c874-5d78-902a-e174a5ecd03e","name":"Mihta Askiy Data Centre","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed gas-powered data centre about 40 km northeast of Peace River in Northern Sunrise County, Alberta. Alberta's project inventory says the plan involves acquiring a partially completed power plant and converting it into a natural-gas-powered data centre. The proponent, Cree Ative Datacenter Corp GP, filed a federal project description for a 650 MW gas plant to serve the data centre, starting with simple-cycle turbines and later converting to combined cycle. The federal agency decided in March 2026 that no further federal assessment was required; Alberta's inventory lists the project as proposed, with work commencing in 2027. Mihta Askiy Data Center Project Cree Ative Datacenter Corp GP Mihta Askiy Datacenter LP"}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-499a1602728034c6a587/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-499a1602728034c6a587.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Government of Alberta, Major Projects"]},{"site_id":"vcc-site-0ecf05307f91c1e40479","name":"QScale Q01 Lévis Campus","country":"Canada","country_iso_a2":"CA","latitude":46.676157,"longitude":-71.32506265,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-06-04","project_count":2,"projects":[{"project_id":"a848e771-2e45-55fb-8d43-db0885bb824f","name":"QScale Q01 Building B","status":"under_construction","status_as_of":"2026-06-04","search_terms":""},{"project_id":"b9f9191a-1f90-551d-a8b9-44e6f8833e96","name":"QScale Q01 campus (Lévis)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"QScale's Q01 campus in Lévis, in the Quebec City area, is a liquid- and air-cooled colocation and AI campus that the company says is powered by 142 MW of renewable energy. Launched in 2021 as an eight-phase project, it was later costed at CAD 1.05 billion; Hewlett Packard Enterprise became its first anchor tenant in 2023. Goldman Sachs Alternatives closed its acquisition of QScale in May 2026, and in June 2026 QScale said construction of a second building adding 60 MW of IT capacity was well underway. Q01 QScale Q01 QScale QScale Hewlett Packard Enterprise Goldman Sachs Alternatives Government of Quebec Hydro-Québec"}],"status_publishers":["QScale"],"power_observations":[{"project_id":"a848e771-2e45-55fb-8d43-db0885bb824f","metric":"critical_it_mw","stage":"design","low":60.0,"base":60.0,"high":60.0,"unit":"MW","as_of_date":"2026-06-04"}],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ecf05307f91c1e40479.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-bea6bf727e581e987a62","name":"Spruce Lake AI Data Centre","country":"Canada","country_iso_a2":"CA","latitude":45.1837119,"longitude":-66.1763155,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"a1f83625-a411-5b1d-9d25-ea41862ebe9c","name":"Spruce Lake AI Data Centre — proposed campus and on-site generation","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bea6bf727e581e987a62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bea6bf727e581e987a62.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; NB Department of Environment and Local Government; Internet Archive"]},{"site_id":"vcc-site-7a7046b12f3789bb93a5","name":"Synapse Data Center (Olds)","country":"Canada","country_iso_a2":"CA","latitude":51.79278,"longitude":-114.10667,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"4a0d8f6f-b848-5650-a479-4f0caee97fa1","name":"Synapse Data Center (Olds)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Synapse Real Estate Corp. proposed a 1 GW AI data centre in the Town of Olds, Alberta, at the northeast corner of Highways 2A and 27, to be the sole user of a 1.4 GW on-site combined-cycle gas plant. The Alberta Utilities Commission rejected a first, deficient plant application in March 2026, and on 17 August 2026 it denied the application in proceeding 30732, finding the site unsuitable for the development. An environmental approval application with Alberta's environment ministry was still listed as in progress, and no development permit had been filed with the town. Synapse Data Center Project Synapse AI Data Center Olds Synapse Real Estate Corp. Town of Olds"}],"status_publishers":["Town of Olds"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a7046b12f3789bb93a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7a7046b12f3789bb93a5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Synapse Real Estate Corp. (hosted by the Town of Olds)"]},{"site_id":"vcc-site-50ba6e2d0f69faaff629","name":"Teton Digital Black Bear power and data centre campus (Swan Hills)","country":"Canada","country_iso_a2":"CA","latitude":54.532535,"longitude":-115.57319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"b10fbc1b-2689-5864-989c-b36b13abb9ad","name":"Teton Digital Black Bear power and data centre campus (Swan Hills)","status":"proposed","status_as_of":"2026-09-23","search_terms":"Proposed gas-powered data centre campus on Crown land about 19 km south of Swan Hills, Alberta, in Big Lakes County. Kiwetinohk Energy first proposed the roughly 460 MW Black Bear combined-cycle plant in 2024 and received a federal decision that no impact assessment was needed; Teton Digital has since taken it up as the power source for about 1,500 acres of adjacent data centre land. Teton describes a 466 MW first phase with a path to about 3 GW, compute online as early as 2027 using grid power, and the full plant running in Q3 2028. Alberta's project inventory lists it as proposed. Black Bear Power Project Black Bear Power Plant Project Black Bear Teton Digital Kiwetinohk Energy Corp. Big Lakes County"}],"status_publishers":["Teton Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50ba6e2d0f69faaff629/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-50ba6e2d0f69faaff629.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada)"]},{"site_id":"vcc-site-0a62731022d2820e105f","name":"Wonder Valley AI data centre park (Alberta)","country":"Canada","country_iso_a2":"CA","latitude":54.8119,"longitude":-118.6834,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"bb1b28fd-610b-5739-b928-e44f21cb6f1b","name":"Wonder Valley AI data centre park (Alberta)","status":"announced","status_as_of":"2026-10-09","search_terms":"Proposed off-grid AI data centre park in the Greenview Industrial Gateway south of Grande Prairie, Alberta, announced in December 2024 by O'Leary Ventures with the Municipal District of Greenview and now led by O'Leary Digital. Backers describe up to 7.5 GW of on-site gas and geothermal generation built in phases, starting with 1.4 GW. O'Leary Digital said in February 2026 that Alberta permitting was underway; a December 2025 report said the site was undeveloped and construction might not start until late 2028. Sturgeon Lake Cree Nation lost an appeal of the gateway's water licence in April 2026; in August 2026 a judge refused an O'Leary-backed bid to halt a Nation challenge. Wonder Valley Wonder Valley AI Data Centre Park Wonder Valley Alberta O'Leary Digital Limited O'Leary Ventures Municipal District of Greenview No. 16 PCL Construction"}],"status_publishers":["O'Leary Digital Limited via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0a62731022d2820e105f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0a62731022d2820e105f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Government of Alberta, Major Projects"]}]}