{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"ES","country":"Spain","slug":"es","site_count":22,"project_count":23,"statuses":{"announced":14,"under_construction":5,"operational":3,"site_preparation":1},"site_ids":["vcc-site-028ea637886484fbc894","vcc-site-0baa18deeb394aec986b","vcc-site-0d25d33c7b8c51f70ba3","vcc-site-155a753d051b04508b1c","vcc-site-1e165cace19ab3a9b463","vcc-site-2337f8b2e15af053c8ab","vcc-site-239e6725a17b43063d1d","vcc-site-26279485fb1f7f11e894","vcc-site-2972c6d36048ca1770e2","vcc-site-4812cee9b68dbae470cd","vcc-site-5b95b2458a9a5add9fad","vcc-site-5c9b661562b39e724fe6","vcc-site-60428cb258a38898ef68","vcc-site-62511f2ff7c107b083ea","vcc-site-6bd6515ae5d1dc80cf5a","vcc-site-7e1b680aa925165fe2ef","vcc-site-b74f3c274a5a8c1e01da","vcc-site-c6017385da6435abc381","vcc-site-d00d83a0549fcc042174","vcc-site-d3094a7612a02678d299","vcc-site-d6e7826cfaef008088a0","vcc-site-fe2aebe364c3b7dd4ae8"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/es/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/ES.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/ES.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/ES.csv"},"sites":[{"site_id":"vcc-site-5b95b2458a9a5add9fad","name":"ACS DC La Puebla data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.634,"longitude":-0.748,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"f07274ee-deff-5651-b606-da909d7328af","name":"ACS DC La Puebla data center campus","status":"announced","status_as_of":"2026-10-05","search_terms":"Data center campus planned by ACS with Benbros Energy on about 25.5 hectares of industrial land in La Puebla de Alfindén, Zaragoza province. Announced in June 2025 with EUR 1,254 million for the first phase and 150 MW of grid access at Red Eléctrica's Peñaflor substation; a second phase depends on a further 150 MW the developers have requested. The regional plan describes two data halls of 40 MW and 60 MW of IT load, a new 400/220 kV substation next to Peñaflor and an underground line to the site. The plan won initial approval in December 2025 and was amended in July 2026 to add the power line projects. Urbanisation works were expected from late 2026 or in 2027. ACS DC LA PUEBLA ACS and Benbros Energy data center, La Puebla de Alfindén ACS Benbros Energy Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5b95b2458a9a5add9fad/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5b95b2458a9a5add9fad.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón"]},{"site_id":"vcc-site-7e1b680aa925165fe2ef","name":"Alto Infrastructure SP01 Granada Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":37.0832838,"longitude":-3.7520406,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-09","oldest_status_as_of":"2026-07-09","project_count":1,"projects":[{"project_id":"4a934222-f3af-5945-bb46-b98bfaef89b7","name":"Alto Infrastructure SP01 Phase 1 10 MW Critical IT","status":"under_construction","status_as_of":"2026-07-09","search_terms":""}],"status_publishers":["Invest in Spain, ICEX España Exportación e Inversiones"],"power_observations":[{"project_id":"4a934222-f3af-5945-bb46-b98bfaef89b7","metric":"critical_it_mw","stage":"planned","low":10.0,"base":10.0,"high":10.0,"unit":"MW","as_of_date":"2026-07-09"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7e1b680aa925165fe2ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7e1b680aa925165fe2ef.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Junta de Andalucía"]},{"site_id":"vcc-site-d6e7826cfaef008088a0","name":"AWS Walqa Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":42.11381388888889,"longitude":-0.4564361111111111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-25","oldest_status_as_of":"2026-06-25","project_count":1,"projects":[{"project_id":"55f4eb88-750d-5aa5-b4cb-bd5b8e746fe6","name":"AWS Walqa Current Data Center Build","status":"under_construction","status_as_of":"2026-06-25","search_terms":""}],"status_publishers":["Government of Aragón"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6e7826cfaef008088a0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6e7826cfaef008088a0.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Government of Aragón / Amazon Data Services Spain, S.L."]},{"site_id":"vcc-site-4812cee9b68dbae470cd","name":"AWS Zaragoza - La Cartuja Data Center Campus (sector Acampo del Marqués)","country":"Spain","country_iso_a2":"ES","latitude":41.571531,"longitude":-0.8060209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-08","oldest_status_as_of":"2026-10-08","project_count":1,"projects":[{"project_id":"533ee340-271a-596d-b402-bcd02ef1b114","name":"AWS CAR data centre, Zaragoza - La Cartuja","status":"announced","status_as_of":"2026-10-08","search_terms":""}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4812cee9b68dbae470cd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4812cee9b68dbae470cd.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Gobierno de Aragón, Boletín Oficial de Aragón"]},{"site_id":"vcc-site-60428cb258a38898ef68","name":"Box2Bit Epilon data center campus (Épila)","country":"Spain","country_iso_a2":"ES","latitude":41.6,"longitude":-1.283,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"46abd4bf-bd8a-5525-9388-c938807fe2f0","name":"Box2Bit Epilon data center campus (Épila)","status":"announced","status_as_of":"2026-06-15","search_terms":"AI-focused data center campus proposed by the Spanish company Box2Bit in Épila, Zaragoza, beside the A-2 motorway. On 28 January 2026 the Aragón government declared it an investment of regional and general interest, citing EUR 3.9 billion in total: EUR 1.125 billion for a first phase due in 2029 and EUR 2.775 billion for later phases. The first phase covers about 33 hectares, two data buildings and 150 MW with guaranteed grid access; later phases could take the site to about 100 hectares and 520 MW, but the additional power is not yet secured. The move followed the exclusion of Box2Bit's earlier Cariñena site from national grid planning. Epilon Epsilon Box2Bit Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón (Aragón Hoy)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60428cb258a38898ef68/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60428cb258a38898ef68.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón (Aragón Hoy)"]},{"site_id":"vcc-site-fe2aebe364c3b7dd4ae8","name":"Data Center Nostrum Evergreen (DC Badajoz), Plataforma Logística del Suroeste Europeo","country":"Spain","country_iso_a2":"ES","latitude":38.9061756,"longitude":-7.0010102,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"3fe9d3c2-f9dd-5560-b63d-2d12b21d2428","name":"Data Center Nostrum Evergreen (DC Badajoz) - planned data centre with 300 MW grid access","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Agencia Estatal Boletín Oficial del Estado"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe2aebe364c3b7dd4ae8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe2aebe364c3b7dd4ae8.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-239e6725a17b43063d1d","name":"Global Switch Madrid Data Centre Campus, Calle Yécora 4","country":"Spain","country_iso_a2":"ES","latitude":40.4479798,"longitude":-3.5747489,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"f9ad6877-6e4a-5767-ad7d-7ac73e77ab47","name":"Global Switch Madrid — existing data-centre operations (Madrid 1, Calle Yécora 4)","status":"operational","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Global Switch"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-239e6725a17b43063d1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-239e6725a17b43063d1d.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-d00d83a0549fcc042174","name":"Goodman MAD01 Madrid Data Centre Campus","country":"Spain","country_iso_a2":"ES","latitude":40.444143,"longitude":-3.546397,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"b0be5071-aff0-5470-a041-a0be3cc8385a","name":"Goodman MAD01 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d00d83a0549fcc042174/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d00d83a0549fcc042174.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Goodman Group","Goodman Group via its published Google Maps link"]},{"site_id":"vcc-site-0d25d33c7b8c51f70ba3","name":"Green IT Aragón data center campus (SAMCA), Luceni","country":"Spain","country_iso_a2":"ES","latitude":41.833,"longitude":-1.233,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"15360f72-acfa-572f-aac9-eb117ae9fc0d","name":"Green IT Aragón data center campus (SAMCA), Luceni","status":"announced","status_as_of":"2026-10-05","search_terms":"Three-building data center campus planned by the SAMCA group in Luceni, Zaragoza province, paired with renewing and expanding SAMCA's nearby wind farms to supply it. Announced in April 2025 at EUR 2,627 million including the renewable generation. Red Eléctrica has permitted 131 MW for a first phase, which could rise to 181 MW and finally 300 MW. A technical annex describes three identical buildings of 72 MW of IT load, each drawing up to 100 MW from the grid. The regional plan received initial approval in December 2025; in October 2026 site works were expected by late 2026 or in 2027, with the first phase targeted for 2028. Green IT Aragón PIGA Green It Aragón SAMCA (Sociedad Anónima Minera Catalano-Aragonesa) SAMCA (Sociedad Anónima Minera Catalano-Aragonesa) Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0d25d33c7b8c51f70ba3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0d25d33c7b8c51f70ba3.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón"]},{"site_id":"vcc-site-0baa18deeb394aec986b","name":"Iron Mountain Madrid Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":40.458191566488146,"longitude":-3.498520384597765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"bf8d11a2-72a6-500d-a532-98fb73958c84","name":"Iron Mountain MAD-2 and MAD-3 20 MW Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0baa18deeb394aec986b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0baa18deeb394aec986b.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Instituto Geografico Nacional / Centro Nacional de Informacion Geografica"]},{"site_id":"vcc-site-c6017385da6435abc381","name":"Merlin Campus de Centros de Datos Zaragoza-WIND (Botorrita)","country":"Spain","country_iso_a2":"ES","latitude":41.5002772,"longitude":-1.0224131,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"6a050050-b65d-570e-9a00-8188ad08a60e","name":"Merlin Zaragoza-WIND Data Center Campus (144 MW IT single-phase development)","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c6017385da6435abc381/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c6017385da6435abc381.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-26279485fb1f7f11e894","name":"MERLIN Edged Bilbao-Arasur Campus","country":"Spain","country_iso_a2":"ES","latitude":42.697694,"longitude":-2.909169,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"7ac977cb-cbe2-5dfd-b058-f26707f86b6c","name":"MERLIN Edged Bilbao-Arasur Building 2 Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-26279485fb1f7f11e894/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-26279485fb1f7f11e894.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Google redirect service resolving MERLIN's published link"]},{"site_id":"vcc-site-5c9b661562b39e724fe6","name":"MERLIN Edged Madrid-Getafe II Campus","country":"Spain","country_iso_a2":"ES","latitude":40.311373,"longitude":-3.70676,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"aa2dc8a4-52d8-5519-b23a-2ff0313db9e3","name":"MERLIN Edged MAD02 Site Preparation","status":"site_preparation","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c9b661562b39e724fe6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c9b661562b39e724fe6.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Edged"]},{"site_id":"vcc-site-2972c6d36048ca1770e2","name":"Meta Talavera de la Reina data center campus","country":"Spain","country_iso_a2":"ES","latitude":39.95833,"longitude":-4.83278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-28","oldest_status_as_of":"2026-08-28","project_count":1,"projects":[{"project_id":"1369aebb-7496-56a6-9260-159cd3a37283","name":"Meta Talavera de la Reina data center campus","status":"announced","status_as_of":"2026-08-28","search_terms":"Planned Meta data center campus in the Torrehierro industrial area of Talavera de la Reina, Toledo, which would be Meta's first large owned data center in Spain. Meta's 2022 announcement put the investment at about EUR 1 billion; environmental documents later estimated EUR 750 million. Meta bought about 190 hectares from the state land agency Sepes in December 2024. After repeated delays, the regional government approved it as a project of singular interest in October 2025 and authorised the land reparcelling in summer 2026, letting Meta seek building permits. A switch to dry-air cooling cut planned water use. Construction had not been reported as started. Meta Torrehierro data center Meta Platforms Meta Platforms Sepes (Entidad Pública Empresarial de Suelo) Junta de Comunidades de Castilla-La Mancha Talavera de la Reina City Council"}],"status_publishers":["iAgua"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2972c6d36048ca1770e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2972c6d36048ca1770e2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["iAgua"]},{"site_id":"vcc-site-155a753d051b04508b1c","name":"Microsoft La Muela datacenter campus (Aragón)","country":"Spain","country_iso_a2":"ES","latitude":41.6068,"longitude":-1.0832,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"a9ca22ae-d872-5122-a052-e5c9ec410abd","name":"Microsoft La Muela datacenter campus (Aragón)","status":"announced","status_as_of":"2026-10-02","search_terms":"Planned Microsoft datacenter campus at the Centrovía industrial estate in La Muela, west of Zaragoza, the largest by area and investment of the three campuses in Microsoft's Aragón plan. The site was declared of general interest in late 2023. The regional plan (PIGA Región MSFT), given initial approval in November 2025, assigns it 146 hectares and about EUR 2.18 billion, with 50 MW secured for a first phase and up to 300 MW sought later through a new substation. The plan still lacked final approval in August 2026, and a modified version went out for public comment in July 2026. Forbes reported first operation was expected from 2030. Microsoft Centrovía La Muela campus Microsoft Gobierno de Aragón Ayuntamiento de La Muela"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-155a753d051b04508b1c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-155a753d051b04508b1c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vozpópuli"]},{"site_id":"vcc-site-b74f3c274a5a8c1e01da","name":"Microsoft Villamayor de Gállego datacenter campus (Aragón)","country":"Spain","country_iso_a2":"ES","latitude":41.6857,"longitude":-0.774,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"ec8c635b-93db-5c3c-904e-820b7c4f1233","name":"Microsoft Villamayor de Gállego datacenter campus (Aragón)","status":"announced","status_as_of":"2026-10-02","search_terms":"Planned Microsoft datacenter campus on Villamayor de Gállego land at the Malpica industrial estate northeast of Zaragoza, the third Aragón site Microsoft disclosed. The regional government declared it of regional interest in July 2024, citing EUR 2.2 billion of total investment and EUR 365.3 million for an initial phase. The November 2025 regional plan (PIGA Región MSFT) lists 81 hectares and about EUR 1.73 billion, with 50 MW secured for a first phase and up to 300 MW sought later. A modified plan went out for public comment in July 2026, and Forbes reported first operation was expected from 2030. Microsoft Malpica campus Microsoft Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b74f3c274a5a8c1e01da/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b74f3c274a5a8c1e01da.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vozpópuli"]},{"site_id":"vcc-site-1e165cace19ab3a9b463","name":"Microsoft Zaragoza (Puerto Venecia) datacenter campus","country":"Spain","country_iso_a2":"ES","latitude":41.6088,"longitude":-0.8872,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-27","oldest_status_as_of":"2026-10-27","project_count":1,"projects":[{"project_id":"6788c655-d9ed-520c-8012-56d246d29a0c","name":"Microsoft Zaragoza (Puerto Venecia) datacenter campus","status":"announced","status_as_of":"2026-10-27","search_terms":"Planned Microsoft datacenter campus in the city of Zaragoza beside the Puerto Venecia shopping area, one of three campuses in the PIGA Región MSFT regional plan. The November 2025 plan assigns it 57 hectares and about EUR 1.44 billion, with 50 MW secured for a first phase and up to 300 MW sought later via the Torrero-Valdeconsejo substation. The regional government declared it of general interest in September 2025 and began expropriating about 16.5 hectares of private land. Landowners and the ZeC party contested the project in 2026. Microsoft says only land clearing is authorized until the plan receives final approval. Microsoft Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1e165cace19ab3a9b463/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1e165cace19ab3a9b463.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["elDiario.es"]},{"site_id":"vcc-site-2337f8b2e15af053c8ab","name":"Nabiax Alcalá Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":40.5195016897773,"longitude":-3.3409773439880954,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":2,"projects":[{"project_id":"1c809265-e426-51c2-add8-42f5070d031f","name":"Nabiax Alcalá Data Center 3 (ADC3)","status":"announced","status_as_of":"2026-09-18","search_terms":""},{"project_id":"a2cd19ae-ea3d-59b4-af8b-788895561963","name":"Nabiax Alcalá Data Center ADC1 and ADC2 — existing data-centre operations","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Ayuntamiento de Alcalá de Henares"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2337f8b2e15af053c8ab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2337f8b2e15af053c8ab.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["CartoCiudad (IGN/CNIG)"]},{"site_id":"vcc-site-d3094a7612a02678d299","name":"Nabiax Julián Camarillo 8 Campus","country":"Spain","country_iso_a2":"ES","latitude":40.4335832,"longitude":-3.6295448,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"7f77bbf2-2081-5279-92c5-6dc9c3f1ab42","name":"Nabiax Julián Camarillo 8 Campus — existing data-centre operations (modules 1-3)","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Ayuntamiento de Alcalá de Henares"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3094a7612a02678d299/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d3094a7612a02678d299.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-62511f2ff7c107b083ea","name":"QTS Calatorao data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.5222,"longitude":-1.3464,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"46434a5c-4980-5f79-ac83-000783b60566","name":"QTS Calatorao data center campus","status":"announced","status_as_of":"2026-09-30","search_terms":"Blackstone, through its data center company QTS, proposes a 224-hectare data center campus on industrial land beside the A-2 motorway near Calatorao in Zaragoza province, Aragon. Announced in October 2024 at up to EUR 7.5 billion and reported at 300 MW of electrical capacity at full build-out, it received a regional general-interest declaration (DIGA) in October 2024 and initial approval of its regional general-interest plan (PIGA) in August 2025. QTS describes it as a proposed development and has not published a construction schedule. Proyecto Rodes Project Rodes Blackstone Aragon data center QTS Data Centers QTS Data Centers Blackstone Gobierno de Aragón"}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62511f2ff7c107b083ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62511f2ff7c107b083ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Brainsre.news"]},{"site_id":"vcc-site-6bd6515ae5d1dc80cf5a","name":"Tillion Aragón data center campus (Azora), Villamayor de Gállego","country":"Spain","country_iso_a2":"ES","latitude":41.68556,"longitude":-0.77389,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"2a273a46-2f4f-5ccb-9d10-6f2bfeb5e5f5","name":"Tillion Aragón data center campus (Azora), Villamayor de Gállego","status":"announced","status_as_of":"2026-10-05","search_terms":"Data center campus planned by Azora, through its Tillion Data Centres business and the project company Tillion Aragón, near Villamayor de Gállego outside Zaragoza. Announced in March 2025 at 150 MW expandable to 300 MW, with EUR 1.1 billion for the first phase and up to about EUR 2 billion in total. Red Eléctrica approved the first 150 MW grid connection in 2024. The regional plan covers four data center buildings and a 400 kV link to the Peñaflor substation. In October 2026 El Español reported the investment had risen to about EUR 2.36 billion, with site works expected from late 2026 or in 2027. Tillion Aragón PIGA Tillion Aragón Azora Tillion Aragón, S.L. Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bd6515ae5d1dc80cf5a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bd6515ae5d1dc80cf5a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Azora"]},{"site_id":"vcc-site-028ea637886484fbc894","name":"Vantage Data Centers Villanueva de Gállego campus","country":"Spain","country_iso_a2":"ES","latitude":41.767,"longitude":-0.817,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-20","oldest_status_as_of":"2026-03-20","project_count":1,"projects":[{"project_id":"a8c0727c-ed59-5641-8856-e4eac08a5cf0","name":"Vantage Data Centers Villanueva de Gállego campus","status":"announced","status_as_of":"2026-03-20","search_terms":"Planned hyperscale data center campus by US operator Vantage Data Centers with the Aragonese company Desarrollos Ecoindustriales La Cartuja, on roughly 40 to 48 hectares of industrial land south of Villanueva de Gállego (Zaragoza), beside the A-23 motorway near Universidad San Jorge. The partners asked for regional general-interest status in May 2025, and the Aragón government approved it in September 2025 for a EUR 3.2 billion investment over ten years in five phases, with 90 MW of supply already granted through Endesa. In March 2026 the project was still seeking authorisation, with initial documents filed with the regional environmental agency (Inaga) and eight data buildings planned. Vantage Zaragoza Vantage Data Centers Desarrollos Ecoindustriales La Cartuja Endesa Gobierno de Aragón"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-028ea637886484fbc894/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-028ea637886484fbc894.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Libertad Digital"]}]}
