{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"IN","country":"India","slug":"in","site_count":26,"project_count":30,"statuses":{"operational":10,"under_construction":7,"announced":6,"partially_operational":6,"shell":1},"site_ids":["vcc-site-07ef7b0d529815ef1fe5","vcc-site-092db086ba59b630b16d","vcc-site-2088ce1cae4288c3f3a1","vcc-site-238b8f47b49203fa68ee","vcc-site-23fd4beb18c498caa043","vcc-site-2b9d83de9f69d94f5df1","vcc-site-37108b4d9d3683d6451d","vcc-site-42f06f3124352e4af817","vcc-site-52b1e1c3038357306a39","vcc-site-53d6b726e740613f2b41","vcc-site-706911d0aa8c08ae8387","vcc-site-788e3c41c2d9ef023cd2","vcc-site-7a48afbd332e0560f535","vcc-site-7f644893d8685d1d4b44","vcc-site-93245fe3abcae4d63260","vcc-site-94af7d57293a1b3a103b","vcc-site-a982e0093e476f44e98f","vcc-site-bb97e3ebf82c06ecfb2c","vcc-site-c4475d593124b26a70cd","vcc-site-c6ffe3d21cef95a1de82","vcc-site-c77e1bff9259ec397770","vcc-site-c7ddba9644af8bc54913","vcc-site-cde9b25f26b96465e0dd","vcc-site-dc7beeb061c0e039f4cf","vcc-site-eb73e734b6b086a24061","vcc-site-f764d5138ed8928c53bc"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/in/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IN.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IN.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IN.csv"},"sites":[{"site_id":"vcc-site-42f06f3124352e4af817","name":"AdaniConneX Hyderabad data centre campus","country":"India","country_iso_a2":"IN","latitude":17.3888,"longitude":78.4611,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"9753db27-dba7-5bba-933f-499d9b7ffa72","name":"AdaniConneX Hyderabad data centre campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Hyderabad campus with a potential capacity of 600 MW of IT load, of which a first phase went live in October 2024. The company says the campus can draw up to 100% renewable power and offers colocation, connectivity and managed services there. A February 2026 Adani group release links its Microsoft partnership to the Hyderabad and Pune campuses without describing the terms. The site address and the size of the live first phase have not been published. AdaniConneX AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-42f06f3124352e4af817/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-42f06f3124352e4af817.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-bb97e3ebf82c06ecfb2c","name":"AdaniConneX Navi Mumbai data centre campus","country":"India","country_iso_a2":"IN","latitude":19.0308,"longitude":73.0199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"96c80c6f-de7a-5e5c-b9b1-fc1bb7c738a6","name":"AdaniConneX Navi Mumbai data centre campus","status":"announced","status_as_of":"2026-10-09","search_terms":"AdaniConneX lists a planned Navi Mumbai campus with a potential capacity of 1,000 MW of IT load, which the company says has not yet launched and will connect to the main internet exchanges over OPGW fibre. The company gives a ready-for-service date of December 2026 onwards and says the campus can use up to 100% renewable power. No address, investment figure, tenant or construction progress has been published in the sources reviewed. AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb97e3ebf82c06ecfb2c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb97e3ebf82c06ecfb2c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-c4475d593124b26a70cd","name":"AdaniConneX Noida data centre campus","country":"India","country_iso_a2":"IN","latitude":28.57,"longitude":77.32,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8c2ed321-ddad-5bb1-ab38-bd5b66bf4f2b","name":"AdaniConneX Noida data centre campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Noida campus in the Delhi NCR region with a potential capacity of 150 MW of IT load and a first phase live from January 2025. In June 2023 the company said a USD 213 million construction loan would fund a 50 MW Noida campus then being built, alongside its Chennai site. The company says the campus can use up to 100% renewable power. The site address and tenants have not been published. AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4475d593124b26a70cd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4475d593124b26a70cd.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-52b1e1c3038357306a39","name":"AdaniConneX Pune Data Center Campus","country":"India","country_iso_a2":"IN","latitude":18.6467083333,"longitude":73.8072666667,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-06-01","project_count":2,"projects":[{"project_id":"df5ccb0c-2ab0-56fc-a260-71db9387c492","name":"AdaniConneX Pune data centre campus","status":"partially_operational","status_as_of":"2026-07-29","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Pune campus with a potential capacity of 250 MW of IT load and a first phase live from October 2025. Adani reported in July 2026 that 9.6 MW of the campus's second phase had been handed over to a customer. The company says the campus can use up to 100% renewable power, and a February 2026 Adani group release links its Microsoft partnership to the Pune and Hyderabad campuses without describing the terms. The site address has not been published. AdaniConneX"},{"project_id":"48eb54d5-dd3f-51a3-aeed-1ddce1949763","name":"AdaniConneX Pune PNQ04 Current Build","status":"under_construction","status_as_of":"2026-06-01","search_terms":""}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-52b1e1c3038357306a39.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Pune Data Center Limited"]},{"site_id":"vcc-site-2b9d83de9f69d94f5df1","name":"AirTrunk HYD1 Hyderabad","country":"India","country_iso_a2":"IN","latitude":17.2327,"longitude":78.1713,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"f8a7bd1c-26a2-5b59-8e1b-d657084c4f7c","name":"AirTrunk HYD1 Hyderabad","status":"announced","status_as_of":"2026-10-09","search_terms":"HYD1 is AirTrunk's Hyderabad campus at Chandanvelly, Telangana, which AirTrunk lists at more than 243 MW on a 13.3-hectare site served by a 440/220 kV substation. AirTrunk entered India in April 2026 by acquiring Blackstone-backed Lumina CloudInfra, whose roughly 600 MW planned pipeline spans Mumbai, Chennai and Hyderabad. AirTrunk's site page gives no construction status or dates, and no other source describing work at the site was found. AirTrunk HYD1 HYD1 Hyderabad AirTrunk Blackstone"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2b9d83de9f69d94f5df1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2b9d83de9f69d94f5df1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-cde9b25f26b96465e0dd","name":"AWS Thane Balkum & Majiwada Data Centre Campus","country":"India","country_iso_a2":"IN","latitude":19.21798328022521,"longitude":72.98729874330893,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-27","oldest_status_as_of":"2026-05-27","project_count":1,"projects":[{"project_id":"60485ece-bd7e-5f82-9f1b-6e271b8dcf45","name":"AWS Thane Balkum & Majiwada Data Centre EC 477127 Current Build","status":"under_construction","status_as_of":"2026-05-27","search_terms":""}],"status_publishers":["Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cde9b25f26b96465e0dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cde9b25f26b96465e0dd.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host","Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Amazon Data Services India Private Limited, proponent","Open Geospatial Consortium"]},{"site_id":"vcc-site-a982e0093e476f44e98f","name":"CapitaLand DC Chennai Ambattur Campus","country":"India","country_iso_a2":"IN","latitude":13.111478605252206,"longitude":80.16026301746629,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c","name":"CapitaLand DC Chennai Current Facility Build","status":"under_construction","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["CapitaLand Investment Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a982e0093e476f44e98f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a982e0093e476f44e98f.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Minerva Veritas Data Centre Private Limited, proponent; PARIVESH, Government of India, host","Ministry of Environment, Forest and Climate Change, India; Minerva Veritas Data Centre Private Limited, proponent","Open Geospatial Consortium"]},{"site_id":"vcc-site-f764d5138ed8928c53bc","name":"CapitaLand DC ITPH Hyderabad Campus","country":"India","country_iso_a2":"IN","latitude":17.43532415,"longitude":78.38405032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"ea847e06-abc6-5935-ad21-a3c0adbec711","name":"CapitaLand DC ITPH Hyderabad Current Facility Build","status":"under_construction","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["CapitaLand India Trust"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f764d5138ed8928c53bc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f764d5138ed8928c53bc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CapitaLand"]},{"site_id":"vcc-site-07ef7b0d529815ef1fe5","name":"CapitaLand DC Navi Mumbai Campus","country":"India","country_iso_a2":"IN","latitude":19.175772,"longitude":73.000187,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":2,"projects":[{"project_id":"847e667c-d263-55ec-b8ff-bfe495a380cb","name":"CapitaLand DC Navi Mumbai Tower 1","status":"operational","status_as_of":"2026-07-29","search_terms":""},{"project_id":"e62026de-3394-51f7-8823-44ee0da1801c","name":"CapitaLand DC Navi Mumbai Tower 2","status":"under_construction","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["CapitaLand India Trust"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07ef7b0d529815ef1fe5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CapitaLand"]},{"site_id":"vcc-site-c77e1bff9259ec397770","name":"CtrlS Bengaluru Datacenter (Electronic City)","country":"India","country_iso_a2":"IN","latitude":12.8425375,"longitude":77.6712825,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b","name":"CtrlS Bengaluru Datacenter — existing operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c77e1bff9259ec397770/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c77e1bff9259ec397770.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-7a48afbd332e0560f535","name":"CtrlS Chandanvelly AI-ready data center park","country":"India","country_iso_a2":"IN","latitude":17.2327,"longitude":78.1713,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-01-23","oldest_status_as_of":"2025-01-23","project_count":1,"projects":[{"project_id":"0d416a87-60ba-5c1d-a419-a94965619724","name":"CtrlS Chandanvelly AI-ready data center park","status":"announced","status_as_of":"2025-01-23","search_terms":"CtrlS Datacenters announced in January 2025 a 40-acre data center park at the planned Chandanvelly Industrial Park near Hyderabad, Telangana, designed for more than 600 MW of IT load at full build. CtrlS said 250 MW of power had been sanctioned for the first phase, served by a dedicated gas-insulated substation expandable to 900 MW, with buildings designed for up to 135 kW per rack and immersion cooling up to 300 kW per rack. No construction update was found. CtrlS Hyderabad datacenter park CtrlS Datacenters Ltd"}],"status_publishers":["W.Media"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a48afbd332e0560f535/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7a48afbd332e0560f535.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-092db086ba59b630b16d","name":"CtrlS Chennai Datacenter Park (Ambattur Industrial Estate)","country":"India","country_iso_a2":"IN","latitude":13.107083,"longitude":80.1629378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-10-23","project_count":1,"projects":[{"project_id":"44e1b458-0352-5802-829c-20ca66739fad","name":"CtrlS Chennai Datacenter Park — existing operations (two-building park)","status":"operational","status_as_of":"2026-10-23","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-092db086ba59b630b16d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-092db086ba59b630b16d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-788e3c41c2d9ef023cd2","name":"CtrlS Hyderabad Financial District Datacenter","country":"India","country_iso_a2":"IN","latitude":17.4233287,"longitude":78.3303868,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"07e7b1f6-3f2e-5631-9bac-62c9f443b2f4","name":"CtrlS Hyderabad Financial District datacenter — existing operations (operator-mapped facility, DC2 or DC3)","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-788e3c41c2d9ef023cd2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-788e3c41c2d9ef023cd2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c6ffe3d21cef95a1de82","name":"CtrlS Kolkata New Town Datacenter Campus","country":"India","country_iso_a2":"IN","latitude":22.6141551,"longitude":88.462587,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"289f7324-bc4a-5d14-b418-9e28a63dfecb","name":"CtrlS Kolkata-DC1 (first phase)","status":"operational","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c6ffe3d21cef95a1de82/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c6ffe3d21cef95a1de82.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-94af7d57293a1b3a103b","name":"CtrlS Mumbai Datacenter Campus (Mahape, Navi Mumbai)","country":"India","country_iso_a2":"IN","latitude":19.1082134,"longitude":73.023588,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"49268cbe-5462-5e7f-b1ba-7aa011b30472","name":"CtrlS Mumbai Datacenter Campus — existing operations of Mumbai DC1 to DC5","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94af7d57293a1b3a103b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94af7d57293a1b3a103b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c7ddba9644af8bc54913","name":"CtrlS Noida Datacenter (Sector 127)","country":"India","country_iso_a2":"IN","latitude":28.5313027,"longitude":77.3509363,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"18b7738e-b22c-58cc-a1eb-ee1e733a1077","name":"CtrlS Noida DC1 — existing operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c7ddba9644af8bc54913/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c7ddba9644af8bc54913.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-238b8f47b49203fa68ee","name":"Digital Edge Navi Mumbai Campus","country":"India","country_iso_a2":"IN","latitude":19.186009104537128,"longitude":73.00324427769986,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","shell","under_construction"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-08-31","project_count":3,"projects":[{"project_id":"29ddb060-c971-5de4-91d5-5e1dbd16601e","name":"Digital Edge BOM1","status":"operational","status_as_of":"2026-10-06","search_terms":""},{"project_id":"10e4ebee-ff2e-59d5-a133-72dfdca2dc72","name":"Digital Edge BOM2","status":"shell","status_as_of":"2026-08-31","search_terms":""},{"project_id":"e1afb7fa-b1f3-521d-ac12-c036f74eecef","name":"Digital Edge BOM3","status":"under_construction","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Digital Edge (Singapore) Holdings Pte Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-238b8f47b49203fa68ee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-238b8f47b49203fa68ee.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Digital Edge DC (India) Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)"]},{"site_id":"vcc-site-53d6b726e740613f2b41","name":"Raiden Infotech Turbhe MIDC Data Centre Campus","country":"India","country_iso_a2":"IN","latitude":19.055427473257335,"longitude":73.02339212361213,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"118053c0-38ee-5fc1-9c4d-f4875cc3c32e","name":"Raiden Infotech Turbhe MIDC Data Centre EC 531703 Current Build","status":"under_construction","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-53d6b726e740613f2b41/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-53d6b726e740613f2b41.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Raiden Infotech India Private Limited, proponent","Open Geospatial Consortium","Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"]},{"site_id":"vcc-site-7f644893d8685d1d4b44","name":"Reliance Jamnagar AI-enabled data centre for Meta","country":"India","country_iso_a2":"IN","latitude":22.4732,"longitude":70.0552,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"987638c1-43b0-5075-a91a-f02ac2f007cc","name":"Reliance Jamnagar AI-enabled data centre for Meta","status":"announced","status_as_of":"2026-06-10","search_terms":"Reliance Industries agreed in June 2026 to develop a 168 MW AI-enabled data centre in Jamnagar, Gujarat, built to suit Meta, which will lease capacity there to support its global infrastructure and AI compute. Reliance is to handle design, construction, utilities, renewable power, network connectivity and managed operations, with delivery targeted within two years and an option to expand. The facility is to be cooled with desalinated seawater. Reliance described it as Meta's first built-to-suit data centre capacity in India. Reliance Industries Limited Reliance Industries Limited Reliance Industries Limited Reliance Industries Limited Meta Platforms"}],"status_publishers":["Reliance Industries Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7f644893d8685d1d4b44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7f644893d8685d1d4b44.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Reliance Industries Limited"]},{"site_id":"vcc-site-dc7beeb061c0e039f4cf","name":"Sify Chennai 02 data center campus, Siruseri","country":"India","country_iso_a2":"IN","latitude":12.835,"longitude":80.2,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"9d173225-d19b-5566-ab43-b319b0434236","name":"Sify Chennai 02 data center campus, Siruseri","status":"partially_operational","status_as_of":"2026-09-29","search_terms":"Sify Infinit Spaces' hyperscale and AI-ready campus at Siruseri, Chennai, is planned as three towers over a shared basement, with an on-site subsea cable landing station and a 230 kV GIS substation. Tamil Nadu's chief minister inaugurated the first tower in April 2025, when Sify said the campus would eventually reach 130 MW and that it and its partners planned to invest INR 10,000 crore over five years. Sify's October 2025 prospectus reported 25.92 MW of built IT capacity in Tower B, of which 4.32 MW was installed, planned another 26 MW there by the year to March 2028, and said work on towers A and C had not begun. Chennai 02 Sify Siruseri campus Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dc7beeb061c0e039f4cf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dc7beeb061c0e039f4cf.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-37108b4d9d3683d6451d","name":"Sify Noida 02 data center campus","country":"India","country_iso_a2":"IN","latitude":28.57,"longitude":77.32,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"d31725a8-2753-5d70-963d-320d4f6fbb61","name":"Sify Noida 02 data center campus","status":"partially_operational","status_as_of":"2026-09-29","search_terms":"Sify Infinit Spaces' second campus in Noida, Uttar Pradesh, within a kilometre of its Noida 01 facility, is planned as three towers with a dedicated on-site 220 kV substation. Uttar Pradesh's chief minister inaugurated it in March 2025 as North India's largest AI-ready data center campus, with total capacity of more than 130 MW. Sify's October 2025 prospectus said only Tower B was operating, with 25.92 MW of built IT capacity of which 4.32 MW was installed at 30 June 2025; a July 2024 term loan funded development work. Noida 02 Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37108b4d9d3683d6451d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37108b4d9d3683d6451d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indian Infrastructure"]},{"site_id":"vcc-site-2088ce1cae4288c3f3a1","name":"Sify Rabale data center campus (Mumbai 03), Navi Mumbai","country":"India","country_iso_a2":"IN","latitude":19.14417,"longitude":73.00861,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c52dcc98-dfd2-5012-8703-5d9e24de51b2","name":"Sify Rabale data center campus (Mumbai 03), Navi Mumbai","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Sify Infinit Spaces' Rabale campus in the TTC Industrial Area, Navi Mumbai, one of its largest, is designed for 12 towers, of which five are operating. Sify's campus page gives 96.94 MW of IT power for them, the figure its October 2025 prospectus reports as built capacity at mid-2025. The hyperscale and AI-ready Tower 5, designed for 43.2 MW, came into service in the 2023-24 financial year and had 30.24 MW installed by June 2025. Sify's website gives more than 377 MW of IT power for the full campus. Towers 11 and 12 (38.88 MW together) were under construction in October 2025 at an estimated INR 11.3 billion, targeted for the year to March 2028. Rabale Data Center campus Mumbai 03 MUM03 Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2088ce1cae4288c3f3a1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2088ce1cae4288c3f3a1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Sify Technologies"]},{"site_id":"vcc-site-eb73e734b6b086a24061","name":"STT Jaipur Sitapura Data Centre","country":"India","country_iso_a2":"IN","latitude":26.7717574,"longitude":75.84492469999999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"63159cf3-e7f3-5aa4-8f39-ca67a7ad7868","name":"STT Jaipur 1","status":"operational","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["ST Telemedia Global Data Centres (India)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eb73e734b6b086a24061/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eb73e734b6b086a24061.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-93245fe3abcae4d63260","name":"STT Navi Mumbai Campus (TTC MIDC, Khairane)","country":"India","country_iso_a2":"IN","latitude":19.1055,"longitude":73.0188917,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"7e62957c-46b3-5c2a-920c-e773d8ce20c2","name":"STT Navi Mumbai — proposed further data-centre expansion (SEAC-2 statement 593234)","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["State Level Expert Appraisal Committee-2 (SEAC-2), Maharashtra; published on the Maharashtra Pollution Control Board's EC public-documents portal (ecmpcb.in)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-93245fe3abcae4d63260/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-93245fe3abcae4d63260.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["State Environment Impact Assessment Authority (SEIAA), Maharashtra; STT Global Data Centres India Private Limited"]},{"site_id":"vcc-site-23fd4beb18c498caa043","name":"TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)","country":"India","country_iso_a2":"IN","latitude":17.3617,"longitude":78.4747,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"0d75be4c-1fff-5854-895c-71aef25eff11","name":"TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)","status":"announced","status_as_of":"2026-09-09","search_terms":"HyperVault AI Data Center Limited, the data center subsidiary of Tata Consultancy Services, announced on 5 September 2026 that it had secured 264 acres in Hyderabad, Telangana, for an AI campus of up to 1 GW, with HyperVault and its partners expected to invest up to Rs 70,000 crore over the build-out. The site is in Bharat Future City on Hyderabad's southern outskirts. Construction will be phased to customer demand, and Telangana's chief minister asked for the campus to open by 2 June 2028. TPG agreed in November 2025 to take a 27.5 to 49 percent stake in HyperVault. HyperVault Hyderabad HyperVault Bharat Future City HyperVault AI Data Center Limited Tata Consultancy Services TPG Government of Telangana"}],"status_publishers":["The Arabian Post"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23fd4beb18c498caa043/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23fd4beb18c498caa043.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Arabian Post"]},{"site_id":"vcc-site-706911d0aa8c08ae8387","name":"Techno Digital Chennai Campus (SIPCOT Siruseri)","country":"India","country_iso_a2":"IN","latitude":12.823080099999999,"longitude":80.2139752,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"d3a4de34-06f6-5b37-9452-7c390cdf72b1","name":"Techno Digital Chennai Phase 1","status":"operational","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Techno Electric & Engineering Company Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-706911d0aa8c08ae8387/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-706911d0aa8c08ae8387.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]}]}
