{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"IT","country":"Italy","slug":"it","site_count":13,"project_count":13,"statuses":{"announced":12,"site_preparation":1},"site_ids":["vcc-site-0dfaa7fc012a8e8b4638","vcc-site-1ad314d3647967ef3f6e","vcc-site-47f902912a847a235f3d","vcc-site-4cde3223014097681c99","vcc-site-50d8ca798842d8a98b32","vcc-site-6410d8c85834272b982b","vcc-site-6637189089f997b28afc","vcc-site-787e06eb4fe56a1cf6c4","vcc-site-885f8423ea04be0404cf","vcc-site-a42091fba7617807a748","vcc-site-a4bfb4274cc4e48492b6","vcc-site-c5b814ddf09ef4e9b7e5","vcc-site-e6669b76221d6e79fd89"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/it/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IT.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IT.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/IT.csv"},"sites":[{"site_id":"vcc-site-50d8ca798842d8a98b32","name":"Amazon Data Services Italy Data Center Campus, Rho/Pero (via Buonarroti, Rho Fiera)","country":"Italy","country_iso_a2":"IT","latitude":45.5223177,"longitude":9.067057,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"b06eb989-f0a5-5e7b-adce-0f791182f6e5","name":"Data Center Edificio A and Edificio B — proposed two-building data-centre campus (MASE ID_VIP 13213 / 14760)","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50d8ca798842d8a98b32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-50d8ca798842d8a98b32.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-6410d8c85834272b982b","name":"Aruba Data Center Campus, Ponte San Pietro (Via San Clemente 53)","country":"Italy","country_iso_a2":"IT","latitude":45.7052355,"longitude":9.5893587,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"27cd8a67-29e5-5e7b-b876-3cfd75d20a59","name":"Data Center D — conversion of an existing building into a data centre with 30 emergency generators (campus expansion, VIA decree DM 592/2025)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica, Direzione generale Valutazioni ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6410d8c85834272b982b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6410d8c85834272b982b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Aruba S.p.A. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-a4bfb4274cc4e48492b6","name":"Cavour Hyperscale Campus (Trino)","country":"Italy","country_iso_a2":"IT","latitude":45.25206,"longitude":8.19393,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"b3d41aee-bf24-5299-97dd-2e16bc40012e","name":"Cavour Hyperscale Campus (Trino)","status":"announced","status_as_of":"2026-07-27","search_terms":"Proposed data processing and AI campus on the site of the former Galileo Ferraris power station at Trino in the province of Vercelli, Piedmont, associated with the Italian engineering and construction group TechBau. On 24 July 2026 Italy's Council of Ministers declared it a programme of preeminent national strategic interest, citing about EUR 4 billion of investment and 300 to 400 MW of power. The site would reuse an existing 380 kV substation and an operating 87.5 MW solar plant, with 100 to 120 MW of battery storage. The timetable calls for the permitting conference to open by the end of 2026, a single authorisation in 2027 and a first lot in service in 2028. Cavour Hyperscale Campus TechBau Government of Italy (Council of Ministers) Regione Piemonte"}],"status_publishers":["Regione Piemonte (Piemonteinforma)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a4bfb4274cc4e48492b6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a4bfb4274cc4e48492b6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Regione Piemonte (Piemonteinforma)"]},{"site_id":"vcc-site-47f902912a847a235f3d","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","country":"Italy","country_iso_a2":"IT","latitude":45.117,"longitude":8.867,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"5d11dbb6-e8aa-5602-9c7c-8997b1c620c1","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","status":"announced","status_as_of":"2026-08-10","search_terms":"Planned AI data center campus of 500 MW of IT capacity at Ferrera Erbognone in the province of Pavia, Lombardy, near Milan. Eni and the UAE operator Khazna Data Centers signed heads of terms in July 2025 for a joint venture in which Khazna designs and develops a phased master plan and Eni supplies low-carbon power from a new gas-fired plant designed to capture its CO2 for storage at Ravenna. It is the first project in an Italy-UAE programme for up to 1 GW of IT capacity. The European Commission cleared the joint venture in August 2026, when the campus was described as still in design. Eni-Khazna AI Data Center Campus Eni Eni Khazna Data Centers European Commission"}],"status_publishers":["Il Sole 24 Ore"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-47f902912a847a235f3d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Eni"]},{"site_id":"vcc-site-0dfaa7fc012a8e8b4638","name":"Equinix ML10x Data Center, Settimo Milanese (former Italtel Building 2 lot, Il Castelletto)","country":"Italy","country_iso_a2":"IT","latitude":45.4769341,"longitude":9.0347199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-12","oldest_status_as_of":"2026-10-12","project_count":1,"projects":[{"project_id":"103b2a1e-5c56-5387-b6cc-7e43d5f92b6a","name":"ML10x (formerly ML10 and ML11) — proposed single-building data centre with 32 standby generators (VIA ID_VIP 14381)","status":"announced","status_as_of":"2026-10-12","search_terms":""}],"status_publishers":["Equinix Hyperscale 2 (ML10) S.r.l. (notice published by MASE on the VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0dfaa7fc012a8e8b4638/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0dfaa7fc012a8e8b4638.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Equinix Hyperscale 2 (ML10) S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-4cde3223014097681c99","name":"K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella","country":"Italy","country_iso_a2":"IT","latitude":45.317,"longitude":9.133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"a0ee0f70-6708-5a9c-8b50-a61e93a5e501","name":"K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella","status":"announced","status_as_of":"2026-08-18","search_terms":"Hyperscale data center campus proposed by K2 Strategic Infrastructure Italy, a company held by K2 Strategic Pte. Ltd., across the municipalities of Zibido San Giacomo and Lacchiarella in the Metropolitan City of Milan. On 4 August 2026 Italy's Council of Ministers declared it a programme of preeminent national strategic interest. Press reports attribute to the Ministry of Enterprises and Made in Italy figures of up to about 400 MW and an estimated EUR 5.3 billion of investment over four years of development and construction. A government commissioner is to coordinate permits. Local groups have raised concerns about new data centers in the area over farmland, water, grid strain and noise. K2 Strategic Infrastructure Italy campus K2 Strategic Infrastructure Italy Italian Council of Ministers Lombardy Region"}],"status_publishers":["Il Giorno"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4cde3223014097681c99/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4cde3223014097681c99.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Il Giorno"]},{"site_id":"vcc-site-6637189089f997b28afc","name":"Microsoft Bornasco Datacenter Campus (ATP1 area, Via dei Pioppi)","country":"Italy","country_iso_a2":"IT","latitude":45.2556197,"longitude":9.209439,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"3c2f50af-b3c5-55c3-a379-449d88205213","name":"MIL06 — second datacenter building (north building) with emergency generators (VIA decree DM 633/2026, ID_VIP 10891)","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica, Direzione generale Valutazioni ambientali, in concert with the Ministero della cultura"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6637189089f997b28afc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6637189089f997b28afc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Microsoft 4825 Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-1ad314d3647967ef3f6e","name":"Microsoft Data Center MIL03, Settimo Milanese (former Italtel area)","country":"Italy","country_iso_a2":"IT","latitude":45.4736116,"longitude":9.0434101,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"543dc47d-09a5-59d2-88cd-af3ed05252c6","name":"Data Center MIL03 — proposed single-building data centre (MASE ID_VIP 10873)","status":"announced","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1ad314d3647967ef3f6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1ad314d3647967ef3f6e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Microsoft 4825 Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-885f8423ea04be0404cf","name":"Microsoft San Bovio Datacenter","country":"Italy","country_iso_a2":"IT","latitude":45.46212956614725,"longitude":9.310638890241082,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"257f3255-46fe-585e-bdf5-9689b34edbdc","name":"Microsoft San Bovio Initial Development","status":"site_preparation","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-885f8423ea04be0404cf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-885f8423ea04be0404cf.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-e6669b76221d6e79fd89","name":"QTS Vimercate data center campus","country":"Italy","country_iso_a2":"IT","latitude":45.617,"longitude":9.367,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"b19d5d3a-c2cc-5cea-9698-fe07ac125c8e","name":"QTS Vimercate data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Proposed first Italian campus of Blackstone-owned QTS Data Centers on the former IBM industrial site at Velasca in Vimercate (Monza and Brianza). QTS's page calls it a proposed development of up to EUR 2.3 billion. At a June 2026 open day QTS presented three buildings and an on-site substation linked to a planned Terna station; local press reported 156 MW (two 60 MW buildings and one of 36 MW), while other reports give about 220 MW or 300 MW. In July 2026 QTS awaited the national environmental assessment before a building permit, aiming to prepare the site by end-2026 and open the first building in the second half of 2028. QTS Vimercate/Milan Velasca data center QTS Data Centers Kryalos SGR Terna Comune di Vimercate"}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6669b76221d6e79fd89/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6669b76221d6e79fd89.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["QTS Data Centers"]},{"site_id":"vcc-site-c5b814ddf09ef4e9b7e5","name":"STACK MIL05 Data Center Campus, Vignate (Via Galileo Galilei)","country":"Italy","country_iso_a2":"IT","latitude":45.5013038,"longitude":9.3698545,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"1087e250-4b6a-5a02-b653-75471ac7caa0","name":"MIL05 — planned 60 MW IT two-building data-centre campus (MIL05A and MIL05B; VIA decree DM 411/2026, ID_VIP 13497)","status":"announced","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["ARPA Lombardia (regional environmental protection agency), published on the MASE VA portal"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5b814ddf09ef4e9b7e5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c5b814ddf09ef4e9b7e5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 5 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-a42091fba7617807a748","name":"STACK MIL07 Data Center, Siziano (Via Lombardia, Polo Logistico Siziano Nord)","country":"Italy","country_iso_a2":"IT","latitude":45.3256542,"longitude":9.2131573,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"f8363f47-86da-5113-ab8c-e9cc731f477b","name":"MIL07 — proposed 12 MW IT data centre replacing an existing industrial building (Data Center Stack Campus Siziano VIA, ID_VIP 14473)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["Istituto Superiore di Sanità, Dipartimento Ambiente e Salute (published on the MASE VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a42091fba7617807a748/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a42091fba7617807a748.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 2 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-787e06eb4fe56a1cf6c4","name":"STACK MIL08 Campus, Siziano (south of the SP40, Ambito ATC-PL1)","country":"Italy","country_iso_a2":"IT","latitude":45.3234652,"longitude":9.213723,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"f94d8a20-e1f8-5f5e-ada8-afa5e02ed5a1","name":"MIL08A — planned 20 MW IT data-centre building on the MIL08 campus (Data Center Stack Campus Siziano VIA, ID_VIP 14473)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["Istituto Superiore di Sanità, Dipartimento Ambiente e Salute (published on the MASE VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-787e06eb4fe56a1cf6c4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-787e06eb4fe56a1cf6c4.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 2 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]}]}
