{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"KR","country":"Korea, Republic of","slug":"kr","site_count":6,"project_count":6,"statuses":{"under_construction":5,"announced":1},"site_ids":["vcc-site-0fd8442bfe3dc0c487e5","vcc-site-5750ea0ecd6d7c900211","vcc-site-8f745cecc590bf000773","vcc-site-af1774a8d4eb3398e76e","vcc-site-e6b61ca210eeece21cf5","vcc-site-e8f2d5efccb035e9135a"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/kr/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/KR.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/KR.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/KR.csv"},"sites":[{"site_id":"vcc-site-e6b61ca210eeece21cf5","name":"Daou Jukjeon CDC Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.332064,"longitude":127.132427,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"057826b7-3798-5e94-9628-e76e45647c61","name":"Daou Jukjeon CDC Current Build","status":"under_construction","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Daou Technology Inc."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6b61ca210eeece21cf5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6b61ca210eeece21cf5.json","geometry_licenses":["CC-BY-4.0","all-rights-reserved"],"geometry_attributions":["Daou Technology Inc.","Google"]},{"site_id":"vcc-site-5750ea0ecd6d7c900211","name":"Digital Edge Seoul Bupyeong Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.518,"longitude":126.7109,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"d2915b77-394c-5202-8c38-cbd3277121c7","name":"Digital Edge SEL3 Phase 2","status":"under_construction","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["SK ecoplant Co., Ltd."],"power_observations":[{"project_id":"d2915b77-394c-5202-8c38-cbd3277121c7","metric":"critical_it_mw","stage":"planned","low":60.0,"base":60.0,"high":60.0,"unit":"MW","as_of_date":"2026-07-09"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5750ea0ecd6d7c900211/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5750ea0ecd6d7c900211.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Digital Edge"]},{"site_id":"vcc-site-0fd8442bfe3dc0c487e5","name":"LG Uplus Paju AIDC","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.8141287,"longitude":126.7561012,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-05","oldest_status_as_of":"2026-06-05","project_count":1,"projects":[{"project_id":"fc6dd688-fca0-5a7f-a6e9-54f9116607c5","name":"LG Uplus Paju AIDC Building 1","status":"under_construction","status_as_of":"2026-06-05","search_terms":""}],"status_publishers":["LG Uplus"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fd8442bfe3dc0c487e5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fd8442bfe3dc0c487e5.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-af1774a8d4eb3398e76e","name":"National AI Computing Center, Solaseado (Haenam)","country":"Korea, Republic of","country_iso_a2":"KR","latitude":34.5742,"longitude":126.5975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"ddaae950-1e47-58e8-b57a-37aeed0eba7a","name":"National AI Computing Center, Solaseado (Haenam)","status":"under_construction","status_as_of":"2026-08-03","search_terms":"South Korea's government-backed National AI Computing Center is being built in the Solaseado data center park in Haenam County, South Jeolla. A consortium led by Samsung SDS was the only bidder in the 2025 tender and was confirmed as operator in 2026; a public-private joint venture, Korea AI Computing Center (KOACC), formed in June 2026 to build and run it. The project is budgeted at more than 2 trillion won through 2030 and targets at least 15,000 advanced GPUs by 2028 and about 50,000 by 2030. Ground was broken on 3 August 2026, with completion targeted for 2028. Korea AI Computing Center KOACC Solaseado National AI Computing Center Korea AI Computing Center Co., Ltd. (KOACC) Korea AI Computing Center Co., Ltd. (KOACC) Samsung SDS Ministry of Science and ICT (South Korea) People's Growth Fund Jeollanam-do provincial government Korea Electric Power Corporation (KEPCO)"}],"status_publishers":["Edaily"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af1774a8d4eb3398e76e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af1774a8d4eb3398e76e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Samsung SDS"]},{"site_id":"vcc-site-8f745cecc590bf000773","name":"NAVER GAK Sejong Data Center Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":36.50782,"longitude":127.34072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-24","oldest_status_as_of":"2026-07-24","project_count":1,"projects":[{"project_id":"253bd505-a3c0-510a-bbac-96c8107358a4","name":"NAVER GAK Sejong AI Factory (NVIDIA DSX, NAVER/Brookfield/NVIDIA)","status":"announced","status_as_of":"2026-07-24","search_terms":""}],"status_publishers":["NAVER Corp."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f745cecc590bf000773/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8f745cecc590bf000773.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-e8f2d5efccb035e9135a","name":"SK AI Data Center Ulsan","country":"Korea, Republic of","country_iso_a2":"KR","latitude":35.5392,"longitude":129.3119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"64f6ec20-7a91-530a-85f2-7748b0e320f8","name":"SK AI Data Center Ulsan","status":"under_construction","status_as_of":"2026-09-14","search_terms":"SK Telecom and other SK Group companies are building an AI data center with Amazon Web Services on a former SK Chemicals site in the Mipo National Industrial Complex in Ulsan, South Korea. Plans call for a first phase of about 41 MW by November 2027 and about 103 MW by February 2029, with up to 60,000 GPUs and a longer-term aim of gigawatt scale. Power is to come from a nearby LNG-fuelled cogeneration plant. Construction began with an August 2025 groundbreaking. In August 2026 SK Telecom agreed to move SK Broadband's data center business, including the Ulsan build, into a new company, SK Horizon, backed by KKR and an IMM-Stonebridge consortium, subject to approvals. SK-AWS Ulsan AI data center Ulsan AI data center SK Telecom SK Broadband SK Ecoplant Amazon Web Services SK Multi-Utility SK Gas Ulsan Metropolitan City SK Horizon"}],"status_publishers":["Light Reading"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e8f2d5efccb035e9135a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e8f2d5efccb035e9135a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AMCHAM Korea / The Chosun Daily"]}]}
