{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"MX","country":"Mexico","slug":"mx","site_count":5,"project_count":5,"statuses":{"operational":3,"announced":1,"proposed":1},"site_ids":["vcc-site-4671bc85b7188cad1b32","vcc-site-4c786f43318a80273283","vcc-site-8626707eb0091306e3b9","vcc-site-9209936dfd95900f78c3","vcc-site-9c0bff4032619ba27290"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/mx/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MX.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MX.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MX.csv"},"sites":[{"site_id":"vcc-site-9209936dfd95900f78c3","name":"CloudHQ QRO Campus (Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.61983,"longitude":-100.1474,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2025-09-30","oldest_status_as_of":"2025-09-30","project_count":1,"projects":[{"project_id":"a7a29c6e-70aa-5f7b-b172-d1abe208715e","name":"CloudHQ QRO Campus (Querétaro)","status":"announced","status_as_of":"2025-09-30","search_terms":"CloudHQ, a US data centre developer, plans a six-building hyperscale campus on about 52 hectares next to Querétaro's international airport in central Mexico. Presented at the Mexican president's morning press conference in September 2025, it carries USD 4.8 billion of planned investment and up to 900 MW of critical IT load, with initial power secured for a first 200 MW. CloudHQ's own campus page lists a smaller 360 MW and readiness within 2027. Reports disagree on whether a tenant lease is signed and whether building work has begun, and no 2026 progress report was found. QRO Campus CloudHQ Querétaro CloudHQ Government of the State of Querétaro Comisión Federal de Electricidad (CFE)"}],"status_publishers":["Telecom Review Americas"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9209936dfd95900f78c3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9209936dfd95900f78c3.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CloudHQ"]},{"site_id":"vcc-site-8626707eb0091306e3b9","name":"KIO Data Centers QRO3, Querétaro","country":"Mexico","country_iso_a2":"MX","latitude":20.56636,"longitude":-100.256724,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-08-17","oldest_status_as_of":"2026-08-17","project_count":1,"projects":[{"project_id":"352e29e6-cabf-5acb-bd20-619157576502","name":"KIO Data Centers QRO3, Querétaro","status":"proposed","status_as_of":"2026-08-17","search_terms":"QRO3 is a proposed next phase of KIO Data Centers' technology campus in the El Marqués Industrial Park in Querétaro, Mexico. In August 2026, around an event at which Mexico's Economy Ministry gave KIO the Hecho en México designation, KIO outlined QRO3 as an expansion of about 100 MW that would be its largest data center, with an investment of up to USD 1.3 billion through 2030. Two of the three trade reports describe the investment as under evaluation or dependent on the project going ahead, and no construction schedule has been disclosed. KIO linked the plan to demand for cloud and AI services. QRO3 KIO Data Centers"}],"status_publishers":["Mexico Business News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8626707eb0091306e3b9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8626707eb0091306e3b9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Mexico Business News"]},{"site_id":"vcc-site-4c786f43318a80273283","name":"ODATA DC QR01 Campus (Agua Azul, El Marqués, Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.58817081212714,"longitude":-100.2004110879323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"00868c36-925e-5338-9c43-dd98f86f6efa","name":"ODATA DC QR01 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c786f43318a80273283/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c786f43318a80273283.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-4671bc85b7188cad1b32","name":"ODATA DC QR02 Campus (Parque Industrial Amexhe, Guanajuato)","country":"Mexico","country_iso_a2":"MX","latitude":20.541647361178175,"longitude":-100.5771870195581,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"ec581670-a3d9-58e6-b51e-7830879393df","name":"ODATA DC QR02 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4671bc85b7188cad1b32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4671bc85b7188cad1b32.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-9c0bff4032619ba27290","name":"ODATA DC QR03 Campus (Parque Industrial PyME, Los Cués, Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.536622709154294,"longitude":-100.23711810421601,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"9a71f89a-424b-5954-b381-c3fff12fc774","name":"ODATA DC QR03 — existing campus data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9c0bff4032619ba27290/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9c0bff4032619ba27290.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]}]}
