{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"MY","country":"Malaysia","slug":"my","site_count":15,"project_count":15,"statuses":{"operational":4,"partially_operational":4,"announced":3,"under_construction":3,"mep_electrical":1},"site_ids":["vcc-site-163f6ec5acc49b77191a","vcc-site-18b5f6f9e4309fa610af","vcc-site-31ed6c5da19a943535f6","vcc-site-355111878b17009b2503","vcc-site-3d8ad7e35f76709e9b15","vcc-site-492efa6e8a99e32cfb93","vcc-site-54113ebec20f61dd4a6e","vcc-site-9d88c072bfebf964cf3a","vcc-site-a9577b8feaea08be317c","vcc-site-b83e933ca77e513685ed","vcc-site-d70371ee13abb96e26fb","vcc-site-ebacb890726508925a40","vcc-site-efc2f094dac7b05317ca","vcc-site-f072e115b808ff8c826d","vcc-site-f8df65a48b8288eac8cb"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/my/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MY.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MY.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/MY.csv"},"sites":[{"site_id":"vcc-site-b83e933ca77e513685ed","name":"AirTrunk JHB1","country":"Malaysia","country_iso_a2":"MY","latitude":1.5367,"longitude":103.7206,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["partially_operational"],"newest_status_as_of":"2024-08-09","oldest_status_as_of":"2024-08-09","project_count":1,"projects":[{"project_id":"abb5573d-8211-5781-be5c-50c8b27d4fe8","name":"AirTrunk JHB1","status":"partially_operational","status_as_of":"2024-08-09","search_terms":"JHB1 is AirTrunk's first hyperscale data center campus in Malaysia, located in Johor Bahru on more than 10 hectares. It opened in July 2024 with initial phases of over 50 MW for large technology customers, and the following month AirTrunk began a 100 MW expansion to take the campus past 150 MW, with remaining phases due over about 18 months. AirTrunk said in April 2026 that JHB1 and its sister campus JHB2 were almost fully contracted. Renewable supply includes a solar-ready roof and a 30 MW virtual power purchase agreement with ib vogt. JHB1 Johor AirTrunk AirTrunk ib vogt"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b83e933ca77e513685ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b83e933ca77e513685ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-3d8ad7e35f76709e9b15","name":"AirTrunk JHB2","country":"Malaysia","country_iso_a2":"MY","latitude":1.4523,"longitude":103.6145,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"ec871425-75fd-5ee1-9a6f-0e901b2f5837","name":"AirTrunk JHB2","status":"announced","status_as_of":"2026-07-29","search_terms":"JHB2 is AirTrunk's second hyperscale campus in Malaysia, announced in February 2025 in Iskandar Puteri, Johor, and scalable to more than 270 MW on a site of over 11 hectares. It is designed for high-density AI loads with liquid cooling and a grid connection from Tenaga Nasional Berhad on an accelerated schedule, with AirTrunk providing land for a new substation. In April 2026 AirTrunk said JHB1 and JHB2 were almost fully contracted, and in July 2026 it secured US$2.325 billion of green project financing for JHB2. The cited sources give no opening date. JHB2 Johor AirTrunk Tenaga Nasional Berhad"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d8ad7e35f76709e9b15/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d8ad7e35f76709e9b15.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-492efa6e8a99e32cfb93","name":"AirTrunk JHB3 Johor Bahru","country":"Malaysia","country_iso_a2":"MY","latitude":1.4222,"longitude":103.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-30","oldest_status_as_of":"2026-04-30","project_count":1,"projects":[{"project_id":"baa5ddbb-3439-5e4f-a03f-265b844b4460","name":"AirTrunk JHB3 Johor Bahru","status":"announced","status_as_of":"2026-04-30","search_terms":"JHB3 is one of two new AirTrunk hyperscale campuses announced on 30 April 2026 in Iskandar Puteri, Johor, next to its JHB1 and JHB2 campuses. AirTrunk lists JHB3 at more than 138 MW across multiple buildings with eight data halls on about 5.4034 hectares, fed at 275 kV from JHB2 and cooled with recycled water, aimed at high-density cloud and AI customers. AirTrunk put the combined investment for JHB3 and JHB4 at MYR12 billion (USD3 billion), with more than 3,000 construction jobs; no construction or opening dates were given. AirTrunk JHB3 JHB3 Johor Bahru AirTrunk"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-492efa6e8a99e32cfb93/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-492efa6e8a99e32cfb93.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-f8df65a48b8288eac8cb","name":"AirTrunk JHB4 Johor Bahru","country":"Malaysia","country_iso_a2":"MY","latitude":1.4222,"longitude":103.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-30","oldest_status_as_of":"2026-04-30","project_count":1,"projects":[{"project_id":"db7fc7c1-cc03-5473-80b8-31b36c8224d5","name":"AirTrunk JHB4 Johor Bahru","status":"announced","status_as_of":"2026-04-30","search_terms":"JHB4 is one of two new AirTrunk hyperscale campuses announced on 30 April 2026 in Iskandar Puteri, Johor, next to its JHB1 and JHB2 campuses. AirTrunk lists JHB4 at more than 142 MW across multiple buildings with eight data halls on about 5.589 hectares, fed at 275 kV from JHB2 and cooled with recycled water, aimed at high-density cloud and AI customers. AirTrunk put the combined investment for JHB4 and JHB3 at MYR12 billion (USD3 billion), with more than 3,000 construction jobs; no construction or opening dates were given. AirTrunk JHB4 JHB4 Johor Bahru AirTrunk"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f8df65a48b8288eac8cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f8df65a48b8288eac8cb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-f072e115b808ff8c826d","name":"Basis Bay Data Centre, 4710 Jalan Cyber Point 5, Cyberjaya","country":"Malaysia","country_iso_a2":"MY","latitude":2.9058489,"longitude":101.6527141,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"a61eb125-7bc8-55fd-a4d0-1456bd20b695","name":"Basis Bay Data Centre — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f072e115b808ff8c826d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f072e115b808ff8c826d.json","geometry_licenses":["google-maps-terms"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-18b5f6f9e4309fa610af","name":"Bridge Data Centres MY06, Sedenak Tech Park","country":"Malaysia","country_iso_a2":"MY","latitude":1.7137,"longitude":103.5248,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"eebaf579-8fee-543e-9f06-f7423d642684","name":"Bridge Data Centres MY06, Sedenak Tech Park","status":"operational","status_as_of":"2026-09-15","search_terms":"Bridge Data Centres' MY06 hyperscale campus sits in Kidex Sedenak, part of the Sedenak Tech Park in Kulai District, Johor. Announced in December 2021 as a three-building, 100 MW IT campus on about 40 acres with RM2.5 billion of investment over five years, its first 20 MW building was built with prefabricated modules and opened in November 2022, with ByteDance as anchor tenant. Bridge now lists MY06 at 508 MW of IT capacity across 15 buildings, and in September 2026 described the Sedenak campus as a fully operating hyperscale site. BDC MY06 Kidex Sedenak MY06 Bridge Data Centres Bridge Data Centres ByteDance System Sdn. Bhd. Bain Capital Tenaga Nasional Berhad"}],"status_publishers":["Bridge Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-18b5f6f9e4309fa610af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-18b5f6f9e4309fa610af.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Malaysian Investment Development Authority (MIDA)"]},{"site_id":"vcc-site-9d88c072bfebf964cf3a","name":"Bridge Data Centres MY07, Ulu Tiram","country":"Malaysia","country_iso_a2":"MY","latitude":1.6,"longitude":103.8203,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"2c24f89f-37e6-5164-a240-e1e3d2fca176","name":"Bridge Data Centres MY07, Ulu Tiram","status":"partially_operational","status_as_of":"2026-09-02","search_terms":"Bridge Data Centres' MY07 is a 65-acre hyperscale campus in Ulu Tiram, Johor Bahru District. In January 2025, while it was under construction, Bridge signed an electricity supply agreement with Tenaga Nasional for the site, reported at 400 MW, and became the first partner in TNB's corporate renewable energy supply scheme. Bridge lists MY07 at 374 MW of IT capacity across eight buildings. A September 2026 Bridge article describes a campus operations team of more than 120 keeping customer-facing services running, with cooling water recycled from treated effluent rather than drawn from potable supply. BDC MY07 Dragonfly MY07 Bridge Data Centres Bridge Data Centres Tenaga Nasional Berhad"}],"status_publishers":["Bridge Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9d88c072bfebf964cf3a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9d88c072bfebf964cf3a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EqualOcean"]},{"site_id":"vcc-site-efc2f094dac7b05317ca","name":"DayOne Kempas Tech Park (KTP) Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.5598368,"longitude":103.7144197,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"6e2e8be0-c4d1-5273-8729-654a0ae8e078","name":"DayOne KTP Data Center Campus — in-service capacity","status":"operational","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efc2f094dac7b05317ca/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-efc2f094dac7b05317ca.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-163f6ec5acc49b77191a","name":"DayOne Nusajaya Tech Park (NTP) Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.4343726,"longitude":103.5996637,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"dbd454ed-d18b-5803-a777-bfd874dcfe22","name":"DayOne NTP Data Center Campus — in-service capacity","status":"operational","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-163f6ec5acc49b77191a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-163f6ec5acc49b77191a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-a9577b8feaea08be317c","name":"Google Data Center, Elmina Business Park","country":"Malaysia","country_iso_a2":"MY","latitude":3.222618484316103,"longitude":101.51973036271843,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-15","oldest_status_as_of":"2026-08-15","project_count":1,"projects":[{"project_id":"e56ff51f-930c-5c5b-bc82-7add264e576e","name":"Google Elmina Current Campus Construction","status":"under_construction","status_as_of":"2026-08-15","search_terms":"Google's first data center in Malaysia is being built in Sime Darby Property's Elmina Business Park in Selangor, in Greater Kuala Lumpur. Google announced in May 2024 a US$2 billion investment covering this data center and its first Malaysian cloud region, and broke ground in October 2024. Sime Darby Property is building the facility to Google's specifications under a lease arrangement with Google, which will operate it; Google says it will be water-cooled. Completion was targeted for early 2026, but Google's location list still showed the Selangor site as in development in October 2026. Google Elmina data centre Google Malaysia cloud region Google Google Google Sime Darby Property Bhd"}],"status_publishers":["Media Selangor; first-hand interview with Google infrastructure principal Ken Siah"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a9577b8feaea08be317c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a9577b8feaea08be317c.json","geometry_licenses":["CC-BY-SA-4.0","CC0-1.0"],"geometry_attributions":["Wikidata contributors"]},{"site_id":"vcc-site-355111878b17009b2503","name":"NEXTDC KL1 Kuala Lumpur Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":3.0946929,"longitude":101.6284258,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"95b33a98-a85e-57af-b18d-6811a7fd3b20","name":"NEXTDC KL1 Remaining In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-355111878b17009b2503/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-355111878b17009b2503.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-31ed6c5da19a943535f6","name":"Racks Central Johor AI Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.5324382237091367,"longitude":103.92817067682181,"geometry_type":"MultiPolygon","official_boundary":false,"locator_scopes":["host_estate_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"f6d1bce2-6fc7-5fd8-a1fb-55d5fe4cd8e9","name":"Racks Central RCJM1 Phase A","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Racks Central"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_host_estate_context_only","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-31ed6c5da19a943535f6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-31ed6c5da19a943535f6.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","all-rights-reserved"],"geometry_attributions":["Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).","Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.","OpenStreetMap Wiki contributors","Racks Central"]},{"site_id":"vcc-site-54113ebec20f61dd4a6e","name":"Vantage Data Centers Cyberjaya II campus (KUL2)","country":"Malaysia","country_iso_a2":"MY","latitude":2.9225,"longitude":101.655,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2024-08-06","oldest_status_as_of":"2024-08-06","project_count":1,"projects":[{"project_id":"a31a1552-7be0-58e9-8097-4083d11175dd","name":"Vantage Data Centers Cyberjaya II campus (KUL2)","status":"under_construction","status_as_of":"2024-08-06","search_terms":"Vantage Data Centers' second hyperscale campus in Cyberjaya, Selangor, next to its existing KUL1 campus. Announced in May 2023 as a 256 MW IT campus of 10 facilities on nearly 35 acres, with the first facility planned for Q4 2025, it broke ground in August 2024 alongside a supply agreement with Tenaga Nasional Berhad for 500 MVA through a dedicated 275 kV substation. Vantage's campus page, viewed in October 2026, now describes a larger plan of 436 MW of critical IT load in six data centers on 52 acres. No source found confirms whether the first facility has opened. KUL2 Cyberjaya II Data Center Campus Vantage Data Centers Tenaga Nasional Berhad (TNB)"}],"status_publishers":["Vantage Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54113ebec20f61dd4a6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54113ebec20f61dd4a6e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vantage Data Centers (press release via Media OutReach, Viet Nam News)"]},{"site_id":"vcc-site-d70371ee13abb96e26fb","name":"Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park","country":"Malaysia","country_iso_a2":"MY","latitude":1.713667,"longitude":103.524778,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"77f10b6a-00c1-5bf7-974e-d4dc4467b35e","name":"Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Hyperscale campus of nearly 73 acres in Sedenak Tech Park, Johor, inside the Johor-Singapore Special Economic Zone. Developed by Yondr Group with green-loan financing, it is planned for more than 300 MW of IT capacity across three data centers. Vantage Data Centers agreed in September 2025 to buy it, alongside a US$1.6 billion investment in its Asia-Pacific platform that partly funded the deal, and completed the purchase in November 2025. Vantage's campus page, viewed in October 2026, says the first facility is operational and the rest are under development. JHB1 Yondr Johor campus Yondr Group Vantage Data Centers Vantage Data Centers Tenaga Nasional Berhad (TNB)"}],"status_publishers":["Vantage Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d70371ee13abb96e26fb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d70371ee13abb96e26fb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vantage Data Centers"]},{"site_id":"vcc-site-ebacb890726508925a40","name":"YTL Green Data Center Park, Kulai","country":"Malaysia","country_iso_a2":"MY","latitude":1.6569,"longitude":103.6059,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"2d2dbfa9-0685-5532-8d89-80ceeaf07427","name":"YTL Green Data Center Park, Kulai","status":"partially_operational","status_as_of":"2026-08-20","search_terms":"YTL Power International is developing a large data center park in Kulai, Johor, paired with a solar plant of about 500 MW and backup supply from the national grid. The park was first described as a 500 MW campus; GDS agreed in 2022 to co-develop part of it, and YTL announced an AI infrastructure collaboration with Nvidia in December 2023. YTL said in late 2025 that an Nvidia GB200-based AI data center at the park was operational, with about 300 MW being built and commissioned. In August 2026 it was reported to be bringing capacity online progressively and planning to raise the park's ceiling from 600 MW to 1,000 MW. YTL Green Data Center Park YTL AI Cloud Johor YTL Power International Berhad YTL Data Center Holdings Pte. Ltd. GDS Holdings Limited YTL Communications Sdn Bhd Nvidia"}],"status_publishers":["EdgeProp Malaysia (The Edge)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ebacb890726508925a40/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ebacb890726508925a40.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["GDS Holdings Limited (SEC Form 6-K exhibit)"]}]}
