{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"NL","country":"Netherlands","slug":"nl","site_count":6,"project_count":6,"statuses":{"under_construction":3,"announced":1,"partially_operational":1,"permitted":1},"site_ids":["vcc-site-044046b0ede92919a936","vcc-site-04be359939cf11193024","vcc-site-5c6aac8d35554558a1fc","vcc-site-bad4f3ef6a837cde9b80","vcc-site-e4874e06dbb0a951c91d","vcc-site-faa101d551da0c45f1c5"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/nl/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/NL.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/NL.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/NL.csv"},"sites":[{"site_id":"vcc-site-bad4f3ef6a837cde9b80","name":"Alphen aan den Rijn Data Center (Boerhaaveweg 10)","country":"Netherlands","country_iso_a2":"NL","latitude":52.12424652903161,"longitude":4.635035543394948,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"89947860-0dcd-543c-9b18-6cd0068420a0","name":"Alphen aan den Rijn Data Center — permitted 8,292 m2 data-centre building","status":"permitted","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Gemeente Alphen aan den Rijn (via Officiële bekendmakingen)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bad4f3ef6a837cde9b80/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bad4f3ef6a837cde9b80.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Kadaster / BAG via PDOK"]},{"site_id":"vcc-site-044046b0ede92919a936","name":"Goodman AMS01 Amsterdam Data Centre Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.37935680103495,"longitude":4.704939898256592,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"f8900f55-087d-5d51-aef2-820402bcbdc2","name":"Goodman AMS01 Phase 1 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-044046b0ede92919a936/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-044046b0ede92919a936.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Officiele Bekendmakingen","Province of Noord-Holland / Officiele Bekendmakingen"]},{"site_id":"vcc-site-faa101d551da0c45f1c5","name":"Iron Mountain Amsterdam Data Center Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.39172475368806,"longitude":4.664735411619385,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e3f1fc38-bc59-5373-803f-d5c86d817096","name":"Iron Mountain AMS-2 10 MW Expansion","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-faa101d551da0c45f1c5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-faa101d551da0c45f1c5.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Officiele Bekendmakingen","Province of Noord-Holland / Officiele Bekendmakingen"]},{"site_id":"vcc-site-04be359939cf11193024","name":"Microsoft Middenmeer Campus West expansion (Agriport Plot B)","country":"Netherlands","country_iso_a2":"NL","latitude":52.78304,"longitude":5.025355,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-03-25","oldest_status_as_of":"2026-03-25","project_count":1,"projects":[{"project_id":"55df6642-2ef8-5b72-a965-996a28bdfb24","name":"Microsoft Middenmeer Campus West expansion (Agriport Plot B)","status":"announced","status_as_of":"2026-03-25","search_terms":"Proposed expansion of Microsoft's datacenters at the Agriport A7 business park in Middenmeer, Hollands Kroon, North Holland. Announced in September 2025, it would add six double-storey datacenter buildings on Plot B, a site of about 53 hectares west of the A7 next to Microsoft's AMS13-14 datacenters, plus a 10-hectare public nature area, forming one eight-building campus. Microsoft has published no capacity figure; in March 2026 the national EIA commission put the planned emergency generator capacity at about 535 MWe and used it as a proxy for electrical demand. Microsoft's indicative timeline targets a permit application in September 2026 and construction from late 2027. Uitbreiding Campus West Microsoft Microsoft Middenmeer Plot B Microsoft Provincie Noord-Holland (Gedeputeerde Staten) Gemeente Hollands Kroon"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04be359939cf11193024/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-04be359939cf11193024.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Microsoft"]},{"site_id":"vcc-site-e4874e06dbb0a951c91d","name":"Pure DC AMS01 Amsterdam Westpoort Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.39534067,"longitude":4.83457733,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-27","oldest_status_as_of":"2026-05-27","project_count":1,"projects":[{"project_id":"a072994f-1b7d-5cc8-98b7-bc79c666c6c3","name":"Pure DC AMS01 Data Hall Development","status":"under_construction","status_as_of":"2026-05-27","search_terms":""}],"status_publishers":["Pure DC"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e4874e06dbb0a951c91d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e4874e06dbb0a951c91d.json","geometry_licenses":["Public-Domain-Mark-1.0"],"geometry_attributions":["BAG address data via PDOK; Public Domain Mark 1.0"]},{"site_id":"vcc-site-5c6aac8d35554558a1fc","name":"QTS Eemshaven data center campus","country":"Netherlands","country_iso_a2":"NL","latitude":53.437501,"longitude":6.858112,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"409466ac-1b48-5098-adf6-4f3a2999b5f6","name":"QTS Eemshaven data center campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Data center campus of Blackstone-backed QTS Data Centers at Huibertgatweg 2 in the Eemshaven port area of Groningen, the Netherlands. QTS bought the existing, then vacant 20 gross MW building in 2019 and in July 2025 was reported to be investing EUR 1.4 billion to expand the campus and double its regional capacity. QTS's campus page now describes up to 18 hectares, three facilities and 200 MW of planned capacity delivered in phases: the first building is operational, the second is in phased delivery and the third is under construction. QTS Eemshaven EEMSDC1 QTS Data Centers QTS Data Centers Blackstone (managed funds) Zentrys Group"}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c6aac8d35554558a1fc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c6aac8d35554558a1fc.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["QTS Data Centers"]}]}
