{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"PL","country":"Poland","slug":"pl","site_count":4,"project_count":4,"statuses":{"announced":2,"operational":1,"site_preparation":1},"site_ids":["vcc-site-881b5cad4e0ce9044fea","vcc-site-9f92408dd0bdc8a0b8b2","vcc-site-cd3c4380161bc1c0389f","vcc-site-e20b61b9b203723af348"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/pl/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PL.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PL.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PL.csv"},"sites":[{"site_id":"vcc-site-e20b61b9b203723af348","name":"Alter GPU Center Stargard Data Processing Centre","country":"Poland","country_iso_a2":"PL","latitude":53.2819096,"longitude":14.9734641,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"a35a1d8e-4066-5d38-86d6-e21c73987243","name":"Alter GPU Center Stargard — data processing centre building (building permit 785/2026)","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Starostwo Powiatowe w Stargardzie (Biuletyn Informacji Publicznej)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e20b61b9b203723af348/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e20b61b9b203723af348.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-881b5cad4e0ce9044fea","name":"Beyond.pl Data Center Campus (Kręglewskiego, Poznań)","country":"Poland","country_iso_a2":"PL","latitude":52.3776022,"longitude":16.976736,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"d9c5dd9d-5cf3-5d6d-89d7-4d29a3d84c65","name":"Beyond.pl Data Center Campus — existing operations (Data Center 2 and AI Factory)","status":"operational","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["Beyond.pl sp. z o.o."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-881b5cad4e0ce9044fea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-881b5cad4e0ce9044fea.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-9f92408dd0bdc8a0b8b2","name":"Sien Real Piaseczno Data Center (ul. Energetyczna)","country":"Poland","country_iso_a2":"PL","latitude":52.0897465,"longitude":21.0299085,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"f988d3dd-5c8e-57ad-840c-cdd8ca84333c","name":"Sien Real Piaseczno Data Center — four-building campus","status":"site_preparation","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Sien Real Sp. z o.o."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9f92408dd0bdc8a0b8b2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9f92408dd0bdc8a0b8b2.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-cd3c4380161bc1c0389f","name":"WBS Power Baltic Data Center Campus, Lublewo","country":"Poland","country_iso_a2":"PL","latitude":54.75972,"longitude":17.94528,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-24","oldest_status_as_of":"2026-03-24","project_count":1,"projects":[{"project_id":"4eea4b6a-9f71-5c9f-81bb-ae597972ddd5","name":"WBS Power Baltic Data Center Campus, Lublewo","status":"announced","status_as_of":"2026-03-24","search_terms":"Hyperscale campus proposed by WBS Power at Lublewo in Choczewo municipality, Pomerania, near the planned Lubiatowo-Kopalino nuclear power plant site. Announced in March 2026, it targets 3.2 GW in four 800 MW phases aimed at AI, HPC and cloud customers. WBS Power says it has grid connection conditions for the full 3.2 GW at a site next to one of Poland's largest substations, with power from conventional sources, renewables and battery storage, and nuclear in the longer term. Preparation of all phases is due by the end of 2027 and the first data center around 2028-2029. No investors, tenants or permits were named. Baltic Data Center Campus Baltic DC Campus WBS Power"}],"status_publishers":["WBS Power (via PR Newswire)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cd3c4380161bc1c0389f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cd3c4380161bc1c0389f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WBS Power (via PR Newswire)"]}]}
