{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"PT","country":"Portugal","slug":"pt","site_count":2,"project_count":3,"statuses":{"under_construction":2,"partially_operational":1},"site_ids":["vcc-site-af26df3b9a306efc763c","vcc-site-fdb92bb99c36b43e6162"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/pt/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PT.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PT.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/PT.csv"},"sites":[{"site_id":"vcc-site-af26df3b9a306efc763c","name":"MERLIN Lisbon Data Center Campus","country":"Portugal","country_iso_a2":"PT","latitude":38.988289,"longitude":-8.963743,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"43ded2e8-5dcf-5174-b553-a4a04aaeebe3","name":"MERLIN Lisbon Phase II Two-Building Development","status":"under_construction","status_as_of":"2026-07-27","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af26df3b9a306efc763c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af26df3b9a306efc763c.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Edged"]},{"site_id":"vcc-site-fdb92bb99c36b43e6162","name":"Start Campus Sines Data Campus","country":"Portugal","country_iso_a2":"PT","latitude":37.93843247395192,"longitude":-8.805549690439344,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-06-23","project_count":2,"projects":[{"project_id":"94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0","name":"Start Campus SIN02 Current Facility Build","status":"under_construction","status_as_of":"2026-06-23","search_terms":""},{"project_id":"3a54ff50-0fd6-5767-86f2-c6818a515bb2","name":"Start Campus SINES data center campus","status":"partially_operational","status_as_of":"2026-10-21","search_terms":"Start Campus is building a six-building data center campus in Sines, Portugal, on a site with a decommissioned power plant, using seawater cooling. Grid power secured from REN gives the campus about 1.2 GW of IT capacity. The first building (SIN01) is in service and full; the much larger second building (SIN02) is under construction and is to be fully occupied by Nscale, which is deploying Nvidia systems for Microsoft. The full campus is targeted around 2030-2031. SINES DC SINES Data Campus Sines 4.0 Start Campus Start Campus Davidson Kempner Pioneer Point Partners Nscale Microsoft NVIDIA REN"}],"status_publishers":["Start Campus"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fdb92bb99c36b43e6162/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fdb92bb99c36b43e6162.json","geometry_licenses":["rights-status-uncertain-fact-extraction-only"],"geometry_attributions":["Agência Portuguesa do Ambiente; Start Campus / TPF project drawing"]}]}