{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"SA","country":"Saudi Arabia","slug":"sa","site_count":6,"project_count":6,"statuses":{"under_construction":4,"announced":2},"site_ids":["vcc-site-74a60737ad3cfc9e9a75","vcc-site-8f9f601fd64ed7dfc62c","vcc-site-a226e4ce3df02dee4be7","vcc-site-a55b68896de9ae43657e","vcc-site-ba5a5fcafa0e68a3bbc8","vcc-site-ca4532d5353073b32508"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/sa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SA.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SA.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SA.csv"},"sites":[{"site_id":"vcc-site-a55b68896de9ae43657e","name":"DataVolt Oxagon AI data centre campus (NEOM)","country":"Saudi Arabia","country_iso_a2":"SA","latitude":27.5679,"longitude":35.546,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"016877e7-a475-5ebe-9219-0ac699cfff53","name":"DataVolt Oxagon AI data centre campus (NEOM)","status":"under_construction","status_as_of":"2026-10-21","search_terms":"Saudi developer DataVolt plans a 1.5 GW AI data centre campus at Oxagon, NEOM's industrial city on the Red Sea coast, on land leased from Oxagon. Under the February 2025 agreement DataVolt committed an initial USD 5 billion to the first phase, which is meant to run on renewable power. In August 2026 DataVolt and HUMAIN broke ground on a jointly developed 100 MW block within a 360 MW first phase, with the first 100 MW expected in service in 2028. Semafor reported in September 2026 that the initial facility would cost about USD 1 billion, and DataVolt's chief executive said the compute would be sold to customers abroad. NEOM net-zero AI factory campus Oxagon AI data center campus DataVolt DataVolt DataVolt HUMAIN"}],"status_publishers":["DataVolt"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a55b68896de9ae43657e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a55b68896de9ae43657e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NEOM"]},{"site_id":"vcc-site-ca4532d5353073b32508","name":"Ezditek RUH01/PNU Riyadh Data Center","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.866954286488,"longitude":46.713968972719,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-18","oldest_status_as_of":"2026-06-18","project_count":1,"projects":[{"project_id":"010c4071-5901-54ea-a312-f59d53358a0a","name":"Ezditek RUH01 Phase 1 Current Build","status":"under_construction","status_as_of":"2026-06-18","search_terms":""}],"status_publishers":["Ezditek"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ca4532d5353073b32508/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ca4532d5353073b32508.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-ba5a5fcafa0e68a3bbc8","name":"Hexagon Data Center (Riyadh)","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.633,"longitude":46.717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-01","oldest_status_as_of":"2026-05-01","project_count":1,"projects":[{"project_id":"912a1942-9e25-5d1f-b3ce-7f39f60ca845","name":"Hexagon Data Center (Riyadh)","status":"under_construction","status_as_of":"2026-05-01","search_terms":"Government data centre being built in Riyadh by the Saudi Data and Artificial Intelligence Authority (SDAIA), billed as the world's largest Tier IV government data centre. The foundation stone was laid in early January 2026 for a facility of up to 480 MW on a site of about 30 million square feet, designed to host more than 290 government systems and to seed a wider national network of centres. Reported project value is about USD 2.7 billion; a project-tracking profile names Albawani as main contractor, says construction was progressing in April 2026 and gives a Q1 2029 completion target. Hexagon Data Centre SDAIA Hexagon Saudi Data and Artificial Intelligence Authority (SDAIA) Albawani"}],"status_publishers":["W.Media"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ba5a5fcafa0e68a3bbc8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ba5a5fcafa0e68a3bbc8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-a226e4ce3df02dee4be7","name":"HUMAIN Al-Saad hyperscale AI data centre campus","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.6389,"longitude":46.716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-27","oldest_status_as_of":"2026-09-27","project_count":1,"projects":[{"project_id":"4f8a32cf-b64b-51b4-8758-368320eb441d","name":"HUMAIN Al-Saad hyperscale AI data centre campus","status":"announced","status_as_of":"2026-09-27","search_terms":"HUMAIN, the AI company owned by Saudi Arabia's Public Investment Fund, plans a 6 GW hyperscale AI data centre campus on a 24 square kilometre site in the Al-Saad area of east Riyadh, to be built in two phases across six plots. HUMAIN tendered the campus enabling infrastructure in May 2026, covering high-voltage distribution, two substations, a 2,000 MVA bulk supply point, water, sewage, roads and fibre. In September 2026 Dammam-based Al-Yamama was reported as the selected contractor under an early contractor involvement process. Neither the contract value nor the total project cost has been disclosed. HUMAIN 6GW Riyadh campus HUMAIN Al-Yamama Company for Trading & Contracting"}],"status_publishers":["MEED"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a226e4ce3df02dee4be7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a226e4ce3df02dee4be7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["MEED"]},{"site_id":"vcc-site-8f9f601fd64ed7dfc62c","name":"HUMAIN Dammam AI data centre","country":"Saudi Arabia","country_iso_a2":"SA","latitude":26.433,"longitude":50.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-08-26","oldest_status_as_of":"2025-08-26","project_count":1,"projects":[{"project_id":"55a2bfbb-45b2-5d51-bc40-4cc74d88ccfd","name":"HUMAIN Dammam AI data centre","status":"under_construction","status_as_of":"2025-08-26","search_terms":"One of the first two data centres of HUMAIN, the Public Investment Fund's AI company, under construction in Dammam in the Eastern Province as of August 2025. HUMAIN's chief executive said each of the two initial sites, in Riyadh and Dammam, would open with up to 100 MW, using US chips including NVIDIA's latest accelerators, with launch targeted for the second quarter of 2026 (headlines said early 2026). The sources reviewed give no district, building details or investment figure, and no later progress report was found. HUMAIN"}],"status_publishers":["Arab News (Reuters)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f9f601fd64ed7dfc62c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8f9f601fd64ed7dfc62c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arab News (Reuters)"]},{"site_id":"vcc-site-74a60737ad3cfc9e9a75","name":"Khazna Data Centers Dammam campus","country":"Saudi Arabia","country_iso_a2":"SA","latitude":26.433,"longitude":50.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-12-09","oldest_status_as_of":"2025-12-09","project_count":1,"projects":[{"project_id":"41ec9844-286f-5128-a8bf-54e1e328301f","name":"Khazna Data Centers Dammam campus","status":"announced","status_as_of":"2025-12-09","search_terms":"Khazna Data Centers, a UAE data centre operator, announced in December 2025 that it had acquired 225,000 square metres of land in Dammam, in Saudi Arabia's Eastern Province, for its first site in the kingdom. The campus is planned for up to 200 MW of AI-ready capacity in a modular design that can be configured for GPU clusters, aimed at cloud and AI hyperscale customers and built to LEED Gold standards. Khazna named a Saudi country head to lead the launch but gave no investment figure or construction schedule. Khazna Dammam Khazna Data Centers Khazna Data Centers"}],"status_publishers":["Khazna Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-74a60737ad3cfc9e9a75/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-74a60737ad3cfc9e9a75.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Khazna Data Centers"]}]}
