{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"SE","country":"Sweden","slug":"se","site_count":6,"project_count":6,"statuses":{"announced":4,"under_construction":2},"site_ids":["vcc-site-424c62f417d6e6ef2c93","vcc-site-6548266e7ea8549844f6","vcc-site-b25b924e3e107c2cbaf1","vcc-site-ce3b42e4fc2f6b33b8a2","vcc-site-d6bacce52b63861e5d12","vcc-site-ee27a3ebdbdf9e17d494"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/se/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SE.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SE.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/SE.csv"},"sites":[{"site_id":"vcc-site-b25b924e3e107c2cbaf1","name":"atNorth SWE02 Stockholm Campus","country":"Sweden","country_iso_a2":"SE","latitude":59.42019318407011,"longitude":17.919052862381037,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-09","oldest_status_as_of":"2026-06-09","project_count":1,"projects":[{"project_id":"def7f329-a075-519e-bc4b-8f8126bc1901","name":"atNorth SWE02 Current Development","status":"under_construction","status_as_of":"2026-06-09","search_terms":""}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b25b924e3e107c2cbaf1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b25b924e3e107c2cbaf1.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Stockholms stad"]},{"site_id":"vcc-site-424c62f417d6e6ef2c93","name":"atNorth SWE04 Sollefteå mega site","country":"Sweden","country_iso_a2":"SE","latitude":63.1785,"longitude":17.0671,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-06-16","project_count":1,"projects":[{"project_id":"77b8badc-29e2-55ce-b570-5d4387e30505","name":"atNorth SWE04 Sollefteå mega site","status":"announced","status_as_of":"2026-06-16","search_terms":"atNorth announced in February 2026 a 300 MW campus, SWE04, at Hamre Industrial Park in Långsele, about 7 km west of Sollefteå in northern Sweden, on a zoned plot it describes as 50 hectares, with operation expected in the first half of 2028. In June 2026 it published a consultation document for an environmental permit application to the Land and Environment Court, describing three main buildings on a property of about 16 hectares, 145 backup generators running on HVO or similar fuel with about 1,200 MW of combustion input, and a planned grid connection agreement with E.ON. Investment has not been disclosed. SWE04 Sollefteå mega site atNorth Långsele atNorth atNorth AB E.ON"}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-424c62f417d6e6ef2c93/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-424c62f417d6e6ef2c93.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["atNorth"]},{"site_id":"vcc-site-6548266e7ea8549844f6","name":"Brookfield AI center, Strängnäs","country":"Sweden","country_iso_a2":"SE","latitude":59.367,"longitude":17.033,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-06-04","oldest_status_as_of":"2025-06-04","project_count":1,"projects":[{"project_id":"6aa46e28-dd40-513b-8722-f514b6503b02","name":"Brookfield AI center, Strängnäs","status":"announced","status_as_of":"2025-06-04","search_terms":"Brookfield Asset Management plans a large AI data center in Strängnäs, Sweden, announced in June 2025. Brookfield said a land allocation agreement for about 350,000 square metres of extra land would let the site grow from 300 MW to 750 MW. Local press placed the site at Gorsingeberget on the edge of town, with the municipality intending to sell the land for SEK 525 million and grant two years of exclusive planning rights. Brookfield expects more than 1,000 permanent jobs and a 10 to 15 year build-out. No 2026 progress report was found. Gorsingeberget AI center Brookfield Asset Management Strängnäs Municipality"}],"status_publishers":["Brookfield Asset Management (via MFN)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6548266e7ea8549844f6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6548266e7ea8549844f6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Brookfield Asset Management (via MFN)"]},{"site_id":"vcc-site-ce3b42e4fc2f6b33b8a2","name":"EcoDataCenter 2 Borlänge campus","country":"Sweden","country_iso_a2":"SE","latitude":60.48556,"longitude":15.43639,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"304e9b81-f1b5-5a80-8ad5-6f46e12f5a85","name":"EcoDataCenter 2 Borlänge campus","status":"under_construction","status_as_of":"2026-10-05","search_terms":"EcoDataCenter campus on part of the former Kvarnsveden paper mill in Borlänge, Dalarna, near its existing Falun site. Announced in September 2024 as a 240 MW plan, it is now marketed with up to 600 MW of available power on about 20 hectares. Construction began in September 2025 and the first phase is targeted for mid-2027. In February 2026 Mistral AI announced a partnership and investment, reported at EUR 1.2 billion, for a dedicated AI data center at the site. Analyst Epoch AI saw four buildings under way in August 2026 imagery and projects modest initial IT power. EcoDataCenter 2 EcoDataCenter Borlänge mega campus EcoDataCenter EcoDataCenter Mistral AI"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ce3b42e4fc2f6b33b8a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ce3b42e4fc2f6b33b8a2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EcoDataCenter"]},{"site_id":"vcc-site-ee27a3ebdbdf9e17d494","name":"EcoDataCenter Smedjebacken Campus (Röbackens industriområde)","country":"Sweden","country_iso_a2":"SE","latitude":60.1245304,"longitude":15.3999722,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"10af7dbf-25d6-5648-acc2-7468e26dffd9","name":"EcoDataCenter Smedjebacken — third data-centre campus (option on about 51.6 ha of Västansjö 2:7)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Smedjebackens kommun (Kommunfullmäktige)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee27a3ebdbdf9e17d494/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee27a3ebdbdf9e17d494.json","geometry_licenses":["not-stated-public-municipal-service"],"geometry_attributions":["Smedjebackens kommun"]},{"site_id":"vcc-site-d6bacce52b63861e5d12","name":"Google Horndal Data Center","country":"Sweden","country_iso_a2":"SE","latitude":60.3205311307345,"longitude":16.402072554128004,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"038be51b-809c-5d3b-a1ee-79438de4a576","name":"Google Horndal Data Center — first facility","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Avesta kommun"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6bacce52b63861e5d12/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6bacce52b63861e5d12.json","geometry_licenses":["not-stated-public-municipal-service"],"geometry_attributions":["Västmanland-Dalarna miljö- och byggförvaltning; cadastral index map data"]}]}
