{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"country":{"country_iso_a2":"US","country":"United States","slug":"us","site_count":321,"project_count":350,"statuses":{"under_construction":111,"announced":104,"operational":69,"partially_operational":18,"permitted":11,"site_preparation":9,"completed":8,"proposed":7,"cancelled":5,"shell":4,"clearing":1,"commissioning":1,"expansion":1,"foundations":1},"site_ids":["vcc-site-00432e4e9c8e2d91ff76","vcc-site-03b70de7405c82d7d585","vcc-site-04c2489b55d49bcb5ef5","vcc-site-074984ad2c3736a6f825","vcc-site-0761b2abd1f4d9887945","vcc-site-07b3e2197c23d98b282e","vcc-site-0819a764e96ce06f14c6","vcc-site-0970d3d992e7ad717052","vcc-site-09a8ea20931b50e7a218","vcc-site-09f1a555b5c0fa48e739","vcc-site-0ac82fd201fa1878b892","vcc-site-0ca1d5c08f1eb1cf1cf3","vcc-site-0db17b27ff270e0d54bb","vcc-site-0de0d46344f06fb773f2","vcc-site-0e7ae0fbb3ce3d7446b5","vcc-site-0fae550d9965f8aa3c37","vcc-site-0fd145d30136b16a75ed","vcc-site-114ba5d9837cfd60a4ff","vcc-site-119a6992bb6bb25cc011","vcc-site-1246c2b9750b8b4832d2","vcc-site-125cb8890e612925ded5","vcc-site-133b0abe4851d7ed6df5","vcc-site-137a78b7abc74703d577","vcc-site-138d436c47cc25fa668a","vcc-site-148cf0bd79f9e16d2422","vcc-site-1576b005c6fed63297a5","vcc-site-1589f325b3b39da5fb19","vcc-site-15afee16348a0ffc414f","vcc-site-1699224923dfab657965","vcc-site-18500c4557e6b208669d","vcc-site-187ee66b58718aeb9633","vcc-site-191fa12b770b8f520c6e","vcc-site-1c1b9d6298cce00eb24d","vcc-site-1c393b2e71d64f0ffd69","vcc-site-1cd4f95be6c1f81fa038","vcc-site-1f215e81ecc04c69b5d6","vcc-site-1f355d1f6aac8ed1e53f","vcc-site-20a2edd7bbbbe47d7c25","vcc-site-210a7753dcf05471886c","vcc-site-21ab745e53a2c9233b3f","vcc-site-21c0a4be06df4b01b5ee","vcc-site-249f52c31025c0aa2ef2","vcc-site-25fb812582eb27da8c68","vcc-site-265ff643497c82472bb3","vcc-site-2890b11431bd73672216","vcc-site-298aaa4c04e0d88160f7","vcc-site-29afcba86015feddd76b","vcc-site-2f048b74f4ed91d150b5","vcc-site-2f392531ebec4705b0aa","vcc-site-2f87e5bd268fd4e684db","vcc-site-30261c455bad7edb8c71","vcc-site-305d2355387f28814a9a","vcc-site-30f713cb9cffaf5fb6ef","vcc-site-325fe9b450140b2fd38f","vcc-site-32a95caf9128d7dd56c8","vcc-site-32e11c649565693b8978","vcc-site-32ea75e1ed330783f230","vcc-site-33110c77390f92dc4432","vcc-site-34901bbf39b3b6b94f30","vcc-site-373d7757d0759da1977f","vcc-site-382d4c7030c7ed7c700d","vcc-site-387901bd13edd6eab35d","vcc-site-3bb40ecdf91f4fb36503","vcc-site-3bc2702357c3d1710f5f","vcc-site-3c5c88d7f501e957c28a","vcc-site-3d19adbe27ca545ec17c","vcc-site-3dedcd29014f493a2abb","vcc-site-3e65a9f3d78bff82cf77","vcc-site-4066c8eef2c3b8f310b2","vcc-site-40e9833a010630a5db0e","vcc-site-40ff56ed0d9c82eb55e2","vcc-site-43a4fd4202a0c1c9518f","vcc-site-43bf6c7b8c9e9dfc51d0","vcc-site-450769770dfe5ea908d6","vcc-site-45292d327405c32357bc","vcc-site-4551992e6d4d1487d1ab","vcc-site-455ad29119b056e3099f","vcc-site-4776103546341c240223","vcc-site-487fd7b91c213d078d2d","vcc-site-4905a5572ec5f3fc6e2d","vcc-site-49244be6634ceff5f4e2","vcc-site-4ac69f22d359cc462f5b","vcc-site-4c3f2c7b887170cea7c1","vcc-site-4c499d2dc9a7337b10dc","vcc-site-4d899f62f639bc060a4d","vcc-site-4e4c2705d8a781a28a23","vcc-site-4e8601c9f4fed3eb64dd","vcc-site-4eb4e1954e068943ce51","vcc-site-4ed4b7a2d6d92a9362bb","vcc-site-4f12ca3947a97b49eaf9","vcc-site-5075de5607dfe2902982","vcc-site-54d4a697323404ecfc35","vcc-site-5530a2d607e4a2cef4c8","vcc-site-560ea7139f27238b7ea1","vcc-site-579777eea0bb5aad46eb","vcc-site-57d107faa5247458cea1","vcc-site-5878345369c98c058193","vcc-site-5aa81e1af3ee4425bc10","vcc-site-5af95dd1d26b0546ea7f","vcc-site-5c50e2f464fe8dff2ed0","vcc-site-5c75a2f4b8b62cd1f40a","vcc-site-5ca8a42664b78d955330","vcc-site-5cc5c2b2cb554d5a3255","vcc-site-5ccd8508002b9845d587","vcc-site-5dae31735952497e716b","vcc-site-5db7c7f92d76e6cad252","vcc-site-60a52daa24c85edeb3a2","vcc-site-60b38ee835b4579aa5f2","vcc-site-611e6c28f02775eb4a91","vcc-site-61c0655ea44ae50a1cdf","vcc-site-62e42a722eab77bd5345","vcc-site-633ec6e59625ded09b1e","vcc-site-64d29806f5007969e3b9","vcc-site-6524649236861b8342aa","vcc-site-6536417bea2567e8dcbf","vcc-site-6547aae0762f92e98a07","vcc-site-65784844ad2a20822ec7","vcc-site-66e95eb80a122bb2ee32","vcc-site-6727a9539ece2f19ad23","vcc-site-6835cf832163c1403b4e","vcc-site-684f1565a0f48756e238","vcc-site-6a1efb9a8859fd17aa59","vcc-site-6afd5a936ac72410543b","vcc-site-6b67dccd90b1a88385b5","vcc-site-6bedc032f2f6fb914715","vcc-site-6d1cd988dd9b7c70c942","vcc-site-6d5fe2fc2166ad27899f","vcc-site-6e1076932d6836b39df9","vcc-site-6f469fef389a90fb70b5","vcc-site-7001df866adca1a08449","vcc-site-7067da1bf27989e69807","vcc-site-72215030ee46f7977c35","vcc-site-72686694ec26fc3c593c","vcc-site-738448e9fca81d322f19","vcc-site-738cf13d66922745ecee","vcc-site-73e7407002d9d2819589","vcc-site-750014b8b5fd122e94b8","vcc-site-755524c9fd6de6eed9f2","vcc-site-75b2e66146cca1b903a2","vcc-site-779f30ba676706e8e5db","vcc-site-77c736fbee4c7b533a8d","vcc-site-77d8a26c721e8f4fbc69","vcc-site-77fa0d95d9c7ed1b2168","vcc-site-7821451336d29c28c9c9","vcc-site-782c0112e90a5282be53","vcc-site-7830f1806bf63c514962","vcc-site-7b36022a26fba8770036","vcc-site-7b3778f58b65d557b1f9","vcc-site-7cb4c635a0469cf8e507","vcc-site-7cc1c64f44550b086450","vcc-site-7ceb4cfa4ba358ea4547","vcc-site-7d81f7c3c7482975b0d3","vcc-site-7ea48a92b2736ef7dbfb","vcc-site-7f2e4f6e487f73dc8a39","vcc-site-803560469e6170c4886f","vcc-site-837c77c61e73b3c11714","vcc-site-844cdbf47a97438d7298","vcc-site-847f0ddc67e6e40ce38a","vcc-site-85a756f01eb0a66b0986","vcc-site-85b3549bb55293336132","vcc-site-86c96db92481ee74998d","vcc-site-88b1acf055e1ab6200e4","vcc-site-88c487e5ee33f7488890","vcc-site-88d9a98c0d66b0ceae9f","vcc-site-88fff6786d166668a98f","vcc-site-890b3878aa06461817af","vcc-site-8afb87845a63a1ff1bdd","vcc-site-8bf35cfa26156a523f47","vcc-site-8c46e553d068c926b093","vcc-site-8cdb2274a5a7f5abf1c9","vcc-site-8d354596ddb2508a0eda","vcc-site-8ea405601b72e53a6661","vcc-site-8fbc644091f2917f0b12","vcc-site-910b8939869a2f993425","vcc-site-916f5efbecb2c091c963","vcc-site-919f7ffc3ffdb8bb8ce7","vcc-site-91ad5264ef3af020a0ed","vcc-site-9369a9dbb7d04a9e1327","vcc-site-93ff129393312a14a668","vcc-site-9621cf551283f98bcd19","vcc-site-978148b11c356a9982f3","vcc-site-983cd9eec3d1aaa46e69","vcc-site-98db1c10877fca784aba","vcc-site-98db91806e7e60522076","vcc-site-990a491f49bc3fcbf938","vcc-site-998792d68106140776c0","vcc-site-9a3b26464f547fa842e6","vcc-site-9b055d4e5c1005522b59","vcc-site-9b47e002ec40fe02a2d7","vcc-site-9b86fe87cb674e474940","vcc-site-9b9b5ef71cedda52fd47","vcc-site-9baf932720ede1abab4a","vcc-site-9bb771ea13115bdd8091","vcc-site-9c23979ae731456903ea","vcc-site-9da1382c1df4f319ef97","vcc-site-9db8ce819a3ab5f33a6f","vcc-site-9ea046e6f8ace1e0118e","vcc-site-9ea881e4f6faab9a0137","vcc-site-9f7647940a58e048e38f","vcc-site-a15d402305ed80ba8cba","vcc-site-a291a33ca480670cccf1","vcc-site-a393d0e2bc6a6f9efbd5","vcc-site-a39bc0fe88ed4e44ee52","vcc-site-a51d60551e72a6720e31","vcc-site-aa53021c0d413ab5dd3d","vcc-site-ab1cba1760d42b280cd1","vcc-site-acf731facf63970bd84b","vcc-site-ad1d7f1998474bbd92ff","vcc-site-ad9a83cc2040a19f7750","vcc-site-af76a0cab4321a3114ec","vcc-site-af9fa3429df36fd38cad","vcc-site-b065c16b51237fbb767f","vcc-site-b1970b8a6c4cf6da5755","vcc-site-b2210602799840717dd3","vcc-site-b2e02b9541ac2f2a5b20","vcc-site-b336a1eb615ea1635dc7","vcc-site-b414ed2a7f2e60f4b886","vcc-site-b504c5e662c0319d165e","vcc-site-b62dd851a89c296d220e","vcc-site-b66784d37126c8c3b6a0","vcc-site-b682d57794ef9e01ae02","vcc-site-b80c969b486b2844a8d9","vcc-site-b8c4e3db81b026f4e42c","vcc-site-b965a370d922dc0156af","vcc-site-ba0ec3c812ffc9dd281f","vcc-site-baa4b50e6b9b2514d6eb","vcc-site-bb30c1cd06b508cbd3e8","vcc-site-bbdc5d36a043320f3d50","vcc-site-bc692da62a6f8f326b7d","vcc-site-bdf4718cb174c2faaaf4","vcc-site-be4bd88c9ffbe4c64a33","vcc-site-be615a0bc019c0f6d350","vcc-site-beb10377588af430b5a6","vcc-site-bf298971fe1dec3fc0ac","vcc-site-bf829ea21a9d7386fb5f","vcc-site-c01c1fc0c8c91c72ed82","vcc-site-c02fc236120aed55d288","vcc-site-c0945d7c74abf8504604","vcc-site-c0c7b4087b3f24c58bce","vcc-site-c14008c0552564c11274","vcc-site-c189870f4e5549026f3e","vcc-site-c1a0f58564147c78c139","vcc-site-c20d15844afd43f823f9","vcc-site-c26e81685b409595414a","vcc-site-c3e5176a28be6c093486","vcc-site-c4391892c0d4ac0e1fd0","vcc-site-c4804ef7941cded66b42","vcc-site-c51acbb151880f9815b8","vcc-site-c520ff5af3bcfa254443","vcc-site-c5988379bc974f1f6240","vcc-site-c797cce86139b7759ceb","vcc-site-c879bad0c737049a2484","vcc-site-c9f14a3df329db2670d8","vcc-site-cb8ab0ad35bb603ea3ba","vcc-site-cc36b171e24c944e6b44","vcc-site-cc4461f1d5e4d1a749c6","vcc-site-cd315d5cbb01f749da8f","vcc-site-ceaefae6fafda18444a6","vcc-site-cf70f4b9add26d9ba26a","vcc-site-d272a722ca415c1be654","vcc-site-d31a8a141bdf3a8c0a86","vcc-site-d38e747e407b815bd5e0","vcc-site-d48a213ebe706be3a283","vcc-site-d5d70748e492c5e2278a","vcc-site-d60291ccffe6616c33cc","vcc-site-d6ba622d89bc8c560c44","vcc-site-d6bcbce9f1b88dd3f4aa","vcc-site-d80966c9e0bc776042e6","vcc-site-d92255df1f2246ac16d5","vcc-site-d98cef70ec1688f58e42","vcc-site-dadea001f97aa8058f7a","vcc-site-daf4677b4e3a650b76af","vcc-site-dba29b971b845ba962a5","vcc-site-dbe568d910290db51ead","vcc-site-dd9326d1acc72c7fff88","vcc-site-de7d1b5d61517ef55cfe","vcc-site-de9d5aa298d1800645ef","vcc-site-deb5e46cd5360d8c29a3","vcc-site-deed58b28fabd02848f5","vcc-site-df5eae227e5b7eb27ea5","vcc-site-df93318f7935fb88ea53","vcc-site-e172e840f11c02402a49","vcc-site-e24b0402ab82d9361bcf","vcc-site-e2ec9daea00e4e3d9dc1","vcc-site-e305b394a907f57f2639","vcc-site-e32e19d96f758bff3de8","vcc-site-e348a191d95cf61970ae","vcc-site-e3da5da9c1c1d3c08f33","vcc-site-e41279afe75118ffe083","vcc-site-e45c459adff2c9da2ec5","vcc-site-e5029d978178bf23ae67","vcc-site-e6ad7f75be14475fcc3b","vcc-site-e7421a3f765fa1b50990","vcc-site-eacfe2edf41e2fe22170","vcc-site-ebc20ddd515fd9367ea7","vcc-site-eeb4a9ca47e0d579a9cb","vcc-site-efe6509451505a0cd770","vcc-site-f0b8b7f1e16f3d11eb7a","vcc-site-f19474c4631ae00b2725","vcc-site-f20ebb79d86fe03fc732","vcc-site-f32edd5086d6199f35be","vcc-site-f3c14c6227b2ae418664","vcc-site-f453a8af189470adeb8b","vcc-site-f49882717c93278a3c62","vcc-site-f65d3c659a862ad07679","vcc-site-f6a2889114e99d84b372","vcc-site-f6d844f91afe8998bb3a","vcc-site-f711d13af70d9b633456","vcc-site-f7c2acac6f50afd8adde","vcc-site-f806b9a83ed45bed3268","vcc-site-f83004f0f102e3cb501e","vcc-site-f831f9e45eca4caf4a67","vcc-site-fa0e11213234b0fa5fb5","vcc-site-fb7c00e3aeff60e7f46c","vcc-site-fcc06643c640f5d8cce2","vcc-site-fcd641148c4f61598efc","vcc-site-fcfc181b3d5d02fb0a65","vcc-site-fe589337beb1f4408111","vcc-site-fe662eaf021a8dc4f203","vcc-site-ff3fe91dbbe9f9beaf9e","vcc-site-ff9c8cdfa2e24daca416"],"url":"https://kiankyars.github.io/datacenter-atlas/countries/us/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/US.json","geojson_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/US.geojson","csv_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/countries/US.csv"},"sites":[{"site_id":"vcc-site-611e6c28f02775eb4a91","name":"1623 Farnam Carrier Hotel Data Center, 1623 Farnam Street, Omaha","country":"United States","country_iso_a2":"US","latitude":41.2572932,"longitude":-95.9382065,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"70814480-a124-568a-b58f-bb6e8599c925","name":"1623 Farnam — existing carrier-hotel and edge data-centre operations","status":"operational","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["1623 Farnam, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-611e6c28f02775eb4a91/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-611e6c28f02775eb4a91.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Douglas County / City of Omaha GIS (DOGIS)"]},{"site_id":"vcc-site-5075de5607dfe2902982","name":"1G Servers LaSalle Data Center (3719 E La Salle St, Phoenix)","country":"United States","country_iso_a2":"US","latitude":33.3965725,"longitude":-112.0001143,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-04","oldest_status_as_of":"2026-09-04","project_count":1,"projects":[{"project_id":"ff3d1015-4ca8-5f31-ba68-1e82e4f2af2f","name":"1G Servers LaSalle Data Center — data-center remodel (City of Phoenix permit 26000895)","status":"completed","status_as_of":"2026-09-04","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5075de5607dfe2902982/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5075de5607dfe2902982.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-4eb4e1954e068943ce51","name":"400 South LaSalle Data Center (Chicago)","country":"United States","country_iso_a2":"US","latitude":41.8764610117,"longitude":-87.6322149991,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"46cf0678-c6f9-5696-a0f1-dda079535517","name":"400 South LaSalle office-to-data-center conversion (Phases 1–3)","status":"permitted","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["City of Chicago, Department of Buildings"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4eb4e1954e068943ce51/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4eb4e1954e068943ce51.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office, Illinois"]},{"site_id":"vcc-site-c797cce86139b7759ceb","name":"934 Central Data Center (10th Street and Central, downtown Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.1026087,"longitude":-94.5872246,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"e056bdb9-901f-5769-a973-295fad6a453b","name":"934 Central Data Center — proposed 384-foot structure with ground-floor retail and a data center (development plan CD-CPC-2026-00074, Ordinance No. 260870)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["City of Kansas City, Missouri (City Clerk, Legistar legislative system)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c797cce86139b7759ceb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c797cce86139b7759ceb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kansas City, Missouri"]},{"site_id":"vcc-site-8ea405601b72e53a6661","name":"Abernathy HPC campus (TeraWulf and Fluidstack joint venture)","country":"United States","country_iso_a2":"US","latitude":33.8322,"longitude":-101.8431,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-02-27","oldest_status_as_of":"2026-02-27","project_count":1,"projects":[{"project_id":"b6f0ed21-2ab2-51e2-971e-4e9512279101","name":"Abernathy HPC campus (TeraWulf and Fluidstack joint venture)","status":"under_construction","status_as_of":"2026-02-27","search_terms":"AI data center campus in Abernathy, Texas, developed by a joint venture of TeraWulf and Fluidstack announced in October 2025. It is designed for 168 MW of critical IT load (up to 240 MW gross) and is fully pre-leased to a Fluidstack entity for up to 25 years, with Google backstopping about $1.3 billion of the lease obligations; the end user is described only as a global hyperscale AI platform. Project financing was priced in December 2025 and commissioning was targeted for the second half of 2026. In July 2026 TeraWulf agreed to sell its 50.1% stake to a Fluidstack-led investor group, with Fluidstack to keep leading the project. Abernathy HPC Campus TeraWulf Fluidstack TeraWulf Fluidstack Fluidstack"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8ea405601b72e53a6661/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8ea405601b72e53a6661.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-1576b005c6fed63297a5","name":"Accokeek Center Data Center Campus (Richmond Highway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.4022586,"longitude":-77.427741,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"a633d518-d911-5f66-83b4-51ce22c6d452","name":"Accokeek Center — proposed two-building 590,000 sq ft data center campus (rezoning RC24155981)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Stafford County, Virginia (Planning Commission; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1576b005c6fed63297a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1576b005c6fed63297a5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-77c736fbee4c7b533a8d","name":"Alamo Mission Data Center Complex (Red Oak, Ellis County)","country":"United States","country_iso_a2":"US","latitude":32.5362805,"longitude":-96.7939496,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"9adddd5d-e057-5a02-8a2e-85c5b400bbe4","name":"Red Oak PD-66R8 Data Center Complex — proposed development plan (zoning case ZC26-15, Ordinance No. 26-032)","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Red Oak, Texas"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77c736fbee4c7b533a8d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77c736fbee4c7b533a8d.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ellis Appraisal District data)"]},{"site_id":"vcc-site-88fff6786d166668a98f","name":"Aligned Conesville CMH-02 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.18252252973112,"longitude":-81.87484638244284,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"26ebe837-0ec5-5973-a729-656b1b4ce011","name":"Aligned Conesville Current Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["CCU Coal & Construction"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88fff6786d166668a98f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88fff6786d166668a98f.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Coshocton County GIS","Coshocton County GIS and Tax Map Office"]},{"site_id":"vcc-site-978148b11c356a9982f3","name":"Aligned Pataskala Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.99112482870804,"longitude":-82.72619614082323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"d2ebc939-3948-5944-b8c9-c62c679eff81","name":"Aligned Pataskala Data Center Campus — proposed campus","status":"announced","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Aligned Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-978148b11c356a9982f3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-978148b11c356a9982f3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-75b2e66146cca1b903a2","name":"Aligned Phoenix Data Center Campus (2500 W Union Hills Dr)","country":"United States","country_iso_a2":"US","latitude":33.6587258,"longitude":-112.1113011,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"93cc5376-c88c-5b6d-861d-423ac5d231db","name":"Aligned PHX-05 Data Center — core and shell","status":"completed","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-75b2e66146cca1b903a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-75b2e66146cca1b903a2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-b336a1eb615ea1635dc7","name":"Aligned Project Phoenix, Shippingport","country":"United States","country_iso_a2":"US","latitude":40.632068,"longitude":-80.414552,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-10","oldest_status_as_of":"2026-09-10","project_count":1,"projects":[{"project_id":"9ecf2558-5470-501a-9d83-5bf628979837","name":"Aligned Project Phoenix / PIT-01 Campus Development","status":"announced","status_as_of":"2026-09-10","search_terms":""}],"status_publishers":["Aligned Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b336a1eb615ea1635dc7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b336a1eb615ea1635dc7.json","geometry_licenses":["source-specific-terms"],"geometry_attributions":["Shippingport Industrial Park / Frontier Group of Companies via Google My Maps"]},{"site_id":"vcc-site-1246c2b9750b8b4832d2","name":"Amazon and STACK campus at Resilient Technology Park, Shreveport","country":"United States","country_iso_a2":"US","latitude":32.4639,"longitude":-93.7944,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"3641032c-9acd-5840-b94b-beab26a1ce0d","name":"Amazon and STACK campus at Resilient Technology Park, Shreveport","status":"announced","status_as_of":"2026-08-27","search_terms":"Data center campus that STACK Infrastructure is to develop, own and lease to Amazon at the 313-acre Resilient Technology Park off Greenwood Road in west Shreveport, Louisiana, next to Interstate 20. The City Council approved it after the planning commission had blocked it, and residents sued in January 2026 seeking judicial review. In February 2026 local radio described a USD 10 billion site plan of seven two-story buildings and nearly 3 million sq ft, though other outlets said the site was left out of Amazon's USD 12 billion regional announcement because of the lawsuit. In August 2026 the state announced USD 6 billion for this third campus, raising Amazon's regional plan to USD 18 billion. Resilient Technology Park Resilient Tech Park 7340 Greenwood Road STACK Infrastructure STACK Infrastructure Amazon (Amazon Web Services) Amazon Southwestern Electric Power Company (SWEPCO) Shreveport City Council"}],"status_publishers":["Louisiana Economic Development"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1246c2b9750b8b4832d2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1246c2b9750b8b4832d2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["News Radio 710 KEEL"]},{"site_id":"vcc-site-138d436c47cc25fa668a","name":"Amazon Falls Township Innovation Campus","country":"United States","country_iso_a2":"US","latitude":40.155464002333,"longitude":-74.75004338781764,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"bdfd522f-2d7e-5d1f-8e00-3c43b462ed27","name":"Amazon Falls Township Active Campus Buildout","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Amazon Innovation Campuses in Pennsylvania"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-138d436c47cc25fa668a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-138d436c47cc25fa668a.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Bucks County GIS","Bucks County Planning Commission / Board of Assessment"]},{"site_id":"vcc-site-b065c16b51237fbb767f","name":"Amazon Salem Township Innovation Campus","country":"United States","country_iso_a2":"US","latitude":41.0839907,"longitude":-76.14337485,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-07-19","project_count":2,"projects":[{"project_id":"c73ac912-e44d-5477-84f5-c5beb4813518","name":"Amazon Salem Township Active Campus Buildout","status":"under_construction","status_as_of":"2026-07-19","search_terms":""},{"project_id":"dc6f83d9-dac5-563a-ba7e-ff18e27ba506","name":"AWS Salem Township Innovation Campus (Susquehanna)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Amazon Web Services campus next to Talen Energy's Susquehanna nuclear plant in Salem Township, Luzerne County. AWS bought Talen's Cumulus campus, planned at up to 960 MW, in March 2024 and won township rezoning in May 2024. In June 2025 Talen agreed to supply Amazon 1,920 MW from Susquehanna through 2042, moving delivery onto the grid after a spring 2026 reconfiguration. The site was one of the first two named in Amazon's plan to invest at least $20 billion in Pennsylvania. Amazon says it operates a data center campus there and shows active construction since October 2025 toward 20 data centers. Cumulus data center campus Salem Township Innovation Campus Amazon Web Services Amazon Web Services Talen Energy PPL Electric Utilities Salem Township"}],"status_publishers":["Amazon Innovation Campuses in Pennsylvania","Amazon Innovation in PA (project website)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b065c16b51237fbb767f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b065c16b51237fbb767f.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c51acbb151880f9815b8","name":"Amazon Web Services Hobart data center campus","country":"United States","country_iso_a2":"US","latitude":41.5286,"longitude":-87.2675,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"8d08b021-e457-5102-9ef2-33528ad786d1","name":"Amazon Web Services Hobart data center campus","status":"announced","status_as_of":"2026-08-25","search_terms":"Planned Amazon data center campus on hundreds of acres of undeveloped land in Hobart, Lake County, Indiana. Hobart confirmed an agreement for the campus less than a day after Amazon announced USD 15 billion for new northern Indiana campuses in November 2025. The city council approved the project, reported at USD 11 billion, in January 2026 with a ten-year tax abatement and a long IT equipment exemption; Amazon has paid the city USD 47 million, with further payments tied to construction milestones. The mayor has estimated up to 25 buildings, with work slated to start in 2026 and finish in 2028. A resident's lawsuit over the approval process was still described as ongoing in August 2026. Amazon Web Services City of Hobart"}],"status_publishers":["FOX 32 Chicago"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c51acbb151880f9815b8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c51acbb151880f9815b8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["21Alive News (WPTA), from Inside INdiana Business"]},{"site_id":"vcc-site-9c23979ae731456903ea","name":"Amazon Web Services King George County campus (Birchwood site)","country":"United States","country_iso_a2":"US","latitude":38.2614,"longitude":-77.3319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c42e542c-bee8-54bc-9f79-9f03d98979ea","name":"Amazon Web Services King George County campus (Birchwood site)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed Amazon Web Services data center campus on about 869 acres at the former Birchwood coal power plant on State Route 3 in the Sealston area of King George County, Virginia. Rezoned in September 2023, it is planned at 7.25 to 7.5 million sq ft, with a first phase of up to eight buildings and about 4 million sq ft and nine more buildings in later phases, and is reported as a USD 6 billion project. The county approved tax incentives in December 2023, but a new board voted in January 2024 to renegotiate them; Amazon sought a vested rights review in 2025, and as of March 2026 the case was pending in circuit court with no construction reported. Birchwood data center campus Amazon Birchwood Amazon Web Services Amazon Web Services Birchwood Power Partners King George County Board of Supervisors Dominion Energy"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9c23979ae731456903ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9c23979ae731456903ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-9bb771ea13115bdd8091","name":"Apple Prineville Data Center Campus","country":"United States","country_iso_a2":"US","latitude":44.2845822,"longitude":-120.8659538,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-08","oldest_status_as_of":"2026-10-08","project_count":2,"projects":[{"project_id":"f977578a-7126-5a1a-a89c-5e40d239e630","name":"Apple Prineville Data Center Campus — eastern campus expansion (PRZ 06 development area)","status":"announced","status_as_of":"2026-10-08","search_terms":""},{"project_id":"e18e9133-3dc6-56b6-951b-d46e80e96690","name":"Apple Prineville Data Center Campus — existing operations","status":"operational","status_as_of":"2026-10-08","search_terms":""}],"status_publishers":["City of Prineville, Oregon"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9bb771ea13115bdd8091/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9bb771ea13115bdd8091.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Crook County, Oregon"]},{"site_id":"vcc-site-60a52daa24c85edeb3a2","name":"Applied Digital Delta Forge 1 Campus","country":"United States","country_iso_a2":"US","latitude":31.38257035,"longitude":-92.68620569018782,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"b7744ad5-aa48-5977-a70e-3d6a588f468d","name":"Delta Forge 1 Current Construction","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital AI factory campus in Boyce, Louisiana, on more than 500 acres, designed for an initial 430 MW of total utility power and up to 300 MW of critical IT load in two 150 MW facilities. Ground was broken in January 2026 with the state undisclosed. In April 2026 an unnamed US high investment-grade hyperscaler leased the 300 MW for about 15 years, worth about 7.5 billion US dollars. The company's July 2026 results release names Boyce, Louisiana. Initial operations are targeted for mid-2027. Delta Forge 1 AI Factory Campus Applied Digital"}],"status_publishers":["Applied Digital Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60a52daa24c85edeb3a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60a52daa24c85edeb3a2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation","OpenStreetMap contributors"]},{"site_id":"vcc-site-8d354596ddb2508a0eda","name":"Applied Digital Delta Forge 2","country":"United States","country_iso_a2":"US","latitude":33.2397,"longitude":-87.3278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"d2bf7339-8e09-50df-8229-96ad3f8fa358","name":"Applied Digital Delta Forge 2","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital's fifth AI factory campus, on about 160 acres of a nearly 1,300-acre site north of Brookwood Parkway in Brookwood, Tuscaloosa County, Alabama. In June 2026 the company announced a 15-year lease of 210 MW of critical IT load to an unnamed US high investment-grade hyperscaler, worth about USD 5.2 billion in base-term revenue, naming only a southern state. Applied Digital confirmed the Brookwood site in September 2026; local reports gave an initial capital investment of about USD 3.29 billion and about 1.26 million square feet of data center space. Construction was set to begin on 1 October 2026, with initial operations expected in Q1 2028. Delta Forge 2 AI Factory Applied Digital Tuscaloosa County Economic Development Authority"}],"status_publishers":["Applied Digital via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d354596ddb2508a0eda/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8d354596ddb2508a0eda.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC 33/40"]},{"site_id":"vcc-site-f453a8af189470adeb8b","name":"Applied Digital Jamestown Data Center Hosting Facility (2671 and 2683 Highway 20 SE, Jamestown, North Dakota)","country":"United States","country_iso_a2":"US","latitude":47.0257128,"longitude":-98.6809839,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"0c012a67-d296-54af-bb26-dab8478ce710","name":"Applied Digital Jamestown — 106 MW data-center hosting facility, existing operations (APLD Hosting LLC)","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Applied Digital Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f453a8af189470adeb8b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f453a8af189470adeb8b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["North Dakota GIS Hub; Stutsman County"]},{"site_id":"vcc-site-0ac82fd201fa1878b892","name":"Applied Digital Polaris Forge 1 Campus","country":"United States","country_iso_a2":"US","latitude":46.014383,"longitude":-98.574269,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","partially_operational","under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-08-31","project_count":3,"projects":[{"project_id":"66926b10-9fe1-5a9c-bcae-d906d05c3093","name":"Applied Digital Ellendale 180 MW data-center hosting facility — existing operations","status":"operational","status_as_of":"2026-08-31","search_terms":""},{"project_id":"32b98d7e-1d0f-5c16-af18-3f469f3b662b","name":"Applied Digital Polaris Forge 1","status":"partially_operational","status_as_of":"2026-10-07","search_terms":"Applied Digital's AI data center campus in Ellendale, North Dakota, leased entirely to CoreWeave under roughly 15-year leases covering 400 MW of critical IT load. The first 100 MW building came online in two 50 MW phases in October and November 2025, and the 150 MW second building came online in two 75 MW phases by October 2026, for 250 MW operating. A third 150 MW building (ELN-04) is under construction, financed through a bridge loan later refinanced with senior secured notes in June 2026. Polaris Forge 1 AI Factory Campus Applied Digital Ellendale AI campus Applied Digital CoreWeave"},{"project_id":"20ee1eea-91bf-52aa-a464-c4a38d436f9e","name":"Polaris Forge 1 Current Expansion","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Applied Digital","Applied Digital Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ac82fd201fa1878b892/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ac82fd201fa1878b892.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["North Dakota Department of Environmental Quality"]},{"site_id":"vcc-site-847f0ddc67e6e40ce38a","name":"Applied Digital Polaris Forge 2 Campus","country":"United States","country_iso_a2":"US","latitude":46.96693921427165,"longitude":-96.86849216498359,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":2,"projects":[{"project_id":"5c691ba6-a630-5ab4-a45d-4d676e3e4d53","name":"Applied Digital Polaris Forge 2","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital AI data center campus near Harwood in Cass County, North Dakota, on more than 900 acres. Announced in August 2025 as a 3 billion US dollar, 280 MW project, it was later described as a 1 GW campus. An unnamed US investment-grade hyperscaler leased the first 200 MW of critical IT load in two buildings for about 15 years and holds a right of first refusal on 800 MW more. Construction is funded partly by 2.15 billion US dollars of senior secured notes issued in March 2026; the company expects initial operations by the end of 2026 and the full 200 MW in 2027. Polaris Forge 2 AI Factory Campus Applied Digital Harwood AI campus Applied Digital Cass County Electric Cooperative Oracle"},{"project_id":"12407b2e-a44d-5c8d-aa62-c7b64045e20f","name":"Polaris Forge 2 Current Construction","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Applied Digital","Applied Digital Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-847f0ddc67e6e40ce38a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-847f0ddc67e6e40ce38a.json","geometry_licenses":["public-domain-per-Cass-County-item-policy"],"geometry_attributions":["Cass County North Dakota"]},{"site_id":"vcc-site-5af95dd1d26b0546ea7f","name":"Applied Digital Polaris Forge 3","country":"United States","country_iso_a2":"US","latitude":47.115,"longitude":-101.2978,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"0eb54c2e-ed0f-58e9-85cc-bf616b723139","name":"Applied Digital Polaris Forge 3","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital's fourth AI factory campus, in Center, Oliver County, North Dakota. In May 2026 the company announced a 15-year take-or-pay lease with an unnamed US high investment-grade hyperscaler for 300 MW of critical IT load, supported by about 430 MW of grid-connected utility power, worth about 7.5 billion US dollars over the base term. The May release withheld the state; the company's October 2026 earnings release names Center, North Dakota. The campus is under construction, with initial operations targeted for 2027. Polaris Forge 3 AI Factory Campus Applied Digital"}],"status_publishers":["Applied Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5af95dd1d26b0546ea7f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5af95dd1d26b0546ea7f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Applied Digital"]},{"site_id":"vcc-site-29afcba86015feddd76b","name":"AVAIO Digital Leo Data Center Campus (Project Leo, East 145th Street, Pulaski County)","country":"United States","country_iso_a2":"US","latitude":34.620842,"longitude":-92.2476545,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"4b987847-c31f-5153-bb2c-d9161dcbb481","name":"AVAIO Digital Leo (Project Leo) — planned AI-ready data center and power campus on 296 acres","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["AVAIO Digital Partners"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-29afcba86015feddd76b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-29afcba86015feddd76b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Arkansas GIS Office, FEATURESERVICES/Planning_Cadastre FeatureServer layer 6 PARCEL_POLYGON_CAMP"]},{"site_id":"vcc-site-deb5e46cd5360d8c29a3","name":"AVAIO Digital Project Hercules Data Center Campus (Appomattox Center for Business and Commerce)","country":"United States","country_iso_a2":"US","latitude":37.3723027,"longitude":-78.8577799,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"38079c3a-f388-570f-bb6c-dd6cdee44bf4","name":"ADP Appomattox Data Hub — proposed data center facilities (AVAIO Project Hercules, tax parcel 63 A 80)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Appomattox County, Virginia (Board of Supervisors; agenda and minutes portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-deb5e46cd5360d8c29a3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-deb5e46cd5360d8c29a3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Appomattox County, Virginia"]},{"site_id":"vcc-site-6727a9539ece2f19ad23","name":"AVAIO Digital Taurus Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.2593,"longitude":-90.0185,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"37e33657-b788-57e6-98f2-b78834cdecda","name":"AVAIO Digital Taurus Phase One Current Campus Build","status":"under_construction","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["AVAIO Digital Partners"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6727a9539ece2f19ad23/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6727a9539ece2f19ad23.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["AVAIO Digital Partners"]},{"site_id":"vcc-site-4e4c2705d8a781a28a23","name":"AWS ALE061 San Antonio Data Center Campus (Bitter Blue, 12807 Donop Road)","country":"United States","country_iso_a2":"US","latitude":29.2931197,"longitude":-98.3918489,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"2ad5981d-82c7-572f-b549-df76fdfe2fe0","name":"Bitter Blue Building 2 (TABS Building B) — new two-storey single-tenant data center (City of San Antonio permit COM-BLG-PMT26-40200489)","status":"permitted","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["City of San Antonio, Development Services Department (Open Data SA)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4e4c2705d8a781a28a23/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4e4c2705d8a781a28a23.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bexar Appraisal District data)"]},{"site_id":"vcc-site-0819a764e96ce06f14c6","name":"AWS Clinton data center (former Delphi plant)","country":"United States","country_iso_a2":"US","latitude":32.3583,"longitude":-90.3556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-06-09","oldest_status_as_of":"2026-06-09","project_count":1,"projects":[{"project_id":"2cb7333c-d029-5457-baf2-346f48e7fb26","name":"AWS Clinton data center (former Delphi plant)","status":"operational","status_as_of":"2026-06-09","search_terms":"Amazon is converting the former Delphi Packard plant in Clinton, Hinds County, into a data center. The governor announced the $1 billion project in April 2026 with about 100 jobs; Amazon says the plant closed in 2009 and then sat empty for years. At a June 2026 ribbon-cutting held to mark the investment, Amazon said this was its first full retrofit of an existing industrial building into a functioning data center, but it gave no in-service date or capacity. AWS says the site will use no water, and the mayor says day-to-day power will come from the grid. AWS Hinds County data center Amazon Web Services Hinds County Economic Development Authority City of Clinton Entergy Mississippi"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0819a764e96ce06f14c6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0819a764e96ce06f14c6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-04c2489b55d49bcb5ef5","name":"AWS Fayette County data center site","country":"United States","country_iso_a2":"US","latitude":39.56,"longitude":-83.45,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2024-12-24","oldest_status_as_of":"2024-12-24","project_count":1,"projects":[{"project_id":"b649f6b4-e5be-5d52-9b44-0273c14cbea3","name":"AWS Fayette County data center site","status":"announced","status_as_of":"2024-12-24","search_terms":"Amazon Web Services named Fayette County, Ohio, in December 2024 as the first new site in a $10 billion Ohio investment plan, estimating $5 billion for new data centers in the county. Amazon said its Ohio expansion could reach up to eight new sites by the end of 2030. It gave no address, power figure, job count or schedule for the Fayette County site. Amazon Web Services"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04c2489b55d49bcb5ef5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-04c2489b55d49bcb5ef5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Amazon"]},{"site_id":"vcc-site-6547aae0762f92e98a07","name":"AWS Lake Anna Technology Campus","country":"United States","country_iso_a2":"US","latitude":38.0606,"longitude":-77.7894,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"39753efd-ec90-5e1a-a234-8551ba238bda","name":"AWS Lake Anna Technology Campus","status":"under_construction","status_as_of":"2026-08-03","search_terms":"One of two Amazon Web Services campuses in Louisa County's Technology Overlay District, part of an $11 billion AWS plan for the county by 2040 announced in August 2023. The 153-acre campus at Kentucky Springs Road and Haley Drive, next to the North Anna nuclear station, is planned for seven standard data centers (about 1.7 million sq ft), two smaller specialty data centers and an administration building, with at least 420 MW of capacity fed by two 300 MW substations. Local reporting described permits issued and contractors preparing to break ground. Amazon in 2026 described a cooling water discharge permit for the site. LATC REB Investments site Amazon Web Services Clark Construction Rappahannock Electric Cooperative Dominion Energy Louisa County"}],"status_publishers":["County of Louisa, Virginia (Board of Supervisors)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6547aae0762f92e98a07/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6547aae0762f92e98a07.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lake Anna Life (Engage Louisa)"]},{"site_id":"vcc-site-6835cf832163c1403b4e","name":"AWS New Carlisle data center campus (Project Rainier)","country":"United States","country_iso_a2":"US","latitude":41.7006,"longitude":-86.4964,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-07-23","oldest_status_as_of":"2026-07-23","project_count":1,"projects":[{"project_id":"a5b2cd4f-b857-573e-82b8-6edc1e776eec","name":"AWS New Carlisle data center campus (Project Rainier)","status":"partially_operational","status_as_of":"2026-07-23","search_terms":"Amazon Web Services campus in the Indiana Enterprise Center near New Carlisle, St. Joseph County, announced in April 2024 as an $11 billion build over roughly a decade. It is one of the sites of Project Rainier, the Trainium2 cluster Anthropic uses to build and deploy Claude, which AWS activated in October 2025. Amazon's utility filings describe a 2,250 MW load. In July 2026 AWS said it had invested $13.8 billion, with about 18 of a planned 30 or so buildings running and construction continuing. Project Rainier AWS Indiana Enterprise Center campus Amazon Web Services Anthropic Indiana Michigan Power Indiana Economic Development Corporation"}],"status_publishers":["WNDU"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6835cf832163c1403b4e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6835cf832163c1403b4e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indiana Economic Development Corporation"]},{"site_id":"vcc-site-85a756f01eb0a66b0986","name":"AWS Northeast Creek Technology Campus (North Creek Technology Campus, Louisa County)","country":"United States","country_iso_a2":"US","latitude":37.9718646,"longitude":-77.9558255,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"5b4e503d-cb49-52f7-aa5e-3b149a27b979","name":"Northeast Creek Technology Campus 2 — proposed campus phase (major site plan SP20-2026, tax parcel 58-30)","status":"announced","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["County of Louisa, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85a756f01eb0a66b0986/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85a756f01eb0a66b0986.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Louisa, Virginia"]},{"site_id":"vcc-site-1f355d1f6aac8ed1e53f","name":"AWS PHX065 Data Center Campus (10464 E Pecos Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.2954401,"longitude":-111.6071195,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"4f149eef-81d8-587f-97ca-9f0da4f4ecd7","name":"AWS PHX065 — two single-storey data-centre buildings under construction (Mesa permits PMT24-15709 and PMT25-13554)","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f355d1f6aac8ed1e53f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f355d1f6aac8ed1e53f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-9b47e002ec40fe02a2d7","name":"AWS Richmond County data center campus","country":"United States","country_iso_a2":"US","latitude":35.0,"longitude":-79.76,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"3e853975-e7a4-52ba-bc38-6b3d09bfdaf0","name":"AWS Richmond County data center campus","status":"under_construction","status_as_of":"2026-09-23","search_terms":"Amazon Web Services campus in rural Richmond County, North Carolina, near the South Carolina line. Announced in June 2025 at an estimated $10 billion for cloud and AI infrastructure, with at least 500 jobs. The county approved 20-year cash grants tied to property taxes, contingent on job and investment targets. Amazon broke ground in October 2025, said in July 2026 that the campus would have 21 buildings, and has applied for an air permit for backup generators. County officials said water, wastewater and fiber upgrades would come at no cost to taxpayers. Amazon Web Services Richmond County"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b47e002ec40fe02a2d7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b47e002ec40fe02a2d7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC11 (The Associated Press)"]},{"site_id":"vcc-site-ab1cba1760d42b280cd1","name":"AWS Vicksburg data center campus","country":"United States","country_iso_a2":"US","latitude":32.3525,"longitude":-90.8775,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-09","oldest_status_as_of":"2026-04-09","project_count":1,"projects":[{"project_id":"077a5970-0684-5ef0-8320-65efbf78c960","name":"AWS Vicksburg data center campus","status":"announced","status_as_of":"2026-04-09","search_terms":"Amazon announced in November 2025 that it would spend at least $3 billion on a new data center campus in Vicksburg, Warren County, with at least 200 full-time jobs. Officials said construction would start in 2026 and the local mayor expected a five-to-seven-year build-out. Amazon said the campus will support AI and cloud computing. Entergy Mississippi agreed to meet its long-term power needs and is building a gas plant at the former Baxter Wilson site to serve the campus and other industrial projects. The April 2026 statewide update still listed it as planned. AWS Warren County data center campus Amazon Web Services Entergy Mississippi Warren County"}],"status_publishers":["Office of Governor Tate Reeves"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ab1cba1760d42b280cd1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-7b36022a26fba8770036","name":"Balico gas-powered data center campus, Pittsylvania County","country":"United States","country_iso_a2":"US","latitude":36.8256,"longitude":-79.3975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2025-04-16","oldest_status_as_of":"2025-04-16","project_count":1,"projects":[{"project_id":"908ba9ce-1e84-567b-926f-8d47d4d2a7ed","name":"Balico gas-powered data center campus, Pittsylvania County","status":"cancelled","status_as_of":"2025-04-16","search_terms":"Rejected plan by Herndon-based Balico for a data center campus with a 3,500 MW on-site natural gas power plant near Chatham in Pittsylvania County, Virginia. The first application, covering 47 parcels and about 2,233 acres with 84 data center buildings, was withdrawn in November 2024 after community meetings. A scaled-down version on about 750 acres with up to 12 buildings kept the 3,500 MW plant; the planning commission unanimously recommended denial in January 2025. On 15 April 2025 county supervisors refused Balico's request to withdraw it again and voted 6-1 against the rezoning, so a new filing had to wait a year. Balico data center campus Balico Chatham project Balico LLC Pittsylvania County Board of Supervisors"}],"status_publishers":["Cardinal News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b36022a26fba8770036/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7b36022a26fba8770036.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WDBJ7"]},{"site_id":"vcc-site-43a4fd4202a0c1c9518f","name":"Bitdeer and Geis Shalersville AI data center campus","country":"United States","country_iso_a2":"US","latitude":41.2456,"longitude":-81.2603,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"9ed96427-8138-552b-9f88-3b1fbeaa341b","name":"Bitdeer and Geis Shalersville AI data center campus","status":"proposed","status_as_of":"2026-10-07","search_terms":"Proposed 15-building AI data center campus by Bitdeer Technologies Group and Geis Development at the Turnpike Commerce Center, just north of the Ohio Turnpike in Shalersville Township, Portage County, Ohio. Plans made public in May 2026 start with two data halls of about 48,000 sq ft each plus an office building and 150 MW of initial power capacity, with a potential 750 MW at full build-out over about five years; construction was put at more than USD 300 million, excluding computing equipment. A township moratorium is in place, and on 6 October 2026 trustees required uses of 25 MW or more to sit on heavy industrial land, which the township lacks; Geis's lawyers threatened to sue. Turnpike Commerce Center data center Bitdeer Shalersville Bitdeer Technologies Group Geis Development Shalersville Holdings (Geis Companies) Shalersville Township"}],"status_publishers":["The Portager"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43a4fd4202a0c1c9518f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-43a4fd4202a0c1c9518f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["News 5 Cleveland (WEWS)"]},{"site_id":"vcc-site-4551992e6d4d1487d1ab","name":"Bitdeer Clarington data center site","country":"United States","country_iso_a2":"US","latitude":39.7728,"longitude":-80.8708,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"6799aac4-c4f8-5902-b8ae-2fffb6fa893d","name":"Bitdeer Clarington data center site","status":"announced","status_as_of":"2026-08-10","search_terms":"Bitdeer development site at Clarington, Monroe County, Ohio, with 570 MW of power under contract with an unnamed local utility. In October 2025 Bitdeer planned a bitcoin mining data center whose core infrastructure would be designed for easy conversion to AI, targeting substation energization in the first half of 2027. Through 2026 the site stayed in design and preparation: legal proceedings filed by neighboring company American Heavy Plate Solutions left the timing of power and construction uncertain, and Bitdeer's listed use for the site moved from HPC/AI in February 2026 to colocation and crypto mining by August 2026. Clarington, Ohio site Bitdeer Technologies Group"}],"status_publishers":["Bitdeer Technologies Group via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4551992e6d4d1487d1ab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4551992e6d4d1487d1ab.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group via SEC EDGAR"]},{"site_id":"vcc-site-6524649236861b8342aa","name":"Bitdeer Massillon Ohio Campus","country":"United States","country_iso_a2":"US","latitude":40.780446738591,"longitude":-81.522276076625,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"fb943def-5b5b-5192-8bb9-599e4cf616cc","name":"Bitdeer Massillon 2026 Fire-Damaged Buildings Reconstruction","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Bitdeer Technologies Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6524649236861b8342aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6524649236861b8342aa.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-755524c9fd6de6eed9f2","name":"Bitdeer Weathersfield (Niles) development site","country":"United States","country_iso_a2":"US","latitude":41.1783,"longitude":-80.7578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"b02620fe-58af-53a3-91fc-855e2454512c","name":"Bitdeer Weathersfield (Niles) development site","status":"announced","status_as_of":"2026-08-10","search_terms":"Bitdeer development site on 41.8 owned acres at the former Niles Generating Station, demolished in 2013, in Weathersfield, Ohio, near Niles. Bitdeer launched it in September 2025 as a 300 MW grid-interconnected power pipeline under an interconnection agreement with FirstEnergy, which first scheduled energization for Q1 2029. Bitdeer's Q2 2026 results, with data as of 31 July 2026, target energization in Q4 2028, cite a transmission line extension agreement with a local utility, and list planned usage as colocation and AI cloud; the site is still described as a development site. Bitdeer Niles Niles, Ohio site Bitdeer Technologies Group Bitdeer Technologies Group FirstEnergy"}],"status_publishers":["Bitdeer Technologies Group via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-755524c9fd6de6eed9f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-755524c9fd6de6eed9f2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group via SEC EDGAR"]},{"site_id":"vcc-site-4ac69f22d359cc462f5b","name":"Bitdeer Wenatchee Washington Campus","country":"United States","country_iso_a2":"US","latitude":47.413902371239,"longitude":-120.209264185842,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"484cf452-3a8f-5574-8003-a5b3f693c5d2","name":"Bitdeer Wenatchee 2026 AI Conversion Site Preparation","status":"site_preparation","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Bitdeer Technologies Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4ac69f22d359cc462f5b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4ac69f22d359cc462f5b.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-7d81f7c3c7482975b0d3","name":"Bogle Drive Data Center Facility (Chantilly, Fairfax County)","country":"United States","country_iso_a2":"US","latitude":38.8948573,"longitude":-77.4631345,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-21","oldest_status_as_of":"2026-08-21","project_count":1,"projects":[{"project_id":"297794f6-b723-5e37-b98e-ebd64488cd8d","name":"Bogle Drive Data Center Facility — two two-storey data centre buildings (site plan SP-2024-00038, 14901 Bogle Dr)","status":"permitted","status_as_of":"2026-08-21","search_terms":""}],"status_publishers":["Fairfax County, Virginia (Land Development Services / Department of Information Technology GIS)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7d81f7c3c7482975b0d3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7d81f7c3c7482975b0d3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fairfax County, Virginia"]},{"site_id":"vcc-site-09f1a555b5c0fa48e739","name":"Borden Data Center, 11484 US Highway 180, Gail (Borden County)","country":"United States","country_iso_a2":"US","latitude":32.7695189,"longitude":-101.5469022,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"21bf5049-02a2-5d15-bcd0-24bc4f831cd8","name":"Borden Data Center — proposed commercial data centre with on-site power generation (TCEQ air permit 185712 pending)","status":"announced","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-09f1a555b5c0fa48e739/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-09f1a555b5c0fa48e739.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points (Borden County 9-1-1 data, source CSEC)"]},{"site_id":"vcc-site-579777eea0bb5aad46eb","name":"Carbon Node East Data Center Campus (Nesquehoning)","country":"United States","country_iso_a2":"US","latitude":40.85644581193348,"longitude":-75.86664563328729,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"b71f1891-ecd8-5578-bd16-5e69e309257f","name":"Carbon Node East Data Center Campus (Nesquehoning) — proposed campus","status":"announced","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["Pennsylvania Department of Environmental Protection"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-579777eea0bb5aad46eb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-579777eea0bb5aad46eb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Carbon County GIS"]},{"site_id":"vcc-site-265ff643497c82472bb3","name":"Chirisa Chesterfield Campus","country":"United States","country_iso_a2":"US","latitude":37.356171271028536,"longitude":-77.33425619418317,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"0b67b532-d779-5784-bd6d-d7ee124844aa","name":"Chirisa Chesterfield Digital Drive Current Build","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Chesterfield County"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-265ff643497c82472bb3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-265ff643497c82472bb3.json","geometry_licenses":["CC0-1.0","all-rights-reserved","no-open-document-redistribution-license-asserted"],"geometry_attributions":["Chesterfield County GIS","Data retrieved from Chesterfield County GIS Data Catalog.","Esri"]},{"site_id":"vcc-site-ad9a83cc2040a19f7750","name":"Cipher Barber Lake data center","country":"United States","country_iso_a2":"US","latitude":32.3961,"longitude":-100.8622,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"8fc14c03-d70a-5634-81e4-883a2fd6eec9","name":"Cipher Barber Lake data center","status":"under_construction","status_as_of":"2026-09-25","search_terms":"AI hosting data center under construction by Cipher Mining, since renamed Cipher Digital, at its Barber Lake site in Colorado City, Texas. In September 2025 Fluidstack leased 168 MW of critical IT load, supported by up to 244 MW of gross capacity, for an initial 10 years; Google backstopped $1.4 billion of Fluidstack's lease obligations and received warrants in Cipher. In September 2026 the lease was extended to 20 years, backed by an added 10-year commitment from an unnamed AI lab, lifting contracted revenue to more than $9 billion. The tenant had begun partial occupancy by August 2026, and data halls are due from the fourth quarter of 2026 through the first quarter of 2027. Barber Lake Cipher Digital (formerly Cipher Mining) Fluidstack"}],"status_publishers":["Cipher Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ad9a83cc2040a19f7750/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ad9a83cc2040a19f7750.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Cipher Mining"]},{"site_id":"vcc-site-6bedc032f2f6fb914715","name":"Cipher Digital Black Pearl Wink Data Center Campus","country":"United States","country_iso_a2":"US","latitude":31.6913247,"longitude":-103.0669994,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"ade90a9a-b55b-503e-a8b9-d2f8340a81d6","name":"Cipher Black Pearl data center","status":"partially_operational","status_as_of":"2026-08-04","search_terms":"Cipher Digital (formerly Cipher Mining) facility on about 75 company-owned acres near Wink, Texas, with 300 MW of approved ERCOT interconnection. Cipher began bitcoin mining there in June 2025, signed a 15-year lease with Amazon Web Services for about 300 gross MW of turnkey data center capacity, which it valued at about USD 5.5 billion, and stopped mining in February 2026. Cipher said it delivered the first data center capacity and rent began in August 2026, two months ahead of the original schedule, while the remaining phase I halls were in fit-out and phase II was still being built. Black Pearl Facility Black Pearl campus Cipher Digital (formerly Cipher Mining) Cipher Digital (formerly Cipher Mining) Amazon Web Services Quanta Services"},{"project_id":"f595ca9f-e584-5dcb-bf76-38b346f6e4aa","name":"Cipher Digital Black Pearl Phase II Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Cipher Digital Inc.","Cipher Digital Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bedc032f2f6fb914715/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bedc032f2f6fb914715.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC"]},{"site_id":"vcc-site-bdf4718cb174c2faaaf4","name":"Cipher Digital Stingray Andrews Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.3720672,"longitude":-102.9824436,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":1,"projects":[{"project_id":"fa44cb24-5185-5616-a6a2-3977f190001f","name":"Cipher Digital Stingray Data Center Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Cipher Digital Inc."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bdf4718cb174c2faaaf4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bdf4718cb174c2faaaf4.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC"]},{"site_id":"vcc-site-d38e747e407b815bd5e0","name":"Cologix Ashburn Data Centers (ASH1 and ASH2, Beaumeade Circle)","country":"United States","country_iso_a2":"US","latitude":39.0185075,"longitude":-77.4588976,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"c79a6dd9-5210-502b-901d-88cf8f9f7dce","name":"Cologix ASH2 — two-storey data centre under construction (21673 Beaumeade Circle)","status":"under_construction","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d38e747e407b815bd5e0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d38e747e407b815bd5e0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-1c1b9d6298cce00eb24d","name":"Cologix JAX1 Data Center (421 West Church Street, Jacksonville)","country":"United States","country_iso_a2":"US","latitude":30.3314574,"longitude":-81.6624451,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"eb6bca44-2db9-506e-a223-eee674fa431a","name":"Cologix JAX1 — existing data-centre and meet-me-room operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1c1b9d6298cce00eb24d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1c1b9d6298cce00eb24d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Florida Department of Revenue Property Tax Oversight; Duval County Property Appraiser; Florida Geographic Information Office"]},{"site_id":"vcc-site-f831f9e45eca4caf4a67","name":"Cologix JAX2 Data Center (4800 Spring Park Road, Jacksonville)","country":"United States","country_iso_a2":"US","latitude":30.2731897,"longitude":-81.613832,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"681b9f58-2183-5dfa-a7db-abc55c98ac70","name":"Cologix JAX2 — existing data-centre operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f831f9e45eca4caf4a67/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f831f9e45eca4caf4a67.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Florida Department of Revenue Property Tax Oversight; Duval County Property Appraiser; Florida Geographic Information Office"]},{"site_id":"vcc-site-7f2e4f6e487f73dc8a39","name":"Colovore Alliance Data Center (Fort Worth)","country":"United States","country_iso_a2":"US","latitude":32.9992394,"longitude":-97.2963204,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"3bb8a866-915c-56ac-9968-1b6774ad25af","name":"Colovore Alliance Data Center — planned building","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7f2e4f6e487f73dc8a39/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7f2e4f6e487f73dc8a39.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Denton Central Appraisal District data)"]},{"site_id":"vcc-site-7821451336d29c28c9c9","name":"Colovore Hutto Data Center","country":"United States","country_iso_a2":"US","latitude":30.5409106,"longitude":-97.5721722,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"26d74e69-10b3-5760-bd22-8e8d94402038","name":"Colovore Hutto Data Center — planned building","status":"announced","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7821451336d29c28c9c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7821451336d29c28c9c9.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Williamson Central Appraisal District data)"]},{"site_id":"vcc-site-3d19adbe27ca545ec17c","name":"Colovore RNO01 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.531425,"longitude":-119.480936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":2,"projects":[{"project_id":"fc372246-e7bd-5e93-8d6a-8558b2eda0ba","name":"Colovore RNO01 — first data center","status":"operational","status_as_of":"2026-09-09","search_terms":""},{"project_id":"1547c04d-5e1f-52ef-a9a7-fd3690e6aedf","name":"Colovore RNO01 — second data center","status":"under_construction","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["Colovore"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d19adbe27ca545ec17c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d19adbe27ca545ec17c.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Nevada Division of State Lands; Nevada Department of Transportation GIS"]},{"site_id":"vcc-site-c189870f4e5549026f3e","name":"Colovore Santa Clara Campus (SJC01, 1101 Space Park Drive, and SJC02, 3060 Raymond Street)","country":"United States","country_iso_a2":"US","latitude":37.3769953,"longitude":-121.9531841,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"e539178f-a47a-55ae-a22e-6efd3e20305e","name":"Colovore SJC01 and SJC02 — existing data-centre operations","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Colovore"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c189870f4e5549026f3e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c189870f4e5549026f3e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-0970d3d992e7ad717052","name":"Compass Datacenters CLT I Campus, 255 Stamey Farm Road, Statesville","country":"United States","country_iso_a2":"US","latitude":35.7727081,"longitude":-80.9765028,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"6dcfaf41-0790-56fa-98f7-32474a8ff23d","name":"Compass Datacenters CLT I — proposed greenfield data-center facility (NC DAQ air-permit application 4900350.26A)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["North Carolina Department of Environmental Quality, Division of Air Quality"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0970d3d992e7ad717052/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0970d3d992e7ad717052.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Iredell County, North Carolina"]},{"site_id":"vcc-site-5530a2d607e4a2cef4c8","name":"Compass Datacenters DFW III Campus (Red Oak)","country":"United States","country_iso_a2":"US","latitude":32.542656,"longitude":-96.7960695,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":3,"projects":[{"project_id":"014445ce-306f-5eec-ad38-52a0fd9d5d7f","name":"Compass DFW III Building 10 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""},{"project_id":"62a1819d-ff21-5f33-9f5d-9854e0f3a9ae","name":"Compass DFW III Building 8 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""},{"project_id":"26e9a9ec-ff08-5906-a61a-6033643fdee2","name":"Compass DFW III Building 9 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5530a2d607e4a2cef4c8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5530a2d607e4a2cef4c8.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ellis Appraisal District and Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-b2e02b9541ac2f2a5b20","name":"Compass Datacenters Hoffman Estates campus","country":"United States","country_iso_a2":"US","latitude":42.0639,"longitude":-88.1469,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a1696719-0fe3-52ce-ad37-43e6d2215f4f","name":"Compass Datacenters Hoffman Estates campus","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Compass Datacenters is redeveloping the former Sears headquarters site, nearly 200 acres in Hoffman Estates about 30 miles west of Chicago, into a hyperscale campus of five data centers. Compass closed on the site in September 2023 and held a kickoff in June 2024, saying demolition of the old Sears buildings would start that summer and data center construction would follow in 2025. Compass put local investment at about USD 10 billion once operational, a figure the village mayor called preliminary, and its markets page lists the campus at 200 MW. In October 2026 Compass still described the campus as being developed. Compass Chicago campus Former Sears headquarters data center campus Compass Datacenters ComEd Village of Hoffman Estates"}],"status_publishers":["Village of Hoffman Estates, Illinois"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2e02b9541ac2f2a5b20/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2e02b9541ac2f2a5b20.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Compass Datacenters"]},{"site_id":"vcc-site-4c3f2c7b887170cea7c1","name":"Compass Datacenters Meridian campus","country":"United States","country_iso_a2":"US","latitude":32.3747,"longitude":-88.7042,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"2b520cfa-8aea-5212-9b60-8ff417ee6578","name":"Compass Datacenters Meridian campus","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Compass Datacenters is developing a single-tenant hyperscale campus of eight data centers in the Meridian I-20/59 Industrial Park in Meridian, Lauderdale County, Mississippi. Announced in January 2025 with Governor Tate Reeves, the project is valued at USD 10 billion at full fit-out including tenant IT equipment and is to be built over about eight years. Mississippi Power will supply about 500 MW and invested in a substation for the park, while the state granted tax exemptions and site support. Compass's market page now describes Meridian as a 320 MW site that broke ground in 2025. Compass Lauderdale County campus Compass Datacenters Mississippi Power Mississippi Development Authority Lauderdale County"}],"status_publishers":["Compass Datacenters"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c3f2c7b887170cea7c1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c3f2c7b887170cea7c1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Compass Datacenters"]},{"site_id":"vcc-site-5ca8a42664b78d955330","name":"Compass Datacenters PHX2 El Mirage Campus (12500 W Joe R Ramirez Rd, El Mirage, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.5767859,"longitude":-112.3296651,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"38e0487a-5298-5e09-a545-539b6a096455","name":"Compass El Mirage (PHX2) — 108 MW data-centre campus under development","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Compass Datacenters"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5ca8a42664b78d955330/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5ca8a42664b78d955330.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor's Office"]},{"site_id":"vcc-site-dadea001f97aa8058f7a","name":"Core Scientific Denton data center (CoreWeave)","country":"United States","country_iso_a2":"US","latitude":33.2164,"longitude":-97.1292,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c62aed61-a87f-57ab-b1a4-76d1867f73b9","name":"Core Scientific Denton data center (CoreWeave)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Core Scientific campus at 8171 Jim Christal Road in Denton, Texas, with 394 MW of gross utility power capacity from Denton Municipal Electric, being fitted out as high-density colocation for CoreWeave as Core Scientific converts its facilities from digital asset mining to HPC colocation. A February 2025 expansion added 70 MW of contracted power and raised CoreWeave's critical IT load at the site to about 260 MW, adding $1.2 billion of contracted revenue. The campus covers 78 acres, and Core Scientific says it is expected to host one of North America's largest supercomputers. Denton 1 Core Scientific Core Scientific CoreWeave Denton Municipal Electric"}],"status_publishers":["Core Scientific"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dadea001f97aa8058f7a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dadea001f97aa8058f7a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["U.S. Securities and Exchange Commission (Core Scientific filing)"]},{"site_id":"vcc-site-684f1565a0f48756e238","name":"Core Scientific Hunt County data center site","country":"United States","country_iso_a2":"US","latitude":33.12,"longitude":-96.09,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"40abc164-3033-5172-b386-52422d1513b9","name":"Core Scientific Hunt County data center site","status":"announced","status_as_of":"2026-07-28","search_terms":"Greenfield data center site in Hunt County, Texas, that Core Scientific bought in 2026 for about USD 233 million, with land and power expected to support about 430 MW of gross utility capacity on an approved ERCOT interconnection ramp schedule. In July 2026 Core Scientific listed it as an AMD site with about 110 MW leased under AMD's 15-year agreements, which cover roughly 530 MW across five Core Scientific sites, and estimated initial delivery in the first half of 2028. Hunt County, TX campus Core Scientific Core Scientific AMD"}],"status_publishers":["Core Scientific, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-684f1565a0f48756e238/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-684f1565a0f48756e238.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Core Scientific"]},{"site_id":"vcc-site-bf829ea21a9d7386fb5f","name":"Core Scientific Muskogee data center campus","country":"United States","country_iso_a2":"US","latitude":35.7433,"longitude":-95.3567,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"d87a919b-df32-53fa-bc01-47b7f6f1dce9","name":"Core Scientific Muskogee data center campus","status":"partially_operational","status_as_of":"2026-07-28","search_terms":"Core Scientific high-density colocation campus at 1525 West 43rd Street South in Muskogee, Oklahoma, served by Oklahoma Gas & Electric. A 70 MW building designed for Nvidia GB300 systems is leased to CoreWeave and was billing by mid-July 2026, and a second building of about 82 MW, now leased to AMD, is under construction for delivery from the second half of 2027. In May 2026 Core Scientific announced plans to grow the campus to about 1.5 GW of gross power, about 1.0 GW leasable, on about 250 acres, and in August 2026 it closed the purchase of Polaris DS, which holds about 440 MW of in-service OG&E grid capacity. Muskogee 1 Core Scientific Core Scientific CoreWeave AMD Oklahoma Gas & Electric"}],"status_publishers":["Core Scientific"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf829ea21a9d7386fb5f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf829ea21a9d7386fb5f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Core Scientific"]},{"site_id":"vcc-site-779f30ba676706e8e5db","name":"Core Scientific Pecos Cottonwood Campus","country":"United States","country_iso_a2":"US","latitude":31.5341897,"longitude":-103.8026586,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","under_construction"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-06-02","project_count":2,"projects":[{"project_id":"8ce04eb2-b1ed-5375-a685-122f79fc2ee6","name":"Core Scientific Pecos data center campus","status":"announced","status_as_of":"2026-07-28","search_terms":"Core Scientific campus on FM 2119 in Pecos, Texas, in the Permian Basin, listed with 300 MW of gross utility power from Texas-New Mexico Power and a 100-acre footprint. In spring 2026 Core Scientific announced a plan to scale Pecos to about 1.5 GW of gross power; trade press says the plan repurposes existing bitcoin mining infrastructure. In July 2026 its earnings presentation listed AMD as tenant of about 185 MW at Pecos, part of roughly 530 MW of 15-year AMD leases across five sites, with initial delivery expected in the first half of 2027. Cottonwood 1 & 2 Pecos, Texas Data Center Core Scientific Core Scientific AMD Texas-New Mexico Power"},{"project_id":"709cd37b-7f3a-5313-b3e2-a18ddc0885ec","name":"Core Scientific Pecos Initial HDC Current Build","status":"under_construction","status_as_of":"2026-06-02","search_terms":""}],"status_publishers":["Adam Sullivan, Core Scientific CEO, on LinkedIn","Core Scientific"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-779f30ba676706e8e5db/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-779f30ba676706e8e5db.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-e41279afe75118ffe083","name":"CoreSite DA1 Irving","country":"United States","country_iso_a2":"US","latitude":32.8331599,"longitude":-96.905188,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"b18029a8-85f3-540a-b255-55f658d4cbfa","name":"CoreSite DA1 — data center base building","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e41279afe75118ffe083/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e41279afe75118ffe083.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-782c0112e90a5282be53","name":"CoreSite DE3 Race Street Campus","country":"United States","country_iso_a2":"US","latitude":39.78611497442305,"longitude":-104.962772152554,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"65e8849e-2ebe-5d58-be63-299cbbcf8d23","name":"CoreSite DE3","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["CoreSite"],"power_observations":[{"project_id":"65e8849e-2ebe-5d58-be63-299cbbcf8d23","metric":"critical_it_mw","stage":"planned","low":18.0,"base":18.0,"high":18.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-782c0112e90a5282be53/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-782c0112e90a5282be53.json","geometry_licenses":["CC-BY-3.0"],"geometry_attributions":["City and County of Denver"]},{"site_id":"vcc-site-7ceb4cfa4ba358ea4547","name":"CoreWeave Kenilworth NEST 11 AI data center","country":"United States","country_iso_a2":"US","latitude":40.6781,"longitude":-74.2881,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"35995588-0599-5f9b-bc3d-29f9f67ea81b","name":"CoreWeave Kenilworth NEST 11 AI data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"CoreWeave is converting a 1982 pharmaceutical research building (11 NEST) on the former Merck campus, now the Northeast Science and Technology Center on Galloping Hill Road in Kenilworth, New Jersey, into an AI data center. It leased the building in October 2024, bought it with 27 adjacent acres for 322 million US dollars in August 2025, and started construction in September 2025. In November 2025 the state EDA approved a 250 million US dollar tax credit for the roughly 1.76 billion US dollar project, reported at 250 MW. CoreWeave's own site page lists 40 MW of planned load. Opening is targeted for early 2027 amid growing local opposition. Kenilworth NEST 11 CoreWeave Kenilworth AI Data Center CoreWeave CoreWeave PSE&G New Jersey Economic Development Authority"}],"status_publishers":["CoreWeave"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ceb4cfa4ba358ea4547/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7ceb4cfa4ba358ea4547.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Real Estate NJ"]},{"site_id":"vcc-site-9b9b5ef71cedda52fd47","name":"CoreWeave/Chirisa Lancaster Greenfield Road Campus","country":"United States","country_iso_a2":"US","latitude":40.048690947149,"longitude":-76.25609093817,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"b75695b9-38e3-58ec-baf2-039179ab353a","name":"CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project","status":"under_construction","status_as_of":"2026-07-22","search_terms":"AI data center development in Lancaster, Pennsylvania, on former LSC Communications printing plant sites, co-developed by Chirisa Technology Parks and Machine Investment Group with CoreWeave as tenant. In July 2025 CoreWeave said it intended to commit about 6 billion US dollars to equip an initial 100 MW facility expandable to 300 MW. Phase one reuses the plant at 216 Greenfield Road and was under construction by October 2025, targeting summer 2027. A new-build phase two of about 735,000 sq ft needed city land development approval; a site at 1375 Harrisburg Pike is also planned. A 4 billion US dollar joint venture with Blue Owl funds the campus. Lancaster AI Hub Lancaster East data center Chirisa Technology Parks Machine Investment Group Machine Investment Group Blue Owl Capital CoreWeave CoreWeave PPL"}],"status_publishers":["Chirisa Technology Parks"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b9b5ef71cedda52fd47.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-0de0d46344f06fb773f2","name":"Cross Mill Center Data Center Site (Sycolin Road, south of Leesburg, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0629388,"longitude":-77.5504577,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"fea4b0c1-1d08-5b31-85f2-c2929ccc1efa","name":"Cross Mill Center — two proposed data center buildings (site plan EPLAN-2026-0140)","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0de0d46344f06fb773f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0de0d46344f06fb773f2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-c520ff5af3bcfa254443","name":"Crossroads Technology Campus (Mills Drive / Eagle Drive, Spotsylvania County)","country":"United States","country_iso_a2":"US","latitude":38.2333408,"longitude":-77.4507297,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"5d4c9287-5ace-5e89-8313-f1824d5dd822","name":"Crossroads Technology Campus — proposed seven-building data center campus (special use permit SUP26-0003)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c520ff5af3bcfa254443/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c520ff5af3bcfa254443.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Spotsylvania County, Virginia"]},{"site_id":"vcc-site-9f7647940a58e048e38f","name":"Crusoe Abilene AI factory campus for Microsoft","country":"United States","country_iso_a2":"US","latitude":32.45,"longitude":-99.75,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"31ee01b0-a72b-5f4a-bcc1-a13a53732efc","name":"Crusoe Abilene AI factory campus for Microsoft","status":"under_construction","status_as_of":"2026-07-15","search_terms":"Crusoe's second AI campus in Abilene, Texas, on Lancium-owned land adjacent to its first Abilene campus, announced in March 2026 to support large-scale AI workloads for Microsoft. The 900 MW site has two buildings, each designed for 336 MW of critical IT load, a 900 MW behind-the-meter on-site power plant paired with medium-voltage battery storage, and closed-loop, non-evaporative liquid cooling. Land clearing and site preparation were under way at announcement, Crusoe said in July 2026 that it was building the campus, and the first building is expected to be energized in mid-2027. Crusoe Abilene second campus Abilene 900 MW campus Crusoe Microsoft Lancium"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9f7647940a58e048e38f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9f7647940a58e048e38f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Crusoe"]},{"site_id":"vcc-site-5cc5c2b2cb554d5a3255","name":"Crusoe and Lancium Childress AI data center campus","country":"United States","country_iso_a2":"US","latitude":34.4281,"longitude":-100.215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"715ba9aa-f36a-5afb-b266-caeb7681b54e","name":"Crusoe and Lancium Childress AI data center campus","status":"announced","status_as_of":"2026-07-15","search_terms":"Crusoe and Lancium announced in July 2026 a grid-connected AI data center campus of 1.0 GW on 270 acres owned by Lancium in Childress, Texas, repeating the partnership model used at Abilene. Lancium owns the land, secures the interconnection and develops the energy infrastructure, including behind-the-meter solar and storage; Crusoe designs, builds and operates the data center for an unnamed hyperscale technology company. Construction was expected to start in the third quarter of 2026, using closed-loop liquid cooling. Childress County Clean Campus Crusoe Crusoe Lancium"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5cc5c2b2cb554d5a3255/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5cc5c2b2cb554d5a3255.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Crusoe"]},{"site_id":"vcc-site-f6a2889114e99d84b372","name":"Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)","country":"United States","country_iso_a2":"US","latitude":41.2737,"longitude":-104.7268,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["permitted"],"newest_status_as_of":"2026-07-08","oldest_status_as_of":"2026-07-08","project_count":1,"projects":[{"project_id":"7a05f519-bf3a-5423-bd7f-fcb8e1cd6c0f","name":"Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)","status":"permitted","status_as_of":"2026-07-08","search_terms":"Crusoe and Tallgrass announced in July 2025 an AI data center campus in southeast Wyoming, starting at 1.8 GW and designed to scale to 10 GW, powered mainly by natural gas from Tallgrass's Wyoming assets and sited near Tallgrass's CO2 sequestration hub. Analyst Cleanview identifies it as Project Jade in Laramie County outside Cheyenne and reports a 900 MW fuel cell air permit application, county approval of the Switchgrass Industrial Park, unanimous site plan approval in January 2026, and phase 1 on-site generation since raised to 2.7 GW. Cleanview gives targets of early 2026 for construction and Q2 2027 for first energization. No tenant has been named. Project Jade Crusoe Wyoming campus Crusoe Tallgrass American Electric Power"}],"status_publishers":["Laramie County, Wyoming (Board of County Commissioners)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6a2889114e99d84b372/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6a2889114e99d84b372.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Tallgrass"]},{"site_id":"vcc-site-d5d70748e492c5e2278a","name":"CyrusOne Aurora Diehl Road Campus","country":"United States","country_iso_a2":"US","latitude":41.798071182484,"longitude":-88.243410186001,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"cf028790-cea6-555d-a3bb-48e08ff78f3b","name":"CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit","status":"completed","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d5d70748e492c5e2278a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d5d70748e492c5e2278a.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-119a6992bb6bb25cc011","name":"CyrusOne Bosque County data center campus (Thad Hill)","country":"United States","country_iso_a2":"US","latitude":31.9,"longitude":-97.63,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-11-03","oldest_status_as_of":"2025-11-03","project_count":1,"projects":[{"project_id":"79276528-66df-572a-8baf-0afce2bb01e4","name":"CyrusOne Bosque County data center campus (Thad Hill)","status":"under_construction","status_as_of":"2025-11-03","search_terms":"Hyperscale data center campus that CyrusOne is building next to Calpine's Thad Hill Energy Center in Bosque County, Texas, under a powered land agreement covering power, grid connection and land. Calpine announced a 190 MW first phase in July 2025, when the project was reported as a USD 1.2 billion investment, and added 210 MW in November 2025 for 400 MW in total. Calpine then said the facility was under construction for operation by the fourth quarter of 2026. CyrusOne's campus page now lists five buildings in two phases, with phase 1 due by the third quarter of 2027 and all phases by the fourth quarter of 2027. CyrusOne DFW10 Bosque County Data Center Thad Hill Energy Center data center CyrusOne CyrusOne Calpine"}],"status_publishers":["Calpine"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-119a6992bb6bb25cc011/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-119a6992bb6bb25cc011.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["American Public Power Association"]},{"site_id":"vcc-site-21ab745e53a2c9233b3f","name":"CyrusOne Fort Worth Campus (DFW7 and DFW8, Asphalt Drive)","country":"United States","country_iso_a2":"US","latitude":32.9006121,"longitude":-97.3898983,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"5a51a37a-28cd-5e9e-b75d-400711c28627","name":"CyrusOne DFW8 interior fit-out (data halls and generator yard)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-21ab745e53a2c9233b3f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-21ab745e53a2c9233b3f.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Tarrant Appraisal District data)"]},{"site_id":"vcc-site-4776103546341c240223","name":"CyrusOne Freestone County data center campus","country":"United States","country_iso_a2":"US","latitude":31.7183,"longitude":-96.1697,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a5618437-38a6-5fd0-a340-56ab10f1e97b","name":"CyrusOne Freestone County data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Multiphase data center campus planned by CyrusOne next to Calpine's Freestone Energy Center in Freestone County, Texas, about 80 miles southeast of Dallas near Fairfield. In February 2026 Calpine, by then part of Constellation, signed a 380 MW agreement providing power, grid connectivity and site infrastructure, plus an exclusive agreement to serve a second 380 MW phase. CyrusOne's campus page lists the project as in development and still awaiting county approval, with more than USD 500 million of investment across phases, power from both the grid and on-site generation, and closed-loop cooling. Freestone County Data Center Freestone Energy Center data center CyrusOne Calpine"}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4776103546341c240223/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4776103546341c240223.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CyrusOne"]},{"site_id":"vcc-site-cf70f4b9add26d9ba26a","name":"CyrusOne Mesa PHX20 Data Center Campus (3255 S 96th St, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3557214,"longitude":-111.6228473,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"f0d20481-63ea-55dd-9ca7-cebf2f4def68","name":"CyrusOne Mesa PHX20 — Shell Building 1, two-storey 243,332 sq ft data hall building under construction (Mesa permit PMT25-13240)","status":"under_construction","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cf70f4b9add26d9ba26a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cf70f4b9add26d9ba26a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-72215030ee46f7977c35","name":"CyrusOne Yorkville Technology Campus","country":"United States","country_iso_a2":"US","latitude":41.67716859169509,"longitude":-88.48222230060607,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"eaea9fff-9fd3-506f-a490-320f64d86dc3","name":"CyrusOne Yorkville Current Site Work","status":"site_preparation","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72215030ee46f7977c35/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72215030ee46f7977c35.json","geometry_licenses":["county-public-gis-fact-extraction-only"],"geometry_attributions":["Kendall County GIS"]},{"site_id":"vcc-site-9621cf551283f98bcd19","name":"DataBank Ashburn Campus (IAD1, IAD3 and IAD4, Red Rum Drive)","country":"United States","country_iso_a2":"US","latitude":39.0165204,"longitude":-77.4821506,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"4e5b5848-9f73-544e-93c0-3de662895673","name":"DataBank Ashburn Campus — existing IAD1 and IAD3 data-centre operations","status":"operational","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9621cf551283f98bcd19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9621cf551283f98bcd19.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-af76a0cab4321a3114ec","name":"DataBank ATL1 Midtown Atlanta (Coda, 760 West Peachtree Street)","country":"United States","country_iso_a2":"US","latitude":33.775481513,"longitude":-84.38775882,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-26","oldest_status_as_of":"2026-09-26","project_count":1,"projects":[{"project_id":"a6a5d4da-ea06-58ef-bd68-fafa2762f626","name":"DataBank ATL1 — existing Midtown Atlanta data-centre operations","status":"operational","status_as_of":"2026-09-26","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af76a0cab4321a3114ec/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af76a0cab4321a3114ec.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-f0b8b7f1e16f3d11eb7a","name":"DataBank Atlanta West End Complex (ATL2 and ATL3, White Street SW)","country":"United States","country_iso_a2":"US","latitude":33.7341341,"longitude":-84.425927,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"cf23693c-99f9-5353-9aa6-4f2bff324fe8","name":"DataBank ATL2 and ATL3 — existing West End data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f0b8b7f1e16f3d11eb7a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f0b8b7f1e16f3d11eb7a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-9db8ce819a3ab5f33a6f","name":"DataBank Centennial Campus (Centennial, Colorado)","country":"United States","country_iso_a2":"US","latitude":39.5908126,"longitude":-104.8469456,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-27","oldest_status_as_of":"2026-09-27","project_count":1,"projects":[{"project_id":"d997e0c0-4c8e-5e1d-9c10-ba8b0d50b8cb","name":"DataBank Centennial Campus — existing DEN2 and DEN5 data-centre operations","status":"operational","status_as_of":"2026-09-27","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9db8ce819a3ab5f33a6f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9db8ce819a3ab5f33a6f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-bc692da62a6f8f326b7d","name":"DataBank DEN1 Englewood Data Center (393 Inverness Parkway)","country":"United States","country_iso_a2":"US","latitude":39.5640232,"longitude":-104.8665716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"04f79b5a-e5fd-59f0-9abe-74a0428c5891","name":"DataBank DEN1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bc692da62a6f8f326b7d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bc692da62a6f8f326b7d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-187ee66b58718aeb9633","name":"DataBank DEN3 Downtown Denver Data Center (1500 Champa Street)","country":"United States","country_iso_a2":"US","latitude":39.7457609,"longitude":-104.9944018,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"c747338c-1512-5adf-92dc-bb6b49c0b0de","name":"DataBank DEN3 — existing carrier-hotel data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-187ee66b58718aeb9633/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-187ee66b58718aeb9633.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-9baf932720ede1abab4a","name":"DataBank DEN4 Westminster Data Center (7579 W. 103rd Avenue)","country":"United States","country_iso_a2":"US","latitude":39.884557,"longitude":-105.0803133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"0f38059a-8dd4-537d-b4a3-71ac9b3c1f4a","name":"DataBank DEN4 — existing edge colocation data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9baf932720ede1abab4a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9baf932720ede1abab4a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; Jefferson County source data"]},{"site_id":"vcc-site-77d8a26c721e8f4fbc69","name":"DataBank Granite Point Campus (Bluffdale, Utah)","country":"United States","country_iso_a2":"US","latitude":40.4803793,"longitude":-111.9053312,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-26","oldest_status_as_of":"2026-09-26","project_count":1,"projects":[{"project_id":"f58ddab9-5f4e-5bd7-9c02-2f6487b4718d","name":"DataBank Granite Point Campus — existing SLC2–SLC6 data-centre operations","status":"operational","status_as_of":"2026-09-26","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77d8a26c721e8f4fbc69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77d8a26c721e8f4fbc69.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-b8c4e3db81b026f4e42c","name":"DataBank LAS1 Las Vegas Data Center (7185 Pollock Drive)","country":"United States","country_iso_a2":"US","latitude":36.0597824,"longitude":-115.1472861,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"53737920-2d47-5535-b321-6820471017bd","name":"DataBank LAS1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b8c4e3db81b026f4e42c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b8c4e3db81b026f4e42c.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-e45c459adff2c9da2ec5","name":"DataBank Lithia Springs Campus (ATL5 and ATL6, 4764 Bakers Ferry Rd SW, South Fulton)","country":"United States","country_iso_a2":"US","latitude":33.7426011,"longitude":-84.5383195,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"29a845f4-112d-500b-85ca-b786282e0d1a","name":"DataBank Lithia Springs Campus — ATL5 and ATL6 campus under construction","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e45c459adff2c9da2ec5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e45c459adff2c9da2ec5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-57d107faa5247458cea1","name":"DataBank MSP2 East Twin Cities Data Center (3255 Neil Armstrong Blvd, Eagan, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.8385707,"longitude":-93.145692,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"866630e0-257c-5936-8fa6-226de93a1936","name":"DataBank MSP2 — existing data-centre and carrier-hotel operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["DataBank"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-57d107faa5247458cea1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-57d107faa5247458cea1.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-e172e840f11c02402a49","name":"DataBank Orangeburg Campus (LGA3 and LGA4, 2000 Corporate Drive, Orangetown)","country":"United States","country_iso_a2":"US","latitude":41.0389044,"longitude":-73.9892114,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-09-01","project_count":2,"projects":[{"project_id":"9abe9b09-5035-5fde-b234-6062a5560f17","name":"DataBank Orangeburg LGA3 — existing data-centre operations","status":"operational","status_as_of":"2026-10-23","search_terms":""},{"project_id":"2e73ce88-4229-5c12-9db4-be3401e390b7","name":"DataBank Orangeburg LGA4 (Orangeburg Phase Two) — proposed second data center on the campus","status":"announced","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e172e840f11c02402a49/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e172e840f11c02402a49.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Rockland County; NYS ITS Geospatial Services; NYS Department of Taxation and Finance ORPTS"]},{"site_id":"vcc-site-32ea75e1ed330783f230","name":"DataBank Plano Campus (Plano, Texas)","country":"United States","country_iso_a2":"US","latitude":33.0871471,"longitude":-96.8156038,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"e7df021c-ec4b-57f4-8937-11b18efe1643","name":"DataBank DFW3 (Plano) — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32ea75e1ed330783f230/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32ea75e1ed330783f230.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Collin Central Appraisal District data)"]},{"site_id":"vcc-site-de7d1b5d61517ef55cfe","name":"DataBank Red Oak Campus","country":"United States","country_iso_a2":"US","latitude":32.53823002269006,"longitude":-96.73491416900481,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-26","oldest_status_as_of":"2026-07-26","project_count":1,"projects":[{"project_id":"546bf83f-2bb4-5539-b576-6b7100981420","name":"DataBank Red Oak First-Phase Current Construction","status":"under_construction","status_as_of":"2026-07-26","search_terms":""}],"status_publishers":["DataBank"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-de7d1b5d61517ef55cfe/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-de7d1b5d61517ef55cfe.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["DataBank","Ellis County, Texas GIS"]},{"site_id":"vcc-site-ff9c8cdfa2e24daca416","name":"DataBank SFO1 Silicon Valley Data Center (5101 Lafayette Street, Santa Clara)","country":"United States","country_iso_a2":"US","latitude":37.4073288,"longitude":-121.9660911,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"ef0ac8ea-e156-5648-a4d0-54051a5ac41a","name":"DataBank SFO1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff9c8cdfa2e24daca416/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff9c8cdfa2e24daca416.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-4d899f62f639bc060a4d","name":"DataBank SLC1 Downtown Salt Lake City Data Center (179 E Social Hall Ave)","country":"United States","country_iso_a2":"US","latitude":40.7685183,"longitude":-111.8858384,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"8b974de3-210e-55e7-892f-24e54ce3fa37","name":"DataBank SLC1 — existing downtown data-centre and carrier-hotel operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4d899f62f639bc060a4d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4d899f62f639bc060a4d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-803560469e6170c4886f","name":"DataBank Summit Park Campus (PIT2, 35 Summit Park Dr, North Fayette Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.4518833,"longitude":-80.1909809,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"521cffe2-e035-55c0-a7c6-7e6cc7fef7f8","name":"DataBank PIT2 Summit Park Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-803560469e6170c4886f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-803560469e6170c4886f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Allegheny County, Pennsylvania"]},{"site_id":"vcc-site-c14008c0552564c11274","name":"DataOne Vineland Two-Phase AI Data Center Facility","country":"United States","country_iso_a2":"US","latitude":39.42519221884926,"longitude":-75.01347153097437,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-08-07","project_count":2,"projects":[{"project_id":"5ace12f8-658e-5956-9173-d78e625d4df9","name":"DataOne Vineland Phase 2 Expansion Current Build","status":"under_construction","status_as_of":"2026-08-07","search_terms":""},{"project_id":"38cbdb58-5ff7-504d-98be-60187be91e02","name":"Nebius Vineland AI factory","status":"under_construction","status_as_of":"2026-10-09","search_terms":"AI data center in Vineland, New Jersey, designed, built, owned and operated by DataOne with Nebius as tenant owning the servers and GPUs, and Vineland-based Northeast Precast as builder. A May 2025 Nebius filing describes a phased development scalable up to 300 MW, with construction begun in early 2025. Nebius named the site in its September 2025 agreement to supply Microsoft with dedicated GPU capacity, valued at about 17.4 billion US dollars through 2031. Power is to come from on-site, off-grid Bloom Energy fuel cells. Nebius's project page says construction is ongoing and the AI factory is expected to be operational by 2027. Nebius x Vineland DataOne DataOne DataOne Nebius Northeast Precast Bloom Energy Microsoft City of Vineland"}],"status_publishers":["City of Vineland Planning Board","Nebius"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c14008c0552564c11274/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c14008c0552564c11274.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Vineland GIS / Engineering"]},{"site_id":"vcc-site-0e7ae0fbb3ce3d7446b5","name":"DC BLOX Huntsville Data Center (333 Diamond Drive NW)","country":"United States","country_iso_a2":"US","latitude":34.7118221,"longitude":-86.6921541,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"d2238225-370a-5c05-9e93-ce7092d5d619","name":"DC BLOX Huntsville — existing Tier III colocation data-centre operations","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["DC BLOX, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0e7ae0fbb3ce3d7446b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0e7ae0fbb3ce3d7446b5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["DC BLOX"]},{"site_id":"vcc-site-98db1c10877fca784aba","name":"DC BLOX Palm Coast Cable Landing Station and Colocation Campus","country":"United States","country_iso_a2":"US","latitude":29.495434584291427,"longitude":-81.1973193341733,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-19","oldest_status_as_of":"2026-06-19","project_count":1,"projects":[{"project_id":"d5b84301-4f54-5958-a0d1-fd2c5a72cc5b","name":"DC BLOX Palm Coast Approved First Building Current Construction","status":"under_construction","status_as_of":"2026-06-19","search_terms":""}],"status_publishers":["City of Palm Coast"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98db1c10877fca784aba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98db1c10877fca784aba.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Palm Coast","City of Palm Coast; Flagler Property Appraiser"]},{"site_id":"vcc-site-c1a0f58564147c78c139","name":"Digi Power X Columbiana AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.182787519671,"longitude":-86.61848137903,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"c794c146-24e6-5cb8-8cd9-a12a266bba83","name":"Digi Power X Columbiana Purpose-Built Flagship Vertical Build","status":"under_construction","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Digi Power X Inc. (distributed by ACCESS Newswire)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1a0f58564147c78c139/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1a0f58564147c78c139.json","geometry_licenses":["US-federal-public-domain"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-f806b9a83ed45bed3268","name":"Digital Realty 330 E. Cermak Site","country":"United States","country_iso_a2":"US","latitude":41.85322925,"longitude":-87.6195243,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"01baa3bb-ea56-5f41-8c67-82dd84f87d51","name":"Digital Realty 330 E. Cermak Current Facility Build","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f806b9a83ed45bed3268/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f806b9a83ed45bed3268.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-4f12ca3947a97b49eaf9","name":"Digital Realty Astra North Campus (Astra Enterprise Park, De Soto, Kansas)","country":"United States","country_iso_a2":"US","latitude":38.9441882,"longitude":-94.987291,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"b401f2bf-a314-578f-a721-af93300d9b8b","name":"Digital Realty Astra North Phase One (Project Jayhawk) — proposed two-storey 450,000 sq ft data center with private and Evergy substations","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["City of De Soto, Kansas"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4f12ca3947a97b49eaf9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4f12ca3947a97b49eaf9.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of De Soto, Kansas"]},{"site_id":"vcc-site-30f713cb9cffaf5fb6ef","name":"Digital Realty ATL13 (56 Marietta Street, Atlanta)","country":"United States","country_iso_a2":"US","latitude":33.755427517,"longitude":-84.391581821,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"d0afe25f-1598-5a04-9fa6-7086b3828de8","name":"Digital Realty ATL13 — existing data-centre and interconnection-hub operations","status":"operational","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30f713cb9cffaf5fb6ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30f713cb9cffaf5fb6ef.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-25fb812582eb27da8c68","name":"Digital Realty ATL14 (250 Williams Street, Atlanta)","country":"United States","country_iso_a2":"US","latitude":33.761624516,"longitude":-84.39132182,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"0efaa92f-b14b-5372-9644-9afafcce26a7","name":"Digital Realty ATL14 — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25fb812582eb27da8c68/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25fb812582eb27da8c68.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-20a2edd7bbbbe47d7c25","name":"Digital Realty Digital Dulles Campus","country":"United States","country_iso_a2":"US","latitude":38.96099867,"longitude":-77.49150786,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-29","oldest_status_as_of":"2026-06-29","project_count":1,"projects":[{"project_id":"f054a923-1869-5cee-aec7-f9673b431f14","name":"Digital Realty Digital Dulles Current 96 MW Development","status":"under_construction","status_as_of":"2026-06-29","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-20a2edd7bbbbe47d7c25/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-20a2edd7bbbbe47d7c25.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Digital Realty"]},{"site_id":"vcc-site-1cd4f95be6c1f81fa038","name":"Digital Realty Garland Campus","country":"United States","country_iso_a2":"US","latitude":32.97626425681991,"longitude":-96.65164807015198,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-08","project_count":2,"projects":[{"project_id":"46ae1bac-a8a9-59a4-98dd-370657d7e099","name":"Digital Realty Garland DFW39 Data Hall 4 Shell Addition (Project Gold Phase 2)","status":"announced","status_as_of":"2026-09-24","search_terms":""},{"project_id":"bbd7e688-1c02-5287-a092-4a7af5293151","name":"Digital Realty Garland DFW45","status":"announced","status_as_of":"2026-09-08","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1cd4f95be6c1f81fa038/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1cd4f95be6c1f81fa038.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority City of Garland"]},{"site_id":"vcc-site-633ec6e59625ded09b1e","name":"Digital Realty Lewisville Campus (Digital Convergence: DFW26 and DFW44)","country":"United States","country_iso_a2":"US","latitude":33.0004451,"longitude":-97.0015209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"ff056790-cb05-594f-80cd-a23bb521aaa8","name":"Digital Realty DFW44 — data hall 4 shell addition (Project Gold Phase 2)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-633ec6e59625ded09b1e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-633ec6e59625ded09b1e.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Denton Central Appraisal District data)"]},{"site_id":"vcc-site-3bc2702357c3d1710f5f","name":"Dulles Electric Data Centers Site (Shaw Road and South Sterling Boulevard, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.9918485,"longitude":-77.4273271,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"fd130aec-dd32-59a3-8d4e-907e82b55770","name":"Dulles Electric Data Centers — two proposed two-storey data center buildings (site plan EPLAN-2024-0154)","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3bc2702357c3d1710f5f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3bc2702357c3d1710f5f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-f6d844f91afe8998bb3a","name":"EdgeConneX Bastrop Campus (AUS01, FM 535, Cedar Creek)","country":"United States","country_iso_a2":"US","latitude":30.1423628,"longitude":-97.5581192,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":2,"projects":[{"project_id":"739874bb-add5-5370-9885-f262b369a606","name":"EdgeConneX EDCAUS13 — planned 729,537 sq ft data center building (6682 FM 535)","status":"announced","status_as_of":"2026-08-20","search_terms":""},{"project_id":"82437338-e2c8-5196-9b60-679edd8b643b","name":"EdgeConneX EDCAUS14 — planned 729,537 sq ft data center building (6682 FM 535)","status":"announced","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6d844f91afe8998bb3a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6d844f91afe8998bb3a.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bastrop Central Appraisal District data)"]},{"site_id":"vcc-site-c4391892c0d4ac0e1fd0","name":"EdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3560344,"longitude":-111.6487547,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-09-23","project_count":2,"projects":[{"project_id":"1780742f-8f14-5403-a90e-a7614ade7643","name":"EdgeConneX PHX11 — 412,065 sq ft core-and-shell data center building with Data Hall 1-4 build-outs, under construction (Mesa permits PMT24-11896, PMT25-09255 and PMT25-17623)","status":"under_construction","status_as_of":"2026-09-23","search_terms":""},{"project_id":"13f6f555-583d-52ba-bf68-d9f2eb55a8ba","name":"EdgeConneX PHX12 — 296,800 sq ft core-and-shell data center building under construction (Mesa permit PMT25-22027)","status":"under_construction","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4391892c0d4ac0e1fd0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4391892c0d4ac0e1fd0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-191fa12b770b8f520c6e","name":"EdgeCore AS02 Sterling Site","country":"United States","country_iso_a2":"US","latitude":38.995010315,"longitude":-77.44612264937976,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"6b62c459-dc75-5f31-87d4-d6dbf47de8b0","name":"EdgeCore AS02 Data Center","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development; county GIS)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-191fa12b770b8f520c6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-191fa12b770b8f520c6e.json","geometry_licenses":["Loudoun-County-GIS-disclaimer"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-ebc20ddd515fd9367ea7","name":"EdgeCore Louisa County campus","country":"United States","country_iso_a2":"US","latitude":37.99,"longitude":-77.96,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8560b48f-07cb-54c8-8b8d-163dc196caee","name":"EdgeCore Louisa County campus","status":"announced","status_as_of":"2026-10-09","search_terms":"EdgeCore Digital Infrastructure plans a hyperscale data center campus on 697 acres it bought from Louisa County in the Shannon Hill Regional Business Park, about 40 miles northwest of Richmond, Virginia. Announced in June 2025, the campus is planned for more than 1.1 GW, which EdgeCore's campus page describes as critical IT load, with investment of more than USD 17 billion. Rappahannock Electric Cooperative is expected to provide power. EdgeCore's announcement cited 3.9 million square feet, while its current campus page lists 3.1 million square feet in at least six single-tenant buildings. EdgeCore Shannon Hill campus EdgeCore Digital Infrastructure Partners Group Rappahannock Electric Cooperative Louisa County"}],"status_publishers":["EdgeCore Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ebc20ddd515fd9367ea7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ebc20ddd515fd9367ea7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeCore Digital Infrastructure"]},{"site_id":"vcc-site-54d4a697323404ecfc35","name":"EdgeCore Mesa data center campus","country":"United States","country_iso_a2":"US","latitude":33.3442,"longitude":-111.6196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2025-05-21","oldest_status_as_of":"2025-05-21","project_count":1,"projects":[{"project_id":"441174d1-4dab-5b80-bfb2-76062cf675aa","name":"EdgeCore Mesa data center campus","status":"partially_operational","status_as_of":"2025-05-21","search_terms":"Wholesale hyperscale data center campus that EdgeCore Digital Infrastructure established in Mesa, Arizona, in April 2023, with power from Salt River Project. Its first building, PH01, was operating by 2025 while PH02 and PH03 were under construction for completion in 2025 and 2026. In May 2025 EdgeCore bought another 43.87 acres, more than doubling its buildable land in Mesa, and raised planned capacity to over 450 MW. EdgeCore's campus page now describes an 84-acre, five-building campus able to support 496 MW of critical IT load in about 2.7 million square feet. EdgeCore Phoenix campus EdgeCore PH01-PH03 EdgeCore Digital Infrastructure EdgeCore Digital Infrastructure EdgeCore Digital Infrastructure Salt River Project"}],"status_publishers":["EdgeCore Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54d4a697323404ecfc35.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeCore Digital Infrastructure"]},{"site_id":"vcc-site-9369a9dbb7d04a9e1327","name":"Edged Chicago Aurora Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.806967678,"longitude":-88.240996871,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-04","oldest_status_as_of":"2026-06-04","project_count":1,"projects":[{"project_id":"b8399bc6-5c72-5627-a035-4fea208cd287","name":"Edged Chicago ORD01-2","status":"shell","status_as_of":"2026-06-04","search_terms":""}],"status_publishers":["Edged US"],"power_observations":[{"project_id":"b8399bc6-5c72-5627-a035-4fea208cd287","metric":"critical_it_mw","stage":"planned","low":72.0,"base":72.0,"high":72.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9369a9dbb7d04a9e1327/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9369a9dbb7d04a9e1327.json","geometry_licenses":["public-domain"],"geometry_attributions":["City of Aurora GIS"]},{"site_id":"vcc-site-7cc1c64f44550b086450","name":"Edged Council Bluffs Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.27500301792117,"longitude":-95.79123326138523,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"85cb6e56-ec73-5685-82e7-15e4ef96106b","name":"Edged Council Bluffs First Data Center","status":"shell","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["Edged US"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7cc1c64f44550b086450/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7cc1c64f44550b086450.json","geometry_licenses":["county-open-data-no-explicit-license"],"geometry_attributions":["Pottawattamie County GIS"]},{"site_id":"vcc-site-c01c1fc0c8c91c72ed82","name":"Edged Fort Worth Project Outpost Campus","country":"United States","country_iso_a2":"US","latitude":32.6902831,"longitude":-97.4919734,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","permitted"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-09-14","project_count":2,"projects":[{"project_id":"77b49daf-24c9-5505-a442-c7c45330d5e6","name":"Edged Fort Worth Project Outpost Building 1 — 488,770 sq ft data-centre cold dark shell (permit PB26-06984)","status":"permitted","status_as_of":"2026-10-22","search_terms":""},{"project_id":"535a2b1a-ea36-5034-a91b-e1e0c00f8837","name":"Edged Fort Worth Project Outpost Building 2","status":"announced","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["City of Fort Worth (Development Services)","Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c01c1fc0c8c91c72ed82/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c01c1fc0c8c91c72ed82.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Tarrant Appraisal District data)"]},{"site_id":"vcc-site-9b055d4e5c1005522b59","name":"Edged Kansas City Data Center (3420 N Arlington Ave, Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.1567908,"longitude":-94.4640853,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-04","oldest_status_as_of":"2026-09-04","project_count":1,"projects":[{"project_id":"f41ace4c-c7e3-554a-9226-aeb45082384d","name":"Edged Kansas City — data-center building (final certificate of occupancy CICO-2026-00896, 3500 N Arlington Ave)","status":"completed","status_as_of":"2026-09-04","search_terms":""}],"status_publishers":["City of Kansas City, Missouri"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b055d4e5c1005522b59/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b055d4e5c1005522b59.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kansas City, Missouri (Open Data KC)"]},{"site_id":"vcc-site-9ea881e4f6faab9a0137","name":"Equinix CH5 Data Center, 2001 Lunt Ave, Elk Grove Village","country":"United States","country_iso_a2":"US","latitude":42.0011268,"longitude":-87.9536421,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"4c84c865-63cc-55a4-b2fe-1e717d5651df","name":"Equinix CH5 - Electrical Room L build-out (Elk Grove Village permit B26-0931)","status":"permitted","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Cook County Assessor's Office"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9ea881e4f6faab9a0137/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9ea881e4f6faab9a0137.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office"]},{"site_id":"vcc-site-b504c5e662c0319d165e","name":"Equinix Great Oaks South Data Center Campus (SV12, SV18 and SV19), 123-131 Great Oaks Blvd, San Jose","country":"United States","country_iso_a2":"US","latitude":37.2337651,"longitude":-121.7829754,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","permitted"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"55a6a29a-9cae-5f56-9394-9656ca317d1b","name":"Equinix SV12x — data-hall fit-outs (San Jose building permits 2024-108710-CI, 2026-141003-CI and 2026-140996-CI)","status":"permitted","status_as_of":"2026-10-19","search_terms":""},{"project_id":"1ed690bc-d1f7-5407-9e91-a6311a4daccd","name":"Equinix SV18 — new IBX colocation data centre, now open (127 Great Oaks Blvd)","status":"operational","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["City of San Jose, Planning, Building and Code Enforcement (San Jose CA Open Data Portal)","Equinix, Inc. (Equinix Community, community.equinix.com)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b504c5e662c0319d165e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b504c5e662c0319d165e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-5aa81e1af3ee4425bc10","name":"Equinix HO1 Houston (1515 Aldine Meadows Road)","country":"United States","country_iso_a2":"US","latitude":29.9359097,"longitude":-95.3642684,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-10-23","project_count":1,"projects":[{"project_id":"fe59dab9-e931-5465-95c7-f69a563caba6","name":"Equinix HO1 — conversion of an interior storage room to additional data hall space (TABS2027004299)","status":"announced","status_as_of":"2026-10-23","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5aa81e1af3ee4425bc10/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5aa81e1af3ee4425bc10.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Harris Appraisal District data)"]},{"site_id":"vcc-site-dba29b971b845ba962a5","name":"Farmington Technology Park (Tract data-center campus, Farmington, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.6228366,"longitude":-93.1222619,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"2cc832db-5309-57f3-9065-e1fb83ce6358","name":"Farmington Technology Park — proposed Tract data-center campus (PUD-1, Ordinance 2024-12; 1st Addition Lot 1 and future 2nd Addition)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["City of Farmington, Minnesota"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dba29b971b845ba962a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dba29b971b845ba962a5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-0fd145d30136b16a75ed","name":"Fermi America Project Matador campus","country":"United States","country_iso_a2":"US","latitude":35.3116,"longitude":-101.5597,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"94562977-e3af-5f59-bee1-896ee8db20f6","name":"Fermi America Project Matador campus","status":"under_construction","status_as_of":"2026-09-28","search_terms":"Fermi Inc. is developing a private-power AI campus in Carson County, Texas, near Amarillo, mostly on land leased from the Texas Tech University System. Its filing describes about 11 GW of planned on-site generation, potentially expandable to about 17 GW, and about 15 million square feet of AI infrastructure space. Gas turbines come first, with nuclear units planned from 2033 and limited grid supply at the start. In August 2026 Fermi signed its first tenant lease, with TensorWave, for 222 MW of facility power. At mid-2026 it reported 1.54 billion US dollars of construction in progress and going-concern doubts that management said its plans alleviate. Private Power HyperGrid Project Matador Fermi Inc. TensorWave Siemens Energy NAES Corporation CBRE Southwestern Public Service Company"}],"status_publishers":["U.S. Securities and Exchange Commission (Fermi Inc. filing)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fd145d30136b16a75ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fd145d30136b16a75ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["U.S. Securities and Exchange Commission (Fermi Inc. filing)"]},{"site_id":"vcc-site-5c75a2f4b8b62cd1f40a","name":"Flexential Douglasville North River Campus","country":"United States","country_iso_a2":"US","latitude":33.7307026,"longitude":-84.6112399,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"8c926b8f-0190-533b-aa7e-3223971b9e23","name":"Flexential Douglasville 2 Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c75a2f4b8b62cd1f40a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c75a2f4b8b62cd1f40a.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-45292d327405c32357bc","name":"Flexential Hillsboro Starr Campus","country":"United States","country_iso_a2":"US","latitude":45.5564617,"longitude":-122.9394058,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"ad57807a-f6b6-55f9-b26f-acd194e12880","name":"Flexential Hillsboro 5 Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-45292d327405c32357bc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-45292d327405c32357bc.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-aa53021c0d413ab5dd3d","name":"Flexential Parker Compark Campus","country":"United States","country_iso_a2":"US","latitude":39.560940360431,"longitude":-104.811935209928,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"8dbc82d0-1a4d-5d8e-955e-c5e4973ea19e","name":"Flexential Parker Data Center Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-aa53021c0d413ab5dd3d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-aa53021c0d413ab5dd3d.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-43bf6c7b8c9e9dfc51d0","name":"Galaxy Helios Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.780636279018,"longitude":-100.867099886006,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["foundations","partially_operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":2,"projects":[{"project_id":"c7adcc1a-b5ed-5df0-b28b-572b6d9dbc4b","name":"Galaxy Helios data center campus","status":"partially_operational","status_as_of":"2026-08-12","search_terms":"Mining campus in Dickens County, in the West Texas panhandle, that Galaxy acquired in 2022 and is converting into AI and HPC data centers. CoreWeave has leased the first 800 MW of gross power in three phases totaling 526 MW of critical IT load, starting with a 15-year lease signed in April 2025. Galaxy delivered the first 133 MW of critical IT load to CoreWeave in 2026, and the eight Phase II data halls are expected online from the second quarter of 2027 into early 2028. ERCOT approved another 830 MW in January 2026, taking approved capacity above 1.6 GW, and Galaxy plans to develop that capacity on a build-to-suit basis. Helios Galaxy Digital Galaxy Digital CoreWeave HITT"},{"project_id":"2f422325-bd08-5072-a93f-dde01520f486","name":"Galaxy Helios Phase II 260 MW Critical IT Build","status":"foundations","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Galaxy","Galaxy Digital"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43bf6c7b8c9e9dfc51d0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-43bf6c7b8c9e9dfc51d0.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau","United States Census Bureau"]},{"site_id":"vcc-site-72686694ec26fc3c593c","name":"Gardner Property Data Center Campus (McGraws Corner Drive and Nolan Road, Gainesville, Prince William County)","country":"United States","country_iso_a2":"US","latitude":38.7975663,"longitude":-77.6229589,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"0d5db76a-de16-5610-a99d-6423d698a26b","name":"Gardner Property — proposed data center buildings and electric substation (SUP2027-00008 / REZ2023-00018)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72686694ec26fc3c593c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72686694ec26fc3c593c.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-e5029d978178bf23ae67","name":"Goodman LAX01 Los Angeles Program Anchor","country":"United States","country_iso_a2":"US","latitude":34.00507389,"longitude":-118.21807054,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"447b19d9-b89b-59a6-9931-824aa1781fb0","name":"Goodman LAX01 First-Site Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5029d978178bf23ae67/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5029d978178bf23ae67.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Los Angeles County Office of the Assessor"]},{"site_id":"vcc-site-137a78b7abc74703d577","name":"Google / Beale Tulsa County Project Clydesdale Campus","country":"United States","country_iso_a2":"US","latitude":36.26982717564227,"longitude":-95.91092189697753,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c","name":"Google / Beale Tulsa County Project Clydesdale Campus Construction","status":"under_construction","status_as_of":"2026-08-19","search_terms":"Beale Infrastructure is building a 506-acre data center campus in unincorporated Tulsa County, Oklahoma, just west of Owasso near Cherokee Industrial Park. Tulsa County commissioners approved the economic development plan and tax incentives in September 2025, and ground was broken on 30 October 2025 for what was billed as a USD 1 billion project. Plans call for at least one phase of about 200,000 sq ft, with up to three more possible, and construction expected to take at least five years. In August 2026 Google was identified as the operator of the campus, which Public Service Company of Oklahoma will power through a new Beale-funded on-site substation. Project Clydesdale Beale Infrastructure Google Public Service Company of Oklahoma Tulsa County Board of Commissioners"}],"status_publishers":["Beale Infrastructure; joint Google and Beale announcement"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-137a78b7abc74703d577/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-137a78b7abc74703d577.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Tulsa Planning Office / INCOG; survey prepared by GEODECA LLC"]},{"site_id":"vcc-site-9da1382c1df4f319ef97","name":"Google Armstrong County data center campus (Crusoe Goodnight)","country":"United States","country_iso_a2":"US","latitude":35.1081,"longitude":-101.3627,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"b7d85afa-fbc0-53d6-b19c-6e00c6639642","name":"Google Armstrong County data center campus (Crusoe Goodnight)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"AI data center campus near Claude, Armstrong County, in the Texas Panhandle, being developed by Crusoe on about 1,300 acres beside the Goodnight wind farms. Google named Armstrong County as a new campus site in its November 2025 Texas program ($40 billion statewide through 2027), and Crusoe confirmed Google as the end user in September 2026. County tax abatement materials described a first phase of four buildings drawing up to 530 MW, within a two-phase 1,030 MW design. State filings in 2026 added two buildings of about 805,000 sq ft each, together estimated at $1 billion. Amended filings added gas turbines and battery storage, and one report says Crusoe agreed to sell the project to Google. Goodnight campus Project Goodnight Crusoe GN DC1 LLC Google Serena"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9da1382c1df4f319ef97/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9da1382c1df4f319ef97.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC 7 Amarillo"]},{"site_id":"vcc-site-15afee16348a0ffc414f","name":"Google Bermuda Hundred Data Center Campus","country":"United States","country_iso_a2":"US","latitude":37.34632783459711,"longitude":-77.30489173364066,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f3cc5dc7-9547-517f-94aa-89e0769f2bf8","name":"Google Bermuda Hundred Current Development","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Chesterfield County"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-15afee16348a0ffc414f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-15afee16348a0ffc414f.json","geometry_licenses":["CC0-1.0","all-rights-reserved","no-open-document-redistribution-license-asserted"],"geometry_attributions":["Chesterfield County GIS","Data retrieved from Chesterfield County GIS Data Catalog.","Esri"]},{"site_id":"vcc-site-5878345369c98c058193","name":"Google Cedar Rapids data center campus (Big Cedar Industrial Center)","country":"United States","country_iso_a2":"US","latitude":41.9172,"longitude":-91.7254,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"27c38b34-579b-5542-b04b-44d6d5747bff","name":"Google Cedar Rapids data center campus (Big Cedar Industrial Center)","status":"under_construction","status_as_of":"2026-10-05","search_terms":"Google's second Iowa data center campus, under construction at Alliant Energy's Big Cedar Industrial Center in Cedar Rapids, Linn County, where QTS has also announced a data center. Google confirmed the campus in May 2025 alongside a $7 billion two-year Iowa investment that also funds expansion in Council Bluffs; Google has not said how much goes to Cedar Rapids. Trade reporting said the first building would be finished in 2026, with four more planned and over 1,200 construction workers. Epoch AI, using satellite imagery and permit data, projects three buildings with about 261 MW of IT power and a capital cost near $9.9 billion by Q2 2027; these are analyst projections, not company figures. Google Google"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5878345369c98c058193/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5878345369c98c058193.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Alliant Energy"]},{"site_id":"vcc-site-844cdbf47a97438d7298","name":"Google Columbia County Data Center Campus (GreenPoint)","country":"United States","country_iso_a2":"US","latitude":33.5129432,"longitude":-82.3412549,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"ef74017c-dd85-5cbf-a87e-46588c0e52cd","name":"Google Columbia County (GreenPoint) Data Center Campus Development","status":"announced","status_as_of":"2026-10-19","search_terms":""}],"status_publishers":["Columbia County, Georgia"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-844cdbf47a97438d7298/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-844cdbf47a97438d7298.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Columbia County, Georgia GIS (PublicAccess map services)"]},{"site_id":"vcc-site-2f048b74f4ed91d150b5","name":"Google Columbus Data Center Campus (225 Rathmell Road / 5076 South High Street)","country":"United States","country_iso_a2":"US","latitude":39.8525275,"longitude":-82.9968088,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"468fe037-24ae-506d-b561-d032fba74f01","name":"Building CLB4 — 288,000 sq ft alteration works (Columbus permit ALTC2502418, final inspection approved)","status":"completed","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Columbus, Ohio (Department of Building and Zoning Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f048b74f4ed91d150b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f048b74f4ed91d150b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Franklin County Auditor"]},{"site_id":"vcc-site-e2ec9daea00e4e3d9dc1","name":"Google Fort Wayne data center","country":"United States","country_iso_a2":"US","latitude":41.018,"longitude":-85.058,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"7c9397d2-971c-5d1e-ad58-210d19777a37","name":"Google Fort Wayne data center","status":"operational","status_as_of":"2026-10-09","search_terms":"Google data center near East Tillman Road and Adams Center Road in Fort Wayne, Allen County, Indiana. Google and the governor announced the $2 billion project and broke ground on 26 April 2024, projecting up to 200 jobs. The state committed a performance-based 35-year data center sales tax exemption, tied to at least $800 million of eligible capital and extendable with further investment. Google announced a collaboration with Indiana Michigan Power to add new clean energy resources to the local grid. Google's Indiana page now describes the Fort Wayne site as operational; no capacity figure has been published. Google Google Indiana Economic Development Corporation Indiana Michigan Power"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e2ec9daea00e4e3d9dc1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e2ec9daea00e4e3d9dc1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indiana Economic Development Corporation"]},{"site_id":"vcc-site-65784844ad2a20822ec7","name":"Google Franklin Township data center proposal (Project Flo)","country":"United States","country_iso_a2":"US","latitude":39.6803,"longitude":-86.0275,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2025-09-22","oldest_status_as_of":"2025-09-22","project_count":1,"projects":[{"project_id":"892af381-b656-528b-a9db-61013937174e","name":"Google Franklin Township data center proposal (Project Flo)","status":"cancelled","status_as_of":"2025-09-22","search_terms":"Proposed Google data center on about 468 acres of farmland in Franklin Township on the southeast side of Indianapolis, reported as a USD 1 billion project; tracker Baxtel says Google proposed it through an affiliate, Deep Meadow Ventures. The Metropolitan Development Commission approved the rezoning in August 2025, but the City-County Council scheduled its own public hearing amid opposition from residents worried about water use, flooding and electricity bills. Google's attorney announced the withdrawal of the rezoning petition at the council meeting on 22 September 2025. No later refiling was found. Project Flo Google Deep Meadow Ventures LLC Indianapolis Metropolitan Development Commission Indianapolis City-County Council"}],"status_publishers":["Inside INdiana Business (Indianapolis Business Journal)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-65784844ad2a20822ec7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-65784844ad2a20822ec7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Inside INdiana Business (Indianapolis Business Journal)"]},{"site_id":"vcc-site-e348a191d95cf61970ae","name":"Google Journey data center campus (Haskell County)","country":"United States","country_iso_a2":"US","latitude":33.1564,"longitude":-99.5683,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-25","oldest_status_as_of":"2026-06-25","project_count":1,"projects":[{"project_id":"93e5705d-3c86-524c-8089-0868d13bbd0d","name":"Google Journey data center campus (Haskell County)","status":"under_construction","status_as_of":"2026-06-25","search_terms":"Data center campus on a 300-acre tract along Red Creek Road, south of US Highway 380 in Haskell County, Texas, owned by Homebound Group LLC. Haskell County labels the Journey abatement as a Google project, and Google named new Haskell County campuses in its November 2025 Texas program. The June 2025 county tax abatement expects Phase 1 capital costs of about $1 billion, allows up to four phases, and requires at least 50 permanent jobs. 2026 state registrations list two buildings at 1362 Red Creek Rd, JNR1A (285,282 sq ft) and JNR2A (210,420 sq ft), each estimated at $400 million, with completion targets in August and October 2027. Journey campus Haskell County Journey Reinvestment Zone Homebound Group LLC Homebound Group LLC Google Haskell County"}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e348a191d95cf61970ae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e348a191d95cf61970ae.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Haskell County, Texas"]},{"site_id":"vcc-site-210a7753dcf05471886c","name":"Google Kansas City data center campus (Hunt Midwest Business Center)","country":"United States","country_iso_a2":"US","latitude":39.168,"longitude":-94.4788,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"52e21086-11ad-588d-a8a8-d9525e5e4744","name":"Google Kansas City data center campus (Hunt Midwest Business Center)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Google's first Missouri data center campus, at the Hunt Midwest Business Center off NE Parvin Road in Kansas City's Northland (Clay County). Google announced the $1 billion project in March 2024, with Evergy powering the site and a 400 MW solar PPA from the Beavertail Solar farm with Ranger Power and DESRI. Google, partly through the Alphabet vehicle Shalerock LLC, had assembled more than 315 acres in the Northland by late 2021 for a project called Project Shale. Google's site now describes two new data centers in Kansas City as in development, while a third-party listing reports the first building operational since 2025 within a four-phase plan of about 1.435 million sq ft. Project Shale Shale 1 Google Shalerock LLC Evergy Ranger Power D. E. Shaw Renewable Investments Port KC"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-210a7753dcf05471886c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-210a7753dcf05471886c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KSHB 41"]},{"site_id":"vcc-site-c3e5176a28be6c093486","name":"Google Mayes County Data Center Campus (Pryor, MidAmerica Industrial Park)","country":"United States","country_iso_a2":"US","latitude":36.2425,"longitude":-95.3302,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"c938d454-2dbb-536c-b054-80b5128d93ce","name":"Google Mayes County (Pryor) — existing data-centre campus operations","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Google LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c3e5176a28be6c093486/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c3e5176a28be6c093486.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma DEQ Air Quality Division; application prepared for Myall, LLC"]},{"site_id":"vcc-site-7b3778f58b65d557b1f9","name":"Google Meitner Energy Center data center (Gray and Roberts counties)","country":"United States","country_iso_a2":"US","latitude":35.5363,"longitude":-100.9602,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-04","oldest_status_as_of":"2026-06-04","project_count":1,"projects":[{"project_id":"db205e2d-f250-5c0b-861e-1c243f7be933","name":"Google Meitner Energy Center data center (Gray and Roberts counties)","status":"under_construction","status_as_of":"2026-06-04","search_terms":"Google data center being built alongside new dedicated generation at the Meitner Energy Center in Gray and Roberts counties in the Texas Panhandle; Google's location list shows a Pampa site in development. Google and Intersect, the energy developer Google closed on buying in March 2026, announced construction on 4 June 2026. The complex pairs the data center with more than 1 GW of wind, solar and battery storage, and on-site gas firming covers a minority of demand. The data center is designed for air cooling. Google has not disclosed the compute load, cost or opening date. An 800-acre Caprock Workforce Hub in Wheeler County is planned to house up to 3,500 workers. Meitner Energy Center Google Intersect"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b3778f58b65d557b1f9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7b3778f58b65d557b1f9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Google"]},{"site_id":"vcc-site-5dae31735952497e716b","name":"Google Mesa Red Hawk Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.3540946,"longitude":-111.676019,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed","under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-09-29","project_count":2,"projects":[{"project_id":"b42b34a0-8ef9-542e-b470-38524064ccfb","name":"Google Mesa Red Hawk — Phase 2 Building 2","status":"completed","status_as_of":"2026-09-29","search_terms":""},{"project_id":"656f3fb9-5028-5b6d-9e54-0f6a57093b30","name":"Google Mesa Red Hawk — Phase 3 (PH03) data hall building","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5dae31735952497e716b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5dae31735952497e716b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor, Arizona"]},{"site_id":"vcc-site-373d7757d0759da1977f","name":"Google Muskogee County Data Center Campus (Acacia House, near Council Hill)","country":"United States","country_iso_a2":"US","latitude":35.58091,"longitude":-95.64531,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"a029c49b-f1c3-5bc5-a718-d55856d28934","name":"Google Muskogee County (Acacia House) — new data-centre campus in development (Acacia Facility, DEQ permit application 2026-0090-C)","status":"announced","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Google LLC"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-373d7757d0759da1977f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-373d7757d0759da1977f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma DEQ Air Quality Division"]},{"site_id":"vcc-site-7ea48a92b2736ef7dbfb","name":"Google New Albany Data Center Campus (1101 Beech Rd SW and 5266 Babbitt Rd)","country":"United States","country_iso_a2":"US","latitude":40.0583337,"longitude":-82.7672501,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"a04d7097-bbed-5206-8e39-acc8dc1f0f37","name":"Google New Albany — existing data-centre campus operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ea48a92b2736ef7dbfb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7ea48a92b2736ef7dbfb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-c26e81685b409595414a","name":"Google Project Cannoli Data Center Campus (Van Buren Township)","country":"United States","country_iso_a2":"US","latitude":42.2258431,"longitude":-83.4351731,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"5ccc6049-7bf8-52f6-be62-865f14b6f20e","name":"Project Cannoli — proposed Google data center campus (Buildings 1-3, network service building and office)","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Wayne County, Michigan (County Commission)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c26e81685b409595414a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c26e81685b409595414a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Wayne County GIS"]},{"site_id":"vcc-site-125cb8890e612925ded5","name":"Google Project Skyway data center campus (Pine Island Industrial PUD, Pine Island, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.2265242,"longitude":-92.6454052,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"76730247-d8d8-5913-beb7-7ae1e64e9e81","name":"Google Project Skyway — proposed data-center campus on the Pine Island Industrial PUD site with four Google-owned substations (PUC route-permit docket E002/TL-26-135)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Minnesota Public Utilities Commission"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-125cb8890e612925ded5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-125cb8890e612925ded5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Minnesota (Department of Commerce, Public Utilities Commission)"]},{"site_id":"vcc-site-d92255df1f2246ac16d5","name":"Google Stillwater data center campus","country":"United States","country_iso_a2":"US","latitude":36.116,"longitude":-97.059,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"1b7d1694-1f94-5ac5-a39d-ef81696ed589","name":"Google Stillwater data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Planned Google data center campus on land Google acquired at the intersection of Perkins and Richmond Roads in Stillwater, Oklahoma, disclosed by the city in March 2025 after county economic development officials had kept the buyer's identity confidential. Local reporting describes a project of up to USD 3 billion that the mayor called a 25-year plan, with first-phase construction expected to finish as early as 2027 and Google initially making payments in lieu of property taxes. Tracker Baxtel lists the campus as planned. Google Google City of Stillwater"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d92255df1f2246ac16d5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d92255df1f2246ac16d5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["City of Stillwater"]},{"site_id":"vcc-site-1c393b2e71d64f0ffd69","name":"Google West Memphis data center campus","country":"United States","country_iso_a2":"US","latitude":35.1163,"longitude":-90.2115,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-02-26","oldest_status_as_of":"2026-02-26","project_count":1,"projects":[{"project_id":"09904943-69d4-51d7-aef7-4ff880e47332","name":"Google West Memphis data center campus","status":"under_construction","status_as_of":"2026-02-26","search_terms":"Google's first Arkansas data center campus, under construction at the south end of Bollinger Road in West Memphis, Crittenden County, on a property reported at 1,000 to 1,200 acres. Google announced it in October 2025 as part of a $4 billion Arkansas commitment running through 2027. The developer of record, Groot LLC, filed plans with the US Army Corps of Engineers in late 2024; earlier reporting described a proposed $10 billion campus with five data center buildings and a substation. Construction began in October 2025 on an 18-24 month schedule. Entergy Arkansas is supplying power under a contract with Google, which is paying part of the cost of a new Entergy solar and storage project. Groot LLC West Memphis data center Google Groot LLC Entergy Arkansas Turner Construction Yates Construction"}],"status_publishers":["Action News 5 (WMC)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1c393b2e71d64f0ffd69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1c393b2e71d64f0ffd69.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Daily Memphian"]},{"site_id":"vcc-site-30261c455bad7edb8c71","name":"HJS Data Building Site (2565 Harrison Road, New Albany)","country":"United States","country_iso_a2":"US","latitude":40.09404769430338,"longitude":-82.73817233294137,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"2788467f-c848-52d5-b711-51dd30c809de","name":"HJS — new 189,378 sq ft data building (2565 Harrison Road)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30261c455bad7edb8c71/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30261c455bad7edb8c71.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-f49882717c93278a3c62","name":"Homer City Energy Campus","country":"United States","country_iso_a2":"US","latitude":40.5108,"longitude":-79.1936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"7d6333d2-26e6-548c-979a-324c7113281b","name":"Homer City Energy Campus","status":"under_construction","status_as_of":"2026-10-20","search_terms":"Redevelopment of the retired Homer City coal-fired generating station in Indiana County, Pennsylvania, into a gas-fired power and data center campus of more than 3,200 acres. Seven GE Vernova 7HA.02 turbines are planned to deliver up to 4.4 GW for multiple large data center customers, with some power also supplied to the local grid. The developer projects more than 10 billion US dollars for power infrastructure and site readiness, with data centers adding more. Pennsylvania regulators issued an air permit in November 2025; by September 2026 more than 1,800 workers were on site, with power production targeted for 2027. No data center tenant has been named. Homer City Redevelopment Homer City Generation Homer City Redevelopment Kiewit Power Constructors Co. GE Vernova Knighthead Capital Management"}],"status_publishers":["Homer City Generation, L.P."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f49882717c93278a3c62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f49882717c93278a3c62.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Pennsylvania Senate Republicans"]},{"site_id":"vcc-site-6f469fef389a90fb70b5","name":"Horizon 1 Kearney Data Center Campus (Tech One, Kearney, Nebraska)","country":"United States","country_iso_a2":"US","latitude":40.7246191,"longitude":-99.0420045,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"cb9d6813-725d-5759-b562-64d29352ef31","name":"Horizon 1 Kearney data center — Conditional Use Permit 2026-04 (Ordinance No. 8823), Lot 1 Tech One Third and Lot 1 Tech One Fifth Subdivisions","status":"permitted","status_as_of":"2026-09-08","search_terms":""}],"status_publishers":["City of Kearney, Nebraska (City Clerk)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6f469fef389a90fb70b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6f469fef389a90fb70b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kearney, Nebraska"]},{"site_id":"vcc-site-a15d402305ed80ba8cba","name":"Hut 8 Beacon Point AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":27.834525,"longitude":-97.614758,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"86c83f59-88b9-5791-bc15-ab6c32f256a7","name":"Hut 8 Beacon Point AI data center campus","status":"under_construction","status_as_of":"2026-08-04","search_terms":"Hut 8 AI data center campus on about 521 acres in Nueces County, Texas, backed by 1,000 MW of utility capacity under an AEP Texas interconnection agreement. In 2026 Hut 8 signed two 15-year leases of 352 MW of IT capacity each with one unnamed high-investment-grade tenant, for 704 MW in total, worth about USD 9.8 billion each in base-term value. Hut 8 said in July 2026 that phase 1 construction had begun and phase 2 site preparation was under way; initial energization is targeted for Q1 2027 and the first phase 2 data hall for Q2 2028. Beacon Point AI Data Center Campus Beacon Point DC Hut 8 AEP Texas"},{"project_id":"9563b94b-4d68-5f38-b2b2-ce63346ebbe8","name":"Hut 8 Beacon Point First Phase 352 MW Critical IT Lease","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Hut 8 Corp.","Hut 8 Corp. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a15d402305ed80ba8cba.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},{"site_id":"vcc-site-1f215e81ecc04c69b5d6","name":"Hut 8 River Bend AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":30.727892,"longitude":-91.299513,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"3e074273-f5f7-5785-ab10-232a5ebd5c6b","name":"Hut 8 River Bend 245 MW Critical IT Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""},{"project_id":"8aa8e9f5-915e-51f6-bc08-463822cf16f9","name":"Hut 8 River Bend AI data center campus","status":"under_construction","status_as_of":"2026-10-05","search_terms":"AI data center campus under construction by Hut 8 in West Feliciana Parish, Louisiana. Phase I is leased to Fluidstack for 245 MW of critical IT load under a 15-year lease valued at $7.0 billion, with Google backstopping the lease obligations; Hut 8 announced a partnership with Anthropic and Fluidstack the same day, and news reports say the capacity is for Anthropic. Entergy Louisiana is to supply an initial 330 MW, with potential to scale to 1,000 MW. Phase I investment is up to $10 billion. Local reporting in October 2026 counted about 1,200 construction workers on site and said the facility will serve Anthropic's Claude. River Bend campus Hut 8 Fluidstack Anthropic Entergy Louisiana Louisiana Economic Development"}],"status_publishers":["Hut 8 Corp.","WAFB"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f215e81ecc04c69b5d6.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},{"site_id":"vcc-site-b80c969b486b2844a8d9","name":"IREN Childress data center campus","country":"United States","country_iso_a2":"US","latitude":34.4281,"longitude":-100.215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"b74385b8-0724-5b4d-b192-4aa5a1c45885","name":"IREN Childress data center campus","status":"partially_operational","status_as_of":"2026-08-27","search_terms":"IREN campus at Childress in the Texas Panhandle with 750 MW of planned gross power capacity on a 576-acre freehold site, connected to the ERCOT grid through IREN-owned on-site substations. It hosts IREN's liquid-cooled Horizon AI cloud buildings, which serve Microsoft under a five-year contract of about $9.7 billion announced in November 2025. Horizon 1, a 50 MW (IT) deployment of NVIDIA GB300 NVL72 systems, was delivered to and accepted by Microsoft in August 2026; Horizon 2 was in commissioning and Horizons 3 and 4 in late-stage construction, with delivery targeted for the fourth quarter of 2026. Horizon data centers (Childress) IREN IREN IREN Microsoft NVIDIA"}],"status_publishers":["U.S. Securities and Exchange Commission (IREN filing)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b80c969b486b2844a8d9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b80c969b486b2844a8d9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["IREN"]},{"site_id":"vcc-site-f19474c4631ae00b2725","name":"IREN Kiowa data center campus","country":"United States","country_iso_a2":"US","latitude":34.7228,"longitude":-95.9025,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"39b97d53-5af7-55ea-bfc4-6f2f08f32e74","name":"IREN Kiowa data center campus","status":"proposed","status_as_of":"2026-09-08","search_terms":"IREN plans a 1.6 GW grid-connected data center campus on a roughly 2,000-acre site just south of Kiowa in Pittsburg County, Oklahoma, between US 69 and Kiowa Lake Road. IREN announced the Oklahoma campus in February 2026, saying grid studies were complete and power would ramp from 2028; local reports say it had bought about 340 acres and would draw on Public Service Company of Oklahoma. A county tax incentive plan with an 85% property tax abatement was tabled in June 2026 for renegotiation, and in September 2026 the project still awaited county approval amid local opposition. Project Emerald Kiowa Data Center Emerald Data Center IREN Public Service Company of Oklahoma Pittsburg County"}],"status_publishers":["News On 6"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f19474c4631ae00b2725/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f19474c4631ae00b2725.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["IREN Ltd via SEC EDGAR"]},{"site_id":"vcc-site-40e9833a010630a5db0e","name":"IREN Sweetwater 2 campus, FM 540, Fisher County (near Hamlin)","country":"United States","country_iso_a2":"US","latitude":32.9320234,"longitude":-100.2213007,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"77e7b15e-e32a-568b-9a13-ada55d03f098","name":"IREN Sweetwater 2 — planned 600 MW data-centre campus on about 500 acres","status":"announced","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-40e9833a010630a5db0e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-40e9833a010630a5db0e.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Fisher Appraisal District data)"]},{"site_id":"vcc-site-f20ebb79d86fe03fc732","name":"Iron Mountain MIA-1 Miami Data Center","country":"United States","country_iso_a2":"US","latitude":25.88415986431,"longitude":-80.247555757503,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"24911fb6-56e2-5357-a224-8cbd977e2234","name":"Iron Mountain MIA-1 Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f20ebb79d86fe03fc732/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f20ebb79d86fe03fc732.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-7067da1bf27989e69807","name":"Iron Mountain NJE-1 New Jersey Data Center","country":"United States","country_iso_a2":"US","latitude":40.529931107088,"longitude":-74.327943023032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"0bf81b53-0bf9-551d-807b-16392ea21962","name":"Iron Mountain NJE-1 Expansion","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7067da1bf27989e69807/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7067da1bf27989e69807.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-983cd9eec3d1aaa46e69","name":"Iron Mountain VA-9 Northern Virginia Data Center","country":"United States","country_iso_a2":"US","latitude":38.772750339621,"longitude":-77.542924596694,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"d83dc321-220b-5c4c-b5af-ff1f4bc19a5d","name":"Iron Mountain VA-9 Phase 1","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-983cd9eec3d1aaa46e69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-983cd9eec3d1aaa46e69.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-cc36b171e24c944e6b44","name":"J5 LLC Piqua Data Center Campus (Washington Road)","country":"United States","country_iso_a2":"US","latitude":40.1131174,"longitude":-84.2516214,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"f9e3cf31-f856-50ef-b3ab-2dd60345d1e6","name":"J5 LLC hyperscale data center campus — planned facility on 607.7 acres at Farrington and Washington roads","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Piqua, Ohio (City Commission, via CivicClerk)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc36b171e24c944e6b44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc36b171e24c944e6b44.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Miami County, Ohio"]},{"site_id":"vcc-site-2f392531ebec4705b0aa","name":"Jefferson Lab Newport News Campus","country":"United States","country_iso_a2":"US","latitude":37.098357742086,"longitude":-76.48969366502,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-12","oldest_status_as_of":"2026-06-12","project_count":1,"projects":[{"project_id":"9283d3fe-3789-54c7-abf4-8bb757e29835","name":"Jefferson Lab Data Center (JLDC)","status":"under_construction","status_as_of":"2026-06-12","search_terms":""}],"status_publishers":["Thomas Jefferson National Accelerator Facility"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f392531ebec4705b0aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f392531ebec4705b0aa.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-d98cef70ec1688f58e42","name":"Joliet Technology Center","country":"United States","country_iso_a2":"US","latitude":41.5297,"longitude":-88.0728,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-23","oldest_status_as_of":"2026-03-23","project_count":1,"projects":[{"project_id":"def89e4b-c93d-5dc8-a955-edd8e51a1058","name":"Joliet Technology Center","status":"announced","status_as_of":"2026-03-23","search_terms":"Hillwood Investment Properties and PowerHouse Data Centers, a division of American Real Estate Partners, plan a 24-building data center campus on about 795 acres in Joliet, Illinois. The developers put the investment at USD 20 billion and describe a phased build of five to seven years with 7,000 to 10,000 construction jobs and power from ComEd. Joliet's city council approved the proposal in March 2026, with construction expected to start in late 2026 or early 2027. No tenant is named; Bisnow says the campus is aimed at potential hyperscale users. Hillwood and PowerHouse Joliet data center campus Hillwood Investment Properties PowerHouse Data Centers ComEd City of Joliet"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d98cef70ec1688f58e42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d98cef70ec1688f58e42.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-af9fa3429df36fd38cad","name":"Keel Moses Lake Data Campus (Grant County, Washington)","country":"United States","country_iso_a2":"US","latitude":47.1969153,"longitude":-119.2939255,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"25a07765-fe7b-52c6-a24c-d628a97151a3","name":"Keel Moses Lake — HPC/AI data center build on the former Bitfarms 18 MW mining site","status":"under_construction","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["Keel Infrastructure Corp. (formerly Bitfarms Ltd.)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af9fa3429df36fd38cad/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af9fa3429df36fd38cad.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Grant County, Washington"]},{"site_id":"vcc-site-2890b11431bd73672216","name":"La Osa Energy Center (Vermaland), Pinal County","country":"United States","country_iso_a2":"US","latitude":32.7636,"longitude":-111.6,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"18844ee0-7ce9-5a0b-9a50-1d9ed0769266","name":"La Osa Energy Center (Vermaland), Pinal County","status":"cancelled","status_as_of":"2026-08-26","search_terms":"Proposed AI data center and energy campus on more than 3,000 acres of rural land outside Eloy in Pinal County, Arizona, from land developer Vermaland. First reported in mid-2025 as a USD 33 billion plan for up to 3 GW, it called for nearly 60 data center buildings with on-site gas plants and battery storage. After strong local opposition, Vermaland offered in May 2026 to cut it by about 80% to 11 buildings and 1 GW of demand; the final proposal included a 500 MW gas plant, batteries and a 600 acre-foot annual freshwater cap. On 26 August 2026 the Pinal County Board of Supervisors rejected the rezoning and site plan 4-1. La Osa La Osa Project La Osa data center Vermaland Pinal County Board of Supervisors Central Arizona Irrigation and Drainage District"}],"status_publishers":["KJZZ"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2890b11431bd73672216/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2890b11431bd73672216.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Baxtel"]},{"site_id":"vcc-site-e305b394a907f57f2639","name":"Lambda Kansas City AI factory","country":"United States","country_iso_a2":"US","latitude":39.0997,"longitude":-94.5783,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-10-28","oldest_status_as_of":"2025-10-28","project_count":1,"projects":[{"project_id":"a95db60b-fb99-5f16-ad4a-c763e4714041","name":"Lambda Kansas City AI factory","status":"announced","status_as_of":"2025-10-28","search_terms":"Lambda announced in October 2025 that it would redevelop a vacant facility built in 2009 in the Northland area of Kansas City, Missouri, into an AI factory, as developer, operator and sole tenant. The site was to launch in early 2026 with 24 MW and more than 10,000 NVIDIA Blackwell Ultra GPUs serving one unnamed customer under a multi-year contract for AI training and inference, with potential to grow beyond 100 MW. No investment figure or street address was disclosed, and no later update on the site's opening was found. Lambda Lambda Lambda"}],"status_publishers":["Lambda"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e305b394a907f57f2639/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e305b394a907f57f2639.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lambda"]},{"site_id":"vcc-site-85b3549bb55293336132","name":"Lancium Clean Campus Abilene AI Data Center","country":"United States","country_iso_a2":"US","latitude":32.509551980071,"longitude":-99.774790370504,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-07-15","project_count":2,"projects":[{"project_id":"938feeec-a323-56e0-b6ce-2590fe58e623","name":"Lancium Clean Campus Abilene Remaining Six-Building Expansion","status":"under_construction","status_as_of":"2026-07-15","search_terms":""},{"project_id":"632aad8a-8c12-5a02-bd17-1138e6b03b6c","name":"Stargate Abilene (Crusoe campus on Lancium land)","status":"partially_operational","status_as_of":"2026-10-05","search_terms":"Crusoe-developed eight-building AI campus in Abilene, Texas, planned at about 1.2 GW and leased to Oracle, which runs it for OpenAI as the flagship Stargate site. Construction began in mid-2024; the first buildings came online in September 2025 and the last building was topped out in November 2025. The build is funded through a Crusoe, Blue Owl and Primary Digital joint venture on Lancium-owned land. A potential 600 MW expansion nearby was floated in 2025, but reports in March 2026 said it had been dropped, which Oracle disputed. In late September 2026 trade press reported six buildings delivered to OpenAI, and analyst Epoch AI projected all eight running by November 2026. Stargate Abilene Lancium Clean Campus Crusoe Abilene Crusoe Blue Owl Capital Primary Digital Infrastructure Lancium Oracle OpenAI"}],"status_publishers":["Epoch AI","Oracle"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85b3549bb55293336132.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-8bf35cfa26156a523f47","name":"Lunavi Cheyenne Data Center (340 Progress Circle)","country":"United States","country_iso_a2":"US","latitude":41.1296651,"longitude":-104.7408848,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-07","oldest_status_as_of":"2026-08-07","project_count":1,"projects":[{"project_id":"5d5dbc90-02ef-5efb-83e8-ca18cdce12f7","name":"Lunavi Cheyenne Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-08-07","search_terms":""}],"status_publishers":["Lunavi, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8bf35cfa26156a523f47/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8bf35cfa26156a523f47.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Lunavi"]},{"site_id":"vcc-site-f83004f0f102e3cb501e","name":"Madera Farm Data Center Campus (Nokesville Road and Farmview Road, Nokesville, Prince William County)","country":"United States","country_iso_a2":"US","latitude":38.6887614,"longitude":-77.5886122,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"548c25fa-2f67-5d90-8567-05a10659525c","name":"Madera Farm — proposed data center campus with electric substations (SUP2027-00002 / REZ2025-00007)","status":"announced","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f83004f0f102e3cb501e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f83004f0f102e3cb501e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-8afb87845a63a1ff1bdd","name":"Manekin Plaza Data Center Site (Manekin Plaza, Loudoun Tech Center, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0238301,"longitude":-77.4077891,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-07","oldest_status_as_of":"2026-08-07","project_count":1,"projects":[{"project_id":"79d740e9-b85c-58a7-8473-419e3a57ceeb","name":"Manekin Plaza — one proposed data center (site plan STPL-2022-0053)","status":"announced","status_as_of":"2026-08-07","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8afb87845a63a1ff1bdd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8afb87845a63a1ff1bdd.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-6b67dccd90b1a88385b5","name":"Massaponax Tech Campus (Massaponax Church Road, Summit Crossing Road and Mills Drive, Spotsylvania County)","country":"United States","country_iso_a2":"US","latitude":38.2103426,"longitude":-77.446502,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"721efffc-1d5b-5e0f-baf7-aacb2db4d60b","name":"Massaponax Tech Campus — proposed data center campus of about 6 million sq ft (rezoning R25-0004)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6b67dccd90b1a88385b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6b67dccd90b1a88385b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Spotsylvania County, Virginia"]},{"site_id":"vcc-site-fcfc181b3d5d02fb0a65","name":"Meta Beaver Dam data center","country":"United States","country_iso_a2":"US","latitude":43.4578,"longitude":-88.8373,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"eaaa4486-a9d9-5cf1-b196-d03c258f8dc1","name":"Meta Beaver Dam data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of more than 700,000 square feet in Beaver Dam, Wisconsin, announced in November 2025 as a USD 1 billion investment and described as optimized for Meta's AI workloads. Meta's fact sheet and location list now give the investment as USD 1 billion or more, and the list gives 2025 as the groundbreaking year. Meta says it planned its energy needs with Alliant Energy and pays the full cost of the power used, and it refers readers to Mortenson for construction information. Meta has not published a power capacity or an opening date. Beaver Dam Data Center Meta Platforms Mortenson Alliant Energy City of Beaver Dam"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcfc181b3d5d02fb0a65/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcfc181b3d5d02fb0a65.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-a39bc0fe88ed4e44ee52","name":"Meta Bowling Green data center","country":"United States","country_iso_a2":"US","latitude":41.4743,"longitude":-83.6661,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"619c5358-cf99-5e82-a690-4ae5c58f07f1","name":"Meta Bowling Green data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of 715,000 square feet in Middleton Township, Wood County, Ohio, near Bowling Green, announced in April 2025 as an investment of more than USD 800 million and described as optimized for Meta's AI workloads. Meta's location list gives 2025 as the groundbreaking year. In February 2026 the Ohio Power Siting Board approved, without public hearings, a 350 MW behind-the-meter gas plant with about 120 MW of batteries next to the data center, to be built and run by Will-Power OH. Meta names Toledo Edison, FirstEnergy and Williams as energy-planning partners and refers readers to JE Dunn Construction for construction information. Bowling Green Data Center Meta Platforms JE Dunn Construction Toledo Edison FirstEnergy Williams Will-Power OH Ohio Power Siting Board"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a39bc0fe88ed4e44ee52/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a39bc0fe88ed4e44ee52.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-a51d60551e72a6720e31","name":"Meta Cheyenne data center","country":"United States","country_iso_a2":"US","latitude":41.14,"longitude":-104.8202,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"da9fec8b-b7a1-54cb-afb9-7f534cbab584","name":"Meta Cheyenne data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of 715,000 square feet in Cheyenne, Wyoming, announced in July 2024 as an investment of more than USD 800 million and described as optimized for Meta's AI workloads. Meta's fact sheet and location list now put the investment at USD 1.2 billion, and the list gives 2024 as the groundbreaking year. Black Hills Energy is Meta's energy partner, and Meta refers readers to Fortis Construction for construction information. Meta reports one Wyoming project adding 365 MW of clean energy and 200 MW of battery storage to the grid. No power capacity or opening date for the data center has been published. Cheyenne Data Center Meta Platforms Fortis Construction Black Hills Energy City of Cheyenne Board of Public Utilities"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a51d60551e72a6720e31/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a51d60551e72a6720e31.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-560ea7139f27238b7ea1","name":"Meta DeKalb Data Center","country":"United States","country_iso_a2":"US","latitude":41.8894,"longitude":-88.7265,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"d3694f4b-3497-5f87-88aa-de8e9449c754","name":"Meta DeKalb Data Center","status":"partially_operational","status_as_of":"2026-10-26","search_terms":"Meta campus at 2050 Metaverse Way on the south side of DeKalb, Illinois, off Interstate 88. Meta broke ground in 2020 on a planned five-building campus of more than 2.3 million sq ft and more than USD 1 billion of investment. It came online in late November 2023, when the Illinois governor attended the opening; local reports said two buildings were serving traffic and about 1 million sq ft had been built. Meta says it planned its energy needs with ComEd and pays the full cost of the energy the campus uses. DeKalb Data Center Meta Platforms Meta Platforms ComEd City of DeKalb"}],"status_publishers":["City of DeKalb, Illinois"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-560ea7139f27238b7ea1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-560ea7139f27238b7ea1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-e24b0402ab82d9361bcf","name":"Meta Eagle Mountain Data Center","country":"United States","country_iso_a2":"US","latitude":40.2688392,"longitude":-112.0177378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":2,"projects":[{"project_id":"ac9265c3-a4f7-5081-8be4-9407d705590a","name":"Meta Eagle Mountain Data Center — 2026 expansion (new buildings)","status":"announced","status_as_of":"2026-09-14","search_terms":""},{"project_id":"a46f5d46-6882-5346-a0af-045ab22826d8","name":"Meta Eagle Mountain Data Center — operating campus","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e24b0402ab82d9361bcf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e24b0402ab82d9361bcf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Utah County, Utah"]},{"site_id":"vcc-site-f711d13af70d9b633456","name":"Meta El Paso Data Center","country":"United States","country_iso_a2":"US","latitude":31.9940441,"longitude":-106.3631625,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"337ace90-652d-52fe-a856-fe9b04b5966f","name":"Meta El Paso Current Development","status":"under_construction","status_as_of":"2026-07-28","search_terms":"AI-oriented Meta campus on roughly 1,000 acres in northeast El Paso, Texas, off Stan Roberts Sr. Avenue near US 54. Announced in October 2025 as a USD 1.5 billion project able to scale to 1 GW, it rose to USD 10 billion or more of Meta investment in 2026. In July 2026 Meta placed it in a joint venture 80% owned by BlackRock-managed funds, with a total development cost of about USD 14 billion and capacity due to start coming online in 2028. El Paso Electric has proposed a 366 MW modular gas plant beside the campus; in September 2026 state judges recommended approving it only if ratepayers do not bear its costs. El Paso Data Center Wurldwide Data Center Meta Platforms Meta Platforms Meta Platforms BlackRock (managed funds) El Paso Electric City of El Paso"}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f711d13af70d9b633456/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f711d13af70d9b633456.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-5db7c7f92d76e6cad252","name":"Meta Fort Worth Data Center","country":"United States","country_iso_a2":"US","latitude":32.9855232,"longitude":-97.2575676,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"9b423eef-70be-54b4-9da0-a66aab247d71","name":"Meta Fort Worth Data Center — operating campus","status":"operational","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Meta Platforms, Inc. (Meta Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5db7c7f92d76e6cad252/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5db7c7f92d76e6cad252.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels; Tarrant Appraisal District"]},{"site_id":"vcc-site-beb10377588af430b5a6","name":"Meta Gallatin Data Center","country":"United States","country_iso_a2":"US","latitude":36.4085,"longitude":-86.3716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2024-11-15","oldest_status_as_of":"2024-11-15","project_count":1,"projects":[{"project_id":"a203f1e3-768b-5094-b606-9c494490e0a6","name":"Meta Gallatin Data Center","status":"partially_operational","status_as_of":"2024-11-15","search_terms":"Multi-building Meta campus on roughly 800 acres in Gallatin, Tennessee. Construction began in August 2020 on what was first a USD 800 million commitment; by September 2022 the project was described as a nearly USD 1 billion investment, and in 2024 Meta filed plans for a further 278,000 sq ft data center that would take the campus to almost 1.9 million sq ft. In November 2024 Meta formally presented the operating campus to officials and said total investment would exceed USD 1.5 billion once the fourth data center is finished. DPR Construction is building the campus, and Meta says it planned its energy needs with the Tennessee Valley Authority. Gallatin Data Center Meta Platforms Meta Platforms DPR Construction Tennessee Valley Authority"}],"status_publishers":["Nashville Business Journal (via Gallatin Economic Development Agency)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-beb10377588af430b5a6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-beb10377588af430b5a6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-60b38ee835b4579aa5f2","name":"Meta Kansas City data center","country":"United States","country_iso_a2":"US","latitude":39.1001,"longitude":-94.5781,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2025-08-20","oldest_status_as_of":"2025-08-20","project_count":1,"projects":[{"project_id":"3315c754-ca0d-5702-8071-44b22787215a","name":"Meta Kansas City data center","status":"operational","status_as_of":"2025-08-20","search_terms":"Meta data center in Kansas City, Missouri, announced in March 2022 as an investment of more than USD 800 million and reported to be serving traffic in August 2025. Meta later put its Missouri investment at more than USD 1 billion and, in its fact sheet, USD 1.2 billion. Construction began in 2022, with an average of 1,500 skilled trade workers on site at peak. Evergy is the utility; Meta says it worked with Evergy on a tariff that lets customers contract for new renewable energy, and it reports three Missouri clean energy projects totaling 599 MW. No power capacity for the data center itself has been published. Kansas City Data Center Meta Platforms Evergy"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60b38ee835b4579aa5f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60b38ee835b4579aa5f2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-d80966c9e0bc776042e6","name":"Meta Kuna Data Center","country":"United States","country_iso_a2":"US","latitude":43.4903,"longitude":-116.3717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e375d86c-75a4-53f3-a80e-31aa6f32b616","name":"Meta Kuna Data Center","status":"operational","status_as_of":"2026-09-03","search_terms":"Meta data center in Kuna, Idaho, about 16 miles from downtown Boise. Announced in February 2022 as a USD 800 million campus with more than 960,000 sq ft of data center space expected by 2025, it broke ground in 2022 and was later paused for a redesign to support AI infrastructure and liquid cooling. Meta began serving traffic from it in the third quarter of 2026, citing a USD 1.2 billion investment and a facility of more than 750,000 sq ft. Meta says it planned its energy needs with Idaho Power, and it built a water and wastewater system that it handed to the City of Kuna. Kuna Data Center Meta Platforms Meta Platforms Idaho Power City of Kuna"}],"status_publishers":["KBOI 2 (CBS2 Idaho News)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d80966c9e0bc776042e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d80966c9e0bc776042e6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NBC 16"]},{"site_id":"vcc-site-3c5c88d7f501e957c28a","name":"Meta Lebanon Indiana Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.06429731968878,"longitude":-86.53099064914196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-06","oldest_status_as_of":"2026-07-06","project_count":1,"projects":[{"project_id":"1f430ea1-a0e6-5a91-b3e7-3f002b331cf6","name":"Meta Lebanon Indiana Current Development","status":"under_construction","status_as_of":"2026-07-06","search_terms":"Meta campus of more than USD 10 billion in the LEAP Innovation and Research District in Lebanon, Indiana, Meta's second data center in the state. The state describes a 1,500-acre site with 13 buildings, 10 of them data centers, built in up to six phases; Meta gives a campus size of roughly 4 million square feet. Ground was broken on 11 February 2026, and local reporting expected operations in 2027 or early 2028. Meta planned its power needs with Wabash Valley Power Alliance and Boone Power, and Citizens Energy Group has said it plans to supply water. Indiana granted a performance-based 35-year sales tax exemption tied to at least USD 1 billion of investment in the first six years. Lebanon Data Center Meta Platforms Mortenson Turner Construction Company Faith Technologies Wabash Valley Power Alliance Boone Power Citizens Energy Group Indiana Economic Development Corporation"}],"status_publishers":["City of Lebanon Board of Zoning Appeals"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3c5c88d7f501e957c28a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3c5c88d7f501e957c28a.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Indiana Department of Natural Resources, Division of Water"]},{"site_id":"vcc-site-5c50e2f464fe8dff2ed0","name":"Meta Los Lunas Data Center (4250 Messenger Loop NW, Huning Ranch Business Park)","country":"United States","country_iso_a2":"US","latitude":34.828031,"longitude":-106.7809835,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"1066dce8-d1ea-5d6d-9685-c2d0c2467850","name":"Meta Los Lunas Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Meta Platforms, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c50e2f464fe8dff2ed0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c50e2f464fe8dff2ed0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Valencia County GIS"]},{"site_id":"vcc-site-cb8ab0ad35bb603ea3ba","name":"Meta Mesa Data Center","country":"United States","country_iso_a2":"US","latitude":33.4222,"longitude":-111.8228,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["expansion"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f","name":"Meta Mesa Data Center","status":"expansion","status_as_of":"2026-10-20","search_terms":"Five-building Meta campus on 396 acres at the southeast corner of Elliot and Ellsworth Roads in Mesa, Arizona (3841 S. Ellsworth Road). Meta broke ground in August 2021 on a USD 800 million, two-building plan; in May 2022 it added three buildings, taking the campus to about 2.5 million sq ft and more than USD 1 billion. DPR Construction is the builder. The first two buildings went live in January 2025, with the rest expected around 2026, and Meta now cites a USD 1.2 billion investment. Salt River Project's 200 MW Brittlebush solar plant dedicates its full output to the campus. Mesa Data Center Meta Platforms Meta Platforms DPR Construction Salt River Project EDP Renewables North America"}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb8ab0ad35bb603ea3ba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cb8ab0ad35bb603ea3ba.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KTAR News"]},{"site_id":"vcc-site-4905a5572ec5f3fc6e2d","name":"Meta Montgomery data center","country":"United States","country_iso_a2":"US","latitude":32.3777,"longitude":-86.3091,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c0f8dadf-2c3d-5176-b649-85363c06e1fa","name":"Meta Montgomery data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus in Montgomery, Alabama. Announced in May 2024 as a 715,000-square-foot campus worth more than USD 800 million, it was expanded in September 2025 with two more buildings, bringing the campus to nearly 1.3 million square feet and the investment to more than USD 1.5 billion; Meta says it will be optimized for AI workloads. Meta's location list gives 2024 as the groundbreaking year. Meta names Alabama Power as its energy-planning partner and refers readers to Hensel Phelps for construction information. Meta's undated fact sheet gives job estimates well above those in its earlier posts. Montgomery Data Center Meta Platforms Hensel Phelps Alabama Power"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4905a5572ec5f3fc6e2d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4905a5572ec5f3fc6e2d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-66e95eb80a122bb2ee32","name":"Meta New Albany data center campus (Prometheus)","country":"United States","country_iso_a2":"US","latitude":40.0812,"longitude":-82.8088,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"edaa7f7d-5025-5f95-9870-3ad12478339c","name":"Meta New Albany data center campus (Prometheus)","status":"partially_operational","status_as_of":"2026-10-26","search_terms":"Meta's campus in New Albany, Ohio, where ground was first broken in 2017, is being expanded to host Prometheus, an AI cluster that Meta says delivers more than 1 GW of compute across several buildings. Meta announced Prometheus in July 2025, and it was expected to come online in 2026. Meta planned the campus's energy needs with AEP, behind-the-meter gas plants are being built by Will-Power OH for a Meta affiliate, and Meta signed nuclear power deals in January 2026 tied to the cluster. Drone imagery reported in September 2026 indicated the southern part of the cluster was running while the northern part was not yet energized. Prometheus New Albany Data Center Meta Platforms American Electric Power (AEP) Will-Power OH Williams Companies Vistra TerraPower Oklo"}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-66e95eb80a122bb2ee32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-66e95eb80a122bb2ee32.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-33110c77390f92dc4432","name":"Meta Richland Parish Data Center","country":"United States","country_iso_a2":"US","latitude":32.5289242,"longitude":-91.6360844,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-16","oldest_status_as_of":"2026-07-14","project_count":2,"projects":[{"project_id":"1404f5cd-04ee-57ea-8f73-91992fea0552","name":"Meta Richland Parish Current Development","status":"under_construction","status_as_of":"2026-07-16","search_terms":""},{"project_id":"803e9da5-cd1e-5849-813c-fe7c5b5f126b","name":"Meta Richland Parish data center (Hyperion)","status":"under_construction","status_as_of":"2026-07-14","search_terms":"Meta campus on the former Franklin Farm megasite in Richland Parish, northeast Louisiana, built to house Hyperion, which Meta calls its largest AI cluster. Announced in December 2024 as a USD 10 billion project, it was placed in late 2025 in a joint venture 80% owned by Blue Owl-managed funds and expanded in July 2026 to a planned 5 GW of IT capacity and more than USD 50 billion of investment. Entergy Louisiana is adding gas-fired generation, batteries and transmission upgrades to serve the site under a 20-year agreement. Construction began in December 2024, and officials expect full build-out around 2036. Hyperion Richland Parish Data Center Holly Ridge Meta Platforms Meta Platforms Meta Platforms Blue Owl Capital (managed funds) PIMCO Entergy Louisiana Turner Construction Company DPR Construction Mortenson Louisiana Economic Development"}],"status_publishers":["Louisiana Economic Development","Turner Construction Company"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-33110c77390f92dc4432.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-6afd5a936ac72410543b","name":"Meta Temple Data Center","country":"United States","country_iso_a2":"US","latitude":31.1056,"longitude":-97.4208,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"2fc433ea-05de-5b3a-b4a1-bd9d544f8ae3","name":"Meta Temple Data Center","status":"operational","status_as_of":"2026-07-22","search_terms":"Meta data center on a 393-acre site off NW H K Dodgen Loop and Industrial Boulevard in Temple, Texas. Announced in March 2022 as a USD 800 million, roughly 900,000 sq ft hyperscale campus expected to be finished in 2024, it broke ground in 2022, was redesigned with construction restarting in 2023, and opened in July 2026 as an AI data center of two buildings and more than 760,000 sq ft. Meta now gives its investment as USD 1.2 billion. Meta describes it as its second data center in Texas. Temple Data Center Meta Platforms Meta Platforms Temple Economic Development Corporation City of Temple"}],"status_publishers":["KWTX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6afd5a936ac72410543b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6afd5a936ac72410543b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KWTX"]},{"site_id":"vcc-site-4ed4b7a2d6d92a9362bb","name":"Meta Tulsa data center","country":"United States","country_iso_a2":"US","latitude":36.1563,"longitude":-95.9928,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"302bc1de-8d94-5ca1-a94e-ceb9facdcc1e","name":"Meta Tulsa data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta AI data center in East Tulsa, Oklahoma, announced in April 2026 as an investment of more than USD 1 billion. Fortis Construction is building a campus of roughly 2 million square feet for Meta, and Meta's location list gives 2026 as the groundbreaking year. Meta names Public Service Company of Oklahoma as its energy-planning partner and reports five Oklahoma clean energy projects totaling 1,273 MW. Meta has not published a power capacity or opening date for the site. Tulsa Data Center Meta Platforms Fortis Construction Public Service Company of Oklahoma Tulsa Metropolitan Utility Authority"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4ed4b7a2d6d92a9362bb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4ed4b7a2d6d92a9362bb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-0ca1d5c08f1eb1cf1cf3","name":"Microsoft Alviso San Jose Datacenter Campus","country":"United States","country_iso_a2":"US","latitude":37.42520058052749,"longitude":-121.92873874095102,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"1861d9fb-3980-5a16-baa1-c32762e244c1","name":"Microsoft Alviso Phase 2 Greenfield Development","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["HITT Contracting"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ca1d5c08f1eb1cf1cf3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ca1d5c08f1eb1cf1cf3.json","geometry_licenses":["city-open-data-disclaimer"],"geometry_attributions":["City of San Jose"]},{"site_id":"vcc-site-9b86fe87cb674e474940","name":"Microsoft Conover Lyle Creek Data Center","country":"United States","country_iso_a2":"US","latitude":35.731135,"longitude":-81.205389,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"eb451867-d1d3-5e41-bce7-d375e861167a","name":"Microsoft Conover Lyle Creek Current Build","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b86fe87cb674e474940/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b86fe87cb674e474940.json","geometry_licenses":["US-federal-public-domain","county-public-gis-fact-extraction-only"],"geometry_attributions":["Catawba County GIS","U.S. Army Corps of Engineers, Wilmington District"]},{"site_id":"vcc-site-c0c7b4087b3f24c58bce","name":"Microsoft EKI Campus, 12501 Cleveland Road, Granger (St. Joseph County, Indiana)","country":"United States","country_iso_a2":"US","latitude":41.728267,"longitude":-86.1163127,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"d68c6e8b-9524-51ca-82f8-74492117f9ae","name":"Microsoft EKI Campus - proposed data center (IDEM new-source construction and FESOP application F 141-50527-00655)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Indiana Department of Environmental Management (IDEM), Office of Air Quality"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c0c7b4087b3f24c58bce/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c0c7b4087b3f24c58bce.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["St. Joseph County, Indiana GIS"]},{"site_id":"vcc-site-487fd7b91c213d078d2d","name":"Microsoft Heath Datacenter","country":"United States","country_iso_a2":"US","latitude":40.025835523589,"longitude":-82.480274580568,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2","name":"Microsoft Heath Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-487fd7b91c213d078d2d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-487fd7b91c213d078d2d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-1589f325b3b39da5fb19","name":"Microsoft Hebron Datacenter","country":"United States","country_iso_a2":"US","latitude":39.972018466398,"longitude":-82.488898833962,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"86bcbcd1-702d-5afa-aeb8-1cb145224b97","name":"Microsoft Hebron Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1589f325b3b39da5fb19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1589f325b3b39da5fb19.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-298aaa4c04e0d88160f7","name":"Microsoft La Porte Indiana Campus","country":"United States","country_iso_a2":"US","latitude":41.57958055,"longitude":-86.69006414,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-18","oldest_status_as_of":"2026-06-18","project_count":1,"projects":[{"project_id":"f2b93d1a-7c33-5a9e-be4d-f7d0dadec047","name":"Microsoft La Porte First Phase Current Build","status":"under_construction","status_as_of":"2026-06-18","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-298aaa4c04e0d88160f7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-298aaa4c04e0d88160f7.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Indiana Geographic Information Office and Indiana local governments","Indiana Geographic Information Office; source originator LaPorte County"]},{"site_id":"vcc-site-fcc06643c640f5d8cce2","name":"Microsoft Mount Pleasant Datacenter Campus","country":"United States","country_iso_a2":"US","latitude":42.676507349999994,"longitude":-87.91034345,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-06-23","project_count":2,"projects":[{"project_id":"0f5f4fcc-53c4-53d0-9795-2a387d195364","name":"Microsoft Fairwater AI datacenter, Mount Pleasant","status":"partially_operational","status_as_of":"2026-06-23","search_terms":"Microsoft AI supercomputing campus in Mount Pleasant, Wisconsin, on land originally slated for Foxconn. The first facility (Phase 1, near County Road KR and 90th Street) has three buildings with about 1.2 million sq ft on 315 acres; equipment came online in April 2026 and Microsoft declared it fully operational on 23 June 2026. A second facility of similar scale (Phase 2), immediately adjacent near KR and County Road H, has been under construction since November 2025 with completion scheduled for 2028. Microsoft pledged USD 3.3 billion for the first facility and USD 4 billion more for the second, and calls the site Fairwater. Fairwater Fairwater 1 Microsoft Mount Pleasant datacenter campus Microsoft Microsoft Microsoft Walsh Construction Kiewit We Energies National Grid Renewables NVIDIA OpenAI"},{"project_id":"ccb7fe0e-f94d-58ca-8d36-695a9cd48d56","name":"Microsoft Mount Pleasant Second Datacenter Facility","status":"under_construction","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Microsoft","Village of Mount Pleasant, Wisconsin"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcc06643c640f5d8cce2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcc06643c640f5d8cce2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c9f14a3df329db2670d8","name":"Microsoft Mount Pleasant Durand Avenue datacenter campus","country":"United States","country_iso_a2":"US","latitude":42.6965,"longitude":-87.947,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"7c5eed16-f5f1-515a-b9ee-b7c30754fc10","name":"Microsoft Mount Pleasant Durand Avenue datacenter campus","status":"under_construction","status_as_of":"2026-07-01","search_terms":"Planned nine-building Microsoft datacenter campus near Durand Avenue in Mount Pleasant, Wisconsin, on a 791-acre parcel Microsoft says it bought in 2024. Village planning documents reported by WPR describe 5.2 million sq ft of development, including a 96,000 sq ft office and other related buildings, with an estimated taxable value of more than USD 7.97 billion. The plan commission recommended the site plan with conditions on traffic and water use, and the village board approved it unanimously in January 2026. Microsoft's construction page reports preliminary earthwork under way since March 2026 at a Phase 3 site at Durand Avenue and Hewitt Memorial Drive. Mount Pleasant Phase 3 (Durand & Hewitt Memorial Drive) Microsoft Microsoft Village of Mount Pleasant"}],"status_publishers":["Microsoft Local"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c9f14a3df329db2670d8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c9f14a3df329db2670d8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Wisconsin Public Radio"]},{"site_id":"vcc-site-c5988379bc974f1f6240","name":"Microsoft Mount Pleasant International Drive datacenter campus","country":"United States","country_iso_a2":"US","latitude":42.7112,"longitude":-87.9339,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-01-27","oldest_status_as_of":"2026-01-27","project_count":1,"projects":[{"project_id":"96848e3f-da64-53c8-be33-bf5c9cd2109a","name":"Microsoft Mount Pleasant International Drive datacenter campus","status":"announced","status_as_of":"2026-01-27","search_terms":"Planned six-building Microsoft datacenter campus along International Drive in Mount Pleasant, Wisconsin, on about 530 acres Microsoft says it bought in 2024. Village planning documents reported by WPR describe more than 3.5 million sq ft of development, including a 74,000 sq ft office and other buildings, with an estimated taxable value of more than USD 5.3 billion. The plan commission recommended the site plan with conditions including a traffic impact analysis and water-use compliance, and the village board approved it unanimously in January 2026. Microsoft called the plans preliminary and gave no construction timeline or energy estimate. Microsoft Microsoft Village of Mount Pleasant"}],"status_publishers":["Spectrum News 1"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5988379bc974f1f6240/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c5988379bc974f1f6240.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Wisconsin Public Radio"]},{"site_id":"vcc-site-c0945d7c74abf8504604","name":"Microsoft New Albany Datacenter","country":"United States","country_iso_a2":"US","latitude":40.103804132848,"longitude":-82.753523444119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f8377a0f-dc89-5b7a-8257-25f25cdbac43","name":"Microsoft New Albany Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c0945d7c74abf8504604/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c0945d7c74abf8504604.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-91ad5264ef3af020a0ed","name":"Microsoft Pecos datacenter campus","country":"United States","country_iso_a2":"US","latitude":31.4156,"longitude":-103.5,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-02","oldest_status_as_of":"2026-07-02","project_count":1,"projects":[{"project_id":"735e570e-2923-5425-a0af-2a13e94f49e3","name":"Microsoft Pecos datacenter campus","status":"announced","status_as_of":"2026-07-02","search_terms":"Microsoft campus announced in June 2026 for Pecos in Reeves County, West Texas, adding about 2 GW of capacity for AI and cloud services through a multibillion-dollar investment over five to seven years. At launch it will run behind the meter on a co-located gas plant, Chevron's Project Kilby, built with Engine No. 1 and GE Vernova and sized to reach 2.67 GW in phases under a 20-year power deal; first power is expected in 2028, subject to Chevron's final investment decision. Microsoft says it funds the generation, plans to connect to the wider grid later, and will use closed-loop cooling. Microsoft Chevron (Energy Forge One LLC) Engine No. 1"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91ad5264ef3af020a0ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-91ad5264ef3af020a0ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Microsoft"]},{"site_id":"vcc-site-eeb4a9ca47e0d579a9cb","name":"Microsoft Silver Springs Datacenter","country":"United States","country_iso_a2":"US","latitude":39.41490935306584,"longitude":-119.24379594248448,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"427dfd4b-2d57-5edf-83ec-1ec7ec3ba846","name":"Microsoft Silver Springs Datacenter — current campus build","status":"site_preparation","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eeb4a9ca47e0d579a9cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eeb4a9ca47e0d579a9cb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lyon County GIS"]},{"site_id":"vcc-site-deed58b28fabd02848f5","name":"Microsoft Union City data center campus (EdgeConneX)","country":"United States","country_iso_a2":"US","latitude":33.605,"longitude":-84.4936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"561d28db-c1e2-5bbc-bda9-e10cbee90d7d","name":"Microsoft Union City data center campus (EdgeConneX)","status":"under_construction","status_as_of":"2026-08-06","search_terms":"Data center campus on 136 acres at 4810 Stonewall Tell Road in Union City, Fulton County, on metro Atlanta's Southside. In July 2024 Microsoft was confirmed as the company seeking a USD 75 million, ten-year property tax break for three planned buildings, and a regional-impact filing described about 2.1 million sq ft in a project a trade report, crediting the Atlanta Journal-Constitution, headlined at USD 1.8 billion. In August 2026 the Atlanta Journal-Constitution described it as an EdgeConneX-developed campus, still under construction, in which Microsoft leases space, with a price tag of nearly USD 2 billion. EdgeConneX Union City campus 4810 Stonewall Tell Road EdgeConneX Microsoft Microsoft Development Authority of Fulton County (Develop Fulton)"}],"status_publishers":["The Atlanta Journal-Constitution"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-deed58b28fabd02848f5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-deed58b28fabd02848f5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Southern Business & Development (via Atlanta Business Chronicle)"]},{"site_id":"vcc-site-bbdc5d36a043320f3d50","name":"Microsoft Wellington Datacenter Site (Gainesville)","country":"United States","country_iso_a2":"US","latitude":38.7930364,"longitude":-77.5813734,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"94517111-8682-5bdf-83b7-b2002e499fa9","name":"Microsoft Wellington Datacenter Site (Gainesville) — proposed campus","status":"announced","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bbdc5d36a043320f3d50/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bbdc5d36a043320f3d50.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-ba0ec3c812ffc9dd281f","name":"Midas Compute Big Spring Facility, 1202 N FM 700, Big Spring (Howard County)","country":"United States","country_iso_a2":"US","latitude":32.2724243,"longitude":-101.4418866,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"375d4c3f-4f3b-535d-943b-07350a579e55","name":"Midas Compute Big Spring Facility — proposed AI computing facility with on-site natural-gas generation (TCEQ air permit 185376 pending)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ba0ec3c812ffc9dd281f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ba0ec3c812ffc9dd281f.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points (Howard County 9-1-1 data, source CSEC)"]},{"site_id":"vcc-site-fe662eaf021a8dc4f203","name":"Monarch Compute Campus Point Pleasant","country":"United States","country_iso_a2":"US","latitude":38.91694204176893,"longitude":-82.11110964992228,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"762397cd-ffc7-55c2-936e-af38cb8d4d0c","name":"Monarch Point Pleasant Current Site Preparation","status":"under_construction","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Nscale Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe662eaf021a8dc4f203/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe662eaf021a8dc4f203.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["West Virginia Department of Environmental Protection"]},{"site_id":"vcc-site-be4bd88c9ffbe4c64a33","name":"Monticello Tech Technology Campus (Edmonson Business Center, Monticello, Minnesota)","country":"United States","country_iso_a2":"US","latitude":45.2669965,"longitude":-93.8077828,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"f2e82e3f-daaf-52ab-9939-f913004d7a76","name":"Monticello Tech — proposed ~3 million sq ft data center technology campus (DCPUD rezoning, CUP and preliminary plat, PC File 2026.34)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["City of Monticello, Minnesota (Community Development)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-be4bd88c9ffbe4c64a33/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-be4bd88c9ffbe4c64a33.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Minnesota Geospatial Information Office; Wright County, Minnesota"]},{"site_id":"vcc-site-6e1076932d6836b39df9","name":"Morris Technology Park","country":"United States","country_iso_a2":"US","latitude":41.38,"longitude":-88.4244,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-01-27","oldest_status_as_of":"2026-01-27","project_count":1,"projects":[{"project_id":"8ac449d0-47a8-5735-a32a-d4eb2a6def53","name":"Morris Technology Park","status":"announced","status_as_of":"2026-01-27","search_terms":"Data center land developer Tract, through an affiliate, bought 343 acres of vacant farmland off Interstate 80 in Morris, Grundy County, Illinois, about 65 miles from downtown Chicago, for a planned 1 GW data center campus of roughly 2.9 million square feet. The project won city approval in 2025, the site is annexed and zoned for it, and it has a transmission security agreement with ComEd. Tract targets initial energization in June 2028 and a full 1 GW load by 2032. Tract's model is to entitle and service raw land and then offer it to large data center users or developers; no end user has been named for this site. Tract Morris data center park Tract ComEd City of Morris"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6e1076932d6836b39df9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6e1076932d6836b39df9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-8cdb2274a5a7f5abf1c9","name":"Nebius Birmingham AI factory (Lakeshore Parkway)","country":"United States","country_iso_a2":"US","latitude":33.5175,"longitude":-86.8094,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"c01f2073-5c23-511c-9d85-80ad9345987a","name":"Nebius Birmingham AI factory (Lakeshore Parkway)","status":"announced","status_as_of":"2026-10-26","search_terms":"Nebius has proposed a two-building AI factory on about 80 acres it owns off Lakeshore Parkway in Birmingham, Alabama, reusing a former bank back-office building. Local television reported in February 2026, without naming who supplied the figure, that Alabama Power would serve the 300 MW facility; it also reported an early-phase permit application with the city and a proposed six-month pause on new data centers. Nebius listed Birmingham among its US data center locations in July 2026. No investment figure, job count or schedule appears in the cited sources. Nebius Nebius Alabama Power"}],"status_publishers":["Nebius Group N.V."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8cdb2274a5a7f5abf1c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8cdb2274a5a7f5abf1c9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WBRC"]},{"site_id":"vcc-site-acf731facf63970bd84b","name":"Nebius Independence AI factory","country":"United States","country_iso_a2":"US","latitude":39.0925,"longitude":-94.4139,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c01906b8-f76a-5afe-ae86-ea56184443f3","name":"Nebius Independence AI factory","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Nebius is building what it calls its first gigawatt-scale AI infrastructure project in the US on about 400 acres in eastern Independence, Missouri, near Route 78 and Little Blue Parkway. The project page describes up to 1.2 GW across four buildings built over five to seven years, with 800 MW from Independence Power & Light and 400 MW of possible on-site generation still under evaluation. Nebius bought the land in December 2025, the City Council approved a Chapter 100 incentive in March 2026, and ground was broken in May 2026 with ARCO as general contractor. Nebius Independence, Missouri AI factory Nebius Nebius ARCO National Construction Independence Power & Light City of Independence"}],"status_publishers":["Nebius"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-acf731facf63970bd84b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-acf731facf63970bd84b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Nebius"]},{"site_id":"vcc-site-ff3fe91dbbe9f9beaf9e","name":"New Hill Digital Campus","country":"United States","country_iso_a2":"US","latitude":35.6811,"longitude":-78.9356,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-03-10","oldest_status_as_of":"2026-03-10","project_count":1,"projects":[{"project_id":"03207f8c-1d9d-577f-9d8c-af881144fb86","name":"New Hill Digital Campus","status":"cancelled","status_as_of":"2026-03-10","search_terms":"Maryland developer Natelli Investments proposed a 250 MW data center campus on about 189 acres of former farmland on Shearon Harris Road in the New Hill community of Wake County, North Carolina, next to Duke Energy's Shearon Harris nuclear plant. The project needed annexation into and rezoning by the Town of Apex and drew organized local opposition in 2025. In March 2026 Natelli withdrew its annexation and rezoning applications, saying it would consider next steps only if Apex amended its zoning rules to allow data centers, while town leaders weighed a one-year moratorium. Apex data center (Natelli Investments) Natelli Investments Town of Apex"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff3fe91dbbe9f9beaf9e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff3fe91dbbe9f9beaf9e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WRAL"]},{"site_id":"vcc-site-0761b2abd1f4d9887945","name":"Novva Colorado Springs Data Center Campus (650 Sybilla Lane)","country":"United States","country_iso_a2":"US","latitude":39.0138515,"longitude":-104.8148032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"357d7e41-90cd-5014-9715-610d0fbf2fbe","name":"Novva Colorado Springs — existing data-centre operations","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0761b2abd1f4d9887945/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0761b2abd1f4d9887945.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; El Paso County source data"]},{"site_id":"vcc-site-baa4b50e6b9b2514d6eb","name":"Novva Las Vegas Data Center (6115 Nicco Way, North Las Vegas)","country":"United States","country_iso_a2":"US","latitude":36.2715265,"longitude":-115.048948,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"4ff23f07-2f3f-5281-a4db-9bf38ff4febf","name":"Novva Las Vegas — existing data-centre operations","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-baa4b50e6b9b2514d6eb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-baa4b50e6b9b2514d6eb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-0fae550d9965f8aa3c37","name":"Novva Mesa Data Center Campus (Ellsworth Rd and Warner Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3397412,"longitude":-111.639471,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"6052bcfe-7547-5b5c-8238-958509f970b2","name":"Novva Mesa — planned 300 MW, five-data-hall data-centre campus in two phases","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fae550d9965f8aa3c37/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fae550d9965f8aa3c37.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-9ea046e6f8ace1e0118e","name":"Novva Utah Data Center Campus (West Jordan, Utah)","country":"United States","country_iso_a2":"US","latitude":40.5726418,"longitude":-112.0459823,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-10","oldest_status_as_of":"2026-09-10","project_count":1,"projects":[{"project_id":"6519eae9-de3d-5743-8bb0-3f307a0ca838","name":"Novva Utah flagship campus — existing data-centre operations","status":"operational","status_as_of":"2026-09-10","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9ea046e6f8ace1e0118e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9ea046e6f8ace1e0118e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-86c96db92481ee74998d","name":"NTT Dallas Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.982500800175,"longitude":-96.654368299801,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-31","oldest_status_as_of":"2026-05-31","project_count":1,"projects":[{"project_id":"9ddf0df3-e40c-515f-9468-ed78f063513b","name":"NTT Dallas TX4 Data Center","status":"under_construction","status_as_of":"2026-05-31","search_terms":""}],"status_publishers":["NTT Global Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-86c96db92481ee74998d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-86c96db92481ee74998d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-0db17b27ff270e0d54bb","name":"NTT Global Data Centers Chicago Campus, Hamilton Lakes, Pierce Road, Itasca (DuPage County)","country":"United States","country_iso_a2":"US","latitude":41.9879041,"longitude":-88.0077012,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"473cb9e4-a120-5423-8065-1925b7678429","name":"NTT Chicago CH3 - new 270,000 sq ft data center building under construction","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Village of Itasca, Illinois"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0db17b27ff270e0d54bb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0db17b27ff270e0d54bb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["DuPage County, Illinois GIS"]},{"site_id":"vcc-site-ad1d7f1998474bbd92ff","name":"NTT Global Data Centers Phoenix (Mesa) Campus (10256 E Elliot Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3548738,"longitude":-111.6111701,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"aef11ac4-4631-562f-92ec-67f92f37369d","name":"NTT Phoenix (Mesa) PH5 — Building 3, two-storey 225,606 sq ft data center under construction (Mesa permit PMT24-17530)","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ad1d7f1998474bbd92ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ad1d7f1998474bbd92ff.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-9a3b26464f547fa842e6","name":"OKC2 (6000 N Shartel Ave, Oklahoma City)","country":"United States","country_iso_a2":"US","latitude":35.53351,"longitude":-97.52242,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"e9ea1026-38e9-5eca-b61c-d5ee08c33edb","name":"OKC2 — GPU computing data center with on-site gas-engine power (proposed new facility)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Oklahoma Department of Environmental Quality, Air Quality Division"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9a3b26464f547fa842e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9a3b26464f547fa842e6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma Department of Environmental Quality"]},{"site_id":"vcc-site-88d9a98c0d66b0ceae9f","name":"Old Ocean Data Center (Nightpeak Energy)","country":"United States","country_iso_a2":"US","latitude":29.0797,"longitude":-95.7494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-03-11","oldest_status_as_of":"2026-03-11","project_count":1,"projects":[{"project_id":"c400f10b-b4a6-5824-987b-3ff8657fb0d3","name":"Old Ocean Data Center (Nightpeak Energy)","status":"proposed","status_as_of":"2026-03-11","search_terms":"Nightpeak Energy proposes a hyperscale data center campus with co-located gas turbine generation on a 158-acre site outside Sweeny in Brazoria County, Texas, about 65 miles southwest of Houston. County meeting documents, as reported by Bisnow, describe two 310 MW data centers at USD 1.5 billion each and two 310 MW combustion turbine plants at USD 250 million each, while Public Citizen describes one data center and one gas plant. On 10 March 2026 the commissioners court unanimously rejected a reinvestment zone and four ten-year, 100% tax abatements; the county judge expected the project to proceed anyway. Nightpeak's website, as quoted by Bisnow, said the campus could energize from 2027. Old Ocean Datacenter Nightpeak Energy Brazoria County Commissioners Court"}],"status_publishers":["Public Citizen"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88d9a98c0d66b0ceae9f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88d9a98c0d66b0ceae9f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Public Citizen"]},{"site_id":"vcc-site-6d1cd988dd9b7c70c942","name":"OpenAI Project Camellia (Effingham County, Georgia)","country":"United States","country_iso_a2":"US","latitude":32.25854279027115,"longitude":-81.2629871231605,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"3013a6c3-32a1-55a9-b77e-777eefc6bfea","name":"OpenAI Project Camellia — planned AI data-centre campus","status":"announced","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["OpenAI"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d1cd988dd9b7c70c942/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d1cd988dd9b7c70c942.json","geometry_licenses":["public-government-record-no-licence-stated"],"geometry_attributions":["Effingham County, Georgia GIS (Parcels2024 feature service)"]},{"site_id":"vcc-site-f65d3c659a862ad07679","name":"Oracle Project Jupiter Doña Ana County AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":31.8182982,"longitude":-106.66530225,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"6f0acd88-cd04-5f3f-915c-48a71fd51f39","name":"Oracle Project Jupiter Doña Ana County Current Campus Build","status":"under_construction","status_as_of":"2026-10-13","search_terms":"Project Jupiter is a four-building AI campus in Doña Ana County, New Mexico, named in September 2025 as one of the new Oracle-linked Stargate sites serving OpenAI. Analysts report STACK Infrastructure and BorderPlex Digital Assets as developers and an 18-year Oracle lease. The campus is off-grid: it was first planned around two gas microgrids, but in April 2026 Oracle and BorderPlex withdrew those air permit applications in favor of up to 2.45 GW of Bloom fuel cells, per analyst Cleanview. Analyst Epoch AI projects about 2.2 GW at completion around late 2028. Foundations were under way by early 2026, and in September 2026 more than 700 New Mexico residents were working on site. Project Jupiter Stargate New Mexico Stargate Project Jupiter STACK Infrastructure BorderPlex Digital Assets Oracle OpenAI Bloom Energy"}],"status_publishers":["Oracle Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f65d3c659a862ad07679/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f65d3c659a862ad07679.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-09a8ea20931b50e7a218","name":"Page, Arizona data center site (Huntley LLC)","country":"United States","country_iso_a2":"US","latitude":36.9142,"longitude":-111.5033,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"bc344b80-1656-5a9a-a788-a5f7cb59131e","name":"Page, Arizona data center site (Huntley LLC)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed data center campus on about 500 acres of city-owned recreational land on the southwest side of Page, Arizona, near Highway 98 and Horseshoe Bend. In October 2025 the city council passed Ordinance 744-25, a land sale agreement with Huntley LLC at USD 14,000 an acre with a feasibility period, milestones and a city buy-back right; it approves no construction, zoning or utilities. Press accounts of filings describe a campus of about 1 GW worth up to USD 10 billion including on-site energy work. A resident referendum petition was rejected on paperwork grounds in late 2025, and in autumn 2026 the city was holding hearings on data center zoning rules. Page data center Horseshoe Bend data center proposal Huntley LLC City of Page Page City Council"}],"status_publishers":["City of Page"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-09a8ea20931b50e7a218/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-09a8ea20931b50e7a218.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arizona Center for Investigative Reporting"]},{"site_id":"vcc-site-3bb40ecdf91f4fb36503","name":"Pemberton Data Center Campus (Centreport Gateway Pemberton Tech Center, Centreport Parkway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.3773957,"longitude":-77.4726441,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"22e9494d-3a20-58b3-bf43-a1f2d9407959","name":"Pemberton Data Center — approved by-right data center campus site plan (tax parcel 37-25, Centreport Parkway)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3bb40ecdf91f4fb36503/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3bb40ecdf91f4fb36503.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-07b3e2197c23d98b282e","name":"Pennsylvania Digital I (PAX-1), Middlesex Township","country":"United States","country_iso_a2":"US","latitude":40.2167,"longitude":-77.1164,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-05","oldest_status_as_of":"2026-03-05","project_count":1,"projects":[{"project_id":"39dca169-c304-53a7-b2a6-15a9a914e4d1","name":"Pennsylvania Digital I (PAX-1), Middlesex Township","status":"announced","status_as_of":"2026-03-05","search_terms":"Hyperscale AI data center development on about 700 acres off Country Club Road in Middlesex Township, Cumberland County, roughly five miles northeast of Carlisle, Pennsylvania. Pennsylvania Data Center Partners and PowerHouse Data Centers announced the USD 15 billion joint venture in July 2025: three campuses of six buildings, each with its own 450 MW substation, for 1.35 GW of utility capacity expandable to 1.8 GW, connected by PPL Electric Utilities. Township supervisors approved subdivision plans in January 2026 and a 450 MW substation in March 2026, before vertical construction began. The developers target 300 MW of power by the second quarter of 2027. Pennsylvania Digital I Pennsylvania Digital 1 PAX-1 PAX PowerHouse Data Centers Pennsylvania Data Center Partners Carlisle Development Partners LLC PPL Electric Utilities Middlesex Township Board of Supervisors"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07b3e2197c23d98b282e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07b3e2197c23d98b282e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["PowerHouse Data Centers"]},{"site_id":"vcc-site-305d2355387f28814a9a","name":"Potomac Church Tech Center Data Center Campus (125 Old Potomac Church Road, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.4113223,"longitude":-77.404247,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"ac26ed39-1397-5aa3-a932-0109d7368ffc","name":"Potomac Church Data Center — Building 1 (complete and occupied)","status":"completed","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-305d2355387f28814a9a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-305d2355387f28814a9a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-6d5fe2fc2166ad27899f","name":"PowerHouse 95 data center campus","country":"United States","country_iso_a2":"US","latitude":38.18,"longitude":-77.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"48d82a4f-46ea-5641-a650-b6e147b30ae6","name":"PowerHouse 95 data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Campus aimed at hyperscale users, planned by PowerHouse Data Centers, a unit of American Real Estate Partners, along the I-95 corridor in Spotsylvania County, Virginia, through a joint venture with Harrison Street. PowerHouse completed the purchase of 145 acres in January 2024 and described an 800 MW campus served by three 300 MW substations, the first meant to deliver 150 MW. Its current campus page lists 227 acres, up to 900 MW of utility power, up to 12 buildings of up to two stories and about 3.6 million sq ft, with power delivery targeted for Q3 2027. PowerHouse 95 PH95 PH 95 PowerHouse Data Centers Harrison Street"}],"status_publishers":["PowerHouse Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5fe2fc2166ad27899f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d5fe2fc2166ad27899f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Converge Digest"]},{"site_id":"vcc-site-910b8939869a2f993425","name":"PowerHouse Grand Prairie campus (PowerHouse and Provident)","country":"United States","country_iso_a2":"US","latitude":32.5069,"longitude":-97.0069,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-02","oldest_status_as_of":"2026-04-02","project_count":1,"projects":[{"project_id":"fe8ac418-224e-5ac7-b342-11689bcc613e","name":"PowerHouse Grand Prairie campus (PowerHouse and Provident)","status":"announced","status_as_of":"2026-04-02","search_terms":"Hyperscale data center campus planned by a PowerHouse Data Centers and Provident Data Centers joint venture on 768 to 810 acres just outside Grand Prairie in northern Ellis County, Texas. The partners plan an on-site 1.8 GW switchyard, with a first 500 MW tranche approved through ERCOT, and 24 buildings in three phases at announcement. A state accessibility filing registered in April 2026 covers Data Center Building 1, a two-story 224,152 sq ft core and shell at 881 Miller Road with an estimated cost of about USD 72.6 million and a scheduled April 2026 to April 2028 build window. PowerHouse Grand Prairie AREP Power House Grand Prairie PowerHouse Data Centers Provident Data Centers Prairie Ridge Phase 1 Owner LP"}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-910b8939869a2f993425/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-910b8939869a2f993425.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["PowerHouse Data Centers"]},{"site_id":"vcc-site-f7c2acac6f50afd8adde","name":"PowerHouse Louisville hyperscale campus (Camp Ground Road)","country":"United States","country_iso_a2":"US","latitude":38.2561,"longitude":-85.7514,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"dd87fe4b-fdb0-5c4e-a906-70fda834e424","name":"PowerHouse Louisville hyperscale campus (Camp Ground Road)","status":"under_construction","status_as_of":"2026-08-13","search_terms":"Hyperscale data center campus on Camp Ground Road in southwest Louisville, Kentucky, developed by a joint venture of PowerHouse Data Centers and Louisville-based Poe Companies and billed as the state's first hyperscale campus. Announced in January 2025 as a 400 MW campus with 335 MW of initial LG&E power secured and the first 130 MW due in October 2026, it sits on about 150 acres with zoning already in place. PowerHouse's campus page now lists up to 525 MW of utility power and up to six buildings. Local reporting in mid-2026 described seven warehouse-sized buildings under construction, with the first phase expected online as soon as October 2026; no tenant has been named. PowerHouse Louisville Camp Ground Road data center Campground Road data center PowerHouse Data Centers Poe Companies Louisville Gas and Electric (LG&E)"}],"status_publishers":["WAVE"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f7c2acac6f50afd8adde/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f7c2acac6f50afd8adde.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WAVE"]},{"site_id":"vcc-site-2f87e5bd268fd4e684db","name":"Project Bedrock Data Center (Carmen Avenue, Inver Grove Heights)","country":"United States","country_iso_a2":"US","latitude":44.8626591,"longitude":-93.0379905,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"ecca382e-3bb8-59a9-86c7-4f77768abcb8","name":"Project Bedrock — 54,070 sq ft data center building (Major Site Plan, Resolution 2026-209, 5890 Carmen Avenue)","status":"permitted","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["City of Inver Grove Heights, Minnesota"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f87e5bd268fd4e684db/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f87e5bd268fd4e684db.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-18500c4557e6b208669d","name":"Project Blue","country":"United States","country_iso_a2":"US","latitude":32.2219,"longitude":-110.9714,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-24","oldest_status_as_of":"2026-04-24","project_count":1,"projects":[{"project_id":"d654ea2a-ea8e-564e-a1df-67f35d52ebbc","name":"Project Blue","status":"under_construction","status_as_of":"2026-04-24","search_terms":"Beale Infrastructure is building a data center campus on about 290 acres of former county land just north of the Pima County Fairgrounds, in unincorporated Pima County outside Tucson's city limits. Tucson's council voted against the project in August 2025, ending annexation talks, so it went ahead under county jurisdiction with a redesigned air-cooled plan. The county puts total investment at USD 3.6 billion, with four buildings in the first phase and up to ten at full build-out. State regulators approved a Tucson Electric Power supply agreement for 286 MW in December 2025, and work on site was reported under way in April 2026. Beale Infrastructure Pima County data center campus Beale Infrastructure Humphrey's Peak Properties, LLC Tucson Electric Power Pima County"}],"status_publishers":["KOLD News 13"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-18500c4557e6b208669d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-18500c4557e6b208669d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Pima County"]},{"site_id":"vcc-site-bb30c1cd06b508cbd3e8","name":"Project Celtics Data Center Campus (Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0550307,"longitude":-77.5451373,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"c805be96-ce2f-596d-b20e-7456144e6d11","name":"Project Celtics — Building 5 core and shell (42630 Patriot Park Dr)","status":"permitted","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb30c1cd06b508cbd3e8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb30c1cd06b508cbd3e8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-d6bcbce9f1b88dd3f4aa","name":"Project Delta Data Center Site (Walnut Cove, Stokes County)","country":"United States","country_iso_a2":"US","latitude":36.3220665,"longitude":-80.1051933,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"79828246-223a-53c3-9ee8-ae36911d2d09","name":"Project Delta — proposed data center campus (conditional rezoning R-A to M-2-CZ, about 1,848.74 acres)","status":"announced","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Stokes County Board of Commissioners, North Carolina"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6bcbce9f1b88dd3f4aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6bcbce9f1b88dd3f4aa.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Stokes County, North Carolina"]},{"site_id":"vcc-site-b66784d37126c8c3b6a0","name":"Project Flex Data Center Campus (Lyon Township, Ambassador Parkway West and Milford Road)","country":"United States","country_iso_a2":"US","latitude":42.5016616,"longitude":-83.6091107,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"8ba06567-a5f5-576e-ad88-833dcd1c700f","name":"Project Flex — proposed data center campus (final site plan under review)","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Charter Township of Lyon, Oakland County, Michigan (archived by the Internet Archive)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b66784d37126c8c3b6a0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b66784d37126c8c3b6a0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oakland County, Michigan"]},{"site_id":"vcc-site-148cf0bd79f9e16d2422","name":"Project Loch Data Center Site (Watkins Centre, 750 Watkins Centre Parkway, Chesterfield County)","country":"United States","country_iso_a2":"US","latitude":37.4956252,"longitude":-77.6925279,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"32c8d09f-86e8-5e80-b656-82d6dc0e4962","name":"Project Loch / Watkins Centre — approved future Google data center site (rezoning 25SN1040)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-148cf0bd79f9e16d2422/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-148cf0bd79f9e16d2422.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Chesterfield County, Virginia"]},{"site_id":"vcc-site-5ccd8508002b9845d587","name":"Project Longhorn Data Center Campus (Cedar Creek)","country":"United States","country_iso_a2":"US","latitude":30.0754157,"longitude":-97.4262036,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"1e498217-a592-5336-9532-f6d41acd105e","name":"Project Longhorn Building One","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5ccd8508002b9845d587/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5ccd8508002b9845d587.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bastrop Central Appraisal District data)"]},{"site_id":"vcc-site-fcd641148c4f61598efc","name":"Project Sail (Prologis data center campus, Coweta County)","country":"United States","country_iso_a2":"US","latitude":33.376,"longitude":-84.788,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-09","oldest_status_as_of":"2026-04-09","project_count":1,"projects":[{"project_id":"4a2847d7-f84f-5f89-a4c2-ee832e1f6cad","name":"Project Sail (Prologis data center campus, Coweta County)","status":"announced","status_as_of":"2026-04-09","search_terms":"Proposed hyperscale data center campus on roughly 830 acres in rural Sargent, about 7 miles northwest of Newnan in Coweta County, Georgia, near Georgia Power's Plant Yates. Atlas Development originally proposed the project, disclosed in early 2025 as a 13-building plan reported at USD 17 billion; Prologis took over development and cut the plan to nine buildings with about 4.34 million square feet. Trade press estimates the campus could need about 900 MW; Chattahoochee Riverkeeper, an environmental group, puts peak demand at full build-out at 910 MW. Coweta County approved the rezoning 3-2 in April 2026 after a moratorium and sustained local opposition. Project Sail Prologis Coweta County data center campus Prologis Atlas Development LLC Georgia Power Coweta County Water & Sewerage Authority Coweta County"}],"status_publishers":["Propmodo"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcd641148c4f61598efc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcd641148c4f61598efc.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Chattahoochee Riverkeeper"]},{"site_id":"vcc-site-6536417bea2567e8dcbf","name":"Project Skye Data Center Site (Upper Magnolia Green, 4201 Moseley Road, Chesterfield County)","country":"United States","country_iso_a2":"US","latitude":37.4398655,"longitude":-77.7590209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"36330248-a95d-5b46-98fe-eb614732b9e2","name":"Project Skye / Upper Magnolia Green — approved future Google data center site (rezoning 25SN1038, Tract A)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6536417bea2567e8dcbf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6536417bea2567e8dcbf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Chesterfield County, Virginia"]},{"site_id":"vcc-site-b1970b8a6c4cf6da5755","name":"Project Thunderbird West Campus (Enid, Oklahoma)","country":"United States","country_iso_a2":"US","latitude":36.3798725,"longitude":-97.8502975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"24162bac-2bb5-5f9d-815d-14978bf69b1b","name":"Project Thunderbird West Campus — proposed data center on the western tract (rezoning A to I-3)","status":"announced","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["City of Enid, Oklahoma (application filed by Plainsmen Holdings, LLC)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b1970b8a6c4cf6da5755/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b1970b8a6c4cf6da5755.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["City of Enid GIS, GC_Parcels map service (Garfield County parcel data)"]},{"site_id":"vcc-site-df93318f7935fb88ea53","name":"Prologis Trenton Project Mila Campus","country":"United States","country_iso_a2":"US","latitude":39.45620000836149,"longitude":-84.45971679023693,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"d6a6d399-4580-54f8-80de-1dc0854e4699","name":"Prologis Trenton Project Mila Campus Construction","status":"under_construction","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Trenton Data Center Campus LLC; hosted by Supreme Court of Ohio"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df93318f7935fb88ea53/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df93318f7935fb88ea53.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Butler County Auditor Office","Butler County Engineer Office"]},{"site_id":"vcc-site-a393d0e2bc6a6f9efbd5","name":"Prometheus Hyperscale Evanston campus","country":"United States","country_iso_a2":"US","latitude":41.2683,"longitude":-110.9632,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-22","oldest_status_as_of":"2026-06-22","project_count":1,"projects":[{"project_id":"74d6b0be-d450-509d-a406-ddfed7ede756","name":"Prometheus Hyperscale Evanston campus","status":"announced","status_as_of":"2026-06-22","search_terms":"Proposed AI data center campus on about 506 acres of family ranchland roughly 12 miles east of Evanston, Wyoming, south of Interstate 80 in Uinta County. Prometheus Hyperscale plans 1.25 GW in a first phase with a stated path to 5 GW, run as an islanded microgrid on on-site natural gas generation rather than the public grid. Uinta County commissioners unanimously granted a conditional use permit in June 2026; the company says construction could start within six months of final permitting and take four to five years. The county sent support letters to Meta and Microsoft, but no tenant has been confirmed. Prometheus Hyperscale flagship campus Wyoming Hyperscale Whitebox Prometheus Hyperscale Uinta County Board of Commissioners"}],"status_publishers":["TownLift"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a393d0e2bc6a6f9efbd5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a393d0e2bc6a6f9efbd5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KPCW"]},{"site_id":"vcc-site-cd315d5cbb01f749da8f","name":"PW Digital Gateway","country":"United States","country_iso_a2":"US","latitude":38.7947,"longitude":-77.6206,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-07-04","oldest_status_as_of":"2026-07-04","project_count":1,"projects":[{"project_id":"4ac7a0d0-0faf-50c0-bed8-08d54e0bc62b","name":"PW Digital Gateway","status":"cancelled","status_as_of":"2026-07-04","search_terms":"Proposed data center corridor of roughly 2,100 acres along Pageland Lane near Gainesville in western Prince William County, Virginia, next to Manassas National Battlefield Park. In December 2023 the county board approved three rezonings (Compass, DG North and DG South) that together allowed about 22 million square feet and up to 37 data centers for QTS and Compass Datacenters. Courts later held the rezonings void because the hearing was improperly advertised. The county and Compass stopped defending them in April 2026, and QTS withdrew its last appeal and ended the project in July 2026. Prince William Digital Gateway Digital Gateway QTS Data Centers Compass Datacenters H&H Capital Acquisitions, LLC Prince William County Board of County Supervisors"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cd315d5cbb01f749da8f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cd315d5cbb01f749da8f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WTOP (republished from InsideNoVa)"]},{"site_id":"vcc-site-990a491f49bc3fcbf938","name":"QTS and Lancium Hall County data center campus","country":"United States","country_iso_a2":"US","latitude":34.3939,"longitude":-100.8953,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["site_preparation"],"newest_status_as_of":"2026-08-28","oldest_status_as_of":"2026-08-28","project_count":1,"projects":[{"project_id":"39eada86-53aa-55d0-ae26-0ff35f9e1207","name":"QTS and Lancium Hall County data center campus","status":"site_preparation","status_as_of":"2026-08-28","search_terms":"Lancium and QTS announced in July 2026 a data center campus near Turkey in Hall County, Texas, with more than 10 billion US dollars of planned capital investment. Lancium owns the campus and provides electrical and civil infrastructure, planning to bring its own power through battery storage and solar; QTS will design, build and operate the data center buildings. The companies said they would fund all needed energy infrastructure upgrades. Up to 7,000 construction jobs at peak and about 350 permanent jobs were projected. No capacity figure, tenant or construction dates were disclosed. Hall County Clean Campus Lancium QTS QTS"}],"status_publishers":["Lancium Inc."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-990a491f49bc3fcbf938/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-990a491f49bc3fcbf938.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lancium"]},{"site_id":"vcc-site-7001df866adca1a08449","name":"QTS Ashburn 1 Data Center Campus (Broderick Drive and Randolph Drive, Sterling)","country":"United States","country_iso_a2":"US","latitude":38.9991033,"longitude":-77.4498323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"7b60b358-a85b-566c-a490-41bce9ef95f3","name":"QTS Ashburn 1 DC2 — data centre under construction (22280 Randolph Drive)","status":"under_construction","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC (QTS Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7001df866adca1a08449/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7001df866adca1a08449.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-98db91806e7e60522076","name":"QTS Aurora DEN1 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.73378311392442,"longitude":-104.71239001410385,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"c23fe40c-0685-5cee-8fab-9c08575e6b27","name":"QTS Aurora DEN1 DC2 Current Fit-Out","status":"under_construction","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["City of Aurora, Colorado"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98db91806e7e60522076/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98db91806e7e60522076.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Aurora, Colorado"]},{"site_id":"vcc-site-d48a213ebe706be3a283","name":"QTS Bessemer Data Center Campus (Project Marvel)","country":"United States","country_iso_a2":"US","latitude":33.3558048,"longitude":-87.0439199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"140949c3-1e73-5aa8-b5cd-2a02f100e24e","name":"QTS Bessemer data center campus (Project Marvel) - site preparation","status":"site_preparation","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC (QTS Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d48a213ebe706be3a283/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d48a213ebe706be3a283.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Bessemer, Alabama (bessemergis ArcGIS organisation); Jefferson County Commission, Information Technology Services - GIS Division"]},{"site_id":"vcc-site-d60291ccffe6616c33cc","name":"QTS Cedar Rapids Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.907294,"longitude":-91.754301,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"ae6f1b86-660b-54e9-bdb0-d29bfeedc551","name":"QTS Cedar Rapids Current Campus Development","status":"under_construction","status_as_of":"2026-07-15","search_terms":""}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d60291ccffe6616c33cc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d60291ccffe6616c33cc.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["QTS Data Centers"]},{"site_id":"vcc-site-3e65a9f3d78bff82cf77","name":"QTS Eagle Mountain SLC1 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.267749221659585,"longitude":-112.03332438583949,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f166440f-2ab0-57ea-9788-c66d89c8704f","name":"QTS Eagle Mountain SLC1 Building 2","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3e65a9f3d78bff82cf77/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3e65a9f3d78bff82cf77.json","geometry_licenses":["county-public-gis-fact-extraction-only"],"geometry_attributions":["GIS Division, Utah County Information Systems Department"]},{"site_id":"vcc-site-32a95caf9128d7dd56c8","name":"QTS Fayetteville campus","country":"United States","country_iso_a2":"US","latitude":33.4478,"longitude":-84.4617,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2025-11-21","oldest_status_as_of":"2025-11-21","project_count":1,"projects":[{"project_id":"7c43c342-562c-5d46-b793-39a4dd2a8cc0","name":"QTS Fayetteville campus","status":"partially_operational","status_as_of":"2025-11-21","search_terms":"QTS is building a multi-building data center campus on about 615 acres along Georgia Highway 54 West in Fayetteville, Georgia, about 25 miles south of Atlanta. QTS bought the site from the Fayette County Development Authority in 2022, when the campus was first unveiled as Project Excalibur, and Bisnow reported it was expected to cost QTS more than USD 1 billion. City filings describe about 7 million square feet of data center and office space. The first building received a certificate of occupancy in May 2025, and by November 2025 two buildings were operating with four more under development. Microsoft has been reported, but not confirmed, as a tenant. Project Excalibur QTS Data Center Fayetteville QTS Data Centers Fayette County Development Authority City of Fayetteville Microsoft"}],"status_publishers":["The Citizen (Fayette County)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32a95caf9128d7dd56c8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32a95caf9128d7dd56c8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Citizen (Fayette County)"]},{"site_id":"vcc-site-b2210602799840717dd3","name":"QTS Irving Data Center Campus (Irving 1, DFW1)","country":"United States","country_iso_a2":"US","latitude":32.895929,"longitude":-96.9815339,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"e045bc2b-5fdc-5483-8603-6e4090397467","name":"QTS DFW1-DC1 data hall 1.2 fit-out (Project Atlas)","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2210602799840717dd3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2210602799840717dd3.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-88c487e5ee33f7488890","name":"QTS South Dallas Campus (DFW2, Wilmer/Lancaster)","country":"United States","country_iso_a2":"US","latitude":32.5863624,"longitude":-96.6985474,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"f3ee5e25-800d-57e3-abac-06cd66ec3b9e","name":"QTS DFW2 DC7","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88c487e5ee33f7488890/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88c487e5ee33f7488890.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-73e7407002d9d2819589","name":"QTS Suwanee Data Center Campus (120 and 300 Satellite Boulevard)","country":"United States","country_iso_a2":"US","latitude":34.0362323,"longitude":-84.0593726,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"18e83a34-b691-5957-bae8-7296f053894d","name":"QTS Suwanee campus — existing data-centre campus operations (DC1 and DC2)","status":"operational","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-73e7407002d9d2819589/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-73e7407002d9d2819589.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Gwinnett County, Georgia"]},{"site_id":"vcc-site-382d4c7030c7ed7c700d","name":"QTS York County Data Center Campus","country":"United States","country_iso_a2":"US","latitude":35.035399273352,"longitude":-81.103431663732,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"5b758548-2a2a-5643-9ebb-d8381bbd2c52","name":"QTS York County Initial-Phase Building 1","status":"shell","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Gilbane Building Company"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-382d4c7030c7ed7c700d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-382d4c7030c7ed7c700d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-bf298971fe1dec3fc0ac","name":"Quantum Frederick data center park","country":"United States","country_iso_a2":"US","latitude":39.4311,"longitude":-77.3972,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-03-12","oldest_status_as_of":"2026-03-12","project_count":1,"projects":[{"project_id":"a490f00a-8b75-5547-b0e9-5fb3b6e5f616","name":"Quantum Frederick data center park","status":"under_construction","status_as_of":"2026-03-12","search_terms":"Master-planned data center park of about 2,100 acres on the former Alcoa Eastalco Works site near Frederick, Maryland. Quantum Loophole bought the land in 2021 with backing from a joint venture with TPG Real Estate, planned to start with 1 GW of transmission capacity, and announced in June 2022 that it had broken ground on shared power, water and fiber infrastructure. TPG took full control at the end of 2024 of a project reported at USD 5 billion. Aligned Data Centers plans four buildings totaling 264 MW in the park, including a 72 MW building reported topped out in March 2026, and Rowan Digital Infrastructure is developing 11 buildings on three sites. Quantum Frederick Quantum Park Quantum Loophole Frederick campus TPG Real Estate TPG Real Estate Quantum Loophole Aligned Data Centers Rowan Digital Infrastructure Turner Construction Company"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf298971fe1dec3fc0ac/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf298971fe1dec3fc0ac.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Baxtel"]},{"site_id":"vcc-site-c879bad0c737049a2484","name":"Related Digital Cheyenne Campus","country":"United States","country_iso_a2":"US","latitude":41.1426277,"longitude":-104.7015111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"31635fdf-a7a6-52c8-91dc-f64e5c7d10d3","name":"Related Digital Cheyenne Phase 1","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["Related Digital"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c879bad0c737049a2484/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c879bad0c737049a2484.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Related Digital"]},{"site_id":"vcc-site-387901bd13edd6eab35d","name":"Riot Platforms Corsicana facility","country":"United States","country_iso_a2":"US","latitude":32.05,"longitude":-96.47,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"27338e9f-68b5-58be-b981-a8a13c391bd6","name":"Riot Platforms Corsicana facility","status":"partially_operational","status_as_of":"2026-08-10","search_terms":"Riot Platforms campus in Navarro County, Texas, begun in 2022 to expand bitcoin mining; its 400 MW first phase of immersion-cooled mining infrastructure was completed in 2024 and still serves mining. Riot now plans to make the site's expected total of about 1 GW of developed capacity available for high-density compute: in January 2026 it said it would convert available Corsicana power for data center use, its 2025 annual report described a first data center phase at Corsicana, and in August 2026 it disclosed a non-binding letter of intent with a single tenant for the full site. The sources opened report no signed lease. Corsicana Facility Riot Corsicana Riot Platforms Riot Platforms"}],"status_publishers":["Riot Platforms, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-387901bd13edd6eab35d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-387901bd13edd6eab35d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Riot Platforms, Inc. via SEC EDGAR"]},{"site_id":"vcc-site-3dedcd29014f493a2abb","name":"Riot Rockdale Campus","country":"United States","country_iso_a2":"US","latitude":30.57589508119766,"longitude":-97.0788554968219,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":2,"projects":[{"project_id":"298d7152-0985-535e-a701-60b689a3cd00","name":"Riot Platforms Rockdale data center campus","status":"partially_operational","status_as_of":"2026-08-10","search_terms":"Riot Platforms bitcoin mining facility on about 200 acres in Rockdale, Milam County, Texas, with a 700 MW grid interconnection, being converted for AI data center tenants. In January 2026 Riot bought the land it had leased and signed AMD for 25 MW of critical IT load, later expanded to 50 MW; the first 25 MW was commissioned in May 2026. In August 2026 Riot signed a 20-year, build-to-suit lease with an unnamed frontier AI lab for 191 MW of critical IT load worth about USD 9.1 billion, with 96 MW due in December 2027 and the rest by June 2028, and put expected capital spending on that build at USD 2.1 to 2.3 billion. Rockdale Facility Rockdale Site Riot Platforms Riot Platforms Riot Platforms AMD"},{"project_id":"b4ff75a2-9d55-54ad-bf27-4c60b096eb0f","name":"Riot Rockdale AMD Expansion Phases 3 and 4","status":"under_construction","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Riot Platforms, Inc.","Riot Platforms, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3dedcd29014f493a2abb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3dedcd29014f493a2abb.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Texas Geographic Information Office","Texas Geographic Information Office / Texas Water Development Board","Texas Geographic Information Office; CSEC originating data","Texas Geographic Information Office; Various 911 Districts"]},{"site_id":"vcc-site-b965a370d922dc0156af","name":"Rowan Cinco Data Center Campus (Rowan Cinco Subdivision, CR 683, between Lytle and Natalia, Medina County)","country":"United States","country_iso_a2":"US","latitude":29.2210266,"longitude":-98.8356334,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"3f60d6db-df2e-579a-9979-16716f33019f","name":"Project Cinco — hyperscale data center campus under construction (first development phase)","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Rowan Digital Infrastructure LLC (Internet Archive copy)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b965a370d922dc0156af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b965a370d922dc0156af.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Medina Appraisal District data)"]},{"site_id":"vcc-site-4066c8eef2c3b8f310b2","name":"Rowan Project Pirate Data Center Campus (CR 683, Lytle, Medina County)","country":"United States","country_iso_a2":"US","latitude":29.2272183,"longitude":-98.8211638,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"49ca3822-f4bc-507e-8b80-c954423118e4","name":"Project Pirate — proposed data center campus on about 280 acres (announced September 2026)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Rowan Digital Infrastructure LLC (Rowan in Medina County project site)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4066c8eef2c3b8f310b2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4066c8eef2c3b8f310b2.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Medina Appraisal District data)"]},{"site_id":"vcc-site-998792d68106140776c0","name":"Rowan Project Temple","country":"United States","country_iso_a2":"US","latitude":31.1056,"longitude":-97.4208,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-29","oldest_status_as_of":"2026-05-29","project_count":1,"projects":[{"project_id":"4a2a09d1-1ace-5ff8-a80f-89996cda5799","name":"Rowan Project Temple","status":"under_construction","status_as_of":"2026-05-29","search_terms":"Rowan Digital Infrastructure is building a 300 MW hyperscale data center campus on about 700 acres in east Temple, Bell County, Texas, roughly 70 miles north of Austin. Temple's council gave final approval to annex and zone the land in 2025, and in January 2026 Rowan reported construction under way, with power secured through Oncor and an unnamed large technology company as the long-term customer. In May 2026 Rowan announced it had closed nearly USD 3 billion of debt financing, and it expects operations in 2027. A third and final building, the Lasso Building, is now planned on adjacent land, and Rowan has offered USD 38 million for city water programs and a planned community center. Project Temple Rowan Temple data center campus Rowan Digital Infrastructure Oncor City of Temple Bell County"}],"status_publishers":["Rowan Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-998792d68106140776c0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-998792d68106140776c0.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-455ad29119b056e3099f","name":"Sabey Indianapolis Decatur Township Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.6652336,"longitude":-86.3018045,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"1a1900a7-4af1-5dd4-ac41-81acc7441736","name":"Sabey Indianapolis Decatur Township Data Center Campus — proposed campus","status":"announced","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-455ad29119b056e3099f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-455ad29119b056e3099f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Indianapolis / Marion County, Indiana"]},{"site_id":"vcc-site-be615a0bc019c0f6d350","name":"Sabey SDC Austin Round Rock Campus","country":"United States","country_iso_a2":"US","latitude":30.48575752775,"longitude":-97.650967159813,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-06-16","project_count":1,"projects":[{"project_id":"ae484949-f575-5553-ad33-bc1f96eab345","name":"Sabey SDC Austin Building B Current Build","status":"shell","status_as_of":"2026-06-16","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-be615a0bc019c0f6d350/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-be615a0bc019c0f6d350.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-fe589337beb1f4408111","name":"Sabey SDC Umatilla Data Center Campus","country":"United States","country_iso_a2":"US","latitude":45.92101509128298,"longitude":-119.25886448534646,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"c4e8eac5-c88e-5147-b4a8-ee54da880ab1","name":"Sabey SDC Umatilla Data Center Campus — current campus build","status":"under_construction","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe589337beb1f4408111/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe589337beb1f4408111.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Umatilla County"]},{"site_id":"vcc-site-919f7ffc3ffdb8bb8ce7","name":"Servpac MTP Data Center (200 Kahelu Ave, Mililani Technology Park, Oahu)","country":"United States","country_iso_a2":"US","latitude":21.4809642,"longitude":-158.0192455,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"ae3d048a-f581-5d2f-be6a-986b2ab6203c","name":"Servpac MTP Data Center Building 1 — existing Tier IV colocation operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["Servpac Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-919f7ffc3ffdb8bb8ce7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-919f7ffc3ffdb8bb8ce7.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Hawaii Statewide GIS Program; City and County of Honolulu (HoLIS)"]},{"site_id":"vcc-site-dd9326d1acc72c7fff88","name":"Shenandoah Computing Data Center Site (MO-92 and N Winan Avenue, Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.3475766,"longitude":-94.7028894,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"c4c375bf-789e-51da-952e-7cdd856dbe4c","name":"Shenandoah Computing LLC — proposed five-building data-processing facility (MoDNR air construction permit application 2025-08-034)","status":"announced","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Missouri Department of Natural Resources, Air Pollution Control Program"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd9326d1acc72c7fff88/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd9326d1acc72c7fff88.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Missouri Department of Natural Resources (application prepared for Shenandoah Computing LLC)"]},{"site_id":"vcc-site-d6ba622d89bc8c560c44","name":"Site Layer 1 Data Center Project (near Playas, Grant County, New Mexico)","country":"United States","country_iso_a2":"US","latitude":31.980569,"longitude":-108.511384,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"060f2d39-9a85-5684-9349-2d84c3ee8ebc","name":"Site Layer 1 Data Center Project — proposed data centre of about 800 MW with 300 MW on-site gas-engine generation","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Site Layer 1, LLC (applicant), prepared by SWCA Environmental Consultants; published by the New Mexico Environment Department"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6ba622d89bc8c560c44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6ba622d89bc8c560c44.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Site Layer 1, LLC; New Mexico Environment Department Air Quality Bureau"]},{"site_id":"vcc-site-daf4677b4e3a650b76af","name":"Skybox Hutto Data Center Campus","country":"United States","country_iso_a2":"US","latitude":30.5423689,"longitude":-97.5185559,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"b03ba807-95f4-5c54-9076-a7ce92a8f213","name":"Skybox Hutto Building 4 — core and shell","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-daf4677b4e3a650b76af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-daf4677b4e3a650b76af.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Williamson Central Appraisal District data)"]},{"site_id":"vcc-site-93ff129393312a14a668","name":"Soluna Project Kati Campus (Willacy County)","country":"United States","country_iso_a2":"US","latitude":26.3123281,"longitude":-97.5708302,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-09-08","project_count":2,"projects":[{"project_id":"f1ade294-dd89-5616-89ce-6e23caef22ad","name":"Soluna Project Kati 1 — 83 MW hosting data center","status":"operational","status_as_of":"2026-09-08","search_terms":""},{"project_id":"3c42e80a-600e-5850-a4cd-a86e5b8dc747","name":"Soluna Project Kati 2 AI data center (MFE-A-Kati2 Building 1)","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Soluna Holdings","Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-93ff129393312a14a668/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-93ff129393312a14a668.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Willacy County Appraisal District data)"]},{"site_id":"vcc-site-b414ed2a7f2e60f4b886","name":"STACK Bossier Highway 3 Technology Park Campus","country":"United States","country_iso_a2":"US","latitude":32.75561,"longitude":-93.73567,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"cbe074bd-68d8-59cb-aaf7-e21fa82b193f","name":"STACK Bossier Highway 3 Technology Park Current Campus Build","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["STACK Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b414ed2a7f2e60f4b886/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b414ed2a7f2e60f4b886.json","geometry_licenses":["all-rights-reserved","no-open-redistribution-license-asserted-for-applicant-map"],"geometry_attributions":["Adobe Systems Incorporated, Adobe Supplement to ISO 32000, BaseVersion 1.7, ExtensionLevel 3, June 2008","U.S. Army Corps of Engineers, Vicksburg District; Headwaters / Bohler Engineering applicant map"]},{"site_id":"vcc-site-4e8601c9f4fed3eb64dd","name":"STACK DFW02 Lancaster Campus","country":"United States","country_iso_a2":"US","latitude":32.5803857,"longitude":-96.7349196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"1729ba44-3ca5-59b5-a297-d36205f72e48","name":"STACK DFW02B","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4e8601c9f4fed3eb64dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4e8601c9f4fed3eb64dd.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-e6ad7f75be14475fcc3b","name":"STACK Infrastructure Berry Hill campus, Pittsylvania County","country":"United States","country_iso_a2":"US","latitude":36.82,"longitude":-79.4,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"e9f8645b-ff54-5ebb-8f6c-6c04dbc8d5e2","name":"STACK Infrastructure Berry Hill campus, Pittsylvania County","status":"announced","status_as_of":"2026-07-27","search_terms":"Hyperscale data center campus planned by STACK Infrastructure on about 2,990 acres of the Southern Virginia Megasite at Berry Hill in Pittsylvania County, Virginia. The Danville-Pittsylvania regional industrial authority approved the land sale in March 2026 at USD 238,000 an acre, about USD 720 million in all. WDBJ reported USD 73 billion of investment over 30 years in April 2026, and county supervisors backed a campus reported at USD 100 billion in July 2026. Appalachian Power will serve the site; the authority's chairman expects the first building to run by about July 2027, and full build-out could take 15 to 30 years. Berry Hill Data Center Southern Virginia Megasite at Berry Hill data center STACK Infrastructure Danville-Pittsylvania Regional Industrial Facility Authority Pittsylvania County Board of Supervisors Appalachian Power"}],"status_publishers":["WSET"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6ad7f75be14475fcc3b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6ad7f75be14475fcc3b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WDBJ7"]},{"site_id":"vcc-site-738cf13d66922745ecee","name":"STACK New Albany Campus (7300 and 7340 Souder Road)","country":"United States","country_iso_a2":"US","latitude":40.1064483,"longitude":-82.8021275,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"118f7c2f-6551-5a7a-bd51-51fe24d627cd","name":"Stack — new 332,089 sq ft data building (7340 Souder Road)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-738cf13d66922745ecee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-738cf13d66922745ecee.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Franklin County Auditor"]},{"site_id":"vcc-site-c4804ef7941cded66b42","name":"STACK POR03 Hillsboro Campus (4735 NE Starr Blvd)","country":"United States","country_iso_a2":"US","latitude":45.5539075,"longitude":-122.9395716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"c87b5961-740a-5004-8cd8-1522c2be045a","name":"STACK POR03 — existing data-centre operations (72 MW operational critical capacity)","status":"operational","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["STACK Infrastructure"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4804ef7941cded66b42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4804ef7941cded66b42.json","geometry_licenses":["RLIS Open Database End User License Agreement (https://rlisdiscovery.oregonmetro.gov/pages/open-database-license)"],"geometry_attributions":["Metro RLIS; Washington County Assessment and Taxation and City of Hillsboro source data"]},{"site_id":"vcc-site-61c0655ea44ae50a1cdf","name":"STACK Stafford Technology Campus (Eskimo Hill Road and Richmond Highway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.3858401,"longitude":-77.4290772,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"a47c82aa-1fa6-51aa-83d4-aaeb9b2fcf87","name":"Stafford Technology Campus (STC) — data center campus in county site-plan review (rezoning RC23154931, proffer amendment RC25156486)","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-61c0655ea44ae50a1cdf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-61c0655ea44ae50a1cdf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-00432e4e9c8e2d91ff76","name":"Stargate Milam County (SB Energy campus)","country":"United States","country_iso_a2":"US","latitude":30.7627,"longitude":-96.9982,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"316e6c68-21e0-50d1-973e-d4fa5847a99f","name":"Stargate Milam County (SB Energy campus)","status":"under_construction","status_as_of":"2026-10-01","search_terms":"A fast-build Stargate AI campus in Milam County, Texas, about 70 miles northeast of Austin, developed by SoftBank in partnership with OpenAI, with SoftBank's SB Energy providing the powered infrastructure. It was announced in September 2025 as one of two SoftBank sites that together could scale to 1.5 GW within about 18 months, and SoftBank said then that it was breaking ground. Analyst Epoch AI projects about 1.2 GW for this site, saw steel framing and roofing on the first building in March 2026 imagery, and cites state filings pointing to delivery of that building by October 2026. SB Energy plans to fund and build new generation and storage for most of the campus power. Stargate Milam County SoftBank Group OpenAI SB Energy SB Energy"}],"status_publishers":["SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-00432e4e9c8e2d91ff76/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-00432e4e9c8e2d91ff76.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Group Corp."]},{"site_id":"vcc-site-eacfe2edf41e2fe22170","name":"Statesboro Burkhalter Road Data Center Site","country":"United States","country_iso_a2":"US","latitude":32.4014009,"longitude":-81.7531068,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"9dc79e44-df1f-503f-9fe4-d7b34f9668fc","name":"Statesboro Burkhalter Road proposed data center (4AM Development, RZ 26-07-05)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["City of Statesboro, Georgia"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eacfe2edf41e2fe22170/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eacfe2edf41e2fe22170.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Statesboro-Bulloch County GIS (stabull.org ArcGIS Server)"]},{"site_id":"vcc-site-8fbc644091f2917f0b12","name":"Sterling Technology Park Data Center Site (22400 Shaw Road, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.9959385,"longitude":-77.4292182,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"5a5e6e4c-11ed-5284-b7e1-854e416eee2f","name":"Sterling Technology Park — proposed data center building with mechanical yards and guard booth (site plan EPLAN-2025-0027)","status":"announced","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8fbc644091f2917f0b12/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8fbc644091f2917f0b12.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-e3da5da9c1c1d3c08f33","name":"Switch Las Vegas NV LAS NAP 17 & 18 Data Center Site (6240 W Maule Ave)","country":"United States","country_iso_a2":"US","latitude":36.0648579,"longitude":-115.2278717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-21","project_count":2,"projects":[{"project_id":"b49b32ee-e208-58d9-9268-69313923e3de","name":"NV LAS NAP 17 & 18 site — single-storey closed-loop water-cooled data center (Clark County permit BD24-61043)","status":"under_construction","status_as_of":"2026-09-21","search_terms":""},{"project_id":"c45c5127-c960-573f-9f35-3d9e47752f17","name":"NV LAS NAP 17 — single-storey closed-loop water-cooled data center with office (Clark County permit BD25-00549)","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Clark County, Nevada (Department of Building and Fire Prevention GIS)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e3da5da9c1c1d3c08f33/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e3da5da9c1c1d3c08f33.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-4c499d2dc9a7337b10dc","name":"Switch The Keep 2 Campus (Bates Road, Cartersville)","country":"United States","country_iso_a2":"US","latitude":34.1068851,"longitude":-84.7950835,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"961f2e3f-ca5e-52ae-a3e6-237e13026b3d","name":"Switch The Keep 2 Campus (Keep 2.0) — data-center campus under construction","status":"under_construction","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Bartow County, Georgia, Office of the County Administrator"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c499d2dc9a7337b10dc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c499d2dc9a7337b10dc.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Bartow County, Georgia, GIS Department"]},{"site_id":"vcc-site-750014b8b5fd122e94b8","name":"TADG ATL02 Ellenwood Data Center Site (4350 E Tanners Church Rd, Clayton County)","country":"United States","country_iso_a2":"US","latitude":33.6374056,"longitude":-84.3042936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"f8e0bbc0-781e-5484-a642-cd6d9795b858","name":"TADG ATL02 / Ellenwood — proposed data center (EPD proposed air permit, application 30104)","status":"announced","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Georgia Environmental Protection Division, Air Protection Branch"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-750014b8b5fd122e94b8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-750014b8b5fd122e94b8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clayton County, Georgia"]},{"site_id":"vcc-site-450769770dfe5ea908d6","name":"Taylor Technology Campus (Big Watt Digital and PowerHouse)","country":"United States","country_iso_a2":"US","latitude":30.5725,"longitude":-97.4167,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8e72e640-c0e0-5e58-8a76-e53c011dcf92","name":"Taylor Technology Campus (Big Watt Digital and PowerHouse)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed 664-acre data center campus with an on-site power plant at 3301 Farm to Market Road 112, just outside Taylor in unincorporated Williamson County, Texas, developed by Big Watt Digital and PowerHouse Data Centers. Bisnow describes 500 MW of data center load with behind-the-meter generation and, citing the Austin Business Journal, says an unnamed tenant could add 500 MW. After withdrawing their annexation and zoning request in September 2026, the developers struck a deal letting the city regulate water use, noise and air quality, with reclaimed-water closed-loop cooling and about USD 28.2 million in community investments; the City Council approved it unanimously on 8 October 2026. Taylor Technology Campus Project Mustang Big Watt Digital PowerHouse Data Centers City of Taylor"}],"status_publishers":["KUT News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-450769770dfe5ea908d6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-450769770dfe5ea908d6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-6a1efb9a8859fd17aa59","name":"TeraWulf Chesapeake Data Campus (Morgantown)","country":"United States","country_iso_a2":"US","latitude":38.3453,"longitude":-76.9711,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"eb75ea0d-8dba-56a1-a956-135227b3d6e6","name":"TeraWulf Chesapeake Data Campus (Morgantown)","status":"proposed","status_as_of":"2026-08-05","search_terms":"TeraWulf plan to buy the Morgantown Generating Station on the Potomac River in Charles County, Maryland, from GenOn and redevelop it as a data campus with on-site power. The former coal plant, whose coal boilers retired in 2022, now runs about 210 to 220 MW of oil-fired units. TeraWulf proposes restarting it on natural gas and adding battery storage to support up to 1 GW of data center load on about 250 buildable acres, starting with about 500 MW. FERC approved the sale in July 2026 and TeraWulf contemplates first data center operations in 2030, but Charles County zoning does not yet allow data centers. Chesapeake Data Campus Chesapeake Data Morgantown Generating Station redevelopment TeraWulf GenOn Holdings"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6a1efb9a8859fd17aa59/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6a1efb9a8859fd17aa59.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-dbe568d910290db51ead","name":"TeraWulf Justified Data campus (Hawesville)","country":"United States","country_iso_a2":"US","latitude":37.9011,"longitude":-86.7494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-24","oldest_status_as_of":"2026-08-24","project_count":1,"projects":[{"project_id":"9dbfd718-7b41-58b1-bb46-0138b96aeca8","name":"TeraWulf Justified Data campus (Hawesville)","status":"announced","status_as_of":"2026-08-24","search_terms":"TeraWulf is redeveloping the former Century Aluminum facility at Hawesville, Kentucky, acquired in early 2026, into an AI data center campus with more than 250 buildable acres, an energized on-site substation and about 480 MW of available power. In July 2026 Anthropic signed a 20-year lease for about 401 MW of critical IT load, expected to bring about $19 billion of rent over the initial term. Kentucky regulators approved a retail electric service agreement of up to 482 MW in August 2026. TeraWulf targets initial capacity in the second half of 2027 and the full 401 MW by early 2028. Justified Data Campus TeraWulf TeraWulf Anthropic Big Rivers Electric Corporation Kenergy Corp. Kentucky Public Service Commission"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dbe568d910290db51ead.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-a291a33ca480670cccf1","name":"TeraWulf Lake Hawkeye data campus","country":"United States","country_iso_a2":"US","latitude":42.5658,"longitude":-76.5319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"2e14f098-9798-567b-ae40-a7d552f9be18","name":"TeraWulf Lake Hawkeye data campus","status":"announced","status_as_of":"2026-08-05","search_terms":"TeraWulf plan to redevelop about 183 leased acres of the former coal-fired Cayuga power plant site on Cayuga Lake in Lansing, Tompkins County, New York, into a high-performance computing campus. Its 80-year ground lease, announced in August 2025, gives exclusive rights to develop up to 400 MW, and TeraWulf first expected 138 MW online in late 2026. That timeline slipped: the project was in town site plan review in May 2026, faced county and resident opposition, and by August 2026 TeraWulf called it a longer-term redevelopment of about 400 MW gross, 320 MW of critical IT load, with operations not expected before about 2029. Cayuga site Lake Hawkeye TeraWulf Cayuga Operating Company Tompkins County"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a291a33ca480670cccf1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a291a33ca480670cccf1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-88b1acf055e1ab6200e4","name":"TeraWulf Lake Mariner Data Campus","country":"United States","country_iso_a2":"US","latitude":43.348937013719,"longitude":-78.602908090738,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"6b11de63-a6b0-5513-87a1-b77ff3b71bfb","name":"Lake Mariner CB-5 Current Build","status":"under_construction","status_as_of":"2026-08-05","search_terms":""},{"project_id":"e389cd04-b538-5729-85a5-8e0b18e78002","name":"TeraWulf Lake Mariner data campus","status":"partially_operational","status_as_of":"2026-08-05","search_terms":"TeraWulf campus on the site of a retired coal-fired power plant in Barker, New York, that began operating in 2022, has hosted bitcoin mining and is being expanded for high-performance computing for AI. TeraWulf has leased 60 MW of critical IT load to Core42 and about 378 MW to Fluidstack, whose lease obligations carry Google credit support. About 102 MW of HPC capacity was earning revenue after building CB-3 was delivered in July 2026, while CB-4 and CB-5 (336 MW combined) were under construction. TeraWulf cites about 500 MW of near-term gross capacity and potential to reach about 750 MW. Lake Mariner Data Campus TeraWulf TeraWulf Fluidstack Core42 New York Power Authority"}],"status_publishers":["TeraWulf","TeraWulf Inc."],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88b1acf055e1ab6200e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88b1acf055e1ab6200e4.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-133b0abe4851d7ed6df5","name":"TeraWulf Muskie Data Campus","country":"United States","country_iso_a2":"US","latitude":38.36,"longitude":-82.69,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"7a5658df-f9c8-55e3-8623-b1a0fa40ce1d","name":"TeraWulf Muskie Data Campus","status":"announced","status_as_of":"2026-10-05","search_terms":"TeraWulf AI and HPC campus in the EastPark Industrial Park in northeast Kentucky, near Ashland on the Boyd and Greenup county line, bought from Industrial Equity Partners in May 2026 with about 285 acres owned or controlled (308 acres per its August release). Kentucky Power, an AEP company, is building a 765/345 kV substation to serve it. In October 2026 TeraWulf raised contracted power to 1 GW under an amended service agreement: the first 500 MW is due to start ramping in 2028 and the second 500 MW was pulled forward to 2029, subject to state regulatory approval. TeraWulf is studying up to 2 GW; no tenant has been named. Muskie Data Campus TeraWulf TeraWulf Kentucky Power"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-133b0abe4851d7ed6df5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-133b0abe4851d7ed6df5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-49244be6634ceff5f4e2","name":"Texas Critical Data Centers (TCDC) campus, Ector County (Odessa)","country":"United States","country_iso_a2":"US","latitude":31.8350404,"longitude":-102.3049819,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"4efddf17-f1a1-5387-9bfb-b4ba18006563","name":"Texas Critical Data Centers (TCDC) Phase 1 — planned AI data-centre phase of about 200 MW (20-year Vistra PPA)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["New Era Energy & Digital, Inc."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-49244be6634ceff5f4e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-49244be6634ceff5f4e2.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ector Appraisal District data)"]},{"site_id":"vcc-site-249f52c31025c0aa2ef2","name":"The Barn Stargate Data Center Campus","country":"United States","country_iso_a2":"US","latitude":42.1239264,"longitude":-83.88208795,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"7d936c4e-29f2-592f-984b-61f5d6367fc8","name":"The Barn Stargate Current Data Center Build","status":"under_construction","status_as_of":"2026-09-28","search_terms":"Related Digital is building The Barn, a 250-acre campus of three single-story buildings in Saline Township, Michigan, exclusively for Oracle, serving OpenAI under the Oracle-OpenAI Stargate expansion. Announced in October 2025 at more than 1 GW, it is described in later coverage as 1.4 GW. DTE Energy is to supply all power, alongside new battery storage paid for by the project. State regulators approved DTE's contracts for the campus in December 2025. In June 2026 the partners marked construction with all buildings under way and the first nearing completion. Walbridge is general contractor; financing mixes Related Digital and Blackstone-affiliated equity with PIMCO-anchored debt. The Barn Stargate Michigan Related Digital Saline Township Related Digital Related Digital Oracle OpenAI Walbridge Blackstone PIMCO DTE Energy Michigan Public Service Commission"}],"status_publishers":["Oracle"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-249f52c31025c0aa2ef2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-249f52c31025c0aa2ef2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-fa0e11213234b0fa5fb5","name":"Thistle Landing Data Center (4801 E Thistle Landing Dr, Phoenix, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3107821,"longitude":-111.9781237,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"77233822-fd54-5bdd-8756-262d0370c049","name":"Thistle Landing Data Center — data-centre campus with Buildings 1, 2 and 5 (City of Phoenix project 23-1632)","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fa0e11213234b0fa5fb5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fa0e11213234b0fa5fb5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-7830f1806bf63c514962","name":"TierPoint Bethlehem (BET) Data Center (3864 Courtney Street, Suite 130, Hanover Township, Northampton County, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.6702124,"longitude":-75.3745128,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"53090dd1-d4e9-53d2-82bf-084376c47e01","name":"TierPoint Bethlehem (BET) — existing data-centre and colocation operations (Suite 130)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7830f1806bf63c514962/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7830f1806bf63c514962.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Northampton County GIS Division; Northampton County Assessment Office; City of Bethlehem GIS"]},{"site_id":"vcc-site-074984ad2c3736a6f825","name":"TierPoint Charlotte - Center Park (CL4) Data Center, 1805 Center Park Drive, Charlotte","country":"United States","country_iso_a2":"US","latitude":35.1733241,"longitude":-80.9281546,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"473ad44e-d96c-5f0a-867c-0396b1a033e3","name":"TierPoint Charlotte - Center Park (CL4) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-074984ad2c3736a6f825/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-074984ad2c3736a6f825.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Mecklenburg County, North Carolina"]},{"site_id":"vcc-site-c02fc236120aed55d288","name":"TierPoint Charlotte - North Myers (CL2) Data Center, 125 North Myers Street, Charlotte","country":"United States","country_iso_a2":"US","latitude":35.222086,"longitude":-80.8352553,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"d4384c13-f8d9-5575-a5b4-eb46e81c517a","name":"TierPoint Charlotte - North Myers (CL2) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c02fc236120aed55d288/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c02fc236120aed55d288.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Mecklenburg County, North Carolina"]},{"site_id":"vcc-site-c20d15844afd43f823f9","name":"TierPoint Chicago - Polk St. Data Center, 601 W Polk St","country":"United States","country_iso_a2":"US","latitude":41.8715974,"longitude":-87.643067,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"6c9f7220-133e-59b3-b2d7-ea0f186a20e7","name":"TierPoint Chicago (Polk St.) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c20d15844afd43f823f9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c20d15844afd43f823f9.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office (Cook County Open Data)"]},{"site_id":"vcc-site-34901bbf39b3b6b94f30","name":"TierPoint Lehigh Valley (LVQ) Data Center (3949 Schelden Circle, Hanover Township, Northampton County, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.6749465,"longitude":-75.3782292,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"6aad999f-6edb-5a38-96d0-ae3afd9036b6","name":"TierPoint Lehigh Valley (LVQ) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-34901bbf39b3b6b94f30/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-34901bbf39b3b6b94f30.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Northampton County GIS Division; Northampton County Assessment Office; City of Bethlehem GIS"]},{"site_id":"vcc-site-d31a8a141bdf3a8c0a86","name":"TierPoint Little Rock (LIT) Data Center, 15707 Chenal Parkway","country":"United States","country_iso_a2":"US","latitude":34.7562277,"longitude":-92.4447834,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"5590ea6f-f859-5d11-9161-e6b1fefa695a","name":"TierPoint Little Rock (LIT) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d31a8a141bdf3a8c0a86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d31a8a141bdf3a8c0a86.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["PAGIS, APPS/OperationalLayers MapServer, Parcels layer"]},{"site_id":"vcc-site-de9d5aa298d1800645ef","name":"TierPoint Milwaukee (MKE) Data Center, 3701 W. Burnham Street","country":"United States","country_iso_a2":"US","latitude":43.0094774,"longitude":-87.9610752,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"52ee15bf-0cfe-5da1-86a3-c49de7d9ac58","name":"TierPoint Milwaukee (MKE) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-de9d5aa298d1800645ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-de9d5aa298d1800645ef.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Milwaukee County Land Information Office"]},{"site_id":"vcc-site-738448e9fca81d322f19","name":"TierPoint Nashville (NSH) Data Center, 311 Eddy Lane, Franklin","country":"United States","country_iso_a2":"US","latitude":35.9241061,"longitude":-86.8553352,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"9201712c-dde7-542a-9a7d-6de8cbd78ab3","name":"TierPoint Nashville (NSH) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-738448e9fca81d322f19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-738448e9fca81d322f19.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Franklin, Tennessee"]},{"site_id":"vcc-site-8c46e553d068c926b093","name":"TierPoint Oklahoma City (OK2) Data Center, 4114 Perimeter Center Place, Oklahoma City","country":"United States","country_iso_a2":"US","latitude":35.514094,"longitude":-97.595073,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e8bb0479-ee8e-5851-ae7b-4a27b9de0739","name":"TierPoint Oklahoma City (OK2) — existing data-centre and colocation operations (4114 Perimeter Center Place)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8c46e553d068c926b093/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8c46e553d068c926b093.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["TierPoint"]},{"site_id":"vcc-site-ceaefae6fafda18444a6","name":"TierPoint Oklahoma City (OKC) Data Center, 4121 Perimeter Center Place, Oklahoma City","country":"United States","country_iso_a2":"US","latitude":35.51421,"longitude":-97.59661,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"248f8940-acc6-51f7-969f-0f4dc46269e7","name":"TierPoint Oklahoma City (OKC) — existing data-centre and colocation operations (4121 Perimeter Center Place)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ceaefae6fafda18444a6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ceaefae6fafda18444a6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma Department of Environmental Quality"]},{"site_id":"vcc-site-21c0a4be06df4b01b5ee","name":"TierPoint Omaha - Bellevue (BEL) Data Center, 1001 North Fort Crook Road, Bellevue","country":"United States","country_iso_a2":"US","latitude":41.1780544,"longitude":-95.9249764,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"a647bb55-d199-5336-a5a1-dd7f3561001f","name":"TierPoint Omaha - Bellevue (BEL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-21c0a4be06df4b01b5ee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-21c0a4be06df4b01b5ee.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Sarpy County, Nebraska"]},{"site_id":"vcc-site-fb7c00e3aeff60e7f46c","name":"TierPoint Omaha - Midlands (MID) Data Center, 11425 South 84th Street, Papillion","country":"United States","country_iso_a2":"US","latitude":41.1345994,"longitude":-96.0393313,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"9a47eeb2-bcae-5992-997f-27bd5b2c07a7","name":"TierPoint Omaha - Midlands (MID) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fb7c00e3aeff60e7f46c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fb7c00e3aeff60e7f46c.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Sarpy County, Nebraska"]},{"site_id":"vcc-site-1699224923dfab657965","name":"TierPoint Philadelphia (PHI) Data Center (4775 League Island Boulevard, Philadelphia Navy Yard, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":39.892589,"longitude":-75.1649717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"bca0a8b4-f537-5572-b15c-f3790b252caa","name":"TierPoint Philadelphia (PHI) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1699224923dfab657965/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1699224923dfab657965.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Philadelphia Department of Records; Philadelphia Water Department; PASDA (Penn State)"]},{"site_id":"vcc-site-cc4461f1d5e4d1a749c6","name":"TierPoint Raleigh (RAL) Data Center, 5301 Departure Drive, Raleigh","country":"United States","country_iso_a2":"US","latitude":35.8544845,"longitude":-78.5970467,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"4daa3897-d7cf-5775-8c5c-765686cf1d2c","name":"TierPoint Raleigh (RAL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc4461f1d5e4d1a749c6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc4461f1d5e4d1a749c6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Wake County, North Carolina"]},{"site_id":"vcc-site-325fe9b450140b2fd38f","name":"TierPoint Raleigh - RTP Data Center, 99 TW Alexander Drive, Durham","country":"United States","country_iso_a2":"US","latitude":35.8971325,"longitude":-78.8786753,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e02ccb7f-c851-5e4f-877f-c2b26b885c2b","name":"TierPoint Raleigh - RTP — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-325fe9b450140b2fd38f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-325fe9b450140b2fd38f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Durham County, North Carolina"]},{"site_id":"vcc-site-03b70de7405c82d7d585","name":"TierPoint Sioux Falls - East (SFE) Data Center, 700 East 54th Street North","country":"United States","country_iso_a2":"US","latitude":43.5961534,"longitude":-96.7168804,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"2e343cc8-5428-5f19-acdb-b3d3d80b93b3","name":"TierPoint Sioux Falls - East (SFE) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-03b70de7405c82d7d585/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-03b70de7405c82d7d585.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Sioux Falls"]},{"site_id":"vcc-site-e32e19d96f758bff3de8","name":"TierPoint St. Louis - Locust (SLL) Data Center, 2300 Locust Street, St. Louis","country":"United States","country_iso_a2":"US","latitude":38.6336159,"longitude":-90.2128665,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1995a5fc-3a8e-5f99-bbf0-bbd0faded2b9","name":"TierPoint St. Louis - Locust (SLL) — new data centre under development in the existing building at 2300 Locust Street","status":"announced","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e32e19d96f758bff3de8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e32e19d96f758bff3de8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of St. Louis Assessor's Office"]},{"site_id":"vcc-site-b682d57794ef9e01ae02","name":"TierPoint St. Louis - Millpark (SLM) Data Center, 2315 Millpark Drive, Maryland Heights","country":"United States","country_iso_a2":"US","latitude":38.700045,"longitude":-90.411022,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"5b9e35f2-eb9b-502a-87bc-17a8d5d55ada","name":"TierPoint St. Louis - Millpark (SLM) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b682d57794ef9e01ae02/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b682d57794ef9e01ae02.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["St. Louis County Assessor's Office; St. Louis County GIS Service Center"]},{"site_id":"vcc-site-40ff56ed0d9c82eb55e2","name":"TierPoint St. Louis - Olive (SLO) Data Center, 1111 Olive Street","country":"United States","country_iso_a2":"US","latitude":38.6297565,"longitude":-90.1964072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"59685341-1718-5d96-a435-afa385230f88","name":"TierPoint St. Louis - Olive (SLO) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-40ff56ed0d9c82eb55e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-40ff56ed0d9c82eb55e2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of St. Louis Assessor's Office"]},{"site_id":"vcc-site-890b3878aa06461817af","name":"TierPoint TekPark Data Center Campus (9999 Hamilton Blvd, Breinigsville, Upper Macungie Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.5446936,"longitude":-75.65578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"77371eb8-5922-55ec-aced-556b60478539","name":"TierPoint Allentown - TekPark (TEK) — existing data-centre and colocation operations (Building 4)","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-890b3878aa06461817af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-890b3878aa06461817af.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lehigh County, Pennsylvania; PASDA (Penn State)"]},{"site_id":"vcc-site-b62dd851a89c296d220e","name":"TierPoint Tulsa - Archer (TUL) Data Center, 322 E. Archer Street","country":"United States","country_iso_a2":"US","latitude":36.1586833,"longitude":-95.9885595,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1cff1c19-f97d-5203-90df-5f1895b1e441","name":"TierPoint Tulsa - Archer (TUL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b62dd851a89c296d220e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b62dd851a89c296d220e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["INCOG Parcels_TulsaCo feature service; Tulsa County Assessor"]},{"site_id":"vcc-site-114ba5d9837cfd60a4ff","name":"TierPoint Tulsa - State Farm (TL2) Data Center, 12151 E. State Farm Boulevard","country":"United States","country_iso_a2":"US","latitude":36.0963433,"longitude":-95.8400326,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1cc6099f-f58c-5c47-a9d4-a73589a05448","name":"TierPoint Tulsa - State Farm (TL2) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-114ba5d9837cfd60a4ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-114ba5d9837cfd60a4ff.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["INCOG Parcels_TulsaCo feature service; Tulsa County Assessor"]},{"site_id":"vcc-site-32e11c649565693b8978","name":"TierPoint Valley Forge Data Center (1000 Adams Avenue, Lower Providence Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.1217531,"longitude":-75.4211112,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"91ae3716-9536-5fe2-8fb8-22e91d3eb39e","name":"TierPoint Valley Forge — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32e11c649565693b8978/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32e11c649565693b8978.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Montgomery County, Pennsylvania; PASDA (Penn State)"]},{"site_id":"vcc-site-7cb4c635a0469cf8e507","name":"Tract Buckeye data center park","country":"United States","country_iso_a2":"US","latitude":33.3706,"longitude":-112.5908,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"3f13d78d-ac2f-533b-8e04-01009bd9d17b","name":"Tract Buckeye data center park","status":"announced","status_as_of":"2026-06-15","search_terms":"Master-planned data center park by land developer Tract on about 2,069 acres in southwest Buckeye, Arizona, south of Interstate 10 on Johnson Road near the municipal airport, on land once planned for a large housing community. Announced in August 2024 after the city council unanimously approved a development agreement and a Buckeye Tech Corridor plan amendment, it could hold up to 40 data centers and 20 million square feet, with Tract working with APS on plans for up to 1.8 GW. The project is valued at about USD 20 billion over a phased 15-year build-out. A June 2026 trade update said it had entered engineering and horizontal infrastructure preparation. Tract Phoenix data center park Tract Arizona Public Service City of Buckeye"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7cb4c635a0469cf8e507/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7cb4c635a0469cf8e507.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arizona's Family (KTVK/KPHO)"]},{"site_id":"vcc-site-77fa0d95d9c7ed1b2168","name":"TRG Spring Cypress Campus","country":"United States","country_iso_a2":"US","latitude":30.066026434779,"longitude":-95.455736245303,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"ba5ddf33-10ec-5fb8-b880-98a04df096b8","name":"TRG HOU2","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["TRG Datacenters"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77fa0d95d9c7ed1b2168/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77fa0d95d9c7ed1b2168.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-e7421a3f765fa1b50990","name":"Vantage Data Centers Stacks Road Site (4380 Stacks Rd, City of South Fulton)","country":"United States","country_iso_a2":"US","latitude":33.6049238,"longitude":-84.5309347,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["clearing"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"9e70b410-86d1-5cd3-84ca-5f2a32cb9fda","name":"Vantage - Stacks Rd — one-building data center with power substation (land cleared)","status":"clearing","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["City of South Fulton, Georgia (GIS, ArcGIS Online organisation cosfga)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7421a3f765fa1b50990/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e7421a3f765fa1b50990.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-f3c14c6227b2ae418664","name":"Vantage Frontier campus (Stargate Shackelford County)","country":"United States","country_iso_a2":"US","latitude":32.7089,"longitude":-99.3308,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"126f2c37-cadc-5f20-9e3c-e544d70b5c37","name":"Vantage Frontier campus (Stargate Shackelford County)","status":"under_construction","status_as_of":"2026-09-08","search_terms":"Vantage Data Centers is building Frontier, a 1,200-acre campus of ten single-story data centers in Shackelford County, Texas, near Abilene. It is planned at 1.4 GW and roughly $25 billion. In September 2025 it was named one of the new Stargate sites under the OpenAI and Oracle agreement. Analysts report power will come from an off-grid natural gas microgrid built and run by VoltaGrid. A groundbreaking was reported in December 2025, and state building registrations filed in mid-2026 list building start dates in 2026 and completions in 2027. Vantage targeted the first building for the second half of 2026, and trade press reports campus completion in 2028. Frontier Project Frontier Stargate Frontier Vantage DC Abilene - TX3 Vantage Data Centers Vantage Data Centers Oracle OpenAI VoltaGrid"}],"status_publishers":["Oracle"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f3c14c6227b2ae418664/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f3c14c6227b2ae418664.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["REBusinessOnline"]},{"site_id":"vcc-site-d272a722ca415c1be654","name":"Vantage Lighthouse Port Washington Data Center Campus","country":"United States","country_iso_a2":"US","latitude":43.430735,"longitude":-87.861494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"3b636397-fbb2-5564-a352-fa1382a218b5","name":"Vantage Lighthouse Port Washington Current Campus Build","status":"under_construction","status_as_of":"2026-10-19","search_terms":"Vantage Data Centers is building Lighthouse, a four-building campus on 672 acres on Port Washington's north side in Wisconsin, for Oracle and OpenAI under the Stargate program. OpenAI, Oracle and Vantage announced it as a Stargate site in October 2025, with close to 1 GW of capacity and completion targeted for 2028. Vantage now lists 902 MW, while local reporting and analyst Epoch AI cite 1.3 GW. The investment is reported at about $15 billion. Two buildings had topped out by mid-2026. We Energies supplies power; an Oracle subsidiary sued state regulators in June 2026 over financial-security rules, and in October 2026 We Energies proposed an Oracle share of nuclear output, pending approval. Lighthouse Project Lighthouse Stargate Wisconsin Vantage Data Centers Vantage Data Centers Oracle OpenAI We Energies Whiting-Turner Contracting The Weitz Co."}],"status_publishers":["Vantage Data Centers (Vantage Lighthouse Campus website)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d272a722ca415c1be654/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d272a722ca415c1be654.json","geometry_licenses":["public-government-record-fact-extraction-only"],"geometry_attributions":["Wisconsin Department of Natural Resources"]},{"site_id":"vcc-site-df5eae227e5b7eb27ea5","name":"WhiteFiber NC-1 AI Data Center Campus (Madison, North Carolina)","country":"United States","country_iso_a2":"US","latitude":36.4036125,"longitude":-79.9894218,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["commissioning"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"89b14ddc-bb8f-5d8b-b4c8-c312e5dcad2a","name":"WhiteFiber NC-1 — initial 40 MW colocation phase (phased delivery and commissioning)","status":"commissioning","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["WhiteFiber, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df5eae227e5b7eb27ea5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df5eae227e5b7eb27ea5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap (NC Center for Geographic Information and Analysis); Rockingham County, North Carolina"]},{"site_id":"vcc-site-837c77c61e73b3c11714","name":"xAI Colossus 1 (Memphis)","country":"United States","country_iso_a2":"US","latitude":35.0599,"longitude":-90.1563,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"d2db6863-886a-5c16-b819-7f2cd95cd87e","name":"xAI Colossus 1 (Memphis)","status":"operational","status_as_of":"2026-10-05","search_terms":"AI supercomputer that xAI built in 2024 inside the former Electrolux manufacturing plant on Paul R. Lowry Road in southwest Memphis. Grid power comes from MLGW and TVA through an existing MLGW substation and a new one paid for by xAI, supplemented by permitted on-site gas turbines and battery storage. Anthropic now describes Colossus 1 as SpaceX's data center, and in May 2026 it agreed to use all of the site's compute capacity, stated as more than 300 MW and over 220,000 NVIDIA GPUs. Colossus Colossus 1 Gigafactory of Compute xAI SpaceX Anthropic Memphis Light, Gas and Water Tennessee Valley Authority Shelby County Health Department"}],"status_publishers":["Anthropic"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-837c77c61e73b3c11714/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-837c77c61e73b3c11714.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WMC Action News 5"]},{"site_id":"vcc-site-62e42a722eab77bd5345","name":"xAI Colossus 2 (Memphis)","country":"United States","country_iso_a2":"US","latitude":34.998,"longitude":-90.0349,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"9002afae-5b81-5c8c-a6f9-4504c91e8624","name":"xAI Colossus 2 (Memphis)","status":"partially_operational","status_as_of":"2026-10-05","search_terms":"Second xAI supercomputer campus, in a building of about one million square feet on Tulane Road in the Whitehaven area of Memphis, near the Mississippi line, which xAI bought in 2025. The site has drawn little or no grid power and runs mainly on gas turbines at a former Duke Energy plant site about 1.5 miles away in Southaven, Mississippi. Mississippi regulators permitted 41 permanent turbines there in March 2026, and environmental and civil rights groups appealed the permit in April 2026. Analyst estimates put its IT load near 1 GW by mid-2026. Anthropic says it has GPU capacity here under an agreement with SpaceX. Colossus II xAI SpaceX Anthropic Cursor MZX Tech LLC Memphis Light, Gas and Water Mississippi Environmental Quality Permit Board"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62e42a722eab77bd5345/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62e42a722eab77bd5345.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Memphis Light, Gas and Water"]},{"site_id":"vcc-site-64d29806f5007969e3b9","name":"xAI MACROHARDRR data center (Southaven)","country":"United States","country_iso_a2":"US","latitude":34.9935,"longitude":-90.0342,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-31","oldest_status_as_of":"2026-07-31","project_count":1,"projects":[{"project_id":"493361d4-686f-5f75-af07-7f95dcf81323","name":"xAI MACROHARDRR data center (Southaven)","status":"operational","status_as_of":"2026-07-31","search_terms":"Third xAI data center in the Memphis area, made by retrofitting a warehouse of roughly 800,000 square feet that xAI bought in late 2025 in Southaven, Mississippi, just south of Colossus 2 across the state line. Mississippi's governor announced it in January 2026 as an investment of more than $20 billion, the largest economic development project in state history, supported by a state sales and use tax exemption and local fee-in-lieu agreements. Musk said it would lift Colossus training compute to about 2 GW, and a July 2026 report relaying his comments said it holds 220,000 NVIDIA GB300 GPUs. MACROHARDRR Macroharder Macro-harder xAI Mississippi Development Authority City of Southaven DeSoto County"}],"status_publishers":["WMC Action News 5"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64d29806f5007969e3b9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-64d29806f5007969e3b9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-efe6509451505a0cd770","name":"Yondr Bristow Campus","country":"United States","country_iso_a2":"US","latitude":38.7762658,"longitude":-77.5833299,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"c37e71f0-6627-56bb-baa4-71a96c045546","name":"Yondr Bristow Campus — Building 3","status":"completed","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office and Department of Development Services GIS)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efe6509451505a0cd770/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-efe6509451505a0cd770.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-916f5efbecb2c091c963","name":"Yondr Hornbaker Road Campus (Manassas)","country":"United States","country_iso_a2":"US","latitude":38.7618511,"longitude":-77.5334719,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"6d108e80-e954-52ee-a829-70a1650baae8","name":"Yondr Hornbaker Road Campus — proposed 72 MW campus","status":"announced","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Yondr Group"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-916f5efbecb2c091c963/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-916f5efbecb2c091c963.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-f32edd5086d6199f35be","name":"Yondr Project Allegro Data Center Campus (Aldie, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.954505,"longitude":-77.548239,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"0e1de1a3-3c6b-5f61-b672-f199d36d265c","name":"Yondr NOV2A — Allegro North Campus Building 2A core/shell and phase 1 (42455 Allegro Ln)","status":"permitted","status_as_of":"2026-10-19","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f32edd5086d6199f35be/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f32edd5086d6199f35be.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]}]}
