[{"site_id":"vcc-site-7e0aadb2cd0ce2755f0d","name":"151 Front Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6446834278069,"longitude":-79.383946611135,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"b2d66094-8af2-56ec-973b-06672cba38f8","name":"Telehouse 151 Front Street West — existing carrier-hotel data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7e0aadb2cd0ce2755f0d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7e0aadb2cd0ce2755f0d.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-611e6c28f02775eb4a91","name":"1623 Farnam Carrier Hotel Data Center, 1623 Farnam Street, Omaha","country":"United States","country_iso_a2":"US","latitude":41.2572932,"longitude":-95.9382065,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"70814480-a124-568a-b58f-bb6e8599c925","name":"1623 Farnam — existing carrier-hotel and edge data-centre operations","status":"operational","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["1623 Farnam, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-611e6c28f02775eb4a91/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-611e6c28f02775eb4a91.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Douglas County / City of Omaha GIS (DOGIS)"]},{"site_id":"vcc-site-5075de5607dfe2902982","name":"1G Servers LaSalle Data Center (3719 E La Salle St, Phoenix)","country":"United States","country_iso_a2":"US","latitude":33.3965725,"longitude":-112.0001143,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-04","oldest_status_as_of":"2026-09-04","project_count":1,"projects":[{"project_id":"ff3d1015-4ca8-5f31-ba68-1e82e4f2af2f","name":"1G Servers LaSalle Data Center — data-center remodel (City of Phoenix permit 26000895)","status":"completed","status_as_of":"2026-09-04","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5075de5607dfe2902982/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5075de5607dfe2902982.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-0c4425440869e26c13cb","name":"250 Front Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6444179127846,"longitude":-79.3877032025565,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"51f99dfe-c2e9-521b-8c22-9b9e9b775ed4","name":"Telehouse 250 Front Street West — existing data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0c4425440869e26c13cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0c4425440869e26c13cb.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-4eb4e1954e068943ce51","name":"400 South LaSalle Data Center (Chicago)","country":"United States","country_iso_a2":"US","latitude":41.8764610117,"longitude":-87.6322149991,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"46cf0678-c6f9-5696-a0f1-dda079535517","name":"400 South LaSalle office-to-data-center conversion (Phases 1–3)","status":"permitted","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["City of Chicago, Department of Buildings"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4eb4e1954e068943ce51/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4eb4e1954e068943ce51.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office, Illinois"]},{"site_id":"vcc-site-dd95c33cd28204fac0aa","name":"47 Grey Eagle Street data centre site (Truman Brewery Block A), Spitalfields","country":"United Kingdom","country_iso_a2":"GB","latitude":51.5213,"longitude":-0.073806,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"a34bf1a2-0f8f-5f19-bd1a-93d5a6f60992","name":"Truman Brewery Block A Data Centre, 47 Grey Eagle Street","status":"permitted","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["Ministry of Housing, Communities and Local Government (Planning Casework Unit)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd95c33cd28204fac0aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd95c33cd28204fac0aa.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Greater London Authority / London Borough of Tower Hamlets"]},{"site_id":"vcc-site-1b88f16ebcce9a59f8d9","name":"905 King Street West Data Centre (Telehouse Canada), Toronto","country":"Canada","country_iso_a2":"CA","latitude":43.6416749107656,"longitude":-79.4122314417539,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"f77d1fd9-8637-58b5-8f5e-2ce4347facc9","name":"Telehouse 905 King Street West — existing data-centre operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Telehouse Canada (KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1b88f16ebcce9a59f8d9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1b88f16ebcce9a59f8d9.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["Contains information licensed under the Open Government Licence - Toronto (City of Toronto)"]},{"site_id":"vcc-site-c797cce86139b7759ceb","name":"934 Central Data Center (10th Street and Central, downtown Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.1026087,"longitude":-94.5872246,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"e056bdb9-901f-5769-a973-295fad6a453b","name":"934 Central Data Center — proposed 384-foot structure with ground-floor retail and a data center (development plan CD-CPC-2026-00074, Ordinance No. 260870)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["City of Kansas City, Missouri (City Clerk, Legistar legislative system)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c797cce86139b7759ceb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c797cce86139b7759ceb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kansas City, Missouri"]},{"site_id":"vcc-site-d7132408cb579e7c7a1f","name":"A100 ROW Liederbach Data Centers (Sindlinger Weg)","country":"Germany","country_iso_a2":"DE","latitude":50.1142317,"longitude":8.5027621,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"5d1c85f8-ac08-55ff-8a9d-a32cf15e716a","name":"A100 ROW Liederbach — two new data centres (FRA145/FRA165)","status":"permitted","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Regierungspräsidium Darmstadt, Abteilung Umwelt Wiesbaden"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d7132408cb579e7c7a1f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d7132408cb579e7c7a1f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Regierungspräsidium Darmstadt"]},{"site_id":"vcc-site-8ea405601b72e53a6661","name":"Abernathy HPC campus (TeraWulf and Fluidstack joint venture)","country":"United States","country_iso_a2":"US","latitude":33.8322,"longitude":-101.8431,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-02-27","oldest_status_as_of":"2026-02-27","project_count":1,"projects":[{"project_id":"b6f0ed21-2ab2-51e2-971e-4e9512279101","name":"Abernathy HPC campus (TeraWulf and Fluidstack joint venture)","status":"under_construction","status_as_of":"2026-02-27","search_terms":"AI data center campus in Abernathy, Texas, developed by a joint venture of TeraWulf and Fluidstack announced in October 2025. It is designed for 168 MW of critical IT load (up to 240 MW gross) and is fully pre-leased to a Fluidstack entity for up to 25 years, with Google backstopping about $1.3 billion of the lease obligations; the end user is described only as a global hyperscale AI platform. Project financing was priced in December 2025 and commissioning was targeted for the second half of 2026. In July 2026 TeraWulf agreed to sell its 50.1% stake to a Fluidstack-led investor group, with Fluidstack to keep leading the project. Abernathy HPC Campus TeraWulf Fluidstack TeraWulf Fluidstack Fluidstack"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8ea405601b72e53a6661/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8ea405601b72e53a6661.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-1576b005c6fed63297a5","name":"Accokeek Center Data Center Campus (Richmond Highway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.4022586,"longitude":-77.427741,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"a633d518-d911-5f66-83b4-51ce22c6d452","name":"Accokeek Center — proposed two-building 590,000 sq ft data center campus (rezoning RC24155981)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Stafford County, Virginia (Planning Commission; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1576b005c6fed63297a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1576b005c6fed63297a5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-5b95b2458a9a5add9fad","name":"ACS DC La Puebla data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.634,"longitude":-0.748,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"f07274ee-deff-5651-b606-da909d7328af","name":"ACS DC La Puebla data center campus","status":"announced","status_as_of":"2026-10-05","search_terms":"Data center campus planned by ACS with Benbros Energy on about 25.5 hectares of industrial land in La Puebla de Alfindén, Zaragoza province. Announced in June 2025 with EUR 1,254 million for the first phase and 150 MW of grid access at Red Eléctrica's Peñaflor substation; a second phase depends on a further 150 MW the developers have requested. The regional plan describes two data halls of 40 MW and 60 MW of IT load, a new 400/220 kV substation next to Peñaflor and an underground line to the site. The plan won initial approval in December 2025 and was amended in July 2026 to add the power line projects. Urbanisation works were expected from late 2026 or in 2027. ACS DC LA PUEBLA ACS and Benbros Energy data center, La Puebla de Alfindén ACS Benbros Energy Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5b95b2458a9a5add9fad/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5b95b2458a9a5add9fad.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón"]},{"site_id":"vcc-site-42f06f3124352e4af817","name":"AdaniConneX Hyderabad data centre campus","country":"India","country_iso_a2":"IN","latitude":17.3888,"longitude":78.4611,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"9753db27-dba7-5bba-933f-499d9b7ffa72","name":"AdaniConneX Hyderabad data centre campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Hyderabad campus with a potential capacity of 600 MW of IT load, of which a first phase went live in October 2024. The company says the campus can draw up to 100% renewable power and offers colocation, connectivity and managed services there. A February 2026 Adani group release links its Microsoft partnership to the Hyderabad and Pune campuses without describing the terms. The site address and the size of the live first phase have not been published. AdaniConneX AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-42f06f3124352e4af817/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-42f06f3124352e4af817.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-bb97e3ebf82c06ecfb2c","name":"AdaniConneX Navi Mumbai data centre campus","country":"India","country_iso_a2":"IN","latitude":19.0308,"longitude":73.0199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"96c80c6f-de7a-5e5c-b9b1-fc1bb7c738a6","name":"AdaniConneX Navi Mumbai data centre campus","status":"announced","status_as_of":"2026-10-09","search_terms":"AdaniConneX lists a planned Navi Mumbai campus with a potential capacity of 1,000 MW of IT load, which the company says has not yet launched and will connect to the main internet exchanges over OPGW fibre. The company gives a ready-for-service date of December 2026 onwards and says the campus can use up to 100% renewable power. No address, investment figure, tenant or construction progress has been published in the sources reviewed. AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb97e3ebf82c06ecfb2c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb97e3ebf82c06ecfb2c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-c4475d593124b26a70cd","name":"AdaniConneX Noida data centre campus","country":"India","country_iso_a2":"IN","latitude":28.57,"longitude":77.32,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8c2ed321-ddad-5bb1-ab38-bd5b66bf4f2b","name":"AdaniConneX Noida data centre campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Noida campus in the Delhi NCR region with a potential capacity of 150 MW of IT load and a first phase live from January 2025. In June 2023 the company said a USD 213 million construction loan would fund a 50 MW Noida campus then being built, alongside its Chennai site. The company says the campus can use up to 100% renewable power. The site address and tenants have not been published. AdaniConneX"}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4475d593124b26a70cd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4475d593124b26a70cd.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AdaniConneX"]},{"site_id":"vcc-site-52b1e1c3038357306a39","name":"AdaniConneX Pune Data Center Campus","country":"India","country_iso_a2":"IN","latitude":18.6467083333,"longitude":73.8072666667,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-06-01","project_count":2,"projects":[{"project_id":"df5ccb0c-2ab0-56fc-a260-71db9387c492","name":"AdaniConneX Pune data centre campus","status":"partially_operational","status_as_of":"2026-07-29","search_terms":"AdaniConneX, the Adani group's data centre business, lists a Pune campus with a potential capacity of 250 MW of IT load and a first phase live from October 2025. Adani reported in July 2026 that 9.6 MW of the campus's second phase had been handed over to a customer. The company says the campus can use up to 100% renewable power, and a February 2026 Adani group release links its Microsoft partnership to the Pune and Hyderabad campuses without describing the terms. The site address has not been published. AdaniConneX"},{"project_id":"48eb54d5-dd3f-51a3-aeed-1ddce1949763","name":"AdaniConneX Pune PNQ04 Current Build","status":"under_construction","status_as_of":"2026-06-01","search_terms":""}],"status_publishers":["AdaniConneX"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-52b1e1c3038357306a39.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Pune Data Center Limited"]},{"site_id":"vcc-site-1a4feac0d2ca521fae3a","name":"Aether FR-SXB2 Strasbourg AI Campus (former Dumarey Powerglide site)","country":"France","country_iso_a2":"FR","latitude":48.514718,"longitude":7.777093,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-12","oldest_status_as_of":"2026-10-12","project_count":1,"projects":[{"project_id":"e1e66d86-3b34-5b26-a20a-073e1ae2f731","name":"Aether FR-SXB2 Strasbourg AI Factory","status":"announced","status_as_of":"2026-10-12","search_terms":""}],"status_publishers":["2CRSi"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1a4feac0d2ca521fae3a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1a4feac0d2ca521fae3a.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN / Base Adresse Nationale"]},{"site_id":"vcc-site-f12c1276f78e5184af30","name":"Africa Data Centres JHB1 Midrand","country":"South Africa","country_iso_a2":"ZA","latitude":-26.0093927,"longitude":28.1202488,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"52003baa-3fef-5672-9e1d-6e4ed1eb1c0b","name":"Africa Data Centres JHB1 Midrand — operating facility","status":"operational","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["Africa Data Centres (Cassava Technologies)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f12c1276f78e5184af30/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f12c1276f78e5184af30.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-7311a9ab273caa85afc2","name":"Agricultural Bank of China Horinger Data Center (Data Centre Third Branch)","country":"China","country_iso_a2":"CN","latitude":40.536553091,"longitude":111.797867534,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19","name":"Agricultural Bank of China Horinger Data Center — newly commissioned data-centre operations","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局（应急局）)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7311a9ab273caa85afc2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7311a9ab273caa85afc2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国农业银行股份有限公司内蒙古自治区分行"]},{"site_id":"vcc-site-f9661fed6650ccc21ce2","name":"AI Tech Tomakomai Kashiwabara Data Center Campus","country":"Japan","country_iso_a2":"JP","latitude":42.69518558066431,"longitude":141.76624601705532,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-19","oldest_status_as_of":"2026-06-19","project_count":1,"projects":[{"project_id":"100cf064-1cae-5dba-a4d9-6c4ae35152ec","name":"AI Tech Tomakomai Phase I Foundation Works","status":"under_construction","status_as_of":"2026-06-19","search_terms":""}],"status_publishers":["Environmentally Friendly Holdings Co., Ltd."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f9661fed6650ccc21ce2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f9661fed6650ccc21ce2.json","geometry_licenses":["CC-BY-version-unspecified; underlying MOJ-map-data-custom-terms-2023-01-23","MOJ-map-data-custom-terms-2023-01-23"],"geometry_attributions":["Ministry of Justice, Japan; AIGID conversion; Data Center Atlas selection and display-anchor derivation"]},{"site_id":"vcc-site-2b9d83de9f69d94f5df1","name":"AirTrunk HYD1 Hyderabad","country":"India","country_iso_a2":"IN","latitude":17.2327,"longitude":78.1713,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"f8a7bd1c-26a2-5b59-8e1b-d657084c4f7c","name":"AirTrunk HYD1 Hyderabad","status":"announced","status_as_of":"2026-10-09","search_terms":"HYD1 is AirTrunk's Hyderabad campus at Chandanvelly, Telangana, which AirTrunk lists at more than 243 MW on a 13.3-hectare site served by a 440/220 kV substation. AirTrunk entered India in April 2026 by acquiring Blackstone-backed Lumina CloudInfra, whose roughly 600 MW planned pipeline spans Mumbai, Chennai and Hyderabad. AirTrunk's site page gives no construction status or dates, and no other source describing work at the site was found. AirTrunk HYD1 HYD1 Hyderabad AirTrunk Blackstone"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2b9d83de9f69d94f5df1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2b9d83de9f69d94f5df1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-b83e933ca77e513685ed","name":"AirTrunk JHB1","country":"Malaysia","country_iso_a2":"MY","latitude":1.5367,"longitude":103.7206,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["partially_operational"],"newest_status_as_of":"2024-08-09","oldest_status_as_of":"2024-08-09","project_count":1,"projects":[{"project_id":"abb5573d-8211-5781-be5c-50c8b27d4fe8","name":"AirTrunk JHB1","status":"partially_operational","status_as_of":"2024-08-09","search_terms":"JHB1 is AirTrunk's first hyperscale data center campus in Malaysia, located in Johor Bahru on more than 10 hectares. It opened in July 2024 with initial phases of over 50 MW for large technology customers, and the following month AirTrunk began a 100 MW expansion to take the campus past 150 MW, with remaining phases due over about 18 months. AirTrunk said in April 2026 that JHB1 and its sister campus JHB2 were almost fully contracted. Renewable supply includes a solar-ready roof and a 30 MW virtual power purchase agreement with ib vogt. JHB1 Johor AirTrunk AirTrunk ib vogt"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b83e933ca77e513685ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b83e933ca77e513685ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-3d8ad7e35f76709e9b15","name":"AirTrunk JHB2","country":"Malaysia","country_iso_a2":"MY","latitude":1.4523,"longitude":103.6145,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"ec871425-75fd-5ee1-9a6f-0e901b2f5837","name":"AirTrunk JHB2","status":"announced","status_as_of":"2026-07-29","search_terms":"JHB2 is AirTrunk's second hyperscale campus in Malaysia, announced in February 2025 in Iskandar Puteri, Johor, and scalable to more than 270 MW on a site of over 11 hectares. It is designed for high-density AI loads with liquid cooling and a grid connection from Tenaga Nasional Berhad on an accelerated schedule, with AirTrunk providing land for a new substation. In April 2026 AirTrunk said JHB1 and JHB2 were almost fully contracted, and in July 2026 it secured US$2.325 billion of green project financing for JHB2. The cited sources give no opening date. JHB2 Johor AirTrunk Tenaga Nasional Berhad"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d8ad7e35f76709e9b15/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d8ad7e35f76709e9b15.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-492efa6e8a99e32cfb93","name":"AirTrunk JHB3 Johor Bahru","country":"Malaysia","country_iso_a2":"MY","latitude":1.4222,"longitude":103.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-30","oldest_status_as_of":"2026-04-30","project_count":1,"projects":[{"project_id":"baa5ddbb-3439-5e4f-a03f-265b844b4460","name":"AirTrunk JHB3 Johor Bahru","status":"announced","status_as_of":"2026-04-30","search_terms":"JHB3 is one of two new AirTrunk hyperscale campuses announced on 30 April 2026 in Iskandar Puteri, Johor, next to its JHB1 and JHB2 campuses. AirTrunk lists JHB3 at more than 138 MW across multiple buildings with eight data halls on about 5.4034 hectares, fed at 275 kV from JHB2 and cooled with recycled water, aimed at high-density cloud and AI customers. AirTrunk put the combined investment for JHB3 and JHB4 at MYR12 billion (USD3 billion), with more than 3,000 construction jobs; no construction or opening dates were given. AirTrunk JHB3 JHB3 Johor Bahru AirTrunk"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-492efa6e8a99e32cfb93/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-492efa6e8a99e32cfb93.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-f8df65a48b8288eac8cb","name":"AirTrunk JHB4 Johor Bahru","country":"Malaysia","country_iso_a2":"MY","latitude":1.4222,"longitude":103.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-30","oldest_status_as_of":"2026-04-30","project_count":1,"projects":[{"project_id":"db7fc7c1-cc03-5473-80b8-31b36c8224d5","name":"AirTrunk JHB4 Johor Bahru","status":"announced","status_as_of":"2026-04-30","search_terms":"JHB4 is one of two new AirTrunk hyperscale campuses announced on 30 April 2026 in Iskandar Puteri, Johor, next to its JHB1 and JHB2 campuses. AirTrunk lists JHB4 at more than 142 MW across multiple buildings with eight data halls on about 5.589 hectares, fed at 275 kV from JHB2 and cooled with recycled water, aimed at high-density cloud and AI customers. AirTrunk put the combined investment for JHB4 and JHB3 at MYR12 billion (USD3 billion), with more than 3,000 construction jobs; no construction or opening dates were given. AirTrunk JHB4 JHB4 Johor Bahru AirTrunk"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f8df65a48b8288eac8cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f8df65a48b8288eac8cb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-63d7eb757cdf71a1ae84","name":"AirTrunk Kurri Kurri Data Centre","country":"Australia","country_iso_a2":"AU","latitude":-32.8167,"longitude":151.4833,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"33a0110e-c5fb-58d0-8913-81aef5fdd9d3","name":"AirTrunk Kurri Kurri Data Centre","status":"announced","status_as_of":"2026-10-14","search_terms":"AirTrunk proposes a 540 MW data center on the former Hydro Aluminium smelter site on Hart Road, Loxford, near Kurri Kurri in the Hunter region of New South Wales. It is being assessed as state significant development; the NSW planning department issued assessment requirements by July 2026 and AirTrunk said it lodged an environmental impact statement in September 2026. Plans show a two-storey building of about 44,220 square metres with air-based cooling and a 132 kV grid connection with a new substation. Coverage puts the investment at about A$3.7 billion, and AirTrunk told local press it targets opening in 2028. Kurri Kurri Data Centre SSD-128819490 AirTrunk McCloy Group NSW Department of Planning, Housing and Infrastructure"}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-63d7eb757cdf71a1ae84/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-63d7eb757cdf71a1ae84.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-631125c7d95912c8b038","name":"AirTrunk SYD2 Sydney North Campus (Lane Cove West)","country":"Australia","country_iso_a2":"AU","latitude":-33.8077875,"longitude":151.1447176,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"11f191bc-3432-5b11-aee1-31eb6121fd19","name":"AirTrunk SYD2 Sydney North — existing hyperscale campus operations (1 Sirius Road)","status":"operational","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["AirTrunk Operating Pty Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-631125c7d95912c8b038/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-631125c7d95912c8b038.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-d3117bafca6bdcc5007e","name":"AirTrunk TOK1 Tokyo East","country":"Japan","country_iso_a2":"JP","latitude":35.8323,"longitude":140.1453,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-03-10","oldest_status_as_of":"2026-03-10","project_count":1,"projects":[{"project_id":"3fe8297a-147b-56fe-a5a6-6ae165798506","name":"AirTrunk TOK1 Tokyo East","status":"partially_operational","status_as_of":"2026-03-10","search_terms":"TOK1 is AirTrunk's flagship hyperscale campus in the Inzai data center hub east of Tokyo, which AirTrunk bills as the biggest hyperscale campus in Japan measured in megawatts. The 13-hectare campus is scalable to more than 300 MW and already has facilities in service. In August 2024 AirTrunk said a 50 MW third phase was on schedule and topping out; it broke ground on a further 40 MW-plus phase in June 2025, and in March 2026 said it had recently begun building over 100 MW of additional IT load. That month it closed a JPY 191.6 billion green loan to refinance existing TOK1 facilities and fund the next phases. TOK1 AirTrunk AirTrunk"}],"status_publishers":["AirTrunk"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3117bafca6bdcc5007e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d3117bafca6bdcc5007e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},{"site_id":"vcc-site-cc8bbdad8c252d9ba4e2","name":"Akashi Astana Data Center Campus","country":"Kazakhstan","country_iso_a2":"KZ","latitude":51.2067694444,"longitude":71.4577083333,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"44130f9f-95af-5f19-9fcf-47aabd3a5c8b","name":"Akashi Astana Phase 1 Current Build","status":"under_construction","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Akashi Data Center"],"power_observations":[{"project_id":"44130f9f-95af-5f19-9fcf-47aabd3a5c8b","metric":"critical_it_mw","stage":"planned","low":5.28,"base":5.28,"high":5.28,"unit":"MW","as_of_date":"2026-07-21"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc8bbdad8c252d9ba4e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc8bbdad8c252d9ba4e2.json","geometry_licenses":["no-license-stated-for-compact-factual-extraction"],"geometry_attributions":["Unified Environmental Portal of Kazakhstan"]},{"site_id":"vcc-site-35381f89404ef4c2a035","name":"Aker Nscale Korgen AI data center","country":"Norway","country_iso_a2":"NO","latitude":66.0766,"longitude":13.8219,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-10-27","oldest_status_as_of":"2025-10-27","project_count":1,"projects":[{"project_id":"88c15bf1-8080-55a3-b2cd-dbd795654bf3","name":"Aker Nscale Korgen AI data center","status":"announced","status_as_of":"2025-10-27","search_terms":"Aker Nscale, then a joint venture of Aker and Nscale, plans an AI data center at Korgen in Hemnes municipality, Nordland, possibly at Statkraft's Nedre Røssåga power station. In October 2025 an Aker investment director estimated the site would draw about 250 MW of grid capacity and said it could be as large as the Narvik project. Aker Nscale had bought out Nordkraft's position and landowner agreements for a plot zoned for commercial use in Hemnes's proposed land-use plan, and was waiting in line for a Statnett power allocation. Trade press put the project at about USD 5.4bn. Aker passed its joint-venture stake to Nscale in March 2026; no later Korgen-specific update was found. Nscale Korgen Aker Nscale Statnett Hemnes Municipality"}],"status_publishers":["High North News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-35381f89404ef4c2a035/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-35381f89404ef4c2a035.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["High North News"]},{"site_id":"vcc-site-77c736fbee4c7b533a8d","name":"Alamo Mission Data Center Complex (Red Oak, Ellis County)","country":"United States","country_iso_a2":"US","latitude":32.5362805,"longitude":-96.7939496,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"9adddd5d-e057-5a02-8a2e-85c5b400bbe4","name":"Red Oak PD-66R8 Data Center Complex — proposed development plan (zoning case ZC26-15, Ordinance No. 26-032)","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Red Oak, Texas"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77c736fbee4c7b533a8d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77c736fbee4c7b533a8d.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ellis Appraisal District data)"]},{"site_id":"vcc-site-88fff6786d166668a98f","name":"Aligned Conesville CMH-02 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.18252252973112,"longitude":-81.87484638244284,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"26ebe837-0ec5-5973-a729-656b1b4ce011","name":"Aligned Conesville Current Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["CCU Coal & Construction"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88fff6786d166668a98f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88fff6786d166668a98f.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Coshocton County GIS","Coshocton County GIS and Tax Map Office"]},{"site_id":"vcc-site-978148b11c356a9982f3","name":"Aligned Pataskala Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.99112482870804,"longitude":-82.72619614082323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"d2ebc939-3948-5944-b8c9-c62c679eff81","name":"Aligned Pataskala Data Center Campus — proposed campus","status":"announced","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Aligned Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-978148b11c356a9982f3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-978148b11c356a9982f3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-75b2e66146cca1b903a2","name":"Aligned Phoenix Data Center Campus (2500 W Union Hills Dr)","country":"United States","country_iso_a2":"US","latitude":33.6587258,"longitude":-112.1113011,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"93cc5376-c88c-5b6d-861d-423ac5d231db","name":"Aligned PHX-05 Data Center — core and shell","status":"completed","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-75b2e66146cca1b903a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-75b2e66146cca1b903a2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-b336a1eb615ea1635dc7","name":"Aligned Project Phoenix, Shippingport","country":"United States","country_iso_a2":"US","latitude":40.632068,"longitude":-80.414552,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-10","oldest_status_as_of":"2026-09-10","project_count":1,"projects":[{"project_id":"9ecf2558-5470-501a-9d83-5bf628979837","name":"Aligned Project Phoenix / PIT-01 Campus Development","status":"announced","status_as_of":"2026-09-10","search_terms":""}],"status_publishers":["Aligned Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b336a1eb615ea1635dc7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b336a1eb615ea1635dc7.json","geometry_licenses":["source-specific-terms"],"geometry_attributions":["Shippingport Industrial Park / Frontier Group of Companies via Google My Maps"]},{"site_id":"vcc-site-bad4f3ef6a837cde9b80","name":"Alphen aan den Rijn Data Center (Boerhaaveweg 10)","country":"Netherlands","country_iso_a2":"NL","latitude":52.12424652903161,"longitude":4.635035543394948,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"89947860-0dcd-543c-9b18-6cd0068420a0","name":"Alphen aan den Rijn Data Center — permitted 8,292 m2 data-centre building","status":"permitted","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Gemeente Alphen aan den Rijn (via Officiële bekendmakingen)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bad4f3ef6a837cde9b80/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bad4f3ef6a837cde9b80.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Kadaster / BAG via PDOK"]},{"site_id":"vcc-site-e20b61b9b203723af348","name":"Alter GPU Center Stargard Data Processing Centre","country":"Poland","country_iso_a2":"PL","latitude":53.2819096,"longitude":14.9734641,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"a35a1d8e-4066-5d38-86d6-e21c73987243","name":"Alter GPU Center Stargard — data processing centre building (building permit 785/2026)","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Starostwo Powiatowe w Stargardzie (Biuletyn Informacji Publicznej)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e20b61b9b203723af348/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e20b61b9b203723af348.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-7e1b680aa925165fe2ef","name":"Alto Infrastructure SP01 Granada Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":37.0832838,"longitude":-3.7520406,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-09","oldest_status_as_of":"2026-07-09","project_count":1,"projects":[{"project_id":"4a934222-f3af-5945-bb46-b98bfaef89b7","name":"Alto Infrastructure SP01 Phase 1 10 MW Critical IT","status":"under_construction","status_as_of":"2026-07-09","search_terms":""}],"status_publishers":["Invest in Spain, ICEX España Exportación e Inversiones"],"power_observations":[{"project_id":"4a934222-f3af-5945-bb46-b98bfaef89b7","metric":"critical_it_mw","stage":"planned","low":10.0,"base":10.0,"high":10.0,"unit":"MW","as_of_date":"2026-07-09"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7e1b680aa925165fe2ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7e1b680aa925165fe2ef.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Junta de Andalucía"]},{"site_id":"vcc-site-1246c2b9750b8b4832d2","name":"Amazon and STACK campus at Resilient Technology Park, Shreveport","country":"United States","country_iso_a2":"US","latitude":32.4639,"longitude":-93.7944,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"3641032c-9acd-5840-b94b-beab26a1ce0d","name":"Amazon and STACK campus at Resilient Technology Park, Shreveport","status":"announced","status_as_of":"2026-08-27","search_terms":"Data center campus that STACK Infrastructure is to develop, own and lease to Amazon at the 313-acre Resilient Technology Park off Greenwood Road in west Shreveport, Louisiana, next to Interstate 20. The City Council approved it after the planning commission had blocked it, and residents sued in January 2026 seeking judicial review. In February 2026 local radio described a USD 10 billion site plan of seven two-story buildings and nearly 3 million sq ft, though other outlets said the site was left out of Amazon's USD 12 billion regional announcement because of the lawsuit. In August 2026 the state announced USD 6 billion for this third campus, raising Amazon's regional plan to USD 18 billion. Resilient Technology Park Resilient Tech Park 7340 Greenwood Road STACK Infrastructure STACK Infrastructure Amazon (Amazon Web Services) Amazon Southwestern Electric Power Company (SWEPCO) Shreveport City Council"}],"status_publishers":["Louisiana Economic Development"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1246c2b9750b8b4832d2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1246c2b9750b8b4832d2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["News Radio 710 KEEL"]},{"site_id":"vcc-site-ddb25aaf67b503ba9f5e","name":"Amazon Data Services Ireland Clonshaugh data storage campus, Clonshaugh Business and Technology Park, Dublin 17","country":"Ireland","country_iso_a2":"IE","latitude":53.4015963,"longitude":-6.2203039,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"3ddbf5b6-f195-53dd-8041-e1587bf83ef4","name":"Amazon Data Services Ireland Clonshaugh data storage facility — existing Buildings W, X and Y","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ddb25aaf67b503ba9f5e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ddb25aaf67b503ba9f5e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-50d8ca798842d8a98b32","name":"Amazon Data Services Italy Data Center Campus, Rho/Pero (via Buonarroti, Rho Fiera)","country":"Italy","country_iso_a2":"IT","latitude":45.5223177,"longitude":9.067057,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"b06eb989-f0a5-5e7b-adce-0f791182f6e5","name":"Data Center Edificio A and Edificio B — proposed two-building data-centre campus (MASE ID_VIP 13213 / 14760)","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50d8ca798842d8a98b32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-50d8ca798842d8a98b32.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Amazon Data Services Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-ea975f39cffa9177571a","name":"Amazon Data Services Ridgeway Data Centre site, Ridgeway Trading Estate, Iver","country":"United Kingdom","country_iso_a2":"GB","latitude":51.513552,"longitude":-0.510034,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"af67ab30-fd53-57ff-b6cf-2a29fd2f3f0b","name":"AWS Ridgeway Data Centre, Iver","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Environment Agency"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ea975f39cffa9177571a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ea975f39cffa9177571a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Amazon Data Services UK Limited / EHS Projects Ltd via Environment Agency consultation"]},{"site_id":"vcc-site-138d436c47cc25fa668a","name":"Amazon Falls Township Innovation Campus","country":"United States","country_iso_a2":"US","latitude":40.155464002333,"longitude":-74.75004338781764,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"bdfd522f-2d7e-5d1f-8e00-3c43b462ed27","name":"Amazon Falls Township Active Campus Buildout","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Amazon Innovation Campuses in Pennsylvania"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-138d436c47cc25fa668a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-138d436c47cc25fa668a.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Bucks County GIS","Bucks County Planning Commission / Board of Assessment"]},{"site_id":"vcc-site-b065c16b51237fbb767f","name":"Amazon Salem Township Innovation Campus","country":"United States","country_iso_a2":"US","latitude":41.0839907,"longitude":-76.14337485,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-07-19","project_count":2,"projects":[{"project_id":"c73ac912-e44d-5477-84f5-c5beb4813518","name":"Amazon Salem Township Active Campus Buildout","status":"under_construction","status_as_of":"2026-07-19","search_terms":""},{"project_id":"dc6f83d9-dac5-563a-ba7e-ff18e27ba506","name":"AWS Salem Township Innovation Campus (Susquehanna)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Amazon Web Services campus next to Talen Energy's Susquehanna nuclear plant in Salem Township, Luzerne County. AWS bought Talen's Cumulus campus, planned at up to 960 MW, in March 2024 and won township rezoning in May 2024. In June 2025 Talen agreed to supply Amazon 1,920 MW from Susquehanna through 2042, moving delivery onto the grid after a spring 2026 reconfiguration. The site was one of the first two named in Amazon's plan to invest at least $20 billion in Pennsylvania. Amazon says it operates a data center campus there and shows active construction since October 2025 toward 20 data centers. Cumulus data center campus Salem Township Innovation Campus Amazon Web Services Amazon Web Services Talen Energy PPL Electric Utilities Salem Township"}],"status_publishers":["Amazon Innovation Campuses in Pennsylvania","Amazon Innovation in PA (project website)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b065c16b51237fbb767f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b065c16b51237fbb767f.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c51acbb151880f9815b8","name":"Amazon Web Services Hobart data center campus","country":"United States","country_iso_a2":"US","latitude":41.5286,"longitude":-87.2675,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"8d08b021-e457-5102-9ef2-33528ad786d1","name":"Amazon Web Services Hobart data center campus","status":"announced","status_as_of":"2026-08-25","search_terms":"Planned Amazon data center campus on hundreds of acres of undeveloped land in Hobart, Lake County, Indiana. Hobart confirmed an agreement for the campus less than a day after Amazon announced USD 15 billion for new northern Indiana campuses in November 2025. The city council approved the project, reported at USD 11 billion, in January 2026 with a ten-year tax abatement and a long IT equipment exemption; Amazon has paid the city USD 47 million, with further payments tied to construction milestones. The mayor has estimated up to 25 buildings, with work slated to start in 2026 and finish in 2028. A resident's lawsuit over the approval process was still described as ongoing in August 2026. Amazon Web Services City of Hobart"}],"status_publishers":["FOX 32 Chicago"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c51acbb151880f9815b8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c51acbb151880f9815b8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["21Alive News (WPTA), from Inside INdiana Business"]},{"site_id":"vcc-site-9c23979ae731456903ea","name":"Amazon Web Services King George County campus (Birchwood site)","country":"United States","country_iso_a2":"US","latitude":38.2614,"longitude":-77.3319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c42e542c-bee8-54bc-9f79-9f03d98979ea","name":"Amazon Web Services King George County campus (Birchwood site)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed Amazon Web Services data center campus on about 869 acres at the former Birchwood coal power plant on State Route 3 in the Sealston area of King George County, Virginia. Rezoned in September 2023, it is planned at 7.25 to 7.5 million sq ft, with a first phase of up to eight buildings and about 4 million sq ft and nine more buildings in later phases, and is reported as a USD 6 billion project. The county approved tax incentives in December 2023, but a new board voted in January 2024 to renegotiate them; Amazon sought a vested rights review in 2025, and as of March 2026 the case was pending in circuit court with no construction reported. Birchwood data center campus Amazon Birchwood Amazon Web Services Amazon Web Services Birchwood Power Partners King George County Board of Supervisors Dominion Energy"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9c23979ae731456903ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9c23979ae731456903ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-c81c0194b0e64300e188","name":"APL Hibikino Data Center Campus, Kitakyushu","country":"Japan","country_iso_a2":"JP","latitude":33.8937,"longitude":130.71315,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"c7ab6b45-ea55-55d0-8fc1-c9ed25d39ace","name":"APL Hibikino Data Center — Hibikino-kita first building development","status":"site_preparation","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Kitakyushu City"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c81c0194b0e64300e188/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c81c0194b0e64300e188.json","geometry_licenses":["CC-BY"],"geometry_attributions":["Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license: Creative Commons Attribution."]},{"site_id":"vcc-site-9bb771ea13115bdd8091","name":"Apple Prineville Data Center Campus","country":"United States","country_iso_a2":"US","latitude":44.2845822,"longitude":-120.8659538,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-08","oldest_status_as_of":"2026-10-08","project_count":2,"projects":[{"project_id":"f977578a-7126-5a1a-a89c-5e40d239e630","name":"Apple Prineville Data Center Campus — eastern campus expansion (PRZ 06 development area)","status":"announced","status_as_of":"2026-10-08","search_terms":""},{"project_id":"e18e9133-3dc6-56b6-951b-d46e80e96690","name":"Apple Prineville Data Center Campus — existing operations","status":"operational","status_as_of":"2026-10-08","search_terms":""}],"status_publishers":["City of Prineville, Oregon"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9bb771ea13115bdd8091/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9bb771ea13115bdd8091.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Crook County, Oregon"]},{"site_id":"vcc-site-60a52daa24c85edeb3a2","name":"Applied Digital Delta Forge 1 Campus","country":"United States","country_iso_a2":"US","latitude":31.38257035,"longitude":-92.68620569018782,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"b7744ad5-aa48-5977-a70e-3d6a588f468d","name":"Delta Forge 1 Current Construction","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital AI factory campus in Boyce, Louisiana, on more than 500 acres, designed for an initial 430 MW of total utility power and up to 300 MW of critical IT load in two 150 MW facilities. Ground was broken in January 2026 with the state undisclosed. In April 2026 an unnamed US high investment-grade hyperscaler leased the 300 MW for about 15 years, worth about 7.5 billion US dollars. The company's July 2026 results release names Boyce, Louisiana. Initial operations are targeted for mid-2027. Delta Forge 1 AI Factory Campus Applied Digital"}],"status_publishers":["Applied Digital Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60a52daa24c85edeb3a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60a52daa24c85edeb3a2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation","OpenStreetMap contributors"]},{"site_id":"vcc-site-8d354596ddb2508a0eda","name":"Applied Digital Delta Forge 2","country":"United States","country_iso_a2":"US","latitude":33.2397,"longitude":-87.3278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"d2bf7339-8e09-50df-8229-96ad3f8fa358","name":"Applied Digital Delta Forge 2","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital's fifth AI factory campus, on about 160 acres of a nearly 1,300-acre site north of Brookwood Parkway in Brookwood, Tuscaloosa County, Alabama. In June 2026 the company announced a 15-year lease of 210 MW of critical IT load to an unnamed US high investment-grade hyperscaler, worth about USD 5.2 billion in base-term revenue, naming only a southern state. Applied Digital confirmed the Brookwood site in September 2026; local reports gave an initial capital investment of about USD 3.29 billion and about 1.26 million square feet of data center space. Construction was set to begin on 1 October 2026, with initial operations expected in Q1 2028. Delta Forge 2 AI Factory Applied Digital Tuscaloosa County Economic Development Authority"}],"status_publishers":["Applied Digital via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d354596ddb2508a0eda/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8d354596ddb2508a0eda.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC 33/40"]},{"site_id":"vcc-site-f453a8af189470adeb8b","name":"Applied Digital Jamestown Data Center Hosting Facility (2671 and 2683 Highway 20 SE, Jamestown, North Dakota)","country":"United States","country_iso_a2":"US","latitude":47.0257128,"longitude":-98.6809839,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"0c012a67-d296-54af-bb26-dab8478ce710","name":"Applied Digital Jamestown — 106 MW data-center hosting facility, existing operations (APLD Hosting LLC)","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Applied Digital Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f453a8af189470adeb8b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f453a8af189470adeb8b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["North Dakota GIS Hub; Stutsman County"]},{"site_id":"vcc-site-0ac82fd201fa1878b892","name":"Applied Digital Polaris Forge 1 Campus","country":"United States","country_iso_a2":"US","latitude":46.014383,"longitude":-98.574269,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","partially_operational","under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-08-31","project_count":3,"projects":[{"project_id":"66926b10-9fe1-5a9c-bcae-d906d05c3093","name":"Applied Digital Ellendale 180 MW data-center hosting facility — existing operations","status":"operational","status_as_of":"2026-08-31","search_terms":""},{"project_id":"32b98d7e-1d0f-5c16-af18-3f469f3b662b","name":"Applied Digital Polaris Forge 1","status":"partially_operational","status_as_of":"2026-10-07","search_terms":"Applied Digital's AI data center campus in Ellendale, North Dakota, leased entirely to CoreWeave under roughly 15-year leases covering 400 MW of critical IT load. The first 100 MW building came online in two 50 MW phases in October and November 2025, and the 150 MW second building came online in two 75 MW phases by October 2026, for 250 MW operating. A third 150 MW building (ELN-04) is under construction, financed through a bridge loan later refinanced with senior secured notes in June 2026. Polaris Forge 1 AI Factory Campus Applied Digital Ellendale AI campus Applied Digital CoreWeave"},{"project_id":"20ee1eea-91bf-52aa-a464-c4a38d436f9e","name":"Polaris Forge 1 Current Expansion","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Applied Digital","Applied Digital Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ac82fd201fa1878b892/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ac82fd201fa1878b892.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["North Dakota Department of Environmental Quality"]},{"site_id":"vcc-site-847f0ddc67e6e40ce38a","name":"Applied Digital Polaris Forge 2 Campus","country":"United States","country_iso_a2":"US","latitude":46.96693921427165,"longitude":-96.86849216498359,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":2,"projects":[{"project_id":"5c691ba6-a630-5ab4-a45d-4d676e3e4d53","name":"Applied Digital Polaris Forge 2","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital AI data center campus near Harwood in Cass County, North Dakota, on more than 900 acres. Announced in August 2025 as a 3 billion US dollar, 280 MW project, it was later described as a 1 GW campus. An unnamed US investment-grade hyperscaler leased the first 200 MW of critical IT load in two buildings for about 15 years and holds a right of first refusal on 800 MW more. Construction is funded partly by 2.15 billion US dollars of senior secured notes issued in March 2026; the company expects initial operations by the end of 2026 and the full 200 MW in 2027. Polaris Forge 2 AI Factory Campus Applied Digital Harwood AI campus Applied Digital Cass County Electric Cooperative Oracle"},{"project_id":"12407b2e-a44d-5c8d-aa62-c7b64045e20f","name":"Polaris Forge 2 Current Construction","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Applied Digital","Applied Digital Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-847f0ddc67e6e40ce38a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-847f0ddc67e6e40ce38a.json","geometry_licenses":["public-domain-per-Cass-County-item-policy"],"geometry_attributions":["Cass County North Dakota"]},{"site_id":"vcc-site-5af95dd1d26b0546ea7f","name":"Applied Digital Polaris Forge 3","country":"United States","country_iso_a2":"US","latitude":47.115,"longitude":-101.2978,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"0eb54c2e-ed0f-58e9-85cc-bf616b723139","name":"Applied Digital Polaris Forge 3","status":"under_construction","status_as_of":"2026-10-07","search_terms":"Applied Digital's fourth AI factory campus, in Center, Oliver County, North Dakota. In May 2026 the company announced a 15-year take-or-pay lease with an unnamed US high investment-grade hyperscaler for 300 MW of critical IT load, supported by about 430 MW of grid-connected utility power, worth about 7.5 billion US dollars over the base term. The May release withheld the state; the company's October 2026 earnings release names Center, North Dakota. The campus is under construction, with initial operations targeted for 2027. Polaris Forge 3 AI Factory Campus Applied Digital"}],"status_publishers":["Applied Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5af95dd1d26b0546ea7f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5af95dd1d26b0546ea7f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Applied Digital"]},{"site_id":"vcc-site-4b59e5bc044bbb495638","name":"Ariake TK2 Data Centre","country":"Japan","country_iso_a2":"JP","latitude":35.632595,"longitude":139.790436,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"24b55f85-4868-57f7-907f-a68abeddb1c1","name":"(仮称)有明TK2データセンター — planned data-centre building","status":"announced","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["Tokyo Metropolitan Government, Bureau of Urban Development (東京都都市整備局)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4b59e5bc044bbb495638/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4b59e5bc044bbb495638.json","geometry_licenses":["GSI content terms (attribution required)"],"geometry_attributions":["Geospatial Information Authority of Japan (国土地理院)"]},{"site_id":"vcc-site-a94efdae4ca44082dd5e","name":"Art Data Centres Ennis campus","country":"Ireland","country_iso_a2":"IE","latitude":52.8463,"longitude":-8.9807,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-25","oldest_status_as_of":"2026-03-25","project_count":1,"projects":[{"project_id":"917342c6-069b-5678-bf52-e27fcf933a5a","name":"Art Data Centres Ennis campus","status":"announced","status_as_of":"2026-03-25","search_terms":"Six-hall, 200 MW data center campus planned by Art Data Centres on about 145 acres beside the Tulla Road on the eastern edge of Ennis, County Clare, near junction 13 of the M18. The national planning board granted permission in April 2024, and in March 2026 the High Court dismissed the last judicial review challenges after years of litigation. Investment is now put at more than EUR 1.6 billion over three phases. Phase 1, with a substation and two data halls, is due for commissioning by the end of 2028; enabling works start with diverting overhead power lines. Ennis data centre campus Art Data Centres Tulla Road campus Art Data Centres An Bord Pleanála (now An Coimisiún Pleanála) EirGrid ESB Networks"}],"status_publishers":["Clare FM"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a94efdae4ca44082dd5e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a94efdae4ca44082dd5e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Clare FM"]},{"site_id":"vcc-site-6410d8c85834272b982b","name":"Aruba Data Center Campus, Ponte San Pietro (Via San Clemente 53)","country":"Italy","country_iso_a2":"IT","latitude":45.7052355,"longitude":9.5893587,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"27cd8a67-29e5-5e7b-b876-3cfd75d20a59","name":"Data Center D — conversion of an existing building into a data centre with 30 emergency generators (campus expansion, VIA decree DM 592/2025)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica, Direzione generale Valutazioni ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6410d8c85834272b982b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6410d8c85834272b982b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Aruba S.p.A. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-74bd4d30e1805ec36812","name":"Ascenty Sumaré Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.812328,"longitude":-47.212871,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-28","oldest_status_as_of":"2026-05-28","project_count":1,"projects":[{"project_id":"5b52a118-2f46-5f43-b308-a3237e99e065","name":"Ascenty Sumaré 3","status":"under_construction","status_as_of":"2026-05-28","search_terms":""}],"status_publishers":["Christopher Torto, Ascenty CEO via LinkedIn"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-74bd4d30e1805ec36812/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-74bd4d30e1805ec36812.json","geometry_licenses":["CC-BY-4.0","all-rights-reserved"],"geometry_attributions":["Digital Realty","Google"]},{"site_id":"vcc-site-29c7aa69cf49aaa11516","name":"Ascenty Vinhedo Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.070216,"longitude":-47.012995,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-28","oldest_status_as_of":"2026-05-28","project_count":1,"projects":[{"project_id":"2cac8eb7-dff6-50bc-be49-b45f6e353982","name":"Ascenty Vinhedo 3","status":"under_construction","status_as_of":"2026-05-28","search_terms":""}],"status_publishers":["Ascenty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-29c7aa69cf49aaa11516/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-29c7aa69cf49aaa11516.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Ascenty"]},{"site_id":"vcc-site-fe9285f72381fc346e86","name":"AST Jāņciems Dispatcher Control and Data Centre","country":"Latvia","country_iso_a2":"LV","latitude":56.933100002,"longitude":24.1814716538,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-27","oldest_status_as_of":"2026-06-27","project_count":1,"projects":[{"project_id":"98e47ac5-8576-53f7-ab71-9f3d683b5ec5","name":"AST Jāņciems Fit-out After Building Completion","status":"shell","status_as_of":"2026-06-27","search_terms":""}],"status_publishers":["AS \"Augstsprieguma tīkls\""],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe9285f72381fc346e86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe9285f72381fc346e86.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Valsts zemes dienests (State Land Service), CC BY 4.0"]},{"site_id":"vcc-site-f53269e6364be91623f1","name":"AtlasEdge DUS001 Düsseldorf Data Centre (Zum Jägerhof 10, Hilden)","country":"Germany","country_iso_a2":"DE","latitude":51.1910348,"longitude":6.9391931,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"ad7cce51-c123-5908-a63a-87968ff5ac0c","name":"AtlasEdge DUS001 Düsseldorf — operating data centre","status":"operational","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["AtlasEdge Data Centres"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f53269e6364be91623f1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f53269e6364be91623f1.json","geometry_licenses":["dl-de/zero-2-0"],"geometry_attributions":["Geobasis NRW"]},{"site_id":"vcc-site-0a01a6bfe38831ba49d1","name":"AtlasEdge Leverkusen Campus (Dornierstraße 10)","country":"Germany","country_iso_a2":"DE","latitude":51.058417,"longitude":7.0200495,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":2,"projects":[{"project_id":"7e16bcb0-a606-5fb5-8fa8-c45ad2c82245","name":"AtlasEdge LEV001 — operating data centre","status":"operational","status_as_of":"2026-08-14","search_terms":""},{"project_id":"06d98c16-17d0-57a4-bc2d-7c71633fb227","name":"AtlasEdge LEV002 — new data centre adjacent to LEV001","status":"under_construction","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["AtlasEdge Data Centres"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0a01a6bfe38831ba49d1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0a01a6bfe38831ba49d1.json","geometry_licenses":["dl-de/zero-2-0"],"geometry_attributions":["Geobasis NRW"]},{"site_id":"vcc-site-3d3008fc5a4f9ce122d3","name":"AtlasEdge STR001 Stuttgart Data Centre (Schickardstraße 19, Böblingen)","country":"Germany","country_iso_a2":"DE","latitude":48.6761416,"longitude":8.967214,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"17b3cc26-c8d8-5aed-af8b-69688781a5b8","name":"AtlasEdge STR001 Stuttgart — operating data centre","status":"operational","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["AtlasEdge Data Centres"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d3008fc5a4f9ce122d3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d3008fc5a4f9ce122d3.json","geometry_licenses":["dl-de/by-2-0"],"geometry_attributions":["Datenquelle: LGL, www.lgl-bw.de, dl-de/by-2-0"]},{"site_id":"vcc-site-e5d89f88732b72ed1705","name":"atNorth DEN02 Varde mega site","country":"Denmark","country_iso_a2":"DK","latitude":55.8058,"longitude":8.6181,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"297b1705-767f-5434-af46-c08932afceb9","name":"atNorth DEN02 Varde mega site","status":"announced","status_as_of":"2026-08-11","search_terms":"atNorth plans its second Danish campus, DEN02, on a greenfield site of about 171-175 hectares at Krageris north of Ølgod in Varde Municipality, western Denmark. The company lists 500 MW of campus power with an initial 250 MW. Local press in November 2025 put the budget for the data center together with about 40 hectares of greenhouses to be developed by Wa3rm at about DKK 37bn, with a first stage due to start operating at the end of 2027 and a second stage in 2029, while the location still needed approval. Surplus heat is to feed Ølgod's district heating, and in August 2026 atNorth named Selected Group to use it for greenhouses next to the campus. DEN02 Varde mega site atNorth Ølgod atNorth"}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5d89f88732b72ed1705/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5d89f88732b72ed1705.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["JydskeVestkysten (republished by atNorth)"]},{"site_id":"vcc-site-4c2cf1101b80a8a4c17e","name":"atNorth FIN04 Kouvola Campus","country":"Finland","country_iso_a2":"FI","latitude":60.78344549044987,"longitude":26.76440419247778,"geometry_type":"MultiPolygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"7c7b8437-ca56-55a0-aa36-54155f43760e","name":"atNorth FIN04 Phase 1","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Finnish Environment Institute Ryhti"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c2cf1101b80a8a4c17e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c2cf1101b80a8a4c17e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Contains data from the National Land Survey of Finland INSPIRE Cadastral Parcels WFS, licensed under CC BY 4.0; retrieved 2026-08-23."]},{"site_id":"vcc-site-3b04bcaab24c7214a619","name":"atNorth FIN05 Salo mega site","country":"Finland","country_iso_a2":"FI","latitude":60.3879,"longitude":23.1249,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"1f415639-6b0f-5f32-b15e-07984488b5cc","name":"atNorth FIN05 Salo mega site","status":"announced","status_as_of":"2026-10-05","search_terms":"atNorth announced on 5 October 2026 a data center campus, FIN05, on a 28.6-hectare development-ready site in Salo, southwest Finland, with about EUR 2bn of its own investment; customer-owned servers could add a further investment estimated at up to EUR 10bn. The press release describes a 75 MW first phase with secured power and a path to up to 230 MW, while the site page lists 230 MW of gross power, up to 160 MW of IT capacity and a 60 MW IT first phase with power planned for Q3 2028. The site will connect to Fingrid's transmission grid through a substation, and atNorth plans long-term power purchase agreements with local suppliers. FIN05 Salo mega site atNorth Fingrid City of Salo"}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3b04bcaab24c7214a619/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3b04bcaab24c7214a619.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["atNorth"]},{"site_id":"vcc-site-17f7ed745e789e79ad69","name":"atNorth ICE02 Reykjanesbær Campus","country":"Iceland","country_iso_a2":"IS","latitude":63.96362605,"longitude":-22.53853195,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"9be0ab88-c727-5dbc-8a12-e2443878b69f","name":"atNorth ICE02 Phase 2 Expansion","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Mannverk"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-17f7ed745e789e79ad69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-17f7ed745e789e79ad69.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-7b9b287883c887b86116","name":"atNorth NOR01 Haugaland mega site","country":"Norway","country_iso_a2":"NO","latitude":59.3154,"longitude":5.4252,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-06-09","oldest_status_as_of":"2026-06-09","project_count":1,"projects":[{"project_id":"ce6cee07-15ea-56c9-83d5-c0cdb18aa695","name":"atNorth NOR01 Haugaland mega site","status":"announced","status_as_of":"2026-06-09","search_terms":"Nordic data center operator atNorth announced in June 2026 its first Norwegian campus, NOR01, on a 36-hectare plot in Haugaland Business Park in Tysvær, western Norway. Initial phases are planned at 120 MW, ramping up to 350 MW, with power availability projected for 2028 once Statnett and regional grid company Fagne complete new substations. atNorth markets the site for high-density AI, machine learning, cloud and HPC workloads, including build-to-suit projects, and expects about 200 people to work there at full capacity. No investment figure or customers have been disclosed. NOR01 Haugaland mega site atNorth Statnett Fagne"}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b9b287883c887b86116/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7b9b287883c887b86116.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["atNorth"]},{"site_id":"vcc-site-b25b924e3e107c2cbaf1","name":"atNorth SWE02 Stockholm Campus","country":"Sweden","country_iso_a2":"SE","latitude":59.42019318407011,"longitude":17.919052862381037,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-09","oldest_status_as_of":"2026-06-09","project_count":1,"projects":[{"project_id":"def7f329-a075-519e-bc4b-8f8126bc1901","name":"atNorth SWE02 Current Development","status":"under_construction","status_as_of":"2026-06-09","search_terms":""}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b25b924e3e107c2cbaf1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b25b924e3e107c2cbaf1.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Stockholms stad"]},{"site_id":"vcc-site-424c62f417d6e6ef2c93","name":"atNorth SWE04 Sollefteå mega site","country":"Sweden","country_iso_a2":"SE","latitude":63.1785,"longitude":17.0671,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-06-16","project_count":1,"projects":[{"project_id":"77b8badc-29e2-55ce-b570-5d4387e30505","name":"atNorth SWE04 Sollefteå mega site","status":"announced","status_as_of":"2026-06-16","search_terms":"atNorth announced in February 2026 a 300 MW campus, SWE04, at Hamre Industrial Park in Långsele, about 7 km west of Sollefteå in northern Sweden, on a zoned plot it describes as 50 hectares, with operation expected in the first half of 2028. In June 2026 it published a consultation document for an environmental permit application to the Land and Environment Court, describing three main buildings on a property of about 16 hectares, 145 backup generators running on HVO or similar fuel with about 1,200 MW of combustion input, and a planned grid connection agreement with E.ON. Investment has not been disclosed. SWE04 Sollefteå mega site atNorth Långsele atNorth atNorth AB E.ON"}],"status_publishers":["atNorth"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-424c62f417d6e6ef2c93/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-424c62f417d6e6ef2c93.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["atNorth"]},{"site_id":"vcc-site-29afcba86015feddd76b","name":"AVAIO Digital Leo Data Center Campus (Project Leo, East 145th Street, Pulaski County)","country":"United States","country_iso_a2":"US","latitude":34.620842,"longitude":-92.2476545,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"4b987847-c31f-5153-bb2c-d9161dcbb481","name":"AVAIO Digital Leo (Project Leo) — planned AI-ready data center and power campus on 296 acres","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["AVAIO Digital Partners"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-29afcba86015feddd76b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-29afcba86015feddd76b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Arkansas GIS Office, FEATURESERVICES/Planning_Cadastre FeatureServer layer 6 PARCEL_POLYGON_CAMP"]},{"site_id":"vcc-site-deb5e46cd5360d8c29a3","name":"AVAIO Digital Project Hercules Data Center Campus (Appomattox Center for Business and Commerce)","country":"United States","country_iso_a2":"US","latitude":37.3723027,"longitude":-78.8577799,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"38079c3a-f388-570f-bb6c-dd6cdee44bf4","name":"ADP Appomattox Data Hub — proposed data center facilities (AVAIO Project Hercules, tax parcel 63 A 80)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Appomattox County, Virginia (Board of Supervisors; agenda and minutes portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-deb5e46cd5360d8c29a3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-deb5e46cd5360d8c29a3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Appomattox County, Virginia"]},{"site_id":"vcc-site-6727a9539ece2f19ad23","name":"AVAIO Digital Taurus Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.2593,"longitude":-90.0185,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"37e33657-b788-57e6-98f2-b78834cdecda","name":"AVAIO Digital Taurus Phase One Current Campus Build","status":"under_construction","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["AVAIO Digital Partners"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6727a9539ece2f19ad23/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6727a9539ece2f19ad23.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["AVAIO Digital Partners"]},{"site_id":"vcc-site-4e4c2705d8a781a28a23","name":"AWS ALE061 San Antonio Data Center Campus (Bitter Blue, 12807 Donop Road)","country":"United States","country_iso_a2":"US","latitude":29.2931197,"longitude":-98.3918489,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"2ad5981d-82c7-572f-b549-df76fdfe2fe0","name":"Bitter Blue Building 2 (TABS Building B) — new two-storey single-tenant data center (City of San Antonio permit COM-BLG-PMT26-40200489)","status":"permitted","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["City of San Antonio, Development Services Department (Open Data SA)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4e4c2705d8a781a28a23/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4e4c2705d8a781a28a23.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bexar Appraisal District data)"]},{"site_id":"vcc-site-0819a764e96ce06f14c6","name":"AWS Clinton data center (former Delphi plant)","country":"United States","country_iso_a2":"US","latitude":32.3583,"longitude":-90.3556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-06-09","oldest_status_as_of":"2026-06-09","project_count":1,"projects":[{"project_id":"2cb7333c-d029-5457-baf2-346f48e7fb26","name":"AWS Clinton data center (former Delphi plant)","status":"operational","status_as_of":"2026-06-09","search_terms":"Amazon is converting the former Delphi Packard plant in Clinton, Hinds County, into a data center. The governor announced the $1 billion project in April 2026 with about 100 jobs; Amazon says the plant closed in 2009 and then sat empty for years. At a June 2026 ribbon-cutting held to mark the investment, Amazon said this was its first full retrofit of an existing industrial building into a functioning data center, but it gave no in-service date or capacity. AWS says the site will use no water, and the mayor says day-to-day power will come from the grid. AWS Hinds County data center Amazon Web Services Hinds County Economic Development Authority City of Clinton Entergy Mississippi"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0819a764e96ce06f14c6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0819a764e96ce06f14c6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-04c2489b55d49bcb5ef5","name":"AWS Fayette County data center site","country":"United States","country_iso_a2":"US","latitude":39.56,"longitude":-83.45,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2024-12-24","oldest_status_as_of":"2024-12-24","project_count":1,"projects":[{"project_id":"b649f6b4-e5be-5d52-9b44-0273c14cbea3","name":"AWS Fayette County data center site","status":"announced","status_as_of":"2024-12-24","search_terms":"Amazon Web Services named Fayette County, Ohio, in December 2024 as the first new site in a $10 billion Ohio investment plan, estimating $5 billion for new data centers in the county. Amazon said its Ohio expansion could reach up to eight new sites by the end of 2030. It gave no address, power figure, job count or schedule for the Fayette County site. Amazon Web Services"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04c2489b55d49bcb5ef5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-04c2489b55d49bcb5ef5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Amazon"]},{"site_id":"vcc-site-6547aae0762f92e98a07","name":"AWS Lake Anna Technology Campus","country":"United States","country_iso_a2":"US","latitude":38.0606,"longitude":-77.7894,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"39753efd-ec90-5e1a-a234-8551ba238bda","name":"AWS Lake Anna Technology Campus","status":"under_construction","status_as_of":"2026-08-03","search_terms":"One of two Amazon Web Services campuses in Louisa County's Technology Overlay District, part of an $11 billion AWS plan for the county by 2040 announced in August 2023. The 153-acre campus at Kentucky Springs Road and Haley Drive, next to the North Anna nuclear station, is planned for seven standard data centers (about 1.7 million sq ft), two smaller specialty data centers and an administration building, with at least 420 MW of capacity fed by two 300 MW substations. Local reporting described permits issued and contractors preparing to break ground. Amazon in 2026 described a cooling water discharge permit for the site. LATC REB Investments site Amazon Web Services Clark Construction Rappahannock Electric Cooperative Dominion Energy Louisa County"}],"status_publishers":["County of Louisa, Virginia (Board of Supervisors)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6547aae0762f92e98a07/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6547aae0762f92e98a07.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lake Anna Life (Engage Louisa)"]},{"site_id":"vcc-site-6835cf832163c1403b4e","name":"AWS New Carlisle data center campus (Project Rainier)","country":"United States","country_iso_a2":"US","latitude":41.7006,"longitude":-86.4964,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-07-23","oldest_status_as_of":"2026-07-23","project_count":1,"projects":[{"project_id":"a5b2cd4f-b857-573e-82b8-6edc1e776eec","name":"AWS New Carlisle data center campus (Project Rainier)","status":"partially_operational","status_as_of":"2026-07-23","search_terms":"Amazon Web Services campus in the Indiana Enterprise Center near New Carlisle, St. Joseph County, announced in April 2024 as an $11 billion build over roughly a decade. It is one of the sites of Project Rainier, the Trainium2 cluster Anthropic uses to build and deploy Claude, which AWS activated in October 2025. Amazon's utility filings describe a 2,250 MW load. In July 2026 AWS said it had invested $13.8 billion, with about 18 of a planned 30 or so buildings running and construction continuing. Project Rainier AWS Indiana Enterprise Center campus Amazon Web Services Anthropic Indiana Michigan Power Indiana Economic Development Corporation"}],"status_publishers":["WNDU"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6835cf832163c1403b4e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6835cf832163c1403b4e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indiana Economic Development Corporation"]},{"site_id":"vcc-site-85a756f01eb0a66b0986","name":"AWS Northeast Creek Technology Campus (North Creek Technology Campus, Louisa County)","country":"United States","country_iso_a2":"US","latitude":37.9718646,"longitude":-77.9558255,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"5b4e503d-cb49-52f7-aa5e-3b149a27b979","name":"Northeast Creek Technology Campus 2 — proposed campus phase (major site plan SP20-2026, tax parcel 58-30)","status":"announced","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["County of Louisa, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85a756f01eb0a66b0986/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85a756f01eb0a66b0986.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Louisa, Virginia"]},{"site_id":"vcc-site-1f355d1f6aac8ed1e53f","name":"AWS PHX065 Data Center Campus (10464 E Pecos Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.2954401,"longitude":-111.6071195,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"4f149eef-81d8-587f-97ca-9f0da4f4ecd7","name":"AWS PHX065 — two single-storey data-centre buildings under construction (Mesa permits PMT24-15709 and PMT25-13554)","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f355d1f6aac8ed1e53f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f355d1f6aac8ed1e53f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-9b47e002ec40fe02a2d7","name":"AWS Richmond County data center campus","country":"United States","country_iso_a2":"US","latitude":35.0,"longitude":-79.76,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"3e853975-e7a4-52ba-bc38-6b3d09bfdaf0","name":"AWS Richmond County data center campus","status":"under_construction","status_as_of":"2026-09-23","search_terms":"Amazon Web Services campus in rural Richmond County, North Carolina, near the South Carolina line. Announced in June 2025 at an estimated $10 billion for cloud and AI infrastructure, with at least 500 jobs. The county approved 20-year cash grants tied to property taxes, contingent on job and investment targets. Amazon broke ground in October 2025, said in July 2026 that the campus would have 21 buildings, and has applied for an air permit for backup generators. County officials said water, wastewater and fiber upgrades would come at no cost to taxpayers. Amazon Web Services Richmond County"}],"status_publishers":["Amazon"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b47e002ec40fe02a2d7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b47e002ec40fe02a2d7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC11 (The Associated Press)"]},{"site_id":"vcc-site-cde9b25f26b96465e0dd","name":"AWS Thane Balkum & Majiwada Data Centre Campus","country":"India","country_iso_a2":"IN","latitude":19.21798328022521,"longitude":72.98729874330893,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-27","oldest_status_as_of":"2026-05-27","project_count":1,"projects":[{"project_id":"60485ece-bd7e-5f82-9f1b-6e271b8dcf45","name":"AWS Thane Balkum & Majiwada Data Centre EC 477127 Current Build","status":"under_construction","status_as_of":"2026-05-27","search_terms":""}],"status_publishers":["Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cde9b25f26b96465e0dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cde9b25f26b96465e0dd.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Amazon Data Services India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host","Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Amazon Data Services India Private Limited, proponent","Open Geospatial Consortium"]},{"site_id":"vcc-site-ab1cba1760d42b280cd1","name":"AWS Vicksburg data center campus","country":"United States","country_iso_a2":"US","latitude":32.3525,"longitude":-90.8775,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-09","oldest_status_as_of":"2026-04-09","project_count":1,"projects":[{"project_id":"077a5970-0684-5ef0-8320-65efbf78c960","name":"AWS Vicksburg data center campus","status":"announced","status_as_of":"2026-04-09","search_terms":"Amazon announced in November 2025 that it would spend at least $3 billion on a new data center campus in Vicksburg, Warren County, with at least 200 full-time jobs. Officials said construction would start in 2026 and the local mayor expected a five-to-seven-year build-out. Amazon said the campus will support AI and cloud computing. Entergy Mississippi agreed to meet its long-term power needs and is building a gas plant at the former Baxter Wilson site to serve the campus and other industrial projects. The April 2026 statewide update still listed it as planned. AWS Warren County data center campus Amazon Web Services Entergy Mississippi Warren County"}],"status_publishers":["Office of Governor Tate Reeves"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ab1cba1760d42b280cd1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-d6e7826cfaef008088a0","name":"AWS Walqa Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":42.11381388888889,"longitude":-0.4564361111111111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-25","oldest_status_as_of":"2026-06-25","project_count":1,"projects":[{"project_id":"55f4eb88-750d-5aa5-b4cb-bd5b8e746fe6","name":"AWS Walqa Current Data Center Build","status":"under_construction","status_as_of":"2026-06-25","search_terms":""}],"status_publishers":["Government of Aragón"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6e7826cfaef008088a0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6e7826cfaef008088a0.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Government of Aragón / Amazon Data Services Spain, S.L."]},{"site_id":"vcc-site-4812cee9b68dbae470cd","name":"AWS Zaragoza - La Cartuja Data Center Campus (sector Acampo del Marqués)","country":"Spain","country_iso_a2":"ES","latitude":41.571531,"longitude":-0.8060209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-08","oldest_status_as_of":"2026-10-08","project_count":1,"projects":[{"project_id":"533ee340-271a-596d-b402-bcd02ef1b114","name":"AWS CAR data centre, Zaragoza - La Cartuja","status":"announced","status_as_of":"2026-10-08","search_terms":""}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4812cee9b68dbae470cd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4812cee9b68dbae470cd.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Gobierno de Aragón, Boletín Oficial de Aragón"]},{"site_id":"vcc-site-7b36022a26fba8770036","name":"Balico gas-powered data center campus, Pittsylvania County","country":"United States","country_iso_a2":"US","latitude":36.8256,"longitude":-79.3975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2025-04-16","oldest_status_as_of":"2025-04-16","project_count":1,"projects":[{"project_id":"908ba9ce-1e84-567b-926f-8d47d4d2a7ed","name":"Balico gas-powered data center campus, Pittsylvania County","status":"cancelled","status_as_of":"2025-04-16","search_terms":"Rejected plan by Herndon-based Balico for a data center campus with a 3,500 MW on-site natural gas power plant near Chatham in Pittsylvania County, Virginia. The first application, covering 47 parcels and about 2,233 acres with 84 data center buildings, was withdrawn in November 2024 after community meetings. A scaled-down version on about 750 acres with up to 12 buildings kept the 3,500 MW plant; the planning commission unanimously recommended denial in January 2025. On 15 April 2025 county supervisors refused Balico's request to withdraw it again and voted 6-1 against the rezoning, so a new filing had to wait a year. Balico data center campus Balico Chatham project Balico LLC Pittsylvania County Board of Supervisors"}],"status_publishers":["Cardinal News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b36022a26fba8770036/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7b36022a26fba8770036.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WDBJ7"]},{"site_id":"vcc-site-f072e115b808ff8c826d","name":"Basis Bay Data Centre, 4710 Jalan Cyber Point 5, Cyberjaya","country":"Malaysia","country_iso_a2":"MY","latitude":2.9058489,"longitude":101.6527141,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"a61eb125-7bc8-55fd-a4d0-1456bd20b695","name":"Basis Bay Data Centre — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f072e115b808ff8c826d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f072e115b808ff8c826d.json","geometry_licenses":["google-maps-terms"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-1502dbd5aa65353012ea","name":"BDx HKG8 Data Center, 38 Wing Kei Road, Kwai Chung","country":"Hong Kong","country_iso_a2":"HK","latitude":22.3603784,"longitude":114.1187743,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-10","oldest_status_as_of":"2026-09-10","project_count":1,"projects":[{"project_id":"4c1f4c7f-4768-5036-8c41-0dd99f486940","name":"BDx HKG8 — operating hyperscale data center","status":"operational","status_as_of":"2026-09-10","search_terms":""}],"status_publishers":["BDx Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1502dbd5aa65353012ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1502dbd5aa65353012ea.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-5376b585718a989c8dc5","name":"Beacon AI Centers Heartland campus (Sturgeon County)","country":"Canada","country_iso_a2":"CA","latitude":53.84032,"longitude":-113.192246,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-03-10","oldest_status_as_of":"2026-03-10","project_count":1,"projects":[{"project_id":"9a4afe64-8789-5cee-8947-61a12f8966a8","name":"Beacon AI Centers Heartland campus (Sturgeon County)","status":"proposed","status_as_of":"2026-03-10","search_terms":"Beacon AI Centers proposes a 317-acre AI data centre campus about 7 km east of Gibbons in Sturgeon County, Alberta, inside the Alberta Industrial Heartland heavy industrial zone. Filings describe four data halls rated at 200 MW each, supplied by an on-site plant of 200 gas engines totalling about 920 MW, built by the project entity Heartland Power. The federal agency decided in March 2026 that no further federal assessment was needed; the plant application filed with the Alberta Utilities Commission in December 2025 had no decision found. The proponent targeted commercial operation in Q3 2027. Beacon AI Centers Heartland Project Beacon Data Centers Heartland Project Beacon Heartland AI Hub Beacon AI Centers Heartland Power Generation LP AltaLink Sturgeon County"}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5376b585718a989c8dc5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5376b585718a989c8dc5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Heartland Power Generation LP (filed with the Impact Assessment Agency of Canada)"]},{"site_id":"vcc-site-ef8be5d9da9f69e72683","name":"Beacon AI Centers Indus campus","country":"Canada","country_iso_a2":"CA","latitude":50.9434,"longitude":-113.8072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"fbbfee97-55a0-5a4e-b000-282ff02a8a39","name":"Beacon AI Centers Indus campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Beacon AI Centers plans an AI data centre campus about 3 km east of Calgary and 2 km northwest of the hamlet of Indus in Rocky View County, Alberta. Federal filings describe four data halls needing 300 MW each, supplied by an on-site gas-fired plant of about 1,494 MW built by the project entity Indus Power. The county approved the area structure plan in June 2025; the plant application is before the Alberta Utilities Commission, and the federal agency decided in March 2026 that no further federal assessment was needed. The proponent targeted commercial operation in Q3 2027. Beacon AI Hub Beacon AI Centers Indus Project Beacon AI Centers Indus Beacon AI Centers Indus Power Generation LP Rocky View County AltaLink"}],"status_publishers":["Rocky View County"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ef8be5d9da9f69e72683/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ef8be5d9da9f69e72683.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indus Power Generation LP via Impact Assessment Agency of Canada registry"]},{"site_id":"vcc-site-0834945607ed54e349ce","name":"Bell AI Fabric Sherwood campus (Regina area)","country":"Canada","country_iso_a2":"CA","latitude":50.473,"longitude":-104.627,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"0b37ac4d-93f2-559b-a6ec-f5a12938681a","name":"Bell AI Fabric Sherwood campus (Regina area)","status":"under_construction","status_as_of":"2026-10-01","search_terms":"Bell Canada is building a 300 MW Bell AI Fabric data centre campus in the Rural Municipality of Sherwood, which surrounds Regina, Saskatchewan. In October 2026 Bell reported structural steel rising on all four first-phase buildings, more than 500 workers on site and the first data hall on track to operate in the first half of 2027. In September 2026 Bell and the Government of Saskatchewan signed a non-binding memorandum for up to 900 MW more, which would make the Sherwood campus the first phase of a potential 1.2 GW provincial AI hub. Bell AI Fabric Saskatchewan Bell Canada Government of Saskatchewan Dynamo Electric"}],"status_publishers":["BCE Inc."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0834945607ed54e349ce/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0834945607ed54e349ce.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["BCE Inc."]},{"site_id":"vcc-site-881b5cad4e0ce9044fea","name":"Beyond.pl Data Center Campus (Kręglewskiego, Poznań)","country":"Poland","country_iso_a2":"PL","latitude":52.3776022,"longitude":16.976736,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"d9c5dd9d-5cf3-5d6d-89d7-4d29a3d84c65","name":"Beyond.pl Data Center Campus — existing operations (Data Center 2 and AI Factory)","status":"operational","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["Beyond.pl sp. z o.o."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-881b5cad4e0ce9044fea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-881b5cad4e0ce9044fea.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-43a4fd4202a0c1c9518f","name":"Bitdeer and Geis Shalersville AI data center campus","country":"United States","country_iso_a2":"US","latitude":41.2456,"longitude":-81.2603,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"9ed96427-8138-552b-9f88-3b1fbeaa341b","name":"Bitdeer and Geis Shalersville AI data center campus","status":"proposed","status_as_of":"2026-10-07","search_terms":"Proposed 15-building AI data center campus by Bitdeer Technologies Group and Geis Development at the Turnpike Commerce Center, just north of the Ohio Turnpike in Shalersville Township, Portage County, Ohio. Plans made public in May 2026 start with two data halls of about 48,000 sq ft each plus an office building and 150 MW of initial power capacity, with a potential 750 MW at full build-out over about five years; construction was put at more than USD 300 million, excluding computing equipment. A township moratorium is in place, and on 6 October 2026 trustees required uses of 25 MW or more to sit on heavy industrial land, which the township lacks; Geis's lawyers threatened to sue. Turnpike Commerce Center data center Bitdeer Shalersville Bitdeer Technologies Group Geis Development Shalersville Holdings (Geis Companies) Shalersville Township"}],"status_publishers":["The Portager"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43a4fd4202a0c1c9518f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-43a4fd4202a0c1c9518f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["News 5 Cleveland (WEWS)"]},{"site_id":"vcc-site-4551992e6d4d1487d1ab","name":"Bitdeer Clarington data center site","country":"United States","country_iso_a2":"US","latitude":39.7728,"longitude":-80.8708,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"6799aac4-c4f8-5902-b8ae-2fffb6fa893d","name":"Bitdeer Clarington data center site","status":"announced","status_as_of":"2026-08-10","search_terms":"Bitdeer development site at Clarington, Monroe County, Ohio, with 570 MW of power under contract with an unnamed local utility. In October 2025 Bitdeer planned a bitcoin mining data center whose core infrastructure would be designed for easy conversion to AI, targeting substation energization in the first half of 2027. Through 2026 the site stayed in design and preparation: legal proceedings filed by neighboring company American Heavy Plate Solutions left the timing of power and construction uncertain, and Bitdeer's listed use for the site moved from HPC/AI in February 2026 to colocation and crypto mining by August 2026. Clarington, Ohio site Bitdeer Technologies Group"}],"status_publishers":["Bitdeer Technologies Group via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4551992e6d4d1487d1ab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4551992e6d4d1487d1ab.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group via SEC EDGAR"]},{"site_id":"vcc-site-63cd8442296ed3e4fc36","name":"Bitdeer Fox Creek energy and computing facility","country":"Canada","country_iso_a2":"CA","latitude":54.395,"longitude":-116.80917,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"602d4e58-abef-54a7-b8f6-894a714e7174","name":"Bitdeer Fox Creek energy and computing facility","status":"under_construction","status_as_of":"2026-08-10","search_terms":"Bitdeer is building a 101 MW natural gas power plant and a data centre of about 100 MW of computing capacity on a 19-acre site about 1.5 km from Fox Creek, Alberta, in the Municipal District of Greenview. Bitdeer bought the permitted site, with a 99 MW grid interconnection approval, in an all-cash deal in February 2025 and broke ground in June 2026 on a USD 155 million project. It will start with bitcoin mining while the data centre is designed to also suit AI workloads. Energization slipped from Q4 2026 to Q2 2027 and then to Q4 2027. Bitdeer Fox Creek Bitdeer Technologies Group Bitdeer Technologies Group Kiwetinohk Energy Corp."}],"status_publishers":["Bitdeer Technologies Group (press release via BNN Bloomberg)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-63cd8442296ed3e4fc36/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-63cd8442296ed3e4fc36.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group (press release via BNN Bloomberg)"]},{"site_id":"vcc-site-6524649236861b8342aa","name":"Bitdeer Massillon Ohio Campus","country":"United States","country_iso_a2":"US","latitude":40.780446738591,"longitude":-81.522276076625,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"fb943def-5b5b-5192-8bb9-599e4cf616cc","name":"Bitdeer Massillon 2026 Fire-Damaged Buildings Reconstruction","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Bitdeer Technologies Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6524649236861b8342aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6524649236861b8342aa.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-755524c9fd6de6eed9f2","name":"Bitdeer Weathersfield (Niles) development site","country":"United States","country_iso_a2":"US","latitude":41.1783,"longitude":-80.7578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"b02620fe-58af-53a3-91fc-855e2454512c","name":"Bitdeer Weathersfield (Niles) development site","status":"announced","status_as_of":"2026-08-10","search_terms":"Bitdeer development site on 41.8 owned acres at the former Niles Generating Station, demolished in 2013, in Weathersfield, Ohio, near Niles. Bitdeer launched it in September 2025 as a 300 MW grid-interconnected power pipeline under an interconnection agreement with FirstEnergy, which first scheduled energization for Q1 2029. Bitdeer's Q2 2026 results, with data as of 31 July 2026, target energization in Q4 2028, cite a transmission line extension agreement with a local utility, and list planned usage as colocation and AI cloud; the site is still described as a development site. Bitdeer Niles Niles, Ohio site Bitdeer Technologies Group Bitdeer Technologies Group FirstEnergy"}],"status_publishers":["Bitdeer Technologies Group via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-755524c9fd6de6eed9f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-755524c9fd6de6eed9f2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bitdeer Technologies Group via SEC EDGAR"]},{"site_id":"vcc-site-4ac69f22d359cc462f5b","name":"Bitdeer Wenatchee Washington Campus","country":"United States","country_iso_a2":"US","latitude":47.413902371239,"longitude":-120.209264185842,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"484cf452-3a8f-5574-8003-a5b3f693c5d2","name":"Bitdeer Wenatchee 2026 AI Conversion Site Preparation","status":"site_preparation","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Bitdeer Technologies Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4ac69f22d359cc462f5b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4ac69f22d359cc462f5b.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-2d9846dc358cfee26779","name":"Bitzero Namsskogan Data Center Campus","country":"Norway","country_iso_a2":"NO","latitude":64.71427,"longitude":12.83406,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["foundations"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"c30aeadf-c2f6-58a5-a8b1-227868f477c1","name":"Bitzero Namsskogan 2026 Power Infrastructure Expansion","status":"foundations","status_as_of":"2026-06-15","search_terms":""}],"status_publishers":["Bitzero Holdings Inc."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2d9846dc358cfee26779/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2d9846dc358cfee26779.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© Kartverket"]},{"site_id":"vcc-site-358391d4dd9bae1018fd","name":"Boda Langfang No. 2 Intelligent Computing Campus","country":"China","country_iso_a2":"CN","latitude":39.483004,"longitude":116.649453,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["commissioning","operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-09-14","project_count":2,"projects":[{"project_id":"760bbd20-e137-5015-9956-1d5b17000e18","name":"Boda Langfang No. 2 Phase 1","status":"operational","status_as_of":"2026-09-14","search_terms":""},{"project_id":"41f90b54-eb7c-5766-bb29-7ad689720c09","name":"Boda Langfang No. 2 Phase 2","status":"commissioning","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["Boda Data (博大数据)","Hebei Daily; republished by Hebei Provincial Cyberspace Administration"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-358391d4dd9bae1018fd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-358391d4dd9bae1018fd.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Boda Data"]},{"site_id":"vcc-site-b2d44ad1ab0fe660b5a2","name":"Boda Shenzhen Qianhai No. 1 Intelligent Computing Campus","country":"China","country_iso_a2":"CN","latitude":22.517282,"longitude":113.89766,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"5ce2d8b1-9a5d-576d-929e-c441774aac87","name":"Boda Qianhai No. 1 Operating Campus","status":"operational","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Boda Data"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2d44ad1ab0fe660b5a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2d44ad1ab0fe660b5a2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Boda Data"]},{"site_id":"vcc-site-7d81f7c3c7482975b0d3","name":"Bogle Drive Data Center Facility (Chantilly, Fairfax County)","country":"United States","country_iso_a2":"US","latitude":38.8948573,"longitude":-77.4631345,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-21","oldest_status_as_of":"2026-08-21","project_count":1,"projects":[{"project_id":"297794f6-b723-5e37-b98e-ebd64488cd8d","name":"Bogle Drive Data Center Facility — two two-storey data centre buildings (site plan SP-2024-00038, 14901 Bogle Dr)","status":"permitted","status_as_of":"2026-08-21","search_terms":""}],"status_publishers":["Fairfax County, Virginia (Land Development Services / Department of Information Technology GIS)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7d81f7c3c7482975b0d3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7d81f7c3c7482975b0d3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fairfax County, Virginia"]},{"site_id":"vcc-site-8b806f7ae4b0034de59b","name":"BONC Horinger Intelligent Computing Centre (Industrial Internet Northern Regional Center)","country":"China","country_iso_a2":"CN","latitude":40.542011667,"longitude":111.810670278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"8140cff8-04b3-5d90-a8bc-f5fb48f7af08","name":"BONC Horinger Intelligent Computing Centre — existing operations","status":"operational","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b806f7ae4b0034de59b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8b806f7ae4b0034de59b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)"]},{"site_id":"vcc-site-09f1a555b5c0fa48e739","name":"Borden Data Center, 11484 US Highway 180, Gail (Borden County)","country":"United States","country_iso_a2":"US","latitude":32.7695189,"longitude":-101.5469022,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"21bf5049-02a2-5d15-bcd0-24bc4f831cd8","name":"Borden Data Center — proposed commercial data centre with on-site power generation (TCEQ air permit 185712 pending)","status":"announced","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-09f1a555b5c0fa48e739/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-09f1a555b5c0fa48e739.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points (Borden County 9-1-1 data, source CSEC)"]},{"site_id":"vcc-site-0ed3e2f5c48bfda417a3","name":"Borealis Blönduós Data Center Campus","country":"Iceland","country_iso_a2":"IS","latitude":65.64727965,"longitude":-20.24300365,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-23","oldest_status_as_of":"2026-06-23","project_count":1,"projects":[{"project_id":"adc32529-cea1-5d06-86de-334e63433be6","name":"Borealis Blönduós Expansion Current Build","status":"under_construction","status_as_of":"2026-06-23","search_terms":""}],"status_publishers":["Landsvirkjun"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ed3e2f5c48bfda417a3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ed3e2f5c48bfda417a3.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-60428cb258a38898ef68","name":"Box2Bit Epilon data center campus (Épila)","country":"Spain","country_iso_a2":"ES","latitude":41.6,"longitude":-1.283,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"46abd4bf-bd8a-5525-9388-c938807fe2f0","name":"Box2Bit Epilon data center campus (Épila)","status":"announced","status_as_of":"2026-06-15","search_terms":"AI-focused data center campus proposed by the Spanish company Box2Bit in Épila, Zaragoza, beside the A-2 motorway. On 28 January 2026 the Aragón government declared it an investment of regional and general interest, citing EUR 3.9 billion in total: EUR 1.125 billion for a first phase due in 2029 and EUR 2.775 billion for later phases. The first phase covers about 33 hectares, two data buildings and 150 MW with guaranteed grid access; later phases could take the site to about 100 hectares and 520 MW, but the additional power is not yet secured. The move followed the exclusion of Box2Bit's earlier Cariñena site from national grid planning. Epilon Epsilon Box2Bit Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón (Aragón Hoy)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60428cb258a38898ef68/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60428cb258a38898ef68.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón (Aragón Hoy)"]},{"site_id":"vcc-site-8345f1f9d37238aa593f","name":"Bridge Data Centres Chonburi hyperscale campus","country":"Thailand","country_iso_a2":"TH","latitude":13.3619,"longitude":100.9792,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2025-10-21","oldest_status_as_of":"2025-10-21","project_count":1,"projects":[{"project_id":"755ec57c-df00-5ee2-a290-9997607440b4","name":"Bridge Data Centres Chonburi hyperscale campus","status":"announced","status_as_of":"2025-10-21","search_terms":"Bridge Data Centres is developing a hyperscale campus on about 100 rai (16 hectares) in Khlong Tamru subdistrict, Mueang Chonburi District, Chonburi Province, Thailand. Bridge announced the project in April 2025 with about US$1.2 billion of investment over three years and up to 200 MW of power; by October 2025 Bridge and trade press described a first phase of about 200 MW and said the project had Board of Investment promotion. In October 2025 Bridge signed a 10-year industrial water supply deal with Eastwater Stecon Utilities, with supply from May 2026. No construction start or opening has been reported in the sources. BDC Chonburi campus Bridge Data Centres (Thailand) Co., Ltd. Bain Capital Thailand Board of Investment"}],"status_publishers":["Bridge Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8345f1f9d37238aa593f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8345f1f9d37238aa593f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bridge Data Centres"]},{"site_id":"vcc-site-18b5f6f9e4309fa610af","name":"Bridge Data Centres MY06, Sedenak Tech Park","country":"Malaysia","country_iso_a2":"MY","latitude":1.7137,"longitude":103.5248,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"eebaf579-8fee-543e-9f06-f7423d642684","name":"Bridge Data Centres MY06, Sedenak Tech Park","status":"operational","status_as_of":"2026-09-15","search_terms":"Bridge Data Centres' MY06 hyperscale campus sits in Kidex Sedenak, part of the Sedenak Tech Park in Kulai District, Johor. Announced in December 2021 as a three-building, 100 MW IT campus on about 40 acres with RM2.5 billion of investment over five years, its first 20 MW building was built with prefabricated modules and opened in November 2022, with ByteDance as anchor tenant. Bridge now lists MY06 at 508 MW of IT capacity across 15 buildings, and in September 2026 described the Sedenak campus as a fully operating hyperscale site. BDC MY06 Kidex Sedenak MY06 Bridge Data Centres Bridge Data Centres ByteDance System Sdn. Bhd. Bain Capital Tenaga Nasional Berhad"}],"status_publishers":["Bridge Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-18b5f6f9e4309fa610af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-18b5f6f9e4309fa610af.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Malaysian Investment Development Authority (MIDA)"]},{"site_id":"vcc-site-9d88c072bfebf964cf3a","name":"Bridge Data Centres MY07, Ulu Tiram","country":"Malaysia","country_iso_a2":"MY","latitude":1.6,"longitude":103.8203,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"2c24f89f-37e6-5164-a240-e1e3d2fca176","name":"Bridge Data Centres MY07, Ulu Tiram","status":"partially_operational","status_as_of":"2026-09-02","search_terms":"Bridge Data Centres' MY07 is a 65-acre hyperscale campus in Ulu Tiram, Johor Bahru District. In January 2025, while it was under construction, Bridge signed an electricity supply agreement with Tenaga Nasional for the site, reported at 400 MW, and became the first partner in TNB's corporate renewable energy supply scheme. Bridge lists MY07 at 374 MW of IT capacity across eight buildings. A September 2026 Bridge article describes a campus operations team of more than 120 keeping customer-facing services running, with cooling water recycled from treated effluent rather than drawn from potable supply. BDC MY07 Dragonfly MY07 Bridge Data Centres Bridge Data Centres Tenaga Nasional Berhad"}],"status_publishers":["Bridge Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9d88c072bfebf964cf3a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9d88c072bfebf964cf3a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EqualOcean"]},{"site_id":"vcc-site-6548266e7ea8549844f6","name":"Brookfield AI center, Strängnäs","country":"Sweden","country_iso_a2":"SE","latitude":59.367,"longitude":17.033,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-06-04","oldest_status_as_of":"2025-06-04","project_count":1,"projects":[{"project_id":"6aa46e28-dd40-513b-8722-f514b6503b02","name":"Brookfield AI center, Strängnäs","status":"announced","status_as_of":"2025-06-04","search_terms":"Brookfield Asset Management plans a large AI data center in Strängnäs, Sweden, announced in June 2025. Brookfield said a land allocation agreement for about 350,000 square metres of extra land would let the site grow from 300 MW to 750 MW. Local press placed the site at Gorsingeberget on the edge of town, with the municipality intending to sell the land for SEK 525 million and grant two years of exclusive planning rights. Brookfield expects more than 1,000 permanent jobs and a 10 to 15 year build-out. No 2026 progress report was found. Gorsingeberget AI center Brookfield Asset Management Strängnäs Municipality"}],"status_publishers":["Brookfield Asset Management (via MFN)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6548266e7ea8549844f6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6548266e7ea8549844f6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Brookfield Asset Management (via MFN)"]},{"site_id":"vcc-site-8a182a091b75047cadab","name":"Bulk DK01 Esbjerg Campus","country":"Denmark","country_iso_a2":"DK","latitude":55.5092486,"longitude":8.4955427,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"d2e988cd-e878-5061-817e-0c1cda87f372","name":"Bulk DK01 Current New Building Construction","status":"under_construction","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Bulk Infrastructure Group AS"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8a182a091b75047cadab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8a182a091b75047cadab.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Bulk Infrastructure Group AS","Schema.org"]},{"site_id":"vcc-site-5565cfa2824c955c2f04","name":"Bulk N01 Vennesla Campus","country":"Norway","country_iso_a2":"NO","latitude":58.2575732,"longitude":7.892050100000001,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"2c3a5bbe-3573-5abe-98dc-8d8312b0a586","name":"Bulk N01 Current New Facility Construction","status":"under_construction","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Bulk Infrastructure Group AS"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5565cfa2824c955c2f04/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5565cfa2824c955c2f04.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Bulk Infrastructure Group AS","Schema.org"]},{"site_id":"vcc-site-945e4d6e1d461ef1ef5e","name":"Campo de Datos Lampa","country":"Chile","country_iso_a2":"CL","latitude":-33.317910875209,"longitude":-70.76770157877,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"a31a3d94-fcb4-5244-b949-fba8af7b7326","name":"Campo de Datos Lampa — hyperscale data-centre proposal","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental, Dirección Regional Metropolitana"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-945e4d6e1d461ef1ef5e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-945e4d6e1d461ef1ef5e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; CI GMF II Chile DevCo I SpA"]},{"site_id":"vcc-site-27b404b316b5fece1ef1","name":"Campus AI Fouju","country":"France","country_iso_a2":"FR","latitude":48.5864,"longitude":2.7785,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"dd65fe26-5f6d-52e8-96b6-8709ca040b13","name":"Campus AI Fouju","status":"under_construction","status_as_of":"2026-09-01","search_terms":"Campus AI, a joint venture of the UAE fund MGX, French public bank Bpifrance, Mistral AI and NVIDIA, is developing a 1.4 GW AI data center campus at Fouju in Seine-et-Marne, about 40 km southeast of Paris. Plans call for roughly eleven data center buildings plus a training building on about 89 hectares, fed by a dedicated 400 kV substation. Environmental authorizations and the phase-one building permit were granted in summer 2026, phase-one works were scheduled from September 2026, and the first three data centers are targeted for early 2028. Local opponents have said they will appeal. Campus IA Campus AI Campus IA Fouju Campus AI MGX Bpifrance Mistral AI NVIDIA Mistral AI Eiffage RTE Préfecture de Seine-et-Marne"}],"status_publishers":["Communauté de communes Brie des Rivières et Châteaux"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-27b404b316b5fece1ef1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-27b404b316b5fece1ef1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Eiffage"]},{"site_id":"vcc-site-a982e0093e476f44e98f","name":"CapitaLand DC Chennai Ambattur Campus","country":"India","country_iso_a2":"IN","latitude":13.111478605252206,"longitude":80.16026301746629,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c","name":"CapitaLand DC Chennai Current Facility Build","status":"under_construction","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["CapitaLand Investment Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a982e0093e476f44e98f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a982e0093e476f44e98f.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Minerva Veritas Data Centre Private Limited, proponent; PARIVESH, Government of India, host","Ministry of Environment, Forest and Climate Change, India; Minerva Veritas Data Centre Private Limited, proponent","Open Geospatial Consortium"]},{"site_id":"vcc-site-f764d5138ed8928c53bc","name":"CapitaLand DC ITPH Hyderabad Campus","country":"India","country_iso_a2":"IN","latitude":17.43532415,"longitude":78.38405032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"ea847e06-abc6-5935-ad21-a3c0adbec711","name":"CapitaLand DC ITPH Hyderabad Current Facility Build","status":"under_construction","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["CapitaLand India Trust"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f764d5138ed8928c53bc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f764d5138ed8928c53bc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CapitaLand"]},{"site_id":"vcc-site-07ef7b0d529815ef1fe5","name":"CapitaLand DC Navi Mumbai Campus","country":"India","country_iso_a2":"IN","latitude":19.175772,"longitude":73.000187,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":2,"projects":[{"project_id":"847e667c-d263-55ec-b8ff-bfe495a380cb","name":"CapitaLand DC Navi Mumbai Tower 1","status":"operational","status_as_of":"2026-07-29","search_terms":""},{"project_id":"e62026de-3394-51f7-8823-44ee0da1801c","name":"CapitaLand DC Navi Mumbai Tower 2","status":"under_construction","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["CapitaLand India Trust"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07ef7b0d529815ef1fe5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CapitaLand"]},{"site_id":"vcc-site-579777eea0bb5aad46eb","name":"Carbon Node East Data Center Campus (Nesquehoning)","country":"United States","country_iso_a2":"US","latitude":40.85644581193348,"longitude":-75.86664563328729,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"b71f1891-ecd8-5578-bd16-5e69e309257f","name":"Carbon Node East Data Center Campus (Nesquehoning) — proposed campus","status":"announced","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["Pennsylvania Department of Environmental Protection"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-579777eea0bb5aad46eb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-579777eea0bb5aad46eb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Carbon County GIS"]},{"site_id":"vcc-site-a4bfb4274cc4e48492b6","name":"Cavour Hyperscale Campus (Trino)","country":"Italy","country_iso_a2":"IT","latitude":45.25206,"longitude":8.19393,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"b3d41aee-bf24-5299-97dd-2e16bc40012e","name":"Cavour Hyperscale Campus (Trino)","status":"announced","status_as_of":"2026-07-27","search_terms":"Proposed data processing and AI campus on the site of the former Galileo Ferraris power station at Trino in the province of Vercelli, Piedmont, associated with the Italian engineering and construction group TechBau. On 24 July 2026 Italy's Council of Ministers declared it a programme of preeminent national strategic interest, citing about EUR 4 billion of investment and 300 to 400 MW of power. The site would reuse an existing 380 kV substation and an operating 87.5 MW solar plant, with 100 to 120 MW of battery storage. The timetable calls for the permitting conference to open by the end of 2026, a single authorisation in 2027 and a first lot in service in 2028. Cavour Hyperscale Campus TechBau Government of Italy (Council of Ministers) Regione Piemonte"}],"status_publishers":["Regione Piemonte (Piemonteinforma)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a4bfb4274cc4e48492b6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a4bfb4274cc4e48492b6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Regione Piemonte (Piemonteinforma)"]},{"site_id":"vcc-site-61f9e739f63e5c96092e","name":"CDC Beard Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-35.34021820343456,"longitude":149.20923007524493,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"9c34c305-5149-5961-b88f-648da82351f7","name":"CDC Beard BE1 Current Data Center Build","status":"operational","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-61f9e739f63e5c96092e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-61f9e739f63e5c96092e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Australian Capital Territory cadastral data, licensed under CC BY 4.0; retrieved 2026-08-23."]},{"site_id":"vcc-site-6ec62bca94b5d5e1db03","name":"CDC Brooklyn Melbourne Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.817378,"longitude":144.843826,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"83efe2e8-3b4b-5260-b4ca-d1dbc653b792","name":"CDC Brooklyn Remaining Facilities Current Build","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["CDC Data Centres"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6ec62bca94b5d5e1db03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6ec62bca94b5d5e1db03.json","geometry_licenses":["ACMA-radiocomms-licence-data-terms"],"geometry_attributions":["Australian Communications and Media Authority"]},{"site_id":"vcc-site-3c1f872aa59b74b065ea","name":"CDC Eastern Creek Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.818072,"longitude":150.837668,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":2,"projects":[{"project_id":"2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16","name":"CDC Eastern Creek EC5 Current Build","status":"operational","status_as_of":"2026-09-16","search_terms":""},{"project_id":"5c366d64-4bb5-5c28-ab62-ec20d60fb31a","name":"CDC Eastern Creek EC6 Current Build","status":"operational","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3c1f872aa59b74b065ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3c1f872aa59b74b065ea.json","geometry_licenses":["no-license-stated-for-compact-factual-extraction"],"geometry_attributions":["NSW Department of Planning, Housing and Infrastructure"]},{"site_id":"vcc-site-d422e986fc30a6bcfc84","name":"CDC Gregadoo Campus, Wagga Wagga","country":"Australia","country_iso_a2":"AU","latitude":-35.2174025,"longitude":147.3862916,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"de970e8d-14a1-5293-80af-73b947790609","name":"CDC Gregadoo (Ashfords Road Data Centre) — proposed four-building campus","status":"announced","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["CDC Data Centres"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d422e986fc30a6bcfc84/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d422e986fc30a6bcfc84.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-a0ad300d0d3c4988033b","name":"CDC KC1 Data Centre, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.84775,"longitude":150.78215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"d2fce530-ae85-5e1d-bcb8-60df813b8a95","name":"KC1 Data Centre, Kemps Creek — proposed 144 MW CDC data centre","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a0ad300d0d3c4988033b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a0ad300d0d3c4988033b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-0f9ffed73b02dd75c9a5","name":"CDC Laverton Melbourne Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.8415726,"longitude":144.7753871,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"9cceddca-71bc-52f2-a417-e9fdf0d7faa3","name":"CDC Laverton Current Build","status":"under_construction","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0f9ffed73b02dd75c9a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0f9ffed73b02dd75c9a5.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-e7cbc915d8b179b3017f","name":"CDC Maddington Perth Campus","country":"Australia","country_iso_a2":"AU","latitude":-32.034181245,"longitude":116.0051610444321,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"bb8ba3ad-d563-5f84-a543-079a10264640","name":"CDC Maddington Current Build","status":"shell","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7cbc915d8b179b3017f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e7cbc915d8b179b3017f.json","geometry_licenses":["rights-status-uncertain-fact-extraction-only"],"geometry_attributions":["City of Gosnells"]},{"site_id":"vcc-site-37ddc3b143bf9ea08d1c","name":"CDC Marsden Park Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.72368555,"longitude":150.8363658,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"164033cb-411d-5ffb-ab5d-b04bdecfa1ac","name":"CDC Marsden Park Early Construction","status":"under_construction","status_as_of":"2026-09-16","search_terms":"CDC Data Centres is building a campus of six four-storey data center buildings on about 20 hectares in the Marsden Park Industrial Precinct in Sydney's north-west, within the City of Blacktown. CDC turned the first sod in October 2024 and plans 504 MW of ICT capacity, scalable toward 1 GW, with a dedicated substation of about 720 MVA. The NSW government approved it as state significant development on 27 November 2025 despite objections from Blacktown City Council; press coverage put the investment at A$3.1 billion. CDC describes the campus as in the early stages of construction. Marsden Park Data Centre SSD-70889211 CDC Data Centres CDC Data Centres CDC Data Centres NSW Department of Planning"}],"status_publishers":["CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37ddc3b143bf9ea08d1c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-f6269b3ff2286b10900d","name":"CEC Tokyo No.2 Data Center (Sunshine 60)","country":"Japan","country_iso_a2":"JP","latitude":35.72940595,"longitude":139.71815675,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"8cb9ee0d-0538-574a-ac8b-04243e9c79b5","name":"CEC Tokyo No.2 Existing Operations at Sunshine 60","status":"operational","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Computer Engineering & Consulting Ltd. (CEC)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6269b3ff2286b10900d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6269b3ff2286b10900d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-cff28f3e3ba00e403b6f","name":"Centro de Almacenamiento de Datos Puente Alto","country":"Chile","country_iso_a2":"CL","latitude":-33.6349591,"longitude":-70.6080068,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"bd7a8723-4523-51d0-b617-13eb54ecfee4","name":"Centro de Almacenamiento de Datos Puente Alto — initial proposal","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Chile — filing by Inmobiliaria STPA SpA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cff28f3e3ba00e403b6f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cff28f3e3ba00e403b6f.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; Inmobiliaria STPA SpA"]},{"site_id":"vcc-site-2a210d223670053bf313","name":"Chief Telecom LY2 AI Data Center (Neihu, Taipei)","country":"Taiwan","country_iso_a2":"TW","latitude":25.0627495,"longitude":121.5777771,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"0cd17299-cbd8-5542-bf34-905d723c48f9","name":"Chief Telecom LY2 AI Data Center — current operations","status":"operational","status_as_of":"2026-08-06","search_terms":""}],"status_publishers":["Chief Telecom Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2a210d223670053bf313/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2a210d223670053bf313.json","geometry_licenses":["Open Government Data License, version 1.0 (Taiwan)"],"geometry_attributions":["臺北市政府民政局 (Taipei City Government, Department of Civil Affairs), 臺北市門牌位置數值資料"]},{"site_id":"vcc-site-8eb173034e749f70b695","name":"China Mobile (Ningxia Zhongwei) Data Center B-Zone","country":"China","country_iso_a2":"CN","latitude":37.638584722,"longitude":105.325881389,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-21","oldest_status_as_of":"2026-08-21","project_count":1,"projects":[{"project_id":"5ba8267e-52f6-5efa-90e9-a9e0a40366d5","name":"China Mobile (Ningxia Zhongwei) Data Center B-Zone Phase 2 — B07 Data Centre","status":"permitted","status_as_of":"2026-08-21","search_terms":""}],"status_publishers":["Zhongwei Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8eb173034e749f70b695/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8eb173034e749f70b695.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]},{"site_id":"vcc-site-767b690a800dad05ddac","name":"China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus","country":"China","country_iso_a2":"CN","latitude":37.370328056,"longitude":105.504329444,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"4e94cc39-0f41-5197-8a42-c2b7e89ff713","name":"China Mobile (Ningxia Zhongwei) Data Center Xuanhe Campus — D07–D10 Machine-Room Buildings","status":"permitted","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["Zhongwei Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-767b690a800dad05ddac/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-767b690a800dad05ddac.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]},{"site_id":"vcc-site-25a38e5a66933753cd86","name":"China Mobile GBA (Shaoguan) Data Center","country":"China","country_iso_a2":"CN","latitude":24.9099635,"longitude":113.5527787,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","completed"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":2,"projects":[{"project_id":"5e52d4ca-f8f7-5153-996f-0291502ccc67","name":"China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2)","status":"announced","status_as_of":"2026-09-30","search_terms":""},{"project_id":"7a5c1f89-4003-574e-9ad7-242ae7ef2d2c","name":"China Mobile GBA (Shaoguan) Data Center — Phase 1 A/B buildings","status":"completed","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Shaoguan Natural Resources Bureau"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25a38e5a66933753cd86.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Natural Resources Bureau"]},{"site_id":"vcc-site-23ffbb893f12f178d8d3","name":"China Mobile Hohhot Data Center","country":"China","country_iso_a2":"CN","latitude":40.5368771,"longitude":111.8163596,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed","operational"],"newest_status_as_of":"2026-10-12","oldest_status_as_of":"2026-08-27","project_count":3,"projects":[{"project_id":"d4f5ee02-4c8a-5252-97fd-e39f7add28bf","name":"China Mobile Hohhot B25/B27 Expansion","status":"completed","status_as_of":"2026-10-10","search_terms":""},{"project_id":"fbffac41-d525-5f63-a471-9c5870b3ed32","name":"China Mobile Hohhot Data Center — B02 machine building operations","status":"operational","status_as_of":"2026-10-12","search_terms":""},{"project_id":"1dd04d18-ca1c-5a59-846b-235ebabebffa","name":"China Mobile Hohhot Data Center — existing intelligent computing centre operations","status":"operational","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Administrative Approval and Government Services Bureau, China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Horinger New Area (行政审批和政务服务局)","Investment Promotion Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区招商服务局)","暖通制冷空调在线 (HVRAC)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23ffbb893f12f178d8d3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23ffbb893f12f178d8d3.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-d176c3ca87edba6d0517","name":"China Mobile International Information Port, Beijing","country":"China","country_iso_a2":"CN","latitude":40.14536515,"longitude":116.2297028,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"98aa0068-2100-53d4-b356-b89ef285efb1","name":"China Mobile Beijing International Information Port No6 / C18 Data Center Development","status":"announced","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["Beijing Public Resources Trading Service"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d176c3ca87edba6d0517/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d176c3ca87edba6d0517.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-f1171e4b8e247993d773","name":"China Mobile Plateau Big Data Center Haidong","country":"China","country_iso_a2":"CN","latitude":36.509652222222,"longitude":102.007272777778,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"e2c7ea58-17cc-594d-8b98-56ca08988c99","name":"China Mobile Plateau Big Data Center Phase 2 Build","status":"under_construction","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Qinghai Daily; Qinghai News (Qinghai Provincial Internet News Center)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1171e4b8e247993d773/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f1171e4b8e247993d773.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Haidong Municipal People's Government"]},{"site_id":"vcc-site-03a8f52a32b90569e4e1","name":"China Telecom Cloud Computing Guizhou Information Park","country":"China","country_iso_a2":"CN","latitude":26.38,"longitude":106.54,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"be874ef3-dd3e-54dd-be06-f01895ac6992","name":"China Telecom Guizhou Information Park B5/B6 Civil Works","status":"completed","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["China Construction Fifth Engineering Bureau, Third Construction Company"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-03a8f52a32b90569e4e1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-03a8f52a32b90569e4e1.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["SASAC official Guozi Xiaoxin account, hosted by The Paper"]},{"site_id":"vcc-site-a3b8ee51c5572c85cebc","name":"China Telecom Cloud Computing Inner Mongolia Information Park (Horinger)","country":"China","country_iso_a2":"CN","latitude":40.537609444,"longitude":111.831047778,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"20c4a224-6f33-5074-8eef-13a7b4568edc","name":"China Telecom Cloud Computing Inner Mongolia Information Park — existing data-centre operations","status":"operational","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Administrative Approval and Government Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区行政审批和政务服务局)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a3b8ee51c5572c85cebc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a3b8ee51c5572c85cebc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国电信股份有限公司云计算内蒙古分公司"]},{"site_id":"vcc-site-e730be87839857aed507","name":"China Telecom GBA Integrated Data Center, Zhenjiang Industrial Park Campus","country":"China","country_iso_a2":"CN","latitude":24.9126292,"longitude":113.5534801,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-24","oldest_status_as_of":"2026-07-24","project_count":1,"projects":[{"project_id":"0dae92e0-0d98-5673-9b35-f59be33bc6c0","name":"China Telecom GBA Integrated Data Center, Zhenjiang Park — Phase 2.1 A7 Intelligent Computing Centre","status":"announced","status_as_of":"2026-07-24","search_terms":""}],"status_publishers":["Shaoguan Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e730be87839857aed507/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e730be87839857aed507.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Natural Resources Bureau"]},{"site_id":"vcc-site-30d08f4b50344183f0ed","name":"China Telecom Innovation Incubation (South) Base, Guangzhou Knowledge City","country":"China","country_iso_a2":"CN","latitude":23.318173,"longitude":113.536462197,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"e7af45b6-0728-50e8-bb27-00499cc2bb29","name":"China Telecom Innovation Incubation (South) Base — AIDC computing infrastructure in Buildings A1, A3 and A4","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Guangdong Energy Bureau (published on the Guangdong Provincial Development and Reform Commission website)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30d08f4b50344183f0ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30d08f4b50344183f0ed.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Guangzhou Planning and Natural Resources Bureau"]},{"site_id":"vcc-site-6ebd1bca968c3c872878","name":"China Telecom Jing-Jin-Ji Intelligent Computing Center, Wuqing","country":"China","country_iso_a2":"CN","latitude":39.61580515,"longitude":116.8418499,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"a7e358de-2d71-502e-81dd-441e02565024","name":"China Telecom Wuqing Jing-Jin-Ji — Existing Operational Facilities","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["中国证券报·中证网 (China Securities Journal)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6ebd1bca968c3c872878/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6ebd1bca968c3c872878.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-1bd306b0006a6578a4a5","name":"China Telecom Lingang Information Park Phase 2","country":"China","country_iso_a2":"CN","latitude":30.9535,"longitude":121.9415,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"d456e2d4-2741-53e1-ae65-a2faf7d199ba","name":"China Telecom Lingang Information Park Phase 2.1","status":"shell","status_as_of":"2026-10-19","search_terms":""}],"status_publishers":["Lingang Special Area Administration (中国（上海）自由贸易试验区临港新片区管理委员会)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1bd306b0006a6578a4a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1bd306b0006a6578a4a5.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-efe797bc04a70a7ce5bb","name":"China Telecom Shaotang Campus, Shaoguan","country":"China","country_iso_a2":"CN","latitude":24.787517222222224,"longitude":113.66191861111112,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"bb2a6c51-4439-5bda-aa65-a5f7f9e14e98","name":"China Telecom Shaotang Campus Development","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Shaoguan Municipal Government / Shaoguan Daily"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efe797bc04a70a7ce5bb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-efe797bc04a70a7ce5bb.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Ecology and Environment Bureau / Guangdong Shaoke Environmental Technology"]},{"site_id":"vcc-site-c66042a23be32caf8198","name":"China Unicom GBA Data Standard Factory Campus, Shaoguan","country":"China","country_iso_a2":"CN","latitude":24.9086711,"longitude":113.5556006,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"1c6c1ab3-5d51-5203-948e-c42de44de16e","name":"China Unicom GBA Data Standard Factory — Data Centre 5","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Shaoguan Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c66042a23be32caf8198/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c66042a23be32caf8198.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Natural Resources Bureau"]},{"site_id":"vcc-site-5cd249b4adc6b7c38a4c","name":"China Unicom Jing-Jin-Ji Digital Technology Industrial Park, Tianjin","country":"China","country_iso_a2":"CN","latitude":39.61740245,"longitude":116.8344899,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"066110dc-81e1-5f18-8a28-b670f1cdde98","name":"China Unicom Tianjin Jing-Jin-Ji Park South Zone DC1 / DC2","status":"operational","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["Beijing TravelSky Birun Technology Co., Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5cd249b4adc6b7c38a4c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5cd249b4adc6b7c38a4c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-76e2cef27fa679357fa6","name":"China Unicom Langfang Zhi Yun Data Center","country":"China","country_iso_a2":"CN","latitude":39.6021711,"longitude":116.71704,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"bd8714fe-60fb-5043-bac6-6b59af35a462","name":"China Unicom Langfang Zhi Yun — Existing Operational Facilities","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["中国证券报·中证网 (China Securities Journal)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-76e2cef27fa679357fa6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-76e2cef27fa679357fa6.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-91bd7dbaaff4a357e678","name":"China Unicom Ningxia Zhongwei Cloud Data Center","country":"China","country_iso_a2":"CN","latitude":37.635448056,"longitude":105.333625556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"2250279c-c24e-5285-b9a7-6dea4b90f7bc","name":"China Unicom Ningxia Zhongwei Cloud Data Center — Park No. 2 Data Centre 9 (DC9)","status":"permitted","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Zhongwei Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91bd7dbaaff4a357e678/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-91bd7dbaaff4a357e678.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]},{"site_id":"vcc-site-ea061b82f82f38517038","name":"Chindata Hebei Cunrui Base, Huailai","country":"China","country_iso_a2":"CN","latitude":40.48965,"longitude":115.56514,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"0ab095f5-73db-5fc6-814d-150f57146f8f","name":"Chindata Hebei Cunrui Base (河北秦淮数据存瑞基地) — Cunrui phases 1-4 existing data-centre operations","status":"operational","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Guangdong HEC Technology Holding Co., Ltd. (广东东阳光科技控股股份有限公司, 600673.SH); published on cninfo"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ea061b82f82f38517038/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ea061b82f82f38517038.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Huailai County People's Government (怀来县人民政府), www.huailai.gov.cn"]},{"site_id":"vcc-site-265ff643497c82472bb3","name":"Chirisa Chesterfield Campus","country":"United States","country_iso_a2":"US","latitude":37.356171271028536,"longitude":-77.33425619418317,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"0b67b532-d779-5784-bd6d-d7ee124844aa","name":"Chirisa Chesterfield Digital Drive Current Build","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Chesterfield County"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-265ff643497c82472bb3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-265ff643497c82472bb3.json","geometry_licenses":["CC0-1.0","all-rights-reserved","no-open-document-redistribution-license-asserted"],"geometry_attributions":["Chesterfield County GIS","Data retrieved from Chesterfield County GIS Data Catalog.","Esri"]},{"site_id":"vcc-site-ffd3318a703242b6a683","name":"CIDC Jing-Meng Green Computing Industrial Park (Ulanqab D-Zone)","country":"China","country_iso_a2":"CN","latitude":40.989204167,"longitude":113.328038056,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"c98b79c0-f429-5dce-af8d-38c040d1516a","name":"CIDC Jing-Meng Green Computing Industrial Park — D-Zone Development","status":"under_construction","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Beijing Urban Construction Group Co., Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ffd3318a703242b6a683/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ffd3318a703242b6a683.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中金(乌兰察布)数据科技有限公司"]},{"site_id":"vcc-site-e5eab403e494a3dd5ba0","name":"CIDC Ulanqab Zero-Carbon Computing Base","country":"China","country_iso_a2":"CN","latitude":40.99166694,"longitude":113.31362861,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-17","oldest_status_as_of":"2026-10-17","project_count":1,"projects":[{"project_id":"83a215f6-40e0-55c1-bf26-176e550c71da","name":"CIDC Ulanqab Zero-Carbon Computing Base — existing commercial data-centre operations","status":"operational","status_as_of":"2026-10-17","search_terms":""}],"status_publishers":["People’s Daily client, Inner Mongolia channel"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5eab403e494a3dd5ba0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5eab403e494a3dd5ba0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; assessment prepared for 中金数据（乌兰察布）有限公司"]},{"site_id":"vcc-site-e0351ba98650d0c9cba2","name":"CIDC Zhongwei Green Intelligent Computing Industrial Base (Xuanhe)","country":"China","country_iso_a2":"CN","latitude":37.378340278,"longitude":105.498314722,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"a67dbc84-b8fc-537c-a3b0-b6515a2fede5","name":"CIDC Zhongwei Green Intelligent Computing Industrial Base (Xuanhe) — Phases 1–2 Development","status":"under_construction","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Shapotou District Branch, Zhongwei Market Supervision Administration"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e0351ba98650d0c9cba2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e0351ba98650d0c9cba2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]},{"site_id":"vcc-site-ad9a83cc2040a19f7750","name":"Cipher Barber Lake data center","country":"United States","country_iso_a2":"US","latitude":32.3961,"longitude":-100.8622,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"8fc14c03-d70a-5634-81e4-883a2fd6eec9","name":"Cipher Barber Lake data center","status":"under_construction","status_as_of":"2026-09-25","search_terms":"AI hosting data center under construction by Cipher Mining, since renamed Cipher Digital, at its Barber Lake site in Colorado City, Texas. In September 2025 Fluidstack leased 168 MW of critical IT load, supported by up to 244 MW of gross capacity, for an initial 10 years; Google backstopped $1.4 billion of Fluidstack's lease obligations and received warrants in Cipher. In September 2026 the lease was extended to 20 years, backed by an added 10-year commitment from an unnamed AI lab, lifting contracted revenue to more than $9 billion. The tenant had begun partial occupancy by August 2026, and data halls are due from the fourth quarter of 2026 through the first quarter of 2027. Barber Lake Cipher Digital (formerly Cipher Mining) Fluidstack"}],"status_publishers":["Cipher Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ad9a83cc2040a19f7750/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ad9a83cc2040a19f7750.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Cipher Mining"]},{"site_id":"vcc-site-6bedc032f2f6fb914715","name":"Cipher Digital Black Pearl Wink Data Center Campus","country":"United States","country_iso_a2":"US","latitude":31.6913247,"longitude":-103.0669994,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"ade90a9a-b55b-503e-a8b9-d2f8340a81d6","name":"Cipher Black Pearl data center","status":"partially_operational","status_as_of":"2026-08-04","search_terms":"Cipher Digital (formerly Cipher Mining) facility on about 75 company-owned acres near Wink, Texas, with 300 MW of approved ERCOT interconnection. Cipher began bitcoin mining there in June 2025, signed a 15-year lease with Amazon Web Services for about 300 gross MW of turnkey data center capacity, which it valued at about USD 5.5 billion, and stopped mining in February 2026. Cipher said it delivered the first data center capacity and rent began in August 2026, two months ahead of the original schedule, while the remaining phase I halls were in fit-out and phase II was still being built. Black Pearl Facility Black Pearl campus Cipher Digital (formerly Cipher Mining) Cipher Digital (formerly Cipher Mining) Amazon Web Services Quanta Services"},{"project_id":"f595ca9f-e584-5dcb-bf76-38b346f6e4aa","name":"Cipher Digital Black Pearl Phase II Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Cipher Digital Inc.","Cipher Digital Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bedc032f2f6fb914715/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bedc032f2f6fb914715.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC"]},{"site_id":"vcc-site-bdf4718cb174c2faaaf4","name":"Cipher Digital Stingray Andrews Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.3720672,"longitude":-102.9824436,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":1,"projects":[{"project_id":"fa44cb24-5185-5616-a6a2-3977f190001f","name":"Cipher Digital Stingray Data Center Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Cipher Digital Inc."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bdf4718cb174c2faaaf4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bdf4718cb174c2faaaf4.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority CSEC"]},{"site_id":"vcc-site-1295b8a3ae3b2543ec97","name":"Cloud4Y DC4Y.1 S33 Marfino Data Center Campus","country":"Russia","country_iso_a2":"RU","latitude":56.07411594800743,"longitude":37.56629790523428,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-01","oldest_status_as_of":"2026-06-01","project_count":1,"projects":[{"project_id":"cbe9c330-13a3-5d1f-a9ba-c981c31585a7","name":"Cloud4Y Marfino Main Building Current Construction","status":"under_construction","status_as_of":"2026-06-01","search_terms":""}],"status_publishers":["Cloud4Y corporate blog on Habr, currently displayed as Cloud4U"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1295b8a3ae3b2543ec97/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1295b8a3ae3b2543ec97.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Cloud4Y","Yandex"]},{"site_id":"vcc-site-68fa7b1f6e39bd438e45","name":"CloudHQ GRU Campus (Paulínia)","country":"Brazil","country_iso_a2":"BR","latitude":-22.77089,"longitude":-47.10425,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-08","oldest_status_as_of":"2026-04-08","project_count":1,"projects":[{"project_id":"8efbf742-c042-5872-9bbe-82d576865125","name":"CloudHQ GRU Campus (Paulínia)","status":"under_construction","status_as_of":"2026-04-08","search_terms":"CloudHQ's first campus in Brazil, in Paulínia in the Campinas region of São Paulo state, was launched with a groundbreaking in March 2023 as a USD 3 billion project of six buildings and up to 288 MW of IT load, in two phases of three 48 MW buildings. Its on-site high-voltage substation, of about 225 to 250 MW, was energised and connected to Brazil's grid by early 2026, well after the original 2024 opening target. 2026 trade reports describe the campus as ready for tenants, with phased commissioning and first operations expected through 2027; one report gives a larger first phase of three 120 MW buildings. GRU Campus GRU Technology Campus CloudHQ Paulínia CloudHQ Afonso França Engenharia LZA Engenharia WEG"}],"status_publishers":["Switchgear Magazine"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-68fa7b1f6e39bd438e45/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-68fa7b1f6e39bd438e45.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CloudHQ"]},{"site_id":"vcc-site-06460b4d3811e49ea522","name":"CloudHQ Project Asahi Technology Campus (BIG HOP, Inzai Makinohara)","country":"Japan","country_iso_a2":"JP","latitude":35.802903,"longitude":140.162869,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"a588c649-ce7d-53c4-9621-c5995883c25b","name":"CloudHQ Project Asahi Technology Campus — planned data-centre buildings at BIG HOP Garden Mall Inzai","status":"announced","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["CloudHQ LLC (published by Inzai City as operator-provided council briefing material)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-06460b4d3811e49ea522/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-06460b4d3811e49ea522.json","geometry_licenses":["CC-BY"],"geometry_attributions":["Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license: Creative Commons Attribution."]},{"site_id":"vcc-site-9209936dfd95900f78c3","name":"CloudHQ QRO Campus (Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.61983,"longitude":-100.1474,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2025-09-30","oldest_status_as_of":"2025-09-30","project_count":1,"projects":[{"project_id":"a7a29c6e-70aa-5f7b-b172-d1abe208715e","name":"CloudHQ QRO Campus (Querétaro)","status":"announced","status_as_of":"2025-09-30","search_terms":"CloudHQ, a US data centre developer, plans a six-building hyperscale campus on about 52 hectares next to Querétaro's international airport in central Mexico. Presented at the Mexican president's morning press conference in September 2025, it carries USD 4.8 billion of planned investment and up to 900 MW of critical IT load, with initial power secured for a first 200 MW. CloudHQ's own campus page lists a smaller 360 MW and readiness within 2027. Reports disagree on whether a tenant lease is signed and whether building work has begun, and no 2026 progress report was found. QRO Campus CloudHQ Querétaro CloudHQ Government of the State of Querétaro Comisión Federal de Electricidad (CFE)"}],"status_publishers":["Telecom Review Americas"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9209936dfd95900f78c3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9209936dfd95900f78c3.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CloudHQ"]},{"site_id":"vcc-site-d38e747e407b815bd5e0","name":"Cologix Ashburn Data Centers (ASH1 and ASH2, Beaumeade Circle)","country":"United States","country_iso_a2":"US","latitude":39.0185075,"longitude":-77.4588976,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"c79a6dd9-5210-502b-901d-88cf8f9f7dce","name":"Cologix ASH2 — two-storey data centre under construction (21673 Beaumeade Circle)","status":"under_construction","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d38e747e407b815bd5e0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d38e747e407b815bd5e0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-1c1b9d6298cce00eb24d","name":"Cologix JAX1 Data Center (421 West Church Street, Jacksonville)","country":"United States","country_iso_a2":"US","latitude":30.3314574,"longitude":-81.6624451,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"eb6bca44-2db9-506e-a223-eee674fa431a","name":"Cologix JAX1 — existing data-centre and meet-me-room operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1c1b9d6298cce00eb24d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1c1b9d6298cce00eb24d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Florida Department of Revenue Property Tax Oversight; Duval County Property Appraiser; Florida Geographic Information Office"]},{"site_id":"vcc-site-f831f9e45eca4caf4a67","name":"Cologix JAX2 Data Center (4800 Spring Park Road, Jacksonville)","country":"United States","country_iso_a2":"US","latitude":30.2731897,"longitude":-81.613832,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"681b9f58-2183-5dfa-a7db-abc55c98ac70","name":"Cologix JAX2 — existing data-centre operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f831f9e45eca4caf4a67/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f831f9e45eca4caf4a67.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Florida Department of Revenue Property Tax Oversight; Duval County Property Appraiser; Florida Geographic Information Office"]},{"site_id":"vcc-site-540736a0838fdf01dd20","name":"Cologix Markham Campus (TOR4 and TOR5), 105 Clegg Road","country":"Canada","country_iso_a2":"CA","latitude":43.8506128,"longitude":-79.3423601,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"28cf6aed-9dc8-582a-8d1b-a20668d2464f","name":"Cologix TOR4 (Building B) — existing data-centre operations","status":"operational","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-540736a0838fdf01dd20/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-540736a0838fdf01dd20.json","geometry_licenses":["York Region Open Data Licence v1.0"],"geometry_attributions":["Contains public sector information made available under The Regional Municipality of York's Open Data Licence"]},{"site_id":"vcc-site-e6e875877584af9248c3","name":"Cologix MTL10 Data Centre, Longueuil (530 rue Bériault)","country":"Canada","country_iso_a2":"CA","latitude":45.565580776655146,"longitude":-73.47536649043357,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"2e99ea7a-e430-5e58-bfea-13213f5925d7","name":"Cologix MTL10 — existing data-centre operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6e875877584af9248c3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6e875877584af9248c3.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ministère des Ressources naturelles et des Forêts, Adresses Québec (Données Québec, CC BY 4.0)"]},{"site_id":"vcc-site-e70b4a3b034963bb17b1","name":"Cologix MTL8 Data Centre, Technoparc Montréal (7350 rue Frederick-Banting)","country":"Canada","country_iso_a2":"CA","latitude":45.481549,"longitude":-73.767768,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"2570a323-6f62-5fbe-8b27-5f70b68c6ea5","name":"Cologix MTL8 — existing data-centre operations","status":"operational","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e70b4a3b034963bb17b1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e70b4a3b034963bb17b1.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ville de Montreal, donnees ouvertes (Creative Commons Attribution 4.0 International)"]},{"site_id":"vcc-site-9994cc5f492fff6c4bd7","name":"Cologix MTL9 Data Centre, Drummondville (2525 rue Canadien)","country":"Canada","country_iso_a2":"CA","latitude":45.879727240119685,"longitude":-72.54484752298539,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"41a8354d-1e09-54bc-bec7-2bf530bfd73c","name":"Cologix MTL9 — existing data-centre operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9994cc5f492fff6c4bd7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9994cc5f492fff6c4bd7.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Ministère des Ressources naturelles et des Forêts, Adresses Québec (Données Québec, CC BY 4.0)"]},{"site_id":"vcc-site-ff75268d33af60aab707","name":"Cologix VAN4 Data Centre, Vancouver (175 West Cordova Street)","country":"Canada","country_iso_a2":"CA","latitude":49.2835679,"longitude":-123.1086748,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"4f184eb0-233a-5360-84b7-ea21a6ab8409","name":"Cologix VAN4 — existing data-centre operations","status":"operational","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Cologix, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff75268d33af60aab707/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff75268d33af60aab707.json","geometry_licenses":["No licence stated on the service; used for identifiers and a computed point only"],"geometry_attributions":["City of Vancouver"]},{"site_id":"vcc-site-7f2e4f6e487f73dc8a39","name":"Colovore Alliance Data Center (Fort Worth)","country":"United States","country_iso_a2":"US","latitude":32.9992394,"longitude":-97.2963204,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"3bb8a866-915c-56ac-9968-1b6774ad25af","name":"Colovore Alliance Data Center — planned building","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7f2e4f6e487f73dc8a39/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7f2e4f6e487f73dc8a39.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Denton Central Appraisal District data)"]},{"site_id":"vcc-site-7821451336d29c28c9c9","name":"Colovore Hutto Data Center","country":"United States","country_iso_a2":"US","latitude":30.5409106,"longitude":-97.5721722,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"26d74e69-10b3-5760-bd22-8e8d94402038","name":"Colovore Hutto Data Center — planned building","status":"announced","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7821451336d29c28c9c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7821451336d29c28c9c9.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Williamson Central Appraisal District data)"]},{"site_id":"vcc-site-3d19adbe27ca545ec17c","name":"Colovore RNO01 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.531425,"longitude":-119.480936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":2,"projects":[{"project_id":"fc372246-e7bd-5e93-8d6a-8558b2eda0ba","name":"Colovore RNO01 — first data center","status":"operational","status_as_of":"2026-09-09","search_terms":""},{"project_id":"1547c04d-5e1f-52ef-a9a7-fd3690e6aedf","name":"Colovore RNO01 — second data center","status":"under_construction","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["Colovore"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d19adbe27ca545ec17c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d19adbe27ca545ec17c.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Nevada Division of State Lands; Nevada Department of Transportation GIS"]},{"site_id":"vcc-site-c189870f4e5549026f3e","name":"Colovore Santa Clara Campus (SJC01, 1101 Space Park Drive, and SJC02, 3060 Raymond Street)","country":"United States","country_iso_a2":"US","latitude":37.3769953,"longitude":-121.9531841,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"e539178f-a47a-55ae-a22e-6efd3e20305e","name":"Colovore SJC01 and SJC02 — existing data-centre operations","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Colovore"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c189870f4e5549026f3e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c189870f4e5549026f3e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-78e17687e90595467a13","name":"Colt Frankfurt 3 Sossenheim Campus","country":"Germany","country_iso_a2":"DE","latitude":50.124526200000005,"longitude":8.5875645,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"7352e9b5-ecec-5497-8c62-3e6a8c7bd012","name":"Colt Frankfurt 3 Current Facility Build","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Colt Data Centre Services"],"power_observations":[{"project_id":"7352e9b5-ecec-5497-8c62-3e6a8c7bd012","metric":"critical_it_mw","stage":"planned","low":32.4,"base":32.4,"high":32.4,"unit":"MW","as_of_date":"2026-07-19"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78e17687e90595467a13/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78e17687e90595467a13.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-9cb7fd51b4bce6de63d8","name":"Colt Inzai Data Centre 4 / Keppel DC REIT Tokyo Data Centre 3 (Otsuka 2-chome, Inzai)","country":"Japan","country_iso_a2":"JP","latitude":35.8086017,"longitude":140.1222606,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"94289d60-657e-5ca7-aa08-0f3b55ba7e76","name":"Colt Inzai Data Centre 4 (Keppel Tokyo Data Centre 3) — existing hyperscale data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9cb7fd51b4bce6de63d8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9cb7fd51b4bce6de63d8.json","geometry_licenses":["CC-BY"],"geometry_attributions":["Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license: Creative Commons Attribution."]},{"site_id":"vcc-site-b38b02f920b409f27698","name":"Colt London Hayes Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":51.5095591,"longitude":-0.394089,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"0bac3fe4-c3dd-54ba-a500-e37599191432","name":"Colt London 4 Current Facility Build","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Colt Data Centre Services"],"power_observations":[{"project_id":"0bac3fe4-c3dd-54ba-a500-e37599191432","metric":"critical_it_mw","stage":"planned","low":31.0,"base":31.0,"high":31.0,"unit":"MW","as_of_date":"2026-07-19"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b38b02f920b409f27698/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b38b02f920b409f27698.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-ca2269119237054941e1","name":"Colt Villebon-sur-Yvette Campus","country":"France","country_iso_a2":"FR","latitude":48.690997187,"longitude":2.2199845682,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"08d881e7-8a1c-50da-81a5-d2ef49f22a7a","name":"Colt Paris 2 Current Facility Build","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Colt Data Centre Services"],"power_observations":[{"project_id":"08d881e7-8a1c-50da-81a5-d2ef49f22a7a","metric":"critical_it_mw","stage":"planned","low":39.6,"base":39.6,"high":39.6,"unit":"MW","as_of_date":"2026-07-19"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ca2269119237054941e1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ca2269119237054941e1.json","geometry_licenses":["etalab-2.0"],"geometry_attributions":["Direction générale des Finances publiques (DGFiP), Cadastre Etalab, millésime 1 June 2026"]},{"site_id":"vcc-site-0970d3d992e7ad717052","name":"Compass Datacenters CLT I Campus, 255 Stamey Farm Road, Statesville","country":"United States","country_iso_a2":"US","latitude":35.7727081,"longitude":-80.9765028,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"6dcfaf41-0790-56fa-98f7-32474a8ff23d","name":"Compass Datacenters CLT I — proposed greenfield data-center facility (NC DAQ air-permit application 4900350.26A)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["North Carolina Department of Environmental Quality, Division of Air Quality"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0970d3d992e7ad717052/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0970d3d992e7ad717052.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Iredell County, North Carolina"]},{"site_id":"vcc-site-5530a2d607e4a2cef4c8","name":"Compass Datacenters DFW III Campus (Red Oak)","country":"United States","country_iso_a2":"US","latitude":32.542656,"longitude":-96.7960695,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":3,"projects":[{"project_id":"014445ce-306f-5eec-ad38-52a0fd9d5d7f","name":"Compass DFW III Building 10 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""},{"project_id":"62a1819d-ff21-5f33-9f5d-9854e0f3a9ae","name":"Compass DFW III Building 8 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""},{"project_id":"26e9a9ec-ff08-5906-a61a-6033643fdee2","name":"Compass DFW III Building 9 — interior/tenant fit-out","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5530a2d607e4a2cef4c8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5530a2d607e4a2cef4c8.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ellis Appraisal District and Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-b2e02b9541ac2f2a5b20","name":"Compass Datacenters Hoffman Estates campus","country":"United States","country_iso_a2":"US","latitude":42.0639,"longitude":-88.1469,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a1696719-0fe3-52ce-ad37-43e6d2215f4f","name":"Compass Datacenters Hoffman Estates campus","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Compass Datacenters is redeveloping the former Sears headquarters site, nearly 200 acres in Hoffman Estates about 30 miles west of Chicago, into a hyperscale campus of five data centers. Compass closed on the site in September 2023 and held a kickoff in June 2024, saying demolition of the old Sears buildings would start that summer and data center construction would follow in 2025. Compass put local investment at about USD 10 billion once operational, a figure the village mayor called preliminary, and its markets page lists the campus at 200 MW. In October 2026 Compass still described the campus as being developed. Compass Chicago campus Former Sears headquarters data center campus Compass Datacenters ComEd Village of Hoffman Estates"}],"status_publishers":["Village of Hoffman Estates, Illinois"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2e02b9541ac2f2a5b20/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2e02b9541ac2f2a5b20.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Compass Datacenters"]},{"site_id":"vcc-site-4c3f2c7b887170cea7c1","name":"Compass Datacenters Meridian campus","country":"United States","country_iso_a2":"US","latitude":32.3747,"longitude":-88.7042,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"2b520cfa-8aea-5212-9b60-8ff417ee6578","name":"Compass Datacenters Meridian campus","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Compass Datacenters is developing a single-tenant hyperscale campus of eight data centers in the Meridian I-20/59 Industrial Park in Meridian, Lauderdale County, Mississippi. Announced in January 2025 with Governor Tate Reeves, the project is valued at USD 10 billion at full fit-out including tenant IT equipment and is to be built over about eight years. Mississippi Power will supply about 500 MW and invested in a substation for the park, while the state granted tax exemptions and site support. Compass's market page now describes Meridian as a 320 MW site that broke ground in 2025. Compass Lauderdale County campus Compass Datacenters Mississippi Power Mississippi Development Authority Lauderdale County"}],"status_publishers":["Compass Datacenters"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c3f2c7b887170cea7c1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c3f2c7b887170cea7c1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Compass Datacenters"]},{"site_id":"vcc-site-5ca8a42664b78d955330","name":"Compass Datacenters PHX2 El Mirage Campus (12500 W Joe R Ramirez Rd, El Mirage, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.5767859,"longitude":-112.3296651,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"38e0487a-5298-5e09-a545-539b6a096455","name":"Compass El Mirage (PHX2) — 108 MW data-centre campus under development","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Compass Datacenters"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5ca8a42664b78d955330/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5ca8a42664b78d955330.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor's Office"]},{"site_id":"vcc-site-dadea001f97aa8058f7a","name":"Core Scientific Denton data center (CoreWeave)","country":"United States","country_iso_a2":"US","latitude":33.2164,"longitude":-97.1292,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c62aed61-a87f-57ab-b1a4-76d1867f73b9","name":"Core Scientific Denton data center (CoreWeave)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Core Scientific campus at 8171 Jim Christal Road in Denton, Texas, with 394 MW of gross utility power capacity from Denton Municipal Electric, being fitted out as high-density colocation for CoreWeave as Core Scientific converts its facilities from digital asset mining to HPC colocation. A February 2025 expansion added 70 MW of contracted power and raised CoreWeave's critical IT load at the site to about 260 MW, adding $1.2 billion of contracted revenue. The campus covers 78 acres, and Core Scientific says it is expected to host one of North America's largest supercomputers. Denton 1 Core Scientific Core Scientific CoreWeave Denton Municipal Electric"}],"status_publishers":["Core Scientific"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dadea001f97aa8058f7a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dadea001f97aa8058f7a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["U.S. Securities and Exchange Commission (Core Scientific filing)"]},{"site_id":"vcc-site-684f1565a0f48756e238","name":"Core Scientific Hunt County data center site","country":"United States","country_iso_a2":"US","latitude":33.12,"longitude":-96.09,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"40abc164-3033-5172-b386-52422d1513b9","name":"Core Scientific Hunt County data center site","status":"announced","status_as_of":"2026-07-28","search_terms":"Greenfield data center site in Hunt County, Texas, that Core Scientific bought in 2026 for about USD 233 million, with land and power expected to support about 430 MW of gross utility capacity on an approved ERCOT interconnection ramp schedule. In July 2026 Core Scientific listed it as an AMD site with about 110 MW leased under AMD's 15-year agreements, which cover roughly 530 MW across five Core Scientific sites, and estimated initial delivery in the first half of 2028. Hunt County, TX campus Core Scientific Core Scientific AMD"}],"status_publishers":["Core Scientific, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-684f1565a0f48756e238/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-684f1565a0f48756e238.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Core Scientific"]},{"site_id":"vcc-site-bf829ea21a9d7386fb5f","name":"Core Scientific Muskogee data center campus","country":"United States","country_iso_a2":"US","latitude":35.7433,"longitude":-95.3567,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"d87a919b-df32-53fa-bc01-47b7f6f1dce9","name":"Core Scientific Muskogee data center campus","status":"partially_operational","status_as_of":"2026-07-28","search_terms":"Core Scientific high-density colocation campus at 1525 West 43rd Street South in Muskogee, Oklahoma, served by Oklahoma Gas & Electric. A 70 MW building designed for Nvidia GB300 systems is leased to CoreWeave and was billing by mid-July 2026, and a second building of about 82 MW, now leased to AMD, is under construction for delivery from the second half of 2027. In May 2026 Core Scientific announced plans to grow the campus to about 1.5 GW of gross power, about 1.0 GW leasable, on about 250 acres, and in August 2026 it closed the purchase of Polaris DS, which holds about 440 MW of in-service OG&E grid capacity. Muskogee 1 Core Scientific Core Scientific CoreWeave AMD Oklahoma Gas & Electric"}],"status_publishers":["Core Scientific"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf829ea21a9d7386fb5f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf829ea21a9d7386fb5f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Core Scientific"]},{"site_id":"vcc-site-779f30ba676706e8e5db","name":"Core Scientific Pecos Cottonwood Campus","country":"United States","country_iso_a2":"US","latitude":31.5341897,"longitude":-103.8026586,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","under_construction"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-06-02","project_count":2,"projects":[{"project_id":"8ce04eb2-b1ed-5375-a685-122f79fc2ee6","name":"Core Scientific Pecos data center campus","status":"announced","status_as_of":"2026-07-28","search_terms":"Core Scientific campus on FM 2119 in Pecos, Texas, in the Permian Basin, listed with 300 MW of gross utility power from Texas-New Mexico Power and a 100-acre footprint. In spring 2026 Core Scientific announced a plan to scale Pecos to about 1.5 GW of gross power; trade press says the plan repurposes existing bitcoin mining infrastructure. In July 2026 its earnings presentation listed AMD as tenant of about 185 MW at Pecos, part of roughly 530 MW of 15-year AMD leases across five sites, with initial delivery expected in the first half of 2027. Cottonwood 1 & 2 Pecos, Texas Data Center Core Scientific Core Scientific AMD Texas-New Mexico Power"},{"project_id":"709cd37b-7f3a-5313-b3e2-a18ddc0885ec","name":"Core Scientific Pecos Initial HDC Current Build","status":"under_construction","status_as_of":"2026-06-02","search_terms":""}],"status_publishers":["Adam Sullivan, Core Scientific CEO, on LinkedIn","Core Scientific"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-779f30ba676706e8e5db/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-779f30ba676706e8e5db.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-e41279afe75118ffe083","name":"CoreSite DA1 Irving","country":"United States","country_iso_a2":"US","latitude":32.8331599,"longitude":-96.905188,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"b18029a8-85f3-540a-b255-55f658d4cbfa","name":"CoreSite DA1 — data center base building","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e41279afe75118ffe083/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e41279afe75118ffe083.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-782c0112e90a5282be53","name":"CoreSite DE3 Race Street Campus","country":"United States","country_iso_a2":"US","latitude":39.78611497442305,"longitude":-104.962772152554,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"65e8849e-2ebe-5d58-be63-299cbbcf8d23","name":"CoreSite DE3","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["CoreSite"],"power_observations":[{"project_id":"65e8849e-2ebe-5d58-be63-299cbbcf8d23","metric":"critical_it_mw","stage":"planned","low":18.0,"base":18.0,"high":18.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-782c0112e90a5282be53/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-782c0112e90a5282be53.json","geometry_licenses":["CC-BY-3.0"],"geometry_attributions":["City and County of Denver"]},{"site_id":"vcc-site-7ceb4cfa4ba358ea4547","name":"CoreWeave Kenilworth NEST 11 AI data center","country":"United States","country_iso_a2":"US","latitude":40.6781,"longitude":-74.2881,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"35995588-0599-5f9b-bc3d-29f9f67ea81b","name":"CoreWeave Kenilworth NEST 11 AI data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"CoreWeave is converting a 1982 pharmaceutical research building (11 NEST) on the former Merck campus, now the Northeast Science and Technology Center on Galloping Hill Road in Kenilworth, New Jersey, into an AI data center. It leased the building in October 2024, bought it with 27 adjacent acres for 322 million US dollars in August 2025, and started construction in September 2025. In November 2025 the state EDA approved a 250 million US dollar tax credit for the roughly 1.76 billion US dollar project, reported at 250 MW. CoreWeave's own site page lists 40 MW of planned load. Opening is targeted for early 2027 amid growing local opposition. Kenilworth NEST 11 CoreWeave Kenilworth AI Data Center CoreWeave CoreWeave PSE&G New Jersey Economic Development Authority"}],"status_publishers":["CoreWeave"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ceb4cfa4ba358ea4547/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7ceb4cfa4ba358ea4547.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Real Estate NJ"]},{"site_id":"vcc-site-9b9b5ef71cedda52fd47","name":"CoreWeave/Chirisa Lancaster Greenfield Road Campus","country":"United States","country_iso_a2":"US","latitude":40.048690947149,"longitude":-76.25609093817,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"b75695b9-38e3-58ec-baf2-039179ab353a","name":"CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project","status":"under_construction","status_as_of":"2026-07-22","search_terms":"AI data center development in Lancaster, Pennsylvania, on former LSC Communications printing plant sites, co-developed by Chirisa Technology Parks and Machine Investment Group with CoreWeave as tenant. In July 2025 CoreWeave said it intended to commit about 6 billion US dollars to equip an initial 100 MW facility expandable to 300 MW. Phase one reuses the plant at 216 Greenfield Road and was under construction by October 2025, targeting summer 2027. A new-build phase two of about 735,000 sq ft needed city land development approval; a site at 1375 Harrisburg Pike is also planned. A 4 billion US dollar joint venture with Blue Owl funds the campus. Lancaster AI Hub Lancaster East data center Chirisa Technology Parks Machine Investment Group Machine Investment Group Blue Owl Capital CoreWeave CoreWeave PPL"}],"status_publishers":["Chirisa Technology Parks"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b9b5ef71cedda52fd47.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-418907144d1bd1426055","name":"CRA Prague Gateway Data Center Campus","country":"Czechia","country_iso_a2":"CZ","latitude":49.948186441032426,"longitude":14.36784629256487,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"acf9eda7-3b44-5e9b-8c40-62783a7e0aa0","name":"CRA Prague Gateway DC Current Campus Build","status":"under_construction","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["České Radiokomunikace a.s. (CRA)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-418907144d1bd1426055/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-418907144d1bd1426055.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Czech Office for Surveying, Mapping and Cadastre (CUZK)"]},{"site_id":"vcc-site-e19fd3b1049113579ba8","name":"Crag Digital Avoca (Echelon DUB20) data centre campus, Avoca River Park, Arklow, Co. Wicklow","country":"Ireland","country_iso_a2":"IE","latitude":52.8116088,"longitude":-6.179335,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"1e22552d-389b-50be-8fe3-592b1a6f7291","name":"Crag Digital Avoca DUB20 — three ICT facility (data centre) buildings with 60 emergency generators (Wicklow 23/72 as amended by 25/60806; EPA IE licence application P1240-01)","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Crag Digital Avoca Limited (agent Sweco Ireland Ltd), published by the Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e19fd3b1049113579ba8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e19fd3b1049113579ba8.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-0de0d46344f06fb773f2","name":"Cross Mill Center Data Center Site (Sycolin Road, south of Leesburg, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0629388,"longitude":-77.5504577,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"fea4b0c1-1d08-5b31-85f2-c2929ccc1efa","name":"Cross Mill Center — two proposed data center buildings (site plan EPLAN-2026-0140)","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0de0d46344f06fb773f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0de0d46344f06fb773f2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-c520ff5af3bcfa254443","name":"Crossroads Technology Campus (Mills Drive / Eagle Drive, Spotsylvania County)","country":"United States","country_iso_a2":"US","latitude":38.2333408,"longitude":-77.4507297,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"5d4c9287-5ace-5e89-8313-f1824d5dd822","name":"Crossroads Technology Campus — proposed seven-building data center campus (special use permit SUP26-0003)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c520ff5af3bcfa254443/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c520ff5af3bcfa254443.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Spotsylvania County, Virginia"]},{"site_id":"vcc-site-9f7647940a58e048e38f","name":"Crusoe Abilene AI factory campus for Microsoft","country":"United States","country_iso_a2":"US","latitude":32.45,"longitude":-99.75,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"31ee01b0-a72b-5f4a-bcc1-a13a53732efc","name":"Crusoe Abilene AI factory campus for Microsoft","status":"under_construction","status_as_of":"2026-07-15","search_terms":"Crusoe's second AI campus in Abilene, Texas, on Lancium-owned land adjacent to its first Abilene campus, announced in March 2026 to support large-scale AI workloads for Microsoft. The 900 MW site has two buildings, each designed for 336 MW of critical IT load, a 900 MW behind-the-meter on-site power plant paired with medium-voltage battery storage, and closed-loop, non-evaporative liquid cooling. Land clearing and site preparation were under way at announcement, Crusoe said in July 2026 that it was building the campus, and the first building is expected to be energized in mid-2027. Crusoe Abilene second campus Abilene 900 MW campus Crusoe Microsoft Lancium"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9f7647940a58e048e38f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9f7647940a58e048e38f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Crusoe"]},{"site_id":"vcc-site-5cc5c2b2cb554d5a3255","name":"Crusoe and Lancium Childress AI data center campus","country":"United States","country_iso_a2":"US","latitude":34.4281,"longitude":-100.215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"715ba9aa-f36a-5afb-b266-caeb7681b54e","name":"Crusoe and Lancium Childress AI data center campus","status":"announced","status_as_of":"2026-07-15","search_terms":"Crusoe and Lancium announced in July 2026 a grid-connected AI data center campus of 1.0 GW on 270 acres owned by Lancium in Childress, Texas, repeating the partnership model used at Abilene. Lancium owns the land, secures the interconnection and develops the energy infrastructure, including behind-the-meter solar and storage; Crusoe designs, builds and operates the data center for an unnamed hyperscale technology company. Construction was expected to start in the third quarter of 2026, using closed-loop liquid cooling. Childress County Clean Campus Crusoe Crusoe Lancium"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5cc5c2b2cb554d5a3255/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5cc5c2b2cb554d5a3255.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Crusoe"]},{"site_id":"vcc-site-f6a2889114e99d84b372","name":"Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)","country":"United States","country_iso_a2":"US","latitude":41.2737,"longitude":-104.7268,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["permitted"],"newest_status_as_of":"2026-07-08","oldest_status_as_of":"2026-07-08","project_count":1,"projects":[{"project_id":"7a05f519-bf3a-5423-bd7f-fcb8e1cd6c0f","name":"Crusoe and Tallgrass AI data center campus near Cheyenne (Project Jade)","status":"permitted","status_as_of":"2026-07-08","search_terms":"Crusoe and Tallgrass announced in July 2025 an AI data center campus in southeast Wyoming, starting at 1.8 GW and designed to scale to 10 GW, powered mainly by natural gas from Tallgrass's Wyoming assets and sited near Tallgrass's CO2 sequestration hub. Analyst Cleanview identifies it as Project Jade in Laramie County outside Cheyenne and reports a 900 MW fuel cell air permit application, county approval of the Switchgrass Industrial Park, unanimous site plan approval in January 2026, and phase 1 on-site generation since raised to 2.7 GW. Cleanview gives targets of early 2026 for construction and Q2 2027 for first energization. No tenant has been named. Project Jade Crusoe Wyoming campus Crusoe Tallgrass American Electric Power"}],"status_publishers":["Laramie County, Wyoming (Board of County Commissioners)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6a2889114e99d84b372/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6a2889114e99d84b372.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Tallgrass"]},{"site_id":"vcc-site-770ec5f91c36fa41886d","name":"CSC LUMI-AI Data Center","country":"Finland","country_iso_a2":"FI","latitude":64.2319866,"longitude":27.691477,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"5bfb4ad8-a8f4-5937-9242-a96f9292c385","name":"CSC LUMI-AI Data Center Current Build","status":"under_construction","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["CSC - IT Center for Science Ltd."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-770ec5f91c36fa41886d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-770ec5f91c36fa41886d.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-c77e1bff9259ec397770","name":"CtrlS Bengaluru Datacenter (Electronic City)","country":"India","country_iso_a2":"IN","latitude":12.8425375,"longitude":77.6712825,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"3328969b-12bc-5ceb-bfe1-ca4e36ea5b1b","name":"CtrlS Bengaluru Datacenter — existing operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c77e1bff9259ec397770/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c77e1bff9259ec397770.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-7a48afbd332e0560f535","name":"CtrlS Chandanvelly AI-ready data center park","country":"India","country_iso_a2":"IN","latitude":17.2327,"longitude":78.1713,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-01-23","oldest_status_as_of":"2025-01-23","project_count":1,"projects":[{"project_id":"0d416a87-60ba-5c1d-a419-a94965619724","name":"CtrlS Chandanvelly AI-ready data center park","status":"announced","status_as_of":"2025-01-23","search_terms":"CtrlS Datacenters announced in January 2025 a 40-acre data center park at the planned Chandanvelly Industrial Park near Hyderabad, Telangana, designed for more than 600 MW of IT load at full build. CtrlS said 250 MW of power had been sanctioned for the first phase, served by a dedicated gas-insulated substation expandable to 900 MW, with buildings designed for up to 135 kW per rack and immersion cooling up to 300 kW per rack. No construction update was found. CtrlS Hyderabad datacenter park CtrlS Datacenters Ltd"}],"status_publishers":["W.Media"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a48afbd332e0560f535/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7a48afbd332e0560f535.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-092db086ba59b630b16d","name":"CtrlS Chennai Datacenter Park (Ambattur Industrial Estate)","country":"India","country_iso_a2":"IN","latitude":13.107083,"longitude":80.1629378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-10-23","project_count":1,"projects":[{"project_id":"44e1b458-0352-5802-829c-20ca66739fad","name":"CtrlS Chennai Datacenter Park — existing operations (two-building park)","status":"operational","status_as_of":"2026-10-23","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-092db086ba59b630b16d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-092db086ba59b630b16d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-788e3c41c2d9ef023cd2","name":"CtrlS Hyderabad Financial District Datacenter","country":"India","country_iso_a2":"IN","latitude":17.4233287,"longitude":78.3303868,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"07e7b1f6-3f2e-5631-9bac-62c9f443b2f4","name":"CtrlS Hyderabad Financial District datacenter — existing operations (operator-mapped facility, DC2 or DC3)","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-788e3c41c2d9ef023cd2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-788e3c41c2d9ef023cd2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c6ffe3d21cef95a1de82","name":"CtrlS Kolkata New Town Datacenter Campus","country":"India","country_iso_a2":"IN","latitude":22.6141551,"longitude":88.462587,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"289f7324-bc4a-5d14-b418-9e28a63dfecb","name":"CtrlS Kolkata-DC1 (first phase)","status":"operational","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c6ffe3d21cef95a1de82/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c6ffe3d21cef95a1de82.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-94af7d57293a1b3a103b","name":"CtrlS Mumbai Datacenter Campus (Mahape, Navi Mumbai)","country":"India","country_iso_a2":"IN","latitude":19.1082134,"longitude":73.023588,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"49268cbe-5462-5e7f-b1ba-7aa011b30472","name":"CtrlS Mumbai Datacenter Campus — existing operations of Mumbai DC1 to DC5","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94af7d57293a1b3a103b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94af7d57293a1b3a103b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c7ddba9644af8bc54913","name":"CtrlS Noida Datacenter (Sector 127)","country":"India","country_iso_a2":"IN","latitude":28.5313027,"longitude":77.3509363,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"18b7738e-b22c-58cc-a1eb-ee1e733a1077","name":"CtrlS Noida DC1 — existing operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["CtrlS Datacenters Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c7ddba9644af8bc54913/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c7ddba9644af8bc54913.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-128ad9b41686ba9b0c03","name":"CX Technology Campus, land north of the former Chapelcross power station, near Annan","country":"United Kingdom","country_iso_a2":"GB","latitude":55.0228064,"longitude":-3.221896,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"3324da97-b2e9-51d8-99bc-66096fffd3c9","name":"CX Technology Campus - proposed eight-building data centre campus (planning permission in principle application, 29 September 2026)","status":"announced","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["CX Tech Limited"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-128ad9b41686ba9b0c03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-128ad9b41686ba9b0c03.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CX Tech Limited"]},{"site_id":"vcc-site-d5d70748e492c5e2278a","name":"CyrusOne Aurora Diehl Road Campus","country":"United States","country_iso_a2":"US","latitude":41.798071182484,"longitude":-88.243410186001,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"cf028790-cea6-555d-a3bb-48e08ff78f3b","name":"CyrusOne Aurora CHI2 Permanent Sound-Mitigation Capital Retrofit","status":"completed","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d5d70748e492c5e2278a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d5d70748e492c5e2278a.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-119a6992bb6bb25cc011","name":"CyrusOne Bosque County data center campus (Thad Hill)","country":"United States","country_iso_a2":"US","latitude":31.9,"longitude":-97.63,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-11-03","oldest_status_as_of":"2025-11-03","project_count":1,"projects":[{"project_id":"79276528-66df-572a-8baf-0afce2bb01e4","name":"CyrusOne Bosque County data center campus (Thad Hill)","status":"under_construction","status_as_of":"2025-11-03","search_terms":"Hyperscale data center campus that CyrusOne is building next to Calpine's Thad Hill Energy Center in Bosque County, Texas, under a powered land agreement covering power, grid connection and land. Calpine announced a 190 MW first phase in July 2025, when the project was reported as a USD 1.2 billion investment, and added 210 MW in November 2025 for 400 MW in total. Calpine then said the facility was under construction for operation by the fourth quarter of 2026. CyrusOne's campus page now lists five buildings in two phases, with phase 1 due by the third quarter of 2027 and all phases by the fourth quarter of 2027. CyrusOne DFW10 Bosque County Data Center Thad Hill Energy Center data center CyrusOne CyrusOne Calpine"}],"status_publishers":["Calpine"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-119a6992bb6bb25cc011/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-119a6992bb6bb25cc011.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["American Public Power Association"]},{"site_id":"vcc-site-21ab745e53a2c9233b3f","name":"CyrusOne Fort Worth Campus (DFW7 and DFW8, Asphalt Drive)","country":"United States","country_iso_a2":"US","latitude":32.9006121,"longitude":-97.3898983,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"5a51a37a-28cd-5e9e-b75d-400711c28627","name":"CyrusOne DFW8 interior fit-out (data halls and generator yard)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-21ab745e53a2c9233b3f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-21ab745e53a2c9233b3f.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Tarrant Appraisal District data)"]},{"site_id":"vcc-site-274ba04f1a143a081314","name":"CyrusOne FRA7 Frankfurt Westside Campus","country":"Germany","country_iso_a2":"DE","latitude":50.093438822,"longitude":8.5805137288,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-12","oldest_status_as_of":"2026-06-12","project_count":1,"projects":[{"project_id":"58f9a985-bfa8-521c-ab85-132aec6799ed","name":"CyrusOne FRA7 Current Multi-Building Development","status":"under_construction","status_as_of":"2026-06-12","search_terms":""}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-274ba04f1a143a081314/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-274ba04f1a143a081314.json","geometry_licenses":["rights-status-not-established"],"geometry_attributions":["Regierungspräsidium Darmstadt"]},{"site_id":"vcc-site-4776103546341c240223","name":"CyrusOne Freestone County data center campus","country":"United States","country_iso_a2":"US","latitude":31.7183,"longitude":-96.1697,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a5618437-38a6-5fd0-a340-56ab10f1e97b","name":"CyrusOne Freestone County data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Multiphase data center campus planned by CyrusOne next to Calpine's Freestone Energy Center in Freestone County, Texas, about 80 miles southeast of Dallas near Fairfield. In February 2026 Calpine, by then part of Constellation, signed a 380 MW agreement providing power, grid connectivity and site infrastructure, plus an exclusive agreement to serve a second 380 MW phase. CyrusOne's campus page lists the project as in development and still awaiting county approval, with more than USD 500 million of investment across phases, power from both the grid and on-site generation, and closed-loop cooling. Freestone County Data Center Freestone Energy Center data center CyrusOne Calpine"}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4776103546341c240223/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4776103546341c240223.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["CyrusOne"]},{"site_id":"vcc-site-cf70f4b9add26d9ba26a","name":"CyrusOne Mesa PHX20 Data Center Campus (3255 S 96th St, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3557214,"longitude":-111.6228473,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"f0d20481-63ea-55dd-9ca7-cebf2f4def68","name":"CyrusOne Mesa PHX20 — Shell Building 1, two-storey 243,332 sq ft data hall building under construction (Mesa permit PMT25-13240)","status":"under_construction","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cf70f4b9add26d9ba26a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cf70f4b9add26d9ba26a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-72215030ee46f7977c35","name":"CyrusOne Yorkville Technology Campus","country":"United States","country_iso_a2":"US","latitude":41.67716859169509,"longitude":-88.48222230060607,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"eaea9fff-9fd3-506f-a490-320f64d86dc3","name":"CyrusOne Yorkville Current Site Work","status":"site_preparation","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["CyrusOne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72215030ee46f7977c35/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72215030ee46f7977c35.json","geometry_licenses":["county-public-gis-fact-extraction-only"],"geometry_attributions":["Kendall County GIS"]},{"site_id":"vcc-site-2c055eade62aa3fef4a9","name":"Dansk Data Center 1 Esbjerg Campus","country":"Denmark","country_iso_a2":"DK","latitude":55.45823408,"longitude":8.45990497,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"52d209cc-c8cd-5f8a-8337-cd887187f383","name":"Dansk Data Center 1 Current Build","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Copenhagen Infrastructure Partners"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2c055eade62aa3fef4a9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2c055eade62aa3fef4a9.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Klimadatastyrelsen / Danmarks Adresseregister (DAR); CC BY 4.0"]},{"site_id":"vcc-site-e6b61ca210eeece21cf5","name":"Daou Jukjeon CDC Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.332064,"longitude":127.132427,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"057826b7-3798-5e94-9628-e76e45647c61","name":"Daou Jukjeon CDC Current Build","status":"under_construction","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Daou Technology Inc."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6b61ca210eeece21cf5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6b61ca210eeece21cf5.json","geometry_licenses":["CC-BY-4.0","all-rights-reserved"],"geometry_attributions":["Daou Technology Inc.","Google"]},{"site_id":"vcc-site-fe2aebe364c3b7dd4ae8","name":"Data Center Nostrum Evergreen (DC Badajoz), Plataforma Logística del Suroeste Europeo","country":"Spain","country_iso_a2":"ES","latitude":38.9061756,"longitude":-7.0010102,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"3fe9d3c2-f9dd-5560-b63d-2d12b21d2428","name":"Data Center Nostrum Evergreen (DC Badajoz) - planned data centre with 300 MW grid access","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Agencia Estatal Boletín Oficial del Estado"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe2aebe364c3b7dd4ae8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe2aebe364c3b7dd4ae8.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-3ea8e4aa476b337b961c","name":"Data Tank Nordic Utajärvi Campus (Mustikkakangas, Prosessitie)","country":"Finland","country_iso_a2":"FI","latitude":64.73442719,"longitude":26.46531028,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"cc3e771b-9291-5917-81e3-83c54a7d3fa6","name":"Data Tank Nordic Utajärvi — four-building data-centre campus (permit 26-0014-RL, Prosessitie)","status":"site_preparation","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Utajärven kunta (Municipality of Utajärvi)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3ea8e4aa476b337b961c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3ea8e4aa476b337b961c.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Finnish Environment Institute Ryhti; CC BY 4.0"]},{"site_id":"vcc-site-9110ab1aaf7969ec33fc","name":"Data World Matatirtha Campus","country":"Nepal","country_iso_a2":"NP","latitude":27.6786359,"longitude":85.2365411,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"36ac2490-7d9c-51f3-96c4-1344481aa4e2","name":"Data World Matatirtha Core Data Center Current Build","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["International Finance Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9110ab1aaf7969ec33fc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9110ab1aaf7969ec33fc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Data World"]},{"site_id":"vcc-site-b373552fd2347b1b42eb","name":"Data4 Athens Campus ATH01 - HERMES (Paiania)","country":"Greece","country_iso_a2":"GR","latitude":37.944187,"longitude":23.872813,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"363dbab8-aaa3-5da4-85ff-c80f749311a2","name":"Data4 ATH01 - HERMES DC01 — completed first-phase data-centre spaces (part of building K1, with gatehouse and HEDNO substation)","status":"completed","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Περιφέρεια Αττικής (Region of Attica); filing by DATA 4 GREECE Μονοπρόσωπη Α.Ε. in the OPS-ADE notification system"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b373552fd2347b1b42eb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b373552fd2347b1b42eb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Περιφέρεια Αττικής / Πληροφοριακό Σύστημα Άσκησης Δραστηριοτήτων και Ελέγχων (ΟΠΣ-ΑΔΕ)"]},{"site_id":"vcc-site-14a570a5f1dfb8b45e8d","name":"Data4 Cambrai E-Valley campus","country":"France","country_iso_a2":"FR","latitude":50.22,"longitude":3.1765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-06-11","oldest_status_as_of":"2026-06-11","project_count":1,"projects":[{"project_id":"f0697b74-aa81-5aca-ab5b-95a2591d7b2c","name":"Data4 Cambrai E-Valley campus","status":"announced","status_as_of":"2026-06-11","search_terms":"Data4, the data center unit of Brookfield, is planning a campus of up to 1 GW at E-Valley on the former Cambrai military air base (BA 103) in northern France. Brookfield's February 2025 France pledge was reported to direct about EUR 15 billion to a Cambrai data center. A June 2026 local report cites a first 300 MW tranche, works from the second half of 2026 and first deliveries in 2027-2028. Enedis tendered about 29 km of medium-voltage cabling in April 2026 to feed four customer substations at the site, with the works set for 2027. E-Valley data center campus Brookfield Cambrai data center Data4 Brookfield Enedis Préfecture du Nord"}],"status_publishers":["info.fr"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-14a570a5f1dfb8b45e8d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-14a570a5f1dfb8b45e8d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Enedis (via Marchés Online)"]},{"site_id":"vcc-site-3b5d1fe13cf00d04d3f2","name":"Data4 Escaudain campus","country":"France","country_iso_a2":"FR","latitude":50.3333,"longitude":3.3438,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"f0afff75-0b96-5e18-a8f9-08ac9a4b99ff","name":"Data4 Escaudain campus","status":"announced","status_as_of":"2026-06-15","search_terms":"Data4, the Brookfield-owned European data center developer, plans a EUR 5 billion, 700 MW AI-oriented campus on the Parc des Soufflantes brownfield in Escaudain, northern France, the former Usinor steelworks. The local authority La Porte du Hainaut picked Data4 in December 2025; after feasibility studies Data4 confirmed the project in June 2026, with further studies and preliminary works over the following year and four data center buildings to follow. The site was among the French government and RTE fast-track grid sites. Parc des Soufflantes data center campus Data4 Brookfield Communauté d'Agglomération de La Porte du Hainaut"}],"status_publishers":["Data4"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3b5d1fe13cf00d04d3f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3b5d1fe13cf00d04d3f2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Data4"]},{"site_id":"vcc-site-4a5d5083c6a8b110c612","name":"Data4 Hanau campus","country":"Germany","country_iso_a2":"DE","latitude":50.1,"longitude":8.95,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-03-11","oldest_status_as_of":"2026-03-11","project_count":1,"projects":[{"project_id":"c53b72b6-ff87-58eb-b74f-7082b159a513","name":"Data4 Hanau campus","status":"under_construction","status_as_of":"2026-03-11","search_terms":"Data4's first German campus, on a former military base in the Großauheim district of Hanau, about 30 minutes from central Frankfurt. Data4, owned by Brookfield, plans 180 MW of power capacity for cloud and AI customers and in September 2025 doubled its planned investment from EUR 1 billion to more than EUR 2 billion when it laid the foundations. The plan includes a combined heat and power plant, a substation, decarbonised energy and waste heat for local district heating. Trade press described the campus as under construction in March 2026; no operating date has been published. Data4 Großauheim campus Data4 Data4 Data4 Brookfield"}],"status_publishers":["Capacity"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4a5d5083c6a8b110c612/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4a5d5083c6a8b110c612.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Data4"]},{"site_id":"vcc-site-9621cf551283f98bcd19","name":"DataBank Ashburn Campus (IAD1, IAD3 and IAD4, Red Rum Drive)","country":"United States","country_iso_a2":"US","latitude":39.0165204,"longitude":-77.4821506,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"4e5b5848-9f73-544e-93c0-3de662895673","name":"DataBank Ashburn Campus — existing IAD1 and IAD3 data-centre operations","status":"operational","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9621cf551283f98bcd19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9621cf551283f98bcd19.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-af76a0cab4321a3114ec","name":"DataBank ATL1 Midtown Atlanta (Coda, 760 West Peachtree Street)","country":"United States","country_iso_a2":"US","latitude":33.775481513,"longitude":-84.38775882,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-26","oldest_status_as_of":"2026-09-26","project_count":1,"projects":[{"project_id":"a6a5d4da-ea06-58ef-bd68-fafa2762f626","name":"DataBank ATL1 — existing Midtown Atlanta data-centre operations","status":"operational","status_as_of":"2026-09-26","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af76a0cab4321a3114ec/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af76a0cab4321a3114ec.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-f0b8b7f1e16f3d11eb7a","name":"DataBank Atlanta West End Complex (ATL2 and ATL3, White Street SW)","country":"United States","country_iso_a2":"US","latitude":33.7341341,"longitude":-84.425927,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"cf23693c-99f9-5353-9aa6-4f2bff324fe8","name":"DataBank ATL2 and ATL3 — existing West End data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f0b8b7f1e16f3d11eb7a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f0b8b7f1e16f3d11eb7a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-9db8ce819a3ab5f33a6f","name":"DataBank Centennial Campus (Centennial, Colorado)","country":"United States","country_iso_a2":"US","latitude":39.5908126,"longitude":-104.8469456,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-27","oldest_status_as_of":"2026-09-27","project_count":1,"projects":[{"project_id":"d997e0c0-4c8e-5e1d-9c10-ba8b0d50b8cb","name":"DataBank Centennial Campus — existing DEN2 and DEN5 data-centre operations","status":"operational","status_as_of":"2026-09-27","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9db8ce819a3ab5f33a6f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9db8ce819a3ab5f33a6f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-bc692da62a6f8f326b7d","name":"DataBank DEN1 Englewood Data Center (393 Inverness Parkway)","country":"United States","country_iso_a2":"US","latitude":39.5640232,"longitude":-104.8665716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"04f79b5a-e5fd-59f0-9abe-74a0428c5891","name":"DataBank DEN1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bc692da62a6f8f326b7d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bc692da62a6f8f326b7d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-187ee66b58718aeb9633","name":"DataBank DEN3 Downtown Denver Data Center (1500 Champa Street)","country":"United States","country_iso_a2":"US","latitude":39.7457609,"longitude":-104.9944018,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"c747338c-1512-5adf-92dc-bb6b49c0b0de","name":"DataBank DEN3 — existing carrier-hotel data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-187ee66b58718aeb9633/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-187ee66b58718aeb9633.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; county assessor source data"]},{"site_id":"vcc-site-9baf932720ede1abab4a","name":"DataBank DEN4 Westminster Data Center (7579 W. 103rd Avenue)","country":"United States","country_iso_a2":"US","latitude":39.884557,"longitude":-105.0803133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"0f38059a-8dd4-537d-b4a3-71ac9b3c1f4a","name":"DataBank DEN4 — existing edge colocation data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9baf932720ede1abab4a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9baf932720ede1abab4a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; Jefferson County source data"]},{"site_id":"vcc-site-77d8a26c721e8f4fbc69","name":"DataBank Granite Point Campus (Bluffdale, Utah)","country":"United States","country_iso_a2":"US","latitude":40.4803793,"longitude":-111.9053312,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-26","oldest_status_as_of":"2026-09-26","project_count":1,"projects":[{"project_id":"f58ddab9-5f4e-5bd7-9c02-2f6487b4718d","name":"DataBank Granite Point Campus — existing SLC2–SLC6 data-centre operations","status":"operational","status_as_of":"2026-09-26","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77d8a26c721e8f4fbc69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77d8a26c721e8f4fbc69.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-b8c4e3db81b026f4e42c","name":"DataBank LAS1 Las Vegas Data Center (7185 Pollock Drive)","country":"United States","country_iso_a2":"US","latitude":36.0597824,"longitude":-115.1472861,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"53737920-2d47-5535-b321-6820471017bd","name":"DataBank LAS1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b8c4e3db81b026f4e42c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b8c4e3db81b026f4e42c.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-e45c459adff2c9da2ec5","name":"DataBank Lithia Springs Campus (ATL5 and ATL6, 4764 Bakers Ferry Rd SW, South Fulton)","country":"United States","country_iso_a2":"US","latitude":33.7426011,"longitude":-84.5383195,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"29a845f4-112d-500b-85ca-b786282e0d1a","name":"DataBank Lithia Springs Campus — ATL5 and ATL6 campus under construction","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e45c459adff2c9da2ec5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e45c459adff2c9da2ec5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-57d107faa5247458cea1","name":"DataBank MSP2 East Twin Cities Data Center (3255 Neil Armstrong Blvd, Eagan, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.8385707,"longitude":-93.145692,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"866630e0-257c-5936-8fa6-226de93a1936","name":"DataBank MSP2 — existing data-centre and carrier-hotel operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["DataBank"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-57d107faa5247458cea1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-57d107faa5247458cea1.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-e172e840f11c02402a49","name":"DataBank Orangeburg Campus (LGA3 and LGA4, 2000 Corporate Drive, Orangetown)","country":"United States","country_iso_a2":"US","latitude":41.0389044,"longitude":-73.9892114,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-09-01","project_count":2,"projects":[{"project_id":"9abe9b09-5035-5fde-b234-6062a5560f17","name":"DataBank Orangeburg LGA3 — existing data-centre operations","status":"operational","status_as_of":"2026-10-23","search_terms":""},{"project_id":"2e73ce88-4229-5c12-9db4-be3401e390b7","name":"DataBank Orangeburg LGA4 (Orangeburg Phase Two) — proposed second data center on the campus","status":"announced","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e172e840f11c02402a49/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e172e840f11c02402a49.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Rockland County; NYS ITS Geospatial Services; NYS Department of Taxation and Finance ORPTS"]},{"site_id":"vcc-site-32ea75e1ed330783f230","name":"DataBank Plano Campus (Plano, Texas)","country":"United States","country_iso_a2":"US","latitude":33.0871471,"longitude":-96.8156038,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"e7df021c-ec4b-57f4-8937-11b18efe1643","name":"DataBank DFW3 (Plano) — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32ea75e1ed330783f230/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32ea75e1ed330783f230.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Collin Central Appraisal District data)"]},{"site_id":"vcc-site-de7d1b5d61517ef55cfe","name":"DataBank Red Oak Campus","country":"United States","country_iso_a2":"US","latitude":32.53823002269006,"longitude":-96.73491416900481,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-26","oldest_status_as_of":"2026-07-26","project_count":1,"projects":[{"project_id":"546bf83f-2bb4-5539-b576-6b7100981420","name":"DataBank Red Oak First-Phase Current Construction","status":"under_construction","status_as_of":"2026-07-26","search_terms":""}],"status_publishers":["DataBank"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-de7d1b5d61517ef55cfe/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-de7d1b5d61517ef55cfe.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["DataBank","Ellis County, Texas GIS"]},{"site_id":"vcc-site-ff9c8cdfa2e24daca416","name":"DataBank SFO1 Silicon Valley Data Center (5101 Lafayette Street, Santa Clara)","country":"United States","country_iso_a2":"US","latitude":37.4073288,"longitude":-121.9660911,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"ef0ac8ea-e156-5648-a4d0-54051a5ac41a","name":"DataBank SFO1 — existing data-centre operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["DataBank Holdings, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff9c8cdfa2e24daca416/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff9c8cdfa2e24daca416.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-4d899f62f639bc060a4d","name":"DataBank SLC1 Downtown Salt Lake City Data Center (179 E Social Hall Ave)","country":"United States","country_iso_a2":"US","latitude":40.7685183,"longitude":-111.8858384,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"8b974de3-210e-55e7-892f-24e54ce3fa37","name":"DataBank SLC1 — existing downtown data-centre and carrier-hotel operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4d899f62f639bc060a4d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4d899f62f639bc060a4d.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-803560469e6170c4886f","name":"DataBank Summit Park Campus (PIT2, 35 Summit Park Dr, North Fayette Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.4518833,"longitude":-80.1909809,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"521cffe2-e035-55c0-a7c6-7e6cc7fef7f8","name":"DataBank PIT2 Summit Park Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["DataBank, Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-803560469e6170c4886f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-803560469e6170c4886f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Allegheny County, Pennsylvania"]},{"site_id":"vcc-site-f72817dc402c9746aa98","name":"Datagrid Makarewa AI Data Centre Campus","country":"New Zealand","country_iso_a2":"NZ","latitude":-46.336918157557804,"longitude":168.38751216734653,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"c71872a1-fc95-5d5b-8ee8-6b5082e974df","name":"Datagrid Makarewa Initial Horizontal Works","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Datagrid New Zealand"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f72817dc402c9746aa98/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f72817dc402c9746aa98.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Crown copyright - Land Information New Zealand; CC BY 4.0"]},{"site_id":"vcc-site-c14008c0552564c11274","name":"DataOne Vineland Two-Phase AI Data Center Facility","country":"United States","country_iso_a2":"US","latitude":39.42519221884926,"longitude":-75.01347153097437,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-08-07","project_count":2,"projects":[{"project_id":"5ace12f8-658e-5956-9173-d78e625d4df9","name":"DataOne Vineland Phase 2 Expansion Current Build","status":"under_construction","status_as_of":"2026-08-07","search_terms":""},{"project_id":"38cbdb58-5ff7-504d-98be-60187be91e02","name":"Nebius Vineland AI factory","status":"under_construction","status_as_of":"2026-10-09","search_terms":"AI data center in Vineland, New Jersey, designed, built, owned and operated by DataOne with Nebius as tenant owning the servers and GPUs, and Vineland-based Northeast Precast as builder. A May 2025 Nebius filing describes a phased development scalable up to 300 MW, with construction begun in early 2025. Nebius named the site in its September 2025 agreement to supply Microsoft with dedicated GPU capacity, valued at about 17.4 billion US dollars through 2031. Power is to come from on-site, off-grid Bloom Energy fuel cells. Nebius's project page says construction is ongoing and the AI factory is expected to be operational by 2027. Nebius x Vineland DataOne DataOne DataOne Nebius Northeast Precast Bloom Energy Microsoft City of Vineland"}],"status_publishers":["City of Vineland Planning Board","Nebius"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c14008c0552564c11274/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c14008c0552564c11274.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Vineland GIS / Engineering"]},{"site_id":"vcc-site-8511f5b23fe433a2c61f","name":"dataR Rellingen Data Center Campus","country":"Germany","country_iso_a2":"DE","latitude":53.6349521,"longitude":9.8728278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"5443b4c1-09dc-5f14-a9a3-ec32c05602fb","name":"dataR Rellingen Current Construction","status":"under_construction","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["dataR GmbH"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8511f5b23fe433a2c61f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8511f5b23fe433a2c61f.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Wiki contributors","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-ad58c35abfe93060c2c2","name":"DataVita Lanarkshire AI Growth Zone campus (Chapelhall)","country":"United Kingdom","country_iso_a2":"GB","latitude":55.835,"longitude":-3.9444,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"d63cbbf2-d501-5bf8-83d4-befc76c4bb39","name":"DataVita Lanarkshire AI Growth Zone campus (Chapelhall)","status":"under_construction","status_as_of":"2026-09-02","search_terms":"DataVita, part of HFD Group, is expanding its data centre campus at Chapelhall near Airdrie, North Lanarkshire, which the UK government named an AI Growth Zone in January 2026, Scotland's first, with GBP 8.2bn of private investment and plans for more than 500 MW of on-site power generation within four years. CoreWeave partnered with DataVita on a GBP 1.5bn AI deployment in 2025 and has contracted the full capacity of an expanded DV1 and a new DV3 building for 15 years. DV3 was under construction in 2026, backed by a roughly GBP 300m debt facility, and in September 2026 DataVita said it had applied for planning permission in principle for a further building, DV4. Lanarkshire AI Growth Zone SAIZ Project DataVita Chapelhall campus DataVita DataVita DataVita CoreWeave National Wealth Fund UK Government North Lanarkshire Council"}],"status_publishers":["DataVita"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ad58c35abfe93060c2c2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ad58c35abfe93060c2c2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["UK Government"]},{"site_id":"vcc-site-a55b68896de9ae43657e","name":"DataVolt Oxagon AI data centre campus (NEOM)","country":"Saudi Arabia","country_iso_a2":"SA","latitude":27.5679,"longitude":35.546,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"016877e7-a475-5ebe-9219-0ac699cfff53","name":"DataVolt Oxagon AI data centre campus (NEOM)","status":"under_construction","status_as_of":"2026-10-21","search_terms":"Saudi developer DataVolt plans a 1.5 GW AI data centre campus at Oxagon, NEOM's industrial city on the Red Sea coast, on land leased from Oxagon. Under the February 2025 agreement DataVolt committed an initial USD 5 billion to the first phase, which is meant to run on renewable power. In August 2026 DataVolt and HUMAIN broke ground on a jointly developed 100 MW block within a 360 MW first phase, with the first 100 MW expected in service in 2028. Semafor reported in September 2026 that the initial facility would cost about USD 1 billion, and DataVolt's chief executive said the compute would be sold to customers abroad. NEOM net-zero AI factory campus Oxagon AI data center campus DataVolt DataVolt DataVolt HUMAIN"}],"status_publishers":["DataVolt"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a55b68896de9ae43657e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a55b68896de9ae43657e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NEOM"]},{"site_id":"vcc-site-7640a30b806a3ae123de","name":"Datum Farnborough Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":51.2803199,"longitude":-0.7967507,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"50d0a2d0-6726-5641-88bb-e0b39fa1a4dc","name":"Datum FRN2 Data Centre Building","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Datum Datacentres Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7640a30b806a3ae123de/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7640a30b806a3ae123de.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps; campus link selected by Datum"]},{"site_id":"vcc-site-2cd20da1713bb0fcfc78","name":"Datum Manchester Campus (Wavell Road, Wythenshawe)","country":"United Kingdom","country_iso_a2":"GB","latitude":53.3791257,"longitude":-2.2586245,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"55b4b687-267c-52da-9a78-f5783bf2559f","name":"Datum Manchester MCR1 and MCR2 — existing operations","status":"operational","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Datum Datacentres Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2cd20da1713bb0fcfc78/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2cd20da1713bb0fcfc78.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-b020cba78b5fa2123866","name":"DayOne Chonburi Tech Park (CTP) data center campus","country":"Thailand","country_iso_a2":"TH","latitude":13.217,"longitude":101.183,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["operational"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"e934864d-423f-5afa-a9a8-09bd05079ee1","name":"DayOne Chonburi Tech Park (CTP) data center campus","status":"operational","status_as_of":"2026-09-20","search_terms":"DayOne Data Centers, a Singapore-based operator, is building the Chonburi Tech Park hyperscale campus in the AMATA City area of Chonburi province, southeast of Bangkok. Groundbreaking was reported in March 2025 for a design of 180 MW of grid capacity in two phases, which trade press tied to a US$1 billion multi-year investment. In November 2025 DayOne added adjacent land that lifts the first site (CTP1) to 300 MW and signed an MoU with Amata for a second plot (CTP2) aimed at a 1 GW platform, plus a floating-solar supply deal. In April 2026 DayOne said more than 100 MW of IT capacity was expected to go live during 2026. Chonburi Tech Park CTP1 CTP2 DayOne Chonburi DayOne Data Centers Amata B.Grimm Renewable Energy (AMBRE) Provincial Electricity Authority (PEA)"}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b020cba78b5fa2123866/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b020cba78b5fa2123866.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Intelligent CIO APAC"]},{"site_id":"vcc-site-458af89082928e776bd0","name":"DayOne Imari Data Center Campus","country":"Japan","country_iso_a2":"JP","latitude":33.260395,"longitude":129.937257,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"cbbbbaa7-eb91-565b-af59-a181348ad761","name":"DayOne Imari Data Center Campus Development","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["DayOne"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-458af89082928e776bd0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-458af89082928e776bd0.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Nikkan Kogyo Shimbun"]},{"site_id":"vcc-site-efc2f094dac7b05317ca","name":"DayOne Kempas Tech Park (KTP) Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.5598368,"longitude":103.7144197,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"6e2e8be0-c4d1-5273-8729-654a0ae8e078","name":"DayOne KTP Data Center Campus — in-service capacity","status":"operational","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efc2f094dac7b05317ca/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-efc2f094dac7b05317ca.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-5a7d73c964538b72f14d","name":"DayOne Kiveriö Unnamed Data Center Campus","country":"Finland","country_iso_a2":"FI","latitude":60.990755708567505,"longitude":25.703874164769484,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"fe92035e-3a00-5a85-b009-34fe9c2c545e","name":"DayOne Kiveriö Unnamed Data Center Construction Project","status":"under_construction","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5a7d73c964538b72f14d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5a7d73c964538b72f14d.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Contains data from the National Land Survey of Finland, INSPIRE Cadastral Parcels, delivered 9 September 2026; reference point transformed from EPSG:3067 to EPSG:4326.","National Land Survey of Finland"]},{"site_id":"vcc-site-4c87177eb4819af9906b","name":"DayOne Kouvola Koria Data Center Campus","country":"Finland","country_iso_a2":"FI","latitude":60.84448911,"longitude":26.63056358,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"61b29115-2dd5-5c0e-af29-3eba5f17105e","name":"DayOne Kouvola Koria Data Center — current build","status":"under_construction","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c87177eb4819af9906b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c87177eb4819af9906b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Finnish Environment Institute Ryhti; CC BY 4.0"]},{"site_id":"vcc-site-163f6ec5acc49b77191a","name":"DayOne Nusajaya Tech Park (NTP) Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.4343726,"longitude":103.5996637,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-20","oldest_status_as_of":"2026-09-20","project_count":1,"projects":[{"project_id":"dbd454ed-d18b-5803-a777-bfd874dcfe22","name":"DayOne NTP Data Center Campus — in-service capacity","status":"operational","status_as_of":"2026-09-20","search_terms":""}],"status_publishers":["DayOne Data Centers Limited via SEC EDGAR"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-163f6ec5acc49b77191a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-163f6ec5acc49b77191a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-0e7ae0fbb3ce3d7446b5","name":"DC BLOX Huntsville Data Center (333 Diamond Drive NW)","country":"United States","country_iso_a2":"US","latitude":34.7118221,"longitude":-86.6921541,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"d2238225-370a-5c05-9e93-ce7092d5d619","name":"DC BLOX Huntsville — existing Tier III colocation data-centre operations","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["DC BLOX, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0e7ae0fbb3ce3d7446b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0e7ae0fbb3ce3d7446b5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["DC BLOX"]},{"site_id":"vcc-site-98db1c10877fca784aba","name":"DC BLOX Palm Coast Cable Landing Station and Colocation Campus","country":"United States","country_iso_a2":"US","latitude":29.495434584291427,"longitude":-81.1973193341733,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-19","oldest_status_as_of":"2026-06-19","project_count":1,"projects":[{"project_id":"d5b84301-4f54-5958-a0d1-fd2c5a72cc5b","name":"DC BLOX Palm Coast Approved First Building Current Construction","status":"under_construction","status_as_of":"2026-06-19","search_terms":""}],"status_publishers":["City of Palm Coast"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98db1c10877fca784aba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98db1c10877fca784aba.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Palm Coast","City of Palm Coast; Flagler Property Appraiser"]},{"site_id":"vcc-site-6feeada268c64029b9d1","name":"DC Terranova Alto Jahuel Data Center","country":"Chile","country_iso_a2":"CL","latitude":-33.718587981578,"longitude":-70.689682900561,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-24","oldest_status_as_of":"2026-07-24","project_count":1,"projects":[{"project_id":"3e912a87-1f2e-5b29-b0f2-f9bb8edded71","name":"Habilitación Data Center Alto Jahuel","status":"announced","status_as_of":"2026-07-24","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental, Dirección Regional Metropolitana"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6feeada268c64029b9d1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6feeada268c64029b9d1.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; DC Terranova SpA"]},{"site_id":"vcc-site-037ab371e8e7c232e27b","name":"DCI Data Center La Pólvora","country":"Chile","country_iso_a2":"CL","latitude":-33.0848225,"longitude":-71.6199437,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"15447405-dc44-5e99-813a-b4f287488f6d","name":"Data Center La Pólvora — initial proposal","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Región de Valparaíso, Chile"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-037ab371e8e7c232e27b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-037ab371e8e7c232e27b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; DCI La Polvora SpA"]},{"site_id":"vcc-site-c99be9c2be480c8126b3","name":"Delska LV DC4 Data Center, Latgales iela 463, Riga","country":"Latvia","country_iso_a2":"LV","latitude":56.8883092,"longitude":24.2347865,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"543c1171-a8f1-57dd-9915-4a23f65bea2f","name":"Delska LV DC4 Riga — proposed new data-centre building","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Būvniecības informācijas sistēma (BIS); case held by Rīgas valstspilsētas pašvaldības Pilsētas attīstības departaments"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c99be9c2be480c8126b3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c99be9c2be480c8126b3.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Valsts zemes dienests"]},{"site_id":"vcc-site-9bb64eeea962a4cadd06","name":"Deutsche Telekom Industrial AI Cloud, Munich Tucherpark","country":"Germany","country_iso_a2":"DE","latitude":48.1527,"longitude":11.5991,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-02-04","oldest_status_as_of":"2026-02-04","project_count":1,"projects":[{"project_id":"54782d37-d21e-5ddf-990b-a578130ac9d0","name":"Deutsche Telekom Industrial AI Cloud, Munich Tucherpark","status":"partially_operational","status_as_of":"2026-02-04","search_terms":"Deutsche Telekom and NVIDIA converted an existing underground data center in Munich's Tucherpark into an AI factory branded the Industrial AI Cloud, at a reported cost of about EUR 1 billion from Telekom and its partners. It is designed for about 10,000 NVIDIA Blackwell GPUs (around 0.5 exaflops) and uses water from the Eisbach stream for cooling. The site officially opened on 2026-02-04 with first customers live, though trade press reported the four GPU halls were still far from complete. Industrial AI Cloud Telekom AI factory Munich KI-Fabrik München Deutsche Telekom Deutsche Telekom Polarise NVIDIA Agile Robots PhysicsX Perplexity"}],"status_publishers":["Deutsche Telekom"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9bb64eeea962a4cadd06/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9bb64eeea962a4cadd06.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Deutsche Telekom"]},{"site_id":"vcc-site-daa4cf7bcc8ec4f62689","name":"Didcot North Data Centre Campus (former Didcot A Power Station), Amazon Data Services UK","country":"United Kingdom","country_iso_a2":"GB","latitude":51.622623,"longitude":-1.2583,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"c841d8e3-3aef-5b81-9a41-365693db81d8","name":"AWS Didcot North Data Centre Campus (DCA-DCD)","status":"announced","status_as_of":"2026-07-27","search_terms":""}],"status_publishers":["Environment Agency"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-daa4cf7bcc8ec4f62689/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-daa4cf7bcc8ec4f62689.json","geometry_licenses":["Open Government Licence v3.0, except where otherwise stated"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-c1a0f58564147c78c139","name":"Digi Power X Columbiana AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.182787519671,"longitude":-86.61848137903,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"c794c146-24e6-5cb8-8cd9-a12a266bba83","name":"Digi Power X Columbiana Purpose-Built Flagship Vertical Build","status":"under_construction","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Digi Power X Inc. (distributed by ACCESS Newswire)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1a0f58564147c78c139/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1a0f58564147c78c139.json","geometry_licenses":["US-federal-public-domain"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-23e1a428ab99ad167ba5","name":"DigiCo SYD1 Ultimo Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.875,"longitude":151.197,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"14a67880-da37-5f59-a2cf-2322bbf778d7","name":"DigiCo SYD1 Ultimo Expansion Early Works","status":"site_preparation","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["EarningsAPI / DREAVERR Digital Solutions LLP; statements attributed to SHAPE CEO Peter Marix-Evans"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23e1a428ab99ad167ba5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23e1a428ab99ad167ba5.json","geometry_licenses":["CC-BY-4.0","CC-BY-4.0-Department-material-scope"],"geometry_attributions":["Google","NSW Department of Planning, Housing and Infrastructure"]},{"site_id":"vcc-site-f42f9f22874b1766554e","name":"Digital Edge CGK Campus","country":"Indonesia","country_iso_a2":"ID","latitude":-6.386820103966021,"longitude":107.18709493651593,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["host_estate_context"],"statuses":["shell"],"newest_status_as_of":"2026-06-08","oldest_status_as_of":"2026-06-08","project_count":1,"projects":[{"project_id":"b2e4945f-3d75-5d9b-b2bb-d65deb74c405","name":"Digital Edge CGK1","status":"shell","status_as_of":"2026-06-08","search_terms":""}],"status_publishers":["Digital Edge Indonesia"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_host_estate_context_only","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f42f9f22874b1766554e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f42f9f22874b1766554e.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).","Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.","OpenStreetMap Wiki contributors"]},{"site_id":"vcc-site-afb6c00afe427fdacc70","name":"Digital Edge EDGE2 Jakarta Campus","country":"Indonesia","country_iso_a2":"ID","latitude":-6.2139768,"longitude":106.8351467,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"c7eebc15-358c-5985-9a48-16f53bdd4726","name":"Digital Edge EDGE2 Phase 3 Electrical and Mechanical Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["PT Indointernet Tbk"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-afb6c00afe427fdacc70/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-afb6c00afe427fdacc70.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation and contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-238b8f47b49203fa68ee","name":"Digital Edge Navi Mumbai Campus","country":"India","country_iso_a2":"IN","latitude":19.186009104537128,"longitude":73.00324427769986,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","shell","under_construction"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-08-31","project_count":3,"projects":[{"project_id":"29ddb060-c971-5de4-91d5-5e1dbd16601e","name":"Digital Edge BOM1","status":"operational","status_as_of":"2026-10-06","search_terms":""},{"project_id":"10e4ebee-ff2e-59d5-a133-72dfdca2dc72","name":"Digital Edge BOM2","status":"shell","status_as_of":"2026-08-31","search_terms":""},{"project_id":"e1afb7fa-b1f3-521d-ac12-c036f74eecef","name":"Digital Edge BOM3","status":"under_construction","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Digital Edge (Singapore) Holdings Pte Ltd"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-238b8f47b49203fa68ee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-238b8f47b49203fa68ee.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Digital Edge DC (India) Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal)"]},{"site_id":"vcc-site-5750ea0ecd6d7c900211","name":"Digital Edge Seoul Bupyeong Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.518,"longitude":126.7109,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"d2915b77-394c-5202-8c38-cbd3277121c7","name":"Digital Edge SEL3 Phase 2","status":"under_construction","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["SK ecoplant Co., Ltd."],"power_observations":[{"project_id":"d2915b77-394c-5202-8c38-cbd3277121c7","metric":"critical_it_mw","stage":"planned","low":60.0,"base":60.0,"high":60.0,"unit":"MW","as_of_date":"2026-07-09"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5750ea0ecd6d7c900211/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5750ea0ecd6d7c900211.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Digital Edge"]},{"site_id":"vcc-site-2375f74ae82f8b71b33b","name":"Digital Realty (iColo) Nairobi Karen Campus","country":"Kenya","country_iso_a2":"KE","latitude":-1.3497326,"longitude":36.7485148,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"c233fed8-c06e-5cac-90ce-7b74c772bcb4","name":"Digital Realty Nairobi Two (NBO2)","status":"operational","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["Digital Realty Trust, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2375f74ae82f8b71b33b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2375f74ae82f8b71b33b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-f806b9a83ed45bed3268","name":"Digital Realty 330 E. Cermak Site","country":"United States","country_iso_a2":"US","latitude":41.85322925,"longitude":-87.6195243,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"01baa3bb-ea56-5f41-8c67-82dd84f87d51","name":"Digital Realty 330 E. Cermak Current Facility Build","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f806b9a83ed45bed3268/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f806b9a83ed45bed3268.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-4f12ca3947a97b49eaf9","name":"Digital Realty Astra North Campus (Astra Enterprise Park, De Soto, Kansas)","country":"United States","country_iso_a2":"US","latitude":38.9441882,"longitude":-94.987291,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"b401f2bf-a314-578f-a721-af93300d9b8b","name":"Digital Realty Astra North Phase One (Project Jayhawk) — proposed two-storey 450,000 sq ft data center with private and Evergy substations","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["City of De Soto, Kansas"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4f12ca3947a97b49eaf9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4f12ca3947a97b49eaf9.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of De Soto, Kansas"]},{"site_id":"vcc-site-593fb07e4ba0373c60a5","name":"Digital Realty Athens Data Center Campus (Koropi)","country":"Greece","country_iso_a2":"GR","latitude":37.87155141033321,"longitude":23.870614305559798,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"c5e1d314-7868-5160-8443-0ca422bfcb74","name":"Digital Realty Athens Campus — ATH1, ATH2 and ATH3 data-centre operations","status":"operational","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["Περιφέρεια Αττικής (Region of Attica); filing by Digital Realty Hellas Monoprosopi A.E. in the OPS-ADE notification system"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-593fb07e4ba0373c60a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-593fb07e4ba0373c60a5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Περιφέρεια Αττικής / Πληροφοριακό Σύστημα Άσκησης Δραστηριοτήτων και Ελέγχων (ΟΠΣ-ΑΔΕ)"]},{"site_id":"vcc-site-30f713cb9cffaf5fb6ef","name":"Digital Realty ATL13 (56 Marietta Street, Atlanta)","country":"United States","country_iso_a2":"US","latitude":33.755427517,"longitude":-84.391581821,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"d0afe25f-1598-5a04-9fa6-7086b3828de8","name":"Digital Realty ATL13 — existing data-centre and interconnection-hub operations","status":"operational","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30f713cb9cffaf5fb6ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30f713cb9cffaf5fb6ef.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-25fb812582eb27da8c68","name":"Digital Realty ATL14 (250 Williams Street, Atlanta)","country":"United States","country_iso_a2":"US","latitude":33.761624516,"longitude":-84.39132182,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"0efaa92f-b14b-5372-9644-9afafcce26a7","name":"Digital Realty ATL14 — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25fb812582eb27da8c68/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25fb812582eb27da8c68.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Atlanta"]},{"site_id":"vcc-site-20a2edd7bbbbe47d7c25","name":"Digital Realty Digital Dulles Campus","country":"United States","country_iso_a2":"US","latitude":38.96099867,"longitude":-77.49150786,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-29","oldest_status_as_of":"2026-06-29","project_count":1,"projects":[{"project_id":"f054a923-1869-5cee-aec7-f9673b431f14","name":"Digital Realty Digital Dulles Current 96 MW Development","status":"under_construction","status_as_of":"2026-06-29","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-20a2edd7bbbbe47d7c25/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-20a2edd7bbbbe47d7c25.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Digital Realty"]},{"site_id":"vcc-site-f98926ffb5ad45066954","name":"Digital Realty Digital Park Fechenheim Campus","country":"Germany","country_iso_a2":"DE","latitude":50.125936,"longitude":8.752816,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-02","oldest_status_as_of":"2026-07-02","project_count":1,"projects":[{"project_id":"b0588082-53ae-577a-b989-667b8f9f171d","name":"Digital Park Fechenheim UW04 Substation","status":"under_construction","status_as_of":"2026-07-02","search_terms":""}],"status_publishers":["Adolf Lupp GmbH + Co KG"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f98926ffb5ad45066954/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f98926ffb5ad45066954.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Digital Realty","Google"]},{"site_id":"vcc-site-1cd4f95be6c1f81fa038","name":"Digital Realty Garland Campus","country":"United States","country_iso_a2":"US","latitude":32.97626425681991,"longitude":-96.65164807015198,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-08","project_count":2,"projects":[{"project_id":"46ae1bac-a8a9-59a4-98dd-370657d7e099","name":"Digital Realty Garland DFW39 Data Hall 4 Shell Addition (Project Gold Phase 2)","status":"announced","status_as_of":"2026-09-24","search_terms":""},{"project_id":"bbd7e688-1c02-5287-a092-4a7af5293151","name":"Digital Realty Garland DFW45","status":"announced","status_as_of":"2026-09-08","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1cd4f95be6c1f81fa038/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1cd4f95be6c1f81fa038.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points; 9-1-1 source authority City of Garland"]},{"site_id":"vcc-site-b614993ee0662837781d","name":"Digital Realty HKG10 (Digital TKO), 33 Chun Choi Street, Tseung Kwan O","country":"Hong Kong","country_iso_a2":"HK","latitude":22.2820438,"longitude":114.2739061,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"a210147b-9a0c-5d6c-a5bb-0ba715380441","name":"Digital Realty HKG10 (Digital TKO) — existing data-centre operations","status":"operational","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Digital Realty Trust, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b614993ee0662837781d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b614993ee0662837781d.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-5df65dfca469cf6edf25","name":"Digital Realty HKG11, 11 Kin Chuen Street, Kwai Chung","country":"Hong Kong","country_iso_a2":"HK","latitude":22.370335,"longitude":114.1290093,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"1d5d71e4-1f7e-5602-a934-e70708618f7e","name":"Digital Realty HKG11 (Kin Chuen) — existing data-centre operations","status":"operational","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Digital Realty Trust, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5df65dfca469cf6edf25/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5df65dfca469cf6edf25.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-633ec6e59625ded09b1e","name":"Digital Realty Lewisville Campus (Digital Convergence: DFW26 and DFW44)","country":"United States","country_iso_a2":"US","latitude":33.0004451,"longitude":-97.0015209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"ff056790-cb05-594f-80cd-a23bb521aaa8","name":"Digital Realty DFW44 — data hall 4 shell addition (Project Gold Phase 2)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-633ec6e59625ded09b1e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-633ec6e59625ded09b1e.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Denton Central Appraisal District data)"]},{"site_id":"vcc-site-dccbfb985ff19eb09f79","name":"Digital Realty Paris Digital Park, La Courneuve (2 avenue Marcel Cachin)","country":"France","country_iso_a2":"FR","latitude":48.9276307,"longitude":2.3985474,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"c177ab92-fb3a-52fa-8756-8e0e385f332b","name":"Paris Digital Park — PAR8, PAR9, PAR10 and PAR11 data-centre operations","status":"operational","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Digital Realty Trust"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dccbfb985ff19eb09f79/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dccbfb985ff19eb09f79.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-0bd2e6c45b00b3abb082","name":"Digital Realty SIN10, 29A International Business Park","country":"Singapore","country_iso_a2":"SG","latitude":1.327726023496895,"longitude":103.7460280617067,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-24","oldest_status_as_of":"2026-08-24","project_count":1,"projects":[{"project_id":"942a1568-1fa1-57cc-91c1-2a34ee385adf","name":"Digital Realty SIN10 — existing data-centre operations","status":"operational","status_as_of":"2026-08-24","search_terms":""}],"status_publishers":["Digital Realty Trust, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0bd2e6c45b00b3abb082/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0bd2e6c45b00b3abb082.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-137418ccdcd0272f024b","name":"Digital Realty VIE13-VIE16 Digital Park Vienna Expansion","country":"Austria","country_iso_a2":"AT","latitude":48.270994,"longitude":16.424095,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"f9e7c64e-3dc3-5d47-a4de-4c72a4284231","name":"Digital Realty VIE13 Phase 1 Current Data Center Build","status":"under_construction","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-137418ccdcd0272f024b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-137418ccdcd0272f024b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Digital Realty"]},{"site_id":"vcc-site-7a8c1ea8c8e33e9b29b6","name":"Digital Realty Zurich Glattbrugg Campus","country":"Switzerland","country_iso_a2":"CH","latitude":47.433812,"longitude":8.556645,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":2,"projects":[{"project_id":"0cf81d42-6358-5126-b828-4a15e1f904b8","name":"Digital Realty ZUR4 — new data center build","status":"under_construction","status_as_of":"2026-08-27","search_terms":""},{"project_id":"0e404b69-4f26-56a2-b20d-09de5aee3955","name":"Digital Realty Zurich Glattbrugg Campus — existing ZUR1, ZUR2 and ZUR3 data-centre operations","status":"operational","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a8c1ea8c8e33e9b29b6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7a8c1ea8c8e33e9b29b6.json","geometry_licenses":["opendata-swiss-open-use-source-attribution-required"],"geometry_attributions":["Swiss Federal Statistical Office, Federal Register of Buildings and Dwellings (GWR); geo.admin.ch API"]},{"site_id":"vcc-site-3bc2702357c3d1710f5f","name":"Dulles Electric Data Centers Site (Shaw Road and South Sterling Boulevard, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.9918485,"longitude":-77.4273271,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"fd130aec-dd32-59a3-8d4e-907e82b55770","name":"Dulles Electric Data Centers — two proposed two-storey data center buildings (site plan EPLAN-2024-0154)","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3bc2702357c3d1710f5f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3bc2702357c3d1710f5f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-f616a1fa427698a3ecec","name":"DVZ Schwerin Lübecker Straße Campus","country":"Germany","country_iso_a2":"DE","latitude":53.6469747,"longitude":11.3811071,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"c1016e49-7b45-52ff-8938-0bd01e78a7ad","name":"DVZ Schwerin New Modular Data Center Current Build","status":"shell","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Data Center Group (general contractor); text and photos DVZ M-V GmbH"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f616a1fa427698a3ecec/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f616a1fa427698a3ecec.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors via Overpass"]},{"site_id":"vcc-site-4ab34595d4e4b5c1dfde","name":"Echelon DUB10 data centre campus, Crag Avenue, Clondalkin Industrial Estate, Dublin 22","country":"Ireland","country_iso_a2":"IE","latitude":53.3302571,"longitude":-6.3832932,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"3ce9b383-1cff-5a84-8705-f2580fe12567","name":"Echelon DUB10 — operating data-centre installation (Energy Centre and data centre buildings; build-out continuing)","status":"operational","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Echelon Clondalkin DC Services Limited (Echelon Data Centres), published by the Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4ab34595d4e4b5c1dfde/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4ab34595d4e4b5c1dfde.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-ce3b42e4fc2f6b33b8a2","name":"EcoDataCenter 2 Borlänge campus","country":"Sweden","country_iso_a2":"SE","latitude":60.48556,"longitude":15.43639,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"304e9b81-f1b5-5a80-8ad5-6f46e12f5a85","name":"EcoDataCenter 2 Borlänge campus","status":"under_construction","status_as_of":"2026-10-05","search_terms":"EcoDataCenter campus on part of the former Kvarnsveden paper mill in Borlänge, Dalarna, near its existing Falun site. Announced in September 2024 as a 240 MW plan, it is now marketed with up to 600 MW of available power on about 20 hectares. Construction began in September 2025 and the first phase is targeted for mid-2027. In February 2026 Mistral AI announced a partnership and investment, reported at EUR 1.2 billion, for a dedicated AI data center at the site. Analyst Epoch AI saw four buildings under way in August 2026 imagery and projects modest initial IT power. EcoDataCenter 2 EcoDataCenter Borlänge mega campus EcoDataCenter EcoDataCenter Mistral AI"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ce3b42e4fc2f6b33b8a2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ce3b42e4fc2f6b33b8a2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EcoDataCenter"]},{"site_id":"vcc-site-ee27a3ebdbdf9e17d494","name":"EcoDataCenter Smedjebacken Campus (Röbackens industriområde)","country":"Sweden","country_iso_a2":"SE","latitude":60.1245304,"longitude":15.3999722,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"10af7dbf-25d6-5648-acc2-7468e26dffd9","name":"EcoDataCenter Smedjebacken — third data-centre campus (option on about 51.6 ha of Västansjö 2:7)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Smedjebackens kommun (Kommunfullmäktige)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee27a3ebdbdf9e17d494/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee27a3ebdbdf9e17d494.json","geometry_licenses":["not-stated-public-municipal-service"],"geometry_attributions":["Smedjebackens kommun"]},{"site_id":"vcc-site-67bfdfeacaaa037663db","name":"ecoDC Hoa Lac Data Centre (Lot E4, ICT Park)","country":"Vietnam","country_iso_a2":"VN","latitude":20.9872951,"longitude":105.5510259,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-01","oldest_status_as_of":"2026-08-01","project_count":1,"projects":[{"project_id":"5c326193-fbdb-5a1e-9e16-4ad98b357d79","name":"ecoDC Hoa Lac (Evolution VN01) — operating data centre","status":"operational","status_as_of":"2026-08-01","search_terms":""}],"status_publishers":["Evolution Data Centres"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-67bfdfeacaaa037663db/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-67bfdfeacaaa037663db.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c7eda914d20e9fef8ecf","name":"ecogrid.energy / Peab Lahti Kujala Data Centre (Vartiokallionkatu 2)","country":"Finland","country_iso_a2":"FI","latitude":60.96707286,"longitude":25.7291156,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"c754e225-867f-5ba1-8064-65515635bf12","name":"Lahti Kujala data centre (ecogrid.energy / Peab) — planned data centre at Vartiokallionkatu 2","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Lahden kaupunki (City of Lahti)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c7eda914d20e9fef8ecf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c7eda914d20e9fef8ecf.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Finnish Environment Institute Ryhti; CC BY 4.0"]},{"site_id":"vcc-site-f6d844f91afe8998bb3a","name":"EdgeConneX Bastrop Campus (AUS01, FM 535, Cedar Creek)","country":"United States","country_iso_a2":"US","latitude":30.1423628,"longitude":-97.5581192,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":2,"projects":[{"project_id":"739874bb-add5-5370-9885-f262b369a606","name":"EdgeConneX EDCAUS13 — planned 729,537 sq ft data center building (6682 FM 535)","status":"announced","status_as_of":"2026-08-20","search_terms":""},{"project_id":"82437338-e2c8-5196-9b60-679edd8b643b","name":"EdgeConneX EDCAUS14 — planned 729,537 sq ft data center building (6682 FM 535)","status":"announced","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6d844f91afe8998bb3a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6d844f91afe8998bb3a.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bastrop Central Appraisal District data)"]},{"site_id":"vcc-site-7edfcf8daddee73f2c4a","name":"EdgeConneX Dublin campus, Newcastle Road (R120), Lucan, Co. Dublin","country":"Ireland","country_iso_a2":"IE","latitude":53.327779,"longitude":-6.4601775,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-08-27","project_count":2,"projects":[{"project_id":"927b4a54-f6bc-5a8c-b0f8-f92720a77c08","name":"EdgeConneX Dublin campus — existing DUB01 and DUB02 data centres east of the R120 (operating)","status":"operational","status_as_of":"2026-08-27","search_terms":""},{"project_id":"3ce61092-1632-5d03-ae17-a8831661e077","name":"EdgeConneX EDCDUB04 and EDCDUB05 data centres with ESSDUB97 energy centre (EPA IE licence P1204-01)","status":"announced","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["EdgeConneX Inc.","Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7edfcf8daddee73f2c4a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7edfcf8daddee73f2c4a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-6fbf2c20aeb106991c61","name":"EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe)","country":"Japan","country_iso_a2":"JP","latitude":34.81444,"longitude":135.76778,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-03-18","oldest_status_as_of":"2026-03-18","project_count":1,"projects":[{"project_id":"ffbda424-5468-5619-97e8-3a32b0522e79","name":"EdgeConneX Greater Osaka campus (Kagoya Tatara Campus, Kyotanabe)","status":"under_construction","status_as_of":"2026-03-18","search_terms":"EdgeConneX, a data center developer backed by EQT Infrastructure, began building a 200 MW AI-ready hyperscale campus in March 2026 on a site of about 130,000 square metres at the Kagoya Tatara Campus in Kyotanabe City, roughly 30 km from central Osaka. The company calls it its first data center campus in Japan. It is being developed in partnership with Kagoya Asset Management; the groundbreaking was for a first building named ITM01, and the first phase is targeted to be ready for service in the first quarter of 2028. EdgeConneX said it plans about 350 MW in total across Greater Osaka, including a second project announced in August 2025. ITM01 Kagoya Tatara Campus EdgeConneX Greater Osaka EdgeConneX"}],"status_publishers":["EdgeConneX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6fbf2c20aeb106991c61/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6fbf2c20aeb106991c61.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeConneX"]},{"site_id":"vcc-site-c4391892c0d4ac0e1fd0","name":"EdgeConneX Mesa Campus (PHX11 and PHX12, 3261 S Hawes Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3560344,"longitude":-111.6487547,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-09-23","project_count":2,"projects":[{"project_id":"1780742f-8f14-5403-a90e-a7614ade7643","name":"EdgeConneX PHX11 — 412,065 sq ft core-and-shell data center building with Data Hall 1-4 build-outs, under construction (Mesa permits PMT24-11896, PMT25-09255 and PMT25-17623)","status":"under_construction","status_as_of":"2026-09-23","search_terms":""},{"project_id":"13f6f555-583d-52ba-bf68-d9f2eb55a8ba","name":"EdgeConneX PHX12 — 296,800 sq ft core-and-shell data center building under construction (Mesa permit PMT25-22027)","status":"under_construction","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4391892c0d4ac0e1fd0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4391892c0d4ac0e1fd0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-191fa12b770b8f520c6e","name":"EdgeCore AS02 Sterling Site","country":"United States","country_iso_a2":"US","latitude":38.995010315,"longitude":-77.44612264937976,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"6b62c459-dc75-5f31-87d4-d6dbf47de8b0","name":"EdgeCore AS02 Data Center","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development; county GIS)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-191fa12b770b8f520c6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-191fa12b770b8f520c6e.json","geometry_licenses":["Loudoun-County-GIS-disclaimer"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-ebc20ddd515fd9367ea7","name":"EdgeCore Louisa County campus","country":"United States","country_iso_a2":"US","latitude":37.99,"longitude":-77.96,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8560b48f-07cb-54c8-8b8d-163dc196caee","name":"EdgeCore Louisa County campus","status":"announced","status_as_of":"2026-10-09","search_terms":"EdgeCore Digital Infrastructure plans a hyperscale data center campus on 697 acres it bought from Louisa County in the Shannon Hill Regional Business Park, about 40 miles northwest of Richmond, Virginia. Announced in June 2025, the campus is planned for more than 1.1 GW, which EdgeCore's campus page describes as critical IT load, with investment of more than USD 17 billion. Rappahannock Electric Cooperative is expected to provide power. EdgeCore's announcement cited 3.9 million square feet, while its current campus page lists 3.1 million square feet in at least six single-tenant buildings. EdgeCore Shannon Hill campus EdgeCore Digital Infrastructure Partners Group Rappahannock Electric Cooperative Louisa County"}],"status_publishers":["EdgeCore Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ebc20ddd515fd9367ea7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ebc20ddd515fd9367ea7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeCore Digital Infrastructure"]},{"site_id":"vcc-site-54d4a697323404ecfc35","name":"EdgeCore Mesa data center campus","country":"United States","country_iso_a2":"US","latitude":33.3442,"longitude":-111.6196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2025-05-21","oldest_status_as_of":"2025-05-21","project_count":1,"projects":[{"project_id":"441174d1-4dab-5b80-bfb2-76062cf675aa","name":"EdgeCore Mesa data center campus","status":"partially_operational","status_as_of":"2025-05-21","search_terms":"Wholesale hyperscale data center campus that EdgeCore Digital Infrastructure established in Mesa, Arizona, in April 2023, with power from Salt River Project. Its first building, PH01, was operating by 2025 while PH02 and PH03 were under construction for completion in 2025 and 2026. In May 2025 EdgeCore bought another 43.87 acres, more than doubling its buildable land in Mesa, and raised planned capacity to over 450 MW. EdgeCore's campus page now describes an 84-acre, five-building campus able to support 496 MW of critical IT load in about 2.7 million square feet. EdgeCore Phoenix campus EdgeCore PH01-PH03 EdgeCore Digital Infrastructure EdgeCore Digital Infrastructure EdgeCore Digital Infrastructure Salt River Project"}],"status_publishers":["EdgeCore Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54d4a697323404ecfc35.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeCore Digital Infrastructure"]},{"site_id":"vcc-site-9369a9dbb7d04a9e1327","name":"Edged Chicago Aurora Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.806967678,"longitude":-88.240996871,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-04","oldest_status_as_of":"2026-06-04","project_count":1,"projects":[{"project_id":"b8399bc6-5c72-5627-a035-4fea208cd287","name":"Edged Chicago ORD01-2","status":"shell","status_as_of":"2026-06-04","search_terms":""}],"status_publishers":["Edged US"],"power_observations":[{"project_id":"b8399bc6-5c72-5627-a035-4fea208cd287","metric":"critical_it_mw","stage":"planned","low":72.0,"base":72.0,"high":72.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9369a9dbb7d04a9e1327/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9369a9dbb7d04a9e1327.json","geometry_licenses":["public-domain"],"geometry_attributions":["City of Aurora GIS"]},{"site_id":"vcc-site-7cc1c64f44550b086450","name":"Edged Council Bluffs Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.27500301792117,"longitude":-95.79123326138523,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"85cb6e56-ec73-5685-82e7-15e4ef96106b","name":"Edged Council Bluffs First Data Center","status":"shell","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["Edged US"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7cc1c64f44550b086450/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7cc1c64f44550b086450.json","geometry_licenses":["county-open-data-no-explicit-license"],"geometry_attributions":["Pottawattamie County GIS"]},{"site_id":"vcc-site-066479e34eed145a2403","name":"Edged Data Center Marseille, former Saint-Louis Sucre refinery (336 rue de Lyon, Marseille 15e)","country":"France","country_iso_a2":"FR","latitude":43.337546,"longitude":5.3638587,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"79e97e1b-1476-5098-ac75-f0c3fb953c67","name":"Edged Marseille Saint-Louis — planned nine-hall data centre (R+3) with 12 emergency generators (ESL PROPERTIES, Edged Energy)","status":"announced","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Provence-Alpes-Côte d'Azur, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-066479e34eed145a2403/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-066479e34eed145a2403.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-c01c1fc0c8c91c72ed82","name":"Edged Fort Worth Project Outpost Campus","country":"United States","country_iso_a2":"US","latitude":32.6902831,"longitude":-97.4919734,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","permitted"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-09-14","project_count":2,"projects":[{"project_id":"77b49daf-24c9-5505-a442-c7c45330d5e6","name":"Edged Fort Worth Project Outpost Building 1 — 488,770 sq ft data-centre cold dark shell (permit PB26-06984)","status":"permitted","status_as_of":"2026-10-22","search_terms":""},{"project_id":"535a2b1a-ea36-5034-a91b-e1e0c00f8837","name":"Edged Fort Worth Project Outpost Building 2","status":"announced","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["City of Fort Worth (Development Services)","Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c01c1fc0c8c91c72ed82/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c01c1fc0c8c91c72ed82.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Tarrant Appraisal District data)"]},{"site_id":"vcc-site-9b055d4e5c1005522b59","name":"Edged Kansas City Data Center (3420 N Arlington Ave, Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.1567908,"longitude":-94.4640853,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-04","oldest_status_as_of":"2026-09-04","project_count":1,"projects":[{"project_id":"f41ace4c-c7e3-554a-9226-aeb45082384d","name":"Edged Kansas City — data-center building (final certificate of occupancy CICO-2026-00896, 3500 N Arlington Ave)","status":"completed","status_as_of":"2026-09-04","search_terms":""}],"status_publishers":["City of Kansas City, Missouri"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b055d4e5c1005522b59/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b055d4e5c1005522b59.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kansas City, Missouri (Open Data KC)"]},{"site_id":"vcc-site-cb4f286ac3fc6ea5a153","name":"Enecom Hiroshima Data Center","country":"Japan","country_iso_a2":"JP","latitude":34.4005909,"longitude":132.4758742,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"6a90d22d-a459-5781-bee3-0f28f1fb17eb","name":"Enecom Hiroshima Data Center Existing Operations","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Enecom"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb4f286ac3fc6ea5a153/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cb4f286ac3fc6ea5a153.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-47f902912a847a235f3d","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","country":"Italy","country_iso_a2":"IT","latitude":45.117,"longitude":8.867,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"5d11dbb6-e8aa-5602-9c7c-8997b1c620c1","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","status":"announced","status_as_of":"2026-08-10","search_terms":"Planned AI data center campus of 500 MW of IT capacity at Ferrera Erbognone in the province of Pavia, Lombardy, near Milan. Eni and the UAE operator Khazna Data Centers signed heads of terms in July 2025 for a joint venture in which Khazna designs and develops a phased master plan and Eni supplies low-carbon power from a new gas-fired plant designed to capture its CO2 for storage at Ravenna. It is the first project in an Italy-UAE programme for up to 1 GW of IT capacity. The European Commission cleared the joint venture in August 2026, when the campus was described as still in design. Eni-Khazna AI Data Center Campus Eni Eni Khazna Data Centers European Commission"}],"status_publishers":["Il Sole 24 Ore"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-47f902912a847a235f3d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Eni"]},{"site_id":"vcc-site-41e0189f5fc22ef9a733","name":"ENKA Data Solutions EDS IST 01 Tuzla Data Center","country":"Türkiye","country_iso_a2":"TR","latitude":40.835152897406935,"longitude":29.323671897992956,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"15e0ef92-6408-5517-b0d4-a6b8707745f4","name":"EDS IST 01 Tuzla Initial Build","status":"under_construction","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["ENKA İnşaat ve Sanayi A.Ş."],"power_observations":[{"project_id":"15e0ef92-6408-5517-b0d4-a6b8707745f4","metric":"critical_it_mw","stage":"design","low":11.0,"base":11.0,"high":11.0,"unit":"MW","as_of_date":"2026-06-12"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-41e0189f5fc22ef9a733/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-41e0189f5fc22ef9a733.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ENKA Data Solutions"]},{"site_id":"vcc-site-16a0fc988ee7cd6daace","name":"ENKA Data Solutions EDS IST 02 Gebze Data Center","country":"Türkiye","country_iso_a2":"TR","latitude":40.79967444069151,"longitude":29.38437845554731,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"1c9fa996-7afb-5616-be3f-744d786d2079","name":"EDS IST 02 Gebze First Phase","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["ENKA İnşaat ve Sanayi A.Ş."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-16a0fc988ee7cd6daace/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-16a0fc988ee7cd6daace.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ENKA Data Solutions"]},{"site_id":"vcc-site-6d5b0030886927a4cf46","name":"envia TEL Datacenter Campus Leipzig","country":"Germany","country_iso_a2":"DE","latitude":51.3726832,"longitude":12.4728004,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-27","oldest_status_as_of":"2026-05-27","project_count":1,"projects":[{"project_id":"898b0895-99d6-545b-8053-79813ae63ffa","name":"envia TEL Leipzig2 Fourth Section Current Construction","status":"under_construction","status_as_of":"2026-05-27","search_terms":""}],"status_publishers":["envia TEL"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5b0030886927a4cf46/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d5b0030886927a4cf46.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim documentation","OpenStreetMap Wiki contributors","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-1ca63216bf79dbfaf507","name":"Envision Ulanqab Zero-Carbon AI Computing Industrial Park (Yiwutang)","country":"China","country_iso_a2":"CN","latitude":40.948786667,"longitude":113.248473611,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-24","oldest_status_as_of":"2026-10-24","project_count":1,"projects":[{"project_id":"8539024c-6724-5e84-8976-94660aa94692","name":"Envision Ulanqab Zero-Carbon AI Computing Industrial Park — Phase 1","status":"under_construction","status_as_of":"2026-10-24","search_terms":""}],"status_publishers":["China State Construction Engineering Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1ca63216bf79dbfaf507/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1ca63216bf79dbfaf507.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 远景（乌兰察布）科技开发有限公司"]},{"site_id":"vcc-site-f5c6fe2a009a33154c02","name":"Equinix BG2 Bogotá Data Center","country":"Colombia","country_iso_a2":"CO","latitude":4.674924542377553,"longitude":-74.15643708982253,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":2,"projects":[{"project_id":"e722e56c-283a-5460-9851-1d8eaf96f647","name":"Equinix BG2 Bogotá — Phase 1 (first 550 cabinets), existing data-centre operations","status":"operational","status_as_of":"2026-08-20","search_terms":""},{"project_id":"bbc71d65-de56-52f2-95eb-0c6458c9a9fc","name":"Equinix BG2 Bogotá — Phase 2 capacity expansion","status":"announced","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Equinix, Inc."],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f5c6fe2a009a33154c02/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f5c6fe2a009a33154c02.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Equinix, Inc.; Internet Archive Wayback Machine"]},{"site_id":"vcc-site-9ea881e4f6faab9a0137","name":"Equinix CH5 Data Center, 2001 Lunt Ave, Elk Grove Village","country":"United States","country_iso_a2":"US","latitude":42.0011268,"longitude":-87.9536421,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"4c84c865-63cc-55a4-b2fe-1e717d5651df","name":"Equinix CH5 - Electrical Room L build-out (Elk Grove Village permit B26-0931)","status":"permitted","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Cook County Assessor's Office"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9ea881e4f6faab9a0137/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9ea881e4f6faab9a0137.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office"]},{"site_id":"vcc-site-b504c5e662c0319d165e","name":"Equinix Great Oaks South Data Center Campus (SV12, SV18 and SV19), 123-131 Great Oaks Blvd, San Jose","country":"United States","country_iso_a2":"US","latitude":37.2337651,"longitude":-121.7829754,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","permitted"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"55a6a29a-9cae-5f56-9394-9656ca317d1b","name":"Equinix SV12x — data-hall fit-outs (San Jose building permits 2024-108710-CI, 2026-141003-CI and 2026-140996-CI)","status":"permitted","status_as_of":"2026-10-19","search_terms":""},{"project_id":"1ed690bc-d1f7-5407-9e91-a6311a4daccd","name":"Equinix SV18 — new IBX colocation data centre, now open (127 Great Oaks Blvd)","status":"operational","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["City of San Jose, Planning, Building and Code Enforcement (San Jose CA Open Data Portal)","Equinix, Inc. (Equinix Community, community.equinix.com)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b504c5e662c0319d165e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b504c5e662c0319d165e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["County of Santa Clara, California"]},{"site_id":"vcc-site-7ab4425c969ecf78eb4a","name":"Equinix HK6, Tsuen Wan","country":"Hong Kong","country_iso_a2":"HK","latitude":22.37406,"longitude":114.1079,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"2c6d1cb0-1c04-5b94-a34d-899d59c01633","name":"Equinix HK6 — existing commercial data-centre operations","status":"operational","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["Asian Telecom; reporting by Gwyneth Bejer"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ab4425c969ecf78eb4a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7ab4425c969ecf78eb4a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Digital Policy Office, Government of the Hong Kong SAR"]},{"site_id":"vcc-site-5aa81e1af3ee4425bc10","name":"Equinix HO1 Houston (1515 Aldine Meadows Road)","country":"United States","country_iso_a2":"US","latitude":29.9359097,"longitude":-95.3642684,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-23","oldest_status_as_of":"2026-10-23","project_count":1,"projects":[{"project_id":"fe59dab9-e931-5465-95c7-f69a563caba6","name":"Equinix HO1 — conversion of an interior storage room to additional data hall space (TABS2027004299)","status":"announced","status_as_of":"2026-10-23","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5aa81e1af3ee4425bc10/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5aa81e1af3ee4425bc10.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Harris Appraisal District data)"]},{"site_id":"vcc-site-0dfaa7fc012a8e8b4638","name":"Equinix ML10x Data Center, Settimo Milanese (former Italtel Building 2 lot, Il Castelletto)","country":"Italy","country_iso_a2":"IT","latitude":45.4769341,"longitude":9.0347199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-12","oldest_status_as_of":"2026-10-12","project_count":1,"projects":[{"project_id":"103b2a1e-5c56-5387-b6cc-7e43d5f92b6a","name":"ML10x (formerly ML10 and ML11) — proposed single-building data centre with 32 standby generators (VIA ID_VIP 14381)","status":"announced","status_as_of":"2026-10-12","search_terms":""}],"status_publishers":["Equinix Hyperscale 2 (ML10) S.r.l. (notice published by MASE on the VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0dfaa7fc012a8e8b4638/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0dfaa7fc012a8e8b4638.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Equinix Hyperscale 2 (ML10) S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-3867ebd8648d7b1a2b65","name":"Equinix MU4 Munich Data Center","country":"Germany","country_iso_a2":"DE","latitude":48.14701805,"longitude":11.6824555,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-07-16","oldest_status_as_of":"2026-07-16","project_count":1,"projects":[{"project_id":"b284fbeb-8cd9-5448-860d-b4f69bb8bd7a","name":"Equinix MU4 Phase 3","status":"shell","status_as_of":"2026-07-16","search_terms":""}],"status_publishers":["Mercury Engineering"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3867ebd8648d7b1a2b65/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3867ebd8648d7b1a2b65.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-8345142de361d22bb22a","name":"Equinix Osaka OS3 — Keihanshin OBP Building","country":"Japan","country_iso_a2":"JP","latitude":34.69267820944037,"longitude":135.53299773523162,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"7f07fd6e-f8cf-5c96-a815-00ee63ed449e","name":"Equinix Osaka OS3 — existing commercial data-centre operations","status":"operational","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Equinix"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8345142de361d22bb22a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8345142de361d22bb22a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Equinix"]},{"site_id":"vcc-site-1a523bfc9fdf63fb20e5","name":"ESR / CloudHQ Cosmosquare Data Centre Campus (Nanko Kita, Osaka)","country":"Japan","country_iso_a2":"JP","latitude":34.6394,"longitude":135.42107,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"09fde369-4735-5bc7-8e24-c3eeab91dcd0","name":"ESR－CHQ南港データセンターOS2 — planned second-phase data-centre building, Cosmosquare campus","status":"announced","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["Ministry of Land, Infrastructure, Transport and Tourism (国土交通省 住宅局 参事官（建築企画担当）)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1a523bfc9fdf63fb20e5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1a523bfc9fdf63fb20e5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CloudHQ"]},{"site_id":"vcc-site-0660c8cc500011957a7b","name":"eStruxture CAL-3 Rocky View Campus","country":"Canada","country_iso_a2":"CA","latitude":51.21083654630298,"longitude":-113.91467685853051,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"a225d046-5d72-5a1f-bf4b-ba454f713a49","name":"eStruxture CAL-3 Initial Build","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["eStruxture"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0660c8cc500011957a7b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0660c8cc500011957a7b.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["eStruxture"]},{"site_id":"vcc-site-ca4532d5353073b32508","name":"Ezditek RUH01/PNU Riyadh Data Center","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.866954286488,"longitude":46.713968972719,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-18","oldest_status_as_of":"2026-06-18","project_count":1,"projects":[{"project_id":"010c4071-5901-54ea-a312-f59d53358a0a","name":"Ezditek RUH01 Phase 1 Current Build","status":"under_construction","status_as_of":"2026-06-18","search_terms":""}],"status_publishers":["Ezditek"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ca4532d5353073b32508/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ca4532d5353073b32508.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-4b475e5672ee780bdd28","name":"fantasista Sendai Imozawa AI Data Center Site","country":"Japan","country_iso_a2":"JP","latitude":38.281613,"longitude":140.812133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"97198e9e-d6ad-569c-88bb-600e36756ad5","name":"fantasista Sendai AI Data Center (Aoba-ku Imozawa) — Phase I development","status":"announced","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["fantasista Co., Ltd. (TSE Standard 1783)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4b475e5672ee780bdd28/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4b475e5672ee780bdd28.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["fantasista Co., Ltd."]},{"site_id":"vcc-site-dba29b971b845ba962a5","name":"Farmington Technology Park (Tract data-center campus, Farmington, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.6228366,"longitude":-93.1222619,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"2cc832db-5309-57f3-9065-e1fb83ce6358","name":"Farmington Technology Park — proposed Tract data-center campus (PUD-1, Ordinance 2024-12; 1st Addition Lot 1 and future 2nd Addition)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["City of Farmington, Minnesota"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dba29b971b845ba962a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dba29b971b845ba962a5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-0fd145d30136b16a75ed","name":"Fermi America Project Matador campus","country":"United States","country_iso_a2":"US","latitude":35.3116,"longitude":-101.5597,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"94562977-e3af-5f59-bee1-896ee8db20f6","name":"Fermi America Project Matador campus","status":"under_construction","status_as_of":"2026-09-28","search_terms":"Fermi Inc. is developing a private-power AI campus in Carson County, Texas, near Amarillo, mostly on land leased from the Texas Tech University System. Its filing describes about 11 GW of planned on-site generation, potentially expandable to about 17 GW, and about 15 million square feet of AI infrastructure space. Gas turbines come first, with nuclear units planned from 2033 and limited grid supply at the start. In August 2026 Fermi signed its first tenant lease, with TensorWave, for 222 MW of facility power. At mid-2026 it reported 1.54 billion US dollars of construction in progress and going-concern doubts that management said its plans alleviate. Private Power HyperGrid Project Matador Fermi Inc. TensorWave Siemens Energy NAES Corporation CBRE Southwestern Public Service Company"}],"status_publishers":["U.S. Securities and Exchange Commission (Fermi Inc. filing)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fd145d30136b16a75ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fd145d30136b16a75ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["U.S. Securities and Exchange Commission (Fermi Inc. filing)"]},{"site_id":"vcc-site-1074a3cbe86088ab582e","name":"Firmus Bell Bay (Long Reach) AI Factory","country":"Australia","country_iso_a2":"AU","latitude":-41.15652,"longitude":146.92765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"377ed501-7a18-5e42-9569-189cdf086ce8","name":"Firmus Bell Bay (Long Reach) AI Factory - DA 2026/29 data centre","status":"announced","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["George Town Council"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1074a3cbe86088ab582e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1074a3cbe86088ab582e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["George Town Council"]},{"site_id":"vcc-site-d7089d81dd52f365db5b","name":"Firmus St Leonards Launceston Campus","country":"Australia","country_iso_a2":"AU","latitude":-41.4408613,"longitude":147.176554,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-02","oldest_status_as_of":"2026-07-02","project_count":1,"projects":[{"project_id":"e8a1add0-19fb-5196-ae75-34353e7d580b","name":"Firmus St Leonards AI Factory Current Construction","status":"under_construction","status_as_of":"2026-07-02","search_terms":""}],"status_publishers":["Australian Broadcasting Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d7089d81dd52f365db5b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d7089d81dd52f365db5b.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim contributors","OpenStreetMap Foundation and contributors","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-23595034ead536d5a4cb","name":"firstcolo FRA7 Rosbach Campus","country":"Germany","country_iso_a2":"DE","latitude":50.29480555555556,"longitude":8.699444444444445,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"4afd2551-1442-5f67-a1d9-0d245835088d","name":"firstcolo FRA7 Current Build","status":"under_construction","status_as_of":"2026-06-15","search_terms":""}],"status_publishers":["firstcolo"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23595034ead536d5a4cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23595034ead536d5a4cb.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["firstcolo Datacenters GmbH"]},{"site_id":"vcc-site-30de35a29d7b36fc6ef8","name":"FlexBase Technologiezentrum Laufenburg Campus","country":"Switzerland","country_iso_a2":"CH","latitude":47.5536415,"longitude":8.0511054,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"c9b6bff7-09a3-599b-9c8c-49243461c0fb","name":"FlexBase New Technology Centre Current Build","status":"under_construction","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["FlexBase Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30de35a29d7b36fc6ef8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30de35a29d7b36fc6ef8.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors via Overpass"]},{"site_id":"vcc-site-5c75a2f4b8b62cd1f40a","name":"Flexential Douglasville North River Campus","country":"United States","country_iso_a2":"US","latitude":33.7307026,"longitude":-84.6112399,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"8c926b8f-0190-533b-aa7e-3223971b9e23","name":"Flexential Douglasville 2 Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c75a2f4b8b62cd1f40a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c75a2f4b8b62cd1f40a.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-45292d327405c32357bc","name":"Flexential Hillsboro Starr Campus","country":"United States","country_iso_a2":"US","latitude":45.5564617,"longitude":-122.9394058,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"ad57807a-f6b6-55f9-b26f-acd194e12880","name":"Flexential Hillsboro 5 Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-45292d327405c32357bc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-45292d327405c32357bc.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation / OpenStreetMap contributors","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-aa53021c0d413ab5dd3d","name":"Flexential Parker Compark Campus","country":"United States","country_iso_a2":"US","latitude":39.560940360431,"longitude":-104.811935209928,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"8dbc82d0-1a4d-5d8e-955e-c5e4973ea19e","name":"Flexential Parker Data Center Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Flexential, distributed by PR Newswire"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-aa53021c0d413ab5dd3d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-aa53021c0d413ab5dd3d.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-c227970382351c470df7","name":"Former Invista Site, Wilton International, Redcar","country":"United Kingdom","country_iso_a2":"GB","latitude":54.5795449,"longitude":-1.1333869,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"40683262-bc3a-5c75-9cdc-ff86edae55da","name":"Sembcorp Wilton International Data Centre - data centre campus (Redcar and Cleveland R/2026/0337/FFM)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Redcar and Cleveland Borough Council"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c227970382351c470df7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c227970382351c470df7.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Applicant planning submission, published by Redcar and Cleveland Borough Council"]},{"site_id":"vcc-site-26f8ccf01233e83baefa","name":"Former Stone Foundries, 669A Woolwich Road and VIP Industrial Estate, Charlton (Royal Borough of Greenwich)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.4915237,"longitude":0.0312653,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"1632962f-c5de-5c03-a818-16819947346d","name":"Charlton data centre proposal - 100,000 sq m GEA data centre with ancillary offices and substations (Royal Greenwich EIA scoping 26/2370/EIA)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Greater London Authority (London Planning Datahub; record supplied by the Royal Borough of Greenwich)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-26f8ccf01233e83baefa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-26f8ccf01233e83baefa.json","geometry_licenses":["not stated by the API (London Planning Datahub public data)"],"geometry_attributions":["Greater London Authority, London Planning Datahub; Royal Borough of Greenwich"]},{"site_id":"vcc-site-f42482b7bf49d6ccbeda","name":"Frederick Street Data Centre, St Leonards","country":"Australia","country_iso_a2":"AU","latitude":-33.819089,"longitude":151.189578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"d6050627-fe95-5732-99c2-d1c646526f05","name":"Frederick Street Data Centre — proposed 81 MW data centre","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f42482b7bf49d6ccbeda/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f42482b7bf49d6ccbeda.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-e7f4d963829eac6090a7","name":"G42 and Microsoft Olkaria geothermal data centre campus","country":"Kenya","country_iso_a2":"KE","latitude":-0.885737,"longitude":36.269989,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-24","oldest_status_as_of":"2026-08-24","project_count":1,"projects":[{"project_id":"e3e31b3f-d0db-54ad-849f-126a4eae2868","name":"G42 and Microsoft Olkaria geothermal data centre campus","status":"announced","status_as_of":"2026-08-24","search_terms":"Planned geothermal-powered data centre campus at Olkaria, near Lake Naivasha in Kenya's Rift Valley, announced in May 2024 by G42 and Microsoft with Kenya's ICT ministry. G42 was to build it and it was to host a new Azure East Africa cloud region, with a 100 MW first phase and potential to grow to about 1 GW; press reports call it a USD 1 billion data centre. The May 2026 opening target was missed: in 2026 the project was reported stalled over power supply limits and unapproved funding, with KenGen saying it remained at design stage, while the government said it had not been abandoned. G42 Microsoft Olkaria EcoCloud Data Centre Kenya Ministry of Information, Communications and the Digital Economy"}],"status_publishers":["Citizen Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7f4d963829eac6090a7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e7f4d963829eac6090a7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Microsoft"]},{"site_id":"vcc-site-ddbdf0b4b1f3a74ce871","name":"Galaxy Backbone National Shared Services Centre (NSSC), Abuja","country":"Nigeria","country_iso_a2":"NG","latitude":9.0648154,"longitude":7.4941134,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"d5e4264c-7cd4-5975-a1a6-23576080cf9c","name":"Galaxy Backbone NSSC Abuja — existing Tier III data-centre operations (NSSC DC1)","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Galaxy Backbone Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ddbdf0b4b1f3a74ce871/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ddbdf0b4b1f3a74ce871.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps; head-office link selected by Galaxy Backbone"]},{"site_id":"vcc-site-c77a955467c6d9e3376d","name":"Galaxy Backbone National Tier IV Data Centre, Kano","country":"Nigeria","country_iso_a2":"NG","latitude":11.9974862,"longitude":8.5590111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"3ac18f5c-5196-54d7-b146-5e0141c2bcfb","name":"Galaxy Backbone Kano — existing Tier IV data-centre operations","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Galaxy Backbone Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c77a955467c6d9e3376d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c77a955467c6d9e3376d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps; Kano office link selected by Galaxy Backbone"]},{"site_id":"vcc-site-43bf6c7b8c9e9dfc51d0","name":"Galaxy Helios Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.780636279018,"longitude":-100.867099886006,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["foundations","partially_operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":2,"projects":[{"project_id":"c7adcc1a-b5ed-5df0-b28b-572b6d9dbc4b","name":"Galaxy Helios data center campus","status":"partially_operational","status_as_of":"2026-08-12","search_terms":"Mining campus in Dickens County, in the West Texas panhandle, that Galaxy acquired in 2022 and is converting into AI and HPC data centers. CoreWeave has leased the first 800 MW of gross power in three phases totaling 526 MW of critical IT load, starting with a 15-year lease signed in April 2025. Galaxy delivered the first 133 MW of critical IT load to CoreWeave in 2026, and the eight Phase II data halls are expected online from the second quarter of 2027 into early 2028. ERCOT approved another 830 MW in January 2026, taking approved capacity above 1.6 GW, and Galaxy plans to develop that capacity on a build-to-suit basis. Helios Galaxy Digital Galaxy Digital CoreWeave HITT"},{"project_id":"2f422325-bd08-5072-a93f-dde01520f486","name":"Galaxy Helios Phase II 260 MW Critical IT Build","status":"foundations","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Galaxy","Galaxy Digital"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-43bf6c7b8c9e9dfc51d0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-43bf6c7b8c9e9dfc51d0.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau","United States Census Bureau"]},{"site_id":"vcc-site-72686694ec26fc3c593c","name":"Gardner Property Data Center Campus (McGraws Corner Drive and Nolan Road, Gainesville, Prince William County)","country":"United States","country_iso_a2":"US","latitude":38.7975663,"longitude":-77.6229589,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"0d5db76a-de16-5610-a99d-6423d698a26b","name":"Gardner Property — proposed data center buildings and electric substation (SUP2027-00008 / REZ2023-00018)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72686694ec26fc3c593c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72686694ec26fc3c593c.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-87e92c2656044bd28d16","name":"GBA Power-Computing Synergy Integrated Intelligent Computing Center, Shaoguan (parcel ZC0201A-28)","country":"China","country_iso_a2":"CN","latitude":24.9067146,"longitude":113.5589144,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"8bd0680d-791c-579e-bcde-54fcf67f7f87","name":"GBA Power-Computing Synergy Integrated Intelligent Computing Center — computing infrastructure Phase 1","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Shaoguan Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-87e92c2656044bd28d16/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-87e92c2656044bd28d16.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Natural Resources Bureau"]},{"site_id":"vcc-site-f6ace3da50c7c2c3c50e","name":"GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone (Xuanhe)","country":"China","country_iso_a2":"CN","latitude":37.364492,"longitude":105.483456,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":2,"projects":[{"project_id":"5162c73e-0ea8-58dc-a0b6-738512de7b1e","name":"GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 1","status":"permitted","status_as_of":"2026-09-30","search_terms":""},{"project_id":"ee5309f9-3359-5fa4-a3b8-add3262fe778","name":"GDS (Wanguo Data) Zhongwei Integrated Green Advanced Demonstration Data Center Industrial Park — A-Zone Phase 2","status":"permitted","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Zhongwei Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6ace3da50c7c2c3c50e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6ace3da50c7c2c3c50e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Data Bureau (中卫市数据局)"]},{"site_id":"vcc-site-b287b39e1341bb948cb6","name":"GDS Shaoguan Computing Cluster, Baitu Industrial Park, Qujiang","country":"China","country_iso_a2":"CN","latitude":24.6864239,"longitude":113.5092922,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"91de96c1-0354-5542-8abc-70cb91d3dc14","name":"GDS Shaoguan Computing Cluster (韶关万国数据算力集群) — data-centre campus development","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b287b39e1341bb948cb6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b287b39e1341bb948cb6.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau"]},{"site_id":"vcc-site-ee16e05bea0e8acb6519","name":"Gießen Katzenfeld Data Center (B-Plan GI 05/23)","country":"Germany","country_iso_a2":"DE","latitude":50.6036056,"longitude":8.659472,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"f2f6161b-6ea7-5161-a1d8-3dc838db9790","name":"Gießen Katzenfeld — planned data centre in the Sondergebiet Rechenzentrum","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Universitätsstadt Gießen, Der Magistrat (Stadtplanungsamt)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee16e05bea0e8acb6519/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee16e05bea0e8acb6519.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Universitätsstadt Gießen"]},{"site_id":"vcc-site-4dfdae431e210f2e2b91","name":"Glendenning Road Data Centre, Glendenning","country":"Australia","country_iso_a2":"AU","latitude":-33.75991,"longitude":150.85192,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"382aa8ea-3bd0-5f14-8138-1b002d2166af","name":"Glendenning Road Data Centre — approved three-building 235 MW campus","status":"permitted","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4dfdae431e210f2e2b91/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4dfdae431e210f2e2b91.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-239e6725a17b43063d1d","name":"Global Switch Madrid Data Centre Campus, Calle Yécora 4","country":"Spain","country_iso_a2":"ES","latitude":40.4479798,"longitude":-3.5747489,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"f9ad6877-6e4a-5767-ad7d-7ac73e77ab47","name":"Global Switch Madrid — existing data-centre operations (Madrid 1, Calle Yécora 4)","status":"operational","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Global Switch"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-239e6725a17b43063d1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-239e6725a17b43063d1d.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-1d11a5d2aee3f873192f","name":"Global Switch Paris Data Centre, Clichy (7 rue Petit)","country":"France","country_iso_a2":"FR","latitude":48.9001797,"longitude":2.2951336,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"447732e9-5ba8-52cb-87ad-8ca3064e01c3","name":"Global Switch Paris — existing data-centre operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Global Switch"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1d11a5d2aee3f873192f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1d11a5d2aee3f873192f.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-044046b0ede92919a936","name":"Goodman AMS01 Amsterdam Data Centre Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.37935680103495,"longitude":4.704939898256592,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"f8900f55-087d-5d51-aef2-820402bcbdc2","name":"Goodman AMS01 Phase 1 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-044046b0ede92919a936/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-044046b0ede92919a936.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Officiele Bekendmakingen","Province of Noord-Holland / Officiele Bekendmakingen"]},{"site_id":"vcc-site-f95670603a10a1f6f24b","name":"Goodman FRA02 Frankfurt Data Centre Campus","country":"Germany","country_iso_a2":"DE","latitude":50.0427,"longitude":8.685529,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"4f86e285-bcf1-537b-b31e-8af7b27ed556","name":"Goodman FRA02 Phase 1 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f95670603a10a1f6f24b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f95670603a10a1f6f24b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Goodman Group","Goodman Group via its published Google Maps link"]},{"site_id":"vcc-site-0bec2abc5fdac2e0fcf6","name":"Goodman HKG09 Kwai Chung Data Centre","country":"Hong Kong","country_iso_a2":"HK","latitude":22.367898205,"longitude":114.136318519,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"c04bedc0-51b3-5d4d-996c-1d1e56de96c0","name":"Goodman HKG09 Current Redevelopment","status":"under_construction","status_as_of":"2026-07-15","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[{"project_id":"c04bedc0-51b3-5d4d-996c-1d1e56de96c0","metric":"critical_it_mw","stage":"planned","low":28.0,"base":28.0,"high":28.0,"unit":"MW","as_of_date":"2026-07-20"},{"project_id":"c04bedc0-51b3-5d4d-996c-1d1e56de96c0","metric":"grid_connection_mw","stage":"contracted","low":50.0,"base":50.0,"high":50.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0bec2abc5fdac2e0fcf6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0bec2abc5fdac2e0fcf6.json","geometry_licenses":["Hong-Kong-DATA.GOV.HK-Terms-of-Use"],"geometry_attributions":["Government of the Hong Kong SAR / Lands Department / DATA.GOV.HK"]},{"site_id":"vcc-site-549acc09ba21cef52928","name":"Goodman HKG10 Tsuen Wan Data Centre","country":"Hong Kong","country_iso_a2":"HK","latitude":22.36449448119447,"longitude":114.1197602223039,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"726d6e35-8381-58ae-8dcd-eeb9ae23583a","name":"Goodman HKG10 Current Redevelopment","status":"under_construction","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-549acc09ba21cef52928/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-549acc09ba21cef52928.json","geometry_licenses":["csdi-terms-free-reuse-with-attribution"],"geometry_attributions":["Lands Department, Government of the Hong Kong SAR; CSDI Portal"]},{"site_id":"vcc-site-e5029d978178bf23ae67","name":"Goodman LAX01 Los Angeles Program Anchor","country":"United States","country_iso_a2":"US","latitude":34.00507389,"longitude":-118.21807054,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"447b19d9-b89b-59a6-9931-824aa1781fb0","name":"Goodman LAX01 First-Site Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5029d978178bf23ae67/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5029d978178bf23ae67.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Los Angeles County Office of the Assessor"]},{"site_id":"vcc-site-d00d83a0549fcc042174","name":"Goodman MAD01 Madrid Data Centre Campus","country":"Spain","country_iso_a2":"ES","latitude":40.444143,"longitude":-3.546397,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"b0be5071-aff0-5470-a041-a0be3cc8385a","name":"Goodman MAD01 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d00d83a0549fcc042174/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d00d83a0549fcc042174.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Goodman Group","Goodman Group via its published Google Maps link"]},{"site_id":"vcc-site-5adc03aabe03531ee95f","name":"Goodman PAR01 Paris Data Centre Campus","country":"France","country_iso_a2":"FR","latitude":48.967618,"longitude":2.569445,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"be6d721d-f632-5c86-a057-78774604bc6c","name":"Goodman PAR01 Phase 1 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5adc03aabe03531ee95f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5adc03aabe03531ee95f.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN Geoplateforme / Base Adresse Nationale"]},{"site_id":"vcc-site-40f241ba326fd84eebf1","name":"Goodman PAR02 Paris Data Centre Campus","country":"France","country_iso_a2":"FR","latitude":48.760391,"longitude":2.447152,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e1aeeee2-575c-5873-a96a-528a6c08b387","name":"Goodman PAR02 Phase 1 Current Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Goodman Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-40f241ba326fd84eebf1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-40f241ba326fd84eebf1.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN Geoplateforme / Base Adresse Nationale"]},{"site_id":"vcc-site-8b9a02f71aaf07a78742","name":"Goodman PAR03 Data Centre, Ballainvilliers (25 chemin des Bellebats)","country":"France","country_iso_a2":"FR","latitude":48.6718138,"longitude":2.2967199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"fba3e0c6-31f0-5378-8096-301509c9f5c3","name":"PAR03 — planned 72 MW IT data centre (SNC DATA SERRES, Goodman France) replacing the former MDS logistics site","status":"announced","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Île-de-France, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b9a02f71aaf07a78742/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8b9a02f71aaf07a78742.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-055591aa5753867f8b62","name":"Goodman Project Apollo Data Centre, 4-10 Talavera Road, Macquarie Park","country":"Australia","country_iso_a2":"AU","latitude":-33.781279,"longitude":151.130674,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"4e3f10ad-6985-5bdd-9829-17cc67d19f53","name":"Project Apollo Data Centre Macquarie Park — approved 135 MW data centre","status":"permitted","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-055591aa5753867f8b62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-055591aa5753867f8b62.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-a86bdb2178dda261ca13","name":"Goodman Project Pluto Data Centre, Guildford West","country":"Australia","country_iso_a2":"AU","latitude":-33.851132,"longitude":150.955072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-07-23","oldest_status_as_of":"2026-07-23","project_count":1,"projects":[{"project_id":"70a1552d-880b-56ea-963d-ce5427afd1dc","name":"Project Pluto Data Centre — approved 100 MW data centre","status":"permitted","status_as_of":"2026-07-23","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a86bdb2178dda261ca13/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a86bdb2178dda261ca13.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-37497f8175db87d92ef8","name":"Goodman SYD01 Artarmon Data Centre","country":"Australia","country_iso_a2":"AU","latitude":-33.818441,"longitude":151.19,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"99fa93f5-9f63-5576-b036-2ee8086032a3","name":"Goodman SYD01 Current Single-Building Development","status":"under_construction","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37497f8175db87d92ef8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37497f8175db87d92ef8.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Goodman Property Services (Aust) Pty Limited; NSW Planning Portal"]},{"site_id":"vcc-site-137a78b7abc74703d577","name":"Google / Beale Tulsa County Project Clydesdale Campus","country":"United States","country_iso_a2":"US","latitude":36.26982717564227,"longitude":-95.91092189697753,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"0a4a2c40-bdf2-5f56-aa09-ecfa54431d3c","name":"Google / Beale Tulsa County Project Clydesdale Campus Construction","status":"under_construction","status_as_of":"2026-08-19","search_terms":"Beale Infrastructure is building a 506-acre data center campus in unincorporated Tulsa County, Oklahoma, just west of Owasso near Cherokee Industrial Park. Tulsa County commissioners approved the economic development plan and tax incentives in September 2025, and ground was broken on 30 October 2025 for what was billed as a USD 1 billion project. Plans call for at least one phase of about 200,000 sq ft, with up to three more possible, and construction expected to take at least five years. In August 2026 Google was identified as the operator of the campus, which Public Service Company of Oklahoma will power through a new Beale-funded on-site substation. Project Clydesdale Beale Infrastructure Google Public Service Company of Oklahoma Tulsa County Board of Commissioners"}],"status_publishers":["Beale Infrastructure; joint Google and Beale announcement"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-137a78b7abc74703d577/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-137a78b7abc74703d577.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Tulsa Planning Office / INCOG; survey prepared by GEODECA LLC"]},{"site_id":"vcc-site-9da1382c1df4f319ef97","name":"Google Armstrong County data center campus (Crusoe Goodnight)","country":"United States","country_iso_a2":"US","latitude":35.1081,"longitude":-101.3627,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"b7d85afa-fbc0-53d6-b19c-6e00c6639642","name":"Google Armstrong County data center campus (Crusoe Goodnight)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"AI data center campus near Claude, Armstrong County, in the Texas Panhandle, being developed by Crusoe on about 1,300 acres beside the Goodnight wind farms. Google named Armstrong County as a new campus site in its November 2025 Texas program ($40 billion statewide through 2027), and Crusoe confirmed Google as the end user in September 2026. County tax abatement materials described a first phase of four buildings drawing up to 530 MW, within a two-phase 1,030 MW design. State filings in 2026 added two buildings of about 805,000 sq ft each, together estimated at $1 billion. Amended filings added gas turbines and battery storage, and one report says Crusoe agreed to sell the project to Google. Goodnight campus Project Goodnight Crusoe GN DC1 LLC Google Serena"}],"status_publishers":["Crusoe"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9da1382c1df4f319ef97/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9da1382c1df4f319ef97.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC 7 Amarillo"]},{"site_id":"vcc-site-15afee16348a0ffc414f","name":"Google Bermuda Hundred Data Center Campus","country":"United States","country_iso_a2":"US","latitude":37.34632783459711,"longitude":-77.30489173364066,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f3cc5dc7-9547-517f-94aa-89e0769f2bf8","name":"Google Bermuda Hundred Current Development","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Chesterfield County"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-15afee16348a0ffc414f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-15afee16348a0ffc414f.json","geometry_licenses":["CC0-1.0","all-rights-reserved","no-open-document-redistribution-license-asserted"],"geometry_attributions":["Chesterfield County GIS","Data retrieved from Chesterfield County GIS Data Catalog.","Esri"]},{"site_id":"vcc-site-5878345369c98c058193","name":"Google Cedar Rapids data center campus (Big Cedar Industrial Center)","country":"United States","country_iso_a2":"US","latitude":41.9172,"longitude":-91.7254,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"27c38b34-579b-5542-b04b-44d6d5747bff","name":"Google Cedar Rapids data center campus (Big Cedar Industrial Center)","status":"under_construction","status_as_of":"2026-10-05","search_terms":"Google's second Iowa data center campus, under construction at Alliant Energy's Big Cedar Industrial Center in Cedar Rapids, Linn County, where QTS has also announced a data center. Google confirmed the campus in May 2025 alongside a $7 billion two-year Iowa investment that also funds expansion in Council Bluffs; Google has not said how much goes to Cedar Rapids. Trade reporting said the first building would be finished in 2026, with four more planned and over 1,200 construction workers. Epoch AI, using satellite imagery and permit data, projects three buildings with about 261 MW of IT power and a capital cost near $9.9 billion by Q2 2027; these are analyst projections, not company figures. Google Google"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5878345369c98c058193/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5878345369c98c058193.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Alliant Energy"]},{"site_id":"vcc-site-f503d67f9ff671372aac","name":"Google Cerrillos Data Center","country":"Chile","country_iso_a2":"CL","latitude":-33.52007,"longitude":-70.72141,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"e200ba11-6c88-546c-9d7a-521c0abcb06e","name":"Google Cerrillos Data Center — redesigned air-cooled proposal","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Región Metropolitana de Santiago, Chile"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f503d67f9ff671372aac/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f503d67f9ff671372aac.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; Inversiones y Servicios Dataluna Ltda."]},{"site_id":"vcc-site-844cdbf47a97438d7298","name":"Google Columbia County Data Center Campus (GreenPoint)","country":"United States","country_iso_a2":"US","latitude":33.5129432,"longitude":-82.3412549,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"ef74017c-dd85-5cbf-a87e-46588c0e52cd","name":"Google Columbia County (GreenPoint) Data Center Campus Development","status":"announced","status_as_of":"2026-10-19","search_terms":""}],"status_publishers":["Columbia County, Georgia"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-844cdbf47a97438d7298/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-844cdbf47a97438d7298.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Columbia County, Georgia GIS (PublicAccess map services)"]},{"site_id":"vcc-site-2f048b74f4ed91d150b5","name":"Google Columbus Data Center Campus (225 Rathmell Road / 5076 South High Street)","country":"United States","country_iso_a2":"US","latitude":39.8525275,"longitude":-82.9968088,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"468fe037-24ae-506d-b561-d032fba74f01","name":"Building CLB4 — 288,000 sq ft alteration works (Columbus permit ALTC2502418, final inspection approved)","status":"completed","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Columbus, Ohio (Department of Building and Zoning Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f048b74f4ed91d150b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f048b74f4ed91d150b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Franklin County Auditor"]},{"site_id":"vcc-site-a9577b8feaea08be317c","name":"Google Data Center, Elmina Business Park","country":"Malaysia","country_iso_a2":"MY","latitude":3.222618484316103,"longitude":101.51973036271843,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-15","oldest_status_as_of":"2026-08-15","project_count":1,"projects":[{"project_id":"e56ff51f-930c-5c5b-bc82-7add264e576e","name":"Google Elmina Current Campus Construction","status":"under_construction","status_as_of":"2026-08-15","search_terms":"Google's first data center in Malaysia is being built in Sime Darby Property's Elmina Business Park in Selangor, in Greater Kuala Lumpur. Google announced in May 2024 a US$2 billion investment covering this data center and its first Malaysian cloud region, and broke ground in October 2024. Sime Darby Property is building the facility to Google's specifications under a lease arrangement with Google, which will operate it; Google says it will be water-cooled. Completion was targeted for early 2026, but Google's location list still showed the Selangor site as in development in October 2026. Google Elmina data centre Google Malaysia cloud region Google Google Google Sime Darby Property Bhd"}],"status_publishers":["Media Selangor; first-hand interview with Google infrastructure principal Ken Siah"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a9577b8feaea08be317c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a9577b8feaea08be317c.json","geometry_licenses":["CC-BY-SA-4.0","CC0-1.0"],"geometry_attributions":["Wikidata contributors"]},{"site_id":"vcc-site-e2ec9daea00e4e3d9dc1","name":"Google Fort Wayne data center","country":"United States","country_iso_a2":"US","latitude":41.018,"longitude":-85.058,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"7c9397d2-971c-5d1e-ad58-210d19777a37","name":"Google Fort Wayne data center","status":"operational","status_as_of":"2026-10-09","search_terms":"Google data center near East Tillman Road and Adams Center Road in Fort Wayne, Allen County, Indiana. Google and the governor announced the $2 billion project and broke ground on 26 April 2024, projecting up to 200 jobs. The state committed a performance-based 35-year data center sales tax exemption, tied to at least $800 million of eligible capital and extendable with further investment. Google announced a collaboration with Indiana Michigan Power to add new clean energy resources to the local grid. Google's Indiana page now describes the Fort Wayne site as operational; no capacity figure has been published. Google Google Indiana Economic Development Corporation Indiana Michigan Power"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e2ec9daea00e4e3d9dc1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e2ec9daea00e4e3d9dc1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indiana Economic Development Corporation"]},{"site_id":"vcc-site-65784844ad2a20822ec7","name":"Google Franklin Township data center proposal (Project Flo)","country":"United States","country_iso_a2":"US","latitude":39.6803,"longitude":-86.0275,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2025-09-22","oldest_status_as_of":"2025-09-22","project_count":1,"projects":[{"project_id":"892af381-b656-528b-a9db-61013937174e","name":"Google Franklin Township data center proposal (Project Flo)","status":"cancelled","status_as_of":"2025-09-22","search_terms":"Proposed Google data center on about 468 acres of farmland in Franklin Township on the southeast side of Indianapolis, reported as a USD 1 billion project; tracker Baxtel says Google proposed it through an affiliate, Deep Meadow Ventures. The Metropolitan Development Commission approved the rezoning in August 2025, but the City-County Council scheduled its own public hearing amid opposition from residents worried about water use, flooding and electricity bills. Google's attorney announced the withdrawal of the rezoning petition at the council meeting on 22 September 2025. No later refiling was found. Project Flo Google Deep Meadow Ventures LLC Indianapolis Metropolitan Development Commission Indianapolis City-County Council"}],"status_publishers":["Inside INdiana Business (Indianapolis Business Journal)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-65784844ad2a20822ec7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-65784844ad2a20822ec7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Inside INdiana Business (Indianapolis Business Journal)"]},{"site_id":"vcc-site-d6bacce52b63861e5d12","name":"Google Horndal Data Center","country":"Sweden","country_iso_a2":"SE","latitude":60.3205311307345,"longitude":16.402072554128004,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"038be51b-809c-5d3b-a1ee-79438de4a576","name":"Google Horndal Data Center — first facility","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Avesta kommun"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6bacce52b63861e5d12/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6bacce52b63861e5d12.json","geometry_licenses":["not-stated-public-municipal-service"],"geometry_attributions":["Västmanland-Dalarna miljö- och byggförvaltning; cadastral index map data"]},{"site_id":"vcc-site-e9b1502f052163b5ab4e","name":"Google Ireland Grange Castle data-centre campus, Grange Castle Business Park South, Dublin","country":"Ireland","country_iso_a2":"IE","latitude":53.3131,"longitude":-6.448767,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"f6259b7c-354f-531b-816b-79e84d7b7df8","name":"Google Grange Castle South Data Storage Facility Expansion","status":"permitted","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["An Coimisiún Pleanála"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e9b1502f052163b5ab4e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e9b1502f052163b5ab4e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Department of Housing, Planning and Local Government; South Dublin County Council"]},{"site_id":"vcc-site-e348a191d95cf61970ae","name":"Google Journey data center campus (Haskell County)","country":"United States","country_iso_a2":"US","latitude":33.1564,"longitude":-99.5683,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-25","oldest_status_as_of":"2026-06-25","project_count":1,"projects":[{"project_id":"93e5705d-3c86-524c-8089-0868d13bbd0d","name":"Google Journey data center campus (Haskell County)","status":"under_construction","status_as_of":"2026-06-25","search_terms":"Data center campus on a 300-acre tract along Red Creek Road, south of US Highway 380 in Haskell County, Texas, owned by Homebound Group LLC. Haskell County labels the Journey abatement as a Google project, and Google named new Haskell County campuses in its November 2025 Texas program. The June 2025 county tax abatement expects Phase 1 capital costs of about $1 billion, allows up to four phases, and requires at least 50 permanent jobs. 2026 state registrations list two buildings at 1362 Red Creek Rd, JNR1A (285,282 sq ft) and JNR2A (210,420 sq ft), each estimated at $400 million, with completion targets in August and October 2027. Journey campus Haskell County Journey Reinvestment Zone Homebound Group LLC Homebound Group LLC Google Haskell County"}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e348a191d95cf61970ae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e348a191d95cf61970ae.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Haskell County, Texas"]},{"site_id":"vcc-site-210a7753dcf05471886c","name":"Google Kansas City data center campus (Hunt Midwest Business Center)","country":"United States","country_iso_a2":"US","latitude":39.168,"longitude":-94.4788,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"52e21086-11ad-588d-a8a8-d9525e5e4744","name":"Google Kansas City data center campus (Hunt Midwest Business Center)","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Google's first Missouri data center campus, at the Hunt Midwest Business Center off NE Parvin Road in Kansas City's Northland (Clay County). Google announced the $1 billion project in March 2024, with Evergy powering the site and a 400 MW solar PPA from the Beavertail Solar farm with Ranger Power and DESRI. Google, partly through the Alphabet vehicle Shalerock LLC, had assembled more than 315 acres in the Northland by late 2021 for a project called Project Shale. Google's site now describes two new data centers in Kansas City as in development, while a third-party listing reports the first building operational since 2025 within a four-phase plan of about 1.435 million sq ft. Project Shale Shale 1 Google Shalerock LLC Evergy Ranger Power D. E. Shaw Renewable Investments Port KC"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-210a7753dcf05471886c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-210a7753dcf05471886c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KSHB 41"]},{"site_id":"vcc-site-c3e5176a28be6c093486","name":"Google Mayes County Data Center Campus (Pryor, MidAmerica Industrial Park)","country":"United States","country_iso_a2":"US","latitude":36.2425,"longitude":-95.3302,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"c938d454-2dbb-536c-b054-80b5128d93ce","name":"Google Mayes County (Pryor) — existing data-centre campus operations","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Google LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c3e5176a28be6c093486/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c3e5176a28be6c093486.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma DEQ Air Quality Division; application prepared for Myall, LLC"]},{"site_id":"vcc-site-7b3778f58b65d557b1f9","name":"Google Meitner Energy Center data center (Gray and Roberts counties)","country":"United States","country_iso_a2":"US","latitude":35.5363,"longitude":-100.9602,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-04","oldest_status_as_of":"2026-06-04","project_count":1,"projects":[{"project_id":"db205e2d-f250-5c0b-861e-1c243f7be933","name":"Google Meitner Energy Center data center (Gray and Roberts counties)","status":"under_construction","status_as_of":"2026-06-04","search_terms":"Google data center being built alongside new dedicated generation at the Meitner Energy Center in Gray and Roberts counties in the Texas Panhandle; Google's location list shows a Pampa site in development. Google and Intersect, the energy developer Google closed on buying in March 2026, announced construction on 4 June 2026. The complex pairs the data center with more than 1 GW of wind, solar and battery storage, and on-site gas firming covers a minority of demand. The data center is designed for air cooling. Google has not disclosed the compute load, cost or opening date. An 800-acre Caprock Workforce Hub in Wheeler County is planned to house up to 3,500 workers. Meitner Energy Center Google Intersect"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7b3778f58b65d557b1f9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7b3778f58b65d557b1f9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Google"]},{"site_id":"vcc-site-5dae31735952497e716b","name":"Google Mesa Red Hawk Data Center Campus","country":"United States","country_iso_a2":"US","latitude":33.3540946,"longitude":-111.676019,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed","under_construction"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-09-29","project_count":2,"projects":[{"project_id":"b42b34a0-8ef9-542e-b470-38524064ccfb","name":"Google Mesa Red Hawk — Phase 2 Building 2","status":"completed","status_as_of":"2026-09-29","search_terms":""},{"project_id":"656f3fb9-5028-5b6d-9e54-0f6a57093b30","name":"Google Mesa Red Hawk — Phase 3 (PH03) data hall building","status":"under_construction","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5dae31735952497e716b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5dae31735952497e716b.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor, Arizona"]},{"site_id":"vcc-site-373d7757d0759da1977f","name":"Google Muskogee County Data Center Campus (Acacia House, near Council Hill)","country":"United States","country_iso_a2":"US","latitude":35.58091,"longitude":-95.64531,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"a029c49b-f1c3-5bc5-a718-d55856d28934","name":"Google Muskogee County (Acacia House) — new data-centre campus in development (Acacia Facility, DEQ permit application 2026-0090-C)","status":"announced","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Google LLC"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-373d7757d0759da1977f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-373d7757d0759da1977f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma DEQ Air Quality Division"]},{"site_id":"vcc-site-7ea48a92b2736ef7dbfb","name":"Google New Albany Data Center Campus (1101 Beech Rd SW and 5266 Babbitt Rd)","country":"United States","country_iso_a2":"US","latitude":40.0583337,"longitude":-82.7672501,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"a04d7097-bbed-5206-8e39-acc8dc1f0f37","name":"Google New Albany — existing data-centre campus operations","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7ea48a92b2736ef7dbfb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7ea48a92b2736ef7dbfb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-c26e81685b409595414a","name":"Google Project Cannoli Data Center Campus (Van Buren Township)","country":"United States","country_iso_a2":"US","latitude":42.2258431,"longitude":-83.4351731,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"5ccc6049-7bf8-52f6-be62-865f14b6f20e","name":"Project Cannoli — proposed Google data center campus (Buildings 1-3, network service building and office)","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Wayne County, Michigan (County Commission)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c26e81685b409595414a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c26e81685b409595414a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Wayne County GIS"]},{"site_id":"vcc-site-125cb8890e612925ded5","name":"Google Project Skyway data center campus (Pine Island Industrial PUD, Pine Island, Minnesota)","country":"United States","country_iso_a2":"US","latitude":44.2265242,"longitude":-92.6454052,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"76730247-d8d8-5913-beb7-7ae1e64e9e81","name":"Google Project Skyway — proposed data-center campus on the Pine Island Industrial PUD site with four Google-owned substations (PUC route-permit docket E002/TL-26-135)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Minnesota Public Utilities Commission"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-125cb8890e612925ded5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-125cb8890e612925ded5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Minnesota (Department of Commerce, Public Utilities Commission)"]},{"site_id":"vcc-site-d92255df1f2246ac16d5","name":"Google Stillwater data center campus","country":"United States","country_iso_a2":"US","latitude":36.116,"longitude":-97.059,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"1b7d1694-1f94-5ac5-a39d-ef81696ed589","name":"Google Stillwater data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Planned Google data center campus on land Google acquired at the intersection of Perkins and Richmond Roads in Stillwater, Oklahoma, disclosed by the city in March 2025 after county economic development officials had kept the buyer's identity confidential. Local reporting describes a project of up to USD 3 billion that the mayor called a 25-year plan, with first-phase construction expected to finish as early as 2027 and Google initially making payments in lieu of property taxes. Tracker Baxtel lists the campus as planned. Google Google City of Stillwater"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d92255df1f2246ac16d5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d92255df1f2246ac16d5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["City of Stillwater"]},{"site_id":"vcc-site-078fc4166e995b536458","name":"Google Waltham Cross data centre","country":"United Kingdom","country_iso_a2":"GB","latitude":51.6858,"longitude":-0.033,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2025-09-16","oldest_status_as_of":"2025-09-16","project_count":1,"projects":[{"project_id":"03b5fd0f-9eaf-5f2b-bd8e-7c11fe6672a9","name":"Google Waltham Cross data centre","status":"operational","status_as_of":"2025-09-16","search_terms":"Google data centre on a 33-acre site in Waltham Cross, Hertfordshire, England. Google announced a $1 billion investment in the new facility in January 2024, describing air-based cooling with provision for off-site heat recovery to nearby homes and businesses. Chancellor Rachel Reeves opened the data centre in September 2025, when Google also announced a two-year GBP 5 billion UK investment covering capital spending, R&D and engineering. Google says the site supports AI services, Google Cloud, Search and Maps. Power capacity has not been disclosed. Google Google"}],"status_publishers":["Google"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-078fc4166e995b536458/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-078fc4166e995b536458.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Google"]},{"site_id":"vcc-site-1c393b2e71d64f0ffd69","name":"Google West Memphis data center campus","country":"United States","country_iso_a2":"US","latitude":35.1163,"longitude":-90.2115,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-02-26","oldest_status_as_of":"2026-02-26","project_count":1,"projects":[{"project_id":"09904943-69d4-51d7-aef7-4ff880e47332","name":"Google West Memphis data center campus","status":"under_construction","status_as_of":"2026-02-26","search_terms":"Google's first Arkansas data center campus, under construction at the south end of Bollinger Road in West Memphis, Crittenden County, on a property reported at 1,000 to 1,200 acres. Google announced it in October 2025 as part of a $4 billion Arkansas commitment running through 2027. The developer of record, Groot LLC, filed plans with the US Army Corps of Engineers in late 2024; earlier reporting described a proposed $10 billion campus with five data center buildings and a substation. Construction began in October 2025 on an 18-24 month schedule. Entergy Arkansas is supplying power under a contract with Google, which is paying part of the cost of a new Entergy solar and storage project. Groot LLC West Memphis data center Google Groot LLC Entergy Arkansas Turner Construction Yates Construction"}],"status_publishers":["Action News 5 (WMC)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1c393b2e71d64f0ffd69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1c393b2e71d64f0ffd69.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Daily Memphian"]},{"site_id":"vcc-site-405cb45c9b94c93cd89a","name":"Graven Hill D1 Site (Circular Road, Ambrosden, Bicester, Oxfordshire)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.8739179,"longitude":-1.1404842,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"00253157-45c0-5fde-ba45-79e7f4d56e84","name":"Graven Hill D1 Data Centre Campus - eight data-centre units (Cherwell reserved matters 25/03310/REM)","status":"permitted","status_as_of":"2026-08-06","search_terms":""}],"status_publishers":["Cherwell District Council"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-405cb45c9b94c93cd89a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-405cb45c9b94c93cd89a.json","geometry_licenses":["not stated by the service (council planning-register map data; no copyright text published)"],"geometry_attributions":["Cherwell District Council"]},{"site_id":"vcc-site-f820a2601bd6a36ffa89","name":"Green Birr Data Center Campus (Areal Grossacher und Grändel, Birr AG)","country":"Switzerland","country_iso_a2":"CH","latitude":47.4328217,"longitude":8.2139272,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"84e6bae8-2f62-534e-9302-8519aeff26e4","name":"Green Birr — planned data-centre campus on the 25 ha Areal Grossacher und Grändel","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Green Datacenter AG / green.ch AG"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f820a2601bd6a36ffa89/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f820a2601bd6a36ffa89.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Kanton Aargau / swisstopo"]},{"site_id":"vcc-site-c61c3aef755484b5c52d","name":"Green Campus ZRH1 Lupfig","country":"Switzerland","country_iso_a2":"CH","latitude":47.44639395,"longitude":8.21083305,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"58129708-0b52-5984-afbc-f8f38e085df1","name":"Green Campus ZRH1 Data Center 4","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["Green"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c61c3aef755484b5c52d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c61c3aef755484b5c52d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-0d25d33c7b8c51f70ba3","name":"Green IT Aragón data center campus (SAMCA), Luceni","country":"Spain","country_iso_a2":"ES","latitude":41.833,"longitude":-1.233,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"15360f72-acfa-572f-aac9-eb117ae9fc0d","name":"Green IT Aragón data center campus (SAMCA), Luceni","status":"announced","status_as_of":"2026-10-05","search_terms":"Three-building data center campus planned by the SAMCA group in Luceni, Zaragoza province, paired with renewing and expanding SAMCA's nearby wind farms to supply it. Announced in April 2025 at EUR 2,627 million including the renewable generation. Red Eléctrica has permitted 131 MW for a first phase, which could rise to 181 MW and finally 300 MW. A technical annex describes three identical buildings of 72 MW of IT load, each drawing up to 100 MW from the grid. The regional plan received initial approval in December 2025; in October 2026 site works were expected by late 2026 or in 2027, with the first phase targeted for 2028. Green IT Aragón PIGA Green It Aragón SAMCA (Sociedad Anónima Minera Catalano-Aragonesa) SAMCA (Sociedad Anónima Minera Catalano-Aragonesa) Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0d25d33c7b8c51f70ba3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0d25d33c7b8c51f70ba3.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Gobierno de Aragón"]},{"site_id":"vcc-site-76ff9a11d8e0e21c29cb","name":"Green Mountain FRA-Mainz Campus","country":"Germany","country_iso_a2":"DE","latitude":50.02764,"longitude":8.24061,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"4eeb97fa-8e1d-53de-ae86-eebc40e97d6f","name":"Green Mountain FRA-Mainz Current Three-Building Development","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Green Mountain"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-76ff9a11d8e0e21c29cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-76ff9a11d8e0e21c29cb.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Energieagentur Rheinland-Pfalz"]},{"site_id":"vcc-site-bcb0361cec82a4bf1063","name":"Green Mountain LON-East data centre campus (Romford North Data Centre), King George Close, Romford (Havering)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.587017,"longitude":0.167675,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"3dfc53ca-e0ad-5697-8870-c1637056840f","name":"Green Mountain LON-East (Romford) - 14 MW AI-ready data-hall expansion inside the existing building (delivered)","status":"completed","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["Green Mountain (Green Mountain AS / Green Mountain DC UK Limited)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bcb0361cec82a4bf1063/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bcb0361cec82a4bf1063.json","geometry_licenses":["Open Government Licence v3.0 (Environment Agency conditional licence as stated in the register metadata)"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-5973ad6c7ce7afc4f6b6","name":"Green Mountain Undheim Campus","country":"Norway","country_iso_a2":"NO","latitude":58.6593348,"longitude":5.7940859,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"0a075c8d-2733-5aba-b19a-4b53e51fd8f8","name":"Green Mountain Undheim Current Two-Building Development","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["Green Mountain"],"power_observations":[{"project_id":"0a075c8d-2733-5aba-b19a-4b53e51fd8f8","metric":"critical_it_mw","stage":"planned","low":80.0,"base":80.0,"high":80.0,"unit":"MW","as_of_date":"2026-07-20"},{"project_id":"0a075c8d-2733-5aba-b19a-4b53e51fd8f8","metric":"gross_facility_mw","stage":"planned","low":100.0,"base":100.0,"high":100.0,"unit":"MW","as_of_date":"2026-07-20"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5973ad6c7ce7afc4f6b6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5973ad6c7ce7afc4f6b6.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© Kartverket"]},{"site_id":"vcc-site-695cedb1c24a33253685","name":"Greenergy Hüüru Data Center Campus","country":"Estonia","country_iso_a2":"EE","latitude":59.38609935,"longitude":24.561964619163426,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"b4349487-1879-5b90-9064-d1b86cb49850","name":"Greenergy Hüüru Data-Hall Expansion","status":"under_construction","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["MCF Group Estonia OÜ (Greenergy Data Centers)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-695cedb1c24a33253685/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-695cedb1c24a33253685.json","geometry_licenses":["ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["OpenStreetMap Foundation","OpenStreetMap contributors"]},{"site_id":"vcc-site-05e278850debfc60136a","name":"GreenSquareDC SYD1 Norwest (3 Brookhollow Avenue)","country":"Australia","country_iso_a2":"AU","latitude":-33.732527,"longitude":150.9680221,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"c220cc67-d17d-507d-831f-65fc789cf9ff","name":"Brookhollow Avenue Data Centre Expansion — proposed 118.3 MW building","status":"announced","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-05e278850debfc60136a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-05e278850debfc60136a.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-91900fdcefed41cee4a5","name":"Grenergy GR Data Alto Jahuel Campus Sur","country":"Chile","country_iso_a2":"CL","latitude":-33.7070532,"longitude":-70.6970217,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"6e51233c-0a51-5e14-9856-69c41180d8b5","name":"Data Center Alto Jahuel Campus Sur — initial data centre","status":"announced","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Huiña SpA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91900fdcefed41cee4a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-91900fdcefed41cee4a5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; GR Huiña SpA"]},{"site_id":"vcc-site-9e62239702eac51c77e0","name":"Grenergy GR Data Polpaico Campus Norte","country":"Chile","country_iso_a2":"CL","latitude":-33.190023846162,"longitude":-70.86943495515,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"83a943e6-7281-58bf-a28c-efae1c984c68","name":"Data Center Polpaico Campus Norte — initial data centre","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Chile — filing by GR Culle SpA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9e62239702eac51c77e0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9e62239702eac51c77e0.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; GR Culle SpA"]},{"site_id":"vcc-site-df0b335d5d064a3edd17","name":"GSA01 Data Centre, Bang Phli (Samut Prakan)","country":"Thailand","country_iso_a2":"TH","latitude":13.592908,"longitude":100.7654867,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"57356470-4a61-51cc-8df5-51d478806300","name":"GSA01 Data Centre — operating 25 MW data centre","status":"operational","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Gulf Development Public Company Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df0b335d5d064a3edd17/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df0b335d5d064a3edd17.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-65c5c08cfcc359b83ade","name":"Haoyang Langfang No. 1 Data Center","country":"China","country_iso_a2":"CN","latitude":39.4604,"longitude":116.2462,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"85adb51e-863a-5c4b-9660-089495964ccb","name":"Haoyang Langfang No. 1 Existing Operations","status":"operational","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Langfang Television; Huanjingjin News; Sina republication"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-65c5c08cfcc359b83ade/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-65c5c08cfcc359b83ade.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-d1b09eaeac654b3c56f6","name":"Herbata data centre campus (Naas)","country":"Ireland","country_iso_a2":"IE","latitude":53.217,"longitude":-6.663,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"2a418e82-60a0-52bf-ac57-8e0e3d3eabdb","name":"Herbata data centre campus (Naas)","status":"announced","status_as_of":"2026-10-09","search_terms":"Proposed EUR 3 billion data centre campus by Herbata Ltd beside the M7 motorway at Naas, County Kildare, Ireland, in the townlands of Halverstown, Jigginstown and Newhall. The plan has six data halls of 30 MW each, 180 MW in total, and would not draw from the national grid: half its power would come from renewable purchase agreements and the rest from on-site gas turbines, gas engines and batteries. Kildare County Council granted permission in August 2025. An Taisce and two environmental groups appealed, as did Herbata over some conditions; in September 2026 the appeals still awaited a decision by An Coimisiún Pleanála. Herbata Data Centre Herbata Ltd Kildare County Council An Coimisiún Pleanála"}],"status_publishers":["An Coimisiún Pleanála"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d1b09eaeac654b3c56f6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d1b09eaeac654b3c56f6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["An Coimisiún Pleanála"]},{"site_id":"vcc-site-ba5a5fcafa0e68a3bbc8","name":"Hexagon Data Center (Riyadh)","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.633,"longitude":46.717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-01","oldest_status_as_of":"2026-05-01","project_count":1,"projects":[{"project_id":"912a1942-9e25-5d1f-b3ce-7f39f60ca845","name":"Hexagon Data Center (Riyadh)","status":"under_construction","status_as_of":"2026-05-01","search_terms":"Government data centre being built in Riyadh by the Saudi Data and Artificial Intelligence Authority (SDAIA), billed as the world's largest Tier IV government data centre. The foundation stone was laid in early January 2026 for a facility of up to 480 MW on a site of about 30 million square feet, designed to host more than 290 government systems and to seed a wider national network of centres. Reported project value is about USD 2.7 billion; a project-tracking profile names Albawani as main contractor, says construction was progressing in April 2026 and gives a Q1 2029 completion target. Hexagon Data Centre SDAIA Hexagon Saudi Data and Artificial Intelligence Authority (SDAIA) Albawani"}],"status_publishers":["W.Media"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ba5a5fcafa0e68a3bbc8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ba5a5fcafa0e68a3bbc8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-542e6b8f3b606a87d245","name":"HiCloud Shantou Undersea Data Center","country":"China","country_iso_a2":"CN","latitude":23.25422,"longitude":116.98489,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"a337e27d-292f-508e-bda7-be73864c774b","name":"Shantou Undersea Data Center Phase 1 (7 MW data-capsule platform)","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Shantou Natural Resources Bureau (Ocean Bureau)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-542e6b8f3b606a87d245/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-542e6b8f3b606a87d245.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shantou Natural Resources Bureau; HiCloud (Guangdong) Technology Co., Ltd."]},{"site_id":"vcc-site-9489efce9491948dd2f9","name":"Highreso Ayagawa Town Data Center","country":"Japan","country_iso_a2":"JP","latitude":34.2202726,"longitude":133.968362,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"e83a4dfc-141f-5213-ac1f-46298013801f","name":"Highreso Ayagawa Existing Operations","status":"operational","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Highreso"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9489efce9491948dd2f9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9489efce9491948dd2f9.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-62d73cc076d6765daf7d","name":"Highreso Kagawa Takamatsu City Data Center","country":"Japan","country_iso_a2":"JP","latitude":34.2942,"longitude":134.0723,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"6daf7e34-6683-5158-98a2-ddd657edc7cb","name":"Highreso Kagawa Takamatsu Existing Operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Highreso"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62d73cc076d6765daf7d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62d73cc076d6765daf7d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-ee413666d6aa0f69a386","name":"HIVE Yguazú Paraguay Campus","country":"Paraguay","country_iso_a2":"PY","latitude":-25.4844770233465,"longitude":-55.0113748914513,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"20a32e9d-3c57-520d-aeb8-ad999d43fee3","name":"HIVE Yguazú 2026 Campus Electrical-Infrastructure Expansion","status":"under_construction","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["HIVE Digital Technologies Ltd."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee413666d6aa0f69a386/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee413666d6aa0f69a386.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Internet Engineering Task Force; RFC Editor","Ministerio del Ambiente y Desarrollo Sostenible, Paraguay"]},{"site_id":"vcc-site-30261c455bad7edb8c71","name":"HJS Data Building Site (2565 Harrison Road, New Albany)","country":"United States","country_iso_a2":"US","latitude":40.09404769430338,"longitude":-82.73817233294137,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"2788467f-c848-52d5-b711-51dd30c809de","name":"HJS — new 189,378 sq ft data building (2565 Harrison Road)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-30261c455bad7edb8c71/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-30261c455bad7edb8c71.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Licking County Auditor"]},{"site_id":"vcc-site-717f1158c9edb82ced9c","name":"HND12 Toyosu Data Centre","country":"Japan","country_iso_a2":"JP","latitude":35.651825,"longitude":139.796417,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"7ffe8a4d-8b2f-5c0b-85a3-34d3aafe374f","name":"(仮称)HND12新築工事 — planned Toyosu data-centre building","status":"announced","status_as_of":"2026-08-06","search_terms":""}],"status_publishers":["Digital Tokyo Bay 1 TMK; USI Engineering; Kume Sekkei"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-717f1158c9edb82ced9c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-717f1158c9edb82ced9c.json","geometry_licenses":["GSI content terms (attribution required)"],"geometry_attributions":["Geospatial Information Authority of Japan"]},{"site_id":"vcc-site-ccd3fa0c0268ff3715c1","name":"Hofheim-Marxheim Data Center (Rheingaustraße 201)","country":"Germany","country_iso_a2":"DE","latitude":50.0573469,"longitude":8.4344557,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"2c71b4fc-2a31-531b-9750-476f761c0a86","name":"Rechenzentrum Hofheim-Marxheim — new three-phase data centre","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Data Center Group"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ccd3fa0c0268ff3715c1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ccd3fa0c0268ff3715c1.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Regierungspräsidium Darmstadt"]},{"site_id":"vcc-site-f49882717c93278a3c62","name":"Homer City Energy Campus","country":"United States","country_iso_a2":"US","latitude":40.5108,"longitude":-79.1936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"7d6333d2-26e6-548c-979a-324c7113281b","name":"Homer City Energy Campus","status":"under_construction","status_as_of":"2026-10-20","search_terms":"Redevelopment of the retired Homer City coal-fired generating station in Indiana County, Pennsylvania, into a gas-fired power and data center campus of more than 3,200 acres. Seven GE Vernova 7HA.02 turbines are planned to deliver up to 4.4 GW for multiple large data center customers, with some power also supplied to the local grid. The developer projects more than 10 billion US dollars for power infrastructure and site readiness, with data centers adding more. Pennsylvania regulators issued an air permit in November 2025; by September 2026 more than 1,800 workers were on site, with power production targeted for 2027. No data center tenant has been named. Homer City Redevelopment Homer City Generation Homer City Redevelopment Kiewit Power Constructors Co. GE Vernova Knighthead Capital Management"}],"status_publishers":["Homer City Generation, L.P."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f49882717c93278a3c62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f49882717c93278a3c62.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Pennsylvania Senate Republicans"]},{"site_id":"vcc-site-6f469fef389a90fb70b5","name":"Horizon 1 Kearney Data Center Campus (Tech One, Kearney, Nebraska)","country":"United States","country_iso_a2":"US","latitude":40.7246191,"longitude":-99.0420045,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"cb9d6813-725d-5759-b562-64d29352ef31","name":"Horizon 1 Kearney data center — Conditional Use Permit 2026-04 (Ordinance No. 8823), Lot 1 Tech One Third and Lot 1 Tech One Fifth Subdivisions","status":"permitted","status_as_of":"2026-09-08","search_terms":""}],"status_publishers":["City of Kearney, Nebraska (City Clerk)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6f469fef389a90fb70b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6f469fef389a90fb70b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Kearney, Nebraska"]},{"site_id":"vcc-site-19bcfff06d0f5183a5b0","name":"Huailai Smart Space AI Industrial Park, Xiaonanxinpu, Huailai","country":"China","country_iso_a2":"CN","latitude":40.31017,"longitude":115.76183,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"ea6aff94-f553-55b4-b5f7-1945b498f07c","name":"Huailai Smart Space AI Industrial Park (怀来县智慧空间人工智能产业园) — data-centre buildings 1#-6# with two 110 kV substations","status":"completed","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Huailai County Natural Resources and Planning Bureau (怀来县自然资源和规划局)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-19bcfff06d0f5183a5b0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-19bcfff06d0f5183a5b0.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Huailai County People's Government (怀来县人民政府), www.huailai.gov.cn"]},{"site_id":"vcc-site-aef6f651cb9065d646b0","name":"Huawei Cloud Horinger Data Center — Yungu South Zone","country":"China","country_iso_a2":"CN","latitude":40.542461667,"longitude":111.853403333,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"7da9b59e-38b7-5335-9393-f739f93d03cd","name":"Huawei Cloud Horinger Yungu South Zone Phase 1 — 3# data-centre machine-room building (3D data centre)","status":"shell","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["Investment Promotion Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区招商服务局)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-aef6f651cb9065d646b0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-aef6f651cb9065d646b0.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司"]},{"site_id":"vcc-site-f335df1fb078ba6f6d19","name":"Huawei Cloud Horinger Data Center — Yungu West Zone","country":"China","country_iso_a2":"CN","latitude":40.533498056,"longitude":111.802858889,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"5c88b0bc-da28-541d-9a42-ef1e195ffcc7","name":"Huawei Cloud Horinger Yungu West Zone Phase 1 — second-batch works (2# data-centre machine-room building and 2# generator platform)","status":"completed","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f335df1fb078ba6f6d19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f335df1fb078ba6f6d19.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 华为云计算技术有限公司"]},{"site_id":"vcc-site-f20ca519143831162a81","name":"Huawei Cloud Ulanqab Phase 3 Campus","country":"China","country_iso_a2":"CN","latitude":40.9844,"longitude":113.3119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-24","oldest_status_as_of":"2026-10-24","project_count":1,"projects":[{"project_id":"d8e9f545-1df0-5a39-b4aa-c67c47f4e846","name":"Huawei Cloud Ulanqab Phase 3 DC5 Mechanical and Electrical Fit-out","status":"under_construction","status_as_of":"2026-10-24","search_terms":""}],"status_publishers":["China State Construction Engineering Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f20ca519143831162a81/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f20ca519143831162a81.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Inner Mongolia Department of Ecology and Environment"]},{"site_id":"vcc-site-78c5dc34cbf7b562f86d","name":"Huizhou University Campus Data Centre","country":"China","country_iso_a2":"CN","latitude":23.0403259,"longitude":114.41396515,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"a1f0e0ac-ee34-552a-995c-d2aeb6989688","name":"Huizhou University — Modular Data-Centre Room Upgrade","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["惠州学院 (Huizhou University)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78c5dc34cbf7b562f86d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78c5dc34cbf7b562f86d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-a226e4ce3df02dee4be7","name":"HUMAIN Al-Saad hyperscale AI data centre campus","country":"Saudi Arabia","country_iso_a2":"SA","latitude":24.6389,"longitude":46.716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-27","oldest_status_as_of":"2026-09-27","project_count":1,"projects":[{"project_id":"4f8a32cf-b64b-51b4-8758-368320eb441d","name":"HUMAIN Al-Saad hyperscale AI data centre campus","status":"announced","status_as_of":"2026-09-27","search_terms":"HUMAIN, the AI company owned by Saudi Arabia's Public Investment Fund, plans a 6 GW hyperscale AI data centre campus on a 24 square kilometre site in the Al-Saad area of east Riyadh, to be built in two phases across six plots. HUMAIN tendered the campus enabling infrastructure in May 2026, covering high-voltage distribution, two substations, a 2,000 MVA bulk supply point, water, sewage, roads and fibre. In September 2026 Dammam-based Al-Yamama was reported as the selected contractor under an early contractor involvement process. Neither the contract value nor the total project cost has been disclosed. HUMAIN 6GW Riyadh campus HUMAIN Al-Yamama Company for Trading & Contracting"}],"status_publishers":["MEED"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a226e4ce3df02dee4be7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a226e4ce3df02dee4be7.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["MEED"]},{"site_id":"vcc-site-8f9f601fd64ed7dfc62c","name":"HUMAIN Dammam AI data centre","country":"Saudi Arabia","country_iso_a2":"SA","latitude":26.433,"longitude":50.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-08-26","oldest_status_as_of":"2025-08-26","project_count":1,"projects":[{"project_id":"55a2bfbb-45b2-5d51-bc40-4cc74d88ccfd","name":"HUMAIN Dammam AI data centre","status":"under_construction","status_as_of":"2025-08-26","search_terms":"One of the first two data centres of HUMAIN, the Public Investment Fund's AI company, under construction in Dammam in the Eastern Province as of August 2025. HUMAIN's chief executive said each of the two initial sites, in Riyadh and Dammam, would open with up to 100 MW, using US chips including NVIDIA's latest accelerators, with launch targeted for the second quarter of 2026 (headlines said early 2026). The sources reviewed give no district, building details or investment figure, and no later progress report was found. HUMAIN"}],"status_publishers":["Arab News (Reuters)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f9f601fd64ed7dfc62c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8f9f601fd64ed7dfc62c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arab News (Reuters)"]},{"site_id":"vcc-site-a15d402305ed80ba8cba","name":"Hut 8 Beacon Point AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":27.834525,"longitude":-97.614758,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"86c83f59-88b9-5791-bc15-ab6c32f256a7","name":"Hut 8 Beacon Point AI data center campus","status":"under_construction","status_as_of":"2026-08-04","search_terms":"Hut 8 AI data center campus on about 521 acres in Nueces County, Texas, backed by 1,000 MW of utility capacity under an AEP Texas interconnection agreement. In 2026 Hut 8 signed two 15-year leases of 352 MW of IT capacity each with one unnamed high-investment-grade tenant, for 704 MW in total, worth about USD 9.8 billion each in base-term value. Hut 8 said in July 2026 that phase 1 construction had begun and phase 2 site preparation was under way; initial energization is targeted for Q1 2027 and the first phase 2 data hall for Q2 2028. Beacon Point AI Data Center Campus Beacon Point DC Hut 8 AEP Texas"},{"project_id":"9563b94b-4d68-5f38-b2b2-ce63346ebbe8","name":"Hut 8 Beacon Point First Phase 352 MW Critical IT Lease","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["Hut 8 Corp.","Hut 8 Corp. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a15d402305ed80ba8cba.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},{"site_id":"vcc-site-1f215e81ecc04c69b5d6","name":"Hut 8 River Bend AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":30.727892,"longitude":-91.299513,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-08-04","project_count":2,"projects":[{"project_id":"3e074273-f5f7-5785-ab10-232a5ebd5c6b","name":"Hut 8 River Bend 245 MW Critical IT Current Build","status":"under_construction","status_as_of":"2026-08-04","search_terms":""},{"project_id":"8aa8e9f5-915e-51f6-bc08-463822cf16f9","name":"Hut 8 River Bend AI data center campus","status":"under_construction","status_as_of":"2026-10-05","search_terms":"AI data center campus under construction by Hut 8 in West Feliciana Parish, Louisiana. Phase I is leased to Fluidstack for 245 MW of critical IT load under a 15-year lease valued at $7.0 billion, with Google backstopping the lease obligations; Hut 8 announced a partnership with Anthropic and Fluidstack the same day, and news reports say the capacity is for Anthropic. Entergy Louisiana is to supply an initial 330 MW, with potential to scale to 1,000 MW. Phase I investment is up to $10 billion. Local reporting in October 2026 counted about 1,200 construction workers on site and said the facility will serve Anthropic's Claude. River Bend campus Hut 8 Fluidstack Anthropic Entergy Louisiana Louisiana Economic Development"}],"status_publishers":["Hut 8 Corp.","WAFB"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f215e81ecc04c69b5d6.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},{"site_id":"vcc-site-2205657258ac3679cfaa","name":"Hyperco Loviisa Data Center Campus","country":"Finland","country_iso_a2":"FI","latitude":60.47436397,"longitude":26.26809647,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"d024514a-30a3-514d-b65e-2743133f6800","name":"Hyperco Loviisa Current Data Center Development","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["City of Loviisa (Loviisan kaupunki)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2205657258ac3679cfaa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2205657258ac3679cfaa.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Finnish Environment Institute Ryhti; CC BY 4.0"]},{"site_id":"vcc-site-1057cda1149b646f7a24","name":"Igoudar Dakhla green data centre complex","country":"Western Sahara","country_iso_a2":"EH","latitude":23.70806,"longitude":-15.94556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-16","oldest_status_as_of":"2026-04-16","project_count":1,"projects":[{"project_id":"40a718e2-038a-5edf-a495-ba05e3f76560","name":"Igoudar Dakhla green data centre complex","status":"announced","status_as_of":"2026-04-16","search_terms":"State-led programme for a green data centre complex in Dakhla targeting 500 MW, unveiled by Morocco in November 2025 for AI and high-performance computing, to be powered by a dedicated solar and wind farm. In April 2026 two ministries, the Dakhla-Oued Ed-Dahab wilaya and regional council, the Mohammed VI Investment Fund and CDG signed an agreement launching the strategic studies that are to set its governance, economic model, phasing and financing. It is planned in two parts, a sovereign segment for national needs and a segment open to private investors. The sources give no investment figure, operator or schedule. Igoudar Numérique Igoudar Dakhla Moroccan Ministry of Digital Transition and Administration Reform Moroccan Ministry of Energy Transition and Sustainable Development Wilaya of Dakhla-Oued Ed-Dahab Regional Council of Dakhla-Oued Ed-Dahab Mohammed VI Investment Fund Caisse de Dépôt et de Gestion (CDG)"}],"status_publishers":["Finances News Hebdo"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1057cda1149b646f7a24/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1057cda1149b646f7a24.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-5910fb4858cae9438a43","name":"IIJ Matsue Data Center Park","country":"Japan","country_iso_a2":"JP","latitude":35.4942,"longitude":133.0636,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"853ee693-9217-5ebe-b59a-b13933cdecfb","name":"IIJ Matsue Existing Operations","status":"operational","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Internet Initiative Japan Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5910fb4858cae9438a43/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5910fb4858cae9438a43.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-38f7e55e7e55aaed6c27","name":"IIJ Shiroi Data Center Campus","country":"Japan","country_iso_a2":"JP","latitude":35.799113,"longitude":140.099553,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-06-25","project_count":2,"projects":[{"project_id":"1f33fed8-b0f9-50e2-8fac-56d135325c27","name":"IIJ Shiroi DCC Phase 3 Server Building","status":"under_construction","status_as_of":"2026-06-25","search_terms":""},{"project_id":"d3d3a8ea-8444-585c-afa4-4a5016a44cd7","name":"IIJ Shiroi Existing Operations (Phases 1 and 2)","status":"operational","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Internet Initiative Japan Inc."],"power_observations":[{"project_id":"1f33fed8-b0f9-50e2-8fac-56d135325c27","metric":"grid_connection_mw","stage":"planned","low":10.0,"base":10.0,"high":10.0,"unit":"MW","as_of_date":"2025-05-08"}],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-38f7e55e7e55aaed6c27/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-38f7e55e7e55aaed6c27.json","geometry_licenses":["e-stat-terms-compatible-with-CC-BY-4.0"],"geometry_attributions":["Portal Site of Official Statistics of Japan (e-Stat); Statistics Bureau of Japan; selected Shapefile feature converted to GeoJSON by Data Center Atlas"]},{"site_id":"vcc-site-4b620bcac790d6755738","name":"Iozera Tetouan AI data center and hub","country":"Morocco","country_iso_a2":"MA","latitude":35.567,"longitude":-5.367,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-09","oldest_status_as_of":"2026-07-09","project_count":1,"projects":[{"project_id":"ee6721e5-5463-5350-9b3d-fe2429103a70","name":"Iozera Tetouan AI data center and hub","status":"announced","status_as_of":"2026-07-09","search_terms":"Proposed 386 MW data center and artificial-intelligence hub in Tetouan, northern Morocco, announced in May 2024 by the US start-up Iozera during a Moroccan government roadshow in North America, with a planned investment of about USD 500 million and renewable power. Plans included AI computing, AI training and data-labelling units, conventional data storage and a start-up incubation centre. Reports from January and July 2026 still describe it as announced; a BMI note summarised by Le360 in July 2026 put commissioning in the second half of 2026, but no source found confirms construction. Iozera Kingdom of Morocco"}],"status_publishers":["Daba Finance"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4b620bcac790d6755738/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4b620bcac790d6755738.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The North Africa Post"]},{"site_id":"vcc-site-b80c969b486b2844a8d9","name":"IREN Childress data center campus","country":"United States","country_iso_a2":"US","latitude":34.4281,"longitude":-100.215,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"b74385b8-0724-5b4d-b192-4aa5a1c45885","name":"IREN Childress data center campus","status":"partially_operational","status_as_of":"2026-08-27","search_terms":"IREN campus at Childress in the Texas Panhandle with 750 MW of planned gross power capacity on a 576-acre freehold site, connected to the ERCOT grid through IREN-owned on-site substations. It hosts IREN's liquid-cooled Horizon AI cloud buildings, which serve Microsoft under a five-year contract of about $9.7 billion announced in November 2025. Horizon 1, a 50 MW (IT) deployment of NVIDIA GB300 NVL72 systems, was delivered to and accepted by Microsoft in August 2026; Horizon 2 was in commissioning and Horizons 3 and 4 in late-stage construction, with delivery targeted for the fourth quarter of 2026. Horizon data centers (Childress) IREN IREN IREN Microsoft NVIDIA"}],"status_publishers":["U.S. Securities and Exchange Commission (IREN filing)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b80c969b486b2844a8d9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b80c969b486b2844a8d9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["IREN"]},{"site_id":"vcc-site-f19474c4631ae00b2725","name":"IREN Kiowa data center campus","country":"United States","country_iso_a2":"US","latitude":34.7228,"longitude":-95.9025,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"39b97d53-5af7-55ea-bfc4-6f2f08f32e74","name":"IREN Kiowa data center campus","status":"proposed","status_as_of":"2026-09-08","search_terms":"IREN plans a 1.6 GW grid-connected data center campus on a roughly 2,000-acre site just south of Kiowa in Pittsburg County, Oklahoma, between US 69 and Kiowa Lake Road. IREN announced the Oklahoma campus in February 2026, saying grid studies were complete and power would ramp from 2028; local reports say it had bought about 340 acres and would draw on Public Service Company of Oklahoma. A county tax incentive plan with an 85% property tax abatement was tabled in June 2026 for renegotiation, and in September 2026 the project still awaited county approval amid local opposition. Project Emerald Kiowa Data Center Emerald Data Center IREN Public Service Company of Oklahoma Pittsburg County"}],"status_publishers":["News On 6"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f19474c4631ae00b2725/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f19474c4631ae00b2725.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["IREN Ltd via SEC EDGAR"]},{"site_id":"vcc-site-40e9833a010630a5db0e","name":"IREN Sweetwater 2 campus, FM 540, Fisher County (near Hamlin)","country":"United States","country_iso_a2":"US","latitude":32.9320234,"longitude":-100.2213007,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"77e7b15e-e32a-568b-9a13-ada55d03f098","name":"IREN Sweetwater 2 — planned 600 MW data-centre campus on about 500 acres","status":"announced","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-40e9833a010630a5db0e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-40e9833a010630a5db0e.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Fisher Appraisal District data)"]},{"site_id":"vcc-site-faa101d551da0c45f1c5","name":"Iron Mountain Amsterdam Data Center Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.39172475368806,"longitude":4.664735411619385,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e3f1fc38-bc59-5373-803f-d5c86d817096","name":"Iron Mountain AMS-2 10 MW Expansion","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-faa101d551da0c45f1c5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-faa101d551da0c45f1c5.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Officiele Bekendmakingen","Province of Noord-Holland / Officiele Bekendmakingen"]},{"site_id":"vcc-site-b2ce7bc4242acd906a7b","name":"Iron Mountain LON-3 London Data Center","country":"United Kingdom","country_iso_a2":"GB","latitude":51.520247952919846,"longitude":-0.6200648150277306,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"825dd9ee-ffe9-525e-8d9f-ec8e370d9944","name":"Iron Mountain LON-3 25 MW Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2ce7bc4242acd906a7b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2ce7bc4242acd906a7b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Ramboll for I3 Solutions, publicly hosted by Environment Agency"]},{"site_id":"vcc-site-0baa18deeb394aec986b","name":"Iron Mountain Madrid Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":40.458191566488146,"longitude":-3.498520384597765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"bf8d11a2-72a6-500d-a532-98fb73958c84","name":"Iron Mountain MAD-2 and MAD-3 20 MW Development","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0baa18deeb394aec986b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0baa18deeb394aec986b.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Instituto Geografico Nacional / Centro Nacional de Informacion Geografica"]},{"site_id":"vcc-site-f20ebb79d86fe03fc732","name":"Iron Mountain MIA-1 Miami Data Center","country":"United States","country_iso_a2":"US","latitude":25.88415986431,"longitude":-80.247555757503,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"24911fb6-56e2-5357-a224-8cbd977e2234","name":"Iron Mountain MIA-1 Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f20ebb79d86fe03fc732/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f20ebb79d86fe03fc732.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-7067da1bf27989e69807","name":"Iron Mountain NJE-1 New Jersey Data Center","country":"United States","country_iso_a2":"US","latitude":40.529931107088,"longitude":-74.327943023032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"0bf81b53-0bf9-551d-807b-16392ea21962","name":"Iron Mountain NJE-1 Expansion","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7067da1bf27989e69807/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7067da1bf27989e69807.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-983cd9eec3d1aaa46e69","name":"Iron Mountain VA-9 Northern Virginia Data Center","country":"United States","country_iso_a2":"US","latitude":38.772750339621,"longitude":-77.542924596694,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"d83dc321-220b-5c4c-b5af-ff1f4bc19a5d","name":"Iron Mountain VA-9 Phase 1","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Iron Mountain Incorporated"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-983cd9eec3d1aaa46e69/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-983cd9eec3d1aaa46e69.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-2b082c2af5f1a4774370","name":"Ishikari Renewable Energy Data Center No.1","country":"Japan","country_iso_a2":"JP","latitude":43.178556,"longitude":141.298122,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"24294ce0-7368-5eb7-8e71-b0639d754082","name":"Ishikari Renewable Energy Data Center No.1","status":"operational","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Hokuden Information Technology Co., Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2b082c2af5f1a4774370/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2b082c2af5f1a4774370.json","geometry_licenses":["CC-BY"],"geometry_attributions":["Japan Ministry of Justice registry map data; AIGID GeoJSON conversion. Catalog license CC BY: http://www.opendefinition.org/licenses/cc-by/"]},{"site_id":"vcc-site-d206490d42111d837e09","name":"iTech Tower 3.1, Fanling","country":"Hong Kong","country_iso_a2":"HK","latitude":22.4959512,"longitude":114.1432855,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"e8b4f13a-720a-5fe1-aae5-93f95e34d7d3","name":"iTech Tower 3.1 — remaining development and fit-out","status":"under_construction","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Grand Ming Group Holdings Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d206490d42111d837e09/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d206490d42111d837e09.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lands Department, HKSAR Government"]},{"site_id":"vcc-site-ca0d588c0ed776b9bd93","name":"iTech Tower 3.2, Fanling","country":"Hong Kong","country_iso_a2":"HK","latitude":22.4955271,"longitude":114.144714,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"674120a7-0cc3-5d3c-bf99-b127a83cbf77","name":"iTech Tower 3.2 — data-centre construction","status":"under_construction","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Grand Ming Group Holdings Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ca0d588c0ed776b9bd93/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ca0d588c0ed776b9bd93.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lands Department, HKSAR Government"]},{"site_id":"vcc-site-e44a72e668fa9ca512fa","name":"iXAfrica NBOX1 Nairobi Campus","country":"Kenya","country_iso_a2":"KE","latitude":-1.3293377,"longitude":36.8859905,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"59f55054-926b-552a-86e6-bc1bdb84562a","name":"iXAfrica NBOX1 — existing campus operations","status":"operational","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["iXAfrica Data Centre Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e44a72e668fa9ca512fa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e44a72e668fa9ca512fa.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-cc36b171e24c944e6b44","name":"J5 LLC Piqua Data Center Campus (Washington Road)","country":"United States","country_iso_a2":"US","latitude":40.1131174,"longitude":-84.2516214,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"f9e3cf31-f856-50ef-b3ab-2dd60345d1e6","name":"J5 LLC hyperscale data center campus — planned facility on 607.7 acres at Farrington and Washington roads","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["City of Piqua, Ohio (City Commission, via CivicClerk)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc36b171e24c944e6b44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc36b171e24c944e6b44.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Miami County, Ohio"]},{"site_id":"vcc-site-2f392531ebec4705b0aa","name":"Jefferson Lab Newport News Campus","country":"United States","country_iso_a2":"US","latitude":37.098357742086,"longitude":-76.48969366502,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-12","oldest_status_as_of":"2026-06-12","project_count":1,"projects":[{"project_id":"9283d3fe-3789-54c7-abf4-8bb757e29835","name":"Jefferson Lab Data Center (JLDC)","status":"under_construction","status_as_of":"2026-06-12","search_terms":""}],"status_publishers":["Thomas Jefferson National Accelerator Facility"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f392531ebec4705b0aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f392531ebec4705b0aa.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-08c96f4448334dc081a5","name":"JERA Chiba Thermal Power Station AI Infrastructure","country":"Japan","country_iso_a2":"JP","latitude":35.5638142,"longitude":140.1019756,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"02a9ee88-08e5-58fd-b715-488b3ee903a3","name":"JERA / RHAELM Chiba AI Data Center Infrastructure","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["JERA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-08c96f4448334dc081a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-08c96f4448334dc081a5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps; address feature selected by JERA"]},{"site_id":"vcc-site-9bae34f907b652d324d1","name":"Jiujiang University Danfengyuan Campus Data Centre","country":"China","country_iso_a2":"CN","latitude":29.68125085,"longitude":116.0070627,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"559170a8-c643-55e7-98cf-7a6d5855acff","name":"Jiujiang University — Danfengyuan Campus Data Centre","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["九江学院 (Jiujiang University)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9bae34f907b652d324d1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9bae34f907b652d324d1.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-d98cef70ec1688f58e42","name":"Joliet Technology Center","country":"United States","country_iso_a2":"US","latitude":41.5297,"longitude":-88.0728,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-23","oldest_status_as_of":"2026-03-23","project_count":1,"projects":[{"project_id":"def89e4b-c93d-5dc8-a955-edd8e51a1058","name":"Joliet Technology Center","status":"announced","status_as_of":"2026-03-23","search_terms":"Hillwood Investment Properties and PowerHouse Data Centers, a division of American Real Estate Partners, plan a 24-building data center campus on about 795 acres in Joliet, Illinois. The developers put the investment at USD 20 billion and describe a phased build of five to seven years with 7,000 to 10,000 construction jobs and power from ComEd. Joliet's city council approved the proposal in March 2026, with construction expected to start in late 2026 or early 2027. No tenant is named; Bisnow says the campus is aimed at potential hyperscale users. Hillwood and PowerHouse Joliet data center campus Hillwood Investment Properties PowerHouse Data Centers ComEd City of Joliet"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d98cef70ec1688f58e42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d98cef70ec1688f58e42.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-f1cbd1f29eadc1834f1d","name":"Julius Avenue Data Centre, North Ryde","country":"Australia","country_iso_a2":"AU","latitude":-33.798462,"longitude":151.143104,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"d753c323-44e4-5720-a8cb-38a2fcca2ed8","name":"Julius Avenue Data Centre — proposed 120 MW data centre (IPC referral)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1cbd1f29eadc1834f1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f1cbd1f29eadc1834f1d.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-4cde3223014097681c99","name":"K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella","country":"Italy","country_iso_a2":"IT","latitude":45.317,"longitude":9.133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"a0ee0f70-6708-5a9c-8b50-a61e93a5e501","name":"K2 hyperscale data center campus, Zibido San Giacomo and Lacchiarella","status":"announced","status_as_of":"2026-08-18","search_terms":"Hyperscale data center campus proposed by K2 Strategic Infrastructure Italy, a company held by K2 Strategic Pte. Ltd., across the municipalities of Zibido San Giacomo and Lacchiarella in the Metropolitan City of Milan. On 4 August 2026 Italy's Council of Ministers declared it a programme of preeminent national strategic interest. Press reports attribute to the Ministry of Enterprises and Made in Italy figures of up to about 400 MW and an estimated EUR 5.3 billion of investment over four years of development and construction. A government commissioner is to coordinate permits. Local groups have raised concerns about new data centers in the area over farmland, water, grid strain and noise. K2 Strategic Infrastructure Italy campus K2 Strategic Infrastructure Italy Italian Council of Ministers Lombardy Region"}],"status_publishers":["Il Giorno"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4cde3223014097681c99/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4cde3223014097681c99.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Il Giorno"]},{"site_id":"vcc-site-a02cb3d08c1f4a1268dd","name":"KAGOYA Japan Keihanna Lab","country":"Japan","country_iso_a2":"JP","latitude":34.748595,"longitude":135.7847233,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"3a5eff63-ee0a-5c1e-8e38-702d30e7c20a","name":"KAGOYA Japan Keihanna Lab Existing Operations","status":"operational","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["KAGOYA JAPAN Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a02cb3d08c1f4a1268dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a02cb3d08c1f4a1268dd.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-136d9a5fb04578ff5d82","name":"Kai Shin Satsumasendai AI Data Center","country":"Japan","country_iso_a2":"JP","latitude":31.8571546,"longitude":130.2007176,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-18","oldest_status_as_of":"2026-07-18","project_count":1,"projects":[{"project_id":"6a7d396b-9e80-516a-acd4-e3b8dde51614","name":"Kai Shin Satsumasendai AI Data Center — commercial campus","status":"announced","status_as_of":"2026-07-18","search_terms":""}],"status_publishers":["Satsumasendai City"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-136d9a5fb04578ff5d82/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-136d9a5fb04578ff5d82.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-c48f4a7325dfc30566cd","name":"KAO Data Harlow Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":51.770073603,"longitude":0.130495857,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-26","oldest_status_as_of":"2026-05-26","project_count":1,"projects":[{"project_id":"7206a400-093d-5c92-b1c5-c4243807de29","name":"KAO Data KLON-03 Data Centre Building","status":"under_construction","status_as_of":"2026-05-26","search_terms":""}],"status_publishers":["Infratil Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c48f4a7325dfc30566cd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c48f4a7325dfc30566cd.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Impact Geotechnical Limited via Environment Agency public consultation"]},{"site_id":"vcc-site-56d5647448719e49b499","name":"Kao Data Park Royal, Frogmore Industrial Estate","country":"United Kingdom","country_iso_a2":"GB","latitude":51.530912,"longitude":-0.264505,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"1cc64264-38aa-5ec3-bbd6-793cb27c5ad0","name":"Kao Data Park Royal Revised Data Centre Development","status":"announced","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Kao Data"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-56d5647448719e49b499/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-56d5647448719e49b499.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Greater London Authority / Ealing Council"]},{"site_id":"vcc-site-94afbf6dc84e8a88fc00","name":"Kasi Cloud LOS campus (Lekki, Lagos)","country":"Nigeria","country_iso_a2":"NG","latitude":6.493394,"longitude":3.720668,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-05-19","oldest_status_as_of":"2026-05-19","project_count":1,"projects":[{"project_id":"cb66229f-70db-5cfc-95b3-f5a05a3e73bc","name":"Kasi Cloud LOS campus (Lekki, Lagos)","status":"partially_operational","status_as_of":"2026-05-19","search_terms":"Hyperscale, AI-ready data centre campus of Kasi Cloud on about 4 hectares in the Maiyegun area of Lekki, Lagos, Nigeria, along the Lagos-Calabar coastal highway. Kasi broke ground in April 2022 on the USD 250 million project and major construction began in the second quarter of 2023. A May 2026 press report says Kasi commissioned the first phase, a 5.5 MW data hall and a 7.5 MW shared ecosystem floor in LOS1, the first of four planned buildings, although Kasi's own website still listed the campus as coming soon in October 2026. LOS1 has four floors of up to 8 MW of critical load each, and a dedicated 132 kV substation can scale the campus to about 100 MW of IT load. Kasi LOS1 Kasi Cloud Lagos campus Kasi Cloud Kasi Cloud Nigeria Sovereign Investment Authority"}],"status_publishers":["Brand Spur Nigeria"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94afbf6dc84e8a88fc00/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94afbf6dc84e8a88fc00.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Capacity Media"]},{"site_id":"vcc-site-ca92145be06417ec9b54","name":"KCCS Zero Emission Data Center Ishikari","country":"Japan","country_iso_a2":"JP","latitude":43.18,"longitude":141.3001,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"a346af4c-3d11-5ed8-ad5e-1b6c6b187458","name":"KCCS ZED Ishikari Existing Operations","status":"operational","status_as_of":"2026-07-28","search_terms":""}],"status_publishers":["Kyocera Communication Systems"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ca92145be06417ec9b54/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ca92145be06417ec9b54.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Source: Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-60fde18b993e0affd6b1","name":"KDDI Osaka Sakai Data Center","country":"Japan","country_iso_a2":"JP","latitude":34.5971,"longitude":135.4397,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-07","oldest_status_as_of":"2026-08-07","project_count":1,"projects":[{"project_id":"7a9f2968-2fd7-5b37-923c-20f616c3dea1","name":"KDDI Osaka Sakai Existing Operations","status":"operational","status_as_of":"2026-08-07","search_terms":""}],"status_publishers":["KDDI Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60fde18b993e0affd6b1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60fde18b993e0affd6b1.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-af9fa3429df36fd38cad","name":"Keel Moses Lake Data Campus (Grant County, Washington)","country":"United States","country_iso_a2":"US","latitude":47.1969153,"longitude":-119.2939255,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"25a07765-fe7b-52c6-a24c-d628a97151a3","name":"Keel Moses Lake — HPC/AI data center build on the former Bitfarms 18 MW mining site","status":"under_construction","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["Keel Infrastructure Corp. (formerly Bitfarms Ltd.)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af9fa3429df36fd38cad/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af9fa3429df36fd38cad.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Grant County, Washington"]},{"site_id":"vcc-site-24ceb3b61375fad98a7c","name":"Keli Xinneng Cloud Computing IDC Data Center, Guangzhou Knowledge City","country":"China","country_iso_a2":"CN","latitude":23.298153111,"longitude":113.542587678,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-21","oldest_status_as_of":"2026-08-21","project_count":1,"projects":[{"project_id":"28088c5e-4989-5ea1-8b9c-06ebb40d0355","name":"Keli Xinneng Efficient Low-Carbon Intelligent Computing Centre — Data-Centre Building 2#, floors 1-3","status":"announced","status_as_of":"2026-08-21","search_terms":""}],"status_publishers":["Guangzhou Municipal Development and Reform Commission"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-24ceb3b61375fad98a7c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-24ceb3b61375fad98a7c.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Guangzhou Planning and Natural Resources Bureau"]},{"site_id":"vcc-site-71ef5f1d2c885cbad9ab","name":"Keppel DC Dublin 1, Citywest Business Campus, Dublin 24","country":"Ireland","country_iso_a2":"IE","latitude":53.2915439,"longitude":-6.4164693,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"d54b6816-13b8-589a-8b4d-32b278ad0a5d","name":"Keppel DC Dublin 1 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-71ef5f1d2c885cbad9ab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-71ef5f1d2c885cbad9ab.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Department of Housing, Planning and Local Government; South Dublin County Council"]},{"site_id":"vcc-site-c816a7e2360de9a63b0b","name":"Keppel DC Dublin 2, Ballycoolin Business and Technology Park, Dublin 15","country":"Ireland","country_iso_a2":"IE","latitude":53.4059975,"longitude":-6.3613361,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"7ea9183c-6944-5812-aa61-4044b344758c","name":"Keppel DC Dublin 2 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c816a7e2360de9a63b0b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c816a7e2360de9a63b0b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Department of Housing, Planning and Local Government; Fingal County Council"]},{"site_id":"vcc-site-23f34abcf20b2f5caee0","name":"Keppel DC REIT DC1, Riverside Road (Woodlands)","country":"Singapore","country_iso_a2":"SG","latitude":1.443029888182275,"longitude":103.7802809388123,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"3a725eb1-3227-540d-b16e-f818179db7c8","name":"DC1 — existing single-tenant data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23f34abcf20b2f5caee0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23f34abcf20b2f5caee0.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-a16531a6bdbdb3815d3c","name":"Keppel DC Singapore 1 (Keppel DigiHub), Serangoon North","country":"Singapore","country_iso_a2":"SG","latitude":1.375541712965949,"longitude":103.8749051943558,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"037638e7-c850-53dd-a6fc-601dc847ad26","name":"Keppel DC Singapore 1 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a16531a6bdbdb3815d3c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a16531a6bdbdb3815d3c.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-7df44d1d3906d0607f98","name":"Keppel DC Singapore 2, 25 Tampines Street 92","country":"Singapore","country_iso_a2":"SG","latitude":1.340487946788611,"longitude":103.9443463621713,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"fd8cd901-18b8-5289-9e50-381a91cff539","name":"Keppel DC Singapore 2 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7df44d1d3906d0607f98/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7df44d1d3906d0607f98.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-8f95457ba8dd823371bc","name":"Keppel DC Singapore 3, 27 Tampines Street 92","country":"Singapore","country_iso_a2":"SG","latitude":1.340163920983619,"longitude":103.9441064895626,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"f947dbef-7c2f-5aab-b476-49c95b10c175","name":"Keppel DC Singapore 3 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f95457ba8dd823371bc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8f95457ba8dd823371bc.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-f4c810b803f361f7f104","name":"Keppel DC Singapore 4, 20 Tampines Street 92","country":"Singapore","country_iso_a2":"SG","latitude":1.342053082785018,"longitude":103.9438494556396,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"ca43f47c-25d3-5bf1-b77a-61f3d291b5b4","name":"Keppel DC Singapore 4 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f4c810b803f361f7f104/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f4c810b803f361f7f104.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-7c48901472d624515b61","name":"Keppel DC Singapore 5, Sunview Way","country":"Singapore","country_iso_a2":"SG","latitude":1.319582478997198,"longitude":103.700190840147,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"c089dcff-09f4-5a57-a82c-755f45442c56","name":"Keppel DC Singapore 5 — existing colocation data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Keppel DC REIT Management Pte. Ltd."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7c48901472d624515b61/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7c48901472d624515b61.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-bb743c7caad1e739c23e","name":"Keppel Genting Lane Data Centre Campus","country":"Singapore","country_iso_a2":"SG","latitude":1.3253514994486562,"longitude":103.87658033544045,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-30","oldest_status_as_of":"2026-07-30","project_count":1,"projects":[{"project_id":"04b22725-af3a-5d12-b2b6-0caf17b0c39e","name":"Keppel DC SGP 9 Current Build","status":"under_construction","status_as_of":"2026-07-30","search_terms":""}],"status_publishers":["Keppel Ltd"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb743c7caad1e739c23e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb743c7caad1e739c23e.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Wiki contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-2fd0970db637e49b2f03","name":"Key Point Vladivostok Data Center","country":"Russia","country_iso_a2":"RU","latitude":43.32741,"longitude":131.971822,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-08","oldest_status_as_of":"2026-09-04","project_count":2,"projects":[{"project_id":"bb621aa0-be0b-5646-8542-088dd3c71e00","name":"Key Point Vladivostok Data Center — operating first phase","status":"operational","status_as_of":"2026-10-08","search_terms":""},{"project_id":"147caa8f-cdad-5f8a-89c9-bdf7964f6a5d","name":"Key Point Vladivostok Data Center — second phase","status":"announced","status_as_of":"2026-09-04","search_terms":""}],"status_publishers":["Key Point Group"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2fd0970db637e49b2f03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2fd0970db637e49b2f03.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Key Point Group"]},{"site_id":"vcc-site-74a60737ad3cfc9e9a75","name":"Khazna Data Centers Dammam campus","country":"Saudi Arabia","country_iso_a2":"SA","latitude":26.433,"longitude":50.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-12-09","oldest_status_as_of":"2025-12-09","project_count":1,"projects":[{"project_id":"41ec9844-286f-5128-a8bf-54e1e328301f","name":"Khazna Data Centers Dammam campus","status":"announced","status_as_of":"2025-12-09","search_terms":"Khazna Data Centers, a UAE data centre operator, announced in December 2025 that it had acquired 225,000 square metres of land in Dammam, in Saudi Arabia's Eastern Province, for its first site in the kingdom. The campus is planned for up to 200 MW of AI-ready capacity in a modular design that can be configured for GPU clusters, aimed at cloud and AI hyperscale customers and built to LEED Gold standards. Khazna named a Saudi country head to lead the launch but gave no investment figure or construction schedule. Khazna Dammam Khazna Data Centers Khazna Data Centers"}],"status_publishers":["Khazna Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-74a60737ad3cfc9e9a75/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-74a60737ad3cfc9e9a75.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Khazna Data Centers"]},{"site_id":"vcc-site-284562d636d49db446ea","name":"Khazna QAJ1 AI data center (Ajman)","country":"United Arab Emirates","country_iso_a2":"AE","latitude":25.41361,"longitude":55.44556,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2025-10-14","oldest_status_as_of":"2025-10-14","project_count":1,"projects":[{"project_id":"384a401d-cc7f-52e4-9ae3-218a378995b9","name":"Khazna QAJ1 AI data center (Ajman)","status":"under_construction","status_as_of":"2025-10-14","search_terms":"AI-optimised, liquid-cooled data center being built by Khazna Data Centers in Ajman, United Arab Emirates, with 20 data halls of 5 MW each for 100 MW of IT load, the largest facility in Khazna's portfolio. Construction by Laing O'Rourke began in October 2024 with a 15-month target, and power is to come from Etihad Water and Electricity. By April 2025 the steel structure was complete and the first phase was rescheduled to December 2026 from an earlier 3Q 2025 date. In February 2026 the Uptime Institute awarded the design documents Tier III certification. QAJ1 QAJ01 Khazna Data Centers Laing O'Rourke Etihad Water and Electricity"}],"status_publishers":["MEED"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-284562d636d49db446ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-284562d636d49db446ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-8626707eb0091306e3b9","name":"KIO Data Centers QRO3, Querétaro","country":"Mexico","country_iso_a2":"MX","latitude":20.56636,"longitude":-100.256724,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-08-17","oldest_status_as_of":"2026-08-17","project_count":1,"projects":[{"project_id":"352e29e6-cabf-5acb-bd20-619157576502","name":"KIO Data Centers QRO3, Querétaro","status":"proposed","status_as_of":"2026-08-17","search_terms":"QRO3 is a proposed next phase of KIO Data Centers' technology campus in the El Marqués Industrial Park in Querétaro, Mexico. In August 2026, around an event at which Mexico's Economy Ministry gave KIO the Hecho en México designation, KIO outlined QRO3 as an expansion of about 100 MW that would be its largest data center, with an investment of up to USD 1.3 billion through 2030. Two of the three trade reports describe the investment as under evaluation or dependent on the project going ahead, and no construction schedule has been disclosed. KIO linked the plan to demand for cloud and AI services. QRO3 KIO Data Centers"}],"status_publishers":["Mexico Business News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8626707eb0091306e3b9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8626707eb0091306e3b9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Mexico Business News"]},{"site_id":"vcc-site-b2fcc0a6771c39846412","name":"Kobe Former Conveyor Tunnel Data Center","country":"Japan","country_iso_a2":"JP","latitude":34.7393,"longitude":135.0901,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"6f5f4bba-93fd-534e-b0bb-e4dc996cd8bc","name":"Kobe Former Conveyor Tunnel Data Center Initial Development","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["Mitsui Fudosan / Kumagai Gumi / Getworks"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2fcc0a6771c39846412/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2fcc0a6771c39846412.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Kobe City"]},{"site_id":"vcc-site-8e57112ad9a221cb5437","name":"Koto Sengoku 3-chome Data Centre ((仮称)江東区千石三丁目計画)","country":"Japan","country_iso_a2":"JP","latitude":35.677183,"longitude":139.818184,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"b28d7b6c-b9dc-5386-8a46-19c5922e79ee","name":"(仮称)江東区千石三丁目計画 — planned five-storey data-centre building, Sengoku 3-chome, Koto","status":"announced","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["Koto City Council (江東区議会)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8e57112ad9a221cb5437/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8e57112ad9a221cb5437.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Koto City"]},{"site_id":"vcc-site-2890b11431bd73672216","name":"La Osa Energy Center (Vermaland), Pinal County","country":"United States","country_iso_a2":"US","latitude":32.7636,"longitude":-111.6,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"18844ee0-7ce9-5a0b-9a50-1d9ed0769266","name":"La Osa Energy Center (Vermaland), Pinal County","status":"cancelled","status_as_of":"2026-08-26","search_terms":"Proposed AI data center and energy campus on more than 3,000 acres of rural land outside Eloy in Pinal County, Arizona, from land developer Vermaland. First reported in mid-2025 as a USD 33 billion plan for up to 3 GW, it called for nearly 60 data center buildings with on-site gas plants and battery storage. After strong local opposition, Vermaland offered in May 2026 to cut it by about 80% to 11 buildings and 1 GW of demand; the final proposal included a 500 MW gas plant, batteries and a 600 acre-foot annual freshwater cap. On 26 August 2026 the Pinal County Board of Supervisors rejected the rezoning and site plan 4-1. La Osa La Osa Project La Osa data center Vermaland Pinal County Board of Supervisors Central Arizona Irrigation and Drainage District"}],"status_publishers":["KJZZ"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2890b11431bd73672216/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2890b11431bd73672216.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Baxtel"]},{"site_id":"vcc-site-f6447e4ed9717931a07f","name":"Lader Energy Data Center Lo Aguirre","country":"Chile","country_iso_a2":"CL","latitude":-33.450639,"longitude":-70.907931,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"5419b282-c968-52f1-85b5-522d4402c0ec","name":"Data Center Lo Aguirre — initial proposal","status":"announced","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Chile — filing by Lader Energy Chile SpA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f6447e4ed9717931a07f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f6447e4ed9717931a07f.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; Lader Energy Chile SpA"]},{"site_id":"vcc-site-e305b394a907f57f2639","name":"Lambda Kansas City AI factory","country":"United States","country_iso_a2":"US","latitude":39.0997,"longitude":-94.5783,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-10-28","oldest_status_as_of":"2025-10-28","project_count":1,"projects":[{"project_id":"a95db60b-fb99-5f16-ad4a-c763e4714041","name":"Lambda Kansas City AI factory","status":"announced","status_as_of":"2025-10-28","search_terms":"Lambda announced in October 2025 that it would redevelop a vacant facility built in 2009 in the Northland area of Kansas City, Missouri, into an AI factory, as developer, operator and sole tenant. The site was to launch in early 2026 with 24 MW and more than 10,000 NVIDIA Blackwell Ultra GPUs serving one unnamed customer under a multi-year contract for AI training and inference, with potential to grow beyond 100 MW. No investment figure or street address was disclosed, and no later update on the site's opening was found. Lambda Lambda Lambda"}],"status_publishers":["Lambda"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e305b394a907f57f2639/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e305b394a907f57f2639.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lambda"]},{"site_id":"vcc-site-85b3549bb55293336132","name":"Lancium Clean Campus Abilene AI Data Center","country":"United States","country_iso_a2":"US","latitude":32.509551980071,"longitude":-99.774790370504,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-07-15","project_count":2,"projects":[{"project_id":"938feeec-a323-56e0-b6ce-2590fe58e623","name":"Lancium Clean Campus Abilene Remaining Six-Building Expansion","status":"under_construction","status_as_of":"2026-07-15","search_terms":""},{"project_id":"632aad8a-8c12-5a02-bd17-1138e6b03b6c","name":"Stargate Abilene (Crusoe campus on Lancium land)","status":"partially_operational","status_as_of":"2026-10-05","search_terms":"Crusoe-developed eight-building AI campus in Abilene, Texas, planned at about 1.2 GW and leased to Oracle, which runs it for OpenAI as the flagship Stargate site. Construction began in mid-2024; the first buildings came online in September 2025 and the last building was topped out in November 2025. The build is funded through a Crusoe, Blue Owl and Primary Digital joint venture on Lancium-owned land. A potential 600 MW expansion nearby was floated in 2025, but reports in March 2026 said it had been dropped, which Oracle disputed. In late September 2026 trade press reported six buildings delivered to OpenAI, and analyst Epoch AI projected all eight running by November 2026. Stargate Abilene Lancium Clean Campus Crusoe Abilene Crusoe Blue Owl Capital Primary Digital Infrastructure Lancium Oracle OpenAI"}],"status_publishers":["Epoch AI","Oracle"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85b3549bb55293336132.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-b02a2d3dd450716a96e3","name":"Land West of Ipswich Road, Keswick, Norfolk (South Norfolk)","country":"United Kingdom","country_iso_a2":"GB","latitude":52.5927586,"longitude":1.2712798,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"badb2857-73a7-505d-9ee4-46ebc88f7644","name":"Keswick data centre, Ipswich Road - proposed data centre with substations and backup generators (South Norfolk 2026/2957)","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["South Norfolk Council (statutory planning notice published in the Eastern Daily Press and on the News Media Association's Public Notice Portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b02a2d3dd450716a96e3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b02a2d3dd450716a96e3.json","geometry_licenses":["not stated (public council planning list)"],"geometry_attributions":["South Norfolk Council"]},{"site_id":"vcc-site-f671a7ae44bca4e0f1f1","name":"LEITWERK BADEN CLOUD Lahr Data Center Campus","country":"Germany","country_iso_a2":"DE","latitude":48.362257,"longitude":7.8169919,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-19","oldest_status_as_of":"2026-06-19","project_count":1,"projects":[{"project_id":"5e0d1954-690d-51cb-816a-88cec595f51a","name":"LEITWERK BADEN CLOUD Lahr Data Center Current Build","status":"under_construction","status_as_of":"2026-06-19","search_terms":""}],"status_publishers":["Elektrizitätswerk Mittelbaden AG & Co. KG"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f671a7ae44bca4e0f1f1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f671a7ae44bca4e0f1f1.json","geometry_licenses":["dl-de/by-2-0","no-open-license-asserted"],"geometry_attributions":["European Commission, INSPIRE registry","LGL-BW (2026) Datenlizenz Deutschland – Namensnennung – Version 2.0, www.lgl-bw.de"]},{"site_id":"vcc-site-0fd8442bfe3dc0c487e5","name":"LG Uplus Paju AIDC","country":"Korea, Republic of","country_iso_a2":"KR","latitude":37.8141287,"longitude":126.7561012,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-05","oldest_status_as_of":"2026-06-05","project_count":1,"projects":[{"project_id":"fc6dd688-fca0-5a7f-a6e9-54f9116607c5","name":"LG Uplus Paju AIDC Building 1","status":"under_construction","status_as_of":"2026-06-05","search_terms":""}],"status_publishers":["LG Uplus"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fd8442bfe3dc0c487e5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fd8442bfe3dc0c487e5.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c16a606f39503a41896b","name":"LLE01 Data Centre Campus, Brebières / Corbehem (former Stora Enso mill, rue de la Papeterie)","country":"France","country_iso_a2":"FR","latitude":50.3363235,"longitude":3.0357216,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"55636d01-97cd-5050-8398-8033d5cec8dc","name":"LLE01 — planned campus of four data-centre buildings (A-D, 264 MW IT) on the former Stora Enso mill site","status":"announced","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Hauts-de-France, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c16a606f39503a41896b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c16a606f39503a41896b.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-8bf35cfa26156a523f47","name":"Lunavi Cheyenne Data Center (340 Progress Circle)","country":"United States","country_iso_a2":"US","latitude":41.1296651,"longitude":-104.7408848,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-07","oldest_status_as_of":"2026-08-07","project_count":1,"projects":[{"project_id":"5d5dbc90-02ef-5efb-83e8-ca18cdce12f7","name":"Lunavi Cheyenne Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-08-07","search_terms":""}],"status_publishers":["Lunavi, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8bf35cfa26156a523f47/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8bf35cfa26156a523f47.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Lunavi"]},{"site_id":"vcc-site-6b8d24b235403e5c99ee","name":"LuxConnect Bettembourg Data Center Campus (202, Z.A.E. Wolser F)","country":"Luxembourg","country_iso_a2":"LU","latitude":49.504914634,"longitude":6.113516916,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"b515955f-ec45-5b8e-9fbd-0bc6debbfe1e","name":"LuxConnect Bettembourg — existing DC 1.1, DC 1.2 and DC 1.3 data-centre operations","status":"operational","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["LuxConnect S.A."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6b8d24b235403e5c99ee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6b8d24b235403e5c99ee.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["ACT / geoportail.lu"]},{"site_id":"vcc-site-dc69df9c22c80a2f2503","name":"LuxConnect DC 2 Bissen (3, op der Poukewiss, ZAC Klengbousbierg)","country":"Luxembourg","country_iso_a2":"LU","latitude":49.787581603,"longitude":6.089656063,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"b7b18d6a-6938-5cae-a2af-96671770e493","name":"LuxConnect DC 2 Bissen — existing data-centre operations","status":"operational","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["LuxConnect S.A."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dc69df9c22c80a2f2503/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dc69df9c22c80a2f2503.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["ACT / geoportail.lu"]},{"site_id":"vcc-site-cc86e5f5e64a0438e8c1","name":"LVRTC Pozitrons Kurzeme Data Center","country":"Latvia","country_iso_a2":"LV","latitude":56.9356302057,"longitude":22.0132502617,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e997ad94-2a62-5c44-90f9-fa27edf77dc2","name":"Pozitrons Phase 1 Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Valsts akciju sabiedrība “Latvijas Valsts radio un televīzijas centrs”"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc86e5f5e64a0438e8c1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc86e5f5e64a0438e8c1.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Valsts zemes dienests (State Land Service of Latvia), CC BY 4.0"]},{"site_id":"vcc-site-bae4ad7e597cccb0da1d","name":"Macquarie IC3 Super West Facility","country":"Australia","country_iso_a2":"AU","latitude":-33.780962349999996,"longitude":151.12696035,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-17","oldest_status_as_of":"2026-07-17","project_count":1,"projects":[{"project_id":"ea4a0cc5-bb09-5a81-b385-38ae79baf22a","name":"Macquarie IC3 Super West Phase 1 Build","status":"under_construction","status_as_of":"2026-07-17","search_terms":""}],"status_publishers":["Macquarie Data Centres"],"power_observations":[{"project_id":"ea4a0cc5-bb09-5a81-b385-38ae79baf22a","metric":"critical_it_mw","stage":"planned","low":6.0,"base":6.0,"high":6.0,"unit":"MW","as_of_date":"2025-12-03"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bae4ad7e597cccb0da1d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bae4ad7e597cccb0da1d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-f83004f0f102e3cb501e","name":"Madera Farm Data Center Campus (Nokesville Road and Farmview Road, Nokesville, Prince William County)","country":"United States","country_iso_a2":"US","latitude":38.6887614,"longitude":-77.5886122,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"548c25fa-2f67-5d90-8567-05a10659525c","name":"Madera Farm — proposed data center campus with electric substations (SUP2027-00002 / REZ2025-00007)","status":"announced","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office GIS, CountyMapper Land Development service)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f83004f0f102e3cb501e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f83004f0f102e3cb501e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-75fed87a1b38b8cd7280","name":"maincubes mainHub Nauen Campus","country":"Germany","country_iso_a2":"DE","latitude":52.5935,"longitude":12.8929999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"3941c42e-216d-52fa-b0d8-d7555b441a1a","name":"maincubes BER02","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["maincubes"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-75fed87a1b38b8cd7280/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-75fed87a1b38b8cd7280.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["maincubes"]},{"site_id":"vcc-site-31d24c0327d82421d62e","name":"Mamre Road Data Centre Campus, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.833794,"longitude":150.784825,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"a4e3a711-2777-56a1-879e-a0c0542bbf3d","name":"Mamre Road Data Centre Campus — proposed 1.2 GW three-building campus","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-31d24c0327d82421d62e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-31d24c0327d82421d62e.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-8afb87845a63a1ff1bdd","name":"Manekin Plaza Data Center Site (Manekin Plaza, Loudoun Tech Center, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0238301,"longitude":-77.4077891,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-07","oldest_status_as_of":"2026-08-07","project_count":1,"projects":[{"project_id":"79d740e9-b85c-58a7-8473-419e3a57ceeb","name":"Manekin Plaza — one proposed data center (site plan STPL-2022-0053)","status":"announced","status_as_of":"2026-08-07","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8afb87845a63a1ff1bdd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8afb87845a63a1ff1bdd.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-85b88a033c68a83f53cc","name":"Manor Farm Data Centre Site, Poyle Road, Slough","country":"United Kingdom","country_iso_a2":"GB","latitude":51.4756994,"longitude":-0.5189138,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"07d69345-9f31-5e9b-aae6-6e6cfeb1b61e","name":"Tritax Manor Farm Data Centre, Slough - 107 MW Phase 1 (appeal APP/J0350/W/25/3366043)","status":"announced","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Tritax Big Box REIT plc (RNS regulatory announcement, as published by Investegate)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b88a033c68a83f53cc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85b88a033c68a83f53cc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Applicant planning submission, published by Slough Borough Council"]},{"site_id":"vcc-site-3a757661d07d9458528e","name":"Mars Road Data Centre, 3-4 Apollo Place and 87-91 Mars Road, Lane Cove West","country":"Australia","country_iso_a2":"AU","latitude":-33.8093435,"longitude":151.1446024,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"b3e54564-1d4b-53da-ae65-0eaa65446581","name":"Mars Road Data Centre — proposed 140 MW data centre (SSD-108835458)","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3a757661d07d9458528e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3a757661d07d9458528e.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-6b67dccd90b1a88385b5","name":"Massaponax Tech Campus (Massaponax Church Road, Summit Crossing Road and Mills Drive, Spotsylvania County)","country":"United States","country_iso_a2":"US","latitude":38.2103426,"longitude":-77.446502,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"721efffc-1d5b-5e0f-baf7-aacb2db4d60b","name":"Massaponax Tech Campus — proposed data center campus of about 6 million sq ft (rezoning R25-0004)","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["Spotsylvania County, Virginia (Planning Commission and Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6b67dccd90b1a88385b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6b67dccd90b1a88385b5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Spotsylvania County, Virginia"]},{"site_id":"vcc-site-f977fefeeef22bdcee98","name":"MC Digital Realty KIX Campus (Saito, Osaka)","country":"Japan","country_iso_a2":"JP","latitude":34.8614235,"longitude":135.5158993,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-08-19","project_count":3,"projects":[{"project_id":"0dbd2056-ca22-5356-9530-048c6921c1cf","name":"MC Digital Realty KIX10 (Digital Osaka 1) — existing operations","status":"operational","status_as_of":"2026-08-19","search_terms":""},{"project_id":"1573fce4-db74-53f6-85b2-73963e6b4a7d","name":"MC Digital Realty KIX13 (Digital Osaka 4) — existing operations","status":"operational","status_as_of":"2026-09-08","search_terms":""},{"project_id":"0ee1555f-978b-581f-bf7f-13ad372304b2","name":"MC Digital Realty KIX15 — new data center build","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Digital Realty"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f977fefeeef22bdcee98/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f977fefeeef22bdcee98.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Digital Realty"]},{"site_id":"vcc-site-4325075080f62b6ecff4","name":"Mega D.C. MDCIL-1 Modi'in Site","country":"Israel","country_iso_a2":"IL","latitude":31.916818855266946,"longitude":34.968828965948944,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"82f20665-aa7b-51d5-b303-ddf63792d77b","name":"Mega D.C. MDCIL-1 Modi'in Phase B Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Mega Or Holdings Ltd"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4325075080f62b6ecff4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4325075080f62b6ecff4.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Israel Planning Administration (iplan.gov.il)"]},{"site_id":"vcc-site-88781eb659e91e68b6e9","name":"Mega D.C. MDCIL-2 Masmiyya Site","country":"Israel","country_iso_a2":"IL","latitude":31.75320023426355,"longitude":34.7789757360257,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e542ef62-912c-5edb-982a-8e463179484b","name":"Mega D.C. MDCIL-2 Masmiyya Facility Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Mega Or Holdings Ltd"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88781eb659e91e68b6e9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88781eb659e91e68b6e9.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Israel Planning Administration (iplan.gov.il)"]},{"site_id":"vcc-site-166ec46634755791abc3","name":"Mega D.C. MDCIL-5 Idan HaNegev Site","country":"Israel","country_iso_a2":"IL","latitude":31.374300109598394,"longitude":34.78993235693893,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"96d7988b-a1e7-517c-9218-462524058a80","name":"Mega D.C. MDCIL-5 Idan HaNegev Phase A Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Mega Or Holdings Ltd"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-166ec46634755791abc3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-166ec46634755791abc3.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Israel Planning Administration (iplan.gov.il)"]},{"site_id":"vcc-site-c6017385da6435abc381","name":"Merlin Campus de Centros de Datos Zaragoza-WIND (Botorrita)","country":"Spain","country_iso_a2":"ES","latitude":41.5002772,"longitude":-1.0224131,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"6a050050-b65d-570e-9a00-8188ad08a60e","name":"Merlin Zaragoza-WIND Data Center Campus (144 MW IT single-phase development)","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c6017385da6435abc381/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c6017385da6435abc381.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-26279485fb1f7f11e894","name":"MERLIN Edged Bilbao-Arasur Campus","country":"Spain","country_iso_a2":"ES","latitude":42.697694,"longitude":-2.909169,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"7ac977cb-cbe2-5dfd-b058-f26707f86b6c","name":"MERLIN Edged Bilbao-Arasur Building 2 Current Build","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-26279485fb1f7f11e894/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-26279485fb1f7f11e894.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Google redirect service resolving MERLIN's published link"]},{"site_id":"vcc-site-5c9b661562b39e724fe6","name":"MERLIN Edged Madrid-Getafe II Campus","country":"Spain","country_iso_a2":"ES","latitude":40.311373,"longitude":-3.70676,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"aa2dc8a4-52d8-5519-b23a-2ff0313db9e3","name":"MERLIN Edged MAD02 Site Preparation","status":"site_preparation","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c9b661562b39e724fe6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c9b661562b39e724fe6.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Edged"]},{"site_id":"vcc-site-af26df3b9a306efc763c","name":"MERLIN Lisbon Data Center Campus","country":"Portugal","country_iso_a2":"PT","latitude":38.988289,"longitude":-8.963743,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"43ded2e8-5dcf-5174-b553-a4a04aaeebe3","name":"MERLIN Lisbon Phase II Two-Building Development","status":"under_construction","status_as_of":"2026-07-27","search_terms":""}],"status_publishers":["MERLIN Properties"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af26df3b9a306efc763c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af26df3b9a306efc763c.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Edged"]},{"site_id":"vcc-site-fcfc181b3d5d02fb0a65","name":"Meta Beaver Dam data center","country":"United States","country_iso_a2":"US","latitude":43.4578,"longitude":-88.8373,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"eaaa4486-a9d9-5cf1-b196-d03c258f8dc1","name":"Meta Beaver Dam data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of more than 700,000 square feet in Beaver Dam, Wisconsin, announced in November 2025 as a USD 1 billion investment and described as optimized for Meta's AI workloads. Meta's fact sheet and location list now give the investment as USD 1 billion or more, and the list gives 2025 as the groundbreaking year. Meta says it planned its energy needs with Alliant Energy and pays the full cost of the power used, and it refers readers to Mortenson for construction information. Meta has not published a power capacity or an opening date. Beaver Dam Data Center Meta Platforms Mortenson Alliant Energy City of Beaver Dam"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcfc181b3d5d02fb0a65/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcfc181b3d5d02fb0a65.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-a39bc0fe88ed4e44ee52","name":"Meta Bowling Green data center","country":"United States","country_iso_a2":"US","latitude":41.4743,"longitude":-83.6661,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"619c5358-cf99-5e82-a690-4ae5c58f07f1","name":"Meta Bowling Green data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of 715,000 square feet in Middleton Township, Wood County, Ohio, near Bowling Green, announced in April 2025 as an investment of more than USD 800 million and described as optimized for Meta's AI workloads. Meta's location list gives 2025 as the groundbreaking year. In February 2026 the Ohio Power Siting Board approved, without public hearings, a 350 MW behind-the-meter gas plant with about 120 MW of batteries next to the data center, to be built and run by Will-Power OH. Meta names Toledo Edison, FirstEnergy and Williams as energy-planning partners and refers readers to JE Dunn Construction for construction information. Bowling Green Data Center Meta Platforms JE Dunn Construction Toledo Edison FirstEnergy Williams Will-Power OH Ohio Power Siting Board"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a39bc0fe88ed4e44ee52/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a39bc0fe88ed4e44ee52.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-a51d60551e72a6720e31","name":"Meta Cheyenne data center","country":"United States","country_iso_a2":"US","latitude":41.14,"longitude":-104.8202,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"da9fec8b-b7a1-54cb-afb9-7f534cbab584","name":"Meta Cheyenne data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus of 715,000 square feet in Cheyenne, Wyoming, announced in July 2024 as an investment of more than USD 800 million and described as optimized for Meta's AI workloads. Meta's fact sheet and location list now put the investment at USD 1.2 billion, and the list gives 2024 as the groundbreaking year. Black Hills Energy is Meta's energy partner, and Meta refers readers to Fortis Construction for construction information. Meta reports one Wyoming project adding 365 MW of clean energy and 200 MW of battery storage to the grid. No power capacity or opening date for the data center has been published. Cheyenne Data Center Meta Platforms Fortis Construction Black Hills Energy City of Cheyenne Board of Public Utilities"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a51d60551e72a6720e31/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a51d60551e72a6720e31.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-560ea7139f27238b7ea1","name":"Meta DeKalb Data Center","country":"United States","country_iso_a2":"US","latitude":41.8894,"longitude":-88.7265,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"d3694f4b-3497-5f87-88aa-de8e9449c754","name":"Meta DeKalb Data Center","status":"partially_operational","status_as_of":"2026-10-26","search_terms":"Meta campus at 2050 Metaverse Way on the south side of DeKalb, Illinois, off Interstate 88. Meta broke ground in 2020 on a planned five-building campus of more than 2.3 million sq ft and more than USD 1 billion of investment. It came online in late November 2023, when the Illinois governor attended the opening; local reports said two buildings were serving traffic and about 1 million sq ft had been built. Meta says it planned its energy needs with ComEd and pays the full cost of the energy the campus uses. DeKalb Data Center Meta Platforms Meta Platforms ComEd City of DeKalb"}],"status_publishers":["City of DeKalb, Illinois"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-560ea7139f27238b7ea1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-560ea7139f27238b7ea1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-e24b0402ab82d9361bcf","name":"Meta Eagle Mountain Data Center","country":"United States","country_iso_a2":"US","latitude":40.2688392,"longitude":-112.0177378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":2,"projects":[{"project_id":"ac9265c3-a4f7-5081-8be4-9407d705590a","name":"Meta Eagle Mountain Data Center — 2026 expansion (new buildings)","status":"announced","status_as_of":"2026-09-14","search_terms":""},{"project_id":"a46f5d46-6882-5346-a0af-045ab22826d8","name":"Meta Eagle Mountain Data Center — operating campus","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e24b0402ab82d9361bcf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e24b0402ab82d9361bcf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Utah County, Utah"]},{"site_id":"vcc-site-f711d13af70d9b633456","name":"Meta El Paso Data Center","country":"United States","country_iso_a2":"US","latitude":31.9940441,"longitude":-106.3631625,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-28","oldest_status_as_of":"2026-07-28","project_count":1,"projects":[{"project_id":"337ace90-652d-52fe-a856-fe9b04b5966f","name":"Meta El Paso Current Development","status":"under_construction","status_as_of":"2026-07-28","search_terms":"AI-oriented Meta campus on roughly 1,000 acres in northeast El Paso, Texas, off Stan Roberts Sr. Avenue near US 54. Announced in October 2025 as a USD 1.5 billion project able to scale to 1 GW, it rose to USD 10 billion or more of Meta investment in 2026. In July 2026 Meta placed it in a joint venture 80% owned by BlackRock-managed funds, with a total development cost of about USD 14 billion and capacity due to start coming online in 2028. El Paso Electric has proposed a 366 MW modular gas plant beside the campus; in September 2026 state judges recommended approving it only if ratepayers do not bear its costs. El Paso Data Center Wurldwide Data Center Meta Platforms Meta Platforms Meta Platforms BlackRock (managed funds) El Paso Electric City of El Paso"}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f711d13af70d9b633456/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f711d13af70d9b633456.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-5db7c7f92d76e6cad252","name":"Meta Fort Worth Data Center","country":"United States","country_iso_a2":"US","latitude":32.9855232,"longitude":-97.2575676,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"9b423eef-70be-54b4-9da0-a66aab247d71","name":"Meta Fort Worth Data Center — operating campus","status":"operational","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Meta Platforms, Inc. (Meta Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5db7c7f92d76e6cad252/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5db7c7f92d76e6cad252.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels; Tarrant Appraisal District"]},{"site_id":"vcc-site-beb10377588af430b5a6","name":"Meta Gallatin Data Center","country":"United States","country_iso_a2":"US","latitude":36.4085,"longitude":-86.3716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2024-11-15","oldest_status_as_of":"2024-11-15","project_count":1,"projects":[{"project_id":"a203f1e3-768b-5094-b606-9c494490e0a6","name":"Meta Gallatin Data Center","status":"partially_operational","status_as_of":"2024-11-15","search_terms":"Multi-building Meta campus on roughly 800 acres in Gallatin, Tennessee. Construction began in August 2020 on what was first a USD 800 million commitment; by September 2022 the project was described as a nearly USD 1 billion investment, and in 2024 Meta filed plans for a further 278,000 sq ft data center that would take the campus to almost 1.9 million sq ft. In November 2024 Meta formally presented the operating campus to officials and said total investment would exceed USD 1.5 billion once the fourth data center is finished. DPR Construction is building the campus, and Meta says it planned its energy needs with the Tennessee Valley Authority. Gallatin Data Center Meta Platforms Meta Platforms DPR Construction Tennessee Valley Authority"}],"status_publishers":["Nashville Business Journal (via Gallatin Economic Development Agency)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-beb10377588af430b5a6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-beb10377588af430b5a6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-60b38ee835b4579aa5f2","name":"Meta Kansas City data center","country":"United States","country_iso_a2":"US","latitude":39.1001,"longitude":-94.5781,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2025-08-20","oldest_status_as_of":"2025-08-20","project_count":1,"projects":[{"project_id":"3315c754-ca0d-5702-8071-44b22787215a","name":"Meta Kansas City data center","status":"operational","status_as_of":"2025-08-20","search_terms":"Meta data center in Kansas City, Missouri, announced in March 2022 as an investment of more than USD 800 million and reported to be serving traffic in August 2025. Meta later put its Missouri investment at more than USD 1 billion and, in its fact sheet, USD 1.2 billion. Construction began in 2022, with an average of 1,500 skilled trade workers on site at peak. Evergy is the utility; Meta says it worked with Evergy on a tariff that lets customers contract for new renewable energy, and it reports three Missouri clean energy projects totaling 599 MW. No power capacity for the data center itself has been published. Kansas City Data Center Meta Platforms Evergy"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-60b38ee835b4579aa5f2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-60b38ee835b4579aa5f2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-d80966c9e0bc776042e6","name":"Meta Kuna Data Center","country":"United States","country_iso_a2":"US","latitude":43.4903,"longitude":-116.3717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e375d86c-75a4-53f3-a80e-31aa6f32b616","name":"Meta Kuna Data Center","status":"operational","status_as_of":"2026-09-03","search_terms":"Meta data center in Kuna, Idaho, about 16 miles from downtown Boise. Announced in February 2022 as a USD 800 million campus with more than 960,000 sq ft of data center space expected by 2025, it broke ground in 2022 and was later paused for a redesign to support AI infrastructure and liquid cooling. Meta began serving traffic from it in the third quarter of 2026, citing a USD 1.2 billion investment and a facility of more than 750,000 sq ft. Meta says it planned its energy needs with Idaho Power, and it built a water and wastewater system that it handed to the City of Kuna. Kuna Data Center Meta Platforms Meta Platforms Idaho Power City of Kuna"}],"status_publishers":["KBOI 2 (CBS2 Idaho News)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d80966c9e0bc776042e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d80966c9e0bc776042e6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NBC 16"]},{"site_id":"vcc-site-3c5c88d7f501e957c28a","name":"Meta Lebanon Indiana Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.06429731968878,"longitude":-86.53099064914196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-06","oldest_status_as_of":"2026-07-06","project_count":1,"projects":[{"project_id":"1f430ea1-a0e6-5a91-b3e7-3f002b331cf6","name":"Meta Lebanon Indiana Current Development","status":"under_construction","status_as_of":"2026-07-06","search_terms":"Meta campus of more than USD 10 billion in the LEAP Innovation and Research District in Lebanon, Indiana, Meta's second data center in the state. The state describes a 1,500-acre site with 13 buildings, 10 of them data centers, built in up to six phases; Meta gives a campus size of roughly 4 million square feet. Ground was broken on 11 February 2026, and local reporting expected operations in 2027 or early 2028. Meta planned its power needs with Wabash Valley Power Alliance and Boone Power, and Citizens Energy Group has said it plans to supply water. Indiana granted a performance-based 35-year sales tax exemption tied to at least USD 1 billion of investment in the first six years. Lebanon Data Center Meta Platforms Mortenson Turner Construction Company Faith Technologies Wabash Valley Power Alliance Boone Power Citizens Energy Group Indiana Economic Development Corporation"}],"status_publishers":["City of Lebanon Board of Zoning Appeals"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3c5c88d7f501e957c28a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3c5c88d7f501e957c28a.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Indiana Department of Natural Resources, Division of Water"]},{"site_id":"vcc-site-5c50e2f464fe8dff2ed0","name":"Meta Los Lunas Data Center (4250 Messenger Loop NW, Huning Ranch Business Park)","country":"United States","country_iso_a2":"US","latitude":34.828031,"longitude":-106.7809835,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"1066dce8-d1ea-5d6d-9685-c2d0c2467850","name":"Meta Los Lunas Data Center — existing data-centre operations","status":"operational","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Meta Platforms, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c50e2f464fe8dff2ed0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c50e2f464fe8dff2ed0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Valencia County GIS"]},{"site_id":"vcc-site-cb8ab0ad35bb603ea3ba","name":"Meta Mesa Data Center","country":"United States","country_iso_a2":"US","latitude":33.4222,"longitude":-111.8228,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["expansion"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f","name":"Meta Mesa Data Center","status":"expansion","status_as_of":"2026-10-20","search_terms":"Five-building Meta campus on 396 acres at the southeast corner of Elliot and Ellsworth Roads in Mesa, Arizona (3841 S. Ellsworth Road). Meta broke ground in August 2021 on a USD 800 million, two-building plan; in May 2022 it added three buildings, taking the campus to about 2.5 million sq ft and more than USD 1 billion. DPR Construction is the builder. The first two buildings went live in January 2025, with the rest expected around 2026, and Meta now cites a USD 1.2 billion investment. Salt River Project's 200 MW Brittlebush solar plant dedicates its full output to the campus. Mesa Data Center Meta Platforms Meta Platforms DPR Construction Salt River Project EDP Renewables North America"}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb8ab0ad35bb603ea3ba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cb8ab0ad35bb603ea3ba.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KTAR News"]},{"site_id":"vcc-site-4905a5572ec5f3fc6e2d","name":"Meta Montgomery data center","country":"United States","country_iso_a2":"US","latitude":32.3777,"longitude":-86.3091,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c0f8dadf-2c3d-5176-b649-85363c06e1fa","name":"Meta Montgomery data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta data center campus in Montgomery, Alabama. Announced in May 2024 as a 715,000-square-foot campus worth more than USD 800 million, it was expanded in September 2025 with two more buildings, bringing the campus to nearly 1.3 million square feet and the investment to more than USD 1.5 billion; Meta says it will be optimized for AI workloads. Meta's location list gives 2024 as the groundbreaking year. Meta names Alabama Power as its energy-planning partner and refers readers to Hensel Phelps for construction information. Meta's undated fact sheet gives job estimates well above those in its earlier posts. Montgomery Data Center Meta Platforms Hensel Phelps Alabama Power"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4905a5572ec5f3fc6e2d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4905a5572ec5f3fc6e2d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-66e95eb80a122bb2ee32","name":"Meta New Albany data center campus (Prometheus)","country":"United States","country_iso_a2":"US","latitude":40.0812,"longitude":-82.8088,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"edaa7f7d-5025-5f95-9870-3ad12478339c","name":"Meta New Albany data center campus (Prometheus)","status":"partially_operational","status_as_of":"2026-10-26","search_terms":"Meta's campus in New Albany, Ohio, where ground was first broken in 2017, is being expanded to host Prometheus, an AI cluster that Meta says delivers more than 1 GW of compute across several buildings. Meta announced Prometheus in July 2025, and it was expected to come online in 2026. Meta planned the campus's energy needs with AEP, behind-the-meter gas plants are being built by Will-Power OH for a Meta affiliate, and Meta signed nuclear power deals in January 2026 tied to the cluster. Drone imagery reported in September 2026 indicated the southern part of the cluster was running while the northern part was not yet energized. Prometheus New Albany Data Center Meta Platforms American Electric Power (AEP) Will-Power OH Williams Companies Vistra TerraPower Oklo"}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-66e95eb80a122bb2ee32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-66e95eb80a122bb2ee32.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-33110c77390f92dc4432","name":"Meta Richland Parish Data Center","country":"United States","country_iso_a2":"US","latitude":32.5289242,"longitude":-91.6360844,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-16","oldest_status_as_of":"2026-07-14","project_count":2,"projects":[{"project_id":"1404f5cd-04ee-57ea-8f73-91992fea0552","name":"Meta Richland Parish Current Development","status":"under_construction","status_as_of":"2026-07-16","search_terms":""},{"project_id":"803e9da5-cd1e-5849-813c-fe7c5b5f126b","name":"Meta Richland Parish data center (Hyperion)","status":"under_construction","status_as_of":"2026-07-14","search_terms":"Meta campus on the former Franklin Farm megasite in Richland Parish, northeast Louisiana, built to house Hyperion, which Meta calls its largest AI cluster. Announced in December 2024 as a USD 10 billion project, it was placed in late 2025 in a joint venture 80% owned by Blue Owl-managed funds and expanded in July 2026 to a planned 5 GW of IT capacity and more than USD 50 billion of investment. Entergy Louisiana is adding gas-fired generation, batteries and transmission upgrades to serve the site under a 20-year agreement. Construction began in December 2024, and officials expect full build-out around 2036. Hyperion Richland Parish Data Center Holly Ridge Meta Platforms Meta Platforms Meta Platforms Blue Owl Capital (managed funds) PIMCO Entergy Louisiana Turner Construction Company DPR Construction Mortenson Louisiana Economic Development"}],"status_publishers":["Louisiana Economic Development","Turner Construction Company"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-33110c77390f92dc4432.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},{"site_id":"vcc-site-b8522efc1a60fe3072e4","name":"Meta Sturgeon County Alberta Data Center","country":"Canada","country_iso_a2":"CA","latitude":53.8180670512532,"longitude":-113.18668173255557,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-08","oldest_status_as_of":"2026-07-08","project_count":1,"projects":[{"project_id":"d1538d73-e301-5203-9e49-924b20051374","name":"Meta Sturgeon County Alberta Current Campus Build","status":"under_construction","status_as_of":"2026-07-08","search_terms":"Meta's first data centre in Canada, a 1 GW campus optimized for its AI workloads in Sturgeon County, Alberta, in the Edmonton region, with more than CA$13 billion of planned investment. Meta announced the groundbreaking in July 2026. Meta says it is fully funding new generation and grid infrastructure in Alberta and names Greenlight Limited Partnership, AltaLink, Capital Power and the Alberta Electric System Operator as energy-planning partners. Frost Collective, a joint venture of Clark Builders and PCL Construction, is the general contractor. The project website's page description cites 1.6 GW, which differs from Meta's 1 GW figure. Sturgeon Data Centre Meta Platforms Frost Collective Clark Builders PCL Construction AltaLink Greenlight Limited Partnership Capital Power Sturgeon County"}],"status_publishers":["Meta"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b8522efc1a60fe3072e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b8522efc1a60fe3072e4.json","geometry_licenses":["Open-Government-Licence-Alberta"],"geometry_attributions":["Government of Alberta"]},{"site_id":"vcc-site-2972c6d36048ca1770e2","name":"Meta Talavera de la Reina data center campus","country":"Spain","country_iso_a2":"ES","latitude":39.95833,"longitude":-4.83278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-28","oldest_status_as_of":"2026-08-28","project_count":1,"projects":[{"project_id":"1369aebb-7496-56a6-9260-159cd3a37283","name":"Meta Talavera de la Reina data center campus","status":"announced","status_as_of":"2026-08-28","search_terms":"Planned Meta data center campus in the Torrehierro industrial area of Talavera de la Reina, Toledo, which would be Meta's first large owned data center in Spain. Meta's 2022 announcement put the investment at about EUR 1 billion; environmental documents later estimated EUR 750 million. Meta bought about 190 hectares from the state land agency Sepes in December 2024. After repeated delays, the regional government approved it as a project of singular interest in October 2025 and authorised the land reparcelling in summer 2026, letting Meta seek building permits. A switch to dry-air cooling cut planned water use. Construction had not been reported as started. Meta Torrehierro data center Meta Platforms Meta Platforms Sepes (Entidad Pública Empresarial de Suelo) Junta de Comunidades de Castilla-La Mancha Talavera de la Reina City Council"}],"status_publishers":["iAgua"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2972c6d36048ca1770e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2972c6d36048ca1770e2.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["iAgua"]},{"site_id":"vcc-site-6afd5a936ac72410543b","name":"Meta Temple Data Center","country":"United States","country_iso_a2":"US","latitude":31.1056,"longitude":-97.4208,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["operational"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"2fc433ea-05de-5b3a-b4a1-bd9d544f8ae3","name":"Meta Temple Data Center","status":"operational","status_as_of":"2026-07-22","search_terms":"Meta data center on a 393-acre site off NW H K Dodgen Loop and Industrial Boulevard in Temple, Texas. Announced in March 2022 as a USD 800 million, roughly 900,000 sq ft hyperscale campus expected to be finished in 2024, it broke ground in 2022, was redesigned with construction restarting in 2023, and opened in July 2026 as an AI data center of two buildings and more than 760,000 sq ft. Meta now gives its investment as USD 1.2 billion. Meta describes it as its second data center in Texas. Temple Data Center Meta Platforms Meta Platforms Temple Economic Development Corporation City of Temple"}],"status_publishers":["KWTX"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6afd5a936ac72410543b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6afd5a936ac72410543b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KWTX"]},{"site_id":"vcc-site-4ed4b7a2d6d92a9362bb","name":"Meta Tulsa data center","country":"United States","country_iso_a2":"US","latitude":36.1563,"longitude":-95.9928,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"302bc1de-8d94-5ca1-a94e-ceb9facdcc1e","name":"Meta Tulsa data center","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Meta AI data center in East Tulsa, Oklahoma, announced in April 2026 as an investment of more than USD 1 billion. Fortis Construction is building a campus of roughly 2 million square feet for Meta, and Meta's location list gives 2026 as the groundbreaking year. Meta names Public Service Company of Oklahoma as its energy-planning partner and reports five Oklahoma clean energy projects totaling 1,273 MW. Meta has not published a power capacity or opening date for the site. Tulsa Data Center Meta Platforms Fortis Construction Public Service Company of Oklahoma Tulsa Metropolitan Utility Authority"}],"status_publishers":["Meta Platforms"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4ed4b7a2d6d92a9362bb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4ed4b7a2d6d92a9362bb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Meta Platforms"]},{"site_id":"vcc-site-0ca1d5c08f1eb1cf1cf3","name":"Microsoft Alviso San Jose Datacenter Campus","country":"United States","country_iso_a2":"US","latitude":37.42520058052749,"longitude":-121.92873874095102,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"1861d9fb-3980-5a16-baa1-c32762e244c1","name":"Microsoft Alviso Phase 2 Greenfield Development","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["HITT Contracting"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ca1d5c08f1eb1cf1cf3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ca1d5c08f1eb1cf1cf3.json","geometry_licenses":["city-open-data-disclaimer"],"geometry_attributions":["City of San Jose"]},{"site_id":"vcc-site-61821b33f526947c1098","name":"Microsoft Bedburg Datacenter Campus (Rheinisches Revier)","country":"Germany","country_iso_a2":"DE","latitude":50.995782,"longitude":6.5365988,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"6dbb2d86-fcab-5d0f-8727-31327222dce1","name":"Microsoft Bedburg NRW08/NRW09 — planned two-phase datacenter campus","status":"announced","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Bezirksregierung Köln, Dezernat 53"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-61821b33f526947c1098/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-61821b33f526947c1098.json","geometry_licenses":["dl-de/zero-2-0"],"geometry_attributions":["Geobasis NRW"]},{"site_id":"vcc-site-6637189089f997b28afc","name":"Microsoft Bornasco Datacenter Campus (ATP1 area, Via dei Pioppi)","country":"Italy","country_iso_a2":"IT","latitude":45.2556197,"longitude":9.209439,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"3c2f50af-b3c5-55c3-a379-449d88205213","name":"MIL06 — second datacenter building (north building) with emergency generators (VIA decree DM 633/2026, ID_VIP 10891)","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica, Direzione generale Valutazioni ambientali, in concert with the Ministero della cultura"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6637189089f997b28afc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6637189089f997b28afc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Microsoft 4825 Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-9b86fe87cb674e474940","name":"Microsoft Conover Lyle Creek Data Center","country":"United States","country_iso_a2":"US","latitude":35.731135,"longitude":-81.205389,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"eb451867-d1d3-5e41-bce7-d375e861167a","name":"Microsoft Conover Lyle Creek Current Build","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b86fe87cb674e474940/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b86fe87cb674e474940.json","geometry_licenses":["US-federal-public-domain","county-public-gis-fact-extraction-only"],"geometry_attributions":["Catawba County GIS","U.S. Army Corps of Engineers, Wilmington District"]},{"site_id":"vcc-site-1ad314d3647967ef3f6e","name":"Microsoft Data Center MIL03, Settimo Milanese (former Italtel area)","country":"Italy","country_iso_a2":"IT","latitude":45.4736116,"longitude":9.0434101,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"543dc47d-09a5-59d2-88cd-af3ed05252c6","name":"Data Center MIL03 — proposed single-building data centre (MASE ID_VIP 10873)","status":"announced","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1ad314d3647967ef3f6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1ad314d3647967ef3f6e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Microsoft 4825 Italy S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-b5af2a524798e325dcd5","name":"Microsoft Dublin Data Center Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22","country":"Ireland","country_iso_a2":"IE","latitude":53.3221532,"longitude":-6.4455824,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":3,"projects":[{"project_id":"c7a4d90f-deb4-5947-aa9b-1727353e1046","name":"Microsoft Dublin Data Center Campus — existing operations of DB3, DB4 and DB5 (EPA IE licence P1190-01)","status":"operational","status_as_of":"2026-08-31","search_terms":""},{"project_id":"08482ecd-5783-562f-b4bc-5162d4af8567","name":"Microsoft Dublin Data Center Campus — existing operations of DUB6, DUB7, DUB8, DUB9, DUB10, DUB12 and DUB13 (EPA IE licence P1191-01)","status":"operational","status_as_of":"2026-08-31","search_terms":""},{"project_id":"005795eb-8491-5477-8870-f5da562329c4","name":"Microsoft Dublin Data Center Campus — operating DUB14 and DUB15 installation with the Central Administration Building (EPA IE licence P1187-01; DUB15 build-out not asserted complete)","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Microsoft Ireland Operations Limited (prepared by AWN Consulting), published by the Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b5af2a524798e325dcd5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b5af2a524798e325dcd5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-c0c7b4087b3f24c58bce","name":"Microsoft EKI Campus, 12501 Cleveland Road, Granger (St. Joseph County, Indiana)","country":"United States","country_iso_a2":"US","latitude":41.728267,"longitude":-86.1163127,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"d68c6e8b-9524-51ca-82f8-74492117f9ae","name":"Microsoft EKI Campus - proposed data center (IDEM new-source construction and FESOP application F 141-50527-00655)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Indiana Department of Environmental Management (IDEM), Office of Air Quality"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c0c7b4087b3f24c58bce/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c0c7b4087b3f24c58bce.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["St. Joseph County, Indiana GIS"]},{"site_id":"vcc-site-81f27673b0960b9da911","name":"Microsoft Espoo Hepokorpi Datacenter Campus","country":"Finland","country_iso_a2":"FI","latitude":60.23775070138893,"longitude":24.687531695669563,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-11","oldest_status_as_of":"2026-06-11","project_count":1,"projects":[{"project_id":"c1af62b5-b9a2-5c15-a8a4-717e1a65ac05","name":"Microsoft Espoo Second Datacenter Building","status":"under_construction","status_as_of":"2026-06-11","search_terms":""}],"status_publishers":["City of Espoo"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-81f27673b0960b9da911/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-81f27673b0960b9da911.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["City of Espoo"]},{"site_id":"vcc-site-12d6215837c6451ab8a3","name":"Microsoft Etobicoke Ontario Datacenter Campus","country":"Canada","country_iso_a2":"CA","latitude":43.7087107176944,"longitude":-79.5482231836428,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"c4ffa53e-bb43-5af1-9e07-aa5045ea480b","name":"Microsoft Etobicoke First Building Current Build","status":"under_construction","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-12d6215837c6451ab8a3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-12d6215837c6451ab8a3.json","geometry_licenses":["Open Government Licence - Toronto"],"geometry_attributions":["City of Toronto","City of Toronto, Geospatial Competency Centre"]},{"site_id":"vcc-site-487fd7b91c213d078d2d","name":"Microsoft Heath Datacenter","country":"United States","country_iso_a2":"US","latitude":40.025835523589,"longitude":-82.480274580568,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"edf978b4-fbe8-5f8a-9fe0-bd1e9f33e1d2","name":"Microsoft Heath Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-487fd7b91c213d078d2d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-487fd7b91c213d078d2d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-1589f325b3b39da5fb19","name":"Microsoft Hebron Datacenter","country":"United States","country_iso_a2":"US","latitude":39.972018466398,"longitude":-82.488898833962,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"86bcbcd1-702d-5afa-aeb8-1cb145224b97","name":"Microsoft Hebron Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1589f325b3b39da5fb19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1589f325b3b39da5fb19.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-23954973324259026d9e","name":"Microsoft Huntstown Data Centre Campus, North Road, Coldwinters, Dublin 11","country":"Ireland","country_iso_a2":"IE","latitude":53.411141,"longitude":-6.3208809,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"e66866c3-8b6d-5a64-8b9a-ed5ead928c25","name":"Microsoft Huntstown Data Centre Campus — data hall Buildings A and B","status":"under_construction","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["Microsoft Ireland Operations Limited (prepared by AWN Consulting), published by the Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23954973324259026d9e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23954973324259026d9e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-004b39e14dadd642b1e8","name":"Microsoft Kirkkonummi Datacenter Campus","country":"Finland","country_iso_a2":"FI","latitude":60.145133329678934,"longitude":24.5488365702344,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":2,"projects":[{"project_id":"64289119-458d-5fc9-bf51-5af6097220eb","name":"Microsoft Kirkkonummi First Datacenter Building","status":"under_construction","status_as_of":"2026-09-24","search_terms":""},{"project_id":"a9441c92-e953-5bdc-a00b-0575d4a1b30a","name":"Microsoft Kirkkonummi Second Datacenter Building","status":"under_construction","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["Winthrop Technologies"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-004b39e14dadd642b1e8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-004b39e14dadd642b1e8.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Municipality of Kirkkonummi"]},{"site_id":"vcc-site-155a753d051b04508b1c","name":"Microsoft La Muela datacenter campus (Aragón)","country":"Spain","country_iso_a2":"ES","latitude":41.6068,"longitude":-1.0832,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"a9ca22ae-d872-5122-a052-e5c9ec410abd","name":"Microsoft La Muela datacenter campus (Aragón)","status":"announced","status_as_of":"2026-10-02","search_terms":"Planned Microsoft datacenter campus at the Centrovía industrial estate in La Muela, west of Zaragoza, the largest by area and investment of the three campuses in Microsoft's Aragón plan. The site was declared of general interest in late 2023. The regional plan (PIGA Región MSFT), given initial approval in November 2025, assigns it 146 hectares and about EUR 2.18 billion, with 50 MW secured for a first phase and up to 300 MW sought later through a new substation. The plan still lacked final approval in August 2026, and a modified version went out for public comment in July 2026. Forbes reported first operation was expected from 2030. Microsoft Centrovía La Muela campus Microsoft Gobierno de Aragón Ayuntamiento de La Muela"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-155a753d051b04508b1c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-155a753d051b04508b1c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vozpópuli"]},{"site_id":"vcc-site-298aaa4c04e0d88160f7","name":"Microsoft La Porte Indiana Campus","country":"United States","country_iso_a2":"US","latitude":41.57958055,"longitude":-86.69006414,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-18","oldest_status_as_of":"2026-06-18","project_count":1,"projects":[{"project_id":"f2b93d1a-7c33-5a9e-be4d-f7d0dadec047","name":"Microsoft La Porte First Phase Current Build","status":"under_construction","status_as_of":"2026-06-18","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-298aaa4c04e0d88160f7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-298aaa4c04e0d88160f7.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["Indiana Geographic Information Office and Indiana local governments","Indiana Geographic Information Office; source originator LaPorte County"]},{"site_id":"vcc-site-3cd7dd9c786c855c1820","name":"Microsoft Lévis Charny Data Center","country":"Canada","country_iso_a2":"CA","latitude":46.7079338,"longitude":-71.2587356420411,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-08","oldest_status_as_of":"2026-06-08","project_count":1,"projects":[{"project_id":"b3656b35-f3ad-5119-8918-ac5237bf2a7f","name":"Microsoft Lévis Charny Development Project","status":"under_construction","status_as_of":"2026-06-08","search_terms":""}],"status_publishers":["Commission de la construction du Québec"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3cd7dd9c786c855c1820/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3cd7dd9c786c855c1820.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["OpenStreetMap Foundation","OpenStreetMap Wiki contributors","OpenStreetMap contributors"]},{"site_id":"vcc-site-495790bb0eec99f8d10f","name":"Microsoft L’Ancienne-Lorette Data Center","country":"Canada","country_iso_a2":"CA","latitude":46.79188968009724,"longitude":-71.34675196270454,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-08","oldest_status_as_of":"2026-06-08","project_count":1,"projects":[{"project_id":"867d91cb-7a17-59db-a92e-4a50a499f54f","name":"Microsoft L’Ancienne-Lorette Development Project","status":"under_construction","status_as_of":"2026-06-08","search_terms":""}],"status_publishers":["Commission de la construction du Québec"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-495790bb0eec99f8d10f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-495790bb0eec99f8d10f.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Québec Ministère des Ressources naturelles et des Forêts"]},{"site_id":"vcc-site-04be359939cf11193024","name":"Microsoft Middenmeer Campus West expansion (Agriport Plot B)","country":"Netherlands","country_iso_a2":"NL","latitude":52.78304,"longitude":5.025355,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-03-25","oldest_status_as_of":"2026-03-25","project_count":1,"projects":[{"project_id":"55df6642-2ef8-5b72-a965-996a28bdfb24","name":"Microsoft Middenmeer Campus West expansion (Agriport Plot B)","status":"announced","status_as_of":"2026-03-25","search_terms":"Proposed expansion of Microsoft's datacenters at the Agriport A7 business park in Middenmeer, Hollands Kroon, North Holland. Announced in September 2025, it would add six double-storey datacenter buildings on Plot B, a site of about 53 hectares west of the A7 next to Microsoft's AMS13-14 datacenters, plus a 10-hectare public nature area, forming one eight-building campus. Microsoft has published no capacity figure; in March 2026 the national EIA commission put the planned emergency generator capacity at about 535 MWe and used it as a proxy for electrical demand. Microsoft's indicative timeline targets a permit application in September 2026 and construction from late 2027. Uitbreiding Campus West Microsoft Microsoft Middenmeer Plot B Microsoft Provincie Noord-Holland (Gedeputeerde Staten) Gemeente Hollands Kroon"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-04be359939cf11193024/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-04be359939cf11193024.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Microsoft"]},{"site_id":"vcc-site-fcc06643c640f5d8cce2","name":"Microsoft Mount Pleasant Datacenter Campus","country":"United States","country_iso_a2":"US","latitude":42.676507349999994,"longitude":-87.91034345,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-06-23","project_count":2,"projects":[{"project_id":"0f5f4fcc-53c4-53d0-9795-2a387d195364","name":"Microsoft Fairwater AI datacenter, Mount Pleasant","status":"partially_operational","status_as_of":"2026-06-23","search_terms":"Microsoft AI supercomputing campus in Mount Pleasant, Wisconsin, on land originally slated for Foxconn. The first facility (Phase 1, near County Road KR and 90th Street) has three buildings with about 1.2 million sq ft on 315 acres; equipment came online in April 2026 and Microsoft declared it fully operational on 23 June 2026. A second facility of similar scale (Phase 2), immediately adjacent near KR and County Road H, has been under construction since November 2025 with completion scheduled for 2028. Microsoft pledged USD 3.3 billion for the first facility and USD 4 billion more for the second, and calls the site Fairwater. Fairwater Fairwater 1 Microsoft Mount Pleasant datacenter campus Microsoft Microsoft Microsoft Walsh Construction Kiewit We Energies National Grid Renewables NVIDIA OpenAI"},{"project_id":"ccb7fe0e-f94d-58ca-8d36-695a9cd48d56","name":"Microsoft Mount Pleasant Second Datacenter Facility","status":"under_construction","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Microsoft","Village of Mount Pleasant, Wisconsin"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcc06643c640f5d8cce2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcc06643c640f5d8cce2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c9f14a3df329db2670d8","name":"Microsoft Mount Pleasant Durand Avenue datacenter campus","country":"United States","country_iso_a2":"US","latitude":42.6965,"longitude":-87.947,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"7c5eed16-f5f1-515a-b9ee-b7c30754fc10","name":"Microsoft Mount Pleasant Durand Avenue datacenter campus","status":"under_construction","status_as_of":"2026-07-01","search_terms":"Planned nine-building Microsoft datacenter campus near Durand Avenue in Mount Pleasant, Wisconsin, on a 791-acre parcel Microsoft says it bought in 2024. Village planning documents reported by WPR describe 5.2 million sq ft of development, including a 96,000 sq ft office and other related buildings, with an estimated taxable value of more than USD 7.97 billion. The plan commission recommended the site plan with conditions on traffic and water use, and the village board approved it unanimously in January 2026. Microsoft's construction page reports preliminary earthwork under way since March 2026 at a Phase 3 site at Durand Avenue and Hewitt Memorial Drive. Mount Pleasant Phase 3 (Durand & Hewitt Memorial Drive) Microsoft Microsoft Village of Mount Pleasant"}],"status_publishers":["Microsoft Local"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c9f14a3df329db2670d8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c9f14a3df329db2670d8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Wisconsin Public Radio"]},{"site_id":"vcc-site-c5988379bc974f1f6240","name":"Microsoft Mount Pleasant International Drive datacenter campus","country":"United States","country_iso_a2":"US","latitude":42.7112,"longitude":-87.9339,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-01-27","oldest_status_as_of":"2026-01-27","project_count":1,"projects":[{"project_id":"96848e3f-da64-53c8-be33-bf5c9cd2109a","name":"Microsoft Mount Pleasant International Drive datacenter campus","status":"announced","status_as_of":"2026-01-27","search_terms":"Planned six-building Microsoft datacenter campus along International Drive in Mount Pleasant, Wisconsin, on about 530 acres Microsoft says it bought in 2024. Village planning documents reported by WPR describe more than 3.5 million sq ft of development, including a 74,000 sq ft office and other buildings, with an estimated taxable value of more than USD 5.3 billion. The plan commission recommended the site plan with conditions including a traffic impact analysis and water-use compliance, and the village board approved it unanimously in January 2026. Microsoft called the plans preliminary and gave no construction timeline or energy estimate. Microsoft Microsoft Village of Mount Pleasant"}],"status_publishers":["Spectrum News 1"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5988379bc974f1f6240/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c5988379bc974f1f6240.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Wisconsin Public Radio"]},{"site_id":"vcc-site-c0945d7c74abf8504604","name":"Microsoft New Albany Datacenter","country":"United States","country_iso_a2":"US","latitude":40.103804132848,"longitude":-82.753523444119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f8377a0f-dc89-5b7a-8257-25f25cdbac43","name":"Microsoft New Albany Initial Site Preparation","status":"site_preparation","status_as_of":"2026-07-01","search_terms":"Three-site Microsoft datacenter program in Licking County, east of Columbus, Ohio, with separate campuses in New Albany, Heath and Hebron. Announced in October 2024 as an initial USD 1 billion investment for Azure cloud capacity, it included a USD 420 million, 245,000 sq ft building on 197 acres in New Albany. In April 2025 Microsoft paused the program, keeping the land and saying two sites would be made farmable. Work resumed in 2026: Heath broke ground in February, and Microsoft's Heath and Hebron pages report tree clearing, mass grading through November 2026 and planned substation work, with no vertical construction timeline. No 2026 update was found for New Albany. Microsoft Heath datacenter Microsoft Hebron datacenter Microsoft New Albany datacenter Microsoft Microsoft Ames Construction"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c0945d7c74abf8504604/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c0945d7c74abf8504604.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-91ad5264ef3af020a0ed","name":"Microsoft Pecos datacenter campus","country":"United States","country_iso_a2":"US","latitude":31.4156,"longitude":-103.5,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-02","oldest_status_as_of":"2026-07-02","project_count":1,"projects":[{"project_id":"735e570e-2923-5425-a0af-2a13e94f49e3","name":"Microsoft Pecos datacenter campus","status":"announced","status_as_of":"2026-07-02","search_terms":"Microsoft campus announced in June 2026 for Pecos in Reeves County, West Texas, adding about 2 GW of capacity for AI and cloud services through a multibillion-dollar investment over five to seven years. At launch it will run behind the meter on a co-located gas plant, Chevron's Project Kilby, built with Engine No. 1 and GE Vernova and sized to reach 2.67 GW in phases under a 20-year power deal; first power is expected in 2028, subject to Chevron's final investment decision. Microsoft says it funds the generation, plans to connect to the wider grid later, and will use closed-loop cooling. Microsoft Chevron (Energy Forge One LLC) Engine No. 1"}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-91ad5264ef3af020a0ed/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-91ad5264ef3af020a0ed.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Microsoft"]},{"site_id":"vcc-site-a984e7c4df277059e820","name":"Microsoft Petit-Landau / Hombourg Datacenter Campus (lieu-dit Alte Stocketen, Haut-Rhin)","country":"France","country_iso_a2":"FR","latitude":47.7457847,"longitude":7.5307248,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-12","oldest_status_as_of":"2026-10-12","project_count":1,"projects":[{"project_id":"675a4400-c7c5-546b-a932-d860a1639092","name":"Microsoft Petit-Landau datacenter (three units, about 36 ha)","status":"announced","status_as_of":"2026-10-12","search_terms":""}],"status_publishers":["Mulhouse Alsace Agglomération (m2A)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a984e7c4df277059e820/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a984e7c4df277059e820.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN / Géoportail de l'urbanisme"]},{"site_id":"vcc-site-885f8423ea04be0404cf","name":"Microsoft San Bovio Datacenter","country":"Italy","country_iso_a2":"IT","latitude":45.46212956614725,"longitude":9.310638890241082,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"257f3255-46fe-585e-bdf5-9689b34edbdc","name":"Microsoft San Bovio Initial Development","status":"site_preparation","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-885f8423ea04be0404cf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-885f8423ea04be0404cf.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-eeb4a9ca47e0d579a9cb","name":"Microsoft Silver Springs Datacenter","country":"United States","country_iso_a2":"US","latitude":39.41490935306584,"longitude":-119.24379594248448,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"427dfd4b-2d57-5edf-83ec-1ec7ec3ba846","name":"Microsoft Silver Springs Datacenter — current campus build","status":"site_preparation","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eeb4a9ca47e0d579a9cb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eeb4a9ca47e0d579a9cb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lyon County GIS"]},{"site_id":"vcc-site-307be41074d784035ee5","name":"Microsoft Skelton Grange datacentre campus, Leeds","country":"United Kingdom","country_iso_a2":"GB","latitude":53.7758,"longitude":-1.4978,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"ca9b7a8f-2f71-5996-8ef1-66d4a2bfe2fa","name":"Microsoft Skelton Grange datacentre campus, Leeds","status":"announced","status_as_of":"2026-08-19","search_terms":"Planned Microsoft hyperscale datacentre campus on the former Skelton Grange power station land at Stourton, Leeds, beside the River Aire. Microsoft bought the first 27-acre plot from Harworth Group in 2024, and a second 21-acre plot is due to transfer. The application covers three data centre buildings of about 424,000 sq ft (about 500,000 sq ft with auxiliary buildings) plus power, water and energy infrastructure. Leeds planners resolved to grant consent in April 2026, subject to conditions and a Section 106 agreement. Harworth estimates about GBP 4 billion of inward investment at completion; a start on site was expected within 12 to 18 months. Skelton Grange (Leeds) datacentre Microsoft Microsoft Harworth Group Leeds City Council"}],"status_publishers":["Harworth Group plc"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-307be41074d784035ee5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-307be41074d784035ee5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Harworth Group"]},{"site_id":"vcc-site-d59b502f505d71569c10","name":"Microsoft SYD01 Huntingwood (Honeman Close Data Centre)","country":"Australia","country_iso_a2":"AU","latitude":-33.799976,"longitude":150.896042,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"26667c0d-56e3-5cf9-b17f-586d2e24f596","name":"Honeman Close Data Centre — approved 140 MW Microsoft data centre","status":"permitted","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d59b502f505d71569c10/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d59b502f505d71569c10.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-deed58b28fabd02848f5","name":"Microsoft Union City data center campus (EdgeConneX)","country":"United States","country_iso_a2":"US","latitude":33.605,"longitude":-84.4936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"561d28db-c1e2-5bbc-bda9-e10cbee90d7d","name":"Microsoft Union City data center campus (EdgeConneX)","status":"under_construction","status_as_of":"2026-08-06","search_terms":"Data center campus on 136 acres at 4810 Stonewall Tell Road in Union City, Fulton County, on metro Atlanta's Southside. In July 2024 Microsoft was confirmed as the company seeking a USD 75 million, ten-year property tax break for three planned buildings, and a regional-impact filing described about 2.1 million sq ft in a project a trade report, crediting the Atlanta Journal-Constitution, headlined at USD 1.8 billion. In August 2026 the Atlanta Journal-Constitution described it as an EdgeConneX-developed campus, still under construction, in which Microsoft leases space, with a price tag of nearly USD 2 billion. EdgeConneX Union City campus 4810 Stonewall Tell Road EdgeConneX Microsoft Microsoft Development Authority of Fulton County (Develop Fulton)"}],"status_publishers":["The Atlanta Journal-Constitution"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-deed58b28fabd02848f5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-deed58b28fabd02848f5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Southern Business & Development (via Atlanta Business Chronicle)"]},{"site_id":"vcc-site-f1711beb19eaf65e19e2","name":"Microsoft Vaughan Datacentre Campus (YTO11)","country":"Canada","country_iso_a2":"CA","latitude":43.792644152673475,"longitude":-79.62864671042952,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","completed"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"288845bc-d2e7-566b-8a48-3a6c6b2892fb","name":"Microsoft Vaughan YTO11 — first building construction","status":"completed","status_as_of":"2026-08-05","search_terms":""},{"project_id":"2325d27c-df20-5307-9f96-2ac81a7af81c","name":"Microsoft Vaughan — second phase (second datacentre building)","status":"announced","status_as_of":"2026-08-05","search_terms":""}],"status_publishers":["Microsoft Corporation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f1711beb19eaf65e19e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f1711beb19eaf65e19e2.json","geometry_licenses":["York Region Open Data Licence v1.0"],"geometry_attributions":["Contains public sector information made available under The Regional Municipality of York's Open Data Licence"]},{"site_id":"vcc-site-b74f3c274a5a8c1e01da","name":"Microsoft Villamayor de Gállego datacenter campus (Aragón)","country":"Spain","country_iso_a2":"ES","latitude":41.6857,"longitude":-0.774,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"ec8c635b-93db-5c3c-904e-820b7c4f1233","name":"Microsoft Villamayor de Gállego datacenter campus (Aragón)","status":"announced","status_as_of":"2026-10-02","search_terms":"Planned Microsoft datacenter campus on Villamayor de Gállego land at the Malpica industrial estate northeast of Zaragoza, the third Aragón site Microsoft disclosed. The regional government declared it of regional interest in July 2024, citing EUR 2.2 billion of total investment and EUR 365.3 million for an initial phase. The November 2025 regional plan (PIGA Región MSFT) lists 81 hectares and about EUR 1.73 billion, with 50 MW secured for a first phase and up to 300 MW sought later. A modified plan went out for public comment in July 2026, and Forbes reported first operation was expected from 2030. Microsoft Malpica campus Microsoft Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b74f3c274a5a8c1e01da/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b74f3c274a5a8c1e01da.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vozpópuli"]},{"site_id":"vcc-site-bbdc5d36a043320f3d50","name":"Microsoft Wellington Datacenter Site (Gainesville)","country":"United States","country_iso_a2":"US","latitude":38.7930364,"longitude":-77.5813734,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"94517111-8682-5bdf-83b7-b2002e499fa9","name":"Microsoft Wellington Datacenter Site (Gainesville) — proposed campus","status":"announced","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Microsoft"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bbdc5d36a043320f3d50/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bbdc5d36a043320f3d50.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-1e165cace19ab3a9b463","name":"Microsoft Zaragoza (Puerto Venecia) datacenter campus","country":"Spain","country_iso_a2":"ES","latitude":41.6088,"longitude":-0.8872,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-27","oldest_status_as_of":"2026-10-27","project_count":1,"projects":[{"project_id":"6788c655-d9ed-520c-8012-56d246d29a0c","name":"Microsoft Zaragoza (Puerto Venecia) datacenter campus","status":"announced","status_as_of":"2026-10-27","search_terms":"Planned Microsoft datacenter campus in the city of Zaragoza beside the Puerto Venecia shopping area, one of three campuses in the PIGA Región MSFT regional plan. The November 2025 plan assigns it 57 hectares and about EUR 1.44 billion, with 50 MW secured for a first phase and up to 300 MW sought later via the Torrero-Valdeconsejo substation. The regional government declared it of general interest in September 2025 and began expropriating about 16.5 hectares of private land. Landowners and the ZeC party contested the project in 2026. Microsoft says only land clearing is authorized until the plan receives final approval. Microsoft Gobierno de Aragón"}],"status_publishers":["Gobierno de Aragón, Boletín Oficial de Aragón"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1e165cace19ab3a9b463/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1e165cace19ab3a9b463.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["elDiario.es"]},{"site_id":"vcc-site-ba0ec3c812ffc9dd281f","name":"Midas Compute Big Spring Facility, 1202 N FM 700, Big Spring (Howard County)","country":"United States","country_iso_a2":"US","latitude":32.2724243,"longitude":-101.4418866,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"375d4c3f-4f3b-535d-943b-07350a579e55","name":"Midas Compute Big Spring Facility — proposed AI computing facility with on-site natural-gas generation (TCEQ air permit 185376 pending)","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["Texas Commission on Environmental Quality (via data.texas.gov)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ba0ec3c812ffc9dd281f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ba0ec3c812ffc9dd281f.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Address Points (Howard County 9-1-1 data, source CSEC)"]},{"site_id":"vcc-site-499a1602728034c6a587","name":"Mihta Askiy Data Centre","country":"Canada","country_iso_a2":"CA","latitude":56.3814,"longitude":-116.7479,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"a2de1edb-c874-5d78-902a-e174a5ecd03e","name":"Mihta Askiy Data Centre","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed gas-powered data centre about 40 km northeast of Peace River in Northern Sunrise County, Alberta. Alberta's project inventory says the plan involves acquiring a partially completed power plant and converting it into a natural-gas-powered data centre. The proponent, Cree Ative Datacenter Corp GP, filed a federal project description for a 650 MW gas plant to serve the data centre, starting with simple-cycle turbines and later converting to combined cycle. The federal agency decided in March 2026 that no further federal assessment was required; Alberta's inventory lists the project as proposed, with work commencing in 2027. Mihta Askiy Data Center Project Cree Ative Datacenter Corp GP Mihta Askiy Datacenter LP"}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-499a1602728034c6a587/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-499a1602728034c6a587.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Government of Alberta, Major Projects"]},{"site_id":"vcc-site-44380dabd3b5dc3b6d10","name":"Mirai Ogaki Data Center Campus","country":"Japan","country_iso_a2":"JP","latitude":35.3681578,"longitude":136.6401464,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"0c37f689-99a9-5751-87e1-e83509752206","name":"Mirai Ogaki Data Center Campus Existing Operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Impress / Cloud Watch; firsthand interview with Mirai Communication Network"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-44380dabd3b5dc3b6d10/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-44380dabd3b5dc3b6d10.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps, selected in the operator access page"]},{"site_id":"vcc-site-625b2485ed0779af5392","name":"Mitsui Fudosan Hino Hinodai Data Center Site (former Hino Motors west plant)","country":"Japan","country_iso_a2":"JP","latitude":35.673367,"longitude":139.377031,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"0ea95bbd-231d-5742-876d-25bf26ab5e0a","name":"Mitsui Fudosan (仮称)日野市日野台3丁目計画 — planned three-building data-centre development, Hino","status":"announced","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Hino City Council (日野市議会)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-625b2485ed0779af5392/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-625b2485ed0779af5392.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Hino City; Mitsui Fudosan Co., Ltd."]},{"site_id":"vcc-site-fe662eaf021a8dc4f203","name":"Monarch Compute Campus Point Pleasant","country":"United States","country_iso_a2":"US","latitude":38.91694204176893,"longitude":-82.11110964992228,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"762397cd-ffc7-55c2-936e-af38cb8d4d0c","name":"Monarch Point Pleasant Current Site Preparation","status":"under_construction","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Nscale Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe662eaf021a8dc4f203/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe662eaf021a8dc4f203.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["West Virginia Department of Environmental Protection"]},{"site_id":"vcc-site-be4bd88c9ffbe4c64a33","name":"Monticello Tech Technology Campus (Edmonson Business Center, Monticello, Minnesota)","country":"United States","country_iso_a2":"US","latitude":45.2669965,"longitude":-93.8077828,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"f2e82e3f-daaf-52ab-9939-f913004d7a76","name":"Monticello Tech — proposed ~3 million sq ft data center technology campus (DCPUD rezoning, CUP and preliminary plat, PC File 2026.34)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["City of Monticello, Minnesota (Community Development)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-be4bd88c9ffbe4c64a33/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-be4bd88c9ffbe4c64a33.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Minnesota Geospatial Information Office; Wright County, Minnesota"]},{"site_id":"vcc-site-6e1076932d6836b39df9","name":"Morris Technology Park","country":"United States","country_iso_a2":"US","latitude":41.38,"longitude":-88.4244,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-01-27","oldest_status_as_of":"2026-01-27","project_count":1,"projects":[{"project_id":"8ac449d0-47a8-5735-a32a-d4eb2a6def53","name":"Morris Technology Park","status":"announced","status_as_of":"2026-01-27","search_terms":"Data center land developer Tract, through an affiliate, bought 343 acres of vacant farmland off Interstate 80 in Morris, Grundy County, Illinois, about 65 miles from downtown Chicago, for a planned 1 GW data center campus of roughly 2.9 million square feet. The project won city approval in 2025, the site is annexed and zoned for it, and it has a transmission security agreement with ComEd. Tract targets initial energization in June 2028 and a full 1 GW load by 2032. Tract's model is to entitle and service raw land and then offer it to large data center users or developers; no end user has been named for this site. Tract Morris data center park Tract ComEd City of Morris"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6e1076932d6836b39df9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6e1076932d6836b39df9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-2337f8b2e15af053c8ab","name":"Nabiax Alcalá Data Center Campus","country":"Spain","country_iso_a2":"ES","latitude":40.5195016897773,"longitude":-3.3409773439880954,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":2,"projects":[{"project_id":"1c809265-e426-51c2-add8-42f5070d031f","name":"Nabiax Alcalá Data Center 3 (ADC3)","status":"announced","status_as_of":"2026-09-18","search_terms":""},{"project_id":"a2cd19ae-ea3d-59b4-af8b-788895561963","name":"Nabiax Alcalá Data Center ADC1 and ADC2 — existing data-centre operations","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Ayuntamiento de Alcalá de Henares"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2337f8b2e15af053c8ab/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2337f8b2e15af053c8ab.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["CartoCiudad (IGN/CNIG)"]},{"site_id":"vcc-site-d3094a7612a02678d299","name":"Nabiax Julián Camarillo 8 Campus","country":"Spain","country_iso_a2":"ES","latitude":40.4335832,"longitude":-3.6295448,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"7f77bbf2-2081-5279-92c5-6dc9c3f1ab42","name":"Nabiax Julián Camarillo 8 Campus — existing data-centre operations (modules 1-3)","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["Ayuntamiento de Alcalá de Henares"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3094a7612a02678d299/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d3094a7612a02678d299.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Dirección General del Catastro"]},{"site_id":"vcc-site-af1774a8d4eb3398e76e","name":"National AI Computing Center, Solaseado (Haenam)","country":"Korea, Republic of","country_iso_a2":"KR","latitude":34.5742,"longitude":126.5975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"ddaae950-1e47-58e8-b57a-37aeed0eba7a","name":"National AI Computing Center, Solaseado (Haenam)","status":"under_construction","status_as_of":"2026-08-03","search_terms":"South Korea's government-backed National AI Computing Center is being built in the Solaseado data center park in Haenam County, South Jeolla. A consortium led by Samsung SDS was the only bidder in the 2025 tender and was confirmed as operator in 2026; a public-private joint venture, Korea AI Computing Center (KOACC), formed in June 2026 to build and run it. The project is budgeted at more than 2 trillion won through 2030 and targets at least 15,000 advanced GPUs by 2028 and about 50,000 by 2030. Ground was broken on 3 August 2026, with completion targeted for 2028. Korea AI Computing Center KOACC Solaseado National AI Computing Center Korea AI Computing Center Co., Ltd. (KOACC) Korea AI Computing Center Co., Ltd. (KOACC) Samsung SDS Ministry of Science and ICT (South Korea) People's Growth Fund Jeollanam-do provincial government Korea Electric Power Corporation (KEPCO)"}],"status_publishers":["Edaily"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-af1774a8d4eb3398e76e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-af1774a8d4eb3398e76e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Samsung SDS"]},{"site_id":"vcc-site-f4ce376b46b4bce92ee6","name":"National Supercomputing Center in Shenzhen Guangming Phase 2 Campus","country":"China","country_iso_a2":"CN","latitude":22.7921,"longitude":113.9113,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"dcf186d3-4aef-5809-a85a-ab800da5b7cb","name":"Shenzhen Guangming Phase 2 LineShine Existing Operations","status":"operational","status_as_of":"2026-09-14","search_terms":""}],"status_publishers":["National Supercomputing Center in Shenzhen (Shenzhen Cloud Computing Center)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f4ce376b46b4bce92ee6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f4ce376b46b4bce92ee6.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-8f745cecc590bf000773","name":"NAVER GAK Sejong Data Center Campus","country":"Korea, Republic of","country_iso_a2":"KR","latitude":36.50782,"longitude":127.34072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-24","oldest_status_as_of":"2026-07-24","project_count":1,"projects":[{"project_id":"253bd505-a3c0-510a-bbac-96c8107358a4","name":"NAVER GAK Sejong AI Factory (NVIDIA DSX, NAVER/Brookfield/NVIDIA)","status":"announced","status_as_of":"2026-07-24","search_terms":""}],"status_publishers":["NAVER Corp."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8f745cecc590bf000773/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8f745cecc590bf000773.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-3975c009e857ca5541f5","name":"NDC Noyal Data Center, Noyal-sur-Vilaine near Rennes (7 rue Alain Fournier)","country":"France","country_iso_a2":"FR","latitude":48.1124635,"longitude":-1.5361261,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"59a0a395-8726-5801-9bc6-8bf61fcad157","name":"NDC Noyal (Rennes) — existing 3 MW IT proximity data centre operations","status":"operational","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Altarea SCA"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3975c009e857ca5541f5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3975c009e857ca5541f5.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-88e44b92657981b033d0","name":"NDC Paris 1 Data Center, Vélizy-Villacoublay (8-10 avenue Morane Saulnier)","country":"France","country_iso_a2":"FR","latitude":48.7822084,"longitude":2.2127298,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"a6052018-742b-5aa3-8945-f0dacc71e74b","name":"NDC Paris 1 — 7 MW IT data centre (permit PC 078 640 24 V1008)","status":"under_construction","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Altarea SCA"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88e44b92657981b033d0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88e44b92657981b033d0.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-8cdb2274a5a7f5abf1c9","name":"Nebius Birmingham AI factory (Lakeshore Parkway)","country":"United States","country_iso_a2":"US","latitude":33.5175,"longitude":-86.8094,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"c01f2073-5c23-511c-9d85-80ad9345987a","name":"Nebius Birmingham AI factory (Lakeshore Parkway)","status":"announced","status_as_of":"2026-10-26","search_terms":"Nebius has proposed a two-building AI factory on about 80 acres it owns off Lakeshore Parkway in Birmingham, Alabama, reusing a former bank back-office building. Local television reported in February 2026, without naming who supplied the figure, that Alabama Power would serve the 300 MW facility; it also reported an early-phase permit application with the city and a proposed six-month pause on new data centers. Nebius listed Birmingham among its US data center locations in July 2026. No investment figure, job count or schedule appears in the cited sources. Nebius Nebius Alabama Power"}],"status_publishers":["Nebius Group N.V."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8cdb2274a5a7f5abf1c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8cdb2274a5a7f5abf1c9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WBRC"]},{"site_id":"vcc-site-acf731facf63970bd84b","name":"Nebius Independence AI factory","country":"United States","country_iso_a2":"US","latitude":39.0925,"longitude":-94.4139,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c01906b8-f76a-5afe-ae86-ea56184443f3","name":"Nebius Independence AI factory","status":"under_construction","status_as_of":"2026-10-09","search_terms":"Nebius is building what it calls its first gigawatt-scale AI infrastructure project in the US on about 400 acres in eastern Independence, Missouri, near Route 78 and Little Blue Parkway. The project page describes up to 1.2 GW across four buildings built over five to seven years, with 800 MW from Independence Power & Light and 400 MW of possible on-site generation still under evaluation. Nebius bought the land in December 2025, the City Council approved a Chapter 100 incentive in March 2026, and ground was broken in May 2026 with ARCO as general contractor. Nebius Independence, Missouri AI factory Nebius Nebius ARCO National Construction Independence Power & Light City of Independence"}],"status_publishers":["Nebius"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-acf731facf63970bd84b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-acf731facf63970bd84b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Nebius"]},{"site_id":"vcc-site-80fb287847eab3cd8bf9","name":"Nebius Pajarila Lappeenranta Campus","country":"Finland","country_iso_a2":"FI","latitude":61.055863394051165,"longitude":28.285490465043303,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"b9ccc1e7-c2da-5822-82bc-b20be7d43dfe","name":"Nebius Pajarila First Phase Current Build","status":"under_construction","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["Fira"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-80fb287847eab3cd8bf9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-80fb287847eab3cd8bf9.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Lappeenranta via Trimble IMS"]},{"site_id":"vcc-site-ff3fe91dbbe9f9beaf9e","name":"New Hill Digital Campus","country":"United States","country_iso_a2":"US","latitude":35.6811,"longitude":-78.9356,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-03-10","oldest_status_as_of":"2026-03-10","project_count":1,"projects":[{"project_id":"03207f8c-1d9d-577f-9d8c-af881144fb86","name":"New Hill Digital Campus","status":"cancelled","status_as_of":"2026-03-10","search_terms":"Maryland developer Natelli Investments proposed a 250 MW data center campus on about 189 acres of former farmland on Shearon Harris Road in the New Hill community of Wake County, North Carolina, next to Duke Energy's Shearon Harris nuclear plant. The project needed annexation into and rezoning by the Town of Apex and drew organized local opposition in 2025. In March 2026 Natelli withdrew its annexation and rezoning applications, saying it would consider next steps only if Apex amended its zoning rules to allow data centers, while town leaders weighed a one-year moratorium. Apex data center (Natelli Investments) Natelli Investments Town of Apex"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ff3fe91dbbe9f9beaf9e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ff3fe91dbbe9f9beaf9e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WRAL"]},{"site_id":"vcc-site-a54941d2855e5bc71a3b","name":"NEXTDC GE1 Geelong Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-38.05612850278812,"longitude":144.37274245303243,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"e39b5191-4a78-5781-8944-24efaf944aa9","name":"NEXTDC GE1 Incremental In-Progress Fit-Out","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a54941d2855e5bc71a3b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a54941d2855e5bc71a3b.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of Victoria, Department of Transport and Planning, Vicmap"]},{"site_id":"vcc-site-355111878b17009b2503","name":"NEXTDC KL1 Kuala Lumpur Data Center Campus","country":"Malaysia","country_iso_a2":"MY","latitude":3.0946929,"longitude":101.6284258,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"95b33a98-a85e-57af-b18d-6811a7fd3b20","name":"NEXTDC KL1 Remaining In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-355111878b17009b2503/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-355111878b17009b2503.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-6c4336501258c6139275","name":"NEXTDC M2 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.7080294,"longitude":144.8756939,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"ad5f9b2b-80bf-5580-92f2-0f53473c882d","name":"NEXTDC M2 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6c4336501258c6139275/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6c4336501258c6139275.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["NEXTDC Limited"]},{"site_id":"vcc-site-dec24d7a34a6a816e35b","name":"NEXTDC M3 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.8048639,"longitude":144.8638438,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"c789668b-ecf3-53b2-b23c-44151e199317","name":"NEXTDC M3 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dec24d7a34a6a816e35b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dec24d7a34a6a816e35b.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-78289e1b65e2284a986f","name":"NEXTDC M4 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.82870623280992,"longitude":144.91146374858133,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","site_preparation"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-01-19","project_count":2,"projects":[{"project_id":"8715738f-39ac-5058-a01a-b62758b49831","name":"NEXTDC M4 Initial Early Works","status":"site_preparation","status_as_of":"2026-06-30","search_terms":""},{"project_id":"869dffc7-22ea-5f40-8810-13d87c696908","name":"NEXTDC M4 Melbourne","status":"announced","status_as_of":"2026-01-19","search_terms":"NEXTDC plans an AI factory and technology campus, called M4, on the former Westgate Park printing complex at 127 Todd Road in Port Melbourne's Fishermans Bend precinct. Announced in June 2025 as an A$2 billion project of up to 150 MW, designed for very high-density Nvidia-class AI racks and linked with university, defence and research partners, it received development approval from the Victorian Government by January 2026, when NEXTDC cited 162 MW. Construction timing has not been published. M4 Technology Campus Fishermans Bend AI Factory and Technology Campus NEXTDC Victorian Government"}],"status_publishers":["NEXTDC","NEXTDC Limited"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78289e1b65e2284a986f.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of Victoria, Department of Transport and Planning, Vicmap"]},{"site_id":"vcc-site-bf97558b9c05a083995c","name":"NEXTDC S3 Sydney Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.8190826,"longitude":151.1845739,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"8a5fbd17-48b6-5484-8c37-ce406068bf3e","name":"NEXTDC S3 Incremental In-Progress Fit-Out","status":"mep_electrical","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["NEXTDC Limited"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf97558b9c05a083995c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf97558b9c05a083995c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-8d8b8d427f99ad4fa5a1","name":"NEXTDC S4 Sydney Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.82784,"longitude":150.82457,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"3761e59a-fe39-523d-83a6-9fbfa9feec85","name":"NEXTDC S4 Initial Development","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8d8b8d427f99ad4fa5a1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8d8b8d427f99ad4fa5a1.json","geometry_licenses":["CC-BY-4.0-Department-material-scope"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-dd0f231b23c8dd96495b","name":"NEXTDC S7 Sydney","country":"Australia","country_iso_a2":"AU","latitude":-33.8059,"longitude":150.85,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"688df4a2-dc56-5cde-901a-87c87a08137e","name":"NEXTDC S7 Sydney","status":"announced","status_as_of":"2026-08-31","search_terms":"NEXTDC plans a hyperscale data center campus of about 550 MW on roughly 258,000 square meters of land it agreed to buy in Eastern Creek, western Sydney, in October 2024, subject to development approval. In December 2025 NEXTDC signed a memorandum of understanding with OpenAI to collaborate on planning, developing and operating the S7 campus and a large GPU supercluster as part of OpenAI's program for countries, with a first phase expected in the second half of 2027 if approvals are secured. NEXTDC's site still lists S7 as in planning. S7 Sydney S7 Eastern Creek NEXTDC NEXTDC OpenAI"}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd0f231b23c8dd96495b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd0f231b23c8dd96495b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NEXTDC"]},{"site_id":"vcc-site-4586aa46386f0cb18dc7","name":"Niger National Data Center PK5","country":"Niger","country_iso_a2":"NE","latitude":13.559683333333,"longitude":2.113511111111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-18","oldest_status_as_of":"2026-06-18","project_count":1,"projects":[{"project_id":"4f39070f-83dd-557a-a1b0-88408f56c1fb","name":"Niger National Data Center PK5 Current Build","status":"under_construction","status_as_of":"2026-06-18","search_terms":""}],"status_publishers":["Gouvernement de la République du Niger"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4586aa46386f0cb18dc7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4586aa46386f0cb18dc7.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Republic of Niger, Ministry of Posts and New Information Technologies / BNEE"]},{"site_id":"vcc-site-24d3b71c367b55fdb41c","name":"Nishitetsu Fukuoka Data Center","country":"Japan","country_iso_a2":"JP","latitude":33.602851,"longitude":130.4143405,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"f8a92123-0878-5133-8c25-697743ed6b37","name":"Nishitetsu Fukuoka Data Center Existing Operations","status":"operational","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Impress / Cloud Watch; firsthand interview with Nishitetsu Information System"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-24d3b71c367b55fdb41c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-24d3b71c367b55fdb41c.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-352a0c950c3b6ff876e1","name":"Nodo Pacífico San Antonio Data Center","country":"Chile","country_iso_a2":"CL","latitude":-33.604324534488,"longitude":-71.577026296743,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"7b2b3bc2-e6e3-53c5-9a5f-bc5b81a67ed4","name":"Centro de Almacenamiento de Datos San Antonio — four-building campus proposal","status":"announced","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Servicio de Evaluación Ambiental (SEA), Chile — filing by Nodo Pacífico SpA"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-352a0c950c3b6ff876e1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-352a0c950c3b6ff876e1.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental de Chile; Nodo Pacífico SpA"]},{"site_id":"vcc-site-1f0a3581ea8ef66ce00b","name":"noris network FRA1 Schwalbach Campus","country":"Germany","country_iso_a2":"DE","latitude":50.1629204,"longitude":8.5325882,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"05033935-bf13-5754-a9af-25c96ea1b473","name":"noris network FRA1 Schwalbach Current Build","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["Data Center Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f0a3581ea8ef66ce00b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f0a3581ea8ef66ce00b.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors via Overpass"]},{"site_id":"vcc-site-2d8fde06f5151b5ae93b","name":"noris network NBG6 Nürnberg Süd Campus","country":"Germany","country_iso_a2":"DE","latitude":49.4100304,"longitude":11.1314551,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"a1390e66-5b95-568b-869b-b9413c56f8ce","name":"noris network NBG6 BA3 Modular Expansion","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["noris network AG, published on LinkedIn"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2d8fde06f5151b5ae93b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2d8fde06f5151b5ae93b.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-786eefb922a1cbdf499f","name":"noris network Rechenzentrum München Ost (Klausnerstraße 30, Aschheim)","country":"Germany","country_iso_a2":"DE","latitude":48.1621097,"longitude":11.7369532,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"a235bfbe-da40-5ac3-a306-e00e7bfcbffa","name":"noris network München Ost (MUC5) — existing data-centre operations","status":"operational","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["noris network AG"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-786eefb922a1cbdf499f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-786eefb922a1cbdf499f.json","geometry_licenses":["CC BY 4.0"],"geometry_attributions":["Bayerische Vermessungsverwaltung – www.geodaten.bayern.de"]},{"site_id":"vcc-site-89dc6bb67642a9c7b145","name":"NorthC Biel (Bern) Data Center (Tennisweg 6, Biel/Bienne)","country":"Switzerland","country_iso_a2":"CH","latitude":47.155735,"longitude":7.279435,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"dde6f480-fc41-5322-b522-a55e8152af3e","name":"NorthC Biel (Bern) — existing data-centre operations","status":"operational","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["NorthC Schweiz AG (NorthC Datacenters)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-89dc6bb67642a9c7b145/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-89dc6bb67642a9c7b145.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["swisstopo / BFS"]},{"site_id":"vcc-site-ece79fca728f9d94dc00","name":"NorthC Frankfurt1 (FRA01)","country":"Germany","country_iso_a2":"DE","latitude":50.099568066327265,"longitude":8.581028313722268,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"c2ec8d08-3436-5bbc-af4e-4eb553297fe2","name":"NorthC Frankfurt1 (FRA01) Current Facility Build","status":"site_preparation","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["NorthC Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ece79fca728f9d94dc00/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ece79fca728f9d94dc00.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stadt Frankfurt am Main"]},{"site_id":"vcc-site-816bd61bc358b33da3c7","name":"NorthC Genf Data Center, The Hive (Route du Nant-d'Avril 152, Meyrin)","country":"Switzerland","country_iso_a2":"CH","latitude":46.227698,"longitude":6.059351,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"3a545d41-0f30-5fe6-b195-db96c62f47cd","name":"NorthC Genf — planned 4.5 MW high-performance data centre in The Hive technology park","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["NorthC Schweiz AG (NorthC Datacenters)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-816bd61bc358b33da3c7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-816bd61bc358b33da3c7.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["swisstopo / BFS"]},{"site_id":"vcc-site-256fe3e79fe67b7a6bd3","name":"NorthC Münchenstein (Basel) 3 Data Center, uptownBasel (Schorenweg 21, Arlesheim)","country":"Switzerland","country_iso_a2":"CH","latitude":47.508571,"longitude":7.612002,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"43897de2-d129-56c2-86a5-d67f12793ad7","name":"NorthC Münchenstein (Basel) 3 — planned AI data centre on the uptownBasel campus","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["NorthC Schweiz AG"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-256fe3e79fe67b7a6bd3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-256fe3e79fe67b7a6bd3.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["swisstopo / BFS"]},{"site_id":"vcc-site-0761b2abd1f4d9887945","name":"Novva Colorado Springs Data Center Campus (650 Sybilla Lane)","country":"United States","country_iso_a2":"US","latitude":39.0138515,"longitude":-104.8148032,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"357d7e41-90cd-5014-9715-610d0fbf2fbe","name":"Novva Colorado Springs — existing data-centre operations","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0761b2abd1f4d9887945/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0761b2abd1f4d9887945.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Colorado OIT GIS; El Paso County source data"]},{"site_id":"vcc-site-baa4b50e6b9b2514d6eb","name":"Novva Las Vegas Data Center (6115 Nicco Way, North Las Vegas)","country":"United States","country_iso_a2":"US","latitude":36.2715265,"longitude":-115.048948,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"4ff23f07-2f3f-5281-a4db-9bf38ff4febf","name":"Novva Las Vegas — existing data-centre operations","status":"operational","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-baa4b50e6b9b2514d6eb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-baa4b50e6b9b2514d6eb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-0fae550d9965f8aa3c37","name":"Novva Mesa Data Center Campus (Ellsworth Rd and Warner Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3397412,"longitude":-111.639471,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-31","oldest_status_as_of":"2026-08-31","project_count":1,"projects":[{"project_id":"6052bcfe-7547-5b5c-8238-958509f970b2","name":"Novva Mesa — planned 300 MW, five-data-hall data-centre campus in two phases","status":"announced","status_as_of":"2026-08-31","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0fae550d9965f8aa3c37/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0fae550d9965f8aa3c37.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-9ea046e6f8ace1e0118e","name":"Novva Utah Data Center Campus (West Jordan, Utah)","country":"United States","country_iso_a2":"US","latitude":40.5726418,"longitude":-112.0459823,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-10","oldest_status_as_of":"2026-09-10","project_count":1,"projects":[{"project_id":"6519eae9-de3d-5743-8bb0-3f307a0ca838","name":"Novva Utah flagship campus — existing data-centre operations","status":"operational","status_as_of":"2026-09-10","search_terms":""}],"status_publishers":["Novva Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9ea046e6f8ace1e0118e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9ea046e6f8ace1e0118e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Salt Lake County, Utah"]},{"site_id":"vcc-site-5eaf486af80fda73af01","name":"Nscale Glomfjord AI Data Center","country":"Norway","country_iso_a2":"NO","latitude":66.81368941404499,"longitude":13.933159544323065,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"ff2f4407-4622-5e87-ad76-322a317fc6cc","name":"Nscale Glomfjord AI Data Center — operating facility","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["NSCALE Ltd (U.S. Securities and Exchange Commission filing)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5eaf486af80fda73af01/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5eaf486af80fda73af01.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© Kartverket"]},{"site_id":"vcc-site-2fb799e38497b94b3ed1","name":"Nscale Kvandal Narvik AI Data Center Campus","country":"Norway","country_iso_a2":"NO","latitude":68.575252,"longitude":17.580056,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-07-06","project_count":2,"projects":[{"project_id":"8d1ed9d7-795d-55a8-b8cf-41e51579dd27","name":"Nscale Kvandal AI data center (Narvik)","status":"under_construction","status_as_of":"2026-09-02","search_terms":"AI data center campus at Kvandal outside Narvik in northern Norway, announced in July 2025 as Stargate Norway by Nscale, Aker and OpenAI with 230 MW planned and ambitions for 290 MW more. The Aker-Nscale joint venture signed a five-year Microsoft contract worth about USD 6.2bn in September 2025, and in April 2026 Microsoft took the capacity first linked to OpenAI, adding more than 30,000 NVIDIA Rubin GPUs for 2027. Aker transferred its half of the joint venture to Nscale in March 2026. Nscale raised USD 790m of debt in May 2026, and in September 2026 contractor HENT held contracts for three buildings totalling 100 MW, with construction under way and completion expected in 2027. Stargate Norway Kvandal North Campus Aker Nscale Narvik Nscale Nscale Aker ASA Microsoft OpenAI NVIDIA HENT Nordscale Operations AS Vattenfall"},{"project_id":"97f12a4b-6526-5c76-94b3-6562420ffe99","name":"Nscale Kvandal Initial 25 MW EPC Current Build","status":"under_construction","status_as_of":"2026-07-06","search_terms":""}],"status_publishers":["Nscale","Sentia (via Inderes)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2fb799e38497b94b3ed1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2fb799e38497b94b3ed1.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Kartverket"]},{"site_id":"vcc-site-86c96db92481ee74998d","name":"NTT Dallas Data Center Campus","country":"United States","country_iso_a2":"US","latitude":32.982500800175,"longitude":-96.654368299801,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-31","oldest_status_as_of":"2026-05-31","project_count":1,"projects":[{"project_id":"9ddf0df3-e40c-515f-9468-ed78f063513b","name":"NTT Dallas TX4 Data Center","status":"under_construction","status_as_of":"2026-05-31","search_terms":""}],"status_publishers":["NTT Global Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-86c96db92481ee74998d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-86c96db92481ee74998d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-d221137896dfa4612857","name":"NTT DATA Keihanna OSK11 Data Center, Hikaridai, Seika","country":"Japan","country_iso_a2":"JP","latitude":34.741379,"longitude":135.765381,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"617e8957-7a4a-56f9-9262-2ad17032c393","name":"NTT DATA Keihanna OSK11 Data Center — existing operations","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["NTT DATA Japan Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d221137896dfa4612857/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d221137896dfa4612857.json","geometry_licenses":["GSI content terms (attribution required)"],"geometry_attributions":["Geospatial Information Authority of Japan (GSI)"]},{"site_id":"vcc-site-fbb0a56d0fdb8284922c","name":"NTT Frankfurt 1 Data Center Campus","country":"Germany","country_iso_a2":"DE","latitude":50.129269550000004,"longitude":8.6019867,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-19","oldest_status_as_of":"2026-07-19","project_count":1,"projects":[{"project_id":"b3b98301-a692-5790-88e7-656d77e8fb69","name":"NTT Frankfurt 1 7.3MW Expansion","status":"under_construction","status_as_of":"2026-07-19","search_terms":""}],"status_publishers":["NTT DATA, Inc."],"power_observations":[{"project_id":"b3b98301-a692-5790-88e7-656d77e8fb69","metric":"critical_it_mw","stage":"planned","low":7.3,"base":7.3,"high":7.3,"unit":"MW","as_of_date":"2026-07-19"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fbb0a56d0fdb8284922c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fbb0a56d0fdb8284922c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-0db17b27ff270e0d54bb","name":"NTT Global Data Centers Chicago Campus, Hamilton Lakes, Pierce Road, Itasca (DuPage County)","country":"United States","country_iso_a2":"US","latitude":41.9879041,"longitude":-88.0077012,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"473cb9e4-a120-5423-8065-1925b7678429","name":"NTT Chicago CH3 - new 270,000 sq ft data center building under construction","status":"under_construction","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Village of Itasca, Illinois"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0db17b27ff270e0d54bb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0db17b27ff270e0d54bb.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["DuPage County, Illinois GIS"]},{"site_id":"vcc-site-ad1d7f1998474bbd92ff","name":"NTT Global Data Centers Phoenix (Mesa) Campus (10256 E Elliot Rd, Mesa, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3548738,"longitude":-111.6111701,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"aef11ac4-4631-562f-92ec-67f92f37369d","name":"NTT Phoenix (Mesa) PH5 — Building 3, two-storey 225,606 sq ft data center under construction (Mesa permit PMT24-17530)","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["City of Mesa, Arizona (Development Services)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ad1d7f1998474bbd92ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ad1d7f1998474bbd92ff.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-627bed0b413c9b712d70","name":"NTT Global Data Centers Tokyo TKY12 campus, Shiroi","country":"Japan","country_iso_a2":"JP","latitude":35.791472,"longitude":140.056306,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-22","oldest_status_as_of":"2026-04-22","project_count":1,"projects":[{"project_id":"511bfd88-0355-5080-b5ef-5a39ec51dfd8","name":"NTT Global Data Centers Tokyo TKY12 campus, Shiroi","status":"announced","status_as_of":"2026-04-22","search_terms":"NTT DATA Group and its data center arm NTT Global Data Centers announced in April 2026 that they had begun developing Tokyo TKY12, a six-building hyperscale campus in Shiroi City, Chiba Prefecture, in the Inzai-Shiroi data center cluster east of Tokyo. It is planned for about 200 MW of total IT capacity on a flat site about 20 m above sea level, near NTT's 50 MW TKY11 facility, which is due to open in April 2027. The first building is to enter service in 2030 or later, once the utility supplies power. No investment figure or construction start date has been disclosed. Tokyo TKY12 TKY12 東京TKY12データセンター NTT Global Data Centers Corporation"}],"status_publishers":["NTT DATA Group / NTT Global Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-627bed0b413c9b712d70/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-627bed0b413c9b712d70.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NTT DATA Group / NTT Global Data Centers"]},{"site_id":"vcc-site-f64c90e878041bd69426","name":"NTT Munich 2 Data Center (MUC2)","country":"Germany","country_iso_a2":"DE","latitude":48.2927153,"longitude":11.5739274,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"b1e5c691-f5e1-5483-94f2-e290125c4e6a","name":"NTT Munich 2 Operating Campus","status":"operational","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["NTT DATA"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f64c90e878041bd69426/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f64c90e878041bd69426.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors; Nominatim"]},{"site_id":"vcc-site-c218c0bdbe74ee944b0d","name":"NUIST Changwang Building Data Centre","country":"China","country_iso_a2":"CN","latitude":32.20710875,"longitude":118.71179245,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-18","oldest_status_as_of":"2026-09-18","project_count":1,"projects":[{"project_id":"69dcda22-5b08-5ec7-a94b-43662c627976","name":"Nanjing University of Information Science and Technology — Changwang Building Data Centre","status":"operational","status_as_of":"2026-09-18","search_terms":""}],"status_publishers":["南京信息工程大学信息化建设与数据管理中心 (NUIST Information Technology and Data Management Centre)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c218c0bdbe74ee944b0d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c218c0bdbe74ee944b0d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-99c848590f717e20510c","name":"NXDATA-3 Bucharest Ring Road Campus","country":"Romania","country_iso_a2":"RO","latitude":44.538685,"longitude":26.129117,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-02","oldest_status_as_of":"2026-06-02","project_count":1,"projects":[{"project_id":"df2b8f33-9c46-5f6a-9853-b47474606979","name":"NXDATA-3 / NX-3 / BUH3","status":"under_construction","status_as_of":"2026-06-02","search_terms":""}],"status_publishers":["NXDATA"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-99c848590f717e20510c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-99c848590f717e20510c.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Inflect, Inc.; compact factual extraction only"]},{"site_id":"vcc-site-dd7aa2bee3ce702f9e7d","name":"Nxera DC Tuas, 7A Tuas Avenue 3","country":"Singapore","country_iso_a2":"SG","latitude":1.320605526549505,"longitude":103.6562059415427,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"48b25fad-0784-57ce-b5b6-e8af4a558632","name":"Nxera DC Tuas — operating 58 MW multi-tenanted data centre","status":"operational","status_as_of":"2026-08-13","search_terms":""}],"status_publishers":["Singapore Telecommunications Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd7aa2bee3ce702f9e7d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd7aa2bee3ce702f9e7d.json","geometry_licenses":["sla-onemap-terms-of-use"],"geometry_attributions":["OneMap, Singapore Land Authority"]},{"site_id":"vcc-site-f5c004356599de3efed9","name":"Nxtra Eko Atlantic Lagos Data Center Campus","country":"Nigeria","country_iso_a2":"NG","latitude":6.4175,"longitude":3.42139,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-23","oldest_status_as_of":"2026-07-23","project_count":1,"projects":[{"project_id":"9fe862f6-ace2-5f5d-9c90-486fa4622982","name":"Nxtra Eko Atlantic Lagos Current Facility Build","status":"under_construction","status_as_of":"2026-07-23","search_terms":""}],"status_publishers":["Airtel Africa"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f5c004356599de3efed9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f5c004356599de3efed9.json","geometry_licenses":["CC-BY-4.0","all-rights-reserved"],"geometry_attributions":["Google","Nxtra Africa"]},{"site_id":"vcc-site-be656b2340b6a4fb77b0","name":"ODATA DC BG01 Cota Campus (Zona Franca Metropolitana)","country":"Colombia","country_iso_a2":"CO","latitude":4.7552422,"longitude":-74.1388944,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"164f11f6-9a53-5753-afb5-44ee4980e068","name":"ODATA DC BG01 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-be656b2340b6a4fb77b0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-be656b2340b6a4fb77b0.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-4c786f43318a80273283","name":"ODATA DC QR01 Campus (Agua Azul, El Marqués, Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.58817081212714,"longitude":-100.2004110879323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"00868c36-925e-5338-9c43-dd98f86f6efa","name":"ODATA DC QR01 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c786f43318a80273283/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c786f43318a80273283.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-4671bc85b7188cad1b32","name":"ODATA DC QR02 Campus (Parque Industrial Amexhe, Guanajuato)","country":"Mexico","country_iso_a2":"MX","latitude":20.541647361178175,"longitude":-100.5771870195581,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"ec581670-a3d9-58e6-b51e-7830879393df","name":"ODATA DC QR02 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4671bc85b7188cad1b32/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4671bc85b7188cad1b32.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-9c0bff4032619ba27290","name":"ODATA DC QR03 Campus (Parque Industrial PyME, Los Cués, Querétaro)","country":"Mexico","country_iso_a2":"MX","latitude":20.536622709154294,"longitude":-100.23711810421601,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"9a71f89a-424b-5954-b381-c3fff12fc774","name":"ODATA DC QR03 — existing campus data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (Aligned Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9c0bff4032619ba27290/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9c0bff4032619ba27290.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-1369d4f518dab01e8e86","name":"ODATA DC RJ01 São João de Meriti Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.7970056,"longitude":-43.3575801,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"2fc00b79-2977-51c1-91f7-9f172d83d684","name":"ODATA DC RJ01 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1369d4f518dab01e8e86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1369d4f518dab01e8e86.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-98743408bd3d8ca8997d","name":"ODATA DC SP01 Santana de Parnaíba Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4550259,"longitude":-46.9151172,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"f37ee081-c590-5df2-98b5-c0529f72d5bd","name":"ODATA DC SP01 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98743408bd3d8ca8997d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98743408bd3d8ca8997d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-15555df7c6a759e5dc6a","name":"ODATA DC SP02 Hortolândia Campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.8995184,"longitude":-47.1952378,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"f6d50d98-b1a0-5d80-94b0-efe426691744","name":"ODATA DC SP02 — existing data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-15555df7c6a759e5dc6a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-15555df7c6a759e5dc6a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-becc8a051b59740dbb4b","name":"ODATA DC SP03 Barueri Campus (Tamboré)","country":"Brazil","country_iso_a2":"BR","latitude":-23.501657,"longitude":-46.8248305,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"9fb2a0b5-cd7e-5dc2-a906-113740c5af5b","name":"ODATA DC SP03 — existing dedicated data centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-becc8a051b59740dbb4b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-becc8a051b59740dbb4b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (an Aligned Data Centers company)"]},{"site_id":"vcc-site-c2fa5b54c32ada55d1e4","name":"ODATA DC SP04 Osasco Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4832219,"longitude":-46.7760035,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-06-18","project_count":2,"projects":[{"project_id":"c160d8d5-7572-53c2-8051-cd7990b1f771","name":"ODATA DC SP04 Phase 2 Expansion","status":"under_construction","status_as_of":"2026-06-18","search_terms":""},{"project_id":"cf3dcf6a-01ed-5b8a-9258-3ba2ed2e85bb","name":"ODATA DC SP04 — existing data-centre operations (excluding the Phase 2 expansion)","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)","ODATA - An Aligned Data Centers Company"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c2fa5b54c32ada55d1e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c2fa5b54c32ada55d1e4.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["ODATA"]},{"site_id":"vcc-site-ba0406a95db28870b984","name":"ODATA DC ST01 Lampa Campus","country":"Chile","country_iso_a2":"CL","latitude":-33.3066668,"longitude":-70.72767259999999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"38863235-56ca-5f00-8131-5e59ac2127ea","name":"ODATA DC ST01 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ba0406a95db28870b984/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ba0406a95db28870b984.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["ODATA (Aligned Data Centers)"]},{"site_id":"vcc-site-5ed22f7924865f555ca4","name":"ODATA DC ST02 San Bernardo Campus","country":"Chile","country_iso_a2":"CL","latitude":-33.531615603589,"longitude":-70.709639399984,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"e2a16723-bf8a-5199-8cee-f18669efd3a6","name":"ODATA DC ST02 — existing data-centre operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["ODATA (an Aligned Data Centers company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5ed22f7924865f555ca4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5ed22f7924865f555ca4.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Servicio de Evaluación Ambiental (SEA), Chile"]},{"site_id":"vcc-site-9a3b26464f547fa842e6","name":"OKC2 (6000 N Shartel Ave, Oklahoma City)","country":"United States","country_iso_a2":"US","latitude":35.53351,"longitude":-97.52242,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"e9ea1026-38e9-5eca-b61c-d5ee08c33edb","name":"OKC2 — GPU computing data center with on-site gas-engine power (proposed new facility)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["Oklahoma Department of Environmental Quality, Air Quality Division"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9a3b26464f547fa842e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9a3b26464f547fa842e6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma Department of Environmental Quality"]},{"site_id":"vcc-site-88d9a98c0d66b0ceae9f","name":"Old Ocean Data Center (Nightpeak Energy)","country":"United States","country_iso_a2":"US","latitude":29.0797,"longitude":-95.7494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-03-11","oldest_status_as_of":"2026-03-11","project_count":1,"projects":[{"project_id":"c400f10b-b4a6-5824-987b-3ff8657fb0d3","name":"Old Ocean Data Center (Nightpeak Energy)","status":"proposed","status_as_of":"2026-03-11","search_terms":"Nightpeak Energy proposes a hyperscale data center campus with co-located gas turbine generation on a 158-acre site outside Sweeny in Brazoria County, Texas, about 65 miles southwest of Houston. County meeting documents, as reported by Bisnow, describe two 310 MW data centers at USD 1.5 billion each and two 310 MW combustion turbine plants at USD 250 million each, while Public Citizen describes one data center and one gas plant. On 10 March 2026 the commissioners court unanimously rejected a reinvestment zone and four ten-year, 100% tax abatements; the county judge expected the project to proceed anyway. Nightpeak's website, as quoted by Bisnow, said the campus could energize from 2027. Old Ocean Datacenter Nightpeak Energy Brazoria County Commissioners Court"}],"status_publishers":["Public Citizen"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88d9a98c0d66b0ceae9f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88d9a98c0d66b0ceae9f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Public Citizen"]},{"site_id":"vcc-site-c1a8be222fca1d1646d2","name":"OME Data Center04 (Shinmachi9-A)","country":"Japan","country_iso_a2":"JP","latitude":35.782779,"longitude":139.3177428,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"7b86e3a5-3492-5bb1-b47c-2010427939cd","name":"OME Data Center04 Shinmachi9-A Building","status":"under_construction","status_as_of":"2026-07-15","search_terms":""}],"status_publishers":["TECRA / TECROWD"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1a8be222fca1d1646d2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1a8be222fca1d1646d2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps; locator selected by TECRA"]},{"site_id":"vcc-site-99459620c3cd48c8a82f","name":"OMNIA Pecém Data Center Campus","country":"Brazil","country_iso_a2":"BR","latitude":-3.65423321723938,"longitude":-38.82234191894531,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","under_construction"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-05-18","project_count":2,"projects":[{"project_id":"ebd0b7e7-0ca5-501e-89ff-74f8bf30f59b","name":"Omnia Data Center Pecém","status":"announced","status_as_of":"2026-05-18","search_terms":"Omnia, a hyperscale data centre platform backed by funds managed by Pátria Investimentos, is developing Data Center Pecém at the Pecém industrial and port complex in Ceará, Brazil, as its first project. In May 2026 Omnia and Casa dos Ventos announced a power purchase agreement valued at about USD 2 billion for an estimated up to 300 average MW of wind energy from projects in Ceará and Piauí, under which Omnia becomes a self-producer with equity in the generation assets. Portuguese Wikipedia, citing Reuters, reports that the facility is intended for ByteDance; the companies' announcement names no tenant, so the link is unconfirmed. No data centre IT capacity or schedule was found. Data Center Pecém Omnia Pátria Investimentos Casa dos Ventos ByteDance"},{"project_id":"0fd5e6a4-6421-5a23-b51c-e490e4a79cd9","name":"OMNIA Pecém Initial Data Center Construction","status":"under_construction","status_as_of":"2026-06-16","search_terms":""}],"status_publishers":["Casa dos Ventos","Complexo do Pecém / ASCOM–Casa Civil"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-99459620c3cd48c8a82f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-99459620c3cd48c8a82f.json","geometry_licenses":["CC-BY-4.0","no-open-license-asserted"],"geometry_attributions":["Google for Developers","Superintendência Estadual do Meio Ambiente do Ceará (SEMACE)"]},{"site_id":"vcc-site-6d1cd988dd9b7c70c942","name":"OpenAI Project Camellia (Effingham County, Georgia)","country":"United States","country_iso_a2":"US","latitude":32.25854279027115,"longitude":-81.2629871231605,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"3013a6c3-32a1-55a9-b77e-777eefc6bfea","name":"OpenAI Project Camellia — planned AI data-centre campus","status":"announced","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["OpenAI"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d1cd988dd9b7c70c942/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d1cd988dd9b7c70c942.json","geometry_licenses":["public-government-record-no-licence-stated"],"geometry_attributions":["Effingham County, Georgia GIS (Parcels2024 feature service)"]},{"site_id":"vcc-site-f65d3c659a862ad07679","name":"Oracle Project Jupiter Doña Ana County AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":31.8182982,"longitude":-106.66530225,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"6f0acd88-cd04-5f3f-915c-48a71fd51f39","name":"Oracle Project Jupiter Doña Ana County Current Campus Build","status":"under_construction","status_as_of":"2026-10-13","search_terms":"Project Jupiter is a four-building AI campus in Doña Ana County, New Mexico, named in September 2025 as one of the new Oracle-linked Stargate sites serving OpenAI. Analysts report STACK Infrastructure and BorderPlex Digital Assets as developers and an 18-year Oracle lease. The campus is off-grid: it was first planned around two gas microgrids, but in April 2026 Oracle and BorderPlex withdrew those air permit applications in favor of up to 2.45 GW of Bloom fuel cells, per analyst Cleanview. Analyst Epoch AI projects about 2.2 GW at completion around late 2028. Foundations were under way by early 2026, and in September 2026 more than 700 New Mexico residents were working on site. Project Jupiter Stargate New Mexico Stargate Project Jupiter STACK Infrastructure BorderPlex Digital Assets Oracle OpenAI Bloom Energy"}],"status_publishers":["Oracle Corporation"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f65d3c659a862ad07679/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f65d3c659a862ad07679.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-09a8ea20931b50e7a218","name":"Page, Arizona data center site (Huntley LLC)","country":"United States","country_iso_a2":"US","latitude":36.9142,"longitude":-111.5033,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"bc344b80-1656-5a9a-a788-a5f7cb59131e","name":"Page, Arizona data center site (Huntley LLC)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed data center campus on about 500 acres of city-owned recreational land on the southwest side of Page, Arizona, near Highway 98 and Horseshoe Bend. In October 2025 the city council passed Ordinance 744-25, a land sale agreement with Huntley LLC at USD 14,000 an acre with a feasibility period, milestones and a city buy-back right; it approves no construction, zoning or utilities. Press accounts of filings describe a campus of about 1 GW worth up to USD 10 billion including on-site energy work. A resident referendum petition was rejected on paperwork grounds in late 2025, and in autumn 2026 the city was holding hearings on data center zoning rules. Page data center Horseshoe Bend data center proposal Huntley LLC City of Page Page City Council"}],"status_publishers":["City of Page"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-09a8ea20931b50e7a218/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-09a8ea20931b50e7a218.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arizona Center for Investigative Reporting"]},{"site_id":"vcc-site-c1888e4188c5e991f794","name":"Paratera Inner Mongolia New Computing Base (Horinger)","country":"China","country_iso_a2":"CN","latitude":40.541793611,"longitude":111.841965833,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"cd72f11f-e9b0-52ab-9b08-2e45abd3a43d","name":"Paratera Inner Mongolia New Computing Base — existing compute-base operations","status":"operational","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1888e4188c5e991f794.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司"]},{"site_id":"vcc-site-f8ae1dad20eb21bb7285","name":"Pazhou Computing Center (Parcel AH090633), Guangzhou","country":"China","country_iso_a2":"CN","latitude":23.092726711,"longitude":113.372659897,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-16","oldest_status_as_of":"2026-09-16","project_count":1,"projects":[{"project_id":"2c4fd73c-47ac-5949-abc1-9218c403d3b9","name":"Pazhou Suangu Xinyue Intelligent Computing Center — Building 2 fit-out","status":"announced","status_as_of":"2026-09-16","search_terms":""}],"status_publishers":["Guangzhou Municipal Development and Reform Commission"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f8ae1dad20eb21bb7285/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f8ae1dad20eb21bb7285.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Guangzhou Planning and Natural Resources Bureau"]},{"site_id":"vcc-site-a186a30e36d357450db4","name":"PBOC Shanghai Zhenguang Road Data Centre","country":"China","country_iso_a2":"CN","latitude":31.2509982,"longitude":121.37865575,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-10","oldest_status_as_of":"2026-10-10","project_count":1,"projects":[{"project_id":"74c7be7b-754b-5b0b-8d26-7134fa7a1220","name":"PBOC Shanghai Same-City Data Centre — Jindianyun Retrofit","status":"announced","status_as_of":"2026-10-10","search_terms":""}],"status_publishers":["中国人民银行集中采购中心 (People’s Bank of China Centralized Procurement Center)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a186a30e36d357450db4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a186a30e36d357450db4.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-3bb40ecdf91f4fb36503","name":"Pemberton Data Center Campus (Centreport Gateway Pemberton Tech Center, Centreport Parkway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.3773957,"longitude":-77.4726441,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"22e9494d-3a20-58b3-bf43-a1f2d9407959","name":"Pemberton Data Center — approved by-right data center campus site plan (tax parcel 37-25, Centreport Parkway)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3bb40ecdf91f4fb36503/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3bb40ecdf91f4fb36503.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-07b3e2197c23d98b282e","name":"Pennsylvania Digital I (PAX-1), Middlesex Township","country":"United States","country_iso_a2":"US","latitude":40.2167,"longitude":-77.1164,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-05","oldest_status_as_of":"2026-03-05","project_count":1,"projects":[{"project_id":"39dca169-c304-53a7-b2a6-15a9a914e4d1","name":"Pennsylvania Digital I (PAX-1), Middlesex Township","status":"announced","status_as_of":"2026-03-05","search_terms":"Hyperscale AI data center development on about 700 acres off Country Club Road in Middlesex Township, Cumberland County, roughly five miles northeast of Carlisle, Pennsylvania. Pennsylvania Data Center Partners and PowerHouse Data Centers announced the USD 15 billion joint venture in July 2025: three campuses of six buildings, each with its own 450 MW substation, for 1.35 GW of utility capacity expandable to 1.8 GW, connected by PPL Electric Utilities. Township supervisors approved subdivision plans in January 2026 and a 450 MW substation in March 2026, before vertical construction began. The developers target 300 MW of power by the second quarter of 2027. Pennsylvania Digital I Pennsylvania Digital 1 PAX-1 PAX PowerHouse Data Centers Pennsylvania Data Center Partners Carlisle Development Partners LLC PPL Electric Utilities Middlesex Township Board of Supervisors"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07b3e2197c23d98b282e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07b3e2197c23d98b282e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["PowerHouse Data Centers"]},{"site_id":"vcc-site-2951be03bc4bb606aa06","name":"PIPA-DC1 Data Center, Blyes (Parc Industriel de la Plaine de l'Ain, ZAC de la Baccolanche)","country":"France","country_iso_a2":"FR","latitude":45.8492855,"longitude":5.2680848,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"0c9c4676-43fe-5d94-b4c0-657ed8c4404c","name":"PIPA-DC1 hyperscale data centre (DC1 and DC2, 130 MW IT)","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Auvergne-Rhône-Alpes, IGEDD"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2951be03bc4bb606aa06/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2951be03bc4bb606aa06.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-c0865a578775670c5f9c","name":"Polarise AI Factory Amberg (former Wertachtal shortwave transmitter site)","country":"Germany","country_iso_a2":"DE","latitude":48.0868088,"longitude":10.6946238,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"5601e404-679e-5364-8632-0d3a72bbddda","name":"Polarise Amberg (Unterallgäu) AI Factory — conversion of the former Wertachtal transmitter building","status":"announced","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["Polarise"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c0865a578775670c5f9c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c0865a578775670c5f9c.json","geometry_licenses":["CC BY 4.0"],"geometry_attributions":["Bayerische Vermessungsverwaltung – www.geodaten.bayern.de"]},{"site_id":"vcc-site-d71a73c55b9d567c70ca","name":"Portus IPHH4 Hamburg (Wendenstraße 285)","country":"Germany","country_iso_a2":"DE","latitude":53.5511422,"longitude":10.0400694,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-07-29","oldest_status_as_of":"2026-07-29","project_count":1,"projects":[{"project_id":"8a4da417-c1d6-5f8a-825e-afd6f0e462b9","name":"Portus IPHH4 — two data-centre buildings (Baugenehmigung M-BP-2262-2025)","status":"permitted","status_as_of":"2026-07-29","search_terms":""}],"status_publishers":["Freie und Hansestadt Hamburg, Bezirksamt Hamburg-Mitte (Fachamt Bauprüfung)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d71a73c55b9d567c70ca/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d71a73c55b9d567c70ca.json","geometry_licenses":["Source attribution required (WFS capabilities: Quellenvermerk; no access constraints)"],"geometry_attributions":["Freie und Hansestadt Hamburg, Landesbetrieb Geoinformation und Vermessung (LGV)"]},{"site_id":"vcc-site-5b9d2c3d36d5b5f40ab6","name":"Portus Munich Data Center Campus","country":"Germany","country_iso_a2":"DE","latitude":48.1585332,"longitude":11.7688419,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-28","oldest_status_as_of":"2026-05-28","project_count":1,"projects":[{"project_id":"9217888a-3e78-5b75-ac86-bd32ef026084","name":"Portus MUC2","status":"under_construction","status_as_of":"2026-05-28","search_terms":""}],"status_publishers":["Portus Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5b9d2c3d36d5b5f40ab6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5b9d2c3d36d5b5f40ab6.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap Wiki contributors","© OpenStreetMap contributors"]},{"site_id":"vcc-site-305d2355387f28814a9a","name":"Potomac Church Tech Center Data Center Campus (125 Old Potomac Church Road, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.4113223,"longitude":-77.404247,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"ac26ed39-1397-5aa3-a932-0109d7368ffc","name":"Potomac Church Data Center — Building 1 (complete and occupied)","status":"completed","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-305d2355387f28814a9a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-305d2355387f28814a9a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-6d5fe2fc2166ad27899f","name":"PowerHouse 95 data center campus","country":"United States","country_iso_a2":"US","latitude":38.18,"longitude":-77.65,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"48d82a4f-46ea-5641-a650-b6e147b30ae6","name":"PowerHouse 95 data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Campus aimed at hyperscale users, planned by PowerHouse Data Centers, a unit of American Real Estate Partners, along the I-95 corridor in Spotsylvania County, Virginia, through a joint venture with Harrison Street. PowerHouse completed the purchase of 145 acres in January 2024 and described an 800 MW campus served by three 300 MW substations, the first meant to deliver 150 MW. Its current campus page lists 227 acres, up to 900 MW of utility power, up to 12 buildings of up to two stories and about 3.6 million sq ft, with power delivery targeted for Q3 2027. PowerHouse 95 PH95 PH 95 PowerHouse Data Centers Harrison Street"}],"status_publishers":["PowerHouse Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5fe2fc2166ad27899f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d5fe2fc2166ad27899f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Converge Digest"]},{"site_id":"vcc-site-910b8939869a2f993425","name":"PowerHouse Grand Prairie campus (PowerHouse and Provident)","country":"United States","country_iso_a2":"US","latitude":32.5069,"longitude":-97.0069,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-02","oldest_status_as_of":"2026-04-02","project_count":1,"projects":[{"project_id":"fe8ac418-224e-5ac7-b342-11689bcc613e","name":"PowerHouse Grand Prairie campus (PowerHouse and Provident)","status":"announced","status_as_of":"2026-04-02","search_terms":"Hyperscale data center campus planned by a PowerHouse Data Centers and Provident Data Centers joint venture on 768 to 810 acres just outside Grand Prairie in northern Ellis County, Texas. The partners plan an on-site 1.8 GW switchyard, with a first 500 MW tranche approved through ERCOT, and 24 buildings in three phases at announcement. A state accessibility filing registered in April 2026 covers Data Center Building 1, a two-story 224,152 sq ft core and shell at 881 Miller Road with an estimated cost of about USD 72.6 million and a scheduled April 2026 to April 2028 build window. PowerHouse Grand Prairie AREP Power House Grand Prairie PowerHouse Data Centers Provident Data Centers Prairie Ridge Phase 1 Owner LP"}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-910b8939869a2f993425/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-910b8939869a2f993425.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["PowerHouse Data Centers"]},{"site_id":"vcc-site-f7c2acac6f50afd8adde","name":"PowerHouse Louisville hyperscale campus (Camp Ground Road)","country":"United States","country_iso_a2":"US","latitude":38.2561,"longitude":-85.7514,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"dd87fe4b-fdb0-5c4e-a906-70fda834e424","name":"PowerHouse Louisville hyperscale campus (Camp Ground Road)","status":"under_construction","status_as_of":"2026-08-13","search_terms":"Hyperscale data center campus on Camp Ground Road in southwest Louisville, Kentucky, developed by a joint venture of PowerHouse Data Centers and Louisville-based Poe Companies and billed as the state's first hyperscale campus. Announced in January 2025 as a 400 MW campus with 335 MW of initial LG&E power secured and the first 130 MW due in October 2026, it sits on about 150 acres with zoning already in place. PowerHouse's campus page now lists up to 525 MW of utility power and up to six buildings. Local reporting in mid-2026 described seven warehouse-sized buildings under construction, with the first phase expected online as soon as October 2026; no tenant has been named. PowerHouse Louisville Camp Ground Road data center Campground Road data center PowerHouse Data Centers Poe Companies Louisville Gas and Electric (LG&E)"}],"status_publishers":["WAVE"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f7c2acac6f50afd8adde/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f7c2acac6f50afd8adde.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WAVE"]},{"site_id":"vcc-site-99d9ae40e299f5a9f017","name":"Princeton Digital Group JC3 Greater Jakarta","country":"Indonesia","country_iso_a2":"ID","latitude":-6.3836,"longitude":107.1911,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-07","oldest_status_as_of":"2026-05-07","project_count":1,"projects":[{"project_id":"c7671f1b-16fb-5d22-b002-93f28cea5585","name":"Princeton Digital Group JC3 Greater Jakarta","status":"under_construction","status_as_of":"2026-05-07","search_terms":"Princeton Digital Group broke ground in November 2025 on JC3, a USD 1 billion, 120 MW AI-ready hyperscale campus in the Greenland International Industrial Center in Bekasi Regency, Greater Jakarta, about 25 km from its JC2 campus in Cibitung. The campus offers direct-to-chip liquid cooling alongside conventional cooling and dual grid feeds from state utility PLN, with a first phase targeted to be ready for service in the fourth quarter of 2026. In May 2026 PDG said it was raising about USD 856 million of debt to fund the ongoing build-out. JC3 PDG JC3 Princeton Digital Group Princeton Digital Group PT Perusahaan Listrik Negara (PLN)"}],"status_publishers":["Princeton Digital Group"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-99d9ae40e299f5a9f017/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-99d9ae40e299f5a9f017.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Princeton Digital Group"]},{"site_id":"vcc-site-c606ab687ab04588148a","name":"Princeton Digital Group JC4 Greater Jakarta","country":"Indonesia","country_iso_a2":"ID","latitude":-6.3836,"longitude":107.1911,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-30","oldest_status_as_of":"2026-04-30","project_count":1,"projects":[{"project_id":"42ae14a5-797b-5251-a05a-c9a12ddc6603","name":"Princeton Digital Group JC4 Greater Jakarta","status":"under_construction","status_as_of":"2026-04-30","search_terms":"Princeton Digital Group announced in April 2026 that it had acquired powered land for JC4, a planned 240 MW campus of four 60 MW buildings on about 106,000 square meters in the Greenland International Industrial Center in Bekasi Regency, Greater Jakarta. The site is about 1.7 km from PDG's JC3 campus, allowing shared power and connectivity infrastructure, and PDG said construction had already begun. No investment figure or completion date has been published. JC4 PDG JC4 Princeton Digital Group Princeton Digital Group"}],"status_publishers":["Princeton Digital Group"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c606ab687ab04588148a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c606ab687ab04588148a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Princeton Digital Group"]},{"site_id":"vcc-site-900b1508d570a2f4253f","name":"Procergs Porto Alegre Data Center Campus","country":"Brazil","country_iso_a2":"BR","latitude":-30.038629,"longitude":-51.2308141,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical"],"newest_status_as_of":"2026-09-13","oldest_status_as_of":"2026-09-13","project_count":1,"projects":[{"project_id":"b91d994d-0f59-5ed8-ad74-20e4ba2251f3","name":"Procergs Porto Alegre New Substation 6033-00","status":"mep_electrical","status_as_of":"2026-09-13","search_terms":""}],"status_publishers":["PROCERGS – Centro de Tecnologia da Informação e Comunicação do Estado do Rio Grande do Sul S.A."],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-900b1508d570a2f4253f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-900b1508d570a2f4253f.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap Wiki contributors","OpenStreetMap contributors","OpenStreetMap contributors / Nominatim"]},{"site_id":"vcc-site-2f87e5bd268fd4e684db","name":"Project Bedrock Data Center (Carmen Avenue, Inver Grove Heights)","country":"United States","country_iso_a2":"US","latitude":44.8626591,"longitude":-93.0379905,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"ecca382e-3bb8-59a9-86c7-4f77768abcb8","name":"Project Bedrock — 54,070 sq ft data center building (Major Site Plan, Resolution 2026-209, 5890 Carmen Avenue)","status":"permitted","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["City of Inver Grove Heights, Minnesota"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2f87e5bd268fd4e684db/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2f87e5bd268fd4e684db.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Dakota County, Minnesota"]},{"site_id":"vcc-site-18500c4557e6b208669d","name":"Project Blue","country":"United States","country_iso_a2":"US","latitude":32.2219,"longitude":-110.9714,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-24","oldest_status_as_of":"2026-04-24","project_count":1,"projects":[{"project_id":"d654ea2a-ea8e-564e-a1df-67f35d52ebbc","name":"Project Blue","status":"under_construction","status_as_of":"2026-04-24","search_terms":"Beale Infrastructure is building a data center campus on about 290 acres of former county land just north of the Pima County Fairgrounds, in unincorporated Pima County outside Tucson's city limits. Tucson's council voted against the project in August 2025, ending annexation talks, so it went ahead under county jurisdiction with a redesigned air-cooled plan. The county puts total investment at USD 3.6 billion, with four buildings in the first phase and up to ten at full build-out. State regulators approved a Tucson Electric Power supply agreement for 286 MW in December 2025, and work on site was reported under way in April 2026. Beale Infrastructure Pima County data center campus Beale Infrastructure Humphrey's Peak Properties, LLC Tucson Electric Power Pima County"}],"status_publishers":["KOLD News 13"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-18500c4557e6b208669d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-18500c4557e6b208669d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Pima County"]},{"site_id":"vcc-site-bb30c1cd06b508cbd3e8","name":"Project Celtics Data Center Campus (Loudoun County)","country":"United States","country_iso_a2":"US","latitude":39.0550307,"longitude":-77.5451373,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"c805be96-ce2f-596d-b20e-7456144e6d11","name":"Project Celtics — Building 5 core and shell (42630 Patriot Park Dr)","status":"permitted","status_as_of":"2026-08-25","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb30c1cd06b508cbd3e8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb30c1cd06b508cbd3e8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-d6bcbce9f1b88dd3f4aa","name":"Project Delta Data Center Site (Walnut Cove, Stokes County)","country":"United States","country_iso_a2":"US","latitude":36.3220665,"longitude":-80.1051933,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"79828246-223a-53c3-9ee8-ae36911d2d09","name":"Project Delta — proposed data center campus (conditional rezoning R-A to M-2-CZ, about 1,848.74 acres)","status":"announced","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Stokes County Board of Commissioners, North Carolina"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6bcbce9f1b88dd3f4aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6bcbce9f1b88dd3f4aa.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Stokes County, North Carolina"]},{"site_id":"vcc-site-b66784d37126c8c3b6a0","name":"Project Flex Data Center Campus (Lyon Township, Ambassador Parkway West and Milford Road)","country":"United States","country_iso_a2":"US","latitude":42.5016616,"longitude":-83.6091107,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"8ba06567-a5f5-576e-ad88-833dcd1c700f","name":"Project Flex — proposed data center campus (final site plan under review)","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Charter Township of Lyon, Oakland County, Michigan (archived by the Internet Archive)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b66784d37126c8c3b6a0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b66784d37126c8c3b6a0.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oakland County, Michigan"]},{"site_id":"vcc-site-df72e462db6b0d2932e6","name":"Project Genesis Data Centre, 192 Narellan Road, Campbelltown","country":"Australia","country_iso_a2":"AU","latitude":-34.0630528,"longitude":150.7937945,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"90d1ea25-305f-5c61-b9ec-053112e6e910","name":"192 Narellan Road Data Centre (Project Genesis) — proposed 100 MW two-building data centre (SSD-150514738)","status":"announced","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Patch Planning for MoreHuman Property Group (filed with and published by the NSW Department of Planning, Housing and Infrastructure)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df72e462db6b0d2932e6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df72e462db6b0d2932e6.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-148cf0bd79f9e16d2422","name":"Project Loch Data Center Site (Watkins Centre, 750 Watkins Centre Parkway, Chesterfield County)","country":"United States","country_iso_a2":"US","latitude":37.4956252,"longitude":-77.6925279,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"32c8d09f-86e8-5e80-b656-82d6dc0e4962","name":"Project Loch / Watkins Centre — approved future Google data center site (rezoning 25SN1040)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-148cf0bd79f9e16d2422/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-148cf0bd79f9e16d2422.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Chesterfield County, Virginia"]},{"site_id":"vcc-site-5ccd8508002b9845d587","name":"Project Longhorn Data Center Campus (Cedar Creek)","country":"United States","country_iso_a2":"US","latitude":30.0754157,"longitude":-97.4262036,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"1e498217-a592-5336-9532-f6d41acd105e","name":"Project Longhorn Building One","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5ccd8508002b9845d587/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5ccd8508002b9845d587.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Bastrop Central Appraisal District data)"]},{"site_id":"vcc-site-fcd641148c4f61598efc","name":"Project Sail (Prologis data center campus, Coweta County)","country":"United States","country_iso_a2":"US","latitude":33.376,"longitude":-84.788,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-04-09","oldest_status_as_of":"2026-04-09","project_count":1,"projects":[{"project_id":"4a2847d7-f84f-5f89-a4c2-ee832e1f6cad","name":"Project Sail (Prologis data center campus, Coweta County)","status":"announced","status_as_of":"2026-04-09","search_terms":"Proposed hyperscale data center campus on roughly 830 acres in rural Sargent, about 7 miles northwest of Newnan in Coweta County, Georgia, near Georgia Power's Plant Yates. Atlas Development originally proposed the project, disclosed in early 2025 as a 13-building plan reported at USD 17 billion; Prologis took over development and cut the plan to nine buildings with about 4.34 million square feet. Trade press estimates the campus could need about 900 MW; Chattahoochee Riverkeeper, an environmental group, puts peak demand at full build-out at 910 MW. Coweta County approved the rezoning 3-2 in April 2026 after a moratorium and sustained local opposition. Project Sail Prologis Coweta County data center campus Prologis Atlas Development LLC Georgia Power Coweta County Water & Sewerage Authority Coweta County"}],"status_publishers":["Propmodo"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcd641148c4f61598efc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcd641148c4f61598efc.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Chattahoochee Riverkeeper"]},{"site_id":"vcc-site-6536417bea2567e8dcbf","name":"Project Skye Data Center Site (Upper Magnolia Green, 4201 Moseley Road, Chesterfield County)","country":"United States","country_iso_a2":"US","latitude":37.4398655,"longitude":-77.7590209,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"36330248-a95d-5b46-98fe-eb614732b9e2","name":"Project Skye / Upper Magnolia Green — approved future Google data center site (rezoning 25SN1038, Tract A)","status":"announced","status_as_of":"2026-08-26","search_terms":""}],"status_publishers":["Chesterfield County, Virginia (Board of Supervisors meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6536417bea2567e8dcbf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6536417bea2567e8dcbf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Chesterfield County, Virginia"]},{"site_id":"vcc-site-b1970b8a6c4cf6da5755","name":"Project Thunderbird West Campus (Enid, Oklahoma)","country":"United States","country_iso_a2":"US","latitude":36.3798725,"longitude":-97.8502975,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"24162bac-2bb5-5f9d-815d-14978bf69b1b","name":"Project Thunderbird West Campus — proposed data center on the western tract (rezoning A to I-3)","status":"announced","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["City of Enid, Oklahoma (application filed by Plainsmen Holdings, LLC)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b1970b8a6c4cf6da5755/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b1970b8a6c4cf6da5755.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["City of Enid GIS, GC_Parcels map service (Garfield County parcel data)"]},{"site_id":"vcc-site-bb6687b18196767278ff","name":"Prologis PN2 DC5 Data Centre, Paris Nord 2, Tremblay-en-France (25 avenue du Bois de la Pie)","country":"France","country_iso_a2":"FR","latitude":48.9781845,"longitude":2.5044348,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-16","oldest_status_as_of":"2026-10-16","project_count":1,"projects":[{"project_id":"347a4d7c-1166-53f8-8d23-58618d82eae3","name":"PN2 DC5 — planned 30 MW IT data centre replacing a 1981 logistics warehouse (SCI Prologis France CLIV)","status":"announced","status_as_of":"2026-10-16","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Île-de-France, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb6687b18196767278ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb6687b18196767278ff.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-df93318f7935fb88ea53","name":"Prologis Trenton Project Mila Campus","country":"United States","country_iso_a2":"US","latitude":39.45620000836149,"longitude":-84.45971679023693,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"d6a6d399-4580-54f8-80de-1dc0854e4699","name":"Prologis Trenton Project Mila Campus Construction","status":"under_construction","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Trenton Data Center Campus LLC; hosted by Supreme Court of Ohio"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df93318f7935fb88ea53/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df93318f7935fb88ea53.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Butler County Auditor Office","Butler County Engineer Office"]},{"site_id":"vcc-site-a393d0e2bc6a6f9efbd5","name":"Prometheus Hyperscale Evanston campus","country":"United States","country_iso_a2":"US","latitude":41.2683,"longitude":-110.9632,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-22","oldest_status_as_of":"2026-06-22","project_count":1,"projects":[{"project_id":"74d6b0be-d450-509d-a406-ddfed7ede756","name":"Prometheus Hyperscale Evanston campus","status":"announced","status_as_of":"2026-06-22","search_terms":"Proposed AI data center campus on about 506 acres of family ranchland roughly 12 miles east of Evanston, Wyoming, south of Interstate 80 in Uinta County. Prometheus Hyperscale plans 1.25 GW in a first phase with a stated path to 5 GW, run as an islanded microgrid on on-site natural gas generation rather than the public grid. Uinta County commissioners unanimously granted a conditional use permit in June 2026; the company says construction could start within six months of final permitting and take four to five years. The county sent support letters to Meta and Microsoft, but no tenant has been confirmed. Prometheus Hyperscale flagship campus Wyoming Hyperscale Whitebox Prometheus Hyperscale Uinta County Board of Commissioners"}],"status_publishers":["TownLift"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a393d0e2bc6a6f9efbd5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a393d0e2bc6a6f9efbd5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KPCW"]},{"site_id":"vcc-site-092ac704ed89ec997ade","name":"Pulsant Birmingham WM-1 (20 Westwood Avenue, Tyseley)","country":"United Kingdom","country_iso_a2":"GB","latitude":52.451436,"longitude":-1.853127,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"5f35374d-0233-5210-a532-46c231885654","name":"Pulsant Birmingham WM-1 - existing data centre operations","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["Pulsant Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-092ac704ed89ec997ade/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-092ac704ed89ec997ade.json","geometry_licenses":["Open Government Licence v3.0 (Environment Agency conditional licence as stated in the record metadata)"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-c21e519be2c319569f09","name":"Pure DC / SEGRO Park Royal LON02, Premier Park","country":"United Kingdom","country_iso_a2":"GB","latitude":51.538258,"longitude":-0.269272,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"387dc6b8-b0e2-55b4-aa9b-ef05304b2e3a","name":"Pure DC / SEGRO Park Royal LON02 Data Centre","status":"permitted","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Greater London Authority / Old Oak and Park Royal Development Corporation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c21e519be2c319569f09/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c21e519be2c319569f09.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Greater London Authority / Old Oak and Park Royal Development Corporation"]},{"site_id":"vcc-site-e4874e06dbb0a951c91d","name":"Pure DC AMS01 Amsterdam Westpoort Campus","country":"Netherlands","country_iso_a2":"NL","latitude":52.39534067,"longitude":4.83457733,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-27","oldest_status_as_of":"2026-05-27","project_count":1,"projects":[{"project_id":"a072994f-1b7d-5cc8-98b7-bc79c666c6c3","name":"Pure DC AMS01 Data Hall Development","status":"under_construction","status_as_of":"2026-05-27","search_terms":""}],"status_publishers":["Pure DC"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e4874e06dbb0a951c91d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e4874e06dbb0a951c91d.json","geometry_licenses":["Public-Domain-Mark-1.0"],"geometry_attributions":["BAG address data via PDOK; Public Domain Mark 1.0"]},{"site_id":"vcc-site-725184148f2278feb335","name":"Pure DC Brent Cross LON01 Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":51.570622900000004,"longitude":-0.23718785,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-02","project_count":2,"projects":[{"project_id":"3f37c23d-8e8a-576c-8af6-de089d6248dc","name":"Pure DC Brent Cross LON01 B1 — existing data-centre operations (Building 1, 20 MW, four data halls)","status":"operational","status_as_of":"2026-09-03","search_terms":""},{"project_id":"0cdff49d-f05c-5993-acd1-d1259fd80165","name":"Pure DC Brent Cross LON01 B2 Composite Build","status":"under_construction","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Glencar Construction","Pure Data Centres Group (Pure DC)"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-725184148f2278feb335/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-725184148f2278feb335.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-4f5f62a0ba3f0df185ae","name":"Pure DC SJK01 Seinäjoki Campus (Kivenneva)","country":"Finland","country_iso_a2":"FI","latitude":62.72047927,"longitude":22.884068,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"952ab701-7f90-529c-80f0-4314102bc089","name":"Pure DC SJK01 Phase 1 — three data-centre buildings (Seinäjoki permit 3024006057, Flinkinsuora 3)","status":"under_construction","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Seinäjoen kaupunki (City of Seinäjoki); archived by Internet Archive"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4f5f62a0ba3f0df185ae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4f5f62a0ba3f0df185ae.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Finnish Environment Institute Ryhti; CC BY 4.0"]},{"site_id":"vcc-site-cd315d5cbb01f749da8f","name":"PW Digital Gateway","country":"United States","country_iso_a2":"US","latitude":38.7947,"longitude":-77.6206,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["cancelled"],"newest_status_as_of":"2026-07-04","oldest_status_as_of":"2026-07-04","project_count":1,"projects":[{"project_id":"4ac7a0d0-0faf-50c0-bed8-08d54e0bc62b","name":"PW Digital Gateway","status":"cancelled","status_as_of":"2026-07-04","search_terms":"Proposed data center corridor of roughly 2,100 acres along Pageland Lane near Gainesville in western Prince William County, Virginia, next to Manassas National Battlefield Park. In December 2023 the county board approved three rezonings (Compass, DG North and DG South) that together allowed about 22 million square feet and up to 37 data centers for QTS and Compass Datacenters. Courts later held the rezonings void because the hearing was improperly advertised. The county and Compass stopped defending them in April 2026, and QTS withdrew its last appeal and ended the project in July 2026. Prince William Digital Gateway Digital Gateway QTS Data Centers Compass Datacenters H&H Capital Acquisitions, LLC Prince William County Board of County Supervisors"}],"status_publishers":["Bisnow"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cd315d5cbb01f749da8f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cd315d5cbb01f749da8f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WTOP (republished from InsideNoVa)"]},{"site_id":"vcc-site-0ecf05307f91c1e40479","name":"QScale Q01 Lévis Campus","country":"Canada","country_iso_a2":"CA","latitude":46.676157,"longitude":-71.32506265,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-06-04","project_count":2,"projects":[{"project_id":"a848e771-2e45-55fb-8d43-db0885bb824f","name":"QScale Q01 Building B","status":"under_construction","status_as_of":"2026-06-04","search_terms":""},{"project_id":"b9f9191a-1f90-551d-a8b9-44e6f8833e96","name":"QScale Q01 campus (Lévis)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"QScale's Q01 campus in Lévis, in the Quebec City area, is a liquid- and air-cooled colocation and AI campus that the company says is powered by 142 MW of renewable energy. Launched in 2021 as an eight-phase project, it was later costed at CAD 1.05 billion; Hewlett Packard Enterprise became its first anchor tenant in 2023. Goldman Sachs Alternatives closed its acquisition of QScale in May 2026, and in June 2026 QScale said construction of a second building adding 60 MW of IT capacity was well underway. Q01 QScale Q01 QScale QScale Hewlett Packard Enterprise Goldman Sachs Alternatives Government of Quebec Hydro-Québec"}],"status_publishers":["QScale"],"power_observations":[{"project_id":"a848e771-2e45-55fb-8d43-db0885bb824f","metric":"critical_it_mw","stage":"design","low":60.0,"base":60.0,"high":60.0,"unit":"MW","as_of_date":"2026-06-04"}],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ecf05307f91c1e40479.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-990a491f49bc3fcbf938","name":"QTS and Lancium Hall County data center campus","country":"United States","country_iso_a2":"US","latitude":34.3939,"longitude":-100.8953,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["site_preparation"],"newest_status_as_of":"2026-08-28","oldest_status_as_of":"2026-08-28","project_count":1,"projects":[{"project_id":"39eada86-53aa-55d0-ae26-0ff35f9e1207","name":"QTS and Lancium Hall County data center campus","status":"site_preparation","status_as_of":"2026-08-28","search_terms":"Lancium and QTS announced in July 2026 a data center campus near Turkey in Hall County, Texas, with more than 10 billion US dollars of planned capital investment. Lancium owns the campus and provides electrical and civil infrastructure, planning to bring its own power through battery storage and solar; QTS will design, build and operate the data center buildings. The companies said they would fund all needed energy infrastructure upgrades. Up to 7,000 construction jobs at peak and about 350 permanent jobs were projected. No capacity figure, tenant or construction dates were disclosed. Hall County Clean Campus Lancium QTS QTS"}],"status_publishers":["Lancium Inc."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-990a491f49bc3fcbf938/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-990a491f49bc3fcbf938.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Lancium"]},{"site_id":"vcc-site-7001df866adca1a08449","name":"QTS Ashburn 1 Data Center Campus (Broderick Drive and Randolph Drive, Sterling)","country":"United States","country_iso_a2":"US","latitude":38.9991033,"longitude":-77.4498323,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"7b60b358-a85b-566c-a490-41bce9ef95f3","name":"QTS Ashburn 1 DC2 — data centre under construction (22280 Randolph Drive)","status":"under_construction","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC (QTS Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7001df866adca1a08449/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7001df866adca1a08449.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-98db91806e7e60522076","name":"QTS Aurora DEN1 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.73378311392442,"longitude":-104.71239001410385,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-19","oldest_status_as_of":"2026-08-19","project_count":1,"projects":[{"project_id":"c23fe40c-0685-5cee-8fab-9c08575e6b27","name":"QTS Aurora DEN1 DC2 Current Fit-Out","status":"under_construction","status_as_of":"2026-08-19","search_terms":""}],"status_publishers":["City of Aurora, Colorado"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-98db91806e7e60522076/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-98db91806e7e60522076.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["City of Aurora, Colorado"]},{"site_id":"vcc-site-d48a213ebe706be3a283","name":"QTS Bessemer Data Center Campus (Project Marvel)","country":"United States","country_iso_a2":"US","latitude":33.3558048,"longitude":-87.0439199,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"140949c3-1e73-5aa8-b5cd-2a02f100e24e","name":"QTS Bessemer data center campus (Project Marvel) - site preparation","status":"site_preparation","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC (QTS Data Centers)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d48a213ebe706be3a283/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d48a213ebe706be3a283.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Bessemer, Alabama (bessemergis ArcGIS organisation); Jefferson County Commission, Information Technology Services - GIS Division"]},{"site_id":"vcc-site-62511f2ff7c107b083ea","name":"QTS Calatorao data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.5222,"longitude":-1.3464,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"46434a5c-4980-5f79-ac83-000783b60566","name":"QTS Calatorao data center campus","status":"announced","status_as_of":"2026-09-30","search_terms":"Blackstone, through its data center company QTS, proposes a 224-hectare data center campus on industrial land beside the A-2 motorway near Calatorao in Zaragoza province, Aragon. Announced in October 2024 at up to EUR 7.5 billion and reported at 300 MW of electrical capacity at full build-out, it received a regional general-interest declaration (DIGA) in October 2024 and initial approval of its regional general-interest plan (PIGA) in August 2025. QTS describes it as a proposed development and has not published a construction schedule. Proyecto Rodes Project Rodes Blackstone Aragon data center QTS Data Centers QTS Data Centers Blackstone Gobierno de Aragón"}],"status_publishers":["Boletín Oficial de Aragón (Gobierno de Aragón)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62511f2ff7c107b083ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62511f2ff7c107b083ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Brainsre.news"]},{"site_id":"vcc-site-ee33430200d597833ebe","name":"QTS Cambois Data Centre Campus","country":"United Kingdom","country_iso_a2":"GB","latitude":55.15092301981584,"longitude":-1.533627047468273,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","civil_works","under_construction"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-07-01","project_count":3,"projects":[{"project_id":"5b11c034-5a3b-5e5d-bc6a-b7122e21fbec","name":"QTS Cambois 2026 Earthworks","status":"civil_works","status_as_of":"2026-07-01","search_terms":""},{"project_id":"2bd78b04-9314-5aa8-ac32-ef30e111bc2e","name":"QTS Cambois Data Centre Campus","status":"under_construction","status_as_of":"2026-08-06","search_terms":"QTS, the Blackstone-owned data centre company, is building its first UK campus on the former Blyth Power Station site at Cambois, Northumberland, with up to GBP 10bn of investment. Plans cover ten three-storey buildings and up to 540,000 square metres, with the architect citing 720 MW of IT capacity. Northumberland County Council approved the scheme in March 2025 and phase-one reserved matters for the first two buildings in December 2025. Work on site began in October 2025, and ground improvement for the first two data centres was under way in August 2026. The site sits in the UK's North East AI Growth Zone. Project Wind Blackstone Northumberland data centre QTS Cambois QTS QTS Blackstone Renaissance Land Keller Northumberland County Council"},{"project_id":"564a45b7-445e-5fab-bb6a-37fffe529883","name":"QTS Cambois Phase 2 - two data centre buildings (Northumberland reserved matters 26/03028/REM)","status":"announced","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["Northumberland County Council (statutory planning notice published in the Northumberland Gazette and on the News Media Association's Public Notice Portal)","Place North East","QTS Data Centers"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ee33430200d597833ebe/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ee33430200d597833ebe.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["QTS Data Centres; Cundall; Environment Agency consultation portal"]},{"site_id":"vcc-site-d60291ccffe6616c33cc","name":"QTS Cedar Rapids Data Center Campus","country":"United States","country_iso_a2":"US","latitude":41.907294,"longitude":-91.754301,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-15","oldest_status_as_of":"2026-07-15","project_count":1,"projects":[{"project_id":"ae6f1b86-660b-54e9-bdb0-d29bfeedc551","name":"QTS Cedar Rapids Current Campus Development","status":"under_construction","status_as_of":"2026-07-15","search_terms":""}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d60291ccffe6616c33cc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d60291ccffe6616c33cc.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["QTS Data Centers"]},{"site_id":"vcc-site-3e65a9f3d78bff82cf77","name":"QTS Eagle Mountain SLC1 Data Center Campus","country":"United States","country_iso_a2":"US","latitude":40.267749221659585,"longitude":-112.03332438583949,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-01","oldest_status_as_of":"2026-07-01","project_count":1,"projects":[{"project_id":"f166440f-2ab0-57ea-9788-c66d89c8704f","name":"QTS Eagle Mountain SLC1 Building 2","status":"under_construction","status_as_of":"2026-07-01","search_terms":""}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3e65a9f3d78bff82cf77/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3e65a9f3d78bff82cf77.json","geometry_licenses":["county-public-gis-fact-extraction-only"],"geometry_attributions":["GIS Division, Utah County Information Systems Department"]},{"site_id":"vcc-site-5c6aac8d35554558a1fc","name":"QTS Eemshaven data center campus","country":"Netherlands","country_iso_a2":"NL","latitude":53.437501,"longitude":6.858112,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"409466ac-1b48-5098-adf6-4f3a2999b5f6","name":"QTS Eemshaven data center campus","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Data center campus of Blackstone-backed QTS Data Centers at Huibertgatweg 2 in the Eemshaven port area of Groningen, the Netherlands. QTS bought the existing, then vacant 20 gross MW building in 2019 and in July 2025 was reported to be investing EUR 1.4 billion to expand the campus and double its regional capacity. QTS's campus page now describes up to 18 hectares, three facilities and 200 MW of planned capacity delivered in phases: the first building is operational, the second is in phased delivery and the third is under construction. QTS Eemshaven EEMSDC1 QTS Data Centers QTS Data Centers Blackstone (managed funds) Zentrys Group"}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5c6aac8d35554558a1fc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5c6aac8d35554558a1fc.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["QTS Data Centers"]},{"site_id":"vcc-site-32a95caf9128d7dd56c8","name":"QTS Fayetteville campus","country":"United States","country_iso_a2":"US","latitude":33.4478,"longitude":-84.4617,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2025-11-21","oldest_status_as_of":"2025-11-21","project_count":1,"projects":[{"project_id":"7c43c342-562c-5d46-b793-39a4dd2a8cc0","name":"QTS Fayetteville campus","status":"partially_operational","status_as_of":"2025-11-21","search_terms":"QTS is building a multi-building data center campus on about 615 acres along Georgia Highway 54 West in Fayetteville, Georgia, about 25 miles south of Atlanta. QTS bought the site from the Fayette County Development Authority in 2022, when the campus was first unveiled as Project Excalibur, and Bisnow reported it was expected to cost QTS more than USD 1 billion. City filings describe about 7 million square feet of data center and office space. The first building received a certificate of occupancy in May 2025, and by November 2025 two buildings were operating with four more under development. Microsoft has been reported, but not confirmed, as a tenant. Project Excalibur QTS Data Center Fayetteville QTS Data Centers Fayette County Development Authority City of Fayetteville Microsoft"}],"status_publishers":["The Citizen (Fayette County)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32a95caf9128d7dd56c8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32a95caf9128d7dd56c8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Citizen (Fayette County)"]},{"site_id":"vcc-site-b2210602799840717dd3","name":"QTS Irving Data Center Campus (Irving 1, DFW1)","country":"United States","country_iso_a2":"US","latitude":32.895929,"longitude":-96.9815339,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"e045bc2b-5fdc-5483-8603-6e4090397467","name":"QTS DFW1-DC1 data hall 1.2 fit-out (Project Atlas)","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b2210602799840717dd3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b2210602799840717dd3.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-88c487e5ee33f7488890","name":"QTS South Dallas Campus (DFW2, Wilmer/Lancaster)","country":"United States","country_iso_a2":"US","latitude":32.5863624,"longitude":-96.6985474,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"f3ee5e25-800d-57e3-abac-06cd66ec3b9e","name":"QTS DFW2 DC7","status":"announced","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88c487e5ee33f7488890/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88c487e5ee33f7488890.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-73e7407002d9d2819589","name":"QTS Suwanee Data Center Campus (120 and 300 Satellite Boulevard)","country":"United States","country_iso_a2":"US","latitude":34.0362323,"longitude":-84.0593726,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"18e83a34-b691-5957-bae8-7296f053894d","name":"QTS Suwanee campus — existing data-centre campus operations (DC1 and DC2)","status":"operational","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["QTS Realty Trust, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-73e7407002d9d2819589/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-73e7407002d9d2819589.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Gwinnett County, Georgia"]},{"site_id":"vcc-site-e6669b76221d6e79fd89","name":"QTS Vimercate data center campus","country":"Italy","country_iso_a2":"IT","latitude":45.617,"longitude":9.367,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"b19d5d3a-c2cc-5cea-9698-fe07ac125c8e","name":"QTS Vimercate data center campus","status":"announced","status_as_of":"2026-10-09","search_terms":"Proposed first Italian campus of Blackstone-owned QTS Data Centers on the former IBM industrial site at Velasca in Vimercate (Monza and Brianza). QTS's page calls it a proposed development of up to EUR 2.3 billion. At a June 2026 open day QTS presented three buildings and an on-site substation linked to a planned Terna station; local press reported 156 MW (two 60 MW buildings and one of 36 MW), while other reports give about 220 MW or 300 MW. In July 2026 QTS awaited the national environmental assessment before a building permit, aiming to prepare the site by end-2026 and open the first building in the second half of 2028. QTS Vimercate/Milan Velasca data center QTS Data Centers Kryalos SGR Terna Comune di Vimercate"}],"status_publishers":["QTS Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6669b76221d6e79fd89/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6669b76221d6e79fd89.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["QTS Data Centers"]},{"site_id":"vcc-site-382d4c7030c7ed7c700d","name":"QTS York County Data Center Campus","country":"United States","country_iso_a2":"US","latitude":35.035399273352,"longitude":-81.103431663732,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"5b758548-2a2a-5643-9ebb-d8381bbd2c52","name":"QTS York County Initial-Phase Building 1","status":"shell","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Gilbane Building Company"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-382d4c7030c7ed7c700d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-382d4c7030c7ed7c700d.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-bf298971fe1dec3fc0ac","name":"Quantum Frederick data center park","country":"United States","country_iso_a2":"US","latitude":39.4311,"longitude":-77.3972,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-03-12","oldest_status_as_of":"2026-03-12","project_count":1,"projects":[{"project_id":"a490f00a-8b75-5547-b0e9-5fb3b6e5f616","name":"Quantum Frederick data center park","status":"under_construction","status_as_of":"2026-03-12","search_terms":"Master-planned data center park of about 2,100 acres on the former Alcoa Eastalco Works site near Frederick, Maryland. Quantum Loophole bought the land in 2021 with backing from a joint venture with TPG Real Estate, planned to start with 1 GW of transmission capacity, and announced in June 2022 that it had broken ground on shared power, water and fiber infrastructure. TPG took full control at the end of 2024 of a project reported at USD 5 billion. Aligned Data Centers plans four buildings totaling 264 MW in the park, including a 72 MW building reported topped out in March 2026, and Rowan Digital Infrastructure is developing 11 buildings on three sites. Quantum Frederick Quantum Park Quantum Loophole Frederick campus TPG Real Estate TPG Real Estate Quantum Loophole Aligned Data Centers Rowan Digital Infrastructure Turner Construction Company"}],"status_publishers":["Baxtel"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bf298971fe1dec3fc0ac/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bf298971fe1dec3fc0ac.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Baxtel"]},{"site_id":"vcc-site-3d1c91f3413a78fdeb4a","name":"R44 Vision DC Data Centre (Rhinstraße 44, Berlin-Marzahn)","country":"Germany","country_iso_a2":"DE","latitude":52.51677505,"longitude":13.5205789,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"ec8e9630-46a9-5fa7-904b-fc786327244c","name":"R44 Vision DC data centre — proposed development with 111.8 MW emergency-power plant","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["Land Berlin, Senatsverwaltung für Mobilität, Verkehr, Klimaschutz und Umwelt"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3d1c91f3413a78fdeb4a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3d1c91f3413a78fdeb4a.json","geometry_licenses":["dl-de/zero-2-0"],"geometry_attributions":["Geoportal Berlin / Adressen Berlin"]},{"site_id":"vcc-site-31ed6c5da19a943535f6","name":"Racks Central Johor AI Campus","country":"Malaysia","country_iso_a2":"MY","latitude":1.5324382237091367,"longitude":103.92817067682181,"geometry_type":"MultiPolygon","official_boundary":false,"locator_scopes":["host_estate_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-30","oldest_status_as_of":"2026-06-30","project_count":1,"projects":[{"project_id":"f6d1bce2-6fc7-5fd8-a1fb-55d5fe4cd8e9","name":"Racks Central RCJM1 Phase A","status":"under_construction","status_as_of":"2026-06-30","search_terms":""}],"status_publishers":["Racks Central"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_host_estate_context_only","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-31ed6c5da19a943535f6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-31ed6c5da19a943535f6.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","all-rights-reserved"],"geometry_attributions":["Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).","Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.","OpenStreetMap Wiki contributors","Racks Central"]},{"site_id":"vcc-site-53d6b726e740613f2b41","name":"Raiden Infotech Turbhe MIDC Data Centre Campus","country":"India","country_iso_a2":"IN","latitude":19.055427473257335,"longitude":73.02339212361213,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"118053c0-38ee-5fc1-9c4d-f4875cc3c32e","name":"Raiden Infotech Turbhe MIDC Data Centre EC 531703 Current Build","status":"under_construction","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-53d6b726e740613f2b41/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-53d6b726e740613f2b41.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Ministry of Environment, Forest and Climate Change, India (PARIVESH portal); Raiden Infotech India Private Limited, proponent","Open Geospatial Consortium","Raiden Infotech India Private Limited, proponent; Ministry of Environment, Forest and Climate Change, India (PARIVESH portal), host"]},{"site_id":"vcc-site-d0dffbb1f095b96397b5","name":"Range Hong Kong Sandy Ridge Data Facility Cluster","country":"Hong Kong","country_iso_a2":"HK","latitude":22.531780035861345,"longitude":114.12237961611477,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"6a3cb870-eb89-5d4b-a486-44eb7d10f8b0","name":"Range Hong Kong Sandy Ridge Campus Current Infrastructure Build","status":"under_construction","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Government of the Hong Kong SAR; Digital Policy Office"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d0dffbb1f095b96397b5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d0dffbb1f095b96397b5.json","geometry_licenses":["csdi-terms-free-reuse-with-attribution"],"geometry_attributions":["Lands Department, Government of the Hong Kong SAR; CSDI Portal"]},{"site_id":"vcc-site-47af94e628501ef86ea5","name":"Raxio AO1 Cacuaco Data Centre","country":"Angola","country_iso_a2":"AO","latitude":-8.765712,"longitude":13.394561,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"915f88b0-52e1-5b56-b526-33df1c2a4523","name":"Raxio AO1 Cacuaco — operating facility","status":"operational","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Raxio Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47af94e628501ef86ea5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-47af94e628501ef86ea5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-ddd8474ccc65fc46569f","name":"Raxio DRC1 Kinshasa Data Centre","country":"Democratic Republic of the Congo","country_iso_a2":"CD","latitude":-4.3568042,"longitude":15.3436234,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"be1287af-1047-5e9a-884a-6b6e8f0695c3","name":"Raxio DRC1 Kinshasa — operating facility","status":"operational","status_as_of":"2026-08-20","search_terms":""}],"status_publishers":["Raxio Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ddd8474ccc65fc46569f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ddd8474ccc65fc46569f.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-bb464b1c449910922b5e","name":"Raxio MZ1 Beluluane Data Centre","country":"Mozambique","country_iso_a2":"MZ","latitude":-25.9198491,"longitude":32.4155179,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"f3f11475-4c25-5230-9363-e7b8fe87f55c","name":"Raxio MZ1 Beluluane — operating facility","status":"operational","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Raxio Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bb464b1c449910922b5e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bb464b1c449910922b5e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-473691fe4a4805a3010d","name":"Raxio UG1 Namanve Data Centre","country":"Uganda","country_iso_a2":"UG","latitude":0.3471334,"longitude":32.6897214,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-06","oldest_status_as_of":"2026-08-06","project_count":1,"projects":[{"project_id":"0b2a5bf9-ef56-5ef6-97c5-c405790000bd","name":"Raxio UG1 Namanve — operating facility","status":"operational","status_as_of":"2026-08-06","search_terms":""}],"status_publishers":["Raxio Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-473691fe4a4805a3010d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-473691fe4a4805a3010d.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-508c3ba12d404b778be3","name":"Rechenzentrum Alteno, Industriegebiet Alteno (Luckau)","country":"Germany","country_iso_a2":"DE","latitude":51.8695943,"longitude":13.797448,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"ceb7d090-6ac2-575e-882b-8fc88aaa4035","name":"Rechenzentrum Alteno — planned hyperscale data centre (B-Plan Nr. 04.1.02, Industriegebiet Alteno)","status":"announced","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Stadt Luckau, Der Bürgermeister"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-508c3ba12d404b778be3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-508c3ba12d404b778be3.json","geometry_licenses":["Datenlizenz Deutschland - Namensnennung 2.0 (dl-de/by-2-0)"],"geometry_attributions":["© GeoBasis-DE/LGB, dl-de/by-2-0 (Daten geändert)"]},{"site_id":"vcc-site-a2932dfc186e6f2538c8","name":"Red Admiral data centre campus, Rochfortbridge","country":"Ireland","country_iso_a2":"IE","latitude":53.416,"longitude":-7.296,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"48458229-1481-521a-8ee4-edcc2d7408bc","name":"Red Admiral data centre campus, Rochfortbridge","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed six-unit data centre campus with a decentralised energy resource and a solar farm on a 600-acre site near Rochfortbridge, County Westmeath, Ireland. The applicant is Red Admiral DC Ltd, and the Westmeath Examiner says the development is part of the Lumcloon Energy Group's wider plans; it reports the project at EUR 1 billion. Westmeath County Council granted a ten-year permission with 32 conditions in early June 2026 despite more than 50 submissions. Third-party appeals were lodged with An Coimisiún Pleanála, with a decision due by 27 October 2026. The energy element needs an EPA industrial emissions licence. Red Admiral DC Red Admiral DC Limited Lumcloon Energy Group Westmeath County Council An Coimisiún Pleanála"}],"status_publishers":["An Coimisiún Pleanála"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a2932dfc186e6f2538c8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a2932dfc186e6f2538c8.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["An Coimisiún Pleanála"]},{"site_id":"vcc-site-c41ec738ae5e543fa00e","name":"Redheughs Avenue Green Data Centre Site, South Gyle, Edinburgh","country":"United Kingdom","country_iso_a2":"GB","latitude":55.932636,"longitude":-3.308412,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-17","oldest_status_as_of":"2026-08-17","project_count":1,"projects":[{"project_id":"26a38f2e-6978-5ee2-a2e2-921350c394fa","name":"Redheughs Avenue Green Data Centre (Edinburgh 25/04239/PPP, appeal PPA-230-2794)","status":"announced","status_as_of":"2026-08-17","search_terms":""}],"status_publishers":["Scottish Government"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c41ec738ae5e543fa00e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c41ec738ae5e543fa00e.json","geometry_licenses":["Open Government Licence v3.0, except where otherwise stated"],"geometry_attributions":["Scottish Government (DPEA)"]},{"site_id":"vcc-site-c879bad0c737049a2484","name":"Related Digital Cheyenne Campus","country":"United States","country_iso_a2":"US","latitude":41.1426277,"longitude":-104.7015111,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"31635fdf-a7a6-52c8-91dc-f64e5c7d10d3","name":"Related Digital Cheyenne Phase 1","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["Related Digital"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c879bad0c737049a2484/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c879bad0c737049a2484.json","geometry_licenses":["all-rights-reserved-fact-extraction-only"],"geometry_attributions":["Related Digital"]},{"site_id":"vcc-site-7f644893d8685d1d4b44","name":"Reliance Jamnagar AI-enabled data centre for Meta","country":"India","country_iso_a2":"IN","latitude":22.4732,"longitude":70.0552,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"987638c1-43b0-5075-a91a-f02ac2f007cc","name":"Reliance Jamnagar AI-enabled data centre for Meta","status":"announced","status_as_of":"2026-06-10","search_terms":"Reliance Industries agreed in June 2026 to develop a 168 MW AI-enabled data centre in Jamnagar, Gujarat, built to suit Meta, which will lease capacity there to support its global infrastructure and AI compute. Reliance is to handle design, construction, utilities, renewable power, network connectivity and managed operations, with delivery targeted within two years and an option to expand. The facility is to be cooled with desalinated seawater. Reliance described it as Meta's first built-to-suit data centre capacity in India. Reliance Industries Limited Reliance Industries Limited Reliance Industries Limited Reliance Industries Limited Meta Platforms"}],"status_publishers":["Reliance Industries Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7f644893d8685d1d4b44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7f644893d8685d1d4b44.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Reliance Industries Limited"]},{"site_id":"vcc-site-aa41036becece52b7ef7","name":"RIKEN Fugaku NEXT Kobe","country":"Japan","country_iso_a2":"JP","latitude":34.6519,"longitude":135.2213,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-13","oldest_status_as_of":"2026-10-13","project_count":1,"projects":[{"project_id":"760ff149-f1e1-5fbb-b4a8-9944c1b9cf88","name":"RIKEN Fugaku NEXT New Computer Building","status":"announced","status_as_of":"2026-10-13","search_terms":""}],"status_publishers":["RIKEN"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-aa41036becece52b7ef7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-aa41036becece52b7ef7.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["RIKEN"]},{"site_id":"vcc-site-72339650a9d5c93e8286","name":"Rio AI City (Elea Data Centers)","country":"Brazil","country_iso_a2":"BR","latitude":-22.977,"longitude":-43.394,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"51f3ec57-401e-5060-9d04-c2dfdfee6b1f","name":"Rio AI City (Elea Data Centers)","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Elea Data Centers is developing Rio AI City, a data centre hub in the Olympic Park area of Rio de Janeiro with institutional support from the city government. Announced in May 2025 with an initial 1.5 GW of energy capacity and potential growth to 3.2 GW, it was later targeted to reach 1.5 GW by 2027 and 3.2 GW by 2032. Elea counts its operating RJO1 facility in the first phase; RJO2 (about 80 MW) was under construction for initial delivery in 2026, and RJO3 and RJO4 would add 120 MW. Elea signed memoranda with the city and Oracle in August 2025 and with the city, energy companies and Tapestry in November 2025. I Squared Capital had completed its acquisition of Elea by June 2026. Rio AI City Elea Data Centers Elea Data Centers I Squared Capital City of Rio de Janeiro"}],"status_publishers":["Elea Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-72339650a9d5c93e8286/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-72339650a9d5c93e8286.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Elea Data Centers via PR Newswire"]},{"site_id":"vcc-site-387901bd13edd6eab35d","name":"Riot Platforms Corsicana facility","country":"United States","country_iso_a2":"US","latitude":32.05,"longitude":-96.47,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"27338e9f-68b5-58be-b981-a8a13c391bd6","name":"Riot Platforms Corsicana facility","status":"partially_operational","status_as_of":"2026-08-10","search_terms":"Riot Platforms campus in Navarro County, Texas, begun in 2022 to expand bitcoin mining; its 400 MW first phase of immersion-cooled mining infrastructure was completed in 2024 and still serves mining. Riot now plans to make the site's expected total of about 1 GW of developed capacity available for high-density compute: in January 2026 it said it would convert available Corsicana power for data center use, its 2025 annual report described a first data center phase at Corsicana, and in August 2026 it disclosed a non-binding letter of intent with a single tenant for the full site. The sources opened report no signed lease. Corsicana Facility Riot Corsicana Riot Platforms Riot Platforms"}],"status_publishers":["Riot Platforms, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-387901bd13edd6eab35d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-387901bd13edd6eab35d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Riot Platforms, Inc. via SEC EDGAR"]},{"site_id":"vcc-site-3dedcd29014f493a2abb","name":"Riot Rockdale Campus","country":"United States","country_iso_a2":"US","latitude":30.57589508119766,"longitude":-97.0788554968219,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":2,"projects":[{"project_id":"298d7152-0985-535e-a701-60b689a3cd00","name":"Riot Platforms Rockdale data center campus","status":"partially_operational","status_as_of":"2026-08-10","search_terms":"Riot Platforms bitcoin mining facility on about 200 acres in Rockdale, Milam County, Texas, with a 700 MW grid interconnection, being converted for AI data center tenants. In January 2026 Riot bought the land it had leased and signed AMD for 25 MW of critical IT load, later expanded to 50 MW; the first 25 MW was commissioned in May 2026. In August 2026 Riot signed a 20-year, build-to-suit lease with an unnamed frontier AI lab for 191 MW of critical IT load worth about USD 9.1 billion, with 96 MW due in December 2027 and the rest by June 2028, and put expected capital spending on that build at USD 2.1 to 2.3 billion. Rockdale Facility Rockdale Site Riot Platforms Riot Platforms Riot Platforms AMD"},{"project_id":"b4ff75a2-9d55-54ad-bf27-4c60b096eb0f","name":"Riot Rockdale AMD Expansion Phases 3 and 4","status":"under_construction","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Riot Platforms, Inc.","Riot Platforms, Inc. via SEC EDGAR"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3dedcd29014f493a2abb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3dedcd29014f493a2abb.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Texas Geographic Information Office","Texas Geographic Information Office / Texas Water Development Board","Texas Geographic Information Office; CSEC originating data","Texas Geographic Information Office; Various 911 Districts"]},{"site_id":"vcc-site-58a51785d405efc9c68d","name":"Road 1 Data Centre, 1-5 Khartoum Road, Macquarie Park","country":"Australia","country_iso_a2":"AU","latitude":-33.781037,"longitude":151.1251473,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"31ea7156-0696-5613-b0cd-73f15fa23a57","name":"Road 1 Data Centre — approved 49 MW data centre (SSD-80814238)","status":"permitted","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-58a51785d405efc9c68d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-58a51785d405efc9c68d.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-b965a370d922dc0156af","name":"Rowan Cinco Data Center Campus (Rowan Cinco Subdivision, CR 683, between Lytle and Natalia, Medina County)","country":"United States","country_iso_a2":"US","latitude":29.2210266,"longitude":-98.8356334,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"3f60d6db-df2e-579a-9979-16716f33019f","name":"Project Cinco — hyperscale data center campus under construction (first development phase)","status":"under_construction","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Rowan Digital Infrastructure LLC (Internet Archive copy)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b965a370d922dc0156af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b965a370d922dc0156af.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Medina Appraisal District data)"]},{"site_id":"vcc-site-4066c8eef2c3b8f310b2","name":"Rowan Project Pirate Data Center Campus (CR 683, Lytle, Medina County)","country":"United States","country_iso_a2":"US","latitude":29.2272183,"longitude":-98.8211638,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-26","oldest_status_as_of":"2026-10-26","project_count":1,"projects":[{"project_id":"49ca3822-f4bc-507e-8b80-c954423118e4","name":"Project Pirate — proposed data center campus on about 280 acres (announced September 2026)","status":"announced","status_as_of":"2026-10-26","search_terms":""}],"status_publishers":["Rowan Digital Infrastructure LLC (Rowan in Medina County project site)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4066c8eef2c3b8f310b2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4066c8eef2c3b8f310b2.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Medina Appraisal District data)"]},{"site_id":"vcc-site-998792d68106140776c0","name":"Rowan Project Temple","country":"United States","country_iso_a2":"US","latitude":31.1056,"longitude":-97.4208,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-05-29","oldest_status_as_of":"2026-05-29","project_count":1,"projects":[{"project_id":"4a2a09d1-1ace-5ff8-a80f-89996cda5799","name":"Rowan Project Temple","status":"under_construction","status_as_of":"2026-05-29","search_terms":"Rowan Digital Infrastructure is building a 300 MW hyperscale data center campus on about 700 acres in east Temple, Bell County, Texas, roughly 70 miles north of Austin. Temple's council gave final approval to annex and zone the land in 2025, and in January 2026 Rowan reported construction under way, with power secured through Oncor and an unnamed large technology company as the long-term customer. In May 2026 Rowan announced it had closed nearly USD 3 billion of debt financing, and it expects operations in 2027. A third and final building, the Lasso Building, is now planned on adjacent land, and Rowan has offered USD 38 million for city water programs and a planned community center. Project Temple Rowan Temple data center campus Rowan Digital Infrastructure Oncor City of Temple Bell County"}],"status_publishers":["Rowan Digital Infrastructure"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-998792d68106140776c0/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-998792d68106140776c0.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-455ad29119b056e3099f","name":"Sabey Indianapolis Decatur Township Data Center Campus","country":"United States","country_iso_a2":"US","latitude":39.6652336,"longitude":-86.3018045,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"1a1900a7-4af1-5dd4-ac41-81acc7441736","name":"Sabey Indianapolis Decatur Township Data Center Campus — proposed campus","status":"announced","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-455ad29119b056e3099f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-455ad29119b056e3099f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Indianapolis / Marion County, Indiana"]},{"site_id":"vcc-site-be615a0bc019c0f6d350","name":"Sabey SDC Austin Round Rock Campus","country":"United States","country_iso_a2":"US","latitude":30.48575752775,"longitude":-97.650967159813,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-06-16","project_count":1,"projects":[{"project_id":"ae484949-f575-5553-ad33-bc1f96eab345","name":"Sabey SDC Austin Building B Current Build","status":"shell","status_as_of":"2026-06-16","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-be615a0bc019c0f6d350/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-be615a0bc019c0f6d350.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-fe589337beb1f4408111","name":"Sabey SDC Umatilla Data Center Campus","country":"United States","country_iso_a2":"US","latitude":45.92101509128298,"longitude":-119.25886448534646,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"c4e8eac5-c88e-5147-b4a8-ee54da880ab1","name":"Sabey SDC Umatilla Data Center Campus — current campus build","status":"under_construction","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["Sabey Data Centers"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fe589337beb1f4408111/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fe589337beb1f4408111.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Umatilla County"]},{"site_id":"vcc-site-c94f01a0c2d16cea9689","name":"Sakura Ishikari Data Center","country":"Japan","country_iso_a2":"JP","latitude":43.1772,"longitude":141.3003,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"490119c4-a270-5e7f-8488-8e0a907cd787","name":"Sakura Ishikari Data Center Existing Operations","status":"operational","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Sakura Internet"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c94f01a0c2d16cea9689/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c94f01a0c2d16cea9689.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Ishikari City"]},{"site_id":"vcc-site-a1239f397b785f28fd31","name":"Scala AI City (Eldorado do Sul)","country":"Brazil","country_iso_a2":"BR","latitude":-30.0839,"longitude":-51.6158,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2025-05-14","oldest_status_as_of":"2025-05-14","project_count":1,"projects":[{"project_id":"d461c464-bedc-555a-a582-c6f96a0a2acc","name":"Scala AI City (Eldorado do Sul)","status":"announced","status_as_of":"2025-05-14","search_terms":"Scala Data Centers plans a data centre city in Eldorado do Sul, in the Porto Alegre metropolitan region of Rio Grande do Sul, Brazil. It signed an agreement with the state government in September 2024 for a first phase of 54 MW of IT capacity, about BRL 3 billion, with potential growth to 4,750 MW and total investment the company puts as high as BRL 500 billion. Eldorado do Sul passed a law in December 2024 adding the site to the urban perimeter, and in May 2025 Brazil's Ministry of Mines and Energy authorized a phased grid connection of up to 5 GW. No construction start had been reported in the sources reviewed. Scala AI City Scala Data Centers Government of Rio Grande do Sul Municipality of Eldorado do Sul Brazil Ministry of Mines and Energy"}],"status_publishers":["Scala Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a1239f397b785f28fd31/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a1239f397b785f28fd31.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Scala Data Centers via PR Newswire"]},{"site_id":"vcc-site-36fd6f2f441272102aa1","name":"Scala Data Centers Tamboré Campus","country":"Brazil","country_iso_a2":"BR","latitude":-23.4656,"longitude":-46.8419,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2025-10-30","oldest_status_as_of":"2025-10-30","project_count":1,"projects":[{"project_id":"4ea35229-9824-5086-8441-310876ea8911","name":"Scala Data Centers Tamboré Campus","status":"partially_operational","status_as_of":"2025-10-30","search_terms":"Scala Data Centers' Tamboré Campus in Barueri, Greater São Paulo, sits beside the Rodoanel ring road and is planned to reach 600 MW across 17 data centre buildings and three substations. Scala inaugurated Phase 2 (158 MW of IT capacity, BRL 6.2 billion) in August 2024 with two hyperscale buildings in service and more under construction. By October 2025 the company reported seven buildings operating, more than BRL 10 billion invested, and a memorandum with the Municipality of Barueri for approval of the campus master plan. Tamboré Campus Campus Tamboré Scala Data Centers Scala Data Centers Municipality of Barueri"}],"status_publishers":["Scala Data Centers via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-36fd6f2f441272102aa1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-36fd6f2f441272102aa1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Scala Data Centers via PR Newswire"]},{"site_id":"vcc-site-b12dddd73cb490c6bb64","name":"Scala Praia do Futuro Campus","country":"Brazil","country_iso_a2":"BR","latitude":-3.7515085,"longitude":-38.4580015,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-04","oldest_status_as_of":"2026-08-04","project_count":1,"projects":[{"project_id":"b5625b8f-5e00-5fbe-b313-ba7adb980583","name":"Scala SFORPF01","status":"under_construction","status_as_of":"2026-08-04","search_terms":""}],"status_publishers":["AZ Quest Panorama Data Centers"],"power_observations":[{"project_id":"b5625b8f-5e00-5fbe-b313-ba7adb980583","metric":"critical_it_mw","stage":"design","low":7.2,"base":7.2,"high":7.2,"unit":"MW","as_of_date":"2026-07-21"}],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b12dddd73cb490c6bb64/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b12dddd73cb490c6bb64.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Prefeitura de Fortaleza - SEUMA; Scala Data Centers"]},{"site_id":"vcc-site-8a73ede727ab01225667","name":"Schwarz Digits Lübbenau Campus","country":"Germany","country_iso_a2":"DE","latitude":51.84710977414326,"longitude":13.960999567308617,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"8f5c2434-0b2d-547e-ac2c-e25ddeefe1b7","name":"Lübbenau Data Center Current Build","status":"under_construction","status_as_of":"2026-08-18","search_terms":"Schwarz Digits, the IT arm of Lidl and Kaufland owner Schwarz Group, is building an EUR 11 billion AI and cloud data center on a 13-hectare former power plant site in Lübbenau (Spreewald), Brandenburg. The first phase has a 200 MW connection and the modular design allows up to 100,000 GPUs over time. Work began in November 2025; the first module is due by the end of 2027, and waste heat is to feed the town's district heating from 2028. The group's cloud unit STACKIT will run it. STACKIT Lübbenau Schwarz Digits STACKIT Lidl Kaufland Baden-Württemberg Police"}],"status_publishers":["convis GmbH, project manager with CPM GmbH"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8a73ede727ab01225667/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8a73ede727ab01225667.json","geometry_licenses":["dl-de/by-2-0"],"geometry_attributions":["© GeoBasis-DE/LGB/LS/VBB GmbH, dl-de/by-2-0, Daten geändert: minimal factual projection"]},{"site_id":"vcc-site-71bd6b3acbcab9b7bb6e","name":"Science Tokyo Yokohama TSUBAME Data Center","country":"Japan","country_iso_a2":"JP","latitude":35.5142302,"longitude":139.4839008,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"85eabbee-ed90-5017-983f-b88d5a7fc133","name":"TSUBAME4 G4-A Data Center Existing Operations","status":"operational","status_as_of":"2026-09-29","search_terms":""}],"status_publishers":["Institute of Science Tokyo"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-71bd6b3acbcab9b7bb6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-71bd6b3acbcab9b7bb6e.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-82a8dc81ee48bf577b42","name":"SCSK netXDC Inzai Campus","country":"Japan","country_iso_a2":"JP","latitude":35.8091485,"longitude":140.1182405,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":2,"projects":[{"project_id":"32892fc9-22d0-5398-a760-fd3c1f12afd9","name":"SCSK netXDC Chiba Center (SI1) and Chiba No.2 Center (SI2) Existing Operations","status":"operational","status_as_of":"2026-10-01","search_terms":""},{"project_id":"400c245c-51e6-5b28-b91f-0c9f27dbaaae","name":"SCSK netXDC Chiba No.3 (SI3)","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["SCSK"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-82a8dc81ee48bf577b42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-82a8dc81ee48bf577b42.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-1a7a99925cc9fdd0d013","name":"SDC-EN Meath I data storage campus, Bracetown and Gunnocks, north of Clonee, Co. Meath","country":"Ireland","country_iso_a2":"IE","latitude":53.4285488,"longitude":-6.4526999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"f36652df-27cc-5c59-a1d6-acf4d3943953","name":"SDC-EN Meath I — four two-storey data storage buildings DC1-DC4 (An Bord Pleanála ABP-307546-20 / Meath RA191593; EPA IE licence application P1239-01)","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["An Coimisiún Pleanála, published by the Environmental Protection Agency (Ireland)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1a7a99925cc9fdd0d013/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1a7a99925cc9fdd0d013.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Environmental Protection Agency (Ireland), LEAP"]},{"site_id":"vcc-site-15b50bfa41a34078c9e4","name":"SenseTime Lingang AIDC","country":"China","country_iso_a2":"CN","latitude":30.882871,"longitude":121.795717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"e1f7e26d-cd26-5ae9-bc60-b3d1e87ef76a","name":"SenseTime Lingang AIDC — Phase 2","status":"permitted","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Lingang Special Area Administration (中国（上海）自由贸易试验区临港新片区管理委员会)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-15b50bfa41a34078c9e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-15b50bfa41a34078c9e4.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["China (Shanghai) Pilot Free Trade Zone Lingang Special Area Administration; drawing by the project builder"]},{"site_id":"vcc-site-919f7ffc3ffdb8bb8ce7","name":"Servpac MTP Data Center (200 Kahelu Ave, Mililani Technology Park, Oahu)","country":"United States","country_iso_a2":"US","latitude":21.4809642,"longitude":-158.0192455,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-25","oldest_status_as_of":"2026-09-25","project_count":1,"projects":[{"project_id":"ae3d048a-f581-5d2f-be6a-986b2ab6203c","name":"Servpac MTP Data Center Building 1 — existing Tier IV colocation operations","status":"operational","status_as_of":"2026-09-25","search_terms":""}],"status_publishers":["Servpac Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-919f7ffc3ffdb8bb8ce7/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-919f7ffc3ffdb8bb8ce7.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["State of Hawaii Statewide GIS Program; City and County of Honolulu (HoLIS)"]},{"site_id":"vcc-site-bcbda65c36f2a4933738","name":"Sesterce Rovaltain Campus, Alixan (115 rue René Truhaut)","country":"France","country_iso_a2":"FR","latitude":44.9930462,"longitude":4.9831222,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-06","oldest_status_as_of":"2026-10-06","project_count":1,"projects":[{"project_id":"c477ef3c-d3e5-5e70-9c27-5f66837e20a7","name":"Rovaltain Sesterce Campus — proposed 40 MW AI supercomputer campus (permit PC 026 004 25 00020, implementation suspended)","status":"announced","status_as_of":"2026-10-06","search_terms":""}],"status_publishers":["Sesterce Group"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bcbda65c36f2a4933738/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bcbda65c36f2a4933738.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-9efe83d178c12b78b29b","name":"Shaanxi Xueqian Normal University Chang’an Campus Data Centre","country":"China","country_iso_a2":"CN","latitude":34.13065395,"longitude":108.93017,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"247e2a4e-ebf1-50e4-ac1b-f8ac3e87826d","name":"Shaanxi Xueqian Normal University — Chang’an Data Centre Room Renovation","status":"completed","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["陕西学前师范学院 (Shaanxi Xueqian Normal University)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9efe83d178c12b78b29b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9efe83d178c12b78b29b.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-64c030a0bd3c9b58776a","name":"Shandong University Longshan Data Centre","country":"China","country_iso_a2":"CN","latitude":36.68664555,"longitude":117.44632435,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"f56086e4-f8b1-546a-8bc2-1dfda7befda9","name":"Shandong University Longshan — Phase 1 Data Centre and Research Platform","status":"under_construction","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["中国建筑第五工程局有限公司 (China Construction Fifth Engineering Bureau)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64c030a0bd3c9b58776a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-64c030a0bd3c9b58776a.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-dd9326d1acc72c7fff88","name":"Shenandoah Computing Data Center Site (MO-92 and N Winan Avenue, Kansas City, Missouri)","country":"United States","country_iso_a2":"US","latitude":39.3475766,"longitude":-94.7028894,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-02","oldest_status_as_of":"2026-09-02","project_count":1,"projects":[{"project_id":"c4c375bf-789e-51da-952e-7cdd856dbe4c","name":"Shenandoah Computing LLC — proposed five-building data-processing facility (MoDNR air construction permit application 2025-08-034)","status":"announced","status_as_of":"2026-09-02","search_terms":""}],"status_publishers":["Missouri Department of Natural Resources, Air Pollution Control Program"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd9326d1acc72c7fff88/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd9326d1acc72c7fff88.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Missouri Department of Natural Resources (application prepared for Shenandoah Computing LLC)"]},{"site_id":"vcc-site-9f92408dd0bdc8a0b8b2","name":"Sien Real Piaseczno Data Center (ul. Energetyczna)","country":"Poland","country_iso_a2":"PL","latitude":52.0897465,"longitude":21.0299085,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["site_preparation"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"f988d3dd-5c8e-57ad-840c-cdd8ca84333c","name":"Sien Real Piaseczno Data Center — four-building campus","status":"site_preparation","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Sien Real Sp. z o.o."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9f92408dd0bdc8a0b8b2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9f92408dd0bdc8a0b8b2.json","geometry_licenses":["public-sector-information"],"geometry_attributions":["Główny Urząd Geodezji i Kartografii"]},{"site_id":"vcc-site-dc7beeb061c0e039f4cf","name":"Sify Chennai 02 data center campus, Siruseri","country":"India","country_iso_a2":"IN","latitude":12.835,"longitude":80.2,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"9d173225-d19b-5566-ab43-b319b0434236","name":"Sify Chennai 02 data center campus, Siruseri","status":"partially_operational","status_as_of":"2026-09-29","search_terms":"Sify Infinit Spaces' hyperscale and AI-ready campus at Siruseri, Chennai, is planned as three towers over a shared basement, with an on-site subsea cable landing station and a 230 kV GIS substation. Tamil Nadu's chief minister inaugurated the first tower in April 2025, when Sify said the campus would eventually reach 130 MW and that it and its partners planned to invest INR 10,000 crore over five years. Sify's October 2025 prospectus reported 25.92 MW of built IT capacity in Tower B, of which 4.32 MW was installed, planned another 26 MW there by the year to March 2028, and said work on towers A and C had not begun. Chennai 02 Sify Siruseri campus Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dc7beeb061c0e039f4cf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dc7beeb061c0e039f4cf.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-37108b4d9d3683d6451d","name":"Sify Noida 02 data center campus","country":"India","country_iso_a2":"IN","latitude":28.57,"longitude":77.32,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-09-29","oldest_status_as_of":"2026-09-29","project_count":1,"projects":[{"project_id":"d31725a8-2753-5d70-963d-320d4f6fbb61","name":"Sify Noida 02 data center campus","status":"partially_operational","status_as_of":"2026-09-29","search_terms":"Sify Infinit Spaces' second campus in Noida, Uttar Pradesh, within a kilometre of its Noida 01 facility, is planned as three towers with a dedicated on-site 220 kV substation. Uttar Pradesh's chief minister inaugurated it in March 2025 as North India's largest AI-ready data center campus, with total capacity of more than 130 MW. Sify's October 2025 prospectus said only Tower B was operating, with 25.92 MW of built IT capacity of which 4.32 MW was installed at 30 June 2025; a July 2024 term loan funded development work. Noida 02 Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies Limited"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37108b4d9d3683d6451d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37108b4d9d3683d6451d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Indian Infrastructure"]},{"site_id":"vcc-site-2088ce1cae4288c3f3a1","name":"Sify Rabale data center campus (Mumbai 03), Navi Mumbai","country":"India","country_iso_a2":"IN","latitude":19.14417,"longitude":73.00861,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"c52dcc98-dfd2-5012-8703-5d9e24de51b2","name":"Sify Rabale data center campus (Mumbai 03), Navi Mumbai","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Sify Infinit Spaces' Rabale campus in the TTC Industrial Area, Navi Mumbai, one of its largest, is designed for 12 towers, of which five are operating. Sify's campus page gives 96.94 MW of IT power for them, the figure its October 2025 prospectus reports as built capacity at mid-2025. The hyperscale and AI-ready Tower 5, designed for 43.2 MW, came into service in the 2023-24 financial year and had 30.24 MW installed by June 2025. Sify's website gives more than 377 MW of IT power for the full campus. Towers 11 and 12 (38.88 MW together) were under construction in October 2025 at an estimated INR 11.3 billion, targeted for the year to March 2028. Rabale Data Center campus Mumbai 03 MUM03 Sify Infinit Spaces Limited Sify Infinit Spaces Limited"}],"status_publishers":["Sify Technologies"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2088ce1cae4288c3f3a1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2088ce1cae4288c3f3a1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Sify Technologies"]},{"site_id":"vcc-site-d6ba622d89bc8c560c44","name":"Site Layer 1 Data Center Project (near Playas, Grant County, New Mexico)","country":"United States","country_iso_a2":"US","latitude":31.980569,"longitude":-108.511384,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"060f2d39-9a85-5684-9349-2d84c3ee8ebc","name":"Site Layer 1 Data Center Project — proposed data centre of about 800 MW with 300 MW on-site gas-engine generation","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Site Layer 1, LLC (applicant), prepared by SWCA Environmental Consultants; published by the New Mexico Environment Department"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d6ba622d89bc8c560c44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d6ba622d89bc8c560c44.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Site Layer 1, LLC; New Mexico Environment Department Air Quality Bureau"]},{"site_id":"vcc-site-e8f2d5efccb035e9135a","name":"SK AI Data Center Ulsan","country":"Korea, Republic of","country_iso_a2":"KR","latitude":35.5392,"longitude":129.3119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-14","oldest_status_as_of":"2026-09-14","project_count":1,"projects":[{"project_id":"64f6ec20-7a91-530a-85f2-7748b0e320f8","name":"SK AI Data Center Ulsan","status":"under_construction","status_as_of":"2026-09-14","search_terms":"SK Telecom and other SK Group companies are building an AI data center with Amazon Web Services on a former SK Chemicals site in the Mipo National Industrial Complex in Ulsan, South Korea. Plans call for a first phase of about 41 MW by November 2027 and about 103 MW by February 2029, with up to 60,000 GPUs and a longer-term aim of gigawatt scale. Power is to come from a nearby LNG-fuelled cogeneration plant. Construction began with an August 2025 groundbreaking. In August 2026 SK Telecom agreed to move SK Broadband's data center business, including the Ulsan build, into a new company, SK Horizon, backed by KKR and an IMM-Stonebridge consortium, subject to approvals. SK-AWS Ulsan AI data center Ulsan AI data center SK Telecom SK Broadband SK Ecoplant Amazon Web Services SK Multi-Utility SK Gas Ulsan Metropolitan City SK Horizon"}],"status_publishers":["Light Reading"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e8f2d5efccb035e9135a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e8f2d5efccb035e9135a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AMCHAM Korea / The Chosun Daily"]},{"site_id":"vcc-site-daf4677b4e3a650b76af","name":"Skybox Hutto Data Center Campus","country":"United States","country_iso_a2":"US","latitude":30.5423689,"longitude":-97.5185559,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"b03ba807-95f4-5c54-9076-a7ce92a8f213","name":"Skybox Hutto Building 4 — core and shell","status":"announced","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-daf4677b4e3a650b76af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-daf4677b4e3a650b76af.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Williamson Central Appraisal District data)"]},{"site_id":"vcc-site-94d1b580090a69685f9f","name":"Skygard OSL1 Hovinbyen Campus","country":"Norway","country_iso_a2":"NO","latitude":59.9294098,"longitude":10.818104,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-16","oldest_status_as_of":"2026-06-16","project_count":1,"projects":[{"project_id":"5ae9f639-4de6-5ce4-af8d-a40d6f8a3bec","name":"Skygard OSL1 Phase 2","status":"under_construction","status_as_of":"2026-06-16","search_terms":""}],"status_publishers":["Sentia"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94d1b580090a69685f9f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94d1b580090a69685f9f.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Kartverket"]},{"site_id":"vcc-site-dcc0320aba1593cc57e4","name":"SNC PARAY DC Data Centre, Paray-Vieille-Poste (1 avenue du Maréchal Devaux)","country":"France","country_iso_a2":"FR","latitude":48.7449901,"longitude":2.3676222,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-14","oldest_status_as_of":"2026-08-14","project_count":1,"projects":[{"project_id":"d02f3aa7-edf2-55d8-9760-25990ac5a6dd","name":"SNC PARAY DC — planned 55 MW IT data centre (12 data halls, Hines) on the former Air France training site","status":"announced","status_as_of":"2026-08-14","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Île-de-France, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dcc0320aba1593cc57e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dcc0320aba1593cc57e4.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-6fc591eaf0edc175a75c","name":"SoftBank Hokkaido Tomakomai AI Data Center","country":"Japan","country_iso_a2":"JP","latitude":42.6341,"longitude":141.6055,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"c4cf35bd-5452-551f-8b1c-bb88d2f2b35b","name":"SoftBank Hokkaido Tomakomai AI Data Center","status":"under_construction","status_as_of":"2026-10-21","search_terms":"SoftBank Corp. and its subsidiary IDC Frontier are building a large AI data center in Tomakomai, Hokkaido, as the core site of SoftBank's Brain DataCenter concept. The plan, selected for a Japanese government regional data center subsidy in 2023, starts with a data center of about 50 MW, with receiving capacity expected to grow past 300 MW on a site of about 700,000 square meters. Ground was broken in April 2025 and SoftBank targets opening in fiscal 2026. The company intends to run the facility on renewable electricity sourced within Hokkaido. Core Brain Hokkaido Tomakomai Data Center SoftBank Corp. IDC Frontier Inc. Ministry of Economy, Trade and Industry (Japan) SB Power Corp. Hokkaido Electric Power Company"}],"status_publishers":["SoftBank Corp."],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6fc591eaf0edc175a75c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6fc591eaf0edc175a75c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Corp."]},{"site_id":"vcc-site-d9155165962c78be00da","name":"SoftBank Osaka Sakai AI data center","country":"Japan","country_iso_a2":"JP","latitude":34.596,"longitude":135.4333,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-23","oldest_status_as_of":"2026-06-23","project_count":1,"projects":[{"project_id":"75596cc6-0434-596d-be35-53be39de9c0a","name":"SoftBank Osaka Sakai AI data center","status":"under_construction","status_as_of":"2026-06-23","search_terms":"SoftBank Corp. is converting part of Sharp's former LCD panel plant in Sakai, Osaka into a large AI data center, reusing the plant's land, buildings, power and cooling infrastructure. SoftBank agreed in March 2025 to buy the land and buildings for about 100 billion yen, targeting operation of an initial phase of roughly 150 MW receiving capacity in 2026 and later expansion beyond 250 MW. In 2026 SoftBank described the site as under construction and as the planned home of GPU cloud and sovereign cloud services, alongside AI server assembly and battery manufacturing. Osaka Sakai Activation Base Sharp Sakai Plant AI data center SoftBank Corp. SoftBank Corp. OpenAI"}],"status_publishers":["SoftBank Corp. (SoftBank News)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d9155165962c78be00da/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d9155165962c78be00da.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Corp."]},{"site_id":"vcc-site-6bf2ad82353d1ed7d3c9","name":"SoftBank-Sesterce Bosquel AI data center","country":"France","country_iso_a2":"FR","latitude":49.7391,"longitude":2.2179,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-01","oldest_status_as_of":"2026-06-01","project_count":1,"projects":[{"project_id":"53a18106-0c3f-5249-8717-107230729abc","name":"SoftBank-Sesterce Bosquel AI data center","status":"announced","status_as_of":"2026-06-01","search_terms":"A joint venture majority-owned by SoftBank Group and formed with Sesterce was selected to develop and operate a 1 GW AI data center campus in Bosquel, Somme, in the Hauts-de-France region. Announced on 2026-05-30 as part of the 2026 Choose France summit, it is one of three named Hauts-de-France sites in SoftBank's 5 GW France plan. No investment figure, construction schedule or permit status has been published for the site; SoftBank cites about 400 long-term jobs once it operates. Bosquel AI campus SoftBank Group Sesterce Communauté de communes Somme Sud-Ouest"}],"status_publishers":["SoftBank Group"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bf2ad82353d1ed7d3c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bf2ad82353d1ed7d3c9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Group"]},{"site_id":"vcc-site-93ff129393312a14a668","name":"Soluna Project Kati Campus (Willacy County)","country":"United States","country_iso_a2":"US","latitude":26.3123281,"longitude":-97.5708302,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-09-08","project_count":2,"projects":[{"project_id":"f1ade294-dd89-5616-89ce-6e23caef22ad","name":"Soluna Project Kati 1 — 83 MW hosting data center","status":"operational","status_as_of":"2026-09-08","search_terms":""},{"project_id":"3c42e80a-600e-5850-a4cd-a86e5b8dc747","name":"Soluna Project Kati 2 AI data center (MFE-A-Kati2 Building 1)","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Soluna Holdings","Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-93ff129393312a14a668/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-93ff129393312a14a668.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Willacy County Appraisal District data)"]},{"site_id":"vcc-site-bea6bf727e581e987a62","name":"Spruce Lake AI Data Centre","country":"Canada","country_iso_a2":"CA","latitude":45.1837119,"longitude":-66.1763155,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"a1f83625-a411-5b1d-9d25-ea41862ebe9c","name":"Spruce Lake AI Data Centre — proposed campus and on-site generation","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["Impact Assessment Agency of Canada"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bea6bf727e581e987a62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bea6bf727e581e987a62.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; NB Department of Environment and Local Government; Internet Archive"]},{"site_id":"vcc-site-b414ed2a7f2e60f4b886","name":"STACK Bossier Highway 3 Technology Park Campus","country":"United States","country_iso_a2":"US","latitude":32.75561,"longitude":-93.73567,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"cbe074bd-68d8-59cb-aaf7-e21fa82b193f","name":"STACK Bossier Highway 3 Technology Park Current Campus Build","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["STACK Infrastructure"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b414ed2a7f2e60f4b886/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b414ed2a7f2e60f4b886.json","geometry_licenses":["all-rights-reserved","no-open-redistribution-license-asserted-for-applicant-map"],"geometry_attributions":["Adobe Systems Incorporated, Adobe Supplement to ISO 32000, BaseVersion 1.7, ExtensionLevel 3, June 2008","U.S. Army Corps of Engineers, Vicksburg District; Headwaters / Bohler Engineering applicant map"]},{"site_id":"vcc-site-4e8601c9f4fed3eb64dd","name":"STACK DFW02 Lancaster Campus","country":"United States","country_iso_a2":"US","latitude":32.5803857,"longitude":-96.7349196,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"1729ba44-3ca5-59b5-a297-d36205f72e48","name":"STACK DFW02B","status":"announced","status_as_of":"2026-10-05","search_terms":""}],"status_publishers":["Texas Department of Licensing and Regulation"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4e8601c9f4fed3eb64dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4e8601c9f4fed3eb64dd.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Dallas Central Appraisal District data)"]},{"site_id":"vcc-site-e6ad7f75be14475fcc3b","name":"STACK Infrastructure Berry Hill campus, Pittsylvania County","country":"United States","country_iso_a2":"US","latitude":36.82,"longitude":-79.4,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-07-27","oldest_status_as_of":"2026-07-27","project_count":1,"projects":[{"project_id":"e9f8645b-ff54-5ebb-8f6c-6c04dbc8d5e2","name":"STACK Infrastructure Berry Hill campus, Pittsylvania County","status":"announced","status_as_of":"2026-07-27","search_terms":"Hyperscale data center campus planned by STACK Infrastructure on about 2,990 acres of the Southern Virginia Megasite at Berry Hill in Pittsylvania County, Virginia. The Danville-Pittsylvania regional industrial authority approved the land sale in March 2026 at USD 238,000 an acre, about USD 720 million in all. WDBJ reported USD 73 billion of investment over 30 years in April 2026, and county supervisors backed a campus reported at USD 100 billion in July 2026. Appalachian Power will serve the site; the authority's chairman expects the first building to run by about July 2027, and full build-out could take 15 to 30 years. Berry Hill Data Center Southern Virginia Megasite at Berry Hill data center STACK Infrastructure Danville-Pittsylvania Regional Industrial Facility Authority Pittsylvania County Board of Supervisors Appalachian Power"}],"status_publishers":["WSET"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e6ad7f75be14475fcc3b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e6ad7f75be14475fcc3b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WDBJ7"]},{"site_id":"vcc-site-c5b814ddf09ef4e9b7e5","name":"STACK MIL05 Data Center Campus, Vignate (Via Galileo Galilei)","country":"Italy","country_iso_a2":"IT","latitude":45.5013038,"longitude":9.3698545,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"1087e250-4b6a-5a02-b653-75471ac7caa0","name":"MIL05 — planned 60 MW IT two-building data-centre campus (MIL05A and MIL05B; VIA decree DM 411/2026, ID_VIP 13497)","status":"announced","status_as_of":"2026-10-09","search_terms":""}],"status_publishers":["ARPA Lombardia (regional environmental protection agency), published on the MASE VA portal"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c5b814ddf09ef4e9b7e5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c5b814ddf09ef4e9b7e5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 5 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-a42091fba7617807a748","name":"STACK MIL07 Data Center, Siziano (Via Lombardia, Polo Logistico Siziano Nord)","country":"Italy","country_iso_a2":"IT","latitude":45.3256542,"longitude":9.2131573,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"f8363f47-86da-5113-ab8c-e9cc731f477b","name":"MIL07 — proposed 12 MW IT data centre replacing an existing industrial building (Data Center Stack Campus Siziano VIA, ID_VIP 14473)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["Istituto Superiore di Sanità, Dipartimento Ambiente e Salute (published on the MASE VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a42091fba7617807a748/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a42091fba7617807a748.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 2 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-787e06eb4fe56a1cf6c4","name":"STACK MIL08 Campus, Siziano (south of the SP40, Ambito ATC-PL1)","country":"Italy","country_iso_a2":"IT","latitude":45.3234652,"longitude":9.213723,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"f94d8a20-e1f8-5f5e-ada8-afa5e02ed5a1","name":"MIL08A — planned 20 MW IT data-centre building on the MIL08 campus (Data Center Stack Campus Siziano VIA, ID_VIP 14473)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["Istituto Superiore di Sanità, Dipartimento Ambiente e Salute (published on the MASE VA portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-787e06eb4fe56a1cf6c4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-787e06eb4fe56a1cf6c4.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Infrastructure Italia Land 2 S.r.l. / MASE Portale Valutazioni e Autorizzazioni Ambientali"]},{"site_id":"vcc-site-738cf13d66922745ecee","name":"STACK New Albany Campus (7300 and 7340 Souder Road)","country":"United States","country_iso_a2":"US","latitude":40.1064483,"longitude":-82.8021275,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-02","oldest_status_as_of":"2026-10-02","project_count":1,"projects":[{"project_id":"118f7c2f-6551-5a7a-bd51-51fe24d627cd","name":"Stack — new 332,089 sq ft data building (7340 Souder Road)","status":"announced","status_as_of":"2026-10-02","search_terms":""}],"status_publishers":["City of New Albany, Ohio"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-738cf13d66922745ecee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-738cf13d66922745ecee.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Franklin County Auditor"]},{"site_id":"vcc-site-c4804ef7941cded66b42","name":"STACK POR03 Hillsboro Campus (4735 NE Starr Blvd)","country":"United States","country_iso_a2":"US","latitude":45.5539075,"longitude":-122.9395716,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-27","oldest_status_as_of":"2026-08-27","project_count":1,"projects":[{"project_id":"c87b5961-740a-5004-8cd8-1522c2be045a","name":"STACK POR03 — existing data-centre operations (72 MW operational critical capacity)","status":"operational","status_as_of":"2026-08-27","search_terms":""}],"status_publishers":["STACK Infrastructure"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c4804ef7941cded66b42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c4804ef7941cded66b42.json","geometry_licenses":["RLIS Open Database End User License Agreement (https://rlisdiscovery.oregonmetro.gov/pages/open-database-license)"],"geometry_attributions":["Metro RLIS; Washington County Assessment and Taxation and City of Hillsboro source data"]},{"site_id":"vcc-site-61c0655ea44ae50a1cdf","name":"STACK Stafford Technology Campus (Eskimo Hill Road and Richmond Highway, Stafford County)","country":"United States","country_iso_a2":"US","latitude":38.3858401,"longitude":-77.4290772,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"a47c82aa-1fa6-51aa-83d4-aaeb9b2fcf87","name":"Stafford Technology Campus (STC) — data center campus in county site-plan review (rezoning RC23154931, proffer amendment RC25156486)","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Stafford County, Virginia (Board of Supervisors; meeting records on the county CivicClerk portal)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-61c0655ea44ae50a1cdf/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-61c0655ea44ae50a1cdf.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stafford County, Virginia"]},{"site_id":"vcc-site-92245ead9744ae6657fb","name":"STACK SYD01 Data Centre, Erskine Park","country":"Australia","country_iso_a2":"AU","latitude":-33.815188,"longitude":150.811826,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"c29f92cc-a75e-501c-b0b4-3d70713762a7","name":"STACK SYD01 Erskine Park — proposed two-building 450 MW data centre","status":"announced","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-92245ead9744ae6657fb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-92245ead9744ae6657fb.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"]},{"site_id":"vcc-site-00432e4e9c8e2d91ff76","name":"Stargate Milam County (SB Energy campus)","country":"United States","country_iso_a2":"US","latitude":30.7627,"longitude":-96.9982,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"316e6c68-21e0-50d1-973e-d4fa5847a99f","name":"Stargate Milam County (SB Energy campus)","status":"under_construction","status_as_of":"2026-10-01","search_terms":"A fast-build Stargate AI campus in Milam County, Texas, about 70 miles northeast of Austin, developed by SoftBank in partnership with OpenAI, with SoftBank's SB Energy providing the powered infrastructure. It was announced in September 2025 as one of two SoftBank sites that together could scale to 1.5 GW within about 18 months, and SoftBank said then that it was breaking ground. Analyst Epoch AI projects about 1.2 GW for this site, saw steel framing and roofing on the first building in March 2026 imagery, and cites state filings pointing to delivery of that building by October 2026. SB Energy plans to fund and build new generation and storage for most of the campus power. Stargate Milam County SoftBank Group OpenAI SB Energy SB Energy"}],"status_publishers":["SB Energy (Energy Global, LP), Milam Data Center site (Internet Archive copy)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-00432e4e9c8e2d91ff76/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-00432e4e9c8e2d91ff76.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Group Corp."]},{"site_id":"vcc-site-401adc8a0db451b1d581","name":"Stargate UAE / UAE-US AI Campus","country":"United Arab Emirates","country_iso_a2":"AE","latitude":24.3438,"longitude":55.1,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin1_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-13","oldest_status_as_of":"2026-08-13","project_count":1,"projects":[{"project_id":"4278fea3-2c31-5512-87d1-d713170569e2","name":"Stargate UAE / UAE-US AI Campus","status":"under_construction","status_as_of":"2026-08-13","search_terms":"A planned 5 GW AI data centre campus in Abu Dhabi, unveiled in May 2025 under a US-UAE technology partnership and led by G42. Its first 1 GW block, branded Stargate UAE, is being developed by G42 unit Khazna Data Centers, with OpenAI and Oracle named as operators and NVIDIA supplying GB300 systems. Construction of an initial 200 MW (two 100 MW buildings) was under way in 2026, with handover targeted for 2026; no completion dates have been given for the rest of the 1 GW cluster or the wider campus. A UAE minister put the cost at more than USD 30 billion in January 2026. Stargate UAE UAE-US AI Campus UAE–U.S. AI Campus G42 Khazna Data Centers OpenAI Oracle NVIDIA Cisco"}],"status_publishers":["G42 via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-401adc8a0db451b1d581/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-401adc8a0db451b1d581.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["G42"]},{"site_id":"vcc-site-fdb92bb99c36b43e6162","name":"Start Campus Sines Data Campus","country":"Portugal","country_iso_a2":"PT","latitude":37.93843247395192,"longitude":-8.805549690439344,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-06-23","project_count":2,"projects":[{"project_id":"94c0f50d-843b-57cd-bfcd-4bd3b7b9d9f0","name":"Start Campus SIN02 Current Facility Build","status":"under_construction","status_as_of":"2026-06-23","search_terms":""},{"project_id":"3a54ff50-0fd6-5767-86f2-c6818a515bb2","name":"Start Campus SINES data center campus","status":"partially_operational","status_as_of":"2026-10-21","search_terms":"Start Campus is building a six-building data center campus in Sines, Portugal, on a site with a decommissioned power plant, using seawater cooling. Grid power secured from REN gives the campus about 1.2 GW of IT capacity. The first building (SIN01) is in service and full; the much larger second building (SIN02) is under construction and is to be fully occupied by Nscale, which is deploying Nvidia systems for Microsoft. The full campus is targeted around 2030-2031. SINES DC SINES Data Campus Sines 4.0 Start Campus Start Campus Davidson Kempner Pioneer Point Partners Nscale Microsoft NVIDIA REN"}],"status_publishers":["Start Campus"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fdb92bb99c36b43e6162/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fdb92bb99c36b43e6162.json","geometry_licenses":["rights-status-uncertain-fact-extraction-only"],"geometry_attributions":["Agência Portuguesa do Ambiente; Start Campus / TPF project drawing"]},{"site_id":"vcc-site-eacfe2edf41e2fe22170","name":"Statesboro Burkhalter Road Data Center Site","country":"United States","country_iso_a2":"US","latitude":32.4014009,"longitude":-81.7531068,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"9dc79e44-df1f-503f-9fe4-d7b34f9668fc","name":"Statesboro Burkhalter Road proposed data center (4AM Development, RZ 26-07-05)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["City of Statesboro, Georgia"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eacfe2edf41e2fe22170/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eacfe2edf41e2fe22170.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Statesboro-Bulloch County GIS (stabull.org ArcGIS Server)"]},{"site_id":"vcc-site-8fbc644091f2917f0b12","name":"Sterling Technology Park Data Center Site (22400 Shaw Road, Sterling, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.9959385,"longitude":-77.4292182,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-21","oldest_status_as_of":"2026-10-21","project_count":1,"projects":[{"project_id":"5a5e6e4c-11ed-5284-b7e1-854e416eee2f","name":"Sterling Technology Park — proposed data center building with mechanical yards and guard booth (site plan EPLAN-2025-0027)","status":"announced","status_as_of":"2026-10-21","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8fbc644091f2917f0b12/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8fbc644091f2917f0b12.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-5f2c7f39622c2ec2ea03","name":"Stockland Aldington Road Data Centre, Kemps Creek","country":"Australia","country_iso_a2":"AU","latitude":-33.8375573,"longitude":150.8028279,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"9cd872c6-3a81-5ec9-9411-22f5c23204b8","name":"Aldington Road Data Centre — proposed two-building 360 MW IT campus","status":"announced","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["NSW Department of Planning, Housing and Infrastructure"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5f2c7f39622c2ec2ea03/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5f2c7f39622c2ec2ea03.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["NSW Spatial Services, Department of Customer Service"]},{"site_id":"vcc-site-78bd59a55f0376662286","name":"STT Fairview data center campus","country":"Philippines","country_iso_a2":"PH","latitude":14.65,"longitude":121.0475,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-04-20","oldest_status_as_of":"2026-04-20","project_count":1,"projects":[{"project_id":"b75df57e-ef16-50f9-b1d8-ae13bae596a5","name":"STT Fairview data center campus","status":"under_construction","status_as_of":"2026-04-20","search_terms":"STT GDC Philippines, a joint venture of Globe Telecom, Ayala Corporation and ST Telemedia Global Data Centres, is building a four-building carrier-neutral campus on Regalado Avenue in Fairview, Quezon City. Announced in May 2023, it is planned at 124 MW of IT load and over 83,000 square metres of floor space. The first building, STT Fairview 1, was designed for 28 MW of IT load and targeted for service in 2025, but in April 2026 the Philippine Star reported the campus would partly open during 2026 with an initial 12 MW and put the project's cost at USD 1 billion. A 10-year MPower renewable supply deal signed in April 2026 covers Fairview and the Cavite data center. STT Fairview STT Fairview 1 STT GDC Philippines (Globe STT GDC Inc.) STT GDC Philippines (Globe STT GDC Inc.) Globe Telecom Ayala Corporation ST Telemedia Global Data Centres Leighton Asia First Balfour MPower (Meralco)"}],"status_publishers":["The Philippine Star"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78bd59a55f0376662286/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78bd59a55f0376662286.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["W.Media"]},{"site_id":"vcc-site-eb73e734b6b086a24061","name":"STT Jaipur Sitapura Data Centre","country":"India","country_iso_a2":"IN","latitude":26.7717574,"longitude":75.84492469999999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-22","oldest_status_as_of":"2026-07-22","project_count":1,"projects":[{"project_id":"63159cf3-e7f3-5aa4-8f39-ca67a7ad7868","name":"STT Jaipur 1","status":"operational","status_as_of":"2026-07-22","search_terms":""}],"status_publishers":["ST Telemedia Global Data Centres (India)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-eb73e734b6b086a24061/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-eb73e734b6b086a24061.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-57a103a9de718a95ae14","name":"STT Jakarta Data Centre Campus","country":"Indonesia","country_iso_a2":"ID","latitude":-6.37400965,"longitude":107.20106675,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell","under_construction"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":3,"projects":[{"project_id":"aa93c84a-17d6-5092-bf57-686f7e1ab4a4","name":"STT Jakarta 3","status":"shell","status_as_of":"2026-06-10","search_terms":""},{"project_id":"42e50e84-873d-562d-b6d2-945ccf04b0e8","name":"STT Jakarta 5","status":"under_construction","status_as_of":"2026-06-10","search_terms":""},{"project_id":"e4e51c8d-a98e-50a4-ba16-0795f1f3f63a","name":"STT Jakarta 6","status":"under_construction","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["ST Telemedia Global Data Centres"],"power_observations":[{"project_id":"aa93c84a-17d6-5092-bf57-686f7e1ab4a4","metric":"critical_it_mw","stage":"planned","low":24.0,"base":24.0,"high":24.0,"unit":"MW","as_of_date":"2026-07-16"},{"project_id":"42e50e84-873d-562d-b6d2-945ccf04b0e8","metric":"critical_it_mw","stage":"planned","low":40.0,"base":40.0,"high":40.0,"unit":"MW","as_of_date":"2026-06-10"},{"project_id":"e4e51c8d-a98e-50a4-ba16-0795f1f3f63a","metric":"critical_it_mw","stage":"planned","low":40.0,"base":40.0,"high":40.0,"unit":"MW","as_of_date":"2026-06-10"}],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-57a103a9de718a95ae14/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-57a103a9de718a95ae14.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-93245fe3abcae4d63260","name":"STT Navi Mumbai Campus (TTC MIDC, Khairane)","country":"India","country_iso_a2":"IN","latitude":19.1055,"longitude":73.0188917,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-15","oldest_status_as_of":"2026-10-15","project_count":1,"projects":[{"project_id":"7e62957c-46b3-5c2a-920c-e773d8ce20c2","name":"STT Navi Mumbai — proposed further data-centre expansion (SEAC-2 statement 593234)","status":"announced","status_as_of":"2026-10-15","search_terms":""}],"status_publishers":["State Level Expert Appraisal Committee-2 (SEAC-2), Maharashtra; published on the Maharashtra Pollution Control Board's EC public-documents portal (ecmpcb.in)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-93245fe3abcae4d63260/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-93245fe3abcae4d63260.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["State Environment Impact Assessment Authority (SEIAA), Maharashtra; STT Global Data Centres India Private Limited"]},{"site_id":"vcc-site-5cc37fe61c7ab26237b3","name":"STT Tokyo Inzai Campus","country":"Japan","country_iso_a2":"JP","latitude":35.8173944,"longitude":140.134879,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-21","oldest_status_as_of":"2026-08-21","project_count":1,"projects":[{"project_id":"0315dd21-342a-5554-91d4-4441583837c7","name":"STT Tokyo 1 Existing Operations","status":"operational","status_as_of":"2026-08-21","search_terms":""}],"status_publishers":["ST Telemedia Global Data Centres"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5cc37fe61c7ab26237b3/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5cc37fe61c7ab26237b3.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-78cf6d7edfbb85373d07","name":"SUNeVision MEGA Fanling","country":"Hong Kong","country_iso_a2":"HK","latitude":22.4962578,"longitude":114.1444937,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"21459922-443b-59b7-b015-81e65cd313a8","name":"MEGA Fanling — existing commercial data-centre operations","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78cf6d7edfbb85373d07/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78cf6d7edfbb85373d07.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lands Department, Government of the Hong Kong SAR"]},{"site_id":"vcc-site-f89651a71f2a783cde44","name":"SUNeVision MEGA Gateway, Ma Kok Street, Tsuen Wan","country":"Hong Kong","country_iso_a2":"HK","latitude":22.3651306,"longitude":114.1190657,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"d619ed78-ed8b-56d3-acba-fcdb148c461e","name":"SUNeVision MEGA Gateway — operating data centre","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f89651a71f2a783cde44/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f89651a71f2a783cde44.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-a3cba6e8a69870f1cfeb","name":"SUNeVision MEGA IDC Tseung Kwan O","country":"Hong Kong","country_iso_a2":"HK","latitude":22.2941409,"longitude":114.2737231,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"1e18ab2f-4947-5e80-9287-96fe3e9012e1","name":"SUNeVision MEGA IDC — Phase One (Tower A) operations","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a3cba6e8a69870f1cfeb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a3cba6e8a69870f1cfeb.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-fcf3fd1e931edd6f079c","name":"SUNeVision MEGA Plus, Tseung Kwan O","country":"Hong Kong","country_iso_a2":"HK","latitude":22.29335,"longitude":114.27418,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"17dac59c-7ed3-5395-a5c6-7c8984ce5c3a","name":"MEGA Plus — existing commercial data-centre operations","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fcf3fd1e931edd6f079c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fcf3fd1e931edd6f079c.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Digital Policy Office, Government of the Hong Kong SAR"]},{"site_id":"vcc-site-5d1fd8fa895b3e7d8285","name":"SUNeVision MEGA Two, 8-12 Wong Chuk Yeung Street, Fo Tan","country":"Hong Kong","country_iso_a2":"HK","latitude":22.3979437,"longitude":114.1904977,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"ec9ecb30-41dc-523a-a7e2-ac3ab7fba81b","name":"SUNeVision MEGA Two — operating data centre","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5d1fd8fa895b3e7d8285/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5d1fd8fa895b3e7d8285.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-73671191cde6bfcb9b42","name":"SUNeVision MEGA-i, 399 Chai Wan Road, Chai Wan","country":"Hong Kong","country_iso_a2":"HK","latitude":22.2660964,"longitude":114.2465195,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"d3e640ef-5a6b-5e03-98b3-15ee3186b4a8","name":"SUNeVision MEGA-i — operating carrier-neutral connectivity-hub data centre","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["SUNeVision Holdings Ltd. via HKEXnews"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-73671191cde6bfcb9b42/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-73671191cde6bfcb9b42.json","geometry_licenses":["no-open-license-asserted"],"geometry_attributions":["Lands Department, HKSAR Government (CSDI)"]},{"site_id":"vcc-site-e3da5da9c1c1d3c08f33","name":"Switch Las Vegas NV LAS NAP 17 & 18 Data Center Site (6240 W Maule Ave)","country":"United States","country_iso_a2":"US","latitude":36.0648579,"longitude":-115.2278717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-21","project_count":2,"projects":[{"project_id":"b49b32ee-e208-58d9-9268-69313923e3de","name":"NV LAS NAP 17 & 18 site — single-storey closed-loop water-cooled data center (Clark County permit BD24-61043)","status":"under_construction","status_as_of":"2026-09-21","search_terms":""},{"project_id":"c45c5127-c960-573f-9f35-3d9e47752f17","name":"NV LAS NAP 17 — single-storey closed-loop water-cooled data center with office (Clark County permit BD25-00549)","status":"under_construction","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Clark County, Nevada (Department of Building and Fire Prevention GIS)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e3da5da9c1c1d3c08f33/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e3da5da9c1c1d3c08f33.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clark County Assessor, Nevada"]},{"site_id":"vcc-site-4c499d2dc9a7337b10dc","name":"Switch The Keep 2 Campus (Bates Road, Cartersville)","country":"United States","country_iso_a2":"US","latitude":34.1068851,"longitude":-84.7950835,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"961f2e3f-ca5e-52ae-a3e6-237e13026b3d","name":"Switch The Keep 2 Campus (Keep 2.0) — data-center campus under construction","status":"under_construction","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Bartow County, Georgia, Office of the County Administrator"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c499d2dc9a7337b10dc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c499d2dc9a7337b10dc.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Bartow County, Georgia, GIS Department"]},{"site_id":"vcc-site-7a7046b12f3789bb93a5","name":"Synapse Data Center (Olds)","country":"Canada","country_iso_a2":"CA","latitude":51.79278,"longitude":-114.10667,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"4a0d8f6f-b848-5650-a479-4f0caee97fa1","name":"Synapse Data Center (Olds)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Synapse Real Estate Corp. proposed a 1 GW AI data centre in the Town of Olds, Alberta, at the northeast corner of Highways 2A and 27, to be the sole user of a 1.4 GW on-site combined-cycle gas plant. The Alberta Utilities Commission rejected a first, deficient plant application in March 2026, and on 17 August 2026 it denied the application in proceeding 30732, finding the site unsuitable for the development. An environmental approval application with Alberta's environment ministry was still listed as in progress, and no development permit had been filed with the town. Synapse Data Center Project Synapse AI Data Center Olds Synapse Real Estate Corp. Town of Olds"}],"status_publishers":["Town of Olds"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7a7046b12f3789bb93a5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7a7046b12f3789bb93a5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Synapse Real Estate Corp. (hosted by the Town of Olds)"]},{"site_id":"vcc-site-750014b8b5fd122e94b8","name":"TADG ATL02 Ellenwood Data Center Site (4350 E Tanners Church Rd, Clayton County)","country":"United States","country_iso_a2":"US","latitude":33.6374056,"longitude":-84.3042936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"f8e0bbc0-781e-5484-a642-cd6d9795b858","name":"TADG ATL02 / Ellenwood — proposed data center (EPD proposed air permit, application 30104)","status":"announced","status_as_of":"2026-09-23","search_terms":""}],"status_publishers":["Georgia Environmental Protection Division, Air Protection Branch"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-750014b8b5fd122e94b8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-750014b8b5fd122e94b8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Clayton County, Georgia"]},{"site_id":"vcc-site-450769770dfe5ea908d6","name":"Taylor Technology Campus (Big Watt Digital and PowerHouse)","country":"United States","country_iso_a2":"US","latitude":30.5725,"longitude":-97.4167,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"8e72e640-c0e0-5e58-8a76-e53c011dcf92","name":"Taylor Technology Campus (Big Watt Digital and PowerHouse)","status":"proposed","status_as_of":"2026-10-09","search_terms":"Proposed 664-acre data center campus with an on-site power plant at 3301 Farm to Market Road 112, just outside Taylor in unincorporated Williamson County, Texas, developed by Big Watt Digital and PowerHouse Data Centers. Bisnow describes 500 MW of data center load with behind-the-meter generation and, citing the Austin Business Journal, says an unnamed tenant could add 500 MW. After withdrawing their annexation and zoning request in September 2026, the developers struck a deal letting the city regulate water use, noise and air quality, with reclaimed-water closed-loop cooling and about USD 28.2 million in community investments; the City Council approved it unanimously on 8 October 2026. Taylor Technology Campus Project Mustang Big Watt Digital PowerHouse Data Centers City of Taylor"}],"status_publishers":["KUT News"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-450769770dfe5ea908d6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-450769770dfe5ea908d6.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Bisnow"]},{"site_id":"vcc-site-b3a2be1a532755abcfa9","name":"TBC Partners Cambois data centre campus","country":"United Kingdom","country_iso_a2":"GB","latitude":55.1453,"longitude":-1.5309,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-08-18","oldest_status_as_of":"2026-08-18","project_count":1,"projects":[{"project_id":"81d20134-d073-5e0c-ad1c-7f8a97f2dadb","name":"TBC Partners Cambois data centre campus","status":"proposed","status_as_of":"2026-08-18","search_terms":"TBC Partners, a UK joint family office focused on energy transition and impact investments, said in January 2025 it had started developing data centres at Blyth and Didcot, describing them as two 300 MW projects with procured demand connections. In August 2026 it asked Northumberland County Council for a screening opinion on whether an environmental impact assessment is needed for a campus of about 12 hectares on Factory Road, Cambois, near the QTS campus. Construction would take about two years, with occupation and operation intended between 2030 and 2035. A full planning application had not been filed. TBC Partners Blyth data centre TBC Partners Northumberland County Council"}],"status_publishers":["BeBeez International (republishing DatacenterDynamics)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b3a2be1a532755abcfa9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b3a2be1a532755abcfa9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["BeBeez International (republishing DatacenterDynamics)"]},{"site_id":"vcc-site-23fd4beb18c498caa043","name":"TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)","country":"India","country_iso_a2":"IN","latitude":17.3617,"longitude":78.4747,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"0d75be4c-1fff-5854-895c-71aef25eff11","name":"TCS HyperVault AI data center campus, Bharat Future City (Hyderabad)","status":"announced","status_as_of":"2026-09-09","search_terms":"HyperVault AI Data Center Limited, the data center subsidiary of Tata Consultancy Services, announced on 5 September 2026 that it had secured 264 acres in Hyderabad, Telangana, for an AI campus of up to 1 GW, with HyperVault and its partners expected to invest up to Rs 70,000 crore over the build-out. The site is in Bharat Future City on Hyderabad's southern outskirts. Construction will be phased to customer demand, and Telangana's chief minister asked for the campus to open by 2 June 2028. TPG agreed in November 2025 to take a 27.5 to 49 percent stake in HyperVault. HyperVault Hyderabad HyperVault Bharat Future City HyperVault AI Data Center Limited Tata Consultancy Services TPG Government of Telangana"}],"status_publishers":["The Arabian Post"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-23fd4beb18c498caa043/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-23fd4beb18c498caa043.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["The Arabian Post"]},{"site_id":"vcc-site-706911d0aa8c08ae8387","name":"Techno Digital Chennai Campus (SIPCOT Siruseri)","country":"India","country_iso_a2":"IN","latitude":12.823080099999999,"longitude":80.2139752,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"d3a4de34-06f6-5b37-9452-7c390cdf72b1","name":"Techno Digital Chennai Phase 1","status":"operational","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Techno Electric & Engineering Company Limited"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-706911d0aa8c08ae8387/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-706911d0aa8c08ae8387.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-63daf0f8749544e0e6f4","name":"TECRA Ome Takinouecho","country":"Japan","country_iso_a2":"JP","latitude":35.78761111111111,"longitude":139.25694444444446,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-15","oldest_status_as_of":"2026-09-15","project_count":1,"projects":[{"project_id":"510a8216-64d9-5626-992a-3ca10f40fb90","name":"OME Data Center07 / DC5 Building B","status":"permitted","status_as_of":"2026-09-15","search_terms":""}],"status_publishers":["TECRA / TECROWD"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-63daf0f8749544e0e6f4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-63daf0f8749544e0e6f4.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["TECRA / TECROWD"]},{"site_id":"vcc-site-4d39b5b9701e6327b926","name":"Telecom Egypt RDH2 Smart Village Campus","country":"Egypt","country_iso_a2":"EG","latitude":30.07671059884446,"longitude":31.021793794673577,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["host_estate_context"],"statuses":["commissioning"],"newest_status_as_of":"2026-06-10","oldest_status_as_of":"2026-06-10","project_count":1,"projects":[{"project_id":"35c427dc-af95-5011-b3ab-3fa7c90fcb30","name":"Telecom Egypt Regional Data Hub 2","status":"commissioning","status_as_of":"2026-06-10","search_terms":""}],"status_publishers":["TAB Egypt"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_host_estate_context_only","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4d39b5b9701e6327b926/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4d39b5b9701e6327b926.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0"],"geometry_attributions":["Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL).","Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL). Extract by Geofabrik GmbH.","OpenStreetMap Wiki contributors"]},{"site_id":"vcc-site-ef1b8d8c8c3eaaae3590","name":"Telehouse Frankfurt Campus (Kleyerstraße 75-87, Frankfurt-Gallus)","country":"Germany","country_iso_a2":"DE","latitude":50.0964652,"longitude":8.6290298,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-01","oldest_status_as_of":"2026-09-01","project_count":1,"projects":[{"project_id":"07b70245-b1c8-537d-a34e-942ff872179e","name":"Telehouse Frankfurt Building N — new 3.6 MW IT data centre","status":"operational","status_as_of":"2026-09-01","search_terms":""}],"status_publishers":["Telehouse (Telehouse France, KDDI group)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ef1b8d8c8c3eaaae3590/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ef1b8d8c8c3eaaae3590.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Stadt Frankfurt am Main"]},{"site_id":"vcc-site-a6106441f8e729be2cfb","name":"Telehouse London Docklands Campus (Docklands Technical Centres)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.511702,"longitude":-0.001647,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","permitted"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-07-28","project_count":2,"projects":[{"project_id":"008b38ef-1e00-52ff-a1de-93052f497631","name":"Telehouse Docklands Existing Operations (North, North Two, East, West and South)","status":"operational","status_as_of":"2026-07-28","search_terms":""},{"project_id":"4859b078-9ad6-5b08-a0d6-a17e57e53d58","name":"Telehouse West 2 (TW2) Data Centre","status":"permitted","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Greater London Authority (London Planning Datahub; record supplied by the London Borough of Tower Hamlets)","Telehouse International Corporation of Europe Ltd (prepared by SLR Consulting), published by the Environment Agency"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a6106441f8e729be2cfb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a6106441f8e729be2cfb.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Telehouse International Corporation of Europe Ltd via Environment Agency consultation"]},{"site_id":"vcc-site-0d9ae5c2942c7b4ce1ae","name":"Telehouse TH3 Paris Magny Campus, Magny-les-Hameaux (1 rue Pablo Picasso)","country":"France","country_iso_a2":"FR","latitude":48.7262938,"longitude":2.0781628,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced","operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-08-18","project_count":2,"projects":[{"project_id":"75647386-a565-5e5c-aca2-077a496cb7bf","name":"Telehouse TH3 Paris Magny — campus data-centre operations (23 MW available after the new 3 MW AI module)","status":"operational","status_as_of":"2026-10-20","search_terms":""},{"project_id":"dfd189fd-bad0-55a0-bbf5-3890969906f7","name":"Telehouse TH3 Paris Magny — new P34 data-centre building (extension under environmental-authorisation and building-permit review, PC 078 356 26 E0004)","status":"announced","status_as_of":"2026-08-18","search_terms":""}],"status_publishers":["Mission régionale d'autorité environnementale (MRAe) Île-de-France, IGEDD; published on the Ministère de la Transition écologique, portail de l'évaluation environnementale","Telehouse France"],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0d9ae5c2942c7b4ce1ae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0d9ae5c2942c7b4ce1ae.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["IGN API Carto / DGFiP cadastre"]},{"site_id":"vcc-site-5da88d035bad0f411f53","name":"Telia Vilnius Data Center","country":"Lithuania","country_iso_a2":"LT","latitude":54.78225305550157,"longitude":25.1830592146347,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"1cae5b48-c630-5f16-9fe2-5d77571cafe9","name":"Telia New Vilnius Data Center","status":"under_construction","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Telia Lietuva, AB"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-5da88d035bad0f411f53/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-5da88d035bad0f411f53.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["Contains information from OpenStreetMap, which is made available under the Open Database License (ODbL)."]},{"site_id":"vcc-site-10c105346f5cad5b0aa5","name":"Ten Brinke Spata Data Center","country":"Greece","country_iso_a2":"GR","latitude":37.96626241294147,"longitude":23.90870178233002,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-21","oldest_status_as_of":"2026-07-21","project_count":1,"projects":[{"project_id":"38033ec9-dbd8-56bb-8a35-0fa91dd284e2","name":"Ten Brinke Spata Data Center Active Construction","status":"under_construction","status_as_of":"2026-07-21","search_terms":""}],"status_publishers":["Ten Brinke Group"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-10c105346f5cad5b0aa5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-10c105346f5cad5b0aa5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Ten Brinke Group"]},{"site_id":"vcc-site-b949024c94d2f75d1cf9","name":"Tencent Huailai Ruibei Cloud Data Center, Cunrui, Huailai","country":"China","country_iso_a2":"CN","latitude":40.48588,"longitude":115.56318,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-08-10","oldest_status_as_of":"2026-08-10","project_count":1,"projects":[{"project_id":"caa1772a-058d-55fc-93a8-4323fc0510c6","name":"Tencent Huailai Ruibei Cloud Data Center (腾讯怀来瑞北云数据中心) — existing data-centre buildings 1#-8# and 9# complex building","status":"completed","status_as_of":"2026-08-10","search_terms":""}],"status_publishers":["Huailai County Spatial Planning Committee Office / Huailai County Natural Resources and Planning Bureau (怀来县国土空间规划委员会办公室 / 怀来县自然资源和规划局), on the Huailai County People's Government portal"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b949024c94d2f75d1cf9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b949024c94d2f75d1cf9.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Huailai County People's Government (怀来县人民政府), www.huailai.gov.cn"]},{"site_id":"vcc-site-2a7b2edfacb6958b2186","name":"Teraco CT1 Data Centre","country":"South Africa","country_iso_a2":"ZA","latitude":-33.9712,"longitude":18.4649,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational","under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-07-17","project_count":2,"projects":[{"project_id":"59a74e45-2dd2-5204-9c65-5430e8fc3148","name":"Teraco CT1 Rondebosch Expansion","status":"under_construction","status_as_of":"2026-07-17","search_terms":""},{"project_id":"c022a853-b68d-5ba2-a87a-dd32b06dbba9","name":"Teraco CT1 Rondebosch — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco","Teraco (a Digital Realty company)"],"power_observations":[{"project_id":"59a74e45-2dd2-5204-9c65-5430e8fc3148","metric":"critical_it_mw","stage":"planned","low":2.0,"base":2.0,"high":2.0,"unit":"MW","as_of_date":"2026-07-17"}],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-2a7b2edfacb6958b2186/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-2a7b2edfacb6958b2186.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco"]},{"site_id":"vcc-site-a9170c09db3573456c17","name":"Teraco CT2 Brackenfell Data Centre","country":"South Africa","country_iso_a2":"ZA","latitude":-33.907417,"longitude":18.67936,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"89da6df7-9c41-5609-ab66-a4f1bb7b6623","name":"Teraco CT2 Brackenfell — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco (a Digital Realty company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a9170c09db3573456c17/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a9170c09db3573456c17.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco (a Digital Realty company)"]},{"site_id":"vcc-site-25872ac9c60d97c88f74","name":"Teraco DB1 Durban Data Centre (Riverhorse Valley)","country":"South Africa","country_iso_a2":"ZA","latitude":-29.7785429,"longitude":30.9918355,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"1cf35763-8794-55da-96d8-c2c215079ace","name":"Teraco DB1 Durban — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco (a Digital Realty company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25872ac9c60d97c88f74/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25872ac9c60d97c88f74.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco (a Digital Realty company)"]},{"site_id":"vcc-site-54dcd527d1f07416946a","name":"Teraco Isando Campus (JB1, JB3, JB5)","country":"South Africa","country_iso_a2":"ZA","latitude":-26.138,"longitude":28.19802,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"0c789c43-9b86-5719-a05c-dc9b8fea735e","name":"Teraco Isando Campus — JB1 East and West, JB3 and JB5 data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco (a Digital Realty company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54dcd527d1f07416946a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54dcd527d1f07416946a.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco (a Digital Realty company)"]},{"site_id":"vcc-site-88cc0a6da3285e4071ff","name":"Teraco JB2 Bredell Data Centre","country":"South Africa","country_iso_a2":"ZA","latitude":-26.0751953,"longitude":28.2783355,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"8288de6b-ae71-5d5b-89bf-d77af67a7a45","name":"Teraco JB2 Bredell — existing data-centre operations","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco (a Digital Realty company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88cc0a6da3285e4071ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88cc0a6da3285e4071ff.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco (a Digital Realty company)"]},{"site_id":"vcc-site-0066c0fc0f857cecd398","name":"Teraco JB4 Bredell Data Centre","country":"South Africa","country_iso_a2":"ZA","latitude":-26.0250175,"longitude":28.2697322,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"cccd9b86-ddbc-586e-bed3-68e3637a9586","name":"Teraco JB4 Bredell — existing data-centre operations (2022 build and 2025 expansion)","status":"operational","status_as_of":"2026-09-28","search_terms":""}],"status_publishers":["Teraco (a Digital Realty company)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0066c0fc0f857cecd398/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0066c0fc0f857cecd398.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Teraco (a Digital Realty company)"]},{"site_id":"vcc-site-6a1efb9a8859fd17aa59","name":"TeraWulf Chesapeake Data Campus (Morgantown)","country":"United States","country_iso_a2":"US","latitude":38.3453,"longitude":-76.9711,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"eb75ea0d-8dba-56a1-a956-135227b3d6e6","name":"TeraWulf Chesapeake Data Campus (Morgantown)","status":"proposed","status_as_of":"2026-08-05","search_terms":"TeraWulf plan to buy the Morgantown Generating Station on the Potomac River in Charles County, Maryland, from GenOn and redevelop it as a data campus with on-site power. The former coal plant, whose coal boilers retired in 2022, now runs about 210 to 220 MW of oil-fired units. TeraWulf proposes restarting it on natural gas and adding battery storage to support up to 1 GW of data center load on about 250 buildable acres, starting with about 500 MW. FERC approved the sale in July 2026 and TeraWulf contemplates first data center operations in 2030, but Charles County zoning does not yet allow data centers. Chesapeake Data Campus Chesapeake Data Morgantown Generating Station redevelopment TeraWulf GenOn Holdings"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6a1efb9a8859fd17aa59/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6a1efb9a8859fd17aa59.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-dbe568d910290db51ead","name":"TeraWulf Justified Data campus (Hawesville)","country":"United States","country_iso_a2":"US","latitude":37.9011,"longitude":-86.7494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-24","oldest_status_as_of":"2026-08-24","project_count":1,"projects":[{"project_id":"9dbfd718-7b41-58b1-bb46-0138b96aeca8","name":"TeraWulf Justified Data campus (Hawesville)","status":"announced","status_as_of":"2026-08-24","search_terms":"TeraWulf is redeveloping the former Century Aluminum facility at Hawesville, Kentucky, acquired in early 2026, into an AI data center campus with more than 250 buildable acres, an energized on-site substation and about 480 MW of available power. In July 2026 Anthropic signed a 20-year lease for about 401 MW of critical IT load, expected to bring about $19 billion of rent over the initial term. Kentucky regulators approved a retail electric service agreement of up to 482 MW in August 2026. TeraWulf targets initial capacity in the second half of 2027 and the full 401 MW by early 2028. Justified Data Campus TeraWulf TeraWulf Anthropic Big Rivers Electric Corporation Kenergy Corp. Kentucky Public Service Commission"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dbe568d910290db51ead.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-a291a33ca480670cccf1","name":"TeraWulf Lake Hawkeye data campus","country":"United States","country_iso_a2":"US","latitude":42.5658,"longitude":-76.5319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":1,"projects":[{"project_id":"2e14f098-9798-567b-ae40-a7d552f9be18","name":"TeraWulf Lake Hawkeye data campus","status":"announced","status_as_of":"2026-08-05","search_terms":"TeraWulf plan to redevelop about 183 leased acres of the former coal-fired Cayuga power plant site on Cayuga Lake in Lansing, Tompkins County, New York, into a high-performance computing campus. Its 80-year ground lease, announced in August 2025, gives exclusive rights to develop up to 400 MW, and TeraWulf first expected 138 MW online in late 2026. That timeline slipped: the project was in town site plan review in May 2026, faced county and resident opposition, and by August 2026 TeraWulf called it a longer-term redevelopment of about 400 MW gross, 320 MW of critical IT load, with operations not expected before about 2029. Cayuga site Lake Hawkeye TeraWulf Cayuga Operating Company Tompkins County"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a291a33ca480670cccf1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a291a33ca480670cccf1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-88b1acf055e1ab6200e4","name":"TeraWulf Lake Mariner Data Campus","country":"United States","country_iso_a2":"US","latitude":43.348937013719,"longitude":-78.602908090738,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational","under_construction"],"newest_status_as_of":"2026-08-05","oldest_status_as_of":"2026-08-05","project_count":2,"projects":[{"project_id":"6b11de63-a6b0-5513-87a1-b77ff3b71bfb","name":"Lake Mariner CB-5 Current Build","status":"under_construction","status_as_of":"2026-08-05","search_terms":""},{"project_id":"e389cd04-b538-5729-85a5-8e0b18e78002","name":"TeraWulf Lake Mariner data campus","status":"partially_operational","status_as_of":"2026-08-05","search_terms":"TeraWulf campus on the site of a retired coal-fired power plant in Barker, New York, that began operating in 2022, has hosted bitcoin mining and is being expanded for high-performance computing for AI. TeraWulf has leased 60 MW of critical IT load to Core42 and about 378 MW to Fluidstack, whose lease obligations carry Google credit support. About 102 MW of HPC capacity was earning revenue after building CB-3 was delivered in July 2026, while CB-4 and CB-5 (336 MW combined) were under construction. TeraWulf cites about 500 MW of near-term gross capacity and potential to reach about 750 MW. Lake Mariner Data Campus TeraWulf TeraWulf Fluidstack Core42 New York Power Authority"}],"status_publishers":["TeraWulf","TeraWulf Inc."],"power_observations":[],"verification_posture":"mixed_review_postures","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-88b1acf055e1ab6200e4/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-88b1acf055e1ab6200e4.json","geometry_licenses":["no-open-redistribution-license-asserted"],"geometry_attributions":["U.S. Census Bureau"]},{"site_id":"vcc-site-133b0abe4851d7ed6df5","name":"TeraWulf Muskie Data Campus","country":"United States","country_iso_a2":"US","latitude":38.36,"longitude":-82.69,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"7a5658df-f9c8-55e3-8623-b1a0fa40ce1d","name":"TeraWulf Muskie Data Campus","status":"announced","status_as_of":"2026-10-05","search_terms":"TeraWulf AI and HPC campus in the EastPark Industrial Park in northeast Kentucky, near Ashland on the Boyd and Greenup county line, bought from Industrial Equity Partners in May 2026 with about 285 acres owned or controlled (308 acres per its August release). Kentucky Power, an AEP company, is building a 765/345 kV substation to serve it. In October 2026 TeraWulf raised contracted power to 1 GW under an amended service agreement: the first 500 MW is due to start ramping in 2028 and the second 500 MW was pulled forward to 2029, subject to state regulatory approval. TeraWulf is studying up to 2 GW; no tenant has been named. Muskie Data Campus TeraWulf TeraWulf Kentucky Power"}],"status_publishers":["TeraWulf"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-133b0abe4851d7ed6df5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-133b0abe4851d7ed6df5.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},{"site_id":"vcc-site-c2bcc9c77043eec23331","name":"Terranova Campinas data centre campus","country":"Brazil","country_iso_a2":"BR","latitude":-22.82778,"longitude":-47.07972,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-08-26","oldest_status_as_of":"2026-08-26","project_count":1,"projects":[{"project_id":"f533639a-f574-566d-a780-db81daa4b78c","name":"Terranova Campinas data centre campus","status":"announced","status_as_of":"2026-08-26","search_terms":"Terranova, a Latin American hyperscale platform backed by investor Actis, plans an AI and cloud data centre campus on about 944,000 square metres at Fazenda Pau D'Alho in Barão Geraldo, Campinas, inside the city's PIDS innovation zone. Phase 1 is planned at 216 MW of IT load, expandable to 386 MW, with an initial investment reported locally at about BRL 5 billion that could reach BRL 20 billion. Grid access for 300 MW was authorised in December 2025 and a substation is due to be energised in December 2027. Trade press reported construction starting in August 2026, but the city said the permits issued covered only a substation; local politicians asked prosecutors to review the licensing. Terranova Campus Campinas Campus Campinas Terranova Actis Prefeitura de Campinas"}],"status_publishers":["Correio da Manhã"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c2bcc9c77043eec23331/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c2bcc9c77043eec23331.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Construction Review Online"]},{"site_id":"vcc-site-3a91e1c2ee3ef8dbd116","name":"Terranova Praia Grande data center campus (proposed)","country":"Brazil","country_iso_a2":"BR","latitude":-24.00611,"longitude":-46.40278,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["proposed"],"newest_status_as_of":"2026-08-25","oldest_status_as_of":"2026-08-25","project_count":1,"projects":[{"project_id":"3fc18374-cbc2-5a11-9356-ab751ac3820c","name":"Terranova Praia Grande data center campus (proposed)","status":"proposed","status_as_of":"2026-08-25","search_terms":"Terranova, an Actis-backed Latin American hyperscale data center platform, has proposed a campus on a site of about one million square metres in Praia Grande on the São Paulo coast, close to the city's submarine cable landing point. It holds a land-control contract and has asked Brazil's grid operator ONS for 450 MW of grid access; the land purchase will close only if ONS approves. In February 2026 Terranova's chief executive estimated a first phase of roughly 350 MW of IT capacity. No investment figure or construction timeline has been disclosed, and an August 2026 report still described the purchase as awaiting ONS approval. Terranova Actis"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3a91e1c2ee3ef8dbd116/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3a91e1c2ee3ef8dbd116.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TELETIME"]},{"site_id":"vcc-site-50ba6e2d0f69faaff629","name":"Teton Digital Black Bear power and data centre campus (Swan Hills)","country":"Canada","country_iso_a2":"CA","latitude":54.532535,"longitude":-115.57319,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["proposed"],"newest_status_as_of":"2026-09-23","oldest_status_as_of":"2026-09-23","project_count":1,"projects":[{"project_id":"b10fbc1b-2689-5864-989c-b36b13abb9ad","name":"Teton Digital Black Bear power and data centre campus (Swan Hills)","status":"proposed","status_as_of":"2026-09-23","search_terms":"Proposed gas-powered data centre campus on Crown land about 19 km south of Swan Hills, Alberta, in Big Lakes County. Kiwetinohk Energy first proposed the roughly 460 MW Black Bear combined-cycle plant in 2024 and received a federal decision that no impact assessment was needed; Teton Digital has since taken it up as the power source for about 1,500 acres of adjacent data centre land. Teton describes a 466 MW first phase with a path to about 3 GW, compute online as early as 2027 using grid power, and the full plant running in Q3 2028. Alberta's project inventory lists it as proposed. Black Bear Power Project Black Bear Power Plant Project Black Bear Teton Digital Kiwetinohk Energy Corp. Big Lakes County"}],"status_publishers":["Teton Digital"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-50ba6e2d0f69faaff629/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-50ba6e2d0f69faaff629.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Kiwetinohk Energy Corp. (filed with the Impact Assessment Agency of Canada)"]},{"site_id":"vcc-site-49244be6634ceff5f4e2","name":"Texas Critical Data Centers (TCDC) campus, Ector County (Odessa)","country":"United States","country_iso_a2":"US","latitude":31.8350404,"longitude":-102.3049819,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-21","oldest_status_as_of":"2026-09-21","project_count":1,"projects":[{"project_id":"4efddf17-f1a1-5387-9bfb-b4ba18006563","name":"Texas Critical Data Centers (TCDC) Phase 1 — planned AI data-centre phase of about 200 MW (20-year Vistra PPA)","status":"announced","status_as_of":"2026-09-21","search_terms":""}],"status_publishers":["New Era Energy & Digital, Inc."],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-49244be6634ceff5f4e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-49244be6634ceff5f4e2.json","geometry_licenses":["public-use-as-is"],"geometry_attributions":["Texas Geographic Information Office, StratMap Land Parcels (Ector Appraisal District data)"]},{"site_id":"vcc-site-249f52c31025c0aa2ef2","name":"The Barn Stargate Data Center Campus","country":"United States","country_iso_a2":"US","latitude":42.1239264,"longitude":-83.88208795,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-28","oldest_status_as_of":"2026-09-28","project_count":1,"projects":[{"project_id":"7d936c4e-29f2-592f-984b-61f5d6367fc8","name":"The Barn Stargate Current Data Center Build","status":"under_construction","status_as_of":"2026-09-28","search_terms":"Related Digital is building The Barn, a 250-acre campus of three single-story buildings in Saline Township, Michigan, exclusively for Oracle, serving OpenAI under the Oracle-OpenAI Stargate expansion. Announced in October 2025 at more than 1 GW, it is described in later coverage as 1.4 GW. DTE Energy is to supply all power, alongside new battery storage paid for by the project. State regulators approved DTE's contracts for the campus in December 2025. In June 2026 the partners marked construction with all buildings under way and the first nearing completion. Walbridge is general contractor; financing mixes Related Digital and Blackstone-affiliated equity with PIMCO-anchored debt. The Barn Stargate Michigan Related Digital Saline Township Related Digital Related Digital Oracle OpenAI Walbridge Blackstone PIMCO DTE Energy Michigan Public Service Commission"}],"status_publishers":["Oracle"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-249f52c31025c0aa2ef2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-249f52c31025c0aa2ef2.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},{"site_id":"vcc-site-c6817507c9eea2ac2529","name":"The HIVE Hybrid Data Center, Bridgetowne East, Pasig","country":"Philippines","country_iso_a2":"PH","latitude":14.5951583,"longitude":121.08690469999999,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"8f7c86c2-3ba8-574a-8bb4-577deaad91fc","name":"The HIVE Hybrid Data Center — operating data centre","status":"operational","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Guangzhou BodaData Technology Co., Ltd. (BodaData)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c6817507c9eea2ac2529/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c6817507c9eea2ac2529.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-fa0e11213234b0fa5fb5","name":"Thistle Landing Data Center (4801 E Thistle Landing Dr, Phoenix, Arizona)","country":"United States","country_iso_a2":"US","latitude":33.3107821,"longitude":-111.9781237,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"77233822-fd54-5bdd-8756-262d0370c049","name":"Thistle Landing Data Center — data-centre campus with Buildings 1, 2 and 5 (City of Phoenix project 23-1632)","status":"announced","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["City of Phoenix, Arizona (Planning and Development Department)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fa0e11213234b0fa5fb5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fa0e11213234b0fa5fb5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Maricopa County Assessor’s Office"]},{"site_id":"vcc-site-7830f1806bf63c514962","name":"TierPoint Bethlehem (BET) Data Center (3864 Courtney Street, Suite 130, Hanover Township, Northampton County, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.6702124,"longitude":-75.3745128,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"53090dd1-d4e9-53d2-82bf-084376c47e01","name":"TierPoint Bethlehem (BET) — existing data-centre and colocation operations (Suite 130)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7830f1806bf63c514962/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7830f1806bf63c514962.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Northampton County GIS Division; Northampton County Assessment Office; City of Bethlehem GIS"]},{"site_id":"vcc-site-074984ad2c3736a6f825","name":"TierPoint Charlotte - Center Park (CL4) Data Center, 1805 Center Park Drive, Charlotte","country":"United States","country_iso_a2":"US","latitude":35.1733241,"longitude":-80.9281546,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"473ad44e-d96c-5f0a-867c-0396b1a033e3","name":"TierPoint Charlotte - Center Park (CL4) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-074984ad2c3736a6f825/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-074984ad2c3736a6f825.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Mecklenburg County, North Carolina"]},{"site_id":"vcc-site-c02fc236120aed55d288","name":"TierPoint Charlotte - North Myers (CL2) Data Center, 125 North Myers Street, Charlotte","country":"United States","country_iso_a2":"US","latitude":35.222086,"longitude":-80.8352553,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"d4384c13-f8d9-5575-a5b4-eb46e81c517a","name":"TierPoint Charlotte - North Myers (CL2) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c02fc236120aed55d288/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c02fc236120aed55d288.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Mecklenburg County, North Carolina"]},{"site_id":"vcc-site-c20d15844afd43f823f9","name":"TierPoint Chicago - Polk St. Data Center, 601 W Polk St","country":"United States","country_iso_a2":"US","latitude":41.8715974,"longitude":-87.643067,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"6c9f7220-133e-59b3-b2d7-ea0f186a20e7","name":"TierPoint Chicago (Polk St.) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c20d15844afd43f823f9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c20d15844afd43f823f9.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Cook County Assessor's Office (Cook County Open Data)"]},{"site_id":"vcc-site-34901bbf39b3b6b94f30","name":"TierPoint Lehigh Valley (LVQ) Data Center (3949 Schelden Circle, Hanover Township, Northampton County, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.6749465,"longitude":-75.3782292,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"6aad999f-6edb-5a38-96d0-ae3afd9036b6","name":"TierPoint Lehigh Valley (LVQ) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-34901bbf39b3b6b94f30/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-34901bbf39b3b6b94f30.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Northampton County GIS Division; Northampton County Assessment Office; City of Bethlehem GIS"]},{"site_id":"vcc-site-d31a8a141bdf3a8c0a86","name":"TierPoint Little Rock (LIT) Data Center, 15707 Chenal Parkway","country":"United States","country_iso_a2":"US","latitude":34.7562277,"longitude":-92.4447834,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"5590ea6f-f859-5d11-9161-e6b1fefa695a","name":"TierPoint Little Rock (LIT) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d31a8a141bdf3a8c0a86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d31a8a141bdf3a8c0a86.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["PAGIS, APPS/OperationalLayers MapServer, Parcels layer"]},{"site_id":"vcc-site-de9d5aa298d1800645ef","name":"TierPoint Milwaukee (MKE) Data Center, 3701 W. Burnham Street","country":"United States","country_iso_a2":"US","latitude":43.0094774,"longitude":-87.9610752,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"52ee15bf-0cfe-5da1-86a3-c49de7d9ac58","name":"TierPoint Milwaukee (MKE) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-de9d5aa298d1800645ef/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-de9d5aa298d1800645ef.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Milwaukee County Land Information Office"]},{"site_id":"vcc-site-738448e9fca81d322f19","name":"TierPoint Nashville (NSH) Data Center, 311 Eddy Lane, Franklin","country":"United States","country_iso_a2":"US","latitude":35.9241061,"longitude":-86.8553352,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"9201712c-dde7-542a-9a7d-6de8cbd78ab3","name":"TierPoint Nashville (NSH) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-738448e9fca81d322f19/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-738448e9fca81d322f19.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Franklin, Tennessee"]},{"site_id":"vcc-site-8c46e553d068c926b093","name":"TierPoint Oklahoma City (OK2) Data Center, 4114 Perimeter Center Place, Oklahoma City","country":"United States","country_iso_a2":"US","latitude":35.514094,"longitude":-97.595073,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e8bb0479-ee8e-5851-ae7b-4a27b9de0739","name":"TierPoint Oklahoma City (OK2) — existing data-centre and colocation operations (4114 Perimeter Center Place)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8c46e553d068c926b093/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8c46e553d068c926b093.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["TierPoint"]},{"site_id":"vcc-site-ceaefae6fafda18444a6","name":"TierPoint Oklahoma City (OKC) Data Center, 4121 Perimeter Center Place, Oklahoma City","country":"United States","country_iso_a2":"US","latitude":35.51421,"longitude":-97.59661,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"248f8940-acc6-51f7-969f-0f4dc46269e7","name":"TierPoint Oklahoma City (OKC) — existing data-centre and colocation operations (4121 Perimeter Center Place)","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ceaefae6fafda18444a6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ceaefae6fafda18444a6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Oklahoma Department of Environmental Quality"]},{"site_id":"vcc-site-21c0a4be06df4b01b5ee","name":"TierPoint Omaha - Bellevue (BEL) Data Center, 1001 North Fort Crook Road, Bellevue","country":"United States","country_iso_a2":"US","latitude":41.1780544,"longitude":-95.9249764,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"a647bb55-d199-5336-a5a1-dd7f3561001f","name":"TierPoint Omaha - Bellevue (BEL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-21c0a4be06df4b01b5ee/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-21c0a4be06df4b01b5ee.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Sarpy County, Nebraska"]},{"site_id":"vcc-site-fb7c00e3aeff60e7f46c","name":"TierPoint Omaha - Midlands (MID) Data Center, 11425 South 84th Street, Papillion","country":"United States","country_iso_a2":"US","latitude":41.1345994,"longitude":-96.0393313,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"9a47eeb2-bcae-5992-997f-27bd5b2c07a7","name":"TierPoint Omaha - Midlands (MID) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-fb7c00e3aeff60e7f46c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-fb7c00e3aeff60e7f46c.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Sarpy County, Nebraska"]},{"site_id":"vcc-site-1699224923dfab657965","name":"TierPoint Philadelphia (PHI) Data Center (4775 League Island Boulevard, Philadelphia Navy Yard, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":39.892589,"longitude":-75.1649717,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"bca0a8b4-f537-5572-b15c-f3790b252caa","name":"TierPoint Philadelphia (PHI) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1699224923dfab657965/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1699224923dfab657965.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Philadelphia Department of Records; Philadelphia Water Department; PASDA (Penn State)"]},{"site_id":"vcc-site-cc4461f1d5e4d1a749c6","name":"TierPoint Raleigh (RAL) Data Center, 5301 Departure Drive, Raleigh","country":"United States","country_iso_a2":"US","latitude":35.8544845,"longitude":-78.5970467,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"4daa3897-d7cf-5775-8c5c-765686cf1d2c","name":"TierPoint Raleigh (RAL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cc4461f1d5e4d1a749c6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cc4461f1d5e4d1a749c6.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Wake County, North Carolina"]},{"site_id":"vcc-site-325fe9b450140b2fd38f","name":"TierPoint Raleigh - RTP Data Center, 99 TW Alexander Drive, Durham","country":"United States","country_iso_a2":"US","latitude":35.8971325,"longitude":-78.8786753,"geometry_type":"Point","official_boundary":false,"locator_scopes":["reviewed_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"e02ccb7f-c851-5e4f-877f-c2b26b885c2b","name":"TierPoint Raleigh - RTP — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-325fe9b450140b2fd38f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-325fe9b450140b2fd38f.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap / NC Center for Geographic Information and Analysis; Durham County, North Carolina"]},{"site_id":"vcc-site-03b70de7405c82d7d585","name":"TierPoint Sioux Falls - East (SFE) Data Center, 700 East 54th Street North","country":"United States","country_iso_a2":"US","latitude":43.5961534,"longitude":-96.7168804,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"2e343cc8-5428-5f19-acdb-b3d3d80b93b3","name":"TierPoint Sioux Falls - East (SFE) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-03b70de7405c82d7d585/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-03b70de7405c82d7d585.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of Sioux Falls"]},{"site_id":"vcc-site-e32e19d96f758bff3de8","name":"TierPoint St. Louis - Locust (SLL) Data Center, 2300 Locust Street, St. Louis","country":"United States","country_iso_a2":"US","latitude":38.6336159,"longitude":-90.2128665,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1995a5fc-3a8e-5f99-bbf0-bbd0faded2b9","name":"TierPoint St. Louis - Locust (SLL) — new data centre under development in the existing building at 2300 Locust Street","status":"announced","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e32e19d96f758bff3de8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e32e19d96f758bff3de8.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of St. Louis Assessor's Office"]},{"site_id":"vcc-site-b682d57794ef9e01ae02","name":"TierPoint St. Louis - Millpark (SLM) Data Center, 2315 Millpark Drive, Maryland Heights","country":"United States","country_iso_a2":"US","latitude":38.700045,"longitude":-90.411022,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"5b9e35f2-eb9b-502a-87bc-17a8d5d55ada","name":"TierPoint St. Louis - Millpark (SLM) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b682d57794ef9e01ae02/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b682d57794ef9e01ae02.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["St. Louis County Assessor's Office; St. Louis County GIS Service Center"]},{"site_id":"vcc-site-40ff56ed0d9c82eb55e2","name":"TierPoint St. Louis - Olive (SLO) Data Center, 1111 Olive Street","country":"United States","country_iso_a2":"US","latitude":38.6297565,"longitude":-90.1964072,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"59685341-1718-5d96-a435-afa385230f88","name":"TierPoint St. Louis - Olive (SLO) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-40ff56ed0d9c82eb55e2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-40ff56ed0d9c82eb55e2.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["City of St. Louis Assessor's Office"]},{"site_id":"vcc-site-890b3878aa06461817af","name":"TierPoint TekPark Data Center Campus (9999 Hamilton Blvd, Breinigsville, Upper Macungie Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.5446936,"longitude":-75.65578,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-01","oldest_status_as_of":"2026-10-01","project_count":1,"projects":[{"project_id":"77371eb8-5922-55ec-aced-556b60478539","name":"TierPoint Allentown - TekPark (TEK) — existing data-centre and colocation operations (Building 4)","status":"operational","status_as_of":"2026-10-01","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-890b3878aa06461817af/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-890b3878aa06461817af.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Lehigh County, Pennsylvania; PASDA (Penn State)"]},{"site_id":"vcc-site-b62dd851a89c296d220e","name":"TierPoint Tulsa - Archer (TUL) Data Center, 322 E. Archer Street","country":"United States","country_iso_a2":"US","latitude":36.1586833,"longitude":-95.9885595,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1cff1c19-f97d-5203-90df-5f1895b1e441","name":"TierPoint Tulsa - Archer (TUL) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b62dd851a89c296d220e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b62dd851a89c296d220e.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["INCOG Parcels_TulsaCo feature service; Tulsa County Assessor"]},{"site_id":"vcc-site-114ba5d9837cfd60a4ff","name":"TierPoint Tulsa - State Farm (TL2) Data Center, 12151 E. State Farm Boulevard","country":"United States","country_iso_a2":"US","latitude":36.0963433,"longitude":-95.8400326,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-03","oldest_status_as_of":"2026-09-03","project_count":1,"projects":[{"project_id":"1cc6099f-f58c-5c47-a9d4-a73589a05448","name":"TierPoint Tulsa - State Farm (TL2) — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-03","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-114ba5d9837cfd60a4ff/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-114ba5d9837cfd60a4ff.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["INCOG Parcels_TulsaCo feature service; Tulsa County Assessor"]},{"site_id":"vcc-site-32e11c649565693b8978","name":"TierPoint Valley Forge Data Center (1000 Adams Avenue, Lower Providence Township, Pennsylvania)","country":"United States","country_iso_a2":"US","latitude":40.1217531,"longitude":-75.4211112,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-11","oldest_status_as_of":"2026-09-11","project_count":1,"projects":[{"project_id":"91ae3716-9536-5fe2-8fb8-22e91d3eb39e","name":"TierPoint Valley Forge — existing data-centre and colocation operations","status":"operational","status_as_of":"2026-09-11","search_terms":""}],"status_publishers":["TierPoint, LLC"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-32e11c649565693b8978/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-32e11c649565693b8978.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Montgomery County, Pennsylvania; PASDA (Penn State)"]},{"site_id":"vcc-site-6bd6515ae5d1dc80cf5a","name":"Tillion Aragón data center campus (Azora), Villamayor de Gállego","country":"Spain","country_iso_a2":"ES","latitude":41.68556,"longitude":-0.77389,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"2a273a46-2f4f-5ccb-9d10-6f2bfeb5e5f5","name":"Tillion Aragón data center campus (Azora), Villamayor de Gállego","status":"announced","status_as_of":"2026-10-05","search_terms":"Data center campus planned by Azora, through its Tillion Data Centres business and the project company Tillion Aragón, near Villamayor de Gállego outside Zaragoza. Announced in March 2025 at 150 MW expandable to 300 MW, with EUR 1.1 billion for the first phase and up to about EUR 2 billion in total. Red Eléctrica approved the first 150 MW grid connection in 2024. The regional plan covers four data center buildings and a 400 kV link to the Peñaflor substation. In October 2026 El Español reported the investment had risen to about EUR 2.36 billion, with site works expected from late 2026 or in 2027. Tillion Aragón PIGA Tillion Aragón Azora Tillion Aragón, S.L. Red Eléctrica Government of Aragon"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bd6515ae5d1dc80cf5a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bd6515ae5d1dc80cf5a.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Azora"]},{"site_id":"vcc-site-db7c6893924a4efae26d","name":"Tongji University Siping East Campus Data Centre","country":"China","country_iso_a2":"CN","latitude":31.28127385,"longitude":121.50197785,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-14","oldest_status_as_of":"2026-10-14","project_count":1,"projects":[{"project_id":"4195ab55-a931-5bf9-9439-0f9f59f0fbbc","name":"Tongji University Siping East Campus — A-building Data-Centre Fit-out","status":"announced","status_as_of":"2026-10-14","search_terms":""}],"status_publishers":["同济大学采购与招标管理办公室 (Tongji University Procurement and Tendering Office)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-db7c6893924a4efae26d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-db7c6893924a4efae26d.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-7cb4c635a0469cf8e507","name":"Tract Buckeye data center park","country":"United States","country_iso_a2":"US","latitude":33.3706,"longitude":-112.5908,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-06-15","oldest_status_as_of":"2026-06-15","project_count":1,"projects":[{"project_id":"3f13d78d-ac2f-533b-8e04-01009bd9d17b","name":"Tract Buckeye data center park","status":"announced","status_as_of":"2026-06-15","search_terms":"Master-planned data center park by land developer Tract on about 2,069 acres in southwest Buckeye, Arizona, south of Interstate 10 on Johnson Road near the municipal airport, on land once planned for a large housing community. Announced in August 2024 after the city council unanimously approved a development agreement and a Buckeye Tech Corridor plan amendment, it could hold up to 40 data centers and 20 million square feet, with Tract working with APS on plans for up to 1.8 GW. The project is valued at about USD 20 billion over a phased 15-year build-out. A June 2026 trade update said it had entered engineering and horizontal infrastructure preparation. Tract Phoenix data center park Tract Arizona Public Service City of Buckeye"}],"status_publishers":["Construction Review Online"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7cb4c635a0469cf8e507/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7cb4c635a0469cf8e507.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Arizona's Family (KTVK/KPHO)"]},{"site_id":"vcc-site-7d2d991a3b3ae84c1d4f","name":"Trebbin Data Center (Krumme Kabeln)","country":"Germany","country_iso_a2":"DE","latitude":52.2288433,"longitude":13.2245702,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-07","oldest_status_as_of":"2026-10-07","project_count":1,"projects":[{"project_id":"0fa0d823-f274-5799-a26f-25fd98a2b0d3","name":"Trebbin Data Center — planned two-building development","status":"announced","status_as_of":"2026-10-07","search_terms":""}],"status_publishers":["Stadt Trebbin"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7d2d991a3b3ae84c1d4f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7d2d991a3b3ae84c1d4f.json","geometry_licenses":["dl-de/by-2-0"],"geometry_attributions":["© GeoBasis-DE/LGB, dl-de/by-2-0"]},{"site_id":"vcc-site-77fa0d95d9c7ed1b2168","name":"TRG Spring Cypress Campus","country":"United States","country_iso_a2":"US","latitude":30.066026434779,"longitude":-95.455736245303,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-20","oldest_status_as_of":"2026-07-20","project_count":1,"projects":[{"project_id":"ba5ddf33-10ec-5fb8-b880-98a04df096b8","name":"TRG HOU2","status":"under_construction","status_as_of":"2026-07-20","search_terms":""}],"status_publishers":["TRG Datacenters"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-77fa0d95d9c7ed1b2168/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-77fa0d95d9c7ed1b2168.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},{"site_id":"vcc-site-09826497b7d6110b1079","name":"Ubitus Maizuru AI Data Center","country":"Japan","country_iso_a2":"JP","latitude":35.515,"longitude":135.4007,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-09","oldest_status_as_of":"2026-09-09","project_count":1,"projects":[{"project_id":"75484d01-aa58-5d95-8834-91103b8af933","name":"Ubitus Maizuru AI Data Center Development","status":"announced","status_as_of":"2026-09-09","search_terms":""}],"status_publishers":["Ubitus"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-09826497b7d6110b1079/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-09826497b7d6110b1079.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Esri, Vantor, Earthstar Geographics, and the GIS User Community"]},{"site_id":"vcc-site-3bc29406d67881d3bce1","name":"Unit 4, Silverdale Industrial Estate, Silverdale Road, Hayes (London Borough of Hillingdon)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.5034892,"longitude":-0.4124808,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"860d95a2-6454-5964-aae2-792acbb78986","name":"Silverdale Road data centre, Hayes - new data centre building with emergency generator (Hillingdon 49261/APP/2024/2904)","status":"permitted","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["London Borough of Hillingdon"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-3bc29406d67881d3bce1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-3bc29406d67881d3bce1.json","geometry_licenses":["not stated by the API (London Planning Datahub public data)"],"geometry_attributions":["Greater London Authority, London Planning Datahub; London Borough of Hillingdon"]},{"site_id":"vcc-site-315b5d219b6cb4413a2b","name":"University of Edinburgh Advanced Computing Facility","country":"United Kingdom","country_iso_a2":"GB","latitude":55.85566265,"longitude":-3.19949765,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["shell"],"newest_status_as_of":"2026-09-22","oldest_status_as_of":"2026-09-22","project_count":1,"projects":[{"project_id":"52b09d3a-44ac-5836-9724-7df5c69687bf","name":"ACF CR4 extension","status":"shell","status_as_of":"2026-09-22","search_terms":""}],"status_publishers":["EPCC, University of Edinburgh"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-315b5d219b6cb4413a2b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-315b5d219b6cb4413a2b.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-e00f4f37e449378136d8","name":"USTC Gaoxin Campus Data Centre","country":"China","country_iso_a2":"CN","latitude":31.82246755,"longitude":117.12384485,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-09-07","oldest_status_as_of":"2026-09-07","project_count":1,"projects":[{"project_id":"9d1a545f-6939-5ea7-aae1-ba9e834b1ba9","name":"University of Science and Technology of China — Gaoxin Campus Data Centre","status":"operational","status_as_of":"2026-09-07","search_terms":""}],"status_publishers":["中国科学技术大学网络信息中心 (USTC Network Information Center)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e00f4f37e449378136d8/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e00f4f37e449378136d8.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["OpenStreetMap contributors"]},{"site_id":"vcc-site-54113ebec20f61dd4a6e","name":"Vantage Data Centers Cyberjaya II campus (KUL2)","country":"Malaysia","country_iso_a2":"MY","latitude":2.9225,"longitude":101.655,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2024-08-06","oldest_status_as_of":"2024-08-06","project_count":1,"projects":[{"project_id":"a31a1552-7be0-58e9-8097-4083d11175dd","name":"Vantage Data Centers Cyberjaya II campus (KUL2)","status":"under_construction","status_as_of":"2024-08-06","search_terms":"Vantage Data Centers' second hyperscale campus in Cyberjaya, Selangor, next to its existing KUL1 campus. Announced in May 2023 as a 256 MW IT campus of 10 facilities on nearly 35 acres, with the first facility planned for Q4 2025, it broke ground in August 2024 alongside a supply agreement with Tenaga Nasional Berhad for 500 MVA through a dedicated 275 kV substation. Vantage's campus page, viewed in October 2026, now describes a larger plan of 436 MW of critical IT load in six data centers on 52 acres. No source found confirms whether the first facility has opened. KUL2 Cyberjaya II Data Center Campus Vantage Data Centers Tenaga Nasional Berhad (TNB)"}],"status_publishers":["Vantage Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54113ebec20f61dd4a6e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54113ebec20f61dd4a6e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vantage Data Centers (press release via Media OutReach, Viet Nam News)"]},{"site_id":"vcc-site-d70371ee13abb96e26fb","name":"Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park","country":"Malaysia","country_iso_a2":"MY","latitude":1.713667,"longitude":103.524778,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"77f10b6a-00c1-5bf7-974e-d4dc4467b35e","name":"Vantage Data Centers Johor campus (JHB1), Sedenak Tech Park","status":"partially_operational","status_as_of":"2026-10-09","search_terms":"Hyperscale campus of nearly 73 acres in Sedenak Tech Park, Johor, inside the Johor-Singapore Special Economic Zone. Developed by Yondr Group with green-loan financing, it is planned for more than 300 MW of IT capacity across three data centers. Vantage Data Centers agreed in September 2025 to buy it, alongside a US$1.6 billion investment in its Asia-Pacific platform that partly funded the deal, and completed the purchase in November 2025. Vantage's campus page, viewed in October 2026, says the first facility is operational and the rest are under development. JHB1 Yondr Johor campus Yondr Group Vantage Data Centers Vantage Data Centers Tenaga Nasional Berhad (TNB)"}],"status_publishers":["Vantage Data Centers"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d70371ee13abb96e26fb/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d70371ee13abb96e26fb.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Vantage Data Centers"]},{"site_id":"vcc-site-e7421a3f765fa1b50990","name":"Vantage Data Centers Stacks Road Site (4380 Stacks Rd, City of South Fulton)","country":"United States","country_iso_a2":"US","latitude":33.6049238,"longitude":-84.5309347,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["clearing"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"9e70b410-86d1-5cd3-84ca-5f2a32cb9fda","name":"Vantage - Stacks Rd — one-building data center with power substation (land cleared)","status":"clearing","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["City of South Fulton, Georgia (GIS, ArcGIS Online organisation cosfga)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e7421a3f765fa1b50990/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e7421a3f765fa1b50990.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Fulton County, Georgia, GIS Division and Board of Assessors"]},{"site_id":"vcc-site-028ea637886484fbc894","name":"Vantage Data Centers Villanueva de Gállego campus","country":"Spain","country_iso_a2":"ES","latitude":41.767,"longitude":-0.817,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-20","oldest_status_as_of":"2026-03-20","project_count":1,"projects":[{"project_id":"a8c0727c-ed59-5641-8856-e4eac08a5cf0","name":"Vantage Data Centers Villanueva de Gállego campus","status":"announced","status_as_of":"2026-03-20","search_terms":"Planned hyperscale data center campus by US operator Vantage Data Centers with the Aragonese company Desarrollos Ecoindustriales La Cartuja, on roughly 40 to 48 hectares of industrial land south of Villanueva de Gállego (Zaragoza), beside the A-23 motorway near Universidad San Jorge. The partners asked for regional general-interest status in May 2025, and the Aragón government approved it in September 2025 for a EUR 3.2 billion investment over ten years in five phases, with 90 MW of supply already granted through Endesa. In March 2026 the project was still seeking authorisation, with initial documents filed with the regional environmental agency (Inaga) and eight data buildings planned. Vantage Zaragoza Vantage Data Centers Desarrollos Ecoindustriales La Cartuja Endesa Gobierno de Aragón"}],"status_publishers":["El Español"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-028ea637886484fbc894/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-028ea637886484fbc894.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Libertad Digital"]},{"site_id":"vcc-site-f3c14c6227b2ae418664","name":"Vantage Frontier campus (Stargate Shackelford County)","country":"United States","country_iso_a2":"US","latitude":32.7089,"longitude":-99.3308,"geometry_type":"Point","official_boundary":false,"locator_scopes":["admin2_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-09-08","oldest_status_as_of":"2026-09-08","project_count":1,"projects":[{"project_id":"126f2c37-cadc-5f20-9e3c-e544d70b5c37","name":"Vantage Frontier campus (Stargate Shackelford County)","status":"under_construction","status_as_of":"2026-09-08","search_terms":"Vantage Data Centers is building Frontier, a 1,200-acre campus of ten single-story data centers in Shackelford County, Texas, near Abilene. It is planned at 1.4 GW and roughly $25 billion. In September 2025 it was named one of the new Stargate sites under the OpenAI and Oracle agreement. Analysts report power will come from an off-grid natural gas microgrid built and run by VoltaGrid. A groundbreaking was reported in December 2025, and state building registrations filed in mid-2026 list building start dates in 2026 and completions in 2027. Vantage targeted the first building for the second half of 2026, and trade press reports campus completion in 2028. Frontier Project Frontier Stargate Frontier Vantage DC Abilene - TX3 Vantage Data Centers Vantage Data Centers Oracle OpenAI VoltaGrid"}],"status_publishers":["Oracle"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f3c14c6227b2ae418664/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f3c14c6227b2ae418664.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["REBusinessOnline"]},{"site_id":"vcc-site-d272a722ca415c1be654","name":"Vantage Lighthouse Port Washington Data Center Campus","country":"United States","country_iso_a2":"US","latitude":43.430735,"longitude":-87.861494,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"3b636397-fbb2-5564-a352-fa1382a218b5","name":"Vantage Lighthouse Port Washington Current Campus Build","status":"under_construction","status_as_of":"2026-10-19","search_terms":"Vantage Data Centers is building Lighthouse, a four-building campus on 672 acres on Port Washington's north side in Wisconsin, for Oracle and OpenAI under the Stargate program. OpenAI, Oracle and Vantage announced it as a Stargate site in October 2025, with close to 1 GW of capacity and completion targeted for 2028. Vantage now lists 902 MW, while local reporting and analyst Epoch AI cite 1.3 GW. The investment is reported at about $15 billion. Two buildings had topped out by mid-2026. We Energies supplies power; an Oracle subsidiary sued state regulators in June 2026 over financial-security rules, and in October 2026 We Energies proposed an Oracle share of nuclear output, pending approval. Lighthouse Project Lighthouse Stargate Wisconsin Vantage Data Centers Vantage Data Centers Oracle OpenAI We Energies Whiting-Turner Contracting The Weitz Co."}],"status_publishers":["Vantage Data Centers (Vantage Lighthouse Campus website)"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d272a722ca415c1be654/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d272a722ca415c1be654.json","geometry_licenses":["public-government-record-fact-extraction-only"],"geometry_attributions":["Wisconsin Department of Natural Resources"]},{"site_id":"vcc-site-1f572e32e4ff9600b76a","name":"Vantage London I (LHR1) campus, Chandos Road Trading Estate (2 Black Arrow House), Park Royal (Old Oak and Park Royal / Ealing)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.527115,"longitude":-0.254983,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"bf858b90-6c38-5d87-8268-63b5cc1609ee","name":"Vantage LHR11/12 (London I) - two-building data centre campus under construction (EA permit EPR/YP3329SB)","status":"under_construction","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["Environment Agency (Public Registers Online, installations compliance documents)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f572e32e4ff9600b76a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f572e32e4ff9600b76a.json","geometry_licenses":["Open Government Licence v3.0 (Environment Agency conditional licence as stated in the register metadata)"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-4189e849954059aaed3e","name":"Vantage London II (LHR2) campus, 37-39 North Acton Road, Park Royal (Old Oak and Park Royal / Ealing)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.533022,"longitude":-0.259746,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-08-11","oldest_status_as_of":"2026-08-11","project_count":1,"projects":[{"project_id":"285b5477-96ae-5541-895b-dc2d31f0b904","name":"Vantage LHR21 (London II) - six-storey data centre under construction and commissioning (EA permit EPR/VP3225SC)","status":"under_construction","status_as_of":"2026-08-11","search_terms":""}],"status_publishers":["Environment Agency (Public Registers Online, installations compliance documents)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4189e849954059aaed3e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4189e849954059aaed3e.json","geometry_licenses":["Open Government Licence v3.0 (Environment Agency conditional licence as stated in the register metadata)"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-36334bc427db6b226db5","name":"Vantage Zurich I (ZRH1) Data Center Campus","country":"Switzerland","country_iso_a2":"CH","latitude":47.50071815284883,"longitude":8.76128018116464,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-07-30","oldest_status_as_of":"2026-07-30","project_count":1,"projects":[{"project_id":"f0e92e2e-e082-5b7f-9486-fd744b5b68e6","name":"Vantage ZRH12","status":"under_construction","status_as_of":"2026-07-30","search_terms":""}],"status_publishers":["ERNE AG Bauunternehmung"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-36334bc427db6b226db5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-36334bc427db6b226db5.json","geometry_licenses":["no-open-license-asserted","swisstopo-free-geodata-terms-2021-03-01","swisstopo-report-A-public-domain"],"geometry_attributions":["© swisstopo"]},{"site_id":"vcc-site-00808116377785b5c125","name":"Verne Mäntsälä Data Center Campus","country":"Finland","country_iso_a2":"FI","latitude":60.63529659183684,"longitude":25.286185526695697,"geometry_type":"Polygon","official_boundary":true,"locator_scopes":["official_boundary"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-17","oldest_status_as_of":"2026-06-17","project_count":1,"projects":[{"project_id":"8f8c241d-ee6b-5182-8a76-ebb101a3f4c2","name":"Verne Mäntsälä Current Campus Development","status":"under_construction","status_as_of":"2026-06-17","search_terms":""}],"status_publishers":["Verne"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_official_boundary","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-00808116377785b5c125/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-00808116377785b5c125.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Municipality of Mäntsälä"]},{"site_id":"vcc-site-e5a0d4deb2ca607b8d79","name":"Veronikas Data Centre, Tārgale Parish, Ventspils Municipality","country":"Latvia","country_iso_a2":"LV","latitude":57.3920384,"longitude":21.66167441,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-22","oldest_status_as_of":"2026-10-22","project_count":1,"projects":[{"project_id":"7b2f1122-2d5f-5b17-af5c-3f672ad6a14e","name":"Data centre \"Veronikas\" — office building with data centre (building permit BIS-BV-4.1-2026-3712)","status":"permitted","status_as_of":"2026-10-22","search_terms":""}],"status_publishers":["Būvniecības informācijas sistēma (BIS); case held by Ventspils novada pašvaldības būvinspekcija"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-e5a0d4deb2ca607b8d79/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-e5a0d4deb2ca607b8d79.json","geometry_licenses":["CC0-1.0"],"geometry_attributions":["Būvniecības valsts kontroles birojs, Būvniecības informācijas sistēma (CC0 1.0)"]},{"site_id":"vcc-site-235f690e5edc065dadae","name":"VIRTUS Saunderton Data Centre Campus (Haw Lane, Saunderton, Buckinghamshire)","country":"United Kingdom","country_iso_a2":"GB","latitude":51.679464,"longitude":-0.8329119,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-09-24","oldest_status_as_of":"2026-09-24","project_count":1,"projects":[{"project_id":"9146829a-b2c8-55db-b98b-83c03b05ed91","name":"VIRTUS Saunderton Campus - LONDON15 to LONDON18 (four data centres, 78 MW IT planned)","status":"announced","status_as_of":"2026-09-24","search_terms":""}],"status_publishers":["VIRTUS Data Centres"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-235f690e5edc065dadae/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-235f690e5edc065dadae.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Virtus Holdco Ltd (prepared by Ramboll UK), published by the Environment Agency"]},{"site_id":"vcc-site-dba81c9003e655831d45","name":"VIRTUS Wustermark campus","country":"Germany","country_iso_a2":"DE","latitude":52.5463,"longitude":12.9404,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-01","oldest_status_as_of":"2026-06-01","project_count":1,"projects":[{"project_id":"b6d175dc-d92a-56ca-a1a7-85306c9de22a","name":"VIRTUS Wustermark campus","status":"under_construction","status_as_of":"2026-06-01","search_terms":"VIRTUS Data Centres, part of ST Telemedia Global Data Centres, is developing a EUR 3 billion data center megacampus on more than 35 hectares in Wustermark, Havelland, about 12 km from Berlin's city limits. The campus is planned for up to nine data centers and 204 MW of IT load, with an initial 300 MW of power delivered through a dedicated substation with dual direct connections to the 50Hertz 380 kV grid, the first such connection for a Berlin-Brandenburg data center campus. Two 185 MVA super-grid transformers had been installed by June 2026; VIRTUS now projects operations from early 2028. Berlin Data Centres Wustermark Campus Wustermark Megacampus VIRTUS Data Centres ST Telemedia Global Data Centres Macquarie Asset Management 50Hertz"}],"status_publishers":["VIRTUS Data Centres"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dba81c9003e655831d45/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dba81c9003e655831d45.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["VIRTUS Data Centres"]},{"site_id":"vcc-site-f76a80176723cddb724a","name":"VNET Ulanqab Zero-Carbon Computing Center","country":"China","country_iso_a2":"CN","latitude":40.95105527777778,"longitude":113.25969666666667,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["mep_electrical","under_construction"],"newest_status_as_of":"2026-10-24","oldest_status_as_of":"2026-10-24","project_count":2,"projects":[{"project_id":"027bafe4-a5c0-56bf-b586-ea6568c4e992","name":"VNET Ulanqab Zero-Carbon Computing Center — building A1 mechanical, electrical and fit-out works","status":"mep_electrical","status_as_of":"2026-10-24","search_terms":""},{"project_id":"7bcd00b3-81ee-5210-8953-915d0e92ddf1","name":"VNET Ulanqab Zero-Carbon Computing Center — Phase 1 A2","status":"under_construction","status_as_of":"2026-10-24","search_terms":""}],"status_publishers":["China State Construction Engineering Corporation"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f76a80176723cddb724a/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f76a80176723cddb724a.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Inner Mongolia Department of Ecology and Environment; applicant Wulanchabu Zhilian Cloud Technology Co., Ltd."]},{"site_id":"vcc-site-f59d2f5037e6cf9243dd","name":"Volcano Engine Inner Mongolia Horinger Compute Centre — Phase 1 Campus","country":"China","country_iso_a2":"CN","latitude":40.58596,"longitude":111.8467,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-10-27","oldest_status_as_of":"2026-10-27","project_count":1,"projects":[{"project_id":"83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","name":"Volcano Engine Inner Mongolia Horinger Compute Centre Phase 1 A — 10-1 data-centre machine-room building","status":"completed","status_as_of":"2026-10-27","search_terms":""}],"status_publishers":["Planning and Construction Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区规划建设局)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f59d2f5037e6cf9243dd/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f59d2f5037e6cf9243dd.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["呼和浩特市生态环境局; report form prepared for 呼和浩特市塞北红城科技有限公司"]},{"site_id":"vcc-site-89983863af9dd704fc99","name":"Volcano Engine Ningxia Zhongwei Xuanhe Compute Centre","country":"China","country_iso_a2":"CN","latitude":37.370623,"longitude":105.486903,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-09-30","oldest_status_as_of":"2026-09-30","project_count":1,"projects":[{"project_id":"1fc276fd-e412-5266-9c77-d4ca01259fbd","name":"Volcano Engine Ningxia Zhongwei Xuanhe Compute Centre — Phase 1 (C1/C2 Super-Core Buildings)","status":"permitted","status_as_of":"2026-09-30","search_terms":""}],"status_publishers":["Zhongwei Natural Resources Bureau"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-89983863af9dd704fc99/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-89983863af9dd704fc99.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Natural Resources Bureau"]},{"site_id":"vcc-site-cd3c4380161bc1c0389f","name":"WBS Power Baltic Data Center Campus, Lublewo","country":"Poland","country_iso_a2":"PL","latitude":54.75972,"longitude":17.94528,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["announced"],"newest_status_as_of":"2026-03-24","oldest_status_as_of":"2026-03-24","project_count":1,"projects":[{"project_id":"4eea4b6a-9f71-5c9f-81bb-ae597972ddd5","name":"WBS Power Baltic Data Center Campus, Lublewo","status":"announced","status_as_of":"2026-03-24","search_terms":"Hyperscale campus proposed by WBS Power at Lublewo in Choczewo municipality, Pomerania, near the planned Lubiatowo-Kopalino nuclear power plant site. Announced in March 2026, it targets 3.2 GW in four 800 MW phases aimed at AI, HPC and cloud customers. WBS Power says it has grid connection conditions for the full 3.2 GW at a site next to one of Poland's largest substations, with power from conventional sources, renewables and battery storage, and nuclear in the longer term. Preparation of all phases is due by the end of 2027 and the first data center around 2028-2029. No investors, tenants or permits were named. Baltic Data Center Campus Baltic DC Campus WBS Power"}],"status_publishers":["WBS Power (via PR Newswire)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cd3c4380161bc1c0389f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cd3c4380161bc1c0389f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WBS Power (via PR Newswire)"]},{"site_id":"vcc-site-df5eae227e5b7eb27ea5","name":"WhiteFiber NC-1 AI Data Center Campus (Madison, North Carolina)","country":"United States","country_iso_a2":"US","latitude":36.4036125,"longitude":-79.9894218,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["commissioning"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"89b14ddc-bb8f-5d8b-b4c8-c312e5dcad2a","name":"WhiteFiber NC-1 — initial 40 MW colocation phase (phased delivery and commissioning)","status":"commissioning","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["WhiteFiber, Inc."],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-df5eae227e5b7eb27ea5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-df5eae227e5b7eb27ea5.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["NC OneMap (NC Center for Geographic Information and Analysis); Rockingham County, North Carolina"]},{"site_id":"vcc-site-c02d5867672125f7e333","name":"Wingu Africa Mbezi Data Centre, Dar es Salaam","country":"Tanzania","country_iso_a2":"TZ","latitude":-6.7160669,"longitude":39.2018546,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-08-12","oldest_status_as_of":"2026-08-12","project_count":1,"projects":[{"project_id":"4f99e7c8-464e-5384-b9c8-0b9470556f66","name":"Wingu Africa Mbezi Data Centre — operating facility","status":"operational","status_as_of":"2026-08-12","search_terms":""}],"status_publishers":["Wingu Africa"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c02d5867672125f7e333/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c02d5867672125f7e333.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Google Maps"]},{"site_id":"vcc-site-0a62731022d2820e105f","name":"Wonder Valley AI data centre park (Alberta)","country":"Canada","country_iso_a2":"CA","latitude":54.8119,"longitude":-118.6834,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["announced"],"newest_status_as_of":"2026-10-09","oldest_status_as_of":"2026-10-09","project_count":1,"projects":[{"project_id":"bb1b28fd-610b-5739-b928-e44f21cb6f1b","name":"Wonder Valley AI data centre park (Alberta)","status":"announced","status_as_of":"2026-10-09","search_terms":"Proposed off-grid AI data centre park in the Greenview Industrial Gateway south of Grande Prairie, Alberta, announced in December 2024 by O'Leary Ventures with the Municipal District of Greenview and now led by O'Leary Digital. Backers describe up to 7.5 GW of on-site gas and geothermal generation built in phases, starting with 1.4 GW. O'Leary Digital said in February 2026 that Alberta permitting was underway; a December 2025 report said the site was undeveloped and construction might not start until late 2028. Sturgeon Lake Cree Nation lost an appeal of the gateway's water licence in April 2026; in August 2026 a judge refused an O'Leary-backed bid to halt a Nation challenge. Wonder Valley Wonder Valley AI Data Centre Park Wonder Valley Alberta O'Leary Digital Limited O'Leary Ventures Municipal District of Greenview No. 16 PCL Construction"}],"status_publishers":["O'Leary Digital Limited via PR Newswire"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0a62731022d2820e105f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0a62731022d2820e105f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Government of Alberta, Major Projects"]},{"site_id":"vcc-site-837c77c61e73b3c11714","name":"xAI Colossus 1 (Memphis)","country":"United States","country_iso_a2":"US","latitude":35.0599,"longitude":-90.1563,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["operational"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"d2db6863-886a-5c16-b819-7f2cd95cd87e","name":"xAI Colossus 1 (Memphis)","status":"operational","status_as_of":"2026-10-05","search_terms":"AI supercomputer that xAI built in 2024 inside the former Electrolux manufacturing plant on Paul R. Lowry Road in southwest Memphis. Grid power comes from MLGW and TVA through an existing MLGW substation and a new one paid for by xAI, supplemented by permitted on-site gas turbines and battery storage. Anthropic now describes Colossus 1 as SpaceX's data center, and in May 2026 it agreed to use all of the site's compute capacity, stated as more than 300 MW and over 220,000 NVIDIA GPUs. Colossus Colossus 1 Gigafactory of Compute xAI SpaceX Anthropic Memphis Light, Gas and Water Tennessee Valley Authority Shelby County Health Department"}],"status_publishers":["Anthropic"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-837c77c61e73b3c11714/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-837c77c61e73b3c11714.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["WMC Action News 5"]},{"site_id":"vcc-site-62e42a722eab77bd5345","name":"xAI Colossus 2 (Memphis)","country":"United States","country_iso_a2":"US","latitude":34.998,"longitude":-90.0349,"geometry_type":"Point","official_boundary":false,"locator_scopes":["project_locator"],"statuses":["partially_operational"],"newest_status_as_of":"2026-10-05","oldest_status_as_of":"2026-10-05","project_count":1,"projects":[{"project_id":"9002afae-5b81-5c8c-a6f9-4504c91e8624","name":"xAI Colossus 2 (Memphis)","status":"partially_operational","status_as_of":"2026-10-05","search_terms":"Second xAI supercomputer campus, in a building of about one million square feet on Tulane Road in the Whitehaven area of Memphis, near the Mississippi line, which xAI bought in 2025. The site has drawn little or no grid power and runs mainly on gas turbines at a former Duke Energy plant site about 1.5 miles away in Southaven, Mississippi. Mississippi regulators permitted 41 permanent turbines there in March 2026, and environmental and civil rights groups appealed the permit in April 2026. Analyst estimates put its IT load near 1 GW by mid-2026. Anthropic says it has GPU capacity here under an agreement with SpaceX. Colossus II xAI SpaceX Anthropic Cursor MZX Tech LLC Memphis Light, Gas and Water Mississippi Environmental Quality Permit Board"}],"status_publishers":["Epoch AI"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62e42a722eab77bd5345/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62e42a722eab77bd5345.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Memphis Light, Gas and Water"]},{"site_id":"vcc-site-64d29806f5007969e3b9","name":"xAI MACROHARDRR data center (Southaven)","country":"United States","country_iso_a2":"US","latitude":34.9935,"longitude":-90.0342,"geometry_type":"Point","official_boundary":false,"locator_scopes":["approximate_site_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-31","oldest_status_as_of":"2026-07-31","project_count":1,"projects":[{"project_id":"493361d4-686f-5f75-af07-7f95dcf81323","name":"xAI MACROHARDRR data center (Southaven)","status":"operational","status_as_of":"2026-07-31","search_terms":"Third xAI data center in the Memphis area, made by retrofitting a warehouse of roughly 800,000 square feet that xAI bought in late 2025 in Southaven, Mississippi, just south of Colossus 2 across the state line. Mississippi's governor announced it in January 2026 as an investment of more than $20 billion, the largest economic development project in state history, supported by a state sales and use tax exemption and local fee-in-lieu agreements. Musk said it would lift Colossus training compute to about 2 GW, and a July 2026 report relaying his comments said it holds 220,000 NVIDIA GB300 GPUs. MACROHARDRR Macroharder Macro-harder xAI Mississippi Development Authority City of Southaven DeSoto County"}],"status_publishers":["WMC Action News 5"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64d29806f5007969e3b9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-64d29806f5007969e3b9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},{"site_id":"vcc-site-780d34f93b2e30c4ae73","name":"XTX Markets Kajaani Data Center Campus","country":"Finland","country_iso_a2":"FI","latitude":64.237214640662,"longitude":27.655443809824,"geometry_type":"Polygon","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-06-25","oldest_status_as_of":"2026-06-25","project_count":1,"projects":[{"project_id":"fe6f26cf-4be9-51a3-857e-fca7ee21726b","name":"XTX Markets Kajaani Second Data Center","status":"under_construction","status_as_of":"2026-06-25","search_terms":""}],"status_publishers":["Bravida"],"power_observations":[],"verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-780d34f93b2e30c4ae73/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-780d34f93b2e30c4ae73.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["Contains data from the National Land Survey of Finland INSPIRE Cadastral Parcels (CP) WFS, licensed under the National Land Survey open data Attribution CC 4.0 licence; retrieved 2026-08-23."]},{"site_id":"vcc-site-efe6509451505a0cd770","name":"Yondr Bristow Campus","country":"United States","country_iso_a2":"US","latitude":38.7762658,"longitude":-77.5833299,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["completed"],"newest_status_as_of":"2026-09-17","oldest_status_as_of":"2026-09-17","project_count":1,"projects":[{"project_id":"c37e71f0-6627-56bb-baa4-71a96c045546","name":"Yondr Bristow Campus — Building 3","status":"completed","status_as_of":"2026-09-17","search_terms":""}],"status_publishers":["Prince William County, Virginia (Planning Office and Department of Development Services GIS)"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-efe6509451505a0cd770/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-efe6509451505a0cd770.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-916f5efbecb2c091c963","name":"Yondr Hornbaker Road Campus (Manassas)","country":"United States","country_iso_a2":"US","latitude":38.7618511,"longitude":-77.5334719,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["announced"],"newest_status_as_of":"2026-08-03","oldest_status_as_of":"2026-08-03","project_count":1,"projects":[{"project_id":"6d108e80-e954-52ee-a829-70a1650baae8","name":"Yondr Hornbaker Road Campus — proposed 72 MW campus","status":"announced","status_as_of":"2026-08-03","search_terms":""}],"status_publishers":["Yondr Group"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-916f5efbecb2c091c963/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-916f5efbecb2c091c963.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Prince William County, Virginia"]},{"site_id":"vcc-site-b5b08e78c9c1b39363aa","name":"Yondr London campus, Wexham Road, Slough","country":"United Kingdom","country_iso_a2":"GB","latitude":51.513155,"longitude":-0.578083,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["operational"],"newest_status_as_of":"2026-07-30","oldest_status_as_of":"2026-07-30","project_count":1,"projects":[{"project_id":"da99fa49-8ca7-53a0-bf2a-fac976c41183","name":"Yondr Slough Buildings A and B Existing Operations","status":"operational","status_as_of":"2026-07-30","search_terms":""}],"status_publishers":["Yondr Group"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b5b08e78c9c1b39363aa/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b5b08e78c9c1b39363aa.json","geometry_licenses":["Open Government Licence v3.0, except where otherwise stated"],"geometry_attributions":["Environment Agency"]},{"site_id":"vcc-site-f32edd5086d6199f35be","name":"Yondr Project Allegro Data Center Campus (Aldie, Loudoun County)","country":"United States","country_iso_a2":"US","latitude":38.954505,"longitude":-77.548239,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["permitted"],"newest_status_as_of":"2026-10-19","oldest_status_as_of":"2026-10-19","project_count":1,"projects":[{"project_id":"0e1de1a3-3c6b-5f61-b672-f199d36d265c","name":"Yondr NOV2A — Allegro North Campus Building 2A core/shell and phase 1 (42455 Allegro Ln)","status":"permitted","status_as_of":"2026-10-19","search_terms":""}],"status_publishers":["Loudoun County, Virginia (Department of Building and Development / Office of Mapping and Geographic Information)"],"power_observations":[],"verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-f32edd5086d6199f35be/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-f32edd5086d6199f35be.json","geometry_licenses":["public-record-source-terms"],"geometry_attributions":["Loudoun County, Virginia"]},{"site_id":"vcc-site-ebacb890726508925a40","name":"YTL Green Data Center Park, Kulai","country":"Malaysia","country_iso_a2":"MY","latitude":1.6569,"longitude":103.6059,"geometry_type":"Point","official_boundary":false,"locator_scopes":["locality_context"],"statuses":["partially_operational"],"newest_status_as_of":"2026-08-20","oldest_status_as_of":"2026-08-20","project_count":1,"projects":[{"project_id":"2d2dbfa9-0685-5532-8d89-80ceeaf07427","name":"YTL Green Data Center Park, Kulai","status":"partially_operational","status_as_of":"2026-08-20","search_terms":"YTL Power International is developing a large data center park in Kulai, Johor, paired with a solar plant of about 500 MW and backup supply from the national grid. The park was first described as a 500 MW campus; GDS agreed in 2022 to co-develop part of it, and YTL announced an AI infrastructure collaboration with Nvidia in December 2023. YTL said in late 2025 that an Nvidia GB200-based AI data center at the park was operational, with about 300 MW being built and commissioned. In August 2026 it was reported to be bringing capacity online progressively and planning to raise the park's ceiling from 600 MW to 1,000 MW. YTL Green Data Center Park YTL AI Cloud Johor YTL Power International Berhad YTL Data Center Holdings Pte. Ltd. GDS Holdings Limited YTL Communications Sdn Bhd Nvidia"}],"status_publishers":["EdgeProp Malaysia (The Edge)"],"power_observations":[],"verification_posture":"imported_source_record","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ebacb890726508925a40/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ebacb890726508925a40.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["GDS Holdings Limited (SEC Form 6-K exhibit)"]},{"site_id":"vcc-site-59f5181a670956fe610c","name":"Zhonglian Zero-Carbon Intelligent Computing (Xuanhe) Industrial Park","country":"China","country_iso_a2":"CN","latitude":37.368345833,"longitude":105.490514167,"geometry_type":"Point","official_boundary":false,"locator_scopes":["campus_locator"],"statuses":["under_construction"],"newest_status_as_of":"2026-10-20","oldest_status_as_of":"2026-10-20","project_count":1,"projects":[{"project_id":"e5f1b401-d5fd-5bd9-a30e-20e2ddd88b3b","name":"Zhonglian Zero-Carbon Intelligent Computing (Xuanhe) Industrial Park — Park Development (A-Zone and B-Zone, Data-Centre Buildings 1#–8#)","status":"under_construction","status_as_of":"2026-10-20","search_terms":""}],"status_publishers":["Shapotou District Branch, Zhongwei Market Supervision Administration"],"power_observations":[],"verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-59f5181a670956fe610c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-59f5181a670956fe610c.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Zhongwei Ecology and Environment Bureau"]}]
