{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-07ef7b0d529815ef1fe5","physical_site_stable_key":"curated:capitaland-dc-navi-mumbai-campus","name":"CapitaLand DC Navi Mumbai Campus","country":"India","country_iso_a2":"IN","latitude":19.175772,"longitude":73.000187,"geometry":{"coordinates":[73.000187,19.175772],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["first_party_published_map_pin"],"geometry_methods":["source_attribute_decimal_coordinates_to_point_without_centroiding"],"geometry_scope_classes":["official_operator_published_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["The dated results table explicitly places Tower 1 and Tower 2 in CapitaLand DC Navi Mumbai; the operator property page names Mumbai 01 in Airoli and provides the campus point. The current point is not a Tower 2 footprint. No building, phase, construction extent or survey accuracy is asserted."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The publisher supplies no numeric horizontal-accuracy statement or surveyed reference feature.","geometry_evidence_ids":["77dc8de7-b028-5897-b0d6-072bc8a1c922"],"project_count":2,"project_ids":["847e667c-d263-55ec-b8ff-bfe495a380cb","e62026de-3394-51f7-8823-44ee0da1801c"],"project_stable_keys":["curated:capitaland-dc-navi-mumbai-campus:tower-1","curated:capitaland-dc-navi-mumbai-campus:tower-2"],"statuses":["operational","under_construction"],"oldest_status_as_of":"2026-07-29","newest_status_as_of":"2026-07-29","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"in","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07ef7b0d529815ef1fe5.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["CapitaLand"]},"projects":[{"project_id":"847e667c-d263-55ec-b8ff-bfe495a380cb","project_stable_key":"curated:capitaland-dc-navi-mumbai-campus:tower-1","site_id":"vcc-site-07ef7b0d529815ef1fe5","physical_site_stable_key":"curated:capitaland-dc-navi-mumbai-campus","name":"CapitaLand DC Navi Mumbai Tower 1","country":"India","country_iso_a2":"IN","latitude":19.175772,"longitude":73.000187,"geometry":{"coordinates":[73.000187,19.175772],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"first_party_published_map_pin","geometry_method":"source_attribute_decimal_coordinates_to_point_without_centroiding","geometry_scope_class":"official_operator_published_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"The dated results table explicitly places Tower 1 and Tower 2 in CapitaLand DC Navi Mumbai; the operator property page names Mumbai 01 in Airoli and provides the campus point. The current point is not a Tower 2 footprint. No building, phase, construction extent or survey accuracy is asserted.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The publisher supplies no numeric horizontal-accuracy statement or surveyed reference feature.","geometry_evidence_id":"77dc8de7-b028-5897-b0d6-072bc8a1c922","last_observed_physical_status":"operational","status_as_of":"2026-07-29","status_age_days_at_review":90,"status_method":"authoritative_physical_status_update","status_evidence_id":"bebf67e1-56af-547c-ba56-6b8a5fb3a97d","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","geometry_source_url":"https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html","project_details":[],"evidence_ids":["77dc8de7-b028-5897-b0d6-072bc8a1c922","bebf67e1-56af-547c-ba56-6b8a5fb3a97d","fdf14fb8-dec6-58f7-9cca-2a210a7852c1"],"status_source":{"evidence_id":"bebf67e1-56af-547c-ba56-6b8a5fb3a97d","title":"CapitaLand India Trust 1H 2026 Financial Results presentation (Navi Mumbai Tower 1 status)","publisher":"CapitaLand India Trust","kind":"company_disclosure","published_at":"2026-07-29","source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","license":"all-rights-reserved","attribution":"CapitaLand India Trust"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/#project-847e667c-d263-55ec-b8ff-bfe495a380cb","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/847e667c-d263-55ec-b8ff-bfe495a380cb.json","geometry_source":{"evidence_id":"77dc8de7-b028-5897-b0d6-072bc8a1c922","title":"CapitaLand Data Centre, Mumbai 01 - official property-page map point","publisher":"CapitaLand","kind":"company_disclosure","published_at":null,"source_url":"https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html","license":"all-rights-reserved","attribution":"CapitaLand"}},{"project_id":"e62026de-3394-51f7-8823-44ee0da1801c","project_stable_key":"curated:capitaland-dc-navi-mumbai-campus:tower-2","site_id":"vcc-site-07ef7b0d529815ef1fe5","physical_site_stable_key":"curated:capitaland-dc-navi-mumbai-campus","name":"CapitaLand DC Navi Mumbai Tower 2","country":"India","country_iso_a2":"IN","latitude":19.175772,"longitude":73.000187,"geometry":{"coordinates":[73.000187,19.175772],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"first_party_published_map_pin","geometry_method":"source_attribute_decimal_coordinates_to_point_without_centroiding","geometry_scope_class":"official_operator_published_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"The dated results table explicitly places Tower 1 and Tower 2 in CapitaLand DC Navi Mumbai; the operator property page names Mumbai 01 in Airoli and provides the campus point. The current point is not a Tower 2 footprint. No building, phase, construction extent or survey accuracy is asserted.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The publisher supplies no numeric horizontal-accuracy statement or surveyed reference feature.","geometry_evidence_id":"77dc8de7-b028-5897-b0d6-072bc8a1c922","last_observed_physical_status":"under_construction","status_as_of":"2026-07-29","status_age_days_at_review":90,"status_method":"authoritative_physical_status_update","status_evidence_id":"bce8fcc5-8779-5852-9c88-28fdd94c9e90","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","geometry_source_url":"https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html","project_details":[],"evidence_ids":["77dc8de7-b028-5897-b0d6-072bc8a1c922","bce8fcc5-8779-5852-9c88-28fdd94c9e90"],"status_source":{"evidence_id":"bce8fcc5-8779-5852-9c88-28fdd94c9e90","title":"CapitaLand India Trust 1H 2026 Financial Results - DCs Under Development","publisher":"CapitaLand India Trust","kind":"company_disclosure","published_at":"2026-07-29","source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","license":"all-rights-reserved","attribution":"CapitaLand India Trust"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/#project-e62026de-3394-51f7-8823-44ee0da1801c","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/e62026de-3394-51f7-8823-44ee0da1801c.json","geometry_source":{"evidence_id":"77dc8de7-b028-5897-b0d6-072bc8a1c922","title":"CapitaLand Data Centre, Mumbai 01 - official property-page map point","publisher":"CapitaLand","kind":"company_disclosure","published_at":null,"source_url":"https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html","license":"all-rights-reserved","attribution":"CapitaLand"}}],"evidence":[{"evidence_id":"77dc8de7-b028-5897-b0d6-072bc8a1c922","roles":["context:geometry_identity","context:site_distinctness","geometry"],"project_ids":["847e667c-d263-55ec-b8ff-bfe495a380cb","e62026de-3394-51f7-8823-44ee0da1801c"],"kind":"company_disclosure","title":"CapitaLand Data Centre, Mumbai 01 - official property-page map point","source_url":"https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html","publisher":"CapitaLand","source_family":"capitaland_official_property_pages","license":"all-rights-reserved","attribution":"CapitaLand","published_at":null,"retrieved_at":"2026-09-08T18:28:04Z","content_hash":"07d35973f72892883a63d699f408c3ad128aee8df088134bb5528636e88659ee","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-07ef7b0d529815ef1fe5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/77dc8de7-b028-5897-b0d6-072bc8a1c922.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/77dc8de7-b028-5897-b0d6-072bc8a1c922.json","archive_url":"https://web.archive.org/web/20260908182804/https://www.capitaland.com/en/find-a-property/global-property-listing/data-centres/capitaland-s-datacentrenavimumbai1.html"},{"evidence_id":"bce8fcc5-8779-5852-9c88-28fdd94c9e90","roles":["physical_status"],"project_ids":["e62026de-3394-51f7-8823-44ee0da1801c"],"kind":"company_disclosure","title":"CapitaLand India Trust 1H 2026 Financial Results - DCs Under Development","source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","publisher":"CapitaLand India Trust","source_family":"capitaland_india_trust_financial_results","license":"all-rights-reserved","attribution":"CapitaLand India Trust","published_at":"2026-07-29","retrieved_at":"2026-09-08T18:28:04Z","content_hash":"5ce78c489021757c8e3f7978039ee3efc256cc58a569625c6f0fc446ea9321af","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-07ef7b0d529815ef1fe5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bce8fcc5-8779-5852-9c88-28fdd94c9e90.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bce8fcc5-8779-5852-9c88-28fdd94c9e90.json","archive_url":"https://web.archive.org/web/20260908182804/https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf"},{"evidence_id":"bebf67e1-56af-547c-ba56-6b8a5fb3a97d","roles":["physical_status"],"project_ids":["847e667c-d263-55ec-b8ff-bfe495a380cb"],"kind":"company_disclosure","title":"CapitaLand India Trust 1H 2026 Financial Results presentation (Navi Mumbai Tower 1 status)","source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf","publisher":"CapitaLand India Trust","source_family":"capitaland_india_trust_financial_results","license":"all-rights-reserved","attribution":"CapitaLand India Trust","published_at":"2026-07-29","retrieved_at":"2026-10-16T18:10:03.898Z","content_hash":"5ce78c489021757c8e3f7978039ee3efc256cc58a569625c6f0fc446ea9321af","publication_date_precision":"day","content_hash_scope":"sha256_exact_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-07ef7b0d529815ef1fe5"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bebf67e1-56af-547c-ba56-6b8a5fb3a97d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bebf67e1-56af-547c-ba56-6b8a5fb3a97d.json","archive_url":"https://web.archive.org/web/20261016181003/https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/july/clint-1h2026-results/2.%20CLINT%201H%202026%20slides_29%20July%202026.pdf"},{"evidence_id":"fdf14fb8-dec6-58f7-9cca-2a210a7852c1","roles":["context:identity","physical_status"],"project_ids":["847e667c-d263-55ec-b8ff-bfe495a380cb","d852bc01-c8e9-57c4-b469-9ff3ea1d8a5c"],"kind":"company_disclosure","title":"CapitaLand Investment reaffirms long-term commitment to Tamil Nadu with unveiling of new Chennai data centre","source_url":"https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/october/cli-affirms-long-term-commitment-to-tamil-nadu/CapitaLand%20Investment%20reaffirms%20long-term%20commitment%20to%20Tamil%20Nadu%20with%20unveiling%20of%20new%20Chennai%20data%20centre.pdf","publisher":"CapitaLand Investment Limited","source_family":"CapitaLand","license":"all-rights-reserved","attribution":"CapitaLand Investment Limited","published_at":"2026-10-15","retrieved_at":"2026-10-16T16:48:02.483Z","content_hash":"61a293901965c156b2ab8bb9fdcdf2b71e1f2b176956355ba9e7df7c2bc6d818","publication_date_precision":"day","content_hash_scope":"sha256_exact_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-07ef7b0d529815ef1fe5","vcc-site-a982e0093e476f44e98f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fdf14fb8-dec6-58f7-9cca-2a210a7852c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fdf14fb8-dec6-58f7-9cca-2a210a7852c1.json","archive_url":"https://web.archive.org/web/20261016164802/https://www.capitaland.com/content/dam/capitaland-newsroom/International/2026/october/cli-affirms-long-term-commitment-to-tamil-nadu/CapitaLand%20Investment%20reaffirms%20long-term%20commitment%20to%20Tamil%20Nadu%20with%20unveiling%20of%20new%20Chennai%20data%20centre.pdf"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-07ef7b0d529815ef1fe5/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-07ef7b0d529815ef1fe5.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-07ef7b0d529815ef1fe5","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
