{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-0ecf05307f91c1e40479","physical_site_stable_key":"curated:qscale-q01-levis-campus","name":"QScale Q01 Lévis Campus","country":"Canada","country_iso_a2":"CA","latitude":46.676157,"longitude":-71.32506265,"geometry":{"coordinates":[[[-71.3254368,46.6766699],[-71.3258964,46.6763421],[-71.3252239,46.6758982],[-71.3251745,46.6759334],[-71.3250213,46.6758322],[-71.3249314,46.6758963],[-71.3245495,46.6756441],[-71.3242289,46.6758727],[-71.3254368,46.6766699]]],"type":"Polygon"},"geometry_type":"Polygon","geometry_source_entity_kinds":["campus"],"geometry_derivations":["cross_source_overlay"],"geometry_methods":["openstreetmap_named_addressed_facility_polygon_as_campus_locator"],"geometry_scope_classes":["reviewed_openstreetmap_named_addressed_qscale_facility_building_polygon"],"geometry_authority_classes":["community_mapped"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Contributor-mapped polygon for one named QScale data-centre building at Q01's exact first-party address, used only to locate the Q01 campus. It is not the Building B footprint or centroid, the Q01 campus boundary, a parcel, a construction extent, or a survey-accuracy claim."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"OpenStreetMap does not state horizontal positional accuracy; community-mapped geometry is not a cadastral or survey product.","geometry_evidence_ids":["8dff3085-994d-5629-b19b-7f2f88c44967"],"project_count":2,"project_ids":["a848e771-2e45-55fb-8d43-db0885bb824f","b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"project_stable_keys":["curated:qscale-q01-levis-campus:building-b","imported:semiconductor-atlas:qscale-q01-levis"],"statuses":["partially_operational","under_construction"],"oldest_status_as_of":"2026-06-04","newest_status_as_of":"2026-10-09","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"ca","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ecf05307f91c1e40479.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},"projects":[{"project_id":"a848e771-2e45-55fb-8d43-db0885bb824f","project_stable_key":"curated:qscale-q01-levis-campus:building-b","site_id":"vcc-site-0ecf05307f91c1e40479","physical_site_stable_key":"curated:qscale-q01-levis-campus","name":"QScale Q01 Building B","country":"Canada","country_iso_a2":"CA","latitude":46.676157,"longitude":-71.32506265,"geometry":{"coordinates":[[[-71.3254368,46.6766699],[-71.3258964,46.6763421],[-71.3252239,46.6758982],[-71.3251745,46.6759334],[-71.3250213,46.6758322],[-71.3249314,46.6758963],[-71.3245495,46.6756441],[-71.3242289,46.6758727],[-71.3254368,46.6766699]]],"type":"Polygon"},"geometry_type":"Polygon","geometry_source_entity_kind":"campus","geometry_derivation":"cross_source_overlay","geometry_method":"openstreetmap_named_addressed_facility_polygon_as_campus_locator","geometry_scope_class":"reviewed_openstreetmap_named_addressed_qscale_facility_building_polygon","geometry_authority_class":"community_mapped","geometry_use_scope":"campus_locator","geometry_precision_scope":"Contributor-mapped polygon for one named QScale data-centre building at Q01's exact first-party address, used only to locate the Q01 campus. It is not the Building B footprint or centroid, the Q01 campus boundary, a parcel, a construction extent, or a survey-accuracy claim.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"OpenStreetMap does not state horizontal positional accuracy; community-mapped geometry is not a cadastral or survey product.","geometry_evidence_id":"8dff3085-994d-5629-b19b-7f2f88c44967","last_observed_physical_status":"under_construction","status_as_of":"2026-06-04","status_age_days_at_review":145,"status_method":"authoritative_physical_status_update","status_evidence_id":"43eab287-205f-5205-ac24-2c93dca605bd","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"source evidence does not distinguish greenfield, expansion, or retrofit","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[{"as_of_date":"2026-06-04","base":60.0,"confidence":0.99,"evidence_id":"43eab287-205f-5205-ac24-2c93dca605bd","high":60.0,"low":60.0,"method":"reported","metric":"critical_it_mw","notes":"Directly labeled IT-capacity design figure; no present-load or operational-capacity claim.","stage":"design","target_date":null,"unit":"MW"}],"power_unknown_reason":null,"annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","geometry_source_url":"https://www.openstreetmap.org/way/1171439340","project_details":[],"evidence_ids":["43eab287-205f-5205-ac24-2c93dca605bd","8dff3085-994d-5629-b19b-7f2f88c44967"],"status_source":{"evidence_id":"43eab287-205f-5205-ac24-2c93dca605bd","title":"QScale Q01 Building B construction update","publisher":"QScale","kind":"company_disclosure","published_at":"2026-06-04","source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","license":"all-rights-reserved","attribution":"QScale"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/#project-a848e771-2e45-55fb-8d43-db0885bb824f","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/a848e771-2e45-55fb-8d43-db0885bb824f.json","geometry_source":{"evidence_id":"8dff3085-994d-5629-b19b-7f2f88c44967","title":"OpenStreetMap way 1171439340: QScale","publisher":"OpenStreetMap contributors","kind":"openstreetmap","published_at":"2023-09-10T19:01:54Z","source_url":"https://www.openstreetmap.org/way/1171439340","license":"ODbL-1.0","attribution":"© OpenStreetMap contributors"}},{"project_id":"b9f9191a-1f90-551d-a8b9-44e6f8833e96","project_stable_key":"imported:semiconductor-atlas:qscale-q01-levis","site_id":"vcc-site-0ecf05307f91c1e40479","physical_site_stable_key":"curated:qscale-q01-levis-campus","name":"QScale Q01 campus (Lévis)","country":"Canada","country_iso_a2":"CA","latitude":46.6761,"longitude":-71.3251,"geometry":{"coordinates":[-71.3251,46.6761],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"site","geometry_authority_class":"compiled_reference","geometry_use_scope":"project_locator","geometry_precision_scope":"QScale's Q01 campus page gives the address 2280 Albert-Dion St, Lévis; coordinates were geocoded from that address to an OpenStreetMap building tagged QScale.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"79ba5ea0-689a-5af4-ba14-30784e107890","last_observed_physical_status":"partially_operational","status_as_of":"2026-10-09","status_age_days_at_review":18,"status_method":"imported_documented_status","status_evidence_id":"bba8372d-6941-50b4-ac42-93b948f99605","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"bd1b7da7-ad64-5106-8974-9e6a18e59762","notes":null,"party":"QScale","relationship_scope":"unknown","role":"developer","source_record_id":"qscale-q01-levis"},{"evidence_id":"183ba80f-eeac-5e5f-a13d-f1640eb9e217","notes":null,"party":"QScale","relationship_scope":"unknown","role":"developer","source_record_id":"qscale-q01-levis"},{"evidence_id":"bba8372d-6941-50b4-ac42-93b948f99605","notes":null,"party":"QScale","relationship_scope":"unknown","role":"developer","source_record_id":"qscale-q01-levis"},{"evidence_id":"47843290-f57d-5b78-bd5b-80bdbcd4692a","notes":null,"party":"QScale","relationship_scope":"unknown","role":"operator","source_record_id":"qscale-q01-levis"},{"evidence_id":"79ba5ea0-689a-5af4-ba14-30784e107890","notes":null,"party":"QScale","relationship_scope":"unknown","role":"operator","source_record_id":"qscale-q01-levis"},{"evidence_id":"47843290-f57d-5b78-bd5b-80bdbcd4692a","notes":"Announced as first anchor tenant in May 2023; deployed its AI cloud at the campus.","party":"Hewlett Packard Enterprise","relationship_scope":"unknown","role":"tenant","source_record_id":"qscale-q01-levis"},{"evidence_id":"79ba5ea0-689a-5af4-ba14-30784e107890","notes":"Announced as first anchor tenant in May 2023; deployed its AI cloud at the campus.","party":"Hewlett Packard Enterprise","relationship_scope":"unknown","role":"tenant","source_record_id":"qscale-q01-levis"},{"evidence_id":"1a572902-495e-5d09-85d2-f9148814a902","notes":"Its infrastructure business acquired QScale; founders and management reinvested.","party":"Goldman Sachs Alternatives","relationship_scope":"unknown","role":"owner","source_record_id":"qscale-q01-levis"},{"evidence_id":"bd1b7da7-ad64-5106-8974-9e6a18e59762","notes":"Provided a loan and bought shares for the first phase in 2021.","party":"Government of Quebec","relationship_scope":"unknown","role":"investor","source_record_id":"qscale-q01-levis"},{"evidence_id":"bd1b7da7-ad64-5106-8974-9e6a18e59762","notes":"Agreement for the use of 140 MW reported at the 2021 launch.","party":"Hydro-Québec","relationship_scope":"unknown","role":"utility","source_record_id":"qscale-q01-levis"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"Goldman Sachs Alternatives","operator":"QScale","users":null,"tenants":"Hewlett Packard Enterprise","customers":null,"status_source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","geometry_source_url":"https://www.qscale.com/q01-campus","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["source_site_point_not_surveyed_boundary","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same QScale Q01 campus at 2280 Albert-Dion Street; coordinates agree within about 7 metres and the Building B issuer source is shared. Source spans operating campus and expansion; existing record is only Building B.","source_record_id":"qscale-q01-levis","target_physical_site_stable_key":"curated:qscale-q01-levis-campus"},"record":{"aliases":["Q01","QScale Q01"],"id":"qscale-q01-levis","last_reviewed":"2026-10-09","location":{"admin1":"Quebec","country":"CA","lat":46.6761,"locality":"Lévis","lon":-71.3251,"note":"QScale's Q01 campus page gives the address 2280 Albert-Dion St, Lévis; coordinates were geocoded from that address to an OpenStreetMap building tagged QScale.","precision":"site","source_ids":["s7"]},"metrics":[{"applies_to":"campus","as_of":"2023-05-22","basis":"planned","metric":"power_capacity","note":"Power capacity listed on the campus page; the 2023 release says the campus is powered by 142 MW of renewable energy. Neither says whether the figure is contracted or how it relates to the 114 MW IT load.","power_scope":"unspecified","qualifier":"exact","source_ids":["s3","s7"],"unit":"MW","value":142},{"applies_to":"campus","as_of":"2021-07-13","basis":"contracted","metric":"power_capacity","note":"Agreement with Hydro-Québec for the use of 140 MW, reported at the 2021 launch.","power_scope":"unspecified","qualifier":"exact","source_ids":["s1"],"unit":"MW","value":140},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"power_capacity","note":"Protected customer IT load stated on the undated campus page.","power_scope":"it_load","qualifier":"exact","source_ids":["s7"],"unit":"MW","value":114},{"applies_to":"phase","as_of":"2026-06-04","basis":"under_construction","metric":"power_capacity","note":"Second building; the release gives its cost as 700 million dollars without a currency code.","phase_label":"Building B","power_scope":"it_load","qualifier":"exact","source_ids":["s6"],"unit":"MW","value":60},{"applies_to":"campus","as_of":"2022-09-21","basis":"announced","metric":"investment","note":"Total for all eight phases. The 2021 launch release gave 867 million dollars, with 195 million for phase 1.","qualifier":"exact","source_ids":["s2"],"unit":"CAD","value":1050000000},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"floor_area","note":"Total building space on the undated campus page; white space about 313,000 sq ft.","qualifier":"approximately","source_ids":["s7"],"unit":"sq_ft","value":930000}],"milestones":[{"date":"2021-07-13","event":"announced","kind":"actual","note":"Launch and financing of the first phase; phase 1 backbone infrastructure was targeted for completion by the end of 2022.","source_ids":["s1"]},{"date":"2022-09-21","event":"other","kind":"actual","note":"Phase 2 construction reported well underway, a year ahead of schedule.","source_ids":["s2"]},{"date":"2023-05-22","event":"other","kind":"actual","note":"Hewlett Packard Enterprise announced as first anchor tenant.","source_ids":["s3"]},{"date":"2024-11-20","event":"other","kind":"actual","note":"Credit facility of up to 320 million dollars arranged to fund phases 3 and 4.","source_ids":["s4"]},{"date":"2026-05-13","event":"other","kind":"actual","note":"Goldman Sachs Alternatives announced that it had closed its acquisition of QScale.","source_ids":["s5"]},{"date":"2026-06-04","event":"expansion_announced","kind":"actual","note":"Construction of Building B (60 MW IT) reported well underway.","source_ids":["s6"]}],"name":"QScale Q01 campus (Lévis)","notes":"Status rests on the June 2026 release, which describes the existing campus in operation while Building B is built, and on QScale's undated campus page, which reports HPE's deployment; status_as_of is the date that page was read (2026-10-09), as are the as_of dates of figures taken from it. Building B's 700 million dollar cost is given without a currency and is not recorded as a metric.","parties":[{"name":"QScale","role":"developer","source_ids":["s1","s2","s6"]},{"name":"QScale","role":"operator","source_ids":["s3","s7"]},{"name":"Hewlett Packard Enterprise","note":"Announced as first anchor tenant in May 2023; deployed its AI cloud at the campus.","role":"tenant","source_ids":["s3","s7"]},{"name":"Goldman Sachs Alternatives","note":"Its infrastructure business acquired QScale; founders and management reinvested.","role":"owner","source_ids":["s5"]},{"name":"Government of Quebec","note":"Provided a loan and bought shares for the first phase in 2021.","role":"investor","source_ids":["s1"]},{"name":"Hydro-Québec","note":"Agreement for the use of 140 MW reported at the 2021 launch.","role":"utility","source_ids":["s1"]}],"power_sources":[{"description":"Supplied by Hydro-Québec through a QScale-owned 120 kV substation; the company describes the supply as 100% renewable.","source_ids":["s1","s7"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2021-07-13","publisher":"QScale","title":"QScale: From Data Processing to Food Self-Sufficiency","type":"company","url":"https://www.qscale.com/news/from-data-processing-to-food-self-sufficiency-financing"},{"accessed":"2026-10-09","id":"s2","published":"2022-09-21","publisher":"QScale","title":"QScale Accelerates Its Expansion and Growth","type":"company","url":"https://www.qscale.com/news/qscale-accelerates-its-expansion-and-growth"},{"accessed":"2026-10-09","id":"s3","published":"2023-05-22","publisher":"QScale","title":"QScale Welcomes Hewlett Packard Enterprise as First Anchor Tenant at Q01 Campus","type":"company","url":"https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260514194651/https://www.qscale.com/news/320m-financing-growth","id":"s4","published":"2024-11-20","publisher":"QScale","title":"QScale Secures Up to $320 Million Funding to Accelerate Growth","type":"company","url":"https://www.qscale.com/news/320m-financing-growth"},{"accessed":"2026-10-09","id":"s5","published":"2026-05-13","publisher":"QScale","title":"Goldman Sachs Alternatives to Acquire QScale, a Leading Canadian Data Center Platform","type":"company","url":"https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale"},{"accessed":"2026-10-09","id":"s6","published":"2026-06-04","publisher":"QScale","title":"QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec","type":"company","url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure"},{"accessed":"2026-10-09","id":"s7","published":null,"publisher":"QScale","title":"Q01 Campus","type":"company","url":"https://www.qscale.com/q01-campus"}],"status":"partially_operational","status_as_of":"2026-10-09","status_source_ids":["s6","s7"],"summary":"QScale's Q01 campus in Lévis, in the Quebec City area, is a liquid- and air-cooled colocation and AI campus that the company says is powered by 142 MW of renewable energy. Launched in 2021 as an eight-phase project, it was later costed at CAD 1.05 billion; Hewlett Packard Enterprise became its first anchor tenant in 2023. Goldman Sachs Alternatives closed its acquisition of QScale in May 2026, and in June 2026 QScale said construction of a second building adding 60 MW of IT capacity was well underway.","workloads":["colocation","ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"bd1b7da7-ad64-5106-8974-9e6a18e59762","s2":"183ba80f-eeac-5e5f-a13d-f1640eb9e217","s3":"47843290-f57d-5b78-bd5b-80bdbcd4692a","s4":"c56477fa-b646-5d68-8657-1b5e25fc2f12","s5":"1a572902-495e-5d09-85d2-f9148814a902","s6":"bba8372d-6941-50b4-ac42-93b948f99605","s7":"79ba5ea0-689a-5af4-ba14-30784e107890"},"source_file":"datacenters/projects/qscale-q01-levis.json","source_record_id":"qscale-q01-levis","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"cc92eb90d7af016cc498a6233f3acd0d2a81a360c55904229d55fd6f73ffc170"}],"evidence_ids":["183ba80f-eeac-5e5f-a13d-f1640eb9e217","1a572902-495e-5d09-85d2-f9148814a902","47843290-f57d-5b78-bd5b-80bdbcd4692a","79ba5ea0-689a-5af4-ba14-30784e107890","bba8372d-6941-50b4-ac42-93b948f99605","bd1b7da7-ad64-5106-8974-9e6a18e59762","c56477fa-b646-5d68-8657-1b5e25fc2f12"],"status_source":{"evidence_id":"bba8372d-6941-50b4-ac42-93b948f99605","title":"QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec","publisher":"QScale","kind":"company_disclosure","published_at":"2026-06-04","source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","license":"source-terms-not-recorded","attribution":"QScale"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/#project-b9f9191a-1f90-551d-a8b9-44e6f8833e96","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/b9f9191a-1f90-551d-a8b9-44e6f8833e96.json","geometry_source":{"evidence_id":"79ba5ea0-689a-5af4-ba14-30784e107890","title":"Q01 Campus","publisher":"QScale","kind":"company_disclosure","published_at":null,"source_url":"https://www.qscale.com/q01-campus","license":"source-terms-not-recorded","attribution":"QScale"}}],"evidence":[{"evidence_id":"1a572902-495e-5d09-85d2-f9148814a902","roles":["imported:record","milestone:other","role:owner"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"Goldman Sachs Alternatives to Acquire QScale, a Leading Canadian Data Center Platform","source_url":"https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2026-05-13","retrieved_at":"2026-10-09","content_hash":"465e6d62f72139e93c755900473aa286022ca28991920d94c96ca07ef06fdedb","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s5","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1a572902-495e-5d09-85d2-f9148814a902.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1a572902-495e-5d09-85d2-f9148814a902.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/goldman-sachs-alternatives-to-acquire-qscale"},{"evidence_id":"8dff3085-994d-5629-b19b-7f2f88c44967","roles":["geometry"],"project_ids":["a848e771-2e45-55fb-8d43-db0885bb824f"],"kind":"openstreetmap","title":"OpenStreetMap way 1171439340: QScale","source_url":"https://www.openstreetmap.org/way/1171439340","publisher":"OpenStreetMap contributors","source_family":"openstreetmap","license":"ODbL-1.0","attribution":"© OpenStreetMap contributors","published_at":"2023-09-10T19:01:54Z","retrieved_at":"2026-07-18T18:15:02.152575Z","content_hash":"b618f90aa1d60b6737ad409febfbd328a24aaa81acc26d9c5e9e14bbcb040e81","publication_date_precision":"datetime","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8dff3085-994d-5629-b19b-7f2f88c44967.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8dff3085-994d-5629-b19b-7f2f88c44967.json","archive_url":"https://web.archive.org/web/20260718181502/https://www.openstreetmap.org/way/1171439340"},{"evidence_id":"79ba5ea0-689a-5af4-ba14-30784e107890","roles":["imported:geometry","imported:record","imported:status","metric:floor_area","metric:power_capacity","power_source:grid","role:operator","role:tenant"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"Q01 Campus","source_url":"https://www.qscale.com/q01-campus","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":null,"retrieved_at":"2026-10-09","content_hash":"6ad9ec6af49c8a8c8859f74073d49483b301a501b06c42e0be9e278505b60ff9","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s7","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/79ba5ea0-689a-5af4-ba14-30784e107890.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/79ba5ea0-689a-5af4-ba14-30784e107890.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/q01-campus"},{"evidence_id":"183ba80f-eeac-5e5f-a13d-f1640eb9e217","roles":["imported:record","metric:investment","milestone:other","role:developer"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"QScale Accelerates Its Expansion and Growth","source_url":"https://www.qscale.com/news/qscale-accelerates-its-expansion-and-growth","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2022-09-21","retrieved_at":"2026-10-09","content_hash":"c8bffa01762068af6a8ceebb09b101b41bd5f1298373b43e6af1814e8a66afe9","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s2","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/183ba80f-eeac-5e5f-a13d-f1640eb9e217.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/183ba80f-eeac-5e5f-a13d-f1640eb9e217.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/qscale-accelerates-its-expansion-and-growth"},{"evidence_id":"bba8372d-6941-50b4-ac42-93b948f99605","roles":["imported:record","imported:status","metric:power_capacity","milestone:expansion_announced","role:developer"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"QScale Begins Construction of Its Second Building at the Q01 Campus, Adding 60 MW of AI-Ready Infrastructure in Quebec","source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2026-06-04","retrieved_at":"2026-10-09","content_hash":"474418bfe4855f9425cc925b517533dd60b48b44948db99772e26c325bed9c5f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s6","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bba8372d-6941-50b4-ac42-93b948f99605.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bba8372d-6941-50b4-ac42-93b948f99605.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure"},{"evidence_id":"43eab287-205f-5205-ac24-2c93dca605bd","roles":["physical_status","typed_metric:critical_it_mw"],"project_ids":["a848e771-2e45-55fb-8d43-db0885bb824f"],"kind":"company_disclosure","title":"QScale Q01 Building B construction update","source_url":"https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure","publisher":"QScale","source_family":"qscale_company_news","license":"all-rights-reserved","attribution":"QScale","published_at":"2026-06-04","retrieved_at":"2026-07-21T18:24:44Z","content_hash":"71cd3c449fce72037b102a9832ab0366ddfb3296002b3783f4d3be28831fe5db","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/43eab287-205f-5205-ac24-2c93dca605bd.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/43eab287-205f-5205-ac24-2c93dca605bd.json","archive_url":"https://web.archive.org/web/20260721182444/https://www.qscale.com/news/q01-building-b-60mw-ai-ready-infrastructure"},{"evidence_id":"c56477fa-b646-5d68-8657-1b5e25fc2f12","roles":["imported:record","milestone:other"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"QScale Secures Up to $320 Million Funding to Accelerate Growth","source_url":"https://www.qscale.com/news/320m-financing-growth","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2024-11-20","retrieved_at":"2026-10-09","content_hash":"90620a4eb43038251c3d3d2f9d40a64f1cda700fc5c85e229c15ffbaae7a5952","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s4","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c56477fa-b646-5d68-8657-1b5e25fc2f12.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c56477fa-b646-5d68-8657-1b5e25fc2f12.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/320m-financing-growth"},{"evidence_id":"47843290-f57d-5b78-bd5b-80bdbcd4692a","roles":["imported:record","metric:power_capacity","milestone:other","role:operator","role:tenant"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"QScale Welcomes Hewlett Packard Enterprise as First Anchor Tenant at Q01 Campus","source_url":"https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2023-05-22","retrieved_at":"2026-10-09","content_hash":"b1b4e0c3d62fc83b79aef6d7ab33e3cd8092bbc66b111ee2a5e887031ceaf01c","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s3","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/47843290-f57d-5b78-bd5b-80bdbcd4692a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/47843290-f57d-5b78-bd5b-80bdbcd4692a.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/hewlett-packard-enterprise-hpe-q01-campus"},{"evidence_id":"bd1b7da7-ad64-5106-8974-9e6a18e59762","roles":["imported:record","metric:power_capacity","milestone:announced","power_source:grid","role:developer","role:investor","role:utility"],"project_ids":["b9f9191a-1f90-551d-a8b9-44e6f8833e96"],"kind":"company_disclosure","title":"QScale: From Data Processing to Food Self-Sufficiency","source_url":"https://www.qscale.com/news/from-data-processing-to-food-self-sufficiency-financing","publisher":"QScale","source_family":"www.qscale.com","license":"source-terms-not-recorded","attribution":"QScale","published_at":"2021-07-13","retrieved_at":"2026-10-09","content_hash":"a2168aeaa01df0a48abbc4dd42e20322f8a891c3db8cef79750a9010676d4ab7","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"qscale-q01-levis","source_local_id":"s1","source_record_sha256":"88ec25d50c62b593691517ad815b73e1bc3d81f12e4e437b5e05f6b866166882","site_ids":["vcc-site-0ecf05307f91c1e40479"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bd1b7da7-ad64-5106-8974-9e6a18e59762.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bd1b7da7-ad64-5106-8974-9e6a18e59762.json","archive_url":"https://web.archive.org/web/20261009/https://www.qscale.com/news/from-data-processing-to-food-self-sufficiency-financing"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-0ecf05307f91c1e40479/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-0ecf05307f91c1e40479.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-0ecf05307f91c1e40479","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
