{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-14a570a5f1dfb8b45e8d","physical_site_stable_key":"imported:semiconductor-atlas:brookfield-cambrai","name":"Data4 Cambrai E-Valley campus","country":"France","country_iso_a2":"FR","latitude":50.22,"longitude":3.1765,"geometry":{"coordinates":[3.1765,50.22],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["approximate_site"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["approximate_site_locator"],"geometry_precision_scopes":["Nominatim position of the E-Valley information board on Avenue de France, Épinoy, inside the former BA 103 base; sources identify the base and E-Valley but not the data center parcel."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["65504e98-2e99-5c57-9dfd-9b25a7cb6e8e"],"project_count":1,"project_ids":["f0697b74-aa81-5aca-ab5b-95a2591d7b2c"],"project_stable_keys":["imported:semiconductor-atlas:brookfield-cambrai"],"statuses":["announced"],"oldest_status_as_of":"2026-06-11","newest_status_as_of":"2026-06-11","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"fr","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-14a570a5f1dfb8b45e8d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-14a570a5f1dfb8b45e8d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Enedis (via Marchés Online)"]},"projects":[{"project_id":"f0697b74-aa81-5aca-ab5b-95a2591d7b2c","project_stable_key":"imported:semiconductor-atlas:brookfield-cambrai","site_id":"vcc-site-14a570a5f1dfb8b45e8d","physical_site_stable_key":"imported:semiconductor-atlas:brookfield-cambrai","name":"Data4 Cambrai E-Valley campus","country":"France","country_iso_a2":"FR","latitude":50.22,"longitude":3.1765,"geometry":{"coordinates":[3.1765,50.22],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"approximate_site","geometry_authority_class":"compiled_reference","geometry_use_scope":"approximate_site_locator","geometry_precision_scope":"Nominatim position of the E-Valley information board on Avenue de France, Épinoy, inside the former BA 103 base; sources identify the base and E-Valley but not the data center parcel.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","last_observed_physical_status":"announced","status_as_of":"2026-06-11","status_age_days_at_review":138,"status_method":"imported_documented_status","status_evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","notes":"Named as the project developer (a Brookfield subsidiary) in local news on the prefect-led steering committee; no Data4 release on Cambrai could be opened.","party":"Data4","relationship_scope":"unknown","role":"developer","source_record_id":"brookfield-cambrai"},{"evidence_id":"9f275d73-26cf-5833-8d2f-0185eb616ae4","notes":"Parent of Data4; early reporting (La Tribune Dimanche via TechCrunch) tied part of Brookfield's France pledge to Cambrai.","party":"Brookfield","relationship_scope":"unknown","role":"investor","source_record_id":"brookfield-cambrai"},{"evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","notes":"Parent of Data4; early reporting (La Tribune Dimanche via TechCrunch) tied part of Brookfield's France pledge to Cambrai.","party":"Brookfield","relationship_scope":"unknown","role":"investor","source_record_id":"brookfield-cambrai"},{"evidence_id":"65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","notes":"Distribution operator tendering the medium-voltage connection works for the E-Valley data center site.","party":"Enedis","relationship_scope":"unknown","role":"utility","source_record_id":"brookfield-cambrai"},{"evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","notes":"The prefecture runs the project steering committee: the then sub-prefect chaired the first meeting on 2026-02-03 and the Nord prefect the second on 2026-06-09.","party":"Préfecture du Nord","relationship_scope":"unknown","role":"government","source_record_id":"brookfield-cambrai"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/","geometry_source_url":"https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1","project_details":[{"identity_decision":{"decision":"unique_site","flags":["approximate_locator_not_boundary"],"rationale":"No matching named development in the 201-project release. Preserve Data4 Cambrai E-Valley campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.","source_record_id":"brookfield-cambrai"},"record":{"aliases":["E-Valley data center campus","Brookfield Cambrai data center"],"id":"brookfield-cambrai","last_reviewed":"2026-10-09","location":{"admin1":"Hauts-de-France","country":"FR","lat":50.22,"locality":"Épinoy (E-Valley, former Cambrai air base)","lon":3.1765,"note":"Nominatim position of the E-Valley information board on Avenue de France, Épinoy, inside the former BA 103 base; sources identify the base and E-Valley but not the data center parcel.","precision":"approximate_site","source_ids":["s2","s3"]},"metrics":[{"applies_to":"campus","as_of":"2026-06-11","basis":"planned","metric":"power_capacity","power_scope":"unspecified","qualifier":"up_to","source_ids":["s1","s3"],"unit":"MW","value":1000},{"applies_to":"phase","as_of":"2026-06-11","basis":"planned","metric":"power_capacity","phase_label":"First tranche","power_scope":"unspecified","qualifier":"exact","source_ids":["s3"],"unit":"MW","value":300},{"applies_to":"campus","as_of":"2025-02-09","basis":"reported","metric":"investment","note":"Media report (La Tribune Dimanche, relayed by TechCrunch); not stated in Brookfield's own release.","qualifier":"approximately","source_ids":["s1"],"unit":"EUR","value":15000000000}],"milestones":[{"date":"2025-02-09","event":"announced","kind":"actual","note":"TechCrunch, relaying La Tribune Dimanche, reported that about EUR 15 billion of Brookfield's EUR 20 billion French pledge would go to a Cambrai data center.","source_ids":["s1"]},{"date":"2026-04-14","event":"other","kind":"actual","note":"Enedis tender for about 29 km of underground HTA cabling to four customer substations, with works scheduled for 2027.","source_ids":["s2"]},{"date":"2026-H2","event":"construction_started","kind":"planned","source_ids":["s3"]},{"date":"2027","event":"first_operational","kind":"planned","note":"First deliveries expected 2027-2028.","source_ids":["s3"]}],"name":"Data4 Cambrai E-Valley campus","notes":"Neither Brookfield nor Data4 published a site-specific release for Cambrai that could be opened; details rest on news reports and the Enedis tender. The info.fr report is labelled as written by an AI editorial agent. It says a significant part of a further EUR 10 billion Brookfield pledge for France is meant for E-Valley; that sum is not a campus figure and is not recorded as a metric. Local officials cite about 4,000 direct and indirect jobs. The 320 hectares often quoted refer to the whole E-Valley site, not the data center plot.","parties":[{"name":"Data4","note":"Named as the project developer (a Brookfield subsidiary) in local news on the prefect-led steering committee; no Data4 release on Cambrai could be opened.","role":"developer","source_ids":["s3"]},{"name":"Brookfield","note":"Parent of Data4; early reporting (La Tribune Dimanche via TechCrunch) tied part of Brookfield's France pledge to Cambrai.","role":"investor","source_ids":["s1","s3"]},{"name":"Enedis","note":"Distribution operator tendering the medium-voltage connection works for the E-Valley data center site.","role":"utility","source_ids":["s2"]},{"name":"Préfecture du Nord","note":"The prefecture runs the project steering committee: the then sub-prefect chaired the first meeting on 2026-02-03 and the Nord prefect the second on 2026-06-09.","role":"government","source_ids":["s3"]}],"power_sources":[{"description":"Medium-voltage feeds from the Haplincourt and Prémy source substations via about 29 km of new underground cable to four customer substations.","source_ids":["s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-02-09","publisher":"TechCrunch","title":"Investments in French AI ecosystem reach $85B as Brookfield commits $20B","type":"news","url":"https://techcrunch.com/2025/02/09/investments-in-french-ai-ecosystem-reach-85b-as-brookfield-commits-20b"},{"accessed":"2026-10-09","id":"s2","published":"2026-04-16","publisher":"Enedis (via Marchés Online)","title":"Travaux d'extension électrique HTA pour le raccordement du site Data Center EVALLEY","type":"utility","url":"https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1"},{"accessed":"2026-10-09","id":"s3","published":"2026-06-11","publisher":"info.fr","title":"Nord : le comité de pilotage des data centers d'E-Valley réuni mardi sous l'égide du préfet","type":"news","url":"https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/"}],"status":"announced","status_as_of":"2026-06-11","status_source_ids":["s3"],"summary":"Data4, the data center unit of Brookfield, is planning a campus of up to 1 GW at E-Valley on the former Cambrai military air base (BA 103) in northern France. Brookfield's February 2025 France pledge was reported to direct about EUR 15 billion to a Cambrai data center. A June 2026 local report cites a first 300 MW tranche, works from the second half of 2026 and first deliveries in 2027-2028. Enedis tendered about 29 km of medium-voltage cabling in April 2026 to feed four customer substations at the site, with the works set for 2027.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"9f275d73-26cf-5833-8d2f-0185eb616ae4","s2":"65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","s3":"ec04f464-c888-5e65-bef1-18866a4b0db1"},"source_file":"datacenters/projects/brookfield-cambrai.json","source_record_id":"brookfield-cambrai","source_record_sha256":"2891f5a66bae56bd7dc5094bb823fef9c967375463700de3fac489238ce67c84","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"d9e4fe305b4ad667bb9ea27e210e6e6172e41a537eca390f04600fd26b3a208d"}],"evidence_ids":["65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","9f275d73-26cf-5833-8d2f-0185eb616ae4","ec04f464-c888-5e65-bef1-18866a4b0db1"],"status_source":{"evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","title":"Nord : le comité de pilotage des data centers d'E-Valley réuni mardi sous l'égide du préfet","publisher":"info.fr","kind":"news","published_at":"2026-06-11","source_url":"https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/","license":"source-terms-not-recorded","attribution":"info.fr"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-14a570a5f1dfb8b45e8d/#project-f0697b74-aa81-5aca-ab5b-95a2591d7b2c","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/f0697b74-aa81-5aca-ab5b-95a2591d7b2c.json","geometry_source":{"evidence_id":"65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","title":"Travaux d'extension électrique HTA pour le raccordement du site Data Center EVALLEY","publisher":"Enedis (via Marchés Online)","kind":"utility_disclosure","published_at":"2026-04-16","source_url":"https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1","license":"source-terms-not-recorded","attribution":"Enedis (via Marchés Online)"}}],"evidence":[{"evidence_id":"9f275d73-26cf-5833-8d2f-0185eb616ae4","roles":["imported:record","metric:investment","metric:power_capacity","milestone:announced","role:investor"],"project_ids":["f0697b74-aa81-5aca-ab5b-95a2591d7b2c"],"kind":"news","title":"Investments in French AI ecosystem reach $85B as Brookfield commits $20B","source_url":"https://techcrunch.com/2025/02/09/investments-in-french-ai-ecosystem-reach-85b-as-brookfield-commits-20b","publisher":"TechCrunch","source_family":"techcrunch.com","license":"source-terms-not-recorded","attribution":"TechCrunch","published_at":"2025-02-09","retrieved_at":"2026-10-09","content_hash":"8ede0a1afc8805357c855691185d19b30e4ca318c3e6afa95b07747677b9be7f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"brookfield-cambrai","source_local_id":"s1","source_record_sha256":"2891f5a66bae56bd7dc5094bb823fef9c967375463700de3fac489238ce67c84","site_ids":["vcc-site-14a570a5f1dfb8b45e8d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f275d73-26cf-5833-8d2f-0185eb616ae4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f275d73-26cf-5833-8d2f-0185eb616ae4.json","archive_url":"https://web.archive.org/web/20261009/https://techcrunch.com/2025/02/09/investments-in-french-ai-ecosystem-reach-85b-as-brookfield-commits-20b"},{"evidence_id":"ec04f464-c888-5e65-bef1-18866a4b0db1","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","milestone:construction_started","milestone:first_operational","role:developer","role:government","role:investor"],"project_ids":["f0697b74-aa81-5aca-ab5b-95a2591d7b2c"],"kind":"news","title":"Nord : le comité de pilotage des data centers d'E-Valley réuni mardi sous l'égide du préfet","source_url":"https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/","publisher":"info.fr","source_family":"info.fr","license":"source-terms-not-recorded","attribution":"info.fr","published_at":"2026-06-11","retrieved_at":"2026-10-09","content_hash":"80f27ebc143a3ac6a5590a7a35c2ca29d7332cfeb75040221a68607d8b368304","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"brookfield-cambrai","source_local_id":"s3","source_record_sha256":"2891f5a66bae56bd7dc5094bb823fef9c967375463700de3fac489238ce67c84","site_ids":["vcc-site-14a570a5f1dfb8b45e8d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ec04f464-c888-5e65-bef1-18866a4b0db1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ec04f464-c888-5e65-bef1-18866a4b0db1.json","archive_url":"https://web.archive.org/web/20261009/https://info.fr/nord-comite-pilotage-data-centers-e-valley-cambrai/"},{"evidence_id":"65504e98-2e99-5c57-9dfd-9b25a7cb6e8e","roles":["imported:geometry","imported:record","milestone:other","power_source:grid","role:utility"],"project_ids":["f0697b74-aa81-5aca-ab5b-95a2591d7b2c"],"kind":"utility_disclosure","title":"Travaux d'extension électrique HTA pour le raccordement du site Data Center EVALLEY","source_url":"https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1","publisher":"Enedis (via Marchés Online)","source_family":"www.marchesonline.com","license":"source-terms-not-recorded","attribution":"Enedis (via Marchés Online)","published_at":"2026-04-16","retrieved_at":"2026-10-09","content_hash":"a373caa5df19059ff23eac6af5ac3f3ed790ea31110910e72a766fc21f805b5f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"brookfield-cambrai","source_local_id":"s2","source_record_sha256":"2891f5a66bae56bd7dc5094bb823fef9c967375463700de3fac489238ce67c84","site_ids":["vcc-site-14a570a5f1dfb8b45e8d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/65504e98-2e99-5c57-9dfd-9b25a7cb6e8e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/65504e98-2e99-5c57-9dfd-9b25a7cb6e8e.json","archive_url":"https://web.archive.org/web/20261009/https://www.marchesonline.com/appels-offres/avis/travaux-d-extension-electrique-hta-pour-le-raccordement/ao-9588877-1"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-14a570a5f1dfb8b45e8d/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-14a570a5f1dfb8b45e8d.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-14a570a5f1dfb8b45e8d","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
