{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-1f215e81ecc04c69b5d6","physical_site_stable_key":"curated:hut8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":30.727892,"longitude":-91.299513,"geometry":{"coordinates":[-91.299513,30.727892],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude."],"geometry_methods":["operator_published_mapbox_campus_marker"],"geometry_scope_classes":["operator_published_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.","geometry_evidence_ids":["111e4ef0-d1c4-5b87-8c40-be427705300f","649edbaf-a971-56f7-93c0-ea2569188d14","688470de-c2fd-561a-93c3-5b4b00bcf981","873a0c1d-1e8a-55f6-81ab-db5d75aa832e","ebef4446-a514-5896-8a6d-c9e0109c3eb4"],"project_count":2,"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"project_stable_keys":["curated:hut8-river-bend-ai-data-center-campus:245mw-critical-it-current-build","imported:semiconductor-atlas:hut8-river-bend-louisiana"],"statuses":["under_construction"],"oldest_status_as_of":"2026-08-04","newest_status_as_of":"2026-10-05","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f215e81ecc04c69b5d6.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},"projects":[{"project_id":"3e074273-f5f7-5785-ab10-232a5ebd5c6b","project_stable_key":"curated:hut8-river-bend-ai-data-center-campus:245mw-critical-it-current-build","site_id":"vcc-site-1f215e81ecc04c69b5d6","physical_site_stable_key":"curated:hut8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend 245 MW Critical IT Current Build","country":"United States","country_iso_a2":"US","latitude":30.727892,"longitude":-91.299513,"geometry":{"coordinates":[-91.299513,30.727892],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude.","geometry_method":"operator_published_mapbox_campus_marker","geometry_scope_class":"operator_published_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.","geometry_evidence_id":"688470de-c2fd-561a-93c3-5b4b00bcf981","last_observed_physical_status":"under_construction","status_as_of":"2026-08-04","status_age_days_at_review":84,"status_method":"authoritative_physical_status_update","status_evidence_id":"b89b0c05-a075-5b61-a0d4-2f673c68a1d3","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","geometry_source_url":"https://www.hut8.com/data-centers/river-bend","project_details":[],"evidence_ids":["111e4ef0-d1c4-5b87-8c40-be427705300f","649edbaf-a971-56f7-93c0-ea2569188d14","64c55c1e-635d-5e2f-ad72-151398b719a5","688470de-c2fd-561a-93c3-5b4b00bcf981","873a0c1d-1e8a-55f6-81ab-db5d75aa832e","b89b0c05-a075-5b61-a0d4-2f673c68a1d3","ebef4446-a514-5896-8a6d-c9e0109c3eb4"],"status_source":{"evidence_id":"b89b0c05-a075-5b61-a0d4-2f673c68a1d3","title":"Hut 8 August 4 River Bend physical construction update","publisher":"Hut 8 Corp.","kind":"company_disclosure","published_at":"2026-08-04","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","license":"all-rights-reserved","attribution":"Hut 8 Corp."},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/#project-3e074273-f5f7-5785-ab10-232a5ebd5c6b","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/3e074273-f5f7-5785-ab10-232a5ebd5c6b.json","geometry_source":{"evidence_id":"688470de-c2fd-561a-93c3-5b4b00bcf981","title":"River Bend named operator record and coordinate","publisher":"Hut 8 Corp.","kind":"company_disclosure","published_at":null,"source_url":"https://www.hut8.com/data-centers/river-bend","license":"all-rights-reserved","attribution":"Hut 8 Corp."}},{"project_id":"8aa8e9f5-915e-51f6-bc08-463822cf16f9","project_stable_key":"imported:semiconductor-atlas:hut8-river-bend-louisiana","site_id":"vcc-site-1f215e81ecc04c69b5d6","physical_site_stable_key":"curated:hut8-river-bend-ai-data-center-campus","name":"Hut 8 River Bend AI data center campus","country":"United States","country_iso_a2":"US","latitude":30.87,"longitude":-91.42,"geometry":{"coordinates":[-91.42,30.87],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"admin2","geometry_authority_class":"compiled_reference","geometry_use_scope":"admin2_context","geometry_precision_scope":"Parish coordinates from Wikipedia; the sources name the parish but not a street address or town.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","last_observed_physical_status":"under_construction","status_as_of":"2026-10-05","status_age_days_at_review":22,"status_method":"imported_documented_status","status_evidence_id":"0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"34c18a94-daee-58ac-a05d-5e7953ceeffb","notes":null,"party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","notes":null,"party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","notes":null,"party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","notes":"Phase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity.","party":"Fluidstack","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","notes":"Phase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity.","party":"Fluidstack","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"3a625ff7-d3f3-5a72-bdb7-713ce15a8145","notes":"Phase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity.","party":"Fluidstack","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"61f0da8a-025f-50f1-b3da-32ba0a073c46","notes":"Reported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed.","party":"Anthropic","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"b3252878-e738-59ab-82da-7b01f9adbdc3","notes":"Reported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed.","party":"Anthropic","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","notes":"Reported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed.","party":"Anthropic","relationship_scope":"unknown","role":"tenant","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","notes":null,"party":"Entergy Louisiana","relationship_scope":"unknown","role":"utility","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","notes":null,"party":"Entergy Louisiana","relationship_scope":"unknown","role":"utility","source_record_id":"hut8-river-bend-louisiana"},{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","notes":"Its secretary was quoted in the announcement and it estimated the indirect jobs; Hut 8 is expected to use the state sales and use tax rebate on data center equipment and the Quality Jobs program.","party":"Louisiana Economic Development","relationship_scope":"unknown","role":"government","source_record_id":"hut8-river-bend-louisiana"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":"Anthropic; Fluidstack","customers":null,"status_source_url":"https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/","geometry_source_url":"https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same Hut 8 River Bend campus in West Feliciana Parish and shared issuer quarterly source. Source combines phase I 245 MW critical IT with potential 1 GW campus growth; existing record is the scoped 245 MW current build.","source_record_id":"hut8-river-bend-louisiana","target_physical_site_stable_key":"curated:hut8-river-bend-ai-data-center-campus"},"record":{"aliases":["River Bend campus"],"id":"hut8-river-bend-louisiana","last_reviewed":"2026-10-09","location":{"admin1":"Louisiana","admin2":"West Feliciana Parish","country":"US","lat":30.87,"lon":-91.42,"note":"Parish coordinates from Wikipedia; the sources name the parish but not a street address or town.","precision":"admin2","source_ids":["s3","s4","s7","s8"]},"metrics":[{"applies_to":"phase","as_of":"2025-12-17","basis":"contracted","metric":"power_capacity","phase_label":"Phase I (Fluidstack lease)","power_scope":"it_load","qualifier":"exact","source_ids":["s1","s4"],"unit":"MW","value":245},{"applies_to":"phase","as_of":"2025-12-17","basis":"planned","metric":"power_capacity","note":"Initial utility capacity from Entergy Louisiana.","phase_label":"Phase I","power_scope":"grid_connection","qualifier":"exact","source_ids":["s3","s4"],"unit":"MW","value":330},{"applies_to":"campus","as_of":"2025-12-17","basis":"planned","metric":"power_capacity","note":"Announcement materials say the campus could scale to 1,000 MW of utility capacity; Hut 8's August 2026 results describe 1,000 MW of potential expansion capacity at River Bend subject to added power.","power_scope":"grid_connection","qualifier":"up_to","source_ids":["s3","s4","s6"],"unit":"MW","value":1000},{"applies_to":"campus","as_of":"2025-12-17","basis":"planned","metric":"power_capacity","note":"Motley Fool says Hut 8 and Fluidstack could deliver as much as 2,295 MW of AI data center infrastructure to Anthropic at River Bend. This exceeds the 1,000 MW utility scale-up cited by other sources, and Hut 8 material that could be read does not state it.","power_scope":"unspecified","qualifier":"up_to","source_ids":["s5"],"unit":"MW","value":2295},{"applies_to":"phase","as_of":"2025-12-17","basis":"announced","metric":"investment","phase_label":"Phase I","qualifier":"up_to","source_ids":["s3","s4"],"unit":"USD","value":10000000000},{"applies_to":"phase","as_of":"2025-12-17","basis":"planned","metric":"jobs_construction","phase_label":"Phase I peak","qualifier":"approximately","source_ids":["s3","s4"],"unit":"count","value":1000},{"applies_to":"campus","as_of":"2026-10-05","basis":"reported","metric":"jobs_construction","note":"Construction workers reported on site in October 2026.","qualifier":"exact","source_ids":["s7"],"unit":"count","value":1200},{"applies_to":"phase","as_of":"2025-12-17","basis":"planned","metric":"jobs_permanent","phase_label":"Phase I","qualifier":"at_least","source_ids":["s3","s4"],"unit":"count","value":75}],"milestones":[{"date":"2025-12-17","event":"announced","kind":"actual","source_ids":["s1","s3"]},{"date":"2027-Q2","event":"first_operational","kind":"planned","note":"Target at announcement; WAFB reported in October 2026 that the facility is expected to be operational by the end of 2027.","source_ids":["s3","s4","s7"]}],"name":"Hut 8 River Bend AI data center campus","parties":[{"name":"Hut 8","role":"developer","source_ids":["s1","s3","s4"]},{"name":"Fluidstack","note":"Phase I tenant for 245 MW of critical IT load; holds a right of first offer on expansion capacity.","role":"tenant","source_ids":["s3","s4","s6"]},{"name":"Anthropic","note":"Reported end user of the capacity leased to Fluidstack: the Motley Fool says the infrastructure will be delivered to Anthropic and WAFB says the facility will serve Claude. Hut 8's release headline announces a partnership with Anthropic and Fluidstack, but its text could not be read, so Anthropic's role at River Bend is not confirmed by the companies in the sources reviewed.","role":"tenant","source_ids":["s2","s5","s7"]},{"name":"Entergy Louisiana","role":"utility","source_ids":["s3","s4"]},{"name":"Louisiana Economic Development","note":"Its secretary was quoted in the announcement and it estimated the indirect jobs; Hut 8 is expected to use the state sales and use tax rebate on data center equipment and the Quality Jobs program.","role":"government","source_ids":["s3"]}],"power_sources":[{"description":"Entergy Louisiana is to supply an initial 330 MW, with possible growth to 1,000 MW; WAFB reports a new on-site substation being built with Entergy and funded by the company.","source_ids":["s4","s7"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-12-17","publisher":"Hut 8","title":"Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value"},{"accessed":"2026-10-09","id":"s2","published":"2025-12-17","publisher":"Hut 8","title":"Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack"},{"accessed":"2026-10-09","id":"s3","published":"2025-12-17","publisher":"Expansion Solutions Magazine","title":"Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus","type":"trade_press","url":"https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20251230201057/https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center","id":"s4","published":"2025-12-22","publisher":"T&D World","title":"Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center","type":"trade_press","url":"https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center"},{"accessed":"2026-10-09","id":"s5","published":"2025-12-18","publisher":"The Motley Fool (via Yahoo Finance)","title":"Why Hut 8 Stock Popped Today","type":"news","url":"https://finance.yahoo.com/news/why-hut-8-stock-popped-005207470.html"},{"accessed":"2026-10-09","id":"s6","published":"2026-08-04","publisher":"Hut 8","title":"Hut 8 Reports Second Quarter 2026 Results","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261007003735/https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/","id":"s7","published":"2026-10-05","publisher":"WAFB","title":"First Look: West Feliciana's data center","type":"news","url":"https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/"},{"accessed":"2026-10-09","id":"s8","published":null,"publisher":"Wikipedia","title":"West Feliciana Parish, Louisiana","type":"other","url":"https://en.wikipedia.org/wiki/West_Feliciana_Parish,_Louisiana"}],"status":"under_construction","status_as_of":"2026-10-05","status_source_ids":["s7","s4"],"summary":"AI data center campus under construction by Hut 8 in West Feliciana Parish, Louisiana. Phase I is leased to Fluidstack for 245 MW of critical IT load under a 15-year lease valued at $7.0 billion, with Google backstopping the lease obligations; Hut 8 announced a partnership with Anthropic and Fluidstack the same day, and news reports say the capacity is for Anthropic. Entergy Louisiana is to supply an initial 330 MW, with potential to scale to 1,000 MW. Phase I investment is up to $10 billion. Local reporting in October 2026 counted about 1,200 construction workers on site and said the facility will serve Anthropic's Claude.","workloads":["ai_training","ai_inference"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"34c18a94-daee-58ac-a05d-5e7953ceeffb","s2":"61f0da8a-025f-50f1-b3da-32ba0a073c46","s3":"932ebe4b-b0e1-5949-9d37-8cdc24107263","s4":"9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","s5":"b3252878-e738-59ab-82da-7b01f9adbdc3","s6":"3a625ff7-d3f3-5a72-bdb7-713ce15a8145","s7":"0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","s8":"db8a5f41-54a7-5429-a346-43a9dcef1a7f"},"source_file":"datacenters/projects/hut8-river-bend-louisiana.json","source_record_id":"hut8-river-bend-louisiana","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"a57ccc13004e57961708a310b651c4b92ffd423c798405ef1944b84fd1f8f50e"}],"evidence_ids":["0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","34c18a94-daee-58ac-a05d-5e7953ceeffb","3a625ff7-d3f3-5a72-bdb7-713ce15a8145","61f0da8a-025f-50f1-b3da-32ba0a073c46","932ebe4b-b0e1-5949-9d37-8cdc24107263","9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","b3252878-e738-59ab-82da-7b01f9adbdc3","db8a5f41-54a7-5429-a346-43a9dcef1a7f"],"status_source":{"evidence_id":"0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","title":"First Look: West Feliciana's data center","publisher":"WAFB","kind":"news","published_at":"2026-10-05","source_url":"https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/","license":"source-terms-not-recorded","attribution":"WAFB"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/#project-8aa8e9f5-915e-51f6-bc08-463822cf16f9","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/8aa8e9f5-915e-51f6-bc08-463822cf16f9.json","geometry_source":{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","title":"Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus","publisher":"Expansion Solutions Magazine","kind":"trade_press","published_at":"2025-12-17","source_url":"https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/","license":"source-terms-not-recorded","attribution":"Expansion Solutions Magazine"}}],"evidence":[{"evidence_id":"0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f","roles":["imported:geometry","imported:record","imported:status","metric:jobs_construction","milestone:first_operational","power_source:grid","role:tenant"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"news","title":"First Look: West Feliciana's data center","source_url":"https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/","publisher":"WAFB","source_family":"www.wafb.com","license":"source-terms-not-recorded","attribution":"WAFB","published_at":"2026-10-05","retrieved_at":"2026-10-09","content_hash":"860502fddd7fbb6b04e926d3d4b788aaa41448bbf993dc2704e2c56391ce28b7","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s7","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0dd7a6bd-41cb-5875-a335-cd3a5bf7fc2f.json","archive_url":"https://web.archive.org/web/20261009/https://www.wafb.com/2026/10/05/first-look-west-felicianas-data-center/"},{"evidence_id":"61f0da8a-025f-50f1-b3da-32ba0a073c46","roles":["imported:record","role:tenant"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"company_disclosure","title":"Hut 8 Announces AI Infrastructure Partnership with Anthropic and Fluidstack","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2025-12-17","retrieved_at":"2026-10-09","content_hash":"b5a571ab567ec918bff617162e7b2326965e984e087aac30082ba2e951345fd0","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s2","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/61f0da8a-025f-50f1-b3da-32ba0a073c46.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/61f0da8a-025f-50f1-b3da-32ba0a073c46.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-announces-ai-infrastructure-partnership-with-anthropic-and-fluidstack"},{"evidence_id":"b89b0c05-a075-5b61-a0d4-2f673c68a1d3","roles":["context:geometry_identity","context:site_distinctness","physical_status"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b"],"kind":"company_disclosure","title":"Hut 8 August 4 River Bend physical construction update","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":"2026-08-04","retrieved_at":"2026-09-08T23:13:46.969Z","content_hash":"5dd5a6ba19bde75372b8a39ab725d97fbd8429e8369a7f1d14ad47942c3e1b58","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b89b0c05-a075-5b61-a0d4-2f673c68a1d3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b89b0c05-a075-5b61-a0d4-2f673c68a1d3.json","archive_url":"https://web.archive.org/web/20260908231346/https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"evidence_id":"111e4ef0-d1c4-5b87-8c40-be427705300f","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 frontend named marker derivation","source_url":"https://www.hut8.com/_nuxt/D5nZ9oDL.js","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:16:24.414Z","content_hash":"832b2a3b34eb077b91faeb7bd5d3575f884ab65d1544dfa8d741bd78f29a4d8e","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/111e4ef0-d1c4-5b87-8c40-be427705300f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/111e4ef0-d1c4-5b87-8c40-be427705300f.json","archive_url":"https://web.archive.org/web/20260908231624/https://www.hut8.com/_nuxt/D5nZ9oDL.js"},{"evidence_id":"649edbaf-a971-56f7-93c0-ea2569188d14","roles":["context:geometry_identity","context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 platform list binds named campuses to map locations","source_url":"https://www.hut8.com/our-platform","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:14:16.902Z","content_hash":"90ed067c4fb5f3998d9528e70a84ab1b6c24414084a00c42abfa432c855a3a19","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/649edbaf-a971-56f7-93c0-ea2569188d14.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/649edbaf-a971-56f7-93c0-ea2569188d14.json","archive_url":"https://web.archive.org/web/20260908231416/https://www.hut8.com/our-platform"},{"evidence_id":"3a625ff7-d3f3-5a72-bdb7-713ce15a8145","roles":["imported:record","metric:power_capacity","role:tenant"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"company_disclosure","title":"Hut 8 Reports Second Quarter 2026 Results","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2026-08-04","retrieved_at":"2026-10-09","content_hash":"f45ef6f66258b70bf676285c3dec2478a1ae555c5ea3dac72d705a5a6e64eb22","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s6","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3a625ff7-d3f3-5a72-bdb7-713ce15a8145.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3a625ff7-d3f3-5a72-bdb7-713ce15a8145.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"evidence_id":"9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c","roles":["imported:geometry","imported:record","imported:status","metric:investment","metric:jobs_construction","metric:jobs_permanent","metric:power_capacity","milestone:first_operational","power_source:grid","role:developer","role:tenant","role:utility"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"trade_press","title":"Hut 8 Selects Entergy, Southeast Louisiana for $10 Billion Artificial Intelligence Data Center","source_url":"https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center","publisher":"T&D World","source_family":"www.tdworld.com","license":"source-terms-not-recorded","attribution":"T&D World","published_at":"2025-12-22","retrieved_at":"2026-10-09","content_hash":"168304e37d4bc5305e06d8a1df08da956015d4bd54d6f0f25c5c398966d37b49","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s4","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9b3fe3a6-8cd3-5ca4-a84b-c6c3023d721c.json","archive_url":"https://web.archive.org/web/20261009/https://www.tdworld.com/smart-utility/news/55339947/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center"},{"evidence_id":"932ebe4b-b0e1-5949-9d37-8cdc24107263","roles":["imported:geometry","imported:record","metric:investment","metric:jobs_construction","metric:jobs_permanent","metric:power_capacity","milestone:announced","milestone:first_operational","role:developer","role:government","role:tenant","role:utility"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"trade_press","title":"Hut 8 Selects Southeast Louisiana for $10B AI Data Center Campus","source_url":"https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/","publisher":"Expansion Solutions Magazine","source_family":"www.expansionsolutionsmagazine.com","license":"source-terms-not-recorded","attribution":"Expansion Solutions Magazine","published_at":"2025-12-17","retrieved_at":"2026-10-09","content_hash":"927e7678142ee9936dd846b6ddb4354aec385f4c71719b285d0e53e646b95f4f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s3","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/932ebe4b-b0e1-5949-9d37-8cdc24107263.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/932ebe4b-b0e1-5949-9d37-8cdc24107263.json","archive_url":"https://web.archive.org/web/20261009/https://www.expansionsolutionsmagazine.com/hut-8-selects-southeast-louisiana-for-10b-ai-data-center-campus/"},{"evidence_id":"34c18a94-daee-58ac-a05d-5e7953ceeffb","roles":["imported:record","metric:power_capacity","milestone:announced","role:developer"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"company_disclosure","title":"Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus with Total Contract Value of $7.0 Billion","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2025-12-17","retrieved_at":"2026-10-09","content_hash":"c876fc1fb02d7cc5c17fa5313806a921e77c266c13bcd9c851b0afca221bb7fc","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s1","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/34c18a94-daee-58ac-a05d-5e7953ceeffb.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/34c18a94-daee-58ac-a05d-5e7953ceeffb.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value"},{"evidence_id":"64c55c1e-635d-5e2f-ad72-151398b719a5","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 website rights notice","source_url":"https://www.hut8.com/terms","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:21:23.834Z","content_hash":"baa8e25485074c69867e1eb23cff4111b0c36a3908b332ae1134644331b03549","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/64c55c1e-635d-5e2f-ad72-151398b719a5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/64c55c1e-635d-5e2f-ad72-151398b719a5.json","archive_url":"https://web.archive.org/web/20260908232123/https://www.hut8.com/terms"},{"evidence_id":"ebef4446-a514-5896-8a6d-c9e0109c3eb4","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Mapbox LngLat geographic coordinate contract","source_url":"https://docs.mapbox.com/mapbox-gl-js/api/geography/","publisher":"Mapbox","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Mapbox","published_at":null,"retrieved_at":"2026-09-08T23:19:42.748Z","content_hash":"65696f2eadafcb1d2e7fc7e9f7c85bb923c0a3f428fb204047e0912890312cc0","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ebef4446-a514-5896-8a6d-c9e0109c3eb4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ebef4446-a514-5896-8a6d-c9e0109c3eb4.json","archive_url":"https://web.archive.org/web/20260908231942/https://docs.mapbox.com/mapbox-gl-js/api/geography/"},{"evidence_id":"873a0c1d-1e8a-55f6-81ab-db5d75aa832e","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"RFC 7946 GeoJSON coordinate reference system","source_url":"https://datatracker.ietf.org/doc/html/rfc7946","publisher":"IETF Trust","source_family":"americas_round9_hut8","license":"IETF-Trust-Legal-Provisions","attribution":"IETF Trust","published_at":null,"retrieved_at":"2026-09-08T23:20:45.353Z","content_hash":"bcaa061faa3f2f3eec2a5846b01e6986a6aacf7fa64c2e88f74fb02d260a1adf","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/873a0c1d-1e8a-55f6-81ab-db5d75aa832e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/873a0c1d-1e8a-55f6-81ab-db5d75aa832e.json","archive_url":"https://web.archive.org/web/20260908232045/https://datatracker.ietf.org/doc/html/rfc7946"},{"evidence_id":"688470de-c2fd-561a-93c3-5b4b00bcf981","roles":["context:geometry_identity","context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b"],"kind":"company_disclosure","title":"River Bend named operator record and coordinate","source_url":"https://www.hut8.com/data-centers/river-bend","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:14:35.204Z","content_hash":"7ad7e581a19a08906a59e4d784587bd390cd0a620dc3d0566ddd0c5f905a529f","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/688470de-c2fd-561a-93c3-5b4b00bcf981.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/688470de-c2fd-561a-93c3-5b4b00bcf981.json","archive_url":"https://web.archive.org/web/20260908231435/https://www.hut8.com/data-centers/river-bend"},{"evidence_id":"db8a5f41-54a7-5429-a346-43a9dcef1a7f","roles":["imported:geometry","imported:record"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"other","title":"West Feliciana Parish, Louisiana","source_url":"https://en.wikipedia.org/wiki/West_Feliciana_Parish,_Louisiana","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"f577e81859fca1b74f4e8ffd78f372da57af97313de6adc41e28acc45487d443","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s8","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/db8a5f41-54a7-5429-a346-43a9dcef1a7f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/db8a5f41-54a7-5429-a346-43a9dcef1a7f.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/West_Feliciana_Parish,_Louisiana"},{"evidence_id":"b3252878-e738-59ab-82da-7b01f9adbdc3","roles":["imported:record","metric:power_capacity","role:tenant"],"project_ids":["8aa8e9f5-915e-51f6-bc08-463822cf16f9"],"kind":"news","title":"Why Hut 8 Stock Popped Today","source_url":"https://finance.yahoo.com/news/why-hut-8-stock-popped-005207470.html","publisher":"The Motley Fool (via Yahoo Finance)","source_family":"finance.yahoo.com","license":"source-terms-not-recorded","attribution":"The Motley Fool (via Yahoo Finance)","published_at":"2025-12-18","retrieved_at":"2026-10-09","content_hash":"f18e6994df4c9dd95659076a2175ab6f68e68bc2930f1fcc8d668baa435c3e7f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-river-bend-louisiana","source_local_id":"s5","source_record_sha256":"fb7eeaf52bb6e7789effaf24b3ee0bb7e31922a38047e56ede8f20f89e9b204a","site_ids":["vcc-site-1f215e81ecc04c69b5d6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b3252878-e738-59ab-82da-7b01f9adbdc3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b3252878-e738-59ab-82da-7b01f9adbdc3.json","archive_url":"https://web.archive.org/web/20261009/https://finance.yahoo.com/news/why-hut-8-stock-popped-005207470.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-1f215e81ecc04c69b5d6/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-1f215e81ecc04c69b5d6.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-1f215e81ecc04c69b5d6","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
