{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-25a38e5a66933753cd86","physical_site_stable_key":"curated:china-mobile-gba-shaoguan-data-center","name":"China Mobile GBA (Shaoguan) Data Center","country":"China","country_iso_a2":"CN","latitude":24.9099635,"longitude":113.5527787,"geometry":{"coordinates":[113.5527787,24.9099635],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["coordinate_transform"],"geometry_methods":["official_plan_gauss_kruger_zone38_coordinates_cgcs2000_transform_imagery_checked"],"geometry_scope_classes":["official_redline_parcel_centroid_from_plan_coordinates"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Centroid of the official ZC0201A-15 planning red line (six transcribed vertices; 73,063 m2 computed vs 73,605 m2 stated) containing built Phase 1 A/B and proposed C/D. The C/D pair centroid lies 51 m south-west. Not a surveyed boundary, entrance or construction extent."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The plans state no datum or survey accuracy; the CGCS2000 zone-38 interpretation is checked only against 10 m Sentinel-2 imagery (registration within roughly 10 m for built controls). Absolute accuracy is not established; decimal places are arithmetic precision.","geometry_evidence_ids":["a753caa5-eb6a-5ecc-a591-bd1f591b7339"],"project_count":2,"project_ids":["5e52d4ca-f8f7-5153-996f-0291502ccc67","7a5c1f89-4003-574e-9ad7-242ae7ef2d2c"],"project_stable_keys":["curated:china-mobile-gba-shaoguan-data-center:phase1-a-b-buildings","curated:china-mobile-gba-shaoguan-data-center:phase2-c-d-buildings"],"statuses":["announced","completed"],"oldest_status_as_of":"2026-09-30","newest_status_as_of":"2026-09-30","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25a38e5a66933753cd86.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Shaoguan Natural Resources Bureau"]},"projects":[{"project_id":"5e52d4ca-f8f7-5153-996f-0291502ccc67","project_stable_key":"curated:china-mobile-gba-shaoguan-data-center:phase2-c-d-buildings","site_id":"vcc-site-25a38e5a66933753cd86","physical_site_stable_key":"curated:china-mobile-gba-shaoguan-data-center","name":"China Mobile GBA (Shaoguan) Data Center — C/D buildings (Phase 2)","country":"China","country_iso_a2":"CN","latitude":24.9099635,"longitude":113.5527787,"geometry":{"coordinates":[113.5527787,24.9099635],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"coordinate_transform","geometry_method":"official_plan_gauss_kruger_zone38_coordinates_cgcs2000_transform_imagery_checked","geometry_scope_class":"official_redline_parcel_centroid_from_plan_coordinates","geometry_authority_class":"compiled_reference","geometry_use_scope":"campus_locator","geometry_precision_scope":"Centroid of the official ZC0201A-15 planning red line (six transcribed vertices; 73,063 m2 computed vs 73,605 m2 stated) containing built Phase 1 A/B and proposed C/D. The C/D pair centroid lies 51 m south-west. Not a surveyed boundary, entrance or construction extent.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The plans state no datum or survey accuracy; the CGCS2000 zone-38 interpretation is checked only against 10 m Sentinel-2 imagery (registration within roughly 10 m for built controls). Absolute accuracy is not established; decimal places are arithmetic precision.","geometry_evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","last_observed_physical_status":"announced","status_as_of":"2026-09-30","status_age_days_at_review":27,"status_method":"authoritative_project_announcement","status_evidence_id":"44c2ba34-a0f9-551d-a93f-810a593219c5","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","party":"China Mobile Communications Group Guangdong Co., Ltd.","relationship_scope":"intended","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"China Mobile Communications Group Guangdong Co., Ltd.","users":null,"tenants":null,"customers":null,"status_source_url":"https://www.sg.gov.cn/bmpdlm/zrzyj/ghgs/ghzd/pqgs/content/post_2886351.html","geometry_source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","project_details":[],"evidence_ids":["0e744963-7dee-5741-b16b-948b53892cad","2e26970a-84ab-5a82-ae46-64074d07d541","44c2ba34-a0f9-551d-a93f-810a593219c5","46ff35a8-8f00-5c95-8c55-2ae66182bd3e","a753caa5-eb6a-5ecc-a591-bd1f591b7339"],"status_source":{"evidence_id":"44c2ba34-a0f9-551d-a93f-810a593219c5","title":"Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station","publisher":"Shaoguan Natural Resources Bureau","kind":"government_record","published_at":"2026-09-30","source_url":"https://www.sg.gov.cn/bmpdlm/zrzyj/ghgs/ghzd/pqgs/content/post_2886351.html","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/#project-5e52d4ca-f8f7-5153-996f-0291502ccc67","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/5e52d4ca-f8f7-5153-996f-0291502ccc67.json","geometry_source":{"evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","title":"Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15","publisher":"Shaoguan Natural Resources Bureau","kind":"government_record","published_at":"2026-09-30","source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau"}},{"project_id":"7a5c1f89-4003-574e-9ad7-242ae7ef2d2c","project_stable_key":"curated:china-mobile-gba-shaoguan-data-center:phase1-a-b-buildings","site_id":"vcc-site-25a38e5a66933753cd86","physical_site_stable_key":"curated:china-mobile-gba-shaoguan-data-center","name":"China Mobile GBA (Shaoguan) Data Center — Phase 1 A/B buildings","country":"China","country_iso_a2":"CN","latitude":24.9099635,"longitude":113.5527787,"geometry":{"coordinates":[113.5527787,24.9099635],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"coordinate_transform","geometry_method":"official_plan_gauss_kruger_zone38_coordinates_cgcs2000_transform_imagery_checked","geometry_scope_class":"official_redline_parcel_centroid_from_plan_coordinates","geometry_authority_class":"compiled_reference","geometry_use_scope":"campus_locator","geometry_precision_scope":"Centroid of the official ZC0201A-15 planning red line (six transcribed vertices; 73,063 m2 computed vs 73,605 m2 stated) containing built Phase 1 A/B and proposed C/D. The C/D pair centroid lies 51 m south-west. Not a surveyed boundary, entrance or construction extent.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The plans state no datum or survey accuracy; the CGCS2000 zone-38 interpretation is checked only against 10 m Sentinel-2 imagery (registration within roughly 10 m for built controls). Absolute accuracy is not established; decimal places are arithmetic precision.","geometry_evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","last_observed_physical_status":"completed","status_as_of":"2026-09-30","status_age_days_at_review":27,"status_method":"authoritative_physical_status_update","status_evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"44c2ba34-a0f9-551d-a93f-810a593219c5","party":"China Mobile Communications Group Guangdong Co., Ltd.","relationship_scope":"current","role":"owner"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"China Mobile Communications Group Guangdong Co., Ltd.","operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","geometry_source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","project_details":[],"evidence_ids":["2e26970a-84ab-5a82-ae46-64074d07d541","44c2ba34-a0f9-551d-a93f-810a593219c5","46ff35a8-8f00-5c95-8c55-2ae66182bd3e","a753caa5-eb6a-5ecc-a591-bd1f591b7339"],"status_source":{"evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","title":"Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15","publisher":"Shaoguan Natural Resources Bureau","kind":"government_record","published_at":"2026-09-30","source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/#project-7a5c1f89-4003-574e-9ad7-242ae7ef2d2c","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/7a5c1f89-4003-574e-9ad7-242ae7ef2d2c.json","geometry_source":{"evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","title":"Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15","publisher":"Shaoguan Natural Resources Bureau","kind":"government_record","published_at":"2026-09-30","source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau"}}],"evidence":[{"evidence_id":"0e744963-7dee-5741-b16b-948b53892cad","roles":["context:identity"],"project_ids":["0dae92e0-0d98-5673-9b35-f59be33bc6c0","1c6c1ab3-5d51-5203-948e-c42de44de16e","5e52d4ca-f8f7-5153-996f-0291502ccc67"],"kind":"other","title":"EOX Sentinel-2 cloudless 2025 mosaic: Shaoguan Zhenjiang data-centre cluster (EPSG:4326 WMS extract)","source_url":"https://tiles.maps.eox.at/wms?service=WMS&version=1.1.1&request=GetMap&layers=s2cloudless-2025&styles=&srs=EPSG:4326&bbox=113.535,24.895,113.570,24.925&width=1750&height=1500&format=image/jpeg","publisher":"EOX IT Services GmbH","source_family":"EOX IT Services GmbH","license":"CC-BY-NC-SA-4.0","attribution":"Sentinel-2 cloudless - https://s2maps.eu by EOX IT Services GmbH (Contains modified Copernicus Sentinel data 2025)","published_at":null,"retrieved_at":"2026-10-16T16:46:05.907Z","content_hash":"fbbdb234d7c59561a9367aae4cc7741c95268c7e66f20e4680a814c237146bea","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-25a38e5a66933753cd86","vcc-site-c66042a23be32caf8198","vcc-site-e730be87839857aed507"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0e744963-7dee-5741-b16b-948b53892cad.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0e744963-7dee-5741-b16b-948b53892cad.json","archive_url":"https://web.archive.org/web/20261016164605/https://tiles.maps.eox.at/wms?service=WMS&version=1.1.1&request=GetMap&layers=s2cloudless-2025&styles=&srs=EPSG:4326&bbox=113.535,24.895,113.570,24.925&width=1750&height=1500&format=image/jpeg"},{"evidence_id":"46ff35a8-8f00-5c95-8c55-2ae66182bd3e","roles":["context:identity"],"project_ids":["5e52d4ca-f8f7-5153-996f-0291502ccc67","7a5c1f89-4003-574e-9ad7-242ae7ef2d2c"],"kind":"government_record","title":"Shaoguan government: China Mobile GBA (Shaoguan) Data Center formally in operation (June 2025)","source_url":"https://www.sg.gov.cn/zfxxgkml/content/post_2751499.html","publisher":"Shaoguan Municipal Government","source_family":"Shaoguan Municipal Government","license":"all-rights-reserved","attribution":"Shaoguan Municipal Government","published_at":"2025-06-13","retrieved_at":"2026-10-16T16:50:07.396Z","content_hash":"688a460b5be88b5798d69382bea330c6e0e6c0988fd411058fd3deef48c58ae1","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-25a38e5a66933753cd86"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/46ff35a8-8f00-5c95-8c55-2ae66182bd3e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/46ff35a8-8f00-5c95-8c55-2ae66182bd3e.json","archive_url":"https://web.archive.org/web/20261016165007/https://www.sg.gov.cn/zfxxgkml/content/post_2751499.html"},{"evidence_id":"2e26970a-84ab-5a82-ae46-64074d07d541","roles":["context:identity"],"project_ids":["0dae92e0-0d98-5673-9b35-f59be33bc6c0","1c6c1ab3-5d51-5203-948e-c42de44de16e","5e52d4ca-f8f7-5153-996f-0291502ccc67","7a5c1f89-4003-574e-9ad7-242ae7ef2d2c"],"kind":"government_record","title":"Shaoguan government: Zhenjiang accelerates GBA computing core (reprinted from Shaoguan Daily)","source_url":"https://www.sg.gov.cn/zsyz/tzhj/zdcy/content/post_2874722.html","publisher":"Shaoguan Municipal Government / Shaoguan Daily","source_family":"Shaoguan Municipal Government / Shaoguan Daily","license":"all-rights-reserved","attribution":"Shaoguan Municipal Government / Shaoguan Daily","published_at":"2026-08-27","retrieved_at":"2026-10-16T16:48:50.059Z","content_hash":"c3611bd68ad18376d16c6eee3ad8a65dc4ae55af364d91f41a3176108a9d10bf","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-25a38e5a66933753cd86","vcc-site-c66042a23be32caf8198","vcc-site-e730be87839857aed507"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e26970a-84ab-5a82-ae46-64074d07d541.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e26970a-84ab-5a82-ae46-64074d07d541.json","archive_url":"https://web.archive.org/web/20261016164850/https://www.sg.gov.cn/zsyz/tzhj/zdcy/content/post_2874722.html"},{"evidence_id":"a753caa5-eb6a-5ecc-a591-bd1f591b7339","roles":["geometry","physical_status","role:operator"],"project_ids":["5e52d4ca-f8f7-5153-996f-0291502ccc67","7a5c1f89-4003-574e-9ad7-242ae7ef2d2c"],"kind":"government_record","title":"Shaoguan NRB pre-approval notice plan sheet: China Mobile GBA (Shaoguan) Data Center C/D, parcel ZC0201A-15","source_url":"https://www.sg.gov.cn/img/0/649/649497/2886351.jpg","publisher":"Shaoguan Natural Resources Bureau","source_family":"Shaoguan Natural Resources Bureau","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau","published_at":"2026-09-30","retrieved_at":"2026-10-16T16:21:31.615Z","content_hash":"2734c774cc1155871c6b59e1a164a905d114c268f2cc51830c5b44da419aa846","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-25a38e5a66933753cd86"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a753caa5-eb6a-5ecc-a591-bd1f591b7339.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a753caa5-eb6a-5ecc-a591-bd1f591b7339.json","archive_url":"https://web.archive.org/web/20261016162131/https://www.sg.gov.cn/img/0/649/649497/2886351.jpg"},{"evidence_id":"44c2ba34-a0f9-551d-a93f-810a593219c5","roles":["announcement","context:identity","role:owner"],"project_ids":["5e52d4ca-f8f7-5153-996f-0291502ccc67","7a5c1f89-4003-574e-9ad7-242ae7ef2d2c"],"kind":"government_record","title":"Shaoguan NRB pre-approval notice: China Mobile GBA (Shaoguan) Data Center C and D buildings, maintenance building and switching station","source_url":"https://www.sg.gov.cn/bmpdlm/zrzyj/ghgs/ghzd/pqgs/content/post_2886351.html","publisher":"Shaoguan Natural Resources Bureau","source_family":"Shaoguan Natural Resources Bureau","license":"all-rights-reserved","attribution":"Shaoguan Natural Resources Bureau","published_at":"2026-09-30","retrieved_at":"2026-10-16T16:19:35.622Z","content_hash":"de9636e2a3a9d19df324fa65154b3d1a396943550b7542499b030034edbe29b0","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-25a38e5a66933753cd86"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/44c2ba34-a0f9-551d-a93f-810a593219c5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/44c2ba34-a0f9-551d-a93f-810a593219c5.json","archive_url":"https://web.archive.org/web/20261016161935/https://www.sg.gov.cn/bmpdlm/zrzyj/ghgs/ghzd/pqgs/content/post_2886351.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-25a38e5a66933753cd86/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-25a38e5a66933753cd86.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-25a38e5a66933753cd86","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
