{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-33110c77390f92dc4432","physical_site_stable_key":"curated:meta-richland-parish-data-center","name":"Meta Richland Parish Data Center","country":"United States","country_iso_a2":"US","latitude":32.5289242,"longitude":-91.6360844,"geometry":{"coordinates":[-91.6360844,32.5289242],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["Use the single exact-name community feature, verify its source object geometry, and emit the unchanged service longitude/latitude in GeoJSON order."],"geometry_methods":["nominatim_exact_named_campus_reference_point"],"geometry_scope_classes":["community_named_campus_reference_point"],"geometry_authority_classes":["community_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["The returned point lies in the northern component of the named three-component campus relation. It represents the overall operator-described campus, not a particular first building, Phase 2 construction, or Laidley/Evest legal parcel. No survey, exact building centroid, active construction footprint or bounded numerical accuracy is claimed."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Community mapper and geocoder provide no bounded horizontal accuracy; coordinate decimal places are not measurement precision.","geometry_evidence_ids":["0357dcf6-dd2c-51fe-b107-8c9b253f17ec","5492ab7f-9c74-548f-b15a-a0173d4d9c47","816746dd-9748-5937-8412-65422ee24556","90966722-c08a-559d-abf9-1e0cd87125ac","d5e0a9c8-25a7-56f4-b135-3a8fc17352e0"],"project_count":2,"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552","803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"project_stable_keys":["curated:meta-richland-parish-data-center:current-development","imported:semiconductor-atlas:meta-hyperion-richland-parish"],"statuses":["under_construction"],"oldest_status_as_of":"2026-07-14","newest_status_as_of":"2026-07-16","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-33110c77390f92dc4432.json","geometry_licenses":["CC-BY-SA-2.0","ODbL-1.0","no-open-license-asserted"],"geometry_attributions":["Nominatim project","OpenStreetMap Foundation","OpenStreetMap contributors","OpenStreetMap contributors via Nominatim"]},"projects":[{"project_id":"1404f5cd-04ee-57ea-8f73-91992fea0552","project_stable_key":"curated:meta-richland-parish-data-center:current-development","site_id":"vcc-site-33110c77390f92dc4432","physical_site_stable_key":"curated:meta-richland-parish-data-center","name":"Meta Richland Parish Current Development","country":"United States","country_iso_a2":"US","latitude":32.5289242,"longitude":-91.6360844,"geometry":{"coordinates":[-91.6360844,32.5289242],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"Use the single exact-name community feature, verify its source object geometry, and emit the unchanged service longitude/latitude in GeoJSON order.","geometry_method":"nominatim_exact_named_campus_reference_point","geometry_scope_class":"community_named_campus_reference_point","geometry_authority_class":"community_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"The returned point lies in the northern component of the named three-component campus relation. It represents the overall operator-described campus, not a particular first building, Phase 2 construction, or Laidley/Evest legal parcel. No survey, exact building centroid, active construction footprint or bounded numerical accuracy is claimed.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Community mapper and geocoder provide no bounded horizontal accuracy; coordinate decimal places are not measurement precision.","geometry_evidence_id":"0357dcf6-dd2c-51fe-b107-8c9b253f17ec","last_observed_physical_status":"under_construction","status_as_of":"2026-07-16","status_age_days_at_review":103,"status_method":"authoritative_physical_status_update","status_evidence_id":"3e31f188-1822-59b3-a3ae-ffd7f298725c","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana","geometry_source_url":"https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1","project_details":[],"evidence_ids":["0357dcf6-dd2c-51fe-b107-8c9b253f17ec","3e31f188-1822-59b3-a3ae-ffd7f298725c","5492ab7f-9c74-548f-b15a-a0173d4d9c47","816746dd-9748-5937-8412-65422ee24556","90966722-c08a-559d-abf9-1e0cd87125ac","bbe5b5b6-1a35-5d71-ab9b-27dbbf404a5a","be721c3f-e877-5d6b-aa16-7ab56c9d5a57","d5e0a9c8-25a7-56f4-b135-3a8fc17352e0"],"status_source":{"evidence_id":"3e31f188-1822-59b3-a3ae-ffd7f298725c","title":"Turner July 16 Richland Parish interior buildout observation","publisher":"Turner Construction Company","kind":"company_disclosure","published_at":"2026-07-16","source_url":"https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana","license":"all-rights-reserved","attribution":"Turner Construction Company"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/#project-1404f5cd-04ee-57ea-8f73-91992fea0552","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/1404f5cd-04ee-57ea-8f73-91992fea0552.json","geometry_source":{"evidence_id":"0357dcf6-dd2c-51fe-b107-8c9b253f17ec","title":"Exact named Meta Richland Parish Data Center Nominatim point","publisher":"OpenStreetMap contributors via Nominatim","kind":"openstreetmap","published_at":null,"source_url":"https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1","license":"ODbL-1.0","attribution":"OpenStreetMap contributors via Nominatim"}},{"project_id":"803e9da5-cd1e-5849-813c-fe7c5b5f126b","project_stable_key":"imported:semiconductor-atlas:meta-hyperion-richland-parish","site_id":"vcc-site-33110c77390f92dc4432","physical_site_stable_key":"curated:meta-richland-parish-data-center","name":"Meta Richland Parish data center (Hyperion)","country":"United States","country_iso_a2":"US","latitude":32.4676,"longitude":-91.6268,"geometry":{"coordinates":[-91.6268,32.4676],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Sources place the campus on the former Franklin Farm megasite between Rayville and Delhi; the 2026 state release is datelined Holly Ridge and WRKF refers to the Holly Ridge site. Coordinates are the Holly Ridge community point from OpenStreetMap Nominatim, not a surveyed site boundary.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","last_observed_physical_status":"under_construction","status_as_of":"2026-07-14","status_age_days_at_review":105,"status_method":"imported_documented_status","status_evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"developer","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"developer","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"fb1aac41-ec76-5e30-9c4d-71a378ffc056","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"developer","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Holds 20% of the joint venture that owns the campus and keeps the development and property-management role.","party":"Meta Platforms","relationship_scope":"unknown","role":"owner","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"b27b5754-60c7-5c40-a6b6-59cfdedcce28","notes":"Holds 20% of the joint venture that owns the campus and keeps the development and property-management role.","party":"Meta Platforms","relationship_scope":"unknown","role":"owner","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Anchor tenant leasing the facilities from the joint venture.","party":"Meta Platforms","relationship_scope":"unknown","role":"tenant","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Funds managed by Blue Owl hold 80% of the joint venture formed in late 2025.","party":"Blue Owl Capital (managed funds)","relationship_scope":"unknown","role":"owner","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"b27b5754-60c7-5c40-a6b6-59cfdedcce28","notes":"Funds managed by Blue Owl hold 80% of the joint venture formed in late 2025.","party":"Blue Owl Capital (managed funds)","relationship_scope":"unknown","role":"owner","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Led the debt placements that helped finance the joint venture.","party":"PIMCO","relationship_scope":"unknown","role":"investor","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","notes":null,"party":"Entergy Louisiana","relationship_scope":"unknown","role":"utility","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"f97052f5-ffa1-5891-9048-536982584e9c","notes":null,"party":"Entergy Louisiana","relationship_scope":"unknown","role":"utility","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","notes":null,"party":"Entergy Louisiana","relationship_scope":"unknown","role":"utility","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Named as a general contractor.","party":"Turner Construction Company","relationship_scope":"unknown","role":"builder","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Named as a general contractor.","party":"DPR Construction","relationship_scope":"unknown","role":"builder","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","notes":"Named as a general contractor.","party":"Mortenson","relationship_scope":"unknown","role":"builder","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","notes":null,"party":"Louisiana Economic Development","relationship_scope":"unknown","role":"government","source_record_id":"meta-hyperion-richland-parish"},{"evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","notes":null,"party":"Louisiana Economic Development","relationship_scope":"unknown","role":"government","source_record_id":"meta-hyperion-richland-parish"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"Blue Owl Capital (managed funds); Meta Platforms","operator":null,"users":null,"tenants":"Meta Platforms","customers":null,"status_source_url":"https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history","geometry_source_url":"https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same Meta Franklin Farm/Richland Parish Hyperion campus. Source includes the 5 GW long-term campus expansion; release evidence explicitly delimits observed phase 1/phase 2 construction, so preserve a broader campus scope.","source_record_id":"meta-hyperion-richland-parish","target_physical_site_stable_key":"curated:meta-richland-parish-data-center"},"record":{"aliases":["Hyperion","Richland Parish Data Center","Holly Ridge"],"id":"meta-hyperion-richland-parish","last_reviewed":"2026-10-09","location":{"admin1":"Louisiana","admin2":"Richland Parish","country":"US","lat":32.4676,"locality":"Holly Ridge","lon":-91.6268,"note":"Sources place the campus on the former Franklin Farm megasite between Rayville and Delhi; the 2026 state release is datelined Holly Ridge and WRKF refers to the Holly Ridge site. Coordinates are the Holly Ridge community point from OpenStreetMap Nominatim, not a surveyed site boundary.","precision":"locality","source_ids":["s1","s4","s5"]},"metrics":[{"applies_to":"campus","as_of":"2026-07-13","basis":"planned","metric":"power_capacity","note":"The state release calls this IT capacity; Meta's fact sheet describes the same 5 GW as compute capacity to house Hyperion, which it calls its largest AI cluster.","power_scope":"it_load","qualifier":"exact","source_ids":["s4","s6"],"unit":"MW","value":5000},{"applies_to":"phase","as_of":"2025-11-05","basis":"planned","metric":"power_capacity","note":"Reported before the 2026 expansion as the initial capacity target, with possible growth toward 5 GW.","phase_label":"Initial build targeted by 2030","power_scope":"unspecified","qualifier":"approximately","source_ids":["s3"],"unit":"MW","value":2000},{"applies_to":"campus","as_of":"2025-08-20","basis":"planned","metric":"power_capacity","note":"Power requirement cited in coverage of the August 2025 utility approval, before the 5 GW expansion.","power_scope":"unspecified","qualifier":"approximately","source_ids":["s2"],"unit":"MW","value":2500},{"applies_to":"campus","as_of":"2024-12-04","basis":"announced","metric":"investment","qualifier":"exact","source_ids":["s1"],"unit":"USD","value":10000000000},{"applies_to":"campus","as_of":"2025-11-05","basis":"reported","metric":"investment","note":"Expected total development cost of the Meta and Blue Owl joint venture, covering buildings and long-lived power, cooling and connectivity infrastructure.","qualifier":"approximately","source_ids":["s3","s7"],"unit":"USD","value":27000000000},{"applies_to":"campus","as_of":"2026-07-13","basis":"announced","metric":"investment","qualifier":"more_than","source_ids":["s4","s6"],"unit":"USD","value":50000000000},{"applies_to":"campus","as_of":"2024-12-04","basis":"planned","metric":"floor_area","qualifier":"exact","source_ids":["s1"],"unit":"sq_ft","value":4000000},{"applies_to":"campus","as_of":"2026-07-13","basis":"planned","metric":"floor_area","note":"Described as nearly 10 million square feet after the 2026 expansion.","qualifier":"approximately","source_ids":["s4"],"unit":"sq_ft","value":10000000},{"applies_to":"campus","as_of":"2024-12-04","basis":"reported","metric":"land_area","qualifier":"exact","source_ids":["s1"],"unit":"acres","value":2250},{"applies_to":"campus","as_of":"2026-07-14","basis":"reported","metric":"land_area","note":"Eventual footprint reported after the 2026 expansion.","qualifier":"more_than","source_ids":["s5"],"unit":"acres","value":3200},{"applies_to":"campus","as_of":"2024-12-04","basis":"planned","metric":"jobs_construction","note":"Peak construction workforce projected at announcement.","qualifier":"exact","source_ids":["s1"],"unit":"count","value":5000},{"applies_to":"campus","as_of":"2026-07-13","basis":"planned","metric":"jobs_construction","note":"Peak construction workforce projected after the expansion.","qualifier":"exact","source_ids":["s4"],"unit":"count","value":7500},{"applies_to":"campus","as_of":"2024-12-04","basis":"planned","metric":"jobs_permanent","qualifier":"at_least","source_ids":["s1"],"unit":"count","value":500},{"applies_to":"campus","as_of":"2026-07-13","basis":"planned","metric":"jobs_permanent","qualifier":"approximately","source_ids":["s4","s6"],"unit":"count","value":1000}],"milestones":[{"date":"2024-12-04","event":"announced","kind":"actual","source_ids":["s1"]},{"date":"2024-12","event":"construction_started","kind":"actual","note":"The state said site work would begin in December; later reporting dates the groundbreaking to December 2024.","source_ids":["s1","s5"]},{"date":"2025-08","event":"other","kind":"actual","note":"The Louisiana Public Service Commission voted 4-1 to approve Entergy Louisiana's three new gas plants tied to the campus, as reported on 2025-08-20.","source_ids":["s2"]},{"date":"2025-10","event":"other","kind":"actual","note":"Meta announced the joint venture with Blue Owl-managed funds at the end of October 2025 and on 21 October cited a development cost of about USD 27 billion.","source_ids":["s3","s7"]},{"date":"2026-07-13","event":"expansion_announced","kind":"actual","note":"Expansion to 5 GW of IT capacity and more than USD 50 billion of investment.","source_ids":["s4","s5"]},{"date":"2030","event":"other","kind":"planned","note":"Target for roughly 2 GW of initial capacity, as reported before the 2026 expansion.","source_ids":["s3"]},{"date":"2036","event":"fully_operational","kind":"planned","note":"Officials expect the full build-out of both phases by 2036.","source_ids":["s5"]}],"name":"Meta Richland Parish data center (Hyperion)","notes":"Meta's fact sheet PDF (s6) shows no publication date; its embedded file creation date is 2026-09-01. The KTVE article (s7) shows only a relative date.","parties":[{"name":"Meta Platforms","role":"developer","source_ids":["s1","s4","s6"]},{"name":"Meta Platforms","note":"Holds 20% of the joint venture that owns the campus and keeps the development and property-management role.","role":"owner","source_ids":["s3","s7"]},{"name":"Meta Platforms","note":"Anchor tenant leasing the facilities from the joint venture.","role":"tenant","source_ids":["s3"]},{"name":"Blue Owl Capital (managed funds)","note":"Funds managed by Blue Owl hold 80% of the joint venture formed in late 2025.","role":"owner","source_ids":["s3","s7"]},{"name":"PIMCO","note":"Led the debt placements that helped finance the joint venture.","role":"investor","source_ids":["s3"]},{"name":"Entergy Louisiana","role":"utility","source_ids":["s1","s2","s4"]},{"name":"Turner Construction Company","note":"Named as a general contractor.","role":"builder","source_ids":["s3"]},{"name":"DPR Construction","note":"Named as a general contractor.","role":"builder","source_ids":["s3"]},{"name":"Mortenson","note":"Named as a general contractor.","role":"builder","source_ids":["s3"]},{"name":"Louisiana Economic Development","role":"government","source_ids":["s1","s4"]}],"power_sources":[{"description":"Supplied by Entergy Louisiana under a 20-year agreement. Regulators approved three new combined-cycle gas units in 2025 (two in Richland Parish, one at Waterford) along with transmission upgrades; the 2026 state release refers to seven new gas plants, while WRKF reports Entergy sought approval for ten. These are utility plants rather than on-site generation.","source_ids":["s2","s3","s4","s5"],"type":"grid"},{"description":"Three grid-scale battery systems are part of the Entergy arrangement announced with the 2026 expansion.","source_ids":["s4"],"type":"battery_storage"},{"description":"The 2026 arrangement includes possible nuclear development, including an output increase at Entergy's Waterford 3 plant.","source_ids":["s4"],"type":"nuclear"},{"description":"Entergy was cleared to fast-track up to 1,500 MW of solar; Meta earlier pledged to help bring at least 1,500 MW of new renewables to the grid and in 2026 committed to fund up to 2.5 GW of clean energy.","source_ids":["s1","s3","s4"],"type":"solar"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2024-12-04","publisher":"Louisiana Economic Development","title":"Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State","type":"government","url":"https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20250821033352/https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/","id":"s2","published":"2025-08-20","publisher":"KALB","title":"La. regulators approve Entergy power plants for Meta's AI data center","type":"news","url":"https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/"},{"accessed":"2026-10-09","id":"s3","published":"2025-11-05","publisher":"Data Center Frontier","title":"Meta's $27B Hyperion Campus: A New Blueprint for AI Infrastructure Finance","type":"trade_press","url":"https://www.datacenterfrontier.com/hyperscale/article/55325337/metas-27b-hyperion-campus-a-new-blueprint-for-ai-infrastructure-finance"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260911184712/https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history?","id":"s4","published":"2026-07-13","publisher":"Louisiana Economic Development","title":"Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History","type":"government","url":"https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history"},{"accessed":"2026-10-09","id":"s5","published":"2026-07-14","publisher":"WRKF","title":"Meta is investing $40B more to expand Richland Parish data center project","type":"news","url":"https://www.wrkf.org/2026-07-14/meta-is-investing-40b-more-to-expand-richland-parish-data-center-project"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260911180758/https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf","id":"s6","published":null,"publisher":"Meta Platforms","title":"Meta Richland Parish Data Center fact sheet","type":"company","url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20251106093133/https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp/","id":"s7","published":null,"publisher":"KTVE (myarklamiss.com)","title":"As development continues, the cost of Meta's data center in Richland Parish will be 3x more than originally projected","type":"news","url":"https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp"}],"status":"under_construction","status_as_of":"2026-07-14","status_source_ids":["s4","s5"],"summary":"Meta campus on the former Franklin Farm megasite in Richland Parish, northeast Louisiana, built to house Hyperion, which Meta calls its largest AI cluster. Announced in December 2024 as a USD 10 billion project, it was placed in late 2025 in a joint venture 80% owned by Blue Owl-managed funds and expanded in July 2026 to a planned 5 GW of IT capacity and more than USD 50 billion of investment. Entergy Louisiana is adding gas-fired generation, batteries and transmission upgrades to serve the site under a 20-year agreement. Construction began in December 2024, and officials expect full build-out around 2036.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"5a7175e6-9682-5800-91dd-b7c4d5de627e","s2":"f97052f5-ffa1-5891-9048-536982584e9c","s3":"ab392225-f519-5c13-8113-ce5f587efb89","s4":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","s5":"8cb69023-eb1a-5305-a41a-5117d50adfb9","s6":"fb1aac41-ec76-5e30-9c4d-71a378ffc056","s7":"b27b5754-60c7-5c40-a6b6-59cfdedcce28"},"source_file":"datacenters/projects/meta-hyperion-richland-parish.json","source_record_id":"meta-hyperion-richland-parish","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"60f52885979d54cae121ce62142985ac61bf565dea5b18fd463e8c93e21ca115"}],"evidence_ids":["2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","5a7175e6-9682-5800-91dd-b7c4d5de627e","8cb69023-eb1a-5305-a41a-5117d50adfb9","ab392225-f519-5c13-8113-ce5f587efb89","b27b5754-60c7-5c40-a6b6-59cfdedcce28","f97052f5-ffa1-5891-9048-536982584e9c","fb1aac41-ec76-5e30-9c4d-71a378ffc056"],"status_source":{"evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","title":"Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History","publisher":"Louisiana Economic Development","kind":"government_record","published_at":"2026-07-13","source_url":"https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history","license":"source-terms-not-recorded","attribution":"Louisiana Economic Development"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/#project-803e9da5-cd1e-5849-813c-fe7c5b5f126b","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/803e9da5-cd1e-5849-813c-fe7c5b5f126b.json","geometry_source":{"evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","title":"Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State","publisher":"Louisiana Economic Development","kind":"government_record","published_at":"2024-12-04","source_url":"https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","license":"source-terms-not-recorded","attribution":"Louisiana Economic Development"}}],"evidence":[{"evidence_id":"b27b5754-60c7-5c40-a6b6-59cfdedcce28","roles":["imported:record","metric:investment","milestone:other","role:owner"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"news","title":"As development continues, the cost of Meta's data center in Richland Parish will be 3x more than originally projected","source_url":"https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp","publisher":"KTVE (myarklamiss.com)","source_family":"www.myarklamiss.com","license":"source-terms-not-recorded","attribution":"KTVE (myarklamiss.com)","published_at":null,"retrieved_at":"2026-10-09","content_hash":"21e02ed3af3408c57903ca441089ba7cce2b4f8759837ef8be23a229800257c6","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s7","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b27b5754-60c7-5c40-a6b6-59cfdedcce28.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b27b5754-60c7-5c40-a6b6-59cfdedcce28.json","archive_url":"https://web.archive.org/web/20261009/https://www.myarklamiss.com/news/as-development-continues-the-cost-of-metas-data-center-in-richland-parish-will-be-3x-more-than-originally-projected/amp"},{"evidence_id":"0357dcf6-dd2c-51fe-b107-8c9b253f17ec","roles":["context:site_distinctness","geometry"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552"],"kind":"openstreetmap","title":"Exact named Meta Richland Parish Data Center Nominatim point","source_url":"https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1","publisher":"OpenStreetMap contributors via Nominatim","source_family":"meta_round10_independent_review","license":"ODbL-1.0","attribution":"OpenStreetMap contributors via Nominatim","published_at":null,"retrieved_at":"2026-09-08T23:44:16Z","content_hash":"619548b627d084a63f05a776ea734cd1c360f4f686b6f58f56feed7d59cc6243","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0357dcf6-dd2c-51fe-b107-8c9b253f17ec.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0357dcf6-dd2c-51fe-b107-8c9b253f17ec.json","archive_url":"https://web.archive.org/web/20260908234416/https://nominatim.openstreetmap.org/search?q=Meta%20Richland%20Parish&countrycodes=us&format=jsonv2&polygon_geojson=1"},{"evidence_id":"f97052f5-ffa1-5891-9048-536982584e9c","roles":["imported:record","metric:power_capacity","milestone:other","power_source:grid","role:utility"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"news","title":"La. regulators approve Entergy power plants for Meta's AI data center","source_url":"https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/","publisher":"KALB","source_family":"www.kalb.com","license":"source-terms-not-recorded","attribution":"KALB","published_at":"2025-08-20","retrieved_at":"2026-10-09","content_hash":"824a2a7f0004054368cb6f3478ccfe7c7467a448b85853f187ff797d1ac63869","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s2","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f97052f5-ffa1-5891-9048-536982584e9c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f97052f5-ffa1-5891-9048-536982584e9c.json","archive_url":"https://web.archive.org/web/20261009/https://www.kalb.com/2025/08/21/la-regulators-approve-entergy-power-plants-metas-ai-data-center/"},{"evidence_id":"2b7eb369-a205-5ca1-93c4-3a6a2058b8a7","roles":["imported:geometry","imported:record","imported:status","metric:floor_area","metric:investment","metric:jobs_construction","metric:jobs_permanent","metric:power_capacity","milestone:expansion_announced","power_source:battery_storage","power_source:grid","power_source:nuclear","power_source:solar","role:developer","role:government","role:utility"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"government_record","title":"Meta Commits More Than $50 Billion for North Louisiana Project, Becoming One of the Largest Data Centers in History","source_url":"https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history","publisher":"Louisiana Economic Development","source_family":"www.opportunitylouisiana.gov","license":"source-terms-not-recorded","attribution":"Louisiana Economic Development","published_at":"2026-07-13","retrieved_at":"2026-10-09","content_hash":"87ec24f1852b0b90601a8255f00c1af828218d6e00b7f2f542944d1930bda3d8","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s4","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2b7eb369-a205-5ca1-93c4-3a6a2058b8a7.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2b7eb369-a205-5ca1-93c4-3a6a2058b8a7.json","archive_url":"https://web.archive.org/web/20261009/https://www.opportunitylouisiana.gov/news/meta-commits-more-than-50-billion-for-north-louisiana-project-becoming-one-of-the-largest-data-centers-in-history"},{"evidence_id":"8cb69023-eb1a-5305-a41a-5117d50adfb9","roles":["imported:geometry","imported:record","imported:status","metric:land_area","milestone:construction_started","milestone:expansion_announced","milestone:fully_operational","power_source:grid"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"news","title":"Meta is investing $40B more to expand Richland Parish data center project","source_url":"https://www.wrkf.org/2026-07-14/meta-is-investing-40b-more-to-expand-richland-parish-data-center-project","publisher":"WRKF","source_family":"www.wrkf.org","license":"source-terms-not-recorded","attribution":"WRKF","published_at":"2026-07-14","retrieved_at":"2026-10-09","content_hash":"fa7ee619f1b5d40faf77a1a0bd545dece5a704cd2f6d474fcb6df423204e8261","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s5","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8cb69023-eb1a-5305-a41a-5117d50adfb9.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8cb69023-eb1a-5305-a41a-5117d50adfb9.json","archive_url":"https://web.archive.org/web/20261009/https://www.wrkf.org/2026-07-14/meta-is-investing-40b-more-to-expand-richland-parish-data-center-project"},{"evidence_id":"be721c3f-e877-5d6b-aa16-7ab56c9d5a57","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552"],"kind":"company_disclosure","title":"Meta Richland Parish campus and contractor identity","source_url":"https://datacenters.atmeta.com/richland-parish-data-center/","publisher":"Meta","source_family":"meta_round10_independent_review","license":"all-rights-reserved","attribution":"Meta","published_at":null,"retrieved_at":"2026-09-08T23:50:02Z","content_hash":"c2517a573f8fdc76e30b348b60c6edab79abb592e644ad1aa3d6f6a1f3c4d5e0","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/be721c3f-e877-5d6b-aa16-7ab56c9d5a57.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/be721c3f-e877-5d6b-aa16-7ab56c9d5a57.json","archive_url":"https://web.archive.org/web/20260908235002/https://datacenters.atmeta.com/richland-parish-data-center/"},{"evidence_id":"fb1aac41-ec76-5e30-9c4d-71a378ffc056","roles":["imported:record","metric:investment","metric:jobs_permanent","metric:power_capacity","role:developer"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"company_disclosure","title":"Meta Richland Parish Data Center fact sheet","source_url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf","publisher":"Meta Platforms","source_family":"datacenters.atmeta.com","license":"source-terms-not-recorded","attribution":"Meta Platforms","published_at":null,"retrieved_at":"2026-10-09","content_hash":"c4e2c066eda0f63a7c0e01f824eddde1ca9732d8cc5bdda6004570a29c6038a6","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s6","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fb1aac41-ec76-5e30-9c4d-71a378ffc056.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fb1aac41-ec76-5e30-9c4d-71a378ffc056.json","archive_url":"https://web.archive.org/web/20261009/https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Richland-Parish-Data-Center.pdf"},{"evidence_id":"d5e0a9c8-25a7-56f4-b135-3a8fc17352e0","roles":["context:site_distinctness","geometry"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552"],"kind":"openstreetmap","title":"Meta Richland Parish Data Center source object identity and geometry corroboration","source_url":"https://api.openstreetmap.org/api/0.6/relation/19710316/full.json","publisher":"OpenStreetMap contributors","source_family":"meta_round10_independent_review","license":"ODbL-1.0","attribution":"OpenStreetMap contributors","published_at":null,"retrieved_at":"2026-09-08T23:45:08Z","content_hash":"7b3d653ac4a8ea367cf46cb6261a4af8138f7996cc5f58c3e4a3244bb8eb6ba3","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d5e0a9c8-25a7-56f4-b135-3a8fc17352e0.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d5e0a9c8-25a7-56f4-b135-3a8fc17352e0.json","archive_url":"https://web.archive.org/web/20260908234508/https://api.openstreetmap.org/api/0.6/relation/19710316/full.json"},{"evidence_id":"5a7175e6-9682-5800-91dd-b7c4d5de627e","roles":["imported:geometry","imported:record","metric:floor_area","metric:investment","metric:jobs_construction","metric:jobs_permanent","metric:land_area","milestone:announced","milestone:construction_started","power_source:solar","role:developer","role:government","role:utility"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"government_record","title":"Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State","source_url":"https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state","publisher":"Louisiana Economic Development","source_family":"opportunitylouisiana.gov","license":"source-terms-not-recorded","attribution":"Louisiana Economic Development","published_at":"2024-12-04","retrieved_at":"2026-10-09","content_hash":"e97ce5e8a19460a83379d9733c02ddc24afb5988d5eeaba1e12b99ac08a90997","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s1","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5a7175e6-9682-5800-91dd-b7c4d5de627e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5a7175e6-9682-5800-91dd-b7c4d5de627e.json","archive_url":"https://web.archive.org/web/20261009/https://opportunitylouisiana.gov/news/meta-selects-northeast-louisiana-as-site-of-10-billion-artificial-intelligence-optimized-data-center-governor-jeff-landry-calls-investment-a-new-chapter-for-state"},{"evidence_id":"ab392225-f519-5c13-8113-ce5f587efb89","roles":["imported:record","metric:investment","metric:power_capacity","milestone:other","power_source:grid","power_source:solar","role:builder","role:investor","role:owner","role:tenant"],"project_ids":["803e9da5-cd1e-5849-813c-fe7c5b5f126b"],"kind":"trade_press","title":"Meta's $27B Hyperion Campus: A New Blueprint for AI Infrastructure Finance","source_url":"https://www.datacenterfrontier.com/hyperscale/article/55325337/metas-27b-hyperion-campus-a-new-blueprint-for-ai-infrastructure-finance","publisher":"Data Center Frontier","source_family":"www.datacenterfrontier.com","license":"source-terms-not-recorded","attribution":"Data Center Frontier","published_at":"2025-11-05","retrieved_at":"2026-10-09","content_hash":"137cf55f504a17d0c4c70ed593221ccd280dbc44ad6263e895b9f8b7513b4c7a","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-hyperion-richland-parish","source_local_id":"s3","source_record_sha256":"32572f3cc36c74b52139674363a64f8dc1cb863db825b2f7c38e412c404e5ebe","site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ab392225-f519-5c13-8113-ce5f587efb89.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ab392225-f519-5c13-8113-ce5f587efb89.json","archive_url":"https://web.archive.org/web/20261009/https://www.datacenterfrontier.com/hyperscale/article/55325337/metas-27b-hyperion-campus-a-new-blueprint-for-ai-infrastructure-finance"},{"evidence_id":"5492ab7f-9c74-548f-b15a-a0173d4d9c47","roles":["context:site_distinctness","geometry"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552","337ace90-652d-52fe-a856-fe9b04b5966f"],"kind":"company_disclosure","title":"Nominatim object geometry WGS84 datum","source_url":"https://nominatim.org/release-docs/latest/develop/Database-Layout/","publisher":"Nominatim project","source_family":"meta_round10_independent_review","license":"no-open-license-asserted","attribution":"Nominatim project","published_at":null,"retrieved_at":"2026-09-08T23:52:53Z","content_hash":"173fa7a8e032ccee5de4412e19d89149a898ee609c1f069253d78c444b7705a6","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432","vcc-site-f711d13af70d9b633456"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5492ab7f-9c74-548f-b15a-a0173d4d9c47.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5492ab7f-9c74-548f-b15a-a0173d4d9c47.json","archive_url":"https://web.archive.org/web/20260908235253/https://nominatim.org/release-docs/latest/develop/Database-Layout/"},{"evidence_id":"90966722-c08a-559d-abf9-1e0cd87125ac","roles":["context:site_distinctness","geometry"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552","337ace90-652d-52fe-a856-fe9b04b5966f"],"kind":"company_disclosure","title":"Nominatim returned point and object reference semantics","source_url":"https://nominatim.org/release-docs/latest/api/Output/","publisher":"Nominatim project","source_family":"meta_round10_independent_review","license":"no-open-license-asserted","attribution":"Nominatim project","published_at":null,"retrieved_at":"2026-09-08T23:52:01Z","content_hash":"2b22abff55df61794873a6648149a09a46262c4f409578cb8d6823de3d6b5f7e","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432","vcc-site-f711d13af70d9b633456"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/90966722-c08a-559d-abf9-1e0cd87125ac.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/90966722-c08a-559d-abf9-1e0cd87125ac.json","archive_url":"https://web.archive.org/web/20260908235201/https://nominatim.org/release-docs/latest/api/Output/"},{"evidence_id":"816746dd-9748-5937-8412-65422ee24556","roles":["context:site_distinctness","geometry"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552","337ace90-652d-52fe-a856-fe9b04b5966f"],"kind":"openstreetmap","title":"OpenStreetMap attribution and ODbL terms","source_url":"https://www.openstreetmap.org/copyright","publisher":"OpenStreetMap Foundation","source_family":"meta_round10_independent_review","license":"CC-BY-SA-2.0","attribution":"OpenStreetMap Foundation","published_at":null,"retrieved_at":"2026-09-08T23:52:00Z","content_hash":"6fb8c3041dd598f5d63befa6ef01badc313abbb41f76431e374eafb72723fac0","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432","vcc-site-f711d13af70d9b633456"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/816746dd-9748-5937-8412-65422ee24556.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/816746dd-9748-5937-8412-65422ee24556.json","archive_url":"https://web.archive.org/web/20260908235200/https://www.openstreetmap.org/copyright"},{"evidence_id":"3e31f188-1822-59b3-a3ae-ffd7f298725c","roles":["context:geometry_identity","context:site_distinctness","physical_status"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552"],"kind":"company_disclosure","title":"Turner July 16 Richland Parish interior buildout observation","source_url":"https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana","publisher":"Turner Construction Company","source_family":"meta_round10_independent_review","license":"all-rights-reserved","attribution":"Turner Construction Company","published_at":"2026-07-16","retrieved_at":"2026-09-08T23:44:14Z","content_hash":"f9536829eedf4c5226ef71cec78fb4979a3cf05d3368d98cd79b3d52dad569cb","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3e31f188-1822-59b3-a3ae-ffd7f298725c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3e31f188-1822-59b3-a3ae-ffd7f298725c.json","archive_url":"https://web.archive.org/web/20260908234414/https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana"},{"evidence_id":"bbe5b5b6-1a35-5d71-ab9b-27dbbf404a5a","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["1404f5cd-04ee-57ea-8f73-91992fea0552"],"kind":"company_disclosure","title":"Turner Richland Parish Phase 1 and Phase 2 scope boundary","source_url":"https://www.turnerconstruction.com/pages/richland-parish-data-center-resource-page","publisher":"Turner Construction Company","source_family":"meta_round10_independent_review","license":"all-rights-reserved","attribution":"Turner Construction Company","published_at":null,"retrieved_at":"2026-09-08T23:49:45Z","content_hash":"ede8a71cb228bb548ac36c9449416356dbfd2c89bd66192b6c601e098e537482","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-33110c77390f92dc4432"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bbe5b5b6-1a35-5d71-ab9b-27dbbf404a5a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bbe5b5b6-1a35-5d71-ab9b-27dbbf404a5a.json","archive_url":"https://web.archive.org/web/20260908234945/https://www.turnerconstruction.com/pages/richland-parish-data-center-resource-page"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-33110c77390f92dc4432/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-33110c77390f92dc4432.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-33110c77390f92dc4432","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}