{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-37ddc3b143bf9ea08d1c","physical_site_stable_key":"curated:cdc-marsden-park-campus","name":"CDC Marsden Park Campus","country":"Australia","country_iso_a2":"AU","latitude":-33.72368555,"longitude":150.8363658,"geometry":{"coordinates":[[[150.8343349,-33.7214556],[150.8339183,-33.7217959],[150.8333619,-33.7220751],[150.8346877,-33.7252481],[150.8366671,-33.7254934],[150.8372247,-33.7255574],[150.8393697,-33.7259155],[150.839282,-33.722045],[150.8343349,-33.7214556]]],"type":"Polygon"},"geometry_type":"Polygon","geometry_source_entity_kinds":["facility"],"geometry_derivations":["capture_replayed_geometry"],"geometry_methods":["cross_source_identity_bridge_to_live_osm_named_cdc_marsden_park_campus_polygon"],"geometry_scope_classes":["community_mapped_named_cdc_marsden_park_campus_development_polygon"],"geometry_authority_classes":["community_mapped"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["The polygon is a contributor-mapped named development outline and the point is only its deterministic longitude-latitude bounding-box midpoint. Neither is a survey, cadastral, planning, parcel, security, building, phase, or current construction boundary. OSM construction tags are retained solely as source context and never provide the selected project's authoritative lifecycle."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"OpenStreetMap supplies no survey accuracy, cadastral authority, planning-boundary authority, or numeric horizontal uncertainty for this way.","geometry_evidence_ids":["ce28239d-1c35-5043-9373-97416961a743"],"project_count":1,"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"project_stable_keys":["curated:cdc-marsden-park-campus:early-construction"],"statuses":["under_construction"],"oldest_status_as_of":"2026-09-16","newest_status_as_of":"2026-09-16","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"au","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37ddc3b143bf9ea08d1c.json","geometry_licenses":["ODbL-1.0"],"geometry_attributions":["© OpenStreetMap contributors"]},"projects":[{"project_id":"164033cb-411d-5ffb-ab5d-b04bdecfa1ac","project_stable_key":"curated:cdc-marsden-park-campus:early-construction","site_id":"vcc-site-37ddc3b143bf9ea08d1c","physical_site_stable_key":"curated:cdc-marsden-park-campus","name":"CDC Marsden Park Early Construction","country":"Australia","country_iso_a2":"AU","latitude":-33.72368555,"longitude":150.8363658,"geometry":{"coordinates":[[[150.8343349,-33.7214556],[150.8339183,-33.7217959],[150.8333619,-33.7220751],[150.8346877,-33.7252481],[150.8366671,-33.7254934],[150.8372247,-33.7255574],[150.8393697,-33.7259155],[150.839282,-33.722045],[150.8343349,-33.7214556]]],"type":"Polygon"},"geometry_type":"Polygon","geometry_source_entity_kind":"facility","geometry_derivation":"capture_replayed_geometry","geometry_method":"cross_source_identity_bridge_to_live_osm_named_cdc_marsden_park_campus_polygon","geometry_scope_class":"community_mapped_named_cdc_marsden_park_campus_development_polygon","geometry_authority_class":"community_mapped","geometry_use_scope":"campus_locator","geometry_precision_scope":"The polygon is a contributor-mapped named development outline and the point is only its deterministic longitude-latitude bounding-box midpoint. Neither is a survey, cadastral, planning, parcel, security, building, phase, or current construction boundary. OSM construction tags are retained solely as source context and never provide the selected project's authoritative lifecycle.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"OpenStreetMap supplies no survey accuracy, cadastral authority, planning-boundary authority, or numeric horizontal uncertainty for this way.","geometry_evidence_id":"ce28239d-1c35-5043-9373-97416961a743","last_observed_physical_status":"under_construction","status_as_of":"2026-09-16","status_age_days_at_review":41,"status_method":"authoritative_physical_status_update","status_evidence_id":"e86d3030-80cb-5a88-a573-405820d7819c","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"source evidence does not distinguish greenfield, expansion, or retrofit","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"56fa3df3-1fe1-50af-80c1-0e2f0f14d610","party":"CDC Data Centres","relationship_scope":"intended","role":"operator"},{"evidence_id":"242c3019-1f53-551c-a0be-de57b4e4352f","notes":null,"party":"CDC Data Centres","relationship_scope":"unknown","role":"developer","source_record_id":"cdc-marsden-park"},{"evidence_id":"adb5e95d-1036-53e3-9d9d-f9b7dd8a942c","notes":null,"party":"CDC Data Centres","relationship_scope":"unknown","role":"developer","source_record_id":"cdc-marsden-park"},{"evidence_id":"b578a483-e755-5e2a-a654-0366ac5903ae","notes":null,"party":"CDC Data Centres","relationship_scope":"unknown","role":"developer","source_record_id":"cdc-marsden-park"},{"evidence_id":"242c3019-1f53-551c-a0be-de57b4e4352f","notes":null,"party":"CDC Data Centres","relationship_scope":"unknown","role":"owner","source_record_id":"cdc-marsden-park"},{"evidence_id":"242c3019-1f53-551c-a0be-de57b4e4352f","notes":null,"party":"CDC Data Centres","relationship_scope":"unknown","role":"operator","source_record_id":"cdc-marsden-park"},{"evidence_id":"feafa66c-aec7-5021-8dbd-502ace1e0b82","notes":"Assessed and approved the campus as state significant development.","party":"NSW Department of Planning","relationship_scope":"unknown","role":"government","source_record_id":"cdc-marsden-park"},{"evidence_id":"adb5e95d-1036-53e3-9d9d-f9b7dd8a942c","notes":"Assessed and approved the campus as state significant development.","party":"NSW Department of Planning","relationship_scope":"unknown","role":"government","source_record_id":"cdc-marsden-park"}],"power_observations":[],"power_unknown_reason":"no typed project power observation; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"CDC Data Centres","operator":"CDC Data Centres","users":null,"tenants":null,"customers":null,"status_source_url":"https://infratil.com/news-and-insights/data-centre-demand-drives-growth-and-guidance-increase/infratil-investor-day-2026-cdc-update/","geometry_source_url":"https://api.openstreetmap.org/api/0.6/way/1336972876/full.json","project_details":[{"identity_decision":{"decision":"exact_project","flags":["administrative_locator_not_project_geometry"],"rationale":"Same CDC six-building Marsden Park development and early-construction scope. The source suburb centroid does not replace the reviewed campus locator.","source_record_id":"cdc-marsden-park","target_project_stable_key":"curated:cdc-marsden-park-campus:early-construction"},"record":{"aliases":["Marsden Park Data Centre","SSD-70889211"],"id":"cdc-marsden-park","last_reviewed":"2026-10-09","location":{"admin1":"New South Wales","admin2":"City of Blacktown","country":"AU","lat":-33.6892,"locality":"Marsden Park","lon":150.8028,"note":"Sources name the Marsden Park Industrial Precinct without a street address; the point is the Marsden Park suburb coordinate from its Wikipedia article, so it marks the suburb rather than the site.","precision":"locality","source_ids":["s1","s2","s3","s6"]},"metrics":[{"applies_to":"campus","as_of":"2025-11-27","basis":"permitted","metric":"power_capacity","note":"CDC calls this total ICT capacity; the planning portal describes it as power consumption of the data centre. W.Media reports the campus can scale toward 1 GW.","power_scope":"it_load","qualifier":"exact","source_ids":["s1","s2","s3"],"unit":"MW","value":504},{"applies_to":"campus","as_of":"2025-11-27","basis":"permitted","metric":"power_capacity","note":"Rating of the on-site substation: 720 MW on the planning portal and 720 MVA in CDC's release.","power_scope":"grid_connection","qualifier":"exact","source_ids":["s1","s2"],"unit":"MW","value":720},{"applies_to":"campus","as_of":"2025-11-28","basis":"reported","metric":"investment","note":"Figure given in coverage of the approval; CDC's own release gives no amount.","qualifier":"exact","source_ids":["s3","s4"],"unit":"AUD","value":3100000000},{"applies_to":"campus","as_of":"2025-11-27","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s1","s2"],"unit":"count","value":6},{"applies_to":"campus","as_of":"2024-10-25","basis":"reported","metric":"land_area","qualifier":"exact","source_ids":["s1"],"unit":"hectares","value":20.1},{"applies_to":"campus","as_of":"2025-12-04","basis":"planned","metric":"jobs_construction","note":"Figure reported by Information Age; CDC's release instead cites more than 10,000 jobs over the life of construction.","qualifier":"exact","source_ids":["s4"],"unit":"count","value":200},{"applies_to":"campus","as_of":"2025-12-04","basis":"planned","metric":"jobs_permanent","qualifier":"exact","source_ids":["s4"],"unit":"count","value":265}],"milestones":[{"date":"2024-10-25","event":"construction_started","kind":"actual","note":"Ceremonial sod-turning, with minor earthworks and site preparation already under way.","source_ids":["s1"]},{"date":"2025-11-27","event":"permit_approved","kind":"actual","note":"Approved as state significant development SSD-70889211; Blacktown City Council had objected on engineering and planning grounds.","source_ids":["s2","s3"]}],"name":"CDC Data Centres Marsden Park campus","notes":"Status rests on CDC's undated Sydney locations page, which described Marsden Park as in the early stages of construction when accessed on 2026-10-09, so status_as_of is the access date. An earlier DatacenterDynamics report on the filing gave a lower investment figure, but that page could not be opened. Wikipedia is cited only for the suburb coordinate.","parties":[{"name":"CDC Data Centres","role":"developer","source_ids":["s1","s3","s4"]},{"name":"CDC Data Centres","role":"owner","source_ids":["s1"]},{"name":"CDC Data Centres","role":"operator","source_ids":["s1"]},{"name":"NSW Department of Planning","note":"Assessed and approved the campus as state significant development.","role":"government","source_ids":["s2","s3"]}],"power_sources":[{"description":"Dedicated on-site substation of about 720 MVA.","source_ids":["s1","s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2024-10-25","publisher":"CDC Data Centres","title":"CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct","type":"company","url":"https://cdc.com/resources/news/cdc-data-centres-breaks-ground-on-new-state-of-the-art-data-centre-development-in-marsden-park-industrial-precinct/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260723073408/https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre","id":"s2","published":null,"publisher":"NSW Planning Portal","title":"Marsden Park Data Centre (SSD-70889211)","type":"government","url":"https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre"},{"accessed":"2026-10-09","id":"s3","published":"2025-11-28","publisher":"W.Media","title":"NSW govt approves CDC's 504 MW campus in Sydney","type":"trade_press","url":"https://w.media/nsw-govt-approves-cdcs-504-mw-campus-in-sydney/"},{"accessed":"2026-10-09","id":"s4","published":"2025-12-04","publisher":"Startup Daily (Information Age)","title":"NSW gives the nod to a $3 billion CDC data centre in Western Sydney","type":"news","url":"https://www.startupdaily.net/?p=131381"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"CDC Data Centres","title":"Sydney and regional NSW locations","type":"company","url":"https://cdc.com/locations/sydney-and-regional-nsw/"},{"accessed":"2026-10-09","id":"s6","published":null,"publisher":"Wikipedia","title":"Marsden Park, New South Wales","type":"other","url":"https://en.wikipedia.org/wiki/Marsden_Park,_New_South_Wales"}],"status":"under_construction","status_as_of":"2026-10-09","status_source_ids":["s5"],"summary":"CDC Data Centres is building a campus of six four-storey data center buildings on about 20 hectares in the Marsden Park Industrial Precinct in Sydney's north-west, within the City of Blacktown. CDC turned the first sod in October 2024 and plans 504 MW of ICT capacity, scalable toward 1 GW, with a dedicated substation of about 720 MVA. The NSW government approved it as state significant development on 27 November 2025 despite objections from Blacktown City Council; press coverage put the investment at A$3.1 billion. CDC describes the campus as in the early stages of construction.","workloads":["cloud","hpc","ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"242c3019-1f53-551c-a0be-de57b4e4352f","s2":"feafa66c-aec7-5021-8dbd-502ace1e0b82","s3":"adb5e95d-1036-53e3-9d9d-f9b7dd8a942c","s4":"b578a483-e755-5e2a-a654-0366ac5903ae","s5":"b011830f-6376-5eb1-9399-1bb70b7f8d81","s6":"b51b6802-aaa4-5be4-91fc-72d370f76b85"},"source_file":"datacenters/projects/cdc-marsden-park.json","source_record_id":"cdc-marsden-park","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"9dd6eb6e5ee39f6394d44a010c9191d933d4d79390405618aacb0ddebb7f150f"}],"evidence_ids":["242c3019-1f53-551c-a0be-de57b4e4352f","56fa3df3-1fe1-50af-80c1-0e2f0f14d610","adb5e95d-1036-53e3-9d9d-f9b7dd8a942c","b011830f-6376-5eb1-9399-1bb70b7f8d81","b51b6802-aaa4-5be4-91fc-72d370f76b85","b578a483-e755-5e2a-a654-0366ac5903ae","ce28239d-1c35-5043-9373-97416961a743","e86d3030-80cb-5a88-a573-405820d7819c","feafa66c-aec7-5021-8dbd-502ace1e0b82"],"status_source":{"evidence_id":"e86d3030-80cb-5a88-a573-405820d7819c","title":"CDC Investor Day Presentation (Infratil Investor Update, 16 September 2026)","publisher":"CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)","kind":"company_disclosure","published_at":"2026-09-16","source_url":"https://infratil.com/news-and-insights/data-centre-demand-drives-growth-and-guidance-increase/infratil-investor-day-2026-cdc-update/","license":"all-rights-reserved","attribution":"CDC Data Centres / Infratil Limited"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/#project-164033cb-411d-5ffb-ab5d-b04bdecfa1ac","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/164033cb-411d-5ffb-ab5d-b04bdecfa1ac.json","geometry_source":{"evidence_id":"ce28239d-1c35-5043-9373-97416961a743","title":"OpenStreetMap way 1336972876 — CDC Marsden Park Campus","publisher":"OpenStreetMap contributors","kind":"open_map_geometry","published_at":"2026-05-24T13:51:52Z","source_url":"https://api.openstreetmap.org/api/0.6/way/1336972876/full.json","license":"ODbL-1.0","attribution":"© OpenStreetMap contributors"}}],"evidence":[{"evidence_id":"242c3019-1f53-551c-a0be-de57b4e4352f","roles":["imported:geometry","imported:record","metric:buildings","metric:land_area","metric:power_capacity","milestone:construction_started","power_source:grid","role:developer","role:operator","role:owner"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"company_disclosure","title":"CDC Data Centres Breaks Ground on New State-of-the-Art Data Centre Development in Marsden Park Industrial Precinct","source_url":"https://cdc.com/resources/news/cdc-data-centres-breaks-ground-on-new-state-of-the-art-data-centre-development-in-marsden-park-industrial-precinct/","publisher":"CDC Data Centres","source_family":"cdc.com","license":"source-terms-not-recorded","attribution":"CDC Data Centres","published_at":"2024-10-25","retrieved_at":"2026-10-09","content_hash":"1b47260f3da54b9ec87a8cfb18e97d9ded2e844e1513ef6896cdff9a92e30bc0","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s1","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/242c3019-1f53-551c-a0be-de57b4e4352f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/242c3019-1f53-551c-a0be-de57b4e4352f.json","archive_url":"https://web.archive.org/web/20261009/https://cdc.com/resources/news/cdc-data-centres-breaks-ground-on-new-state-of-the-art-data-centre-development-in-marsden-park-industrial-precinct/"},{"evidence_id":"e86d3030-80cb-5a88-a573-405820d7819c","roles":["physical_status"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac","2e2b9d40-5024-5e6d-bbb2-56a8b16b9c16","5c366d64-4bb5-5c28-ab62-ec20d60fb31a","9c34c305-5149-5961-b88f-648da82351f7","9cceddca-71bc-52f2-a417-e9fdf0d7faa3","bb8ba3ad-d563-5f84-a543-079a10264640"],"kind":"company_disclosure","title":"CDC Investor Day Presentation (Infratil Investor Update, 16 September 2026)","source_url":"https://infratil.com/news-and-insights/data-centre-demand-drives-growth-and-guidance-increase/infratil-investor-day-2026-cdc-update/","publisher":"CDC Data Centres (presentation released by Infratil Limited, NZX/ASX: IFT)","source_family":"Infratil market releases","license":"all-rights-reserved","attribution":"CDC Data Centres / Infratil Limited","published_at":"2026-09-16","retrieved_at":"2026-10-26T19:06:50.858Z","content_hash":"971c5cac53ff8e04a61557ee623c8b8ca34ade097bc3b024b37658babce592af","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-0f9ffed73b02dd75c9a5","vcc-site-37ddc3b143bf9ea08d1c","vcc-site-3c1f872aa59b74b065ea","vcc-site-61f9e739f63e5c96092e","vcc-site-e7cbc915d8b179b3017f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e86d3030-80cb-5a88-a573-405820d7819c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e86d3030-80cb-5a88-a573-405820d7819c.json","archive_url":"https://web.archive.org/web/20261026190650/https://infratil.com/news-and-insights/data-centre-demand-drives-growth-and-guidance-increase/infratil-investor-day-2026-cdc-update/"},{"evidence_id":"56fa3df3-1fe1-50af-80c1-0e2f0f14d610","roles":["physical_status","role:operator"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"company_disclosure","title":"CDC Marsden Park Campus current status","source_url":"https://cdc.com.au/locations/sydney/","publisher":"CDC Data Centres","source_family":"cdc_current_location_pages","license":"all-rights-reserved","attribution":"CDC Data Centres","published_at":null,"retrieved_at":"2026-07-21T17:12:46Z","content_hash":"66d6de9440d4496482af80159cbe361afdb8e36bdebd5edf81ac1c65f1337620","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/56fa3df3-1fe1-50af-80c1-0e2f0f14d610.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/56fa3df3-1fe1-50af-80c1-0e2f0f14d610.json","archive_url":"https://web.archive.org/web/20260721171246/https://cdc.com.au/locations/sydney/"},{"evidence_id":"feafa66c-aec7-5021-8dbd-502ace1e0b82","roles":["imported:geometry","imported:record","metric:buildings","metric:power_capacity","milestone:permit_approved","power_source:grid","role:government"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"government_record","title":"Marsden Park Data Centre (SSD-70889211)","source_url":"https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre","publisher":"NSW Planning Portal","source_family":"www.planningportal.nsw.gov.au","license":"source-terms-not-recorded","attribution":"NSW Planning Portal","published_at":null,"retrieved_at":"2026-10-09","content_hash":"affdb4c05e4fd9ce15e93fef86065d35691c169928880524b7946c3e5b85f56d","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s2","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/feafa66c-aec7-5021-8dbd-502ace1e0b82.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/feafa66c-aec7-5021-8dbd-502ace1e0b82.json","archive_url":"https://web.archive.org/web/20261009/https://www.planningportal.nsw.gov.au/major-projects/projects/marsden-park-data-centre"},{"evidence_id":"b51b6802-aaa4-5be4-91fc-72d370f76b85","roles":["imported:geometry","imported:record"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"other","title":"Marsden Park, New South Wales","source_url":"https://en.wikipedia.org/wiki/Marsden_Park,_New_South_Wales","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"7fa9e8bf2b83645f019be8c1cf972a3b55e34b1038a875dcedc9a4ef6730cb03","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s6","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b51b6802-aaa4-5be4-91fc-72d370f76b85.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b51b6802-aaa4-5be4-91fc-72d370f76b85.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Marsden_Park,_New_South_Wales"},{"evidence_id":"b578a483-e755-5e2a-a654-0366ac5903ae","roles":["imported:record","metric:investment","metric:jobs_construction","metric:jobs_permanent","role:developer"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"news","title":"NSW gives the nod to a $3 billion CDC data centre in Western Sydney","source_url":"https://www.startupdaily.net/?p=131381","publisher":"Startup Daily (Information Age)","source_family":"www.startupdaily.net","license":"source-terms-not-recorded","attribution":"Startup Daily (Information Age)","published_at":"2025-12-04","retrieved_at":"2026-10-09","content_hash":"e4911f2a1b62cfd1b89a7dad7ae658db55e5f4c082b943a732dbde949417c9d7","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s4","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b578a483-e755-5e2a-a654-0366ac5903ae.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b578a483-e755-5e2a-a654-0366ac5903ae.json","archive_url":"https://web.archive.org/web/20261009/https://www.startupdaily.net/?p=131381"},{"evidence_id":"adb5e95d-1036-53e3-9d9d-f9b7dd8a942c","roles":["imported:geometry","imported:record","metric:investment","metric:power_capacity","milestone:permit_approved","role:developer","role:government"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"trade_press","title":"NSW govt approves CDC's 504 MW campus in Sydney","source_url":"https://w.media/nsw-govt-approves-cdcs-504-mw-campus-in-sydney/","publisher":"W.Media","source_family":"w.media","license":"source-terms-not-recorded","attribution":"W.Media","published_at":"2025-11-28","retrieved_at":"2026-10-09","content_hash":"cfc646b8cbd1e0964703443b2c51039ce43d43884583608079216add2d1d016e","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s3","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/adb5e95d-1036-53e3-9d9d-f9b7dd8a942c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/adb5e95d-1036-53e3-9d9d-f9b7dd8a942c.json","archive_url":"https://web.archive.org/web/20261009/https://w.media/nsw-govt-approves-cdcs-504-mw-campus-in-sydney/"},{"evidence_id":"ce28239d-1c35-5043-9373-97416961a743","roles":["geometry"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"open_map_geometry","title":"OpenStreetMap way 1336972876 — CDC Marsden Park Campus","source_url":"https://api.openstreetmap.org/api/0.6/way/1336972876/full.json","publisher":"OpenStreetMap contributors","source_family":"openstreetmap_api","license":"ODbL-1.0","attribution":"© OpenStreetMap contributors","published_at":"2026-05-24T13:51:52Z","retrieved_at":"2026-08-20T23:53:37Z","content_hash":"f176dfe0fd79fca768f9290dc5aa2204df379204403753640b3d48015b0fe8d8","publication_date_precision":"datetime","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ce28239d-1c35-5043-9373-97416961a743.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ce28239d-1c35-5043-9373-97416961a743.json","archive_url":"https://web.archive.org/web/20260820235337/https://api.openstreetmap.org/api/0.6/way/1336972876/full.json"},{"evidence_id":"b011830f-6376-5eb1-9399-1bb70b7f8d81","roles":["imported:record","imported:status"],"project_ids":["164033cb-411d-5ffb-ab5d-b04bdecfa1ac"],"kind":"company_disclosure","title":"Sydney and regional NSW locations","source_url":"https://cdc.com/locations/sydney-and-regional-nsw/","publisher":"CDC Data Centres","source_family":"cdc.com","license":"source-terms-not-recorded","attribution":"CDC Data Centres","published_at":null,"retrieved_at":"2026-10-09","content_hash":"f17cb698213f8d00f74822e976185eb369b22df8e4608d03266f64cebd820fdf","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"cdc-marsden-park","source_local_id":"s5","source_record_sha256":"7f5328a6e8a50cf869cf98075451fd843a9f85bd3c5f6c8f2ec96b1a664b20b4","site_ids":["vcc-site-37ddc3b143bf9ea08d1c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b011830f-6376-5eb1-9399-1bb70b7f8d81.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b011830f-6376-5eb1-9399-1bb70b7f8d81.json","archive_url":"https://web.archive.org/web/20261009/https://cdc.com/locations/sydney-and-regional-nsw/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-37ddc3b143bf9ea08d1c/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-37ddc3b143bf9ea08d1c.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-37ddc3b143bf9ea08d1c","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
