{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-47f902912a847a235f3d","physical_site_stable_key":"imported:semiconductor-atlas:eni-khazna-ferrera-erbognone","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","country":"Italy","country_iso_a2":"IT","latitude":45.117,"longitude":8.867,"geometry":{"coordinates":[8.867,45.117],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["a7222596-74ce-5d03-8348-f324c5280b8d"],"project_count":1,"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"project_stable_keys":["imported:semiconductor-atlas:eni-khazna-ferrera-erbognone"],"statuses":["announced"],"oldest_status_as_of":"2026-08-10","newest_status_as_of":"2026-08-10","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"it","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-47f902912a847a235f3d.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Eni"]},"projects":[{"project_id":"5d11dbb6-e8aa-5602-9c7c-8997b1c620c1","project_stable_key":"imported:semiconductor-atlas:eni-khazna-ferrera-erbognone","site_id":"vcc-site-47f902912a847a235f3d","physical_site_stable_key":"imported:semiconductor-atlas:eni-khazna-ferrera-erbognone","name":"Eni and Khazna AI data center campus, Ferrera Erbognone","country":"Italy","country_iso_a2":"IT","latitude":45.117,"longitude":8.867,"geometry":{"coordinates":[8.867,45.117],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","last_observed_physical_status":"announced","status_as_of":"2026-08-10","status_age_days_at_review":78,"status_method":"imported_documented_status","status_evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","notes":"Joint venture partner.","party":"Eni","relationship_scope":"unknown","role":"developer","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","notes":"Joint venture partner.","party":"Eni","relationship_scope":"unknown","role":"developer","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","notes":"To supply power from a new high-efficiency gas plant with carbon capture.","party":"Eni","relationship_scope":"unknown","role":"power_supplier","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"5b709fe6-737f-5e00-805f-0c1c9a39e15b","notes":"To supply power from a new high-efficiency gas plant with carbon capture.","party":"Eni","relationship_scope":"unknown","role":"power_supplier","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","notes":"To supply power from a new high-efficiency gas plant with carbon capture.","party":"Eni","relationship_scope":"unknown","role":"power_supplier","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","notes":"Joint venture partner appointed to design and develop the phased master plan, bringing data center design and operations expertise.","party":"Khazna Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"5b709fe6-737f-5e00-805f-0c1c9a39e15b","notes":"Joint venture partner appointed to design and develop the phased master plan, bringing data center design and operations expertise.","party":"Khazna Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","notes":"Joint venture partner appointed to design and develop the phased master plan, bringing data center design and operations expertise.","party":"Khazna Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","notes":"Cleared the joint venture under the simplified merger procedure in August 2026.","party":"European Commission","relationship_scope":"unknown","role":"government","source_record_id":"eni-khazna-ferrera-erbognone"},{"evidence_id":"029f0c50-dc53-50c2-a0bd-44f17b527093","notes":"Cleared the joint venture under the simplified merger procedure in August 2026.","party":"European Commission","relationship_scope":"unknown","role":"government","source_record_id":"eni-khazna-ferrera-erbognone"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj","geometry_source_url":"https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve Eni and Khazna AI data center campus, Ferrera Erbognone as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"eni-khazna-ferrera-erbognone"},"record":{"aliases":["Eni-Khazna AI Data Center Campus"],"id":"eni-khazna-ferrera-erbognone","last_reviewed":"2026-10-09","location":{"admin1":"Lombardy","admin2":"Province of Pavia","country":"IT","lat":45.117,"locality":"Ferrera Erbognone","lon":8.867,"note":"Municipality centroid from the Ferrera Erbognone Wikipedia article. Sources name the municipality only.","precision":"locality","source_ids":["s1","s2","s5"]},"metrics":[{"applies_to":"campus","as_of":"2026-08-10","basis":"planned","metric":"power_capacity","note":"Total IT capacity, to be reached in phases on a modular design.","power_scope":"it_load","qualifier":"exact","source_ids":["s1","s2","s3"],"unit":"MW","value":500}],"milestones":[{"date":"2025-02","event":"other","kind":"actual","note":"Italy-UAE strategic partnership launched, targeting up to 1 GW of IT capacity in Italy.","source_ids":["s1","s2"]},{"date":"2025-07-11","event":"announced","kind":"actual","note":"Heads of terms for the joint venture signed in Rome.","source_ids":["s1","s2"]},{"date":"2026-08","event":"other","kind":"actual","note":"European Commission merger clearance of the Eni-Khazna joint venture, finding no competition concerns.","source_ids":["s3","s4"]}],"name":"Eni and Khazna AI data center campus, Ferrera Erbognone","notes":"No investment figure, phase schedule or operating date has been disclosed. Eni said development activities were under way when the heads of terms were signed, but in August 2026 Il Sole 24 Ore described the campus as still being designed; no construction start was found.","parties":[{"name":"Eni","note":"Joint venture partner.","role":"developer","source_ids":["s1","s3"]},{"name":"Eni","note":"To supply power from a new high-efficiency gas plant with carbon capture.","role":"power_supplier","source_ids":["s1","s2","s3"]},{"name":"Khazna Data Centers","note":"Joint venture partner appointed to design and develop the phased master plan, bringing data center design and operations expertise.","role":"developer","source_ids":["s1","s2","s3"]},{"name":"European Commission","note":"Cleared the joint venture under the simplified merger procedure in August 2026.","role":"government","source_ids":["s3","s4"]}],"power_sources":[{"description":"Eni is to supply what it calls blue power from a new high-efficiency gas-fired plant designed to capture its CO2, which would be sent to a storage site in Ravenna. The plant's location relative to the campus is not stated.","source_ids":["s1","s2","s3"],"type":"other"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261001233652/https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html","id":"s1","published":"2025-07-11","publisher":"Eni","title":"Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan","type":"company","url":"https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html"},{"accessed":"2026-10-09","id":"s2","published":"2025-07-11","publisher":"G42","title":"Khazna Data Centers and Eni Partner to Develop 500 MW AI Data Center Campus Near Milan","type":"company","url":"https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan"},{"accessed":"2026-10-09","id":"s3","published":"2026-08-10","publisher":"Il Sole 24 Ore","title":"Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate","type":"news","url":"https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj"},{"accessed":"2026-10-09","id":"s4","published":"2026-08-10","publisher":"Eunews","title":"EU Commission approves Khazna–ENI joint venture, says it does “not raise competition concerns”","type":"news","url":"https://www.eunews.it/en/2026/08/10/eu-commission-approves-khazna-eni-joint-venture-says-it-does-not-raise-competition-concerns/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260316013115/https://en.wikipedia.org/wiki/Ferrera_Erbognone","id":"s5","published":null,"publisher":"Wikipedia","title":"Ferrera Erbognone","type":"other","url":"https://en.wikipedia.org/wiki/Ferrera_Erbognone"}],"status":"announced","status_as_of":"2026-08-10","status_source_ids":["s3","s4"],"summary":"Planned AI data center campus of 500 MW of IT capacity at Ferrera Erbognone in the province of Pavia, Lombardy, near Milan. Eni and the UAE operator Khazna Data Centers signed heads of terms in July 2025 for a joint venture in which Khazna designs and develops a phased master plan and Eni supplies low-carbon power from a new gas-fired plant designed to capture its CO2 for storage at Ravenna. It is the first project in an Italy-UAE programme for up to 1 GW of IT capacity. The European Commission cleared the joint venture in August 2026, when the campus was described as still in design.","workloads":["ai_unspecified","hpc"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"a7222596-74ce-5d03-8348-f324c5280b8d","s2":"5b709fe6-737f-5e00-805f-0c1c9a39e15b","s3":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","s4":"029f0c50-dc53-50c2-a0bd-44f17b527093","s5":"c1d35c79-3955-5d20-859b-aba1f85f1dcf"},"source_file":"datacenters/projects/eni-khazna-ferrera-erbognone.json","source_record_id":"eni-khazna-ferrera-erbognone","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"5d6f173907b551c8d0863cbddd6acafe7403c26409eb13fbd0fcf1d906bac40b"}],"evidence_ids":["029f0c50-dc53-50c2-a0bd-44f17b527093","3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","5b709fe6-737f-5e00-805f-0c1c9a39e15b","a7222596-74ce-5d03-8348-f324c5280b8d","c1d35c79-3955-5d20-859b-aba1f85f1dcf"],"status_source":{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","title":"Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate","publisher":"Il Sole 24 Ore","kind":"news","published_at":"2026-08-10","source_url":"https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj","license":"source-terms-not-recorded","attribution":"Il Sole 24 Ore"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/#project-5d11dbb6-e8aa-5602-9c7c-8997b1c620c1","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/5d11dbb6-e8aa-5602-9c7c-8997b1c620c1.json","geometry_source":{"evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","title":"Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan","publisher":"Eni","kind":"company_disclosure","published_at":"2025-07-11","source_url":"https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html","license":"source-terms-not-recorded","attribution":"Eni"}}],"evidence":[{"evidence_id":"3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a","roles":["imported:record","imported:status","metric:power_capacity","milestone:other","power_source:other","role:developer","role:government","role:power_supplier"],"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"kind":"news","title":"Data centres: EU gives the green light to the Eni-Khazna joint venture. Lombardy hub set to accelerate","source_url":"https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj","publisher":"Il Sole 24 Ore","source_family":"en.ilsole24ore.com","license":"source-terms-not-recorded","attribution":"Il Sole 24 Ore","published_at":"2026-08-10","retrieved_at":"2026-10-09","content_hash":"3db0d30135348bfcf27a9600a0a72a6d7e2c52e0df680e3fe8a6e537d4c4c7af","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"eni-khazna-ferrera-erbognone","source_local_id":"s3","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","site_ids":["vcc-site-47f902912a847a235f3d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3d3ba2e4-8795-5efc-b13e-9d6eacf95b5a.json","archive_url":"https://web.archive.org/web/20261009/https://en.ilsole24ore.com/art/data-centre-eu-gives-green-light-to-eni-khazna-joint-venture-lombardy-hub-to-be-accelerated-AJl2Zcj"},{"evidence_id":"029f0c50-dc53-50c2-a0bd-44f17b527093","roles":["imported:record","imported:status","milestone:other","role:government"],"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"kind":"news","title":"EU Commission approves Khazna–ENI joint venture, says it does “not raise competition concerns”","source_url":"https://www.eunews.it/en/2026/08/10/eu-commission-approves-khazna-eni-joint-venture-says-it-does-not-raise-competition-concerns/","publisher":"Eunews","source_family":"www.eunews.it","license":"source-terms-not-recorded","attribution":"Eunews","published_at":"2026-08-10","retrieved_at":"2026-10-09","content_hash":"bff1f288e495deeb21f303e2c0108348c73de88ce7c2469bf694bc27f131603e","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"eni-khazna-ferrera-erbognone","source_local_id":"s4","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","site_ids":["vcc-site-47f902912a847a235f3d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/029f0c50-dc53-50c2-a0bd-44f17b527093.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/029f0c50-dc53-50c2-a0bd-44f17b527093.json","archive_url":"https://web.archive.org/web/20261009/https://www.eunews.it/en/2026/08/10/eu-commission-approves-khazna-eni-joint-venture-says-it-does-not-raise-competition-concerns/"},{"evidence_id":"c1d35c79-3955-5d20-859b-aba1f85f1dcf","roles":["imported:geometry","imported:record"],"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"kind":"other","title":"Ferrera Erbognone","source_url":"https://en.wikipedia.org/wiki/Ferrera_Erbognone","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"e5a849f2588e2102d710475bd1ed3018b8df2fe25e15da7f0688a4d34ed2c8e7","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"eni-khazna-ferrera-erbognone","source_local_id":"s5","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","site_ids":["vcc-site-47f902912a847a235f3d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c1d35c79-3955-5d20-859b-aba1f85f1dcf.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c1d35c79-3955-5d20-859b-aba1f85f1dcf.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Ferrera_Erbognone"},{"evidence_id":"5b709fe6-737f-5e00-805f-0c1c9a39e15b","roles":["imported:geometry","imported:record","metric:power_capacity","milestone:announced","milestone:other","power_source:other","role:developer","role:power_supplier"],"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"kind":"company_disclosure","title":"Khazna Data Centers and Eni Partner to Develop 500 MW AI Data Center Campus Near Milan","source_url":"https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan","publisher":"G42","source_family":"www.g42.ai","license":"source-terms-not-recorded","attribution":"G42","published_at":"2025-07-11","retrieved_at":"2026-10-09","content_hash":"b7d1a4e9befda030009d264449a46def210fda0757e151e5a6721400441fe14f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"eni-khazna-ferrera-erbognone","source_local_id":"s2","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","site_ids":["vcc-site-47f902912a847a235f3d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5b709fe6-737f-5e00-805f-0c1c9a39e15b.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5b709fe6-737f-5e00-805f-0c1c9a39e15b.json","archive_url":"https://web.archive.org/web/20261009/https://www.g42.ai/resources/news/khazna-data-centers-and-eni-partner-develop-500-mw-ai-data-center-campus-near-milan"},{"evidence_id":"a7222596-74ce-5d03-8348-f324c5280b8d","roles":["imported:geometry","imported:record","metric:power_capacity","milestone:announced","milestone:other","power_source:other","role:developer","role:power_supplier"],"project_ids":["5d11dbb6-e8aa-5602-9c7c-8997b1c620c1"],"kind":"company_disclosure","title":"Khazna Data Centers and Eni partner to develop 500 MW AI Data Center Campus near Milan","source_url":"https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html","publisher":"Eni","source_family":"www.eni.com","license":"source-terms-not-recorded","attribution":"Eni","published_at":"2025-07-11","retrieved_at":"2026-10-09","content_hash":"f47b66b73f4cc8a813fddd4943ff4813daffcc189c375cba652037461ed59f9b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"eni-khazna-ferrera-erbognone","source_local_id":"s1","source_record_sha256":"a0cb3643305f3a5a888c331dde151b57fce4ada563e49634d96a348a6f0ea568","site_ids":["vcc-site-47f902912a847a235f3d"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a7222596-74ce-5d03-8348-f324c5280b8d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a7222596-74ce-5d03-8348-f324c5280b8d.json","archive_url":"https://web.archive.org/web/20261009/https://www.eni.com/en-IT/media/press-release/2025/07/pr-khazna-data-centers-eni-partner-develop-i-data-center-campus.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-47f902912a847a235f3d/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-47f902912a847a235f3d.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-47f902912a847a235f3d","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
