{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-4c3f2c7b887170cea7c1","physical_site_stable_key":"imported:semiconductor-atlas:compass-meridian-mississippi","name":"Compass Datacenters Meridian campus","country":"United States","country_iso_a2":"US","latitude":32.3747,"longitude":-88.7042,"geometry":{"coordinates":[-88.7042,32.3747],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Wikipedia coordinates for Meridian. Compass places the campus in the Meridian I-20/59 Industrial Park; no cited source gives site coordinates."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["3b11e0f1-1a48-542b-9b5c-c681ae6ed732"],"project_count":1,"project_ids":["2b520cfa-8aea-5212-9b60-8ff417ee6578"],"project_stable_keys":["imported:semiconductor-atlas:compass-meridian-mississippi"],"statuses":["under_construction"],"oldest_status_as_of":"2026-10-09","newest_status_as_of":"2026-10-09","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c3f2c7b887170cea7c1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c3f2c7b887170cea7c1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Compass Datacenters"]},"projects":[{"project_id":"2b520cfa-8aea-5212-9b60-8ff417ee6578","project_stable_key":"imported:semiconductor-atlas:compass-meridian-mississippi","site_id":"vcc-site-4c3f2c7b887170cea7c1","physical_site_stable_key":"imported:semiconductor-atlas:compass-meridian-mississippi","name":"Compass Datacenters Meridian campus","country":"United States","country_iso_a2":"US","latitude":32.3747,"longitude":-88.7042,"geometry":{"coordinates":[-88.7042,32.3747],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Wikipedia coordinates for Meridian. Compass places the campus in the Meridian I-20/59 Industrial Park; no cited source gives site coordinates.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","last_observed_physical_status":"under_construction","status_as_of":"2026-10-09","status_age_days_at_review":18,"status_method":"imported_documented_status","status_evidence_id":"a9095004-9c5e-5929-a366-d8ece83e55c5","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","notes":null,"party":"Compass Datacenters","relationship_scope":"unknown","role":"developer","source_record_id":"compass-meridian-mississippi"},{"evidence_id":"a9095004-9c5e-5929-a366-d8ece83e55c5","notes":null,"party":"Compass Datacenters","relationship_scope":"unknown","role":"developer","source_record_id":"compass-meridian-mississippi"},{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","notes":"Supplying power and invested in a substation for the industrial park.","party":"Mississippi Power","relationship_scope":"unknown","role":"utility","source_record_id":"compass-meridian-mississippi"},{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","notes":"Assisting with site preparation and certifying Compass for state data center tax exemptions.","party":"Mississippi Development Authority","relationship_scope":"unknown","role":"government","source_record_id":"compass-meridian-mississippi"},{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","notes":"Obtained a state site grant for the industrial park.","party":"Lauderdale County","relationship_scope":"unknown","role":"government","source_record_id":"compass-meridian-mississippi"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.compassdatacenters.com/data-center-markets/","geometry_source_url":"https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve Compass Datacenters Meridian campus as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"compass-meridian-mississippi"},"record":{"aliases":["Compass Lauderdale County campus"],"id":"compass-meridian-mississippi","last_reviewed":"2026-10-09","location":{"admin1":"Mississippi","admin2":"Lauderdale County","country":"US","lat":32.3747,"locality":"Meridian","lon":-88.7042,"note":"Wikipedia coordinates for Meridian. Compass places the campus in the Meridian I-20/59 Industrial Park; no cited source gives site coordinates.","precision":"locality","source_ids":["s1"]},"metrics":[{"applies_to":"campus","as_of":"2025-01-09","basis":"announced","metric":"investment","note":"Value at full fit-out, including future tenants' IT equipment.","qualifier":"exact","source_ids":["s1"],"unit":"USD","value":10000000000},{"applies_to":"campus","as_of":"2025-01-09","basis":"planned","metric":"power_capacity","note":"Power that Mississippi Power will supply to the facility, per the announcement.","power_scope":"grid_connection","qualifier":"approximately","source_ids":["s1"],"unit":"MW","value":500},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"power_capacity","note":"Figure on Compass's undated markets page as viewed on the access date; it is lower than the roughly 500 MW in the announcement and the page does not say which measure it uses.","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":320},{"applies_to":"campus","as_of":"2025-01-09","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s1"],"unit":"count","value":8}],"milestones":[{"date":"2025-01-09","event":"announced","kind":"actual","source_ids":["s1"]},{"date":"2025","event":"construction_started","kind":"actual","source_ids":["s2"]}],"name":"Compass Datacenters Meridian campus","notes":"Status rests on Compass's undated markets page, viewed on 2026-10-09, which says the Meridian site broke ground in 2025; no dated construction update was found.","parties":[{"name":"Compass Datacenters","role":"developer","source_ids":["s1","s2"]},{"name":"Mississippi Power","note":"Supplying power and invested in a substation for the industrial park.","role":"utility","source_ids":["s1"]},{"name":"Mississippi Development Authority","note":"Assisting with site preparation and certifying Compass for state data center tax exemptions.","role":"government","source_ids":["s1"]},{"name":"Lauderdale County","note":"Obtained a state site grant for the industrial park.","role":"government","source_ids":["s1"]}],"power_sources":[{"description":"Supply from Mississippi Power, which also invested in a substation serving the industrial park.","source_ids":["s1"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260908030331/https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/","id":"s1","published":"2025-01-09","publisher":"Compass Datacenters","title":"Compass project generates $10 billion investment in Lauderdale County","type":"company","url":"https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/"},{"accessed":"2026-10-09","id":"s2","published":null,"publisher":"Compass Datacenters","title":"Data Center Markets - Compass Datacenters","type":"company","url":"https://www.compassdatacenters.com/data-center-markets/"}],"status":"under_construction","status_as_of":"2026-10-09","status_source_ids":["s2"],"summary":"Compass Datacenters is developing a single-tenant hyperscale campus of eight data centers in the Meridian I-20/59 Industrial Park in Meridian, Lauderdale County, Mississippi. Announced in January 2025 with Governor Tate Reeves, the project is valued at USD 10 billion at full fit-out including tenant IT equipment and is to be built over about eight years. Mississippi Power will supply about 500 MW and invested in a substation for the park, while the state granted tax exemptions and site support. Compass's market page now describes Meridian as a 320 MW site that broke ground in 2025."},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","s2":"a9095004-9c5e-5929-a366-d8ece83e55c5"},"source_file":"datacenters/projects/compass-meridian-mississippi.json","source_record_id":"compass-meridian-mississippi","source_record_sha256":"a18df3f46fbdb7b6bbbba380d6ce88046afae5e7f7409b3cc456fe2a94fdb4c6","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"8a912593f9baab1d2ffa6c2d31b0051dfe27418b9f4236cdf8a31320ca63e2f2"}],"evidence_ids":["3b11e0f1-1a48-542b-9b5c-c681ae6ed732","a9095004-9c5e-5929-a366-d8ece83e55c5"],"status_source":{"evidence_id":"a9095004-9c5e-5929-a366-d8ece83e55c5","title":"Data Center Markets - Compass Datacenters","publisher":"Compass Datacenters","kind":"company_disclosure","published_at":null,"source_url":"https://www.compassdatacenters.com/data-center-markets/","license":"source-terms-not-recorded","attribution":"Compass Datacenters"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c3f2c7b887170cea7c1/#project-2b520cfa-8aea-5212-9b60-8ff417ee6578","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/2b520cfa-8aea-5212-9b60-8ff417ee6578.json","geometry_source":{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","title":"Compass project generates $10 billion investment in Lauderdale County","publisher":"Compass Datacenters","kind":"company_disclosure","published_at":"2025-01-09","source_url":"https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/","license":"source-terms-not-recorded","attribution":"Compass Datacenters"}}],"evidence":[{"evidence_id":"3b11e0f1-1a48-542b-9b5c-c681ae6ed732","roles":["imported:geometry","imported:record","metric:buildings","metric:investment","metric:power_capacity","milestone:announced","power_source:grid","role:developer","role:government","role:utility"],"project_ids":["2b520cfa-8aea-5212-9b60-8ff417ee6578"],"kind":"company_disclosure","title":"Compass project generates $10 billion investment in Lauderdale County","source_url":"https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/","publisher":"Compass Datacenters","source_family":"www.compassdatacenters.com","license":"source-terms-not-recorded","attribution":"Compass Datacenters","published_at":"2025-01-09","retrieved_at":"2026-10-09","content_hash":"aa5ed441ec23a4b997c2cb874662ba23b9f06e58f2b3b6eb77a30e6fcf8be60b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"compass-meridian-mississippi","source_local_id":"s1","source_record_sha256":"a18df3f46fbdb7b6bbbba380d6ce88046afae5e7f7409b3cc456fe2a94fdb4c6","site_ids":["vcc-site-4c3f2c7b887170cea7c1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b11e0f1-1a48-542b-9b5c-c681ae6ed732.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b11e0f1-1a48-542b-9b5c-c681ae6ed732.json","archive_url":"https://web.archive.org/web/20261009/https://www.compassdatacenters.com/news/compass-10b-investment-lauderdale-county-mississippi/"},{"evidence_id":"a9095004-9c5e-5929-a366-d8ece83e55c5","roles":["imported:record","imported:status","metric:power_capacity","milestone:construction_started","role:developer"],"project_ids":["2b520cfa-8aea-5212-9b60-8ff417ee6578"],"kind":"company_disclosure","title":"Data Center Markets - Compass Datacenters","source_url":"https://www.compassdatacenters.com/data-center-markets/","publisher":"Compass Datacenters","source_family":"www.compassdatacenters.com","license":"source-terms-not-recorded","attribution":"Compass Datacenters","published_at":null,"retrieved_at":"2026-10-09","content_hash":"fdf5bdcc663cb15c71c1c26c9bfc5d6e7a4211fe654628ba58647d3dc8609548","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"compass-meridian-mississippi","source_local_id":"s2","source_record_sha256":"a18df3f46fbdb7b6bbbba380d6ce88046afae5e7f7409b3cc456fe2a94fdb4c6","site_ids":["vcc-site-4c3f2c7b887170cea7c1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a9095004-9c5e-5929-a366-d8ece83e55c5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a9095004-9c5e-5929-a366-d8ece83e55c5.json","archive_url":"https://web.archive.org/web/20261009/https://www.compassdatacenters.com/data-center-markets/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-4c3f2c7b887170cea7c1/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-4c3f2c7b887170cea7c1.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-4c3f2c7b887170cea7c1","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
