{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-52b1e1c3038357306a39","physical_site_stable_key":"curated:adaniconnex-pune-data-center-campus","name":"AdaniConneX Pune Data Center Campus","country":"India","country_iso_a2":"IN","latitude":18.6467083333,"longitude":73.8072666667,"geometry":{"coordinates":[73.8072666667,18.6467083333],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_project_report_coordinate_to_point"],"geometry_scope_classes":["official_source_reported_project_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["project_locator"],"geometry_precision_scopes":["Official source-reported point used only to locate the PNQ04 project. It is not a project centroid, footprint, parcel, building outline, construction extent, campus boundary, or survey-accuracy claim."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report does not identify the coordinate's datum, reference feature, collection method, or horizontal accuracy.","geometry_evidence_ids":["9e5f7eb0-994d-534d-8715-b16378b71787"],"project_count":2,"project_ids":["48eb54d5-dd3f-51a3-aeed-1ddce1949763","df5ccb0c-2ab0-56fc-a260-71db9387c492"],"project_stable_keys":["curated:adaniconnex-pune-data-center-campus:pnq04-current-build","imported:semiconductor-atlas:adaniconnex-pune"],"statuses":["partially_operational","under_construction"],"oldest_status_as_of":"2026-06-01","newest_status_as_of":"2026-07-29","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"in","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-52b1e1c3038357306a39.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Pune Data Center Limited"]},"projects":[{"project_id":"df5ccb0c-2ab0-56fc-a260-71db9387c492","project_stable_key":"imported:semiconductor-atlas:adaniconnex-pune","site_id":"vcc-site-52b1e1c3038357306a39","physical_site_stable_key":"curated:adaniconnex-pune-data-center-campus","name":"AdaniConneX Pune data centre campus","country":"India","country_iso_a2":"IN","latitude":18.5211,"longitude":73.8553,"geometry":{"coordinates":[73.8553,18.5211],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Sources name Pune only. Coordinates are the Pune city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","last_observed_physical_status":"partially_operational","status_as_of":"2026-07-29","status_age_days_at_review":90,"status_method":"imported_documented_status","status_evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","notes":null,"party":"AdaniConneX","relationship_scope":"unknown","role":"developer","source_record_id":"adaniconnex-pune"},{"evidence_id":"6171a3e1-fbf0-57db-b1c6-39747fcf427d","notes":null,"party":"AdaniConneX","relationship_scope":"unknown","role":"developer","source_record_id":"adaniconnex-pune"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.adaniconnex.com/data-centers","geometry_source_url":"https://www.adaniconnex.com/data-centers","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Pune campus context includes operating first and second phases and 250 MW potential; existing record specifically selects PNQ04 current construction. Preserve campus metrics and operating status separately from PNQ04.","source_record_id":"adaniconnex-pune","target_physical_site_stable_key":"curated:adaniconnex-pune-data-center-campus"},"record":{"aliases":[],"id":"adaniconnex-pune","last_reviewed":"2026-10-09","location":{"admin1":"Maharashtra","admin2":"Pune","country":"IN","lat":18.5211,"locality":"Pune","lon":73.8553,"note":"Sources name Pune only. Coordinates are the Pune city coordinates from Wikipedia (Nominatim was rate-limiting requests), not the site.","precision":"locality","source_ids":["s1","s2","s3"]},"metrics":[{"applies_to":"campus","as_of":"2026","basis":"planned","metric":"power_capacity","note":"Listed by the company as potential capacity in IT load.","power_scope":"it_load","qualifier":"up_to","source_ids":["s1"],"unit":"MW","value":250},{"applies_to":"phase","as_of":"2026-07-29","basis":"operational","metric":"power_capacity","phase_label":"Phase II capacity handed over to customer","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":9.6}],"milestones":[{"date":"2025-10","event":"first_operational","kind":"actual","note":"Company lists Phase 1 as live from October 2025, although the same page also describes the Pune facility as soon to be launched.","source_ids":["s1"]}],"name":"AdaniConneX Pune data centre campus","notes":"Microsoft is not listed as a party because the Adani release does not state its role at the Pune campus, and the customer that received the Phase II capacity is not named. The capacity of Phase 1 is not published. The July 2026 results release also gives an operational capacity of 65.4 MW after the handover without saying whether that figure covers Pune alone or all AdaniConneX sites, so it is not recorded.","parties":[{"name":"AdaniConneX","role":"developer","source_ids":["s1","s2"]}],"power_sources":[{"description":"Company states up to 100% renewable energy; the supply arrangement is not described.","source_ids":["s1"],"type":"other"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":null,"publisher":"AdaniConneX","title":"Data Centers","type":"company","url":"https://www.adaniconnex.com/data-centers"},{"accessed":"2026-10-09","id":"s2","published":"2026-07-29","publisher":"Adani Group","title":"Adani Enterprises Ltd announces Q1-FY27 results","type":"company","url":"https://www.adani.com/newsroom/media-releases/adani-enterprises-ltd-announces-q1-fy27-results"},{"accessed":"2026-10-09","id":"s3","published":"2026-02-17","publisher":"Adani Group","title":"Adani Commits USD 100 Bn to Sovereign AI Infrastructure","type":"company","url":"https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure"}],"status":"partially_operational","status_as_of":"2026-07-29","status_source_ids":["s1","s2"],"summary":"AdaniConneX, the Adani group's data centre business, lists a Pune campus with a potential capacity of 250 MW of IT load and a first phase live from October 2025. Adani reported in July 2026 that 9.6 MW of the campus's second phase had been handed over to a customer. The company says the campus can use up to 100% renewable power, and a February 2026 Adani group release links its Microsoft partnership to the Pune and Hyderabad campuses without describing the terms. The site address has not been published.","workloads":["colocation"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","s2":"6171a3e1-fbf0-57db-b1c6-39747fcf427d","s3":"e666c457-e5fe-5f03-a81a-7b7c4b14153a"},"source_file":"datacenters/projects/adaniconnex-pune.json","source_record_id":"adaniconnex-pune","source_record_sha256":"033d7eddbf642d0c4965f4294ae5a51c8130e8723703ed51dbd4a9b76da8d2a9","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"1e1befbb85b31275c876195ef6f9e930a3a0b09253f8bedd90d5a4b86a03b86a"}],"evidence_ids":["42643fbc-e1c7-5395-9f08-a0b26d79fd1d","6171a3e1-fbf0-57db-b1c6-39747fcf427d","e666c457-e5fe-5f03-a81a-7b7c4b14153a"],"status_source":{"evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","title":"Data Centers","publisher":"AdaniConneX","kind":"company_disclosure","published_at":null,"source_url":"https://www.adaniconnex.com/data-centers","license":"source-terms-not-recorded","attribution":"AdaniConneX"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/#project-df5ccb0c-2ab0-56fc-a260-71db9387c492","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/df5ccb0c-2ab0-56fc-a260-71db9387c492.json","geometry_source":{"evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","title":"Data Centers","publisher":"AdaniConneX","kind":"company_disclosure","published_at":null,"source_url":"https://www.adaniconnex.com/data-centers","license":"source-terms-not-recorded","attribution":"AdaniConneX"}},{"project_id":"48eb54d5-dd3f-51a3-aeed-1ddce1949763","project_stable_key":"curated:adaniconnex-pune-data-center-campus:pnq04-current-build","site_id":"vcc-site-52b1e1c3038357306a39","physical_site_stable_key":"curated:adaniconnex-pune-data-center-campus","name":"AdaniConneX Pune PNQ04 Current Build","country":"India","country_iso_a2":"IN","latitude":18.6467083333,"longitude":73.8072666667,"geometry":{"coordinates":[73.8072666667,18.6467083333],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"direct_geometry","geometry_method":"official_project_report_coordinate_to_point","geometry_scope_class":"official_source_reported_project_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"project_locator","geometry_precision_scope":"Official source-reported point used only to locate the PNQ04 project. It is not a project centroid, footprint, parcel, building outline, construction extent, campus boundary, or survey-accuracy claim.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The report does not identify the coordinate's datum, reference feature, collection method, or horizontal accuracy.","geometry_evidence_id":"9e5f7eb0-994d-534d-8715-b16378b71787","last_observed_physical_status":"under_construction","status_as_of":"2026-06-01","status_age_days_at_review":148,"status_method":"authoritative_physical_status_update","status_evidence_id":"f3905471-9d3d-5be1-9e61-e78c956f4384","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"source evidence does not distinguish greenfield, expansion, or retrofit","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed project power observation; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth","geometry_source_url":"https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf","project_details":[],"evidence_ids":["9e5f7eb0-994d-534d-8715-b16378b71787","f3905471-9d3d-5be1-9e61-e78c956f4384"],"status_source":{"evidence_id":"f3905471-9d3d-5be1-9e61-e78c956f4384","title":"Scaling India's data centres responsibly for the AI Era: Bridging People, Planet and Growth","publisher":"AdaniConneX","kind":"company_disclosure","published_at":"2026-06-01","source_url":"https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth","license":"all-rights-reserved","attribution":"AdaniConneX"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/#project-48eb54d5-dd3f-51a3-aeed-1ddce1949763","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/48eb54d5-dd3f-51a3-aeed-1ddce1949763.json","geometry_source":{"evidence_id":"9e5f7eb0-994d-534d-8715-b16378b71787","title":"Compliance to Stipulated Conditions in Environment Clearance, October 2024 to March 2025 — Development of Data Center PNQ04","publisher":"Pune Data Center Limited","kind":"company_disclosure","published_at":null,"source_url":"https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf","license":"all-rights-reserved","attribution":"Pune Data Center Limited"}}],"evidence":[{"evidence_id":"e666c457-e5fe-5f03-a81a-7b7c4b14153a","roles":["imported:geometry","imported:record"],"project_ids":["df5ccb0c-2ab0-56fc-a260-71db9387c492"],"kind":"company_disclosure","title":"Adani Commits USD 100 Bn to Sovereign AI Infrastructure","source_url":"https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure","publisher":"Adani Group","source_family":"www.adani.com","license":"source-terms-not-recorded","attribution":"Adani Group","published_at":"2026-02-17","retrieved_at":"2026-10-09","content_hash":"1daa63b212cfc50cb284f650881ca6429c8856927ebed3862ee8695a4a14d643","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"adaniconnex-pune","source_local_id":"s3","source_record_sha256":"033d7eddbf642d0c4965f4294ae5a51c8130e8723703ed51dbd4a9b76da8d2a9","site_ids":["vcc-site-52b1e1c3038357306a39"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e666c457-e5fe-5f03-a81a-7b7c4b14153a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e666c457-e5fe-5f03-a81a-7b7c4b14153a.json","archive_url":"https://web.archive.org/web/20261009/https://www.adani.com/newsroom/media-releases/Adani-Commits-USD-100-Bn-to-Sovereign-AI-Infrastructure"},{"evidence_id":"6171a3e1-fbf0-57db-b1c6-39747fcf427d","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","role:developer"],"project_ids":["df5ccb0c-2ab0-56fc-a260-71db9387c492"],"kind":"company_disclosure","title":"Adani Enterprises Ltd announces Q1-FY27 results","source_url":"https://www.adani.com/newsroom/media-releases/adani-enterprises-ltd-announces-q1-fy27-results","publisher":"Adani Group","source_family":"www.adani.com","license":"source-terms-not-recorded","attribution":"Adani Group","published_at":"2026-07-29","retrieved_at":"2026-10-09","content_hash":"b8f1e9afcde88e53d645745ac91853e3e28746a907f986b76fc733728f299082","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"adaniconnex-pune","source_local_id":"s2","source_record_sha256":"033d7eddbf642d0c4965f4294ae5a51c8130e8723703ed51dbd4a9b76da8d2a9","site_ids":["vcc-site-52b1e1c3038357306a39"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6171a3e1-fbf0-57db-b1c6-39747fcf427d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6171a3e1-fbf0-57db-b1c6-39747fcf427d.json","archive_url":"https://web.archive.org/web/20261009/https://www.adani.com/newsroom/media-releases/adani-enterprises-ltd-announces-q1-fy27-results"},{"evidence_id":"9e5f7eb0-994d-534d-8715-b16378b71787","roles":["geometry"],"project_ids":["48eb54d5-dd3f-51a3-aeed-1ddce1949763"],"kind":"company_disclosure","title":"Compliance to Stipulated Conditions in Environment Clearance, October 2024 to March 2025 — Development of Data Center PNQ04","source_url":"https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf","publisher":"Pune Data Center Limited","source_family":"adaniconnex_environmental_compliance_reports","license":"all-rights-reserved","attribution":"Pune Data Center Limited","published_at":null,"retrieved_at":"2026-07-21T16:11:57Z","content_hash":"406e7134f896a916f6ac978a888183f67de62218cbfbd24a90248af52af544f4","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-52b1e1c3038357306a39"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9e5f7eb0-994d-534d-8715-b16378b71787.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9e5f7eb0-994d-534d-8715-b16378b71787.json","archive_url":"https://web.archive.org/web/20260721161157/https://www.adaniconnex.com/-/media/Project/AdaniConneX/AdaniConneX-AboutUs-Assets/Certifications/Post-EC-compliance-report-PNQ26--with-Anneure.pdf"},{"evidence_id":"42643fbc-e1c7-5395-9f08-a0b26d79fd1d","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","milestone:first_operational","power_source:other","role:developer"],"project_ids":["df5ccb0c-2ab0-56fc-a260-71db9387c492"],"kind":"company_disclosure","title":"Data Centers","source_url":"https://www.adaniconnex.com/data-centers","publisher":"AdaniConneX","source_family":"www.adaniconnex.com","license":"source-terms-not-recorded","attribution":"AdaniConneX","published_at":null,"retrieved_at":"2026-10-09","content_hash":"0e1ea80dd682092f0243900f30e671ba78883ad026fc9a183e367761f4fb6154","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"adaniconnex-pune","source_local_id":"s1","source_record_sha256":"033d7eddbf642d0c4965f4294ae5a51c8130e8723703ed51dbd4a9b76da8d2a9","site_ids":["vcc-site-52b1e1c3038357306a39"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/42643fbc-e1c7-5395-9f08-a0b26d79fd1d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/42643fbc-e1c7-5395-9f08-a0b26d79fd1d.json","archive_url":"https://web.archive.org/web/20261009/https://www.adaniconnex.com/data-centers"},{"evidence_id":"f3905471-9d3d-5be1-9e61-e78c956f4384","roles":["physical_status"],"project_ids":["48eb54d5-dd3f-51a3-aeed-1ddce1949763"],"kind":"company_disclosure","title":"Scaling India's data centres responsibly for the AI Era: Bridging People, Planet and Growth","source_url":"https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth","publisher":"AdaniConneX","source_family":"adaniconnex_current_development_updates","license":"all-rights-reserved","attribution":"AdaniConneX","published_at":"2026-06-01","retrieved_at":"2026-07-21T16:11:00Z","content_hash":"ec057dbf5efe7c0b5f8344cbdd7e74b1cf1d208c8ff2545c1f4f4dc45b6721ff","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-52b1e1c3038357306a39"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f3905471-9d3d-5be1-9e61-e78c956f4384.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f3905471-9d3d-5be1-9e61-e78c956f4384.json","archive_url":"https://web.archive.org/web/20260721161100/https://resources.adaniconnex.com/blog/scaling-indias-data-centres-responsibly-for-the-ai-era-bridging-people-planet-and-growth"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-52b1e1c3038357306a39/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-52b1e1c3038357306a39.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-52b1e1c3038357306a39","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
