{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-54d4a697323404ecfc35","physical_site_stable_key":"imported:semiconductor-atlas:edgecore-mesa","name":"EdgeCore Mesa data center campus","country":"United States","country_iso_a2":"US","latitude":33.3442,"longitude":-111.6196,"geometry":{"coordinates":[-111.6196,33.3442],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["approximate_site"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["approximate_site_locator"],"geometry_precision_scopes":["Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["3b92e884-db33-5b13-be1e-bcb97a3e4344"],"project_count":1,"project_ids":["441174d1-4dab-5b80-bfb2-76062cf675aa"],"project_stable_keys":["imported:semiconductor-atlas:edgecore-mesa"],"statuses":["partially_operational"],"oldest_status_as_of":"2025-05-21","newest_status_as_of":"2025-05-21","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54d4a697323404ecfc35.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["EdgeCore Digital Infrastructure"]},"projects":[{"project_id":"441174d1-4dab-5b80-bfb2-76062cf675aa","project_stable_key":"imported:semiconductor-atlas:edgecore-mesa","site_id":"vcc-site-54d4a697323404ecfc35","physical_site_stable_key":"imported:semiconductor-atlas:edgecore-mesa","name":"EdgeCore Mesa data center campus","country":"United States","country_iso_a2":"US","latitude":33.3442,"longitude":-111.6196,"geometry":{"coordinates":[-111.6196,33.3442],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"approximate_site","geometry_authority_class":"compiled_reference","geometry_use_scope":"approximate_site_locator","geometry_precision_scope":"Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","last_observed_physical_status":"partially_operational","status_as_of":"2025-05-21","status_age_days_at_review":524,"status_method":"imported_documented_status","status_evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","notes":null,"party":"EdgeCore Digital Infrastructure","relationship_scope":"unknown","role":"developer","source_record_id":"edgecore-mesa"},{"evidence_id":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","notes":null,"party":"EdgeCore Digital Infrastructure","relationship_scope":"unknown","role":"developer","source_record_id":"edgecore-mesa"},{"evidence_id":"37a8ffc7-4e5e-5503-9fee-9d738613bcef","notes":null,"party":"EdgeCore Digital Infrastructure","relationship_scope":"unknown","role":"developer","source_record_id":"edgecore-mesa"},{"evidence_id":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","notes":"Described as a wholesale data center developer, owner and operator.","party":"EdgeCore Digital Infrastructure","relationship_scope":"unknown","role":"owner","source_record_id":"edgecore-mesa"},{"evidence_id":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","notes":null,"party":"EdgeCore Digital Infrastructure","relationship_scope":"unknown","role":"operator","source_record_id":"edgecore-mesa"},{"evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","notes":null,"party":"Salt River Project","relationship_scope":"unknown","role":"utility","source_record_id":"edgecore-mesa"},{"evidence_id":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","notes":null,"party":"Salt River Project","relationship_scope":"unknown","role":"utility","source_record_id":"edgecore-mesa"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"EdgeCore Digital Infrastructure","operator":"EdgeCore Digital Infrastructure","users":null,"tenants":null,"customers":null,"status_source_url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","geometry_source_url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["approximate_locator_not_boundary"],"rationale":"No matching named development in the 201-project release. Preserve EdgeCore Mesa data center campus as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.","source_record_id":"edgecore-mesa"},"record":{"aliases":["EdgeCore Phoenix campus","EdgeCore PH01-PH03"],"id":"edgecore-mesa","last_reviewed":"2026-10-09","location":{"admin1":"Arizona","country":"US","lat":33.3442,"locality":"Mesa","lon":-111.6196,"note":"Point from the local OpenStreetMap layer (datacenters/layers/osm/features.geojson): a building footprint tagged EdgeCore at South Everton Terrace, Mesa (OSM way 808979618). It marks one existing building, not the centroid of the expanded 84-acre campus. The cited sources name Mesa but give no street address.","precision":"approximate_site","source_ids":["s1","s3"]},"metrics":[{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"power_capacity","note":"Critical IT load of the five-building campus on EdgeCore's undated campus page, dated here by access.","power_scope":"it_load","qualifier":"exact","source_ids":["s3"],"unit":"MW","value":496},{"applies_to":"campus","as_of":"2025-05-20","basis":"planned","metric":"power_capacity","note":"Total announced with the May 2025 land purchase.","power_scope":"unspecified","qualifier":"more_than","source_ids":["s1","s2"],"unit":"MW","value":450},{"applies_to":"phase","as_of":"2025-05-20","basis":"planned","metric":"power_capacity","phase_label":"43.87-acre expansion parcel","power_scope":"unspecified","qualifier":"more_than","source_ids":["s1","s2"],"unit":"MW","value":250},{"applies_to":"campus","as_of":"2026-10-09","basis":"reported","metric":"land_area","qualifier":"exact","source_ids":["s3"],"unit":"acres","value":84},{"applies_to":"phase","as_of":"2025-05-20","basis":"acquired","metric":"land_area","phase_label":"43.87-acre expansion parcel","qualifier":"exact","source_ids":["s1","s2"],"unit":"acres","value":43.87},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s3"],"unit":"count","value":5},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"floor_area","qualifier":"approximately","source_ids":["s3"],"unit":"sq_ft","value":2700000}],"milestones":[{"date":"2023-04","event":"other","kind":"actual","note":"EdgeCore dates the establishment of its first Mesa campus to April 2023.","source_ids":["s1","s2"]},{"date":"2025-05-20","event":"expansion_announced","kind":"actual","note":"Purchase of 43.87 more acres and expansion to over 450 MW announced.","source_ids":["s1","s2"]},{"date":"2025","event":"other","kind":"planned","note":"Completion year for one of the two buildings under construction; the sources give 2025 and 2026 for PH02 and PH03 without saying which is which.","source_ids":["s2"]},{"date":"2026","event":"other","kind":"planned","note":"Completion year for the other building under construction (PH02 or PH03).","source_ids":["s2"]}],"name":"EdgeCore Mesa data center campus","notes":"Status rests on the May 2025 release; no 2026 source confirming whether PH02 and PH03 were finished was found. EdgeCore's campus page is undated and does not give per-building status, so its figures carry the access date. The May 2025 release also said 206 MW had been built and commissioned on the original Mesa land while two buildings were still under construction; that figure is left out of the metrics because it is unclear what share was operating.","parties":[{"name":"EdgeCore Digital Infrastructure","role":"developer","source_ids":["s1","s2","s3"]},{"name":"EdgeCore Digital Infrastructure","note":"Described as a wholesale data center developer, owner and operator.","role":"owner","source_ids":["s2"]},{"name":"EdgeCore Digital Infrastructure","role":"operator","source_ids":["s2"]},{"name":"Salt River Project","role":"utility","source_ids":["s1","s2"]}],"power_sources":[{"description":"Salt River Project serves the operating building and was slated to power PH02 and PH03 on completion.","source_ids":["s1","s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-05-20","publisher":"EdgeCore Digital Infrastructure","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","type":"company","url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260117165151/https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure","id":"s2","published":"2025-05-21","publisher":"InBusiness Phoenix","title":"Data Center Developer Announces Expansion of Metro Phoenix Infrastructure","type":"trade_press","url":"https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure"},{"accessed":"2026-10-09","id":"s3","published":null,"publisher":"EdgeCore Digital Infrastructure","title":"Phoenix data center campus","type":"company","url":"https://edgecore.com/locations/phoenix-data-center"}],"status":"partially_operational","status_as_of":"2025-05-21","status_source_ids":["s1","s2"],"summary":"Wholesale hyperscale data center campus that EdgeCore Digital Infrastructure established in Mesa, Arizona, in April 2023, with power from Salt River Project. Its first building, PH01, was operating by 2025 while PH02 and PH03 were under construction for completion in 2025 and 2026. In May 2025 EdgeCore bought another 43.87 acres, more than doubling its buildable land in Mesa, and raised planned capacity to over 450 MW. EdgeCore's campus page now describes an 84-acre, five-building campus able to support 496 MW of critical IT load in about 2.7 million square feet.","workloads":[]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"3b92e884-db33-5b13-be1e-bcb97a3e4344","s2":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","s3":"37a8ffc7-4e5e-5503-9fee-9d738613bcef"},"source_file":"datacenters/projects/edgecore-mesa.json","source_record_id":"edgecore-mesa","source_record_sha256":"11108ce31c1e8198f200d4be4681d069335589ece0fb1c2199fee548a18090d2","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"d32b94b194c30dba40bff79ef74b21ea7a36e3842c000a463ca9cc87f9e2155a"}],"evidence_ids":["37a8ffc7-4e5e-5503-9fee-9d738613bcef","3b92e884-db33-5b13-be1e-bcb97a3e4344","ab3cd05e-2e1f-549b-aa63-11daa1b7f34a"],"status_source":{"evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","publisher":"EdgeCore Digital Infrastructure","kind":"company_disclosure","published_at":"2025-05-20","source_url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","license":"source-terms-not-recorded","attribution":"EdgeCore Digital Infrastructure"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/#project-441174d1-4dab-5b80-bfb2-76062cf675aa","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/441174d1-4dab-5b80-bfb2-76062cf675aa.json","geometry_source":{"evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","publisher":"EdgeCore Digital Infrastructure","kind":"company_disclosure","published_at":"2025-05-20","source_url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","license":"source-terms-not-recorded","attribution":"EdgeCore Digital Infrastructure"}}],"evidence":[{"evidence_id":"ab3cd05e-2e1f-549b-aa63-11daa1b7f34a","roles":["imported:record","imported:status","metric:land_area","metric:power_capacity","milestone:expansion_announced","milestone:other","power_source:grid","role:developer","role:operator","role:owner","role:utility"],"project_ids":["441174d1-4dab-5b80-bfb2-76062cf675aa"],"kind":"trade_press","title":"Data Center Developer Announces Expansion of Metro Phoenix Infrastructure","source_url":"https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure","publisher":"InBusiness Phoenix","source_family":"inbusinessphx.com","license":"source-terms-not-recorded","attribution":"InBusiness Phoenix","published_at":"2025-05-21","retrieved_at":"2026-10-09","content_hash":"fa45949b3cbaf7d12161746429c41c15d171d9453d97ac3ea4418a6d2ed42b48","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"edgecore-mesa","source_local_id":"s2","source_record_sha256":"11108ce31c1e8198f200d4be4681d069335589ece0fb1c2199fee548a18090d2","site_ids":["vcc-site-54d4a697323404ecfc35"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ab3cd05e-2e1f-549b-aa63-11daa1b7f34a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ab3cd05e-2e1f-549b-aa63-11daa1b7f34a.json","archive_url":"https://web.archive.org/web/20261009/https://inbusinessphx.com/technology-innovation/data-center-developer-announces-expansion-of-metro-phoenix-infrastructure"},{"evidence_id":"3b92e884-db33-5b13-be1e-bcb97a3e4344","roles":["imported:geometry","imported:record","imported:status","metric:land_area","metric:power_capacity","milestone:expansion_announced","milestone:other","power_source:grid","role:developer","role:utility"],"project_ids":["441174d1-4dab-5b80-bfb2-76062cf675aa"],"kind":"company_disclosure","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","source_url":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","publisher":"EdgeCore Digital Infrastructure","source_family":"edgecore.com","license":"source-terms-not-recorded","attribution":"EdgeCore Digital Infrastructure","published_at":"2025-05-20","retrieved_at":"2026-10-09","content_hash":"9b0b658c498ca92acc465a0ffeb1a794d9afede12ac4f95fd4a4b8f094caa3d6","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"edgecore-mesa","source_local_id":"s1","source_record_sha256":"11108ce31c1e8198f200d4be4681d069335589ece0fb1c2199fee548a18090d2","site_ids":["vcc-site-54d4a697323404ecfc35"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b92e884-db33-5b13-be1e-bcb97a3e4344.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3b92e884-db33-5b13-be1e-bcb97a3e4344.json","archive_url":"https://web.archive.org/web/20261009/https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/"},{"evidence_id":"37a8ffc7-4e5e-5503-9fee-9d738613bcef","roles":["imported:geometry","imported:record","metric:buildings","metric:floor_area","metric:land_area","metric:power_capacity","role:developer"],"project_ids":["441174d1-4dab-5b80-bfb2-76062cf675aa"],"kind":"company_disclosure","title":"Phoenix data center campus","source_url":"https://edgecore.com/locations/phoenix-data-center","publisher":"EdgeCore Digital Infrastructure","source_family":"edgecore.com","license":"source-terms-not-recorded","attribution":"EdgeCore Digital Infrastructure","published_at":null,"retrieved_at":"2026-10-09","content_hash":"3409245d898b380fbec9363aee2417210d0946f1fee9d786ba99b90487f86d81","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"edgecore-mesa","source_local_id":"s3","source_record_sha256":"11108ce31c1e8198f200d4be4681d069335589ece0fb1c2199fee548a18090d2","site_ids":["vcc-site-54d4a697323404ecfc35"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/37a8ffc7-4e5e-5503-9fee-9d738613bcef.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/37a8ffc7-4e5e-5503-9fee-9d738613bcef.json","archive_url":"https://web.archive.org/web/20261009/https://edgecore.com/locations/phoenix-data-center"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-54d4a697323404ecfc35/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-54d4a697323404ecfc35.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-54d4a697323404ecfc35","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
