{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-62511f2ff7c107b083ea","physical_site_stable_key":"imported:semiconductor-atlas:blackstone-calatorao","name":"QTS Calatorao data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.5222,"longitude":-1.3464,"geometry":{"coordinates":[-1.3464,41.5222],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Nominatim centroid of the municipality of Calatorao; sources place the site on industrial land beside the A-2 about 7 km from the town centre, without a parcel."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["1503cf45-fa45-5d59-a7fc-7ce360a11a88"],"project_count":1,"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"project_stable_keys":["imported:semiconductor-atlas:blackstone-calatorao"],"statuses":["announced"],"oldest_status_as_of":"2026-09-30","newest_status_as_of":"2026-09-30","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"es","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62511f2ff7c107b083ea/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62511f2ff7c107b083ea.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Brainsre.news"]},"projects":[{"project_id":"46434a5c-4980-5f79-ac83-000783b60566","project_stable_key":"imported:semiconductor-atlas:blackstone-calatorao","site_id":"vcc-site-62511f2ff7c107b083ea","physical_site_stable_key":"imported:semiconductor-atlas:blackstone-calatorao","name":"QTS Calatorao data center campus","country":"Spain","country_iso_a2":"ES","latitude":41.5222,"longitude":-1.3464,"geometry":{"coordinates":[-1.3464,41.5222],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Nominatim centroid of the municipality of Calatorao; sources place the site on industrial land beside the A-2 about 7 km from the town centre, without a parcel.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","last_observed_physical_status":"announced","status_as_of":"2026-09-30","status_age_days_at_review":27,"status_method":"authoritative_project_announcement","status_evidence_id":"ea820b0c-c502-5dc0-94a7-d6e5bf2faa14","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"3532813c-b4a1-5d46-8164-c9c929b18eb7","notes":null,"party":"QTS Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"blackstone-calatorao"},{"evidence_id":"2f20d843-ded1-5a00-a865-11fe3f8c9c66","notes":null,"party":"QTS Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"blackstone-calatorao"},{"evidence_id":"3532813c-b4a1-5d46-8164-c9c929b18eb7","notes":null,"party":"QTS Data Centers","relationship_scope":"unknown","role":"operator","source_record_id":"blackstone-calatorao"},{"evidence_id":"2f20d843-ded1-5a00-a865-11fe3f8c9c66","notes":null,"party":"QTS Data Centers","relationship_scope":"unknown","role":"operator","source_record_id":"blackstone-calatorao"},{"evidence_id":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","notes":"Funds managed by Blackstone affiliates finance the project; QTS is a Blackstone portfolio company.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"blackstone-calatorao"},{"evidence_id":"0ff34972-d808-5d05-8f04-291c5f48f7ae","notes":"Funds managed by Blackstone affiliates finance the project; QTS is a Blackstone portfolio company.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"blackstone-calatorao"},{"evidence_id":"3532813c-b4a1-5d46-8164-c9c929b18eb7","notes":"Funds managed by Blackstone affiliates finance the project; QTS is a Blackstone portfolio company.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"blackstone-calatorao"},{"evidence_id":"2f20d843-ded1-5a00-a865-11fe3f8c9c66","notes":"Funds managed by Blackstone affiliates finance the project; QTS is a Blackstone portfolio company.","party":"Blackstone","relationship_scope":"unknown","role":"investor","source_record_id":"blackstone-calatorao"},{"evidence_id":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","notes":"Granted the DIGA declaration and the initial PIGA approval.","party":"Gobierno de Aragón","relationship_scope":"unknown","role":"government","source_record_id":"blackstone-calatorao"},{"evidence_id":"078ea19d-9af1-51c4-938d-74a15d90c5e2","notes":"Granted the DIGA declaration and the initial PIGA approval.","party":"Gobierno de Aragón","relationship_scope":"unknown","role":"government","source_record_id":"blackstone-calatorao"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":"QTS Data Centers","users":null,"tenants":null,"customers":null,"status_source_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1468143560505","geometry_source_url":"https://brainsre.news/blackstone-7500-millones-data-center-aragon/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve QTS Calatorao data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"blackstone-calatorao"},"record":{"aliases":["Proyecto Rodes","Project Rodes","Blackstone Aragon data center"],"id":"blackstone-calatorao","last_reviewed":"2026-10-09","location":{"admin1":"Aragón","admin2":"Zaragoza","country":"ES","lat":41.5222,"locality":"Calatorao","lon":-1.3464,"note":"Nominatim centroid of the municipality of Calatorao; sources place the site on industrial land beside the A-2 about 7 km from the town centre, without a parcel.","precision":"locality","source_ids":["s1","s2","s5"]},"metrics":[{"applies_to":"campus","as_of":"2024-10-14","basis":"announced","metric":"investment","note":"Investment Monitor, citing Reuters, reported that half the site would be developed first and a further EUR 7.5 billion invested later for the remainder; that second tranche is not added here.","qualifier":"up_to","source_ids":["s1","s2","s3"],"unit":"EUR","value":7500000000},{"applies_to":"campus","as_of":"2024-10-16","basis":"planned","metric":"power_capacity","note":"Reported electrical capacity when fully operational; not confirmed on the QTS page.","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":300},{"applies_to":"campus","as_of":"2024-10-14","basis":"planned","metric":"land_area","qualifier":"exact","source_ids":["s1","s2","s3","s5"],"unit":"hectares","value":224}],"milestones":[{"date":"2024-10-14","event":"announced","kind":"actual","note":"Announced by Aragon's regional president.","source_ids":["s1"]},{"date":"2024-10","event":"other","kind":"actual","note":"Aragon's cabinet approved a declaration of regional general interest (DIGA), starting the planning process.","source_ids":["s1","s3"]},{"date":"2025-08","event":"other","kind":"actual","note":"Initial (not final) approval of the regional general-interest plan (PIGA), published in the Boletín Oficial de Aragón in late August 2025.","source_ids":["s4"]}],"name":"QTS Calatorao data center campus","notes":"Aragon cites up to 1,400 direct jobs in technology, construction and other sectors, and QTS about 1,400 direct plus up to 2,000 indirect jobs; these are not split by phase, so no jobs metric is recorded. No 2026 status update could be found; QTS's undated pages describe a proposed development worth several billion euros.","parties":[{"name":"QTS Data Centers","role":"developer","source_ids":["s5","s6"]},{"name":"QTS Data Centers","role":"operator","source_ids":["s5","s6"]},{"name":"Blackstone","note":"Funds managed by Blackstone affiliates finance the project; QTS is a Blackstone portfolio company.","role":"investor","source_ids":["s1","s2","s5","s6"]},{"name":"Gobierno de Aragón","note":"Granted the DIGA declaration and the initial PIGA approval.","role":"government","source_ids":["s1","s4"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260606020551/https://brainsre.news/blackstone-7500-millones-data-center-aragon/","id":"s1","published":"2024-10-14","publisher":"Brainsre.news","title":"Blackstone invertirá hasta 7.500 millones en un data center en Aragón","type":"trade_press","url":"https://brainsre.news/blackstone-7500-millones-data-center-aragon/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260613090146/https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain/","id":"s2","published":"2024-10-16","publisher":"Investment Monitor","title":"Blackstone to make $8.2bn data centre investment in Spain","type":"trade_press","url":"https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20241202150640/https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/","id":"s3","published":"2024-10-15","publisher":"Merca2","title":"Aragón, la mina de oro española de los centros de datos: Microsoft, AWS, Meta y Blackstone","type":"news","url":"https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260815160219/https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html","id":"s4","published":"2025-08-27","publisher":"elDiario.es","title":"La explosión de los centros de datos en Aragón: entre la opacidad, el choque institucional y el riesgo de colapso","type":"news","url":"https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"QTS Data Centers","title":"Calatorao data centre campus","type":"company","url":"https://q.com/data-centers/calatorao-en/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260420152346/https://q.com/data-centers/calatorao/","id":"s6","published":null,"publisher":"QTS Data Centers","title":"Campus de centros de datos de Calatorao","type":"company","url":"https://q.com/data-centers/calatorao/"}],"status":"announced","status_as_of":"2025-08-27","status_source_ids":["s4","s5"],"summary":"Blackstone, through its data center company QTS, proposes a 224-hectare data center campus on industrial land beside the A-2 motorway near Calatorao in Zaragoza province, Aragon. Announced in October 2024 at up to EUR 7.5 billion and reported at 300 MW of electrical capacity at full build-out, it received a regional general-interest declaration (DIGA) in October 2024 and initial approval of its regional general-interest plan (PIGA) in August 2025. QTS describes it as a proposed development and has not published a construction schedule.","workloads":[]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","s2":"0ff34972-d808-5d05-8f04-291c5f48f7ae","s3":"b4db59c0-9e24-5b3f-81e3-26d557f8fd1a","s4":"078ea19d-9af1-51c4-938d-74a15d90c5e2","s5":"3532813c-b4a1-5d46-8164-c9c929b18eb7","s6":"2f20d843-ded1-5a00-a865-11fe3f8c9c66"},"source_file":"datacenters/projects/blackstone-calatorao.json","source_record_id":"blackstone-calatorao","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"809006638c4dc4beaaf5db9656e3859be9545d10813d822fab2e462375c982ab"}],"evidence_ids":["078ea19d-9af1-51c4-938d-74a15d90c5e2","0ff34972-d808-5d05-8f04-291c5f48f7ae","1503cf45-fa45-5d59-a7fc-7ce360a11a88","2f20d843-ded1-5a00-a865-11fe3f8c9c66","3532813c-b4a1-5d46-8164-c9c929b18eb7","b4db59c0-9e24-5b3f-81e3-26d557f8fd1a","ea820b0c-c502-5dc0-94a7-d6e5bf2faa14"],"status_source":{"evidence_id":"ea820b0c-c502-5dc0-94a7-d6e5bf2faa14","title":"ORDEN VFL/1400/2026: partial definitive approval of the PIGA \"Proyecto Rhodes\" data-centre campus, Calatorao","publisher":"Boletín Oficial de Aragón (Gobierno de Aragón)","kind":"government_record","published_at":"2026-09-30","source_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1468143560505","license":"public-sector-information","attribution":"Gobierno de Aragón, Boletín Oficial de Aragón"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62511f2ff7c107b083ea/#project-46434a5c-4980-5f79-ac83-000783b60566","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/46434a5c-4980-5f79-ac83-000783b60566.json","geometry_source":{"evidence_id":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","title":"Blackstone invertirá hasta 7.500 millones en un data center en Aragón","publisher":"Brainsre.news","kind":"trade_press","published_at":"2024-10-14","source_url":"https://brainsre.news/blackstone-7500-millones-data-center-aragon/","license":"source-terms-not-recorded","attribution":"Brainsre.news"}}],"evidence":[{"evidence_id":"b4db59c0-9e24-5b3f-81e3-26d557f8fd1a","roles":["imported:record","metric:investment","metric:land_area","milestone:other"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"news","title":"Aragón, la mina de oro española de los centros de datos: Microsoft, AWS, Meta y Blackstone","source_url":"https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/","publisher":"Merca2","source_family":"www.merca2.es","license":"source-terms-not-recorded","attribution":"Merca2","published_at":"2024-10-15","retrieved_at":"2026-10-09","content_hash":"e2893c6bc0ea3b1da5d22bad654b0920a0921f1f7099e9f937eeb01f7820d980","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s3","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b4db59c0-9e24-5b3f-81e3-26d557f8fd1a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b4db59c0-9e24-5b3f-81e3-26d557f8fd1a.json","archive_url":"https://web.archive.org/web/20261009/https://www.merca2.es/2024/10/15/aragon-centros-datos-blackstone-2029461/"},{"evidence_id":"1503cf45-fa45-5d59-a7fc-7ce360a11a88","roles":["imported:geometry","imported:record","metric:investment","metric:land_area","milestone:announced","milestone:other","role:government","role:investor"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"trade_press","title":"Blackstone invertirá hasta 7.500 millones en un data center en Aragón","source_url":"https://brainsre.news/blackstone-7500-millones-data-center-aragon/","publisher":"Brainsre.news","source_family":"brainsre.news","license":"source-terms-not-recorded","attribution":"Brainsre.news","published_at":"2024-10-14","retrieved_at":"2026-10-09","content_hash":"512ccaab5844e5f631756c99eee4584b808c9293061728b19c3b49f117ead5a5","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s1","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1503cf45-fa45-5d59-a7fc-7ce360a11a88.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1503cf45-fa45-5d59-a7fc-7ce360a11a88.json","archive_url":"https://web.archive.org/web/20261009/https://brainsre.news/blackstone-7500-millones-data-center-aragon/"},{"evidence_id":"0ff34972-d808-5d05-8f04-291c5f48f7ae","roles":["imported:geometry","imported:record","metric:investment","metric:land_area","metric:power_capacity","role:investor"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"trade_press","title":"Blackstone to make $8.2bn data centre investment in Spain","source_url":"https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain","publisher":"Investment Monitor","source_family":"www.investmentmonitor.ai","license":"source-terms-not-recorded","attribution":"Investment Monitor","published_at":"2024-10-16","retrieved_at":"2026-10-09","content_hash":"1d5b05f5eddbb80a9414e1f0ce366722769f9148f6bd85a759f1f8f2b3aa53ef","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s2","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0ff34972-d808-5d05-8f04-291c5f48f7ae.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0ff34972-d808-5d05-8f04-291c5f48f7ae.json","archive_url":"https://web.archive.org/web/20261009/https://www.investmentmonitor.ai/news/blackstone-to-make-8-2bn-data-centre-investment-in-spain"},{"evidence_id":"3532813c-b4a1-5d46-8164-c9c929b18eb7","roles":["imported:geometry","imported:record","imported:status","metric:land_area","role:developer","role:investor","role:operator"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"company_disclosure","title":"Calatorao data centre campus","source_url":"https://q.com/data-centers/calatorao-en/","publisher":"QTS Data Centers","source_family":"q.com","license":"source-terms-not-recorded","attribution":"QTS Data Centers","published_at":null,"retrieved_at":"2026-10-09","content_hash":"63885ea623d5e050b5bc8150d851787bb0c638549d2bc10c60bc8393a295c56e","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s5","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3532813c-b4a1-5d46-8164-c9c929b18eb7.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3532813c-b4a1-5d46-8164-c9c929b18eb7.json","archive_url":"https://web.archive.org/web/20261009/https://q.com/data-centers/calatorao-en/"},{"evidence_id":"2f20d843-ded1-5a00-a865-11fe3f8c9c66","roles":["imported:record","role:developer","role:investor","role:operator"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"company_disclosure","title":"Campus de centros de datos de Calatorao","source_url":"https://q.com/data-centers/calatorao/","publisher":"QTS Data Centers","source_family":"q.com","license":"source-terms-not-recorded","attribution":"QTS Data Centers","published_at":null,"retrieved_at":"2026-10-09","content_hash":"37f890869b1119e3a64e55b3ccde618ba9b8a2334308f01ef3ffc6123efc2134","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s6","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2f20d843-ded1-5a00-a865-11fe3f8c9c66.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2f20d843-ded1-5a00-a865-11fe3f8c9c66.json","archive_url":"https://web.archive.org/web/20261009/https://q.com/data-centers/calatorao/"},{"evidence_id":"078ea19d-9af1-51c4-938d-74a15d90c5e2","roles":["imported:record","imported:status","milestone:other","role:government"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"news","title":"La explosión de los centros de datos en Aragón: entre la opacidad, el choque institucional y el riesgo de colapso","source_url":"https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html","publisher":"elDiario.es","source_family":"www.eldiario.es","license":"source-terms-not-recorded","attribution":"elDiario.es","published_at":"2025-08-27","retrieved_at":"2026-10-09","content_hash":"e34407249b0c908201fe9fcd4e1bfd82f6aad85305bf4f1a5d2b80bb096d093b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"blackstone-calatorao","source_local_id":"s4","source_record_sha256":"6afcb1fbc59cf3659ffc3e2d0aa618b2fd646f74ecfb8cd734af34d6d752dadf","site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/078ea19d-9af1-51c4-938d-74a15d90c5e2.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/078ea19d-9af1-51c4-938d-74a15d90c5e2.json","archive_url":"https://web.archive.org/web/20261009/https://www.eldiario.es/aragon/politica/explosion-centros-datos-aragon-opacidad-choque-institucional-riesgo-colapso_1_12559021.amp.html"},{"evidence_id":"ea820b0c-c502-5dc0-94a7-d6e5bf2faa14","roles":["announcement"],"project_ids":["46434a5c-4980-5f79-ac83-000783b60566"],"kind":"government_record","title":"ORDEN VFL/1400/2026: partial definitive approval of the PIGA \"Proyecto Rhodes\" data-centre campus, Calatorao","source_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1468143560505","publisher":"Boletín Oficial de Aragón (Gobierno de Aragón)","source_family":"Boletín Oficial de Aragón","license":"public-sector-information","attribution":"Gobierno de Aragón, Boletín Oficial de Aragón","published_at":"2026-09-30","retrieved_at":"2026-10-16T20:36:23.597Z","content_hash":"c31b1cf617ac05bcaca6658f2d5f8c5e0e514f4fa477bf3cafffb31fef82c898","publication_date_precision":"day","content_hash_scope":"sha256_exact_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-62511f2ff7c107b083ea"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ea820b0c-c502-5dc0-94a7-d6e5bf2faa14.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ea820b0c-c502-5dc0-94a7-d6e5bf2faa14.json","archive_url":"https://web.archive.org/web/20261016203623/https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1468143560505"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-62511f2ff7c107b083ea/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-62511f2ff7c107b083ea.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-62511f2ff7c107b083ea","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
