{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-64d29806f5007969e3b9","physical_site_stable_key":"imported:semiconductor-atlas:xai-macrohardrr-southaven","name":"xAI MACROHARDRR data center (Southaven)","country":"United States","country_iso_a2":"US","latitude":34.9935,"longitude":-90.0342,"geometry":{"coordinates":[-90.0342,34.9935],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["approximate_site"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["approximate_site_locator"],"geometry_precision_scopes":["Center of the OpenStreetMap building tagged 'xAI Macrohardrr' on Stateline Road West, taken from this project's OpenStreetMap data center layer (no geocoder call), about 0.5 km south of the Colossus 2 building. This matches Cleanview's address of 2400 Stateline Road, Southaven, and WREG's description of the warehouse as just south of Colossus 2."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["dbe7d792-d348-5083-ba1b-746c73feceff"],"project_count":1,"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"project_stable_keys":["imported:semiconductor-atlas:xai-macrohardrr-southaven"],"statuses":["operational"],"oldest_status_as_of":"2026-07-31","newest_status_as_of":"2026-07-31","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64d29806f5007969e3b9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-64d29806f5007969e3b9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},"projects":[{"project_id":"493361d4-686f-5f75-af07-7f95dcf81323","project_stable_key":"imported:semiconductor-atlas:xai-macrohardrr-southaven","site_id":"vcc-site-64d29806f5007969e3b9","physical_site_stable_key":"imported:semiconductor-atlas:xai-macrohardrr-southaven","name":"xAI MACROHARDRR data center (Southaven)","country":"United States","country_iso_a2":"US","latitude":34.9935,"longitude":-90.0342,"geometry":{"coordinates":[-90.0342,34.9935],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"approximate_site","geometry_authority_class":"compiled_reference","geometry_use_scope":"approximate_site_locator","geometry_precision_scope":"Center of the OpenStreetMap building tagged 'xAI Macrohardrr' on Stateline Road West, taken from this project's OpenStreetMap data center layer (no geocoder call), about 0.5 km south of the Colossus 2 building. This matches Cleanview's address of 2400 Stateline Road, Southaven, and WREG's description of the warehouse as just south of Colossus 2.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","last_observed_physical_status":"operational","status_as_of":"2026-07-31","status_age_days_at_review":88,"status_method":"imported_documented_status","status_evidence_id":"c52407e5-1780-5f03-8e8f-48c0b2f8a1e6","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","notes":null,"party":"xAI","relationship_scope":"unknown","role":"developer","source_record_id":"xai-macrohardrr-southaven"},{"evidence_id":"e95c5c49-e364-5a92-b52b-4559e4b1ae2b","notes":null,"party":"xAI","relationship_scope":"unknown","role":"developer","source_record_id":"xai-macrohardrr-southaven"},{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","notes":"Approved the project for the state Data Center Incentive sales and use tax exemption.","party":"Mississippi Development Authority","relationship_scope":"unknown","role":"government","source_record_id":"xai-macrohardrr-southaven"},{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","notes":"Supports the project through a fee-in-lieu agreement.","party":"City of Southaven","relationship_scope":"unknown","role":"government","source_record_id":"xai-macrohardrr-southaven"},{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","notes":"Supports the project through a fee-in-lieu agreement.","party":"DeSoto County","relationship_scope":"unknown","role":"government","source_record_id":"xai-macrohardrr-southaven"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/","geometry_source_url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["approximate_locator_not_boundary"],"rationale":"No matching named development in the 201-project release. Preserve xAI MACROHARDRR data center (Southaven) as an independent source record; its approximate_site locator does not itself establish a surveyed physical site.","source_record_id":"xai-macrohardrr-southaven","source_relations":[{"reason":"Colossus 2 Memphis and MACROHARDRR Southaven are separately named facilities in Tennessee and Mississippi; nearby coordinates do not merge them.","relationship":"separate_nearby_facilities","source_id":"xai-colossus-2-memphis"}]},"record":{"aliases":["MACROHARDRR","Macroharder","Macro-harder"],"id":"xai-macrohardrr-southaven","last_reviewed":"2026-10-09","location":{"admin1":"Mississippi","admin2":"DeSoto County","country":"US","lat":34.9935,"locality":"Southaven","lon":-90.0342,"note":"Center of the OpenStreetMap building tagged 'xAI Macrohardrr' on Stateline Road West, taken from this project's OpenStreetMap data center layer (no geocoder call), about 0.5 km south of the Colossus 2 building. This matches Cleanview's address of 2400 Stateline Road, Southaven, and WREG's description of the warehouse as just south of Colossus 2.","precision":"approximate_site","source_ids":["s1","s2","s5"]},"metrics":[{"applies_to":"campus","as_of":"2026-01-08","basis":"announced","metric":"investment","qualifier":"more_than","source_ids":["s1","s2"],"unit":"USD","value":20000000000},{"applies_to":"campus","as_of":"2026-01-08","basis":"under_construction","metric":"floor_area","note":"Size of the warehouse being retrofitted; Converge Digest and Cleanview give about 810,000 square feet and WREG gives 800,000.","qualifier":"approximately","source_ids":["s3","s5","s2"],"unit":"sq_ft","value":810000},{"accelerator_model":"NVIDIA GB300","applies_to":"campus","as_of":"2026-07-31","basis":"installed","metric":"accelerators","note":"Elon Musk's figure as relayed by WMC in July 2026; not confirmed in a company filing. No Colossus 2 figure is repeated here.","qualifier":"exact","source_ids":["s4"],"unit":"count","value":220000}],"milestones":[{"date":"2025-12","event":"site_acquired","kind":"actual","note":"Musk disclosed the purchase of an 800,000-square-foot Southaven warehouse on December 30, 2025; the governor's release says xAI bought an existing building for the project.","source_ids":["s2","s1"]},{"date":"2026-01-08","event":"announced","kind":"actual","source_ids":["s1","s2"]},{"date":"2026-02","event":"first_operational","kind":"planned","note":"Target stated at the January 2026 announcement; no source reviewed confirms the actual start date.","source_ids":["s1","s3"]}],"name":"xAI MACROHARDRR data center (Southaven)","notes":"Status is inferred from a July 2026 WMC report that calls Macro-harder an existing site equipped with 220,000 GB300 GPUs, relaying Elon Musk; no source reviewed confirms when operations began. Converge Digest labels the building 'Colossus 2 (MACROHARDRR)', and analyst estimates for Colossus 2 (xai-colossus-2-memphis) may include it; no Colossus 2 figure is repeated here. The 2 GW figure in the announcements refers to xAI's combined Colossus compute, not this building alone.","parties":[{"name":"xAI","role":"developer","source_ids":["s1","s2"]},{"name":"Mississippi Development Authority","note":"Approved the project for the state Data Center Incentive sales and use tax exemption.","role":"government","source_ids":["s1"]},{"name":"City of Southaven","note":"Supports the project through a fee-in-lieu agreement.","role":"government","source_ids":["s1"]},{"name":"DeSoto County","note":"Supports the project through a fee-in-lieu agreement.","role":"government","source_ids":["s1"]}],"power_sources":[],"related_ids":["xai-colossus-memphis","xai-colossus-2-memphis"],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2026-01-08","publisher":"Office of Governor Tate Reeves","title":"Tech leader xAI investing more than $20 billion in Southaven","type":"government","url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/"},{"accessed":"2026-10-09","id":"s2","published":"2026-01-08","publisher":"WREG (via Yahoo News)","title":"xAI investing $20B in Southaven, Mississippi facility, governor says","type":"news","url":"https://www.yahoo.com/news/articles/ms-governor-confirms-major-announcement-173629625.html"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260109084929/https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/","id":"s3","published":"2026-01-08","publisher":"Converge Digest","title":"xAI Commits $20B to 2-GW AI Data Center in Mississippi","type":"trade_press","url":"https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/"},{"accessed":"2026-10-09","id":"s4","published":"2026-07-31","publisher":"WMC Action News 5","title":"xAI announces fourth data center; turbines to be removed from Southaven site","type":"news","url":"https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"Cleanview","title":"Colossus 1 & 2 | Behind-the-Meter Data Centers","type":"analyst","url":"https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus"}],"status":"operational","status_as_of":"2026-07-31","status_source_ids":["s4"],"summary":"Third xAI data center in the Memphis area, made by retrofitting a warehouse of roughly 800,000 square feet that xAI bought in late 2025 in Southaven, Mississippi, just south of Colossus 2 across the state line. Mississippi's governor announced it in January 2026 as an investment of more than $20 billion, the largest economic development project in state history, supported by a state sales and use tax exemption and local fee-in-lieu agreements. Musk said it would lift Colossus training compute to about 2 GW, and a July 2026 report relaying his comments said it holds 220,000 NVIDIA GB300 GPUs.","workloads":["ai_training"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"dbe7d792-d348-5083-ba1b-746c73feceff","s2":"e95c5c49-e364-5a92-b52b-4559e4b1ae2b","s3":"b5704d88-91a8-5275-b39b-7734d91b39fc","s4":"c52407e5-1780-5f03-8e8f-48c0b2f8a1e6","s5":"4f86e4e6-8bc3-5dbf-bd88-d502ab8f697f"},"source_file":"datacenters/projects/xai-macrohardrr-southaven.json","source_record_id":"xai-macrohardrr-southaven","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"abf3551fad31d958a766d3a571a49c602f4511d97258795493fb0411254fead0"}],"evidence_ids":["4f86e4e6-8bc3-5dbf-bd88-d502ab8f697f","b5704d88-91a8-5275-b39b-7734d91b39fc","c52407e5-1780-5f03-8e8f-48c0b2f8a1e6","dbe7d792-d348-5083-ba1b-746c73feceff","e95c5c49-e364-5a92-b52b-4559e4b1ae2b"],"status_source":{"evidence_id":"c52407e5-1780-5f03-8e8f-48c0b2f8a1e6","title":"xAI announces fourth data center; turbines to be removed from Southaven site","publisher":"WMC Action News 5","kind":"news","published_at":"2026-07-31","source_url":"https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/","license":"source-terms-not-recorded","attribution":"WMC Action News 5"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64d29806f5007969e3b9/#project-493361d4-686f-5f75-af07-7f95dcf81323","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/493361d4-686f-5f75-af07-7f95dcf81323.json","geometry_source":{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","title":"Tech leader xAI investing more than $20 billion in Southaven","publisher":"Office of Governor Tate Reeves","kind":"government_record","published_at":"2026-01-08","source_url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves"}}],"evidence":[{"evidence_id":"4f86e4e6-8bc3-5dbf-bd88-d502ab8f697f","roles":["imported:geometry","imported:record","metric:floor_area"],"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"kind":"analyst_report","title":"Colossus 1 & 2 | Behind-the-Meter Data Centers","source_url":"https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus","publisher":"Cleanview","source_family":"cleanview.co","license":"source-terms-not-recorded","attribution":"Cleanview","published_at":null,"retrieved_at":"2026-10-09","content_hash":"119588f3b296f68107f972ee5a74f003f069a5f0d8929f015d9d7567109a8f5c","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"xai-macrohardrr-southaven","source_local_id":"s5","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","site_ids":["vcc-site-64d29806f5007969e3b9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4f86e4e6-8bc3-5dbf-bd88-d502ab8f697f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4f86e4e6-8bc3-5dbf-bd88-d502ab8f697f.json","archive_url":"https://web.archive.org/web/20261009/https://cleanview.co/reports/behind-the-meter-data-centers/full-report/colossus"},{"evidence_id":"dbe7d792-d348-5083-ba1b-746c73feceff","roles":["imported:geometry","imported:record","metric:investment","milestone:announced","milestone:first_operational","milestone:site_acquired","role:developer","role:government"],"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"kind":"government_record","title":"Tech leader xAI investing more than $20 billion in Southaven","source_url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","publisher":"Office of Governor Tate Reeves","source_family":"governorreeves.ms.gov","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves","published_at":"2026-01-08","retrieved_at":"2026-10-09","content_hash":"7abe26eb5d4571b855322b62f149ffcb31282a11ae491c1dceb6a0b668766f33","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"xai-macrohardrr-southaven","source_local_id":"s1","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","site_ids":["vcc-site-64d29806f5007969e3b9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dbe7d792-d348-5083-ba1b-746c73feceff.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dbe7d792-d348-5083-ba1b-746c73feceff.json","archive_url":"https://web.archive.org/web/20261009/https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/"},{"evidence_id":"c52407e5-1780-5f03-8e8f-48c0b2f8a1e6","roles":["imported:record","imported:status","metric:accelerators"],"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"kind":"news","title":"xAI announces fourth data center; turbines to be removed from Southaven site","source_url":"https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/","publisher":"WMC Action News 5","source_family":"www.actionnews5.com","license":"source-terms-not-recorded","attribution":"WMC Action News 5","published_at":"2026-07-31","retrieved_at":"2026-10-09","content_hash":"533ff61a3e5594631bdc9c44a3fdd03a0eb8a86344c0b459768d6fe8cb5ebf29","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"xai-macrohardrr-southaven","source_local_id":"s4","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","site_ids":["vcc-site-64d29806f5007969e3b9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c52407e5-1780-5f03-8e8f-48c0b2f8a1e6.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c52407e5-1780-5f03-8e8f-48c0b2f8a1e6.json","archive_url":"https://web.archive.org/web/20261009/https://www.actionnews5.com/2026/07/31/xai-announces-fourth-data-center-turbines-be-removed-southaven-site/"},{"evidence_id":"b5704d88-91a8-5275-b39b-7734d91b39fc","roles":["imported:record","metric:floor_area","milestone:first_operational"],"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"kind":"trade_press","title":"xAI Commits $20B to 2-GW AI Data Center in Mississippi","source_url":"https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/","publisher":"Converge Digest","source_family":"convergedigest.com","license":"source-terms-not-recorded","attribution":"Converge Digest","published_at":"2026-01-08","retrieved_at":"2026-10-09","content_hash":"5184b40f878a461e3f49aae4fa73df387d28e5a05383a62f4b6e6ec9d7907612","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"xai-macrohardrr-southaven","source_local_id":"s3","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","site_ids":["vcc-site-64d29806f5007969e3b9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5704d88-91a8-5275-b39b-7734d91b39fc.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5704d88-91a8-5275-b39b-7734d91b39fc.json","archive_url":"https://web.archive.org/web/20261009/https://convergedigest.com/xai-commits-20b-to-2-gw-ai-data-center-in-mississippi/"},{"evidence_id":"e95c5c49-e364-5a92-b52b-4559e4b1ae2b","roles":["imported:geometry","imported:record","metric:floor_area","metric:investment","milestone:announced","milestone:site_acquired","role:developer"],"project_ids":["493361d4-686f-5f75-af07-7f95dcf81323"],"kind":"news","title":"xAI investing $20B in Southaven, Mississippi facility, governor says","source_url":"https://www.yahoo.com/news/articles/ms-governor-confirms-major-announcement-173629625.html","publisher":"WREG (via Yahoo News)","source_family":"www.yahoo.com","license":"source-terms-not-recorded","attribution":"WREG (via Yahoo News)","published_at":"2026-01-08","retrieved_at":"2026-10-09","content_hash":"bff24312de70f29f592a49425454339fbcdc5c21fbefa4bcdf9b145f99232cd2","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"xai-macrohardrr-southaven","source_local_id":"s2","source_record_sha256":"2572c4fde54bafc4d980d59bc119cb0b9bafddbeb07826d0fda56041cc74e91d","site_ids":["vcc-site-64d29806f5007969e3b9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e95c5c49-e364-5a92-b52b-4559e4b1ae2b.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e95c5c49-e364-5a92-b52b-4559e4b1ae2b.json","archive_url":"https://web.archive.org/web/20261009/https://www.yahoo.com/news/articles/ms-governor-confirms-major-announcement-173629625.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-64d29806f5007969e3b9/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-64d29806f5007969e3b9.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-64d29806f5007969e3b9","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
