{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-6bf2ad82353d1ed7d3c9","physical_site_stable_key":"imported:semiconductor-atlas:softbank-sesterce-bosquel","name":"SoftBank-Sesterce Bosquel AI data center","country":"France","country_iso_a2":"FR","latitude":49.7391,"longitude":2.2179,"geometry":{"coordinates":[2.2179,49.7391],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed"],"project_count":1,"project_ids":["53a18106-0c3f-5249-8717-107230729abc"],"project_stable_keys":["imported:semiconductor-atlas:softbank-sesterce-bosquel"],"statuses":["announced"],"oldest_status_as_of":"2026-06-01","newest_status_as_of":"2026-06-01","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"fr","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bf2ad82353d1ed7d3c9/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bf2ad82353d1ed7d3c9.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Group"]},"projects":[{"project_id":"53a18106-0c3f-5249-8717-107230729abc","project_stable_key":"imported:semiconductor-atlas:softbank-sesterce-bosquel","site_id":"vcc-site-6bf2ad82353d1ed7d3c9","physical_site_stable_key":"imported:semiconductor-atlas:softbank-sesterce-bosquel","name":"SoftBank-Sesterce Bosquel AI data center","country":"France","country_iso_a2":"FR","latitude":49.7391,"longitude":2.2179,"geometry":{"coordinates":[2.2179,49.7391],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","last_observed_physical_status":"announced","status_as_of":"2026-06-01","status_age_days_at_review":148,"status_method":"imported_documented_status","status_evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","notes":"Majority owner of the joint venture.","party":"SoftBank Group","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-sesterce-bosquel"},{"evidence_id":"27ef5292-9eef-504b-97ab-5d854f237d7f","notes":"Majority owner of the joint venture.","party":"SoftBank Group","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-sesterce-bosquel"},{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","notes":"Joint venture partner; the venture as a whole was selected to develop and operate the campus.","party":"Sesterce","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-sesterce-bosquel"},{"evidence_id":"27ef5292-9eef-504b-97ab-5d854f237d7f","notes":"Joint venture partner; the venture as a whole was selected to develop and operate the campus.","party":"Sesterce","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-sesterce-bosquel"},{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","notes":"Named as a partner; the Somme prefect refers to a call for expressions of interest launched by the CC2SO, the community of communes' abbreviation.","party":"Communauté de communes Somme Sud-Ouest","relationship_scope":"unknown","role":"government","source_record_id":"softbank-sesterce-bosquel"},{"evidence_id":"27ef5292-9eef-504b-97ab-5d854f237d7f","notes":"Named as a partner; the Somme prefect refers to a call for expressions of interest launched by the CC2SO, the community of communes' abbreviation.","party":"Communauté de communes Somme Sud-Ouest","relationship_scope":"unknown","role":"government","source_record_id":"softbank-sesterce-bosquel"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://group.softbank/en/news/press/20260531","geometry_source_url":"https://group.softbank/en/news/press/20260531","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve SoftBank-Sesterce Bosquel AI data center as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"softbank-sesterce-bosquel"},"record":{"aliases":["Bosquel AI campus"],"id":"softbank-sesterce-bosquel","last_reviewed":"2026-10-09","location":{"admin1":"Hauts-de-France","admin2":"Somme","country":"FR","lat":49.7391,"locality":"Bosquel","lon":2.2179,"note":"Nominatim centroid of the commune of Bosquel (Somme); sources name the commune only.","precision":"locality","source_ids":["s1","s2"]},"metrics":[{"applies_to":"campus","as_of":"2026-05-31","basis":"planned","metric":"power_capacity","power_scope":"unspecified","qualifier":"exact","source_ids":["s1","s2"],"unit":"MW","value":1000},{"applies_to":"campus","as_of":"2026-05-31","basis":"planned","metric":"jobs_permanent","qualifier":"exact","source_ids":["s1"],"unit":"count","value":400}],"milestones":[{"date":"2026-05-30","event":"announced","kind":"actual","note":"Announced in Paris alongside SoftBank's 5 GW France plan at Choose France 2026.","source_ids":["s1","s3"]}],"name":"SoftBank-Sesterce Bosquel AI data center","notes":"SoftBank's France plan gives an initial EUR 45 billion for 3.1 GW across Dunkirk (Loon-Plage), Bosquel and Bouchain by 2031, without a per-site split, so no investment is attributed to Bosquel. The campus design is by architecture firm Patriarche.","parties":[{"name":"SoftBank Group","note":"Majority owner of the joint venture.","role":"developer","source_ids":["s1","s2"]},{"name":"Sesterce","note":"Joint venture partner; the venture as a whole was selected to develop and operate the campus.","role":"developer","source_ids":["s1","s2"]},{"name":"Communauté de communes Somme Sud-Ouest","note":"Named as a partner; the Somme prefect refers to a call for expressions of interest launched by the CC2SO, the community of communes' abbreviation.","role":"government","source_ids":["s1","s2"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2026-05-31","publisher":"SoftBank Group","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","type":"company","url":"https://group.softbank/en/news/press/20260531"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260719180330/https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france","id":"s2","published":"2026-06-01","publisher":"Sesterce","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","type":"company","url":"https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france"},{"accessed":"2026-10-09","id":"s3","published":"2026-05-31","publisher":"SoftBank Group","title":"SoftBank Group to Build 5 GW of AI Data Center Capacity in France","type":"company","url":"https://group.softbank/en/news/press/20260531_0"}],"status":"announced","status_as_of":"2026-06-01","status_source_ids":["s1","s2"],"summary":"A joint venture majority-owned by SoftBank Group and formed with Sesterce was selected to develop and operate a 1 GW AI data center campus in Bosquel, Somme, in the Hauts-de-France region. Announced on 2026-05-30 as part of the 2026 Choose France summit, it is one of three named Hauts-de-France sites in SoftBank's 5 GW France plan. No investment figure, construction schedule or permit status has been published for the site; SoftBank cites about 400 long-term jobs once it operates.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","s2":"27ef5292-9eef-504b-97ab-5d854f237d7f","s3":"e1cecd9d-e332-58f0-9b1b-4e7dfb13e101"},"source_file":"datacenters/projects/softbank-sesterce-bosquel.json","source_record_id":"softbank-sesterce-bosquel","source_record_sha256":"eb3ff773b740b83fac744a336f55d4b004403fa67da697dbc4c4340bb3aa23dd","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"87f6315aa67b2532e26f672b5172cf4c61921d629ae1c7cc9864f727d45400f5"}],"evidence_ids":["27ef5292-9eef-504b-97ab-5d854f237d7f","e1cecd9d-e332-58f0-9b1b-4e7dfb13e101","f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed"],"status_source":{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","publisher":"SoftBank Group","kind":"company_disclosure","published_at":"2026-05-31","source_url":"https://group.softbank/en/news/press/20260531","license":"source-terms-not-recorded","attribution":"SoftBank Group"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bf2ad82353d1ed7d3c9/#project-53a18106-0c3f-5249-8717-107230729abc","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/53a18106-0c3f-5249-8717-107230729abc.json","geometry_source":{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","publisher":"SoftBank Group","kind":"company_disclosure","published_at":"2026-05-31","source_url":"https://group.softbank/en/news/press/20260531","license":"source-terms-not-recorded","attribution":"SoftBank Group"}}],"evidence":[{"evidence_id":"27ef5292-9eef-504b-97ab-5d854f237d7f","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","role:developer","role:government"],"project_ids":["53a18106-0c3f-5249-8717-107230729abc"],"kind":"company_disclosure","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","source_url":"https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france","publisher":"Sesterce","source_family":"www.sesterce.com","license":"source-terms-not-recorded","attribution":"Sesterce","published_at":"2026-06-01","retrieved_at":"2026-10-09","content_hash":"dfca3a61b82e61e2d64f964d43821062ca39c6e11d68aaac1411d9278af573ad","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-sesterce-bosquel","source_local_id":"s2","source_record_sha256":"eb3ff773b740b83fac744a336f55d4b004403fa67da697dbc4c4340bb3aa23dd","site_ids":["vcc-site-6bf2ad82353d1ed7d3c9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/27ef5292-9eef-504b-97ab-5d854f237d7f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/27ef5292-9eef-504b-97ab-5d854f237d7f.json","archive_url":"https://web.archive.org/web/20261009/https://www.sesterce.com/newsroom/softbank-group-sesterce-1gw-ai-data-center-bosquel-france"},{"evidence_id":"f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed","roles":["imported:geometry","imported:record","imported:status","metric:jobs_permanent","metric:power_capacity","milestone:announced","role:developer","role:government"],"project_ids":["53a18106-0c3f-5249-8717-107230729abc"],"kind":"company_disclosure","title":"SoftBank Group and Sesterce to Develop 1 GW AI Data Center in Bosquel, France","source_url":"https://group.softbank/en/news/press/20260531","publisher":"SoftBank Group","source_family":"group.softbank","license":"source-terms-not-recorded","attribution":"SoftBank Group","published_at":"2026-05-31","retrieved_at":"2026-10-09","content_hash":"4d62b354bd21d1691df8583ad19b7088e888d035448bf8fd8f3fef70dc3d6cb4","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-sesterce-bosquel","source_local_id":"s1","source_record_sha256":"eb3ff773b740b83fac744a336f55d4b004403fa67da697dbc4c4340bb3aa23dd","site_ids":["vcc-site-6bf2ad82353d1ed7d3c9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f59be53e-26ee-5e1c-b1ad-7b5ff0f833ed.json","archive_url":"https://web.archive.org/web/20261009/https://group.softbank/en/news/press/20260531"},{"evidence_id":"e1cecd9d-e332-58f0-9b1b-4e7dfb13e101","roles":["imported:record","milestone:announced"],"project_ids":["53a18106-0c3f-5249-8717-107230729abc"],"kind":"company_disclosure","title":"SoftBank Group to Build 5 GW of AI Data Center Capacity in France","source_url":"https://group.softbank/en/news/press/20260531_0","publisher":"SoftBank Group","source_family":"group.softbank","license":"source-terms-not-recorded","attribution":"SoftBank Group","published_at":"2026-05-31","retrieved_at":"2026-10-09","content_hash":"2bf16f8d22f59e04bc2b762bc27c72daa7dd8c8a244c764af7b99934cf874063","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-sesterce-bosquel","source_local_id":"s3","source_record_sha256":"eb3ff773b740b83fac744a336f55d4b004403fa67da697dbc4c4340bb3aa23dd","site_ids":["vcc-site-6bf2ad82353d1ed7d3c9"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e1cecd9d-e332-58f0-9b1b-4e7dfb13e101.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e1cecd9d-e332-58f0-9b1b-4e7dfb13e101.json","archive_url":"https://web.archive.org/web/20261009/https://group.softbank/en/news/press/20260531_0"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6bf2ad82353d1ed7d3c9/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6bf2ad82353d1ed7d3c9.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-6bf2ad82353d1ed7d3c9","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
