{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-6d5fe2fc2166ad27899f","physical_site_stable_key":"imported:semiconductor-atlas:powerhouse-95-spotsylvania","name":"PowerHouse 95 data center campus","country":"United States","country_iso_a2":"US","latitude":38.18,"longitude":-77.65,"geometry":{"coordinates":[-77.65,38.18],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["admin2"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["admin2_context"],"geometry_precision_scopes":["Sources say only that the campus is in Spotsylvania along the I-95 corridor near existing electrical infrastructure. The point is the Spotsylvania County coordinate from its Wikipedia article, not the site."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["d440612d-86b8-51ec-96fc-7b670f03f886"],"project_count":1,"project_ids":["48d82a4f-46ea-5641-a650-b6e147b30ae6"],"project_stable_keys":["imported:semiconductor-atlas:powerhouse-95-spotsylvania"],"statuses":["announced"],"oldest_status_as_of":"2026-10-09","newest_status_as_of":"2026-10-09","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5fe2fc2166ad27899f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d5fe2fc2166ad27899f.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Converge Digest"]},"projects":[{"project_id":"48d82a4f-46ea-5641-a650-b6e147b30ae6","project_stable_key":"imported:semiconductor-atlas:powerhouse-95-spotsylvania","site_id":"vcc-site-6d5fe2fc2166ad27899f","physical_site_stable_key":"imported:semiconductor-atlas:powerhouse-95-spotsylvania","name":"PowerHouse 95 data center campus","country":"United States","country_iso_a2":"US","latitude":38.18,"longitude":-77.65,"geometry":{"coordinates":[-77.65,38.18],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"admin2","geometry_authority_class":"compiled_reference","geometry_use_scope":"admin2_context","geometry_precision_scope":"Sources say only that the campus is in Spotsylvania along the I-95 corridor near existing electrical infrastructure. The point is the Spotsylvania County coordinate from its Wikipedia article, not the site.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"d440612d-86b8-51ec-96fc-7b670f03f886","last_observed_physical_status":"announced","status_as_of":"2026-10-09","status_age_days_at_review":18,"status_method":"imported_documented_status","status_evidence_id":"5b280a15-6eba-5485-a6b5-07fd1b7c5915","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"d440612d-86b8-51ec-96fc-7b670f03f886","notes":"Wholly owned by American Real Estate Partners (AREP).","party":"PowerHouse Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"powerhouse-95-spotsylvania"},{"evidence_id":"2bd6997a-8723-5dfc-a591-49bb888061d9","notes":"Wholly owned by American Real Estate Partners (AREP).","party":"PowerHouse Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"powerhouse-95-spotsylvania"},{"evidence_id":"5b280a15-6eba-5485-a6b5-07fd1b7c5915","notes":"Wholly owned by American Real Estate Partners (AREP).","party":"PowerHouse Data Centers","relationship_scope":"unknown","role":"developer","source_record_id":"powerhouse-95-spotsylvania"},{"evidence_id":"d440612d-86b8-51ec-96fc-7b670f03f886","notes":"Investment management firm and PowerHouse's joint venture partner; the land was acquired through the joint venture.","party":"Harrison Street","relationship_scope":"unknown","role":"investor","source_record_id":"powerhouse-95-spotsylvania"},{"evidence_id":"2bd6997a-8723-5dfc-a591-49bb888061d9","notes":"Investment management firm and PowerHouse's joint venture partner; the land was acquired through the joint venture.","party":"Harrison Street","relationship_scope":"unknown","role":"investor","source_record_id":"powerhouse-95-spotsylvania"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://powerhousedata.com/data-center/powerhouse-95","geometry_source_url":"https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve PowerHouse 95 data center campus as an independent source record; its admin2 locator does not itself establish a surveyed physical site.","source_record_id":"powerhouse-95-spotsylvania"},"record":{"aliases":["PowerHouse 95","PH95","PH 95"],"id":"powerhouse-95-spotsylvania","last_reviewed":"2026-10-09","location":{"admin1":"Virginia","admin2":"Spotsylvania County","country":"US","lat":38.18,"lon":-77.65,"note":"Sources say only that the campus is in Spotsylvania along the I-95 corridor near existing electrical infrastructure. The point is the Spotsylvania County coordinate from its Wikipedia article, not the site.","precision":"admin2","source_ids":["s1","s2","s4"]},"metrics":[{"applies_to":"campus","as_of":"2024-01-25","basis":"planned","metric":"power_capacity","note":"Campus size as reported with the land purchase. The same reports describe three 300 MW substations, which would exceed this figure; they do not reconcile the two.","power_scope":"unspecified","qualifier":"exact","source_ids":["s1","s2"],"unit":"MW","value":800},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"power_capacity","note":"Maximum utility power listed on PowerHouse's undated campus page, accessed 2026-10-09.","power_scope":"grid_connection","qualifier":"up_to","source_ids":["s3"],"unit":"MW","value":900},{"applies_to":"phase","as_of":"2024-01-25","basis":"planned","metric":"power_capacity","note":"Expected by October 2025 according to Converge Digest; Lightwave gave October 2024 for the first substation coming online. The current campus page targets power delivery in Q3 2027.","phase_label":"First substation (initial delivery)","power_scope":"grid_connection","qualifier":"exact","source_ids":["s1"],"unit":"MW","value":150},{"applies_to":"campus","as_of":"2024-01-23","basis":"acquired","metric":"land_area","qualifier":"exact","source_ids":["s1","s2"],"unit":"acres","value":145},{"applies_to":"campus","as_of":"2026-10-09","basis":"reported","metric":"land_area","note":"Acreage shown on the current campus page; the sources do not explain the increase from 145 acres.","qualifier":"exact","source_ids":["s3"],"unit":"acres","value":227},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"buildings","note":"Up to two stories each. In January 2024 Converge Digest described a design for four to eight powered shells.","qualifier":"up_to","source_ids":["s3"],"unit":"count","value":12},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"floor_area","note":"Developable floor area listed on the campus page as 3.6M sq ft.","qualifier":"approximately","source_ids":["s3"],"unit":"sq_ft","value":3600000}],"milestones":[{"date":"2024-01-23","event":"site_acquired","kind":"actual","note":"PowerHouse announced on this date that it had completed the purchase of 145 acres through the Harrison Street joint venture.","source_ids":["s1","s2"]},{"date":"2027-Q3","event":"other","kind":"planned","note":"Power delivery target on the campus page, which also lists construction and delivery running from Q2 2024 to Q4 2027 and, inconsistently, a Q3 2026 delivery date.","source_ids":["s3"]}],"name":"PowerHouse 95 data center campus","notes":"Status rests on PowerHouse's undated living campus page, so status_as_of is the access date. The page's construction window starting Q2 2024 suggests site work may have begun, but no dated source confirming a construction start or a tenant could be opened, so the status is kept at announced. The 2024 reports describe the campus as aimed at hyperscale users in northern Virginia.","parties":[{"name":"PowerHouse Data Centers","note":"Wholly owned by American Real Estate Partners (AREP).","role":"developer","source_ids":["s1","s2","s3"]},{"name":"Harrison Street","note":"Investment management firm and PowerHouse's joint venture partner; the land was acquired through the joint venture.","role":"investor","source_ids":["s1","s2"]}],"power_sources":[{"description":"Utility power through substations: three 300 MW substations were planned in 2024; the utility is not named in the cited sources.","source_ids":["s1","s2","s3"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20240301025938/https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/","id":"s1","published":"2024-01-25","publisher":"Converge Digest","title":"PowerHouse plans 800 MW data center campus in Spotsylvania, VA","type":"trade_press","url":"https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/"},{"accessed":"2026-10-09","id":"s2","published":"2024-01-30","publisher":"Lightwave","title":"PowerHouse Data Centers announces purchase of 145 acres in Spotsylvania, Va. for PowerHouse 95 campus","type":"trade_press","url":"https://www.lightwaveonline.com/data-center/article/14304356/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260918144226/https://www.powerhousedata.com/data-center/powerhouse-95","id":"s3","published":null,"publisher":"PowerHouse Data Centers","title":"PowerHouse 95","type":"company","url":"https://powerhousedata.com/data-center/powerhouse-95"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260822162111/https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia","id":"s4","published":null,"publisher":"Wikipedia","title":"Spotsylvania County, Virginia","type":"other","url":"https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia"}],"status":"announced","status_as_of":"2026-10-09","status_source_ids":["s3"],"summary":"Campus aimed at hyperscale users, planned by PowerHouse Data Centers, a unit of American Real Estate Partners, along the I-95 corridor in Spotsylvania County, Virginia, through a joint venture with Harrison Street. PowerHouse completed the purchase of 145 acres in January 2024 and described an 800 MW campus served by three 300 MW substations, the first meant to deliver 150 MW. Its current campus page lists 227 acres, up to 900 MW of utility power, up to 12 buildings of up to two stories and about 3.6 million sq ft, with power delivery targeted for Q3 2027.","workloads":[]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"d440612d-86b8-51ec-96fc-7b670f03f886","s2":"2bd6997a-8723-5dfc-a591-49bb888061d9","s3":"5b280a15-6eba-5485-a6b5-07fd1b7c5915","s4":"63079fb8-ed1a-5481-9439-63c2f66005e1"},"source_file":"datacenters/projects/powerhouse-95-spotsylvania.json","source_record_id":"powerhouse-95-spotsylvania","source_record_sha256":"f0b18d16b3585dbcbd5b508f44acc06b6752ef0ee16c2c6b445248f02291d9c6","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"b7af86891ac1f351a9a3b7538e7808c52342d8f3c19f5ad1091aba8b2e211671"}],"evidence_ids":["2bd6997a-8723-5dfc-a591-49bb888061d9","5b280a15-6eba-5485-a6b5-07fd1b7c5915","63079fb8-ed1a-5481-9439-63c2f66005e1","d440612d-86b8-51ec-96fc-7b670f03f886"],"status_source":{"evidence_id":"5b280a15-6eba-5485-a6b5-07fd1b7c5915","title":"PowerHouse 95","publisher":"PowerHouse Data Centers","kind":"company_disclosure","published_at":null,"source_url":"https://powerhousedata.com/data-center/powerhouse-95","license":"source-terms-not-recorded","attribution":"PowerHouse Data Centers"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5fe2fc2166ad27899f/#project-48d82a4f-46ea-5641-a650-b6e147b30ae6","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/48d82a4f-46ea-5641-a650-b6e147b30ae6.json","geometry_source":{"evidence_id":"d440612d-86b8-51ec-96fc-7b670f03f886","title":"PowerHouse plans 800 MW data center campus in Spotsylvania, VA","publisher":"Converge Digest","kind":"trade_press","published_at":"2024-01-25","source_url":"https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/","license":"source-terms-not-recorded","attribution":"Converge Digest"}}],"evidence":[{"evidence_id":"5b280a15-6eba-5485-a6b5-07fd1b7c5915","roles":["imported:record","imported:status","metric:buildings","metric:floor_area","metric:land_area","metric:power_capacity","milestone:other","power_source:grid","role:developer"],"project_ids":["48d82a4f-46ea-5641-a650-b6e147b30ae6"],"kind":"company_disclosure","title":"PowerHouse 95","source_url":"https://powerhousedata.com/data-center/powerhouse-95","publisher":"PowerHouse Data Centers","source_family":"powerhousedata.com","license":"source-terms-not-recorded","attribution":"PowerHouse Data Centers","published_at":null,"retrieved_at":"2026-10-09","content_hash":"8ff7f7e07ad148147165e3b92dc3e5002a4c1f927aee903c954a6d913ab39fe7","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"powerhouse-95-spotsylvania","source_local_id":"s3","source_record_sha256":"f0b18d16b3585dbcbd5b508f44acc06b6752ef0ee16c2c6b445248f02291d9c6","site_ids":["vcc-site-6d5fe2fc2166ad27899f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5b280a15-6eba-5485-a6b5-07fd1b7c5915.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5b280a15-6eba-5485-a6b5-07fd1b7c5915.json","archive_url":"https://web.archive.org/web/20261009/https://powerhousedata.com/data-center/powerhouse-95"},{"evidence_id":"2bd6997a-8723-5dfc-a591-49bb888061d9","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","milestone:site_acquired","power_source:grid","role:developer","role:investor"],"project_ids":["48d82a4f-46ea-5641-a650-b6e147b30ae6"],"kind":"trade_press","title":"PowerHouse Data Centers announces purchase of 145 acres in Spotsylvania, Va. for PowerHouse 95 campus","source_url":"https://www.lightwaveonline.com/data-center/article/14304356/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus","publisher":"Lightwave","source_family":"www.lightwaveonline.com","license":"source-terms-not-recorded","attribution":"Lightwave","published_at":"2024-01-30","retrieved_at":"2026-10-09","content_hash":"a326f425c37e519adba01d0b071adf37fe17265c2a75cc9e9800256639ce97be","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"powerhouse-95-spotsylvania","source_local_id":"s2","source_record_sha256":"f0b18d16b3585dbcbd5b508f44acc06b6752ef0ee16c2c6b445248f02291d9c6","site_ids":["vcc-site-6d5fe2fc2166ad27899f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2bd6997a-8723-5dfc-a591-49bb888061d9.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2bd6997a-8723-5dfc-a591-49bb888061d9.json","archive_url":"https://web.archive.org/web/20261009/https://www.lightwaveonline.com/data-center/article/14304356/powerhouse-data-centers-announces-purchase-of-145-acres-in-spotsylvania-va-for-powerhouse-95-campus"},{"evidence_id":"d440612d-86b8-51ec-96fc-7b670f03f886","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","milestone:site_acquired","power_source:grid","role:developer","role:investor"],"project_ids":["48d82a4f-46ea-5641-a650-b6e147b30ae6"],"kind":"trade_press","title":"PowerHouse plans 800 MW data center campus in Spotsylvania, VA","source_url":"https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/","publisher":"Converge Digest","source_family":"convergedigest.com","license":"source-terms-not-recorded","attribution":"Converge Digest","published_at":"2024-01-25","retrieved_at":"2026-10-09","content_hash":"6c2d2d95e2bd90bfb49b0fcbc6ce9d5ffbc17ba568bb5211794a52f9a3694532","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"powerhouse-95-spotsylvania","source_local_id":"s1","source_record_sha256":"f0b18d16b3585dbcbd5b508f44acc06b6752ef0ee16c2c6b445248f02291d9c6","site_ids":["vcc-site-6d5fe2fc2166ad27899f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d440612d-86b8-51ec-96fc-7b670f03f886.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d440612d-86b8-51ec-96fc-7b670f03f886.json","archive_url":"https://web.archive.org/web/20261009/https://convergedigest.com/powerhouse-plans-800-mw-data-center-campus-in-spotsylvania-va/"},{"evidence_id":"63079fb8-ed1a-5481-9439-63c2f66005e1","roles":["imported:geometry","imported:record"],"project_ids":["48d82a4f-46ea-5641-a650-b6e147b30ae6"],"kind":"other","title":"Spotsylvania County, Virginia","source_url":"https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"4f4b5f87685eef5c928e6f334d4b233564fce85960facaf7b014f9e0cbb8c839","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"powerhouse-95-spotsylvania","source_local_id":"s4","source_record_sha256":"f0b18d16b3585dbcbd5b508f44acc06b6752ef0ee16c2c6b445248f02291d9c6","site_ids":["vcc-site-6d5fe2fc2166ad27899f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/63079fb8-ed1a-5481-9439-63c2f66005e1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/63079fb8-ed1a-5481-9439-63c2f66005e1.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Spotsylvania_County,_Virginia"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6d5fe2fc2166ad27899f/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6d5fe2fc2166ad27899f.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-6d5fe2fc2166ad27899f","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
