{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-6fc591eaf0edc175a75c","physical_site_stable_key":"imported:semiconductor-atlas:softbank-tomakomai","name":"SoftBank Hokkaido Tomakomai AI Data Center","country":"Japan","country_iso_a2":"JP","latitude":42.6341,"longitude":141.6055,"geometry":{"coordinates":[141.6055,42.6341],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Sources name Tomakomai City only; coordinates are the OpenStreetMap Nominatim centroid of the city boundary."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["d00b5a09-e567-5c82-9aaf-df71b5f87d92"],"project_count":1,"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"project_stable_keys":["imported:semiconductor-atlas:softbank-tomakomai"],"statuses":["under_construction"],"oldest_status_as_of":"2026-10-21","newest_status_as_of":"2026-10-21","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"jp","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6fc591eaf0edc175a75c/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6fc591eaf0edc175a75c.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["SoftBank Corp."]},"projects":[{"project_id":"c4cf35bd-5452-551f-8b1c-bb88d2f2b35b","project_stable_key":"imported:semiconductor-atlas:softbank-tomakomai","site_id":"vcc-site-6fc591eaf0edc175a75c","physical_site_stable_key":"imported:semiconductor-atlas:softbank-tomakomai","name":"SoftBank Hokkaido Tomakomai AI Data Center","country":"Japan","country_iso_a2":"JP","latitude":42.6341,"longitude":141.6055,"geometry":{"coordinates":[141.6055,42.6341],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Sources name Tomakomai City only; coordinates are the OpenStreetMap Nominatim centroid of the city boundary.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","last_observed_physical_status":"under_construction","status_as_of":"2026-10-21","status_age_days_at_review":6,"status_method":"authoritative_physical_status_update","status_evidence_id":"9b22a038-1afb-5454-9245-9d88fc5251bd","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","notes":null,"party":"SoftBank Corp.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"632852c2-37ac-5865-a1e0-f1dc8194b01b","notes":null,"party":"SoftBank Corp.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"fc76f541-11a1-591d-81c9-ab51f1a96bd1","notes":null,"party":"SoftBank Corp.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"f563155b-3553-53d5-9133-c6523341f108","notes":null,"party":"SoftBank Corp.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","notes":"SoftBank subsidiary; co-selected with SoftBank as development operator under the subsidy program and named as co-builder at groundbreaking.","party":"IDC Frontier Inc.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"632852c2-37ac-5865-a1e0-f1dc8194b01b","notes":"SoftBank subsidiary; co-selected with SoftBank as development operator under the subsidy program and named as co-builder at groundbreaking.","party":"IDC Frontier Inc.","relationship_scope":"unknown","role":"developer","source_record_id":"softbank-tomakomai"},{"evidence_id":"aff59ec7-86fe-5451-8100-89ec85a970d5","notes":"Provides a subsidy under its FY2023 regional data center program; trade press reported a maximum of 30 billion yen, about half the project cost.","party":"Ministry of Economy, Trade and Industry (Japan)","relationship_scope":"unknown","role":"government","source_record_id":"softbank-tomakomai"},{"evidence_id":"7a38daa4-627c-57b8-8305-b0d22ccb8a8f","notes":"Provides a subsidy under its FY2023 regional data center program; trade press reported a maximum of 30 billion yen, about half the project cost.","party":"Ministry of Economy, Trade and Industry (Japan)","relationship_scope":"unknown","role":"government","source_record_id":"softbank-tomakomai"},{"evidence_id":"fc76f541-11a1-591d-81c9-ab51f1a96bd1","notes":"Provides a subsidy under its FY2023 regional data center program; trade press reported a maximum of 30 billion yen, about half the project cost.","party":"Ministry of Economy, Trade and Industry (Japan)","relationship_scope":"unknown","role":"government","source_record_id":"softbank-tomakomai"},{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","notes":null,"party":"SB Power Corp.","relationship_scope":"unknown","role":"power_supplier","source_record_id":"softbank-tomakomai"},{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","notes":null,"party":"Hokkaido Electric Power Company","relationship_scope":"unknown","role":"power_supplier","source_record_id":"softbank-tomakomai"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.softbank.jp/sbnews/entry/20261021_01","geometry_source_url":"https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve SoftBank Hokkaido Tomakomai AI Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"softbank-tomakomai"},"record":{"aliases":["Core Brain","Hokkaido Tomakomai Data Center"],"id":"softbank-tomakomai","last_reviewed":"2026-10-09","location":{"admin1":"Hokkaido","country":"JP","lat":42.6341,"locality":"Tomakomai","lon":141.6055,"note":"Sources name Tomakomai City only; coordinates are the OpenStreetMap Nominatim centroid of the city boundary.","precision":"locality","source_ids":["s1","s4","s5"]},"metrics":[{"applies_to":"phase","as_of":"2023-11-07","basis":"planned","metric":"power_capacity","note":"SoftBank describes the first stage as a data center of about 50 MW scale, without saying whether this is receiving capacity or IT load.","phase_label":"Initial phase targeted for FY2026","power_scope":"unspecified","qualifier":"approximately","source_ids":["s1"],"unit":"MW","value":50},{"applies_to":"phase","as_of":"2025-04-30","basis":"planned","metric":"power_capacity","note":"Trade press figure at groundbreaking; scope not stated.","phase_label":"Phase 1 (completion scheduled 2026)","power_scope":"unspecified","qualifier":"exact","source_ids":["s5"],"unit":"MW","value":50},{"applies_to":"phase","as_of":"2023-11-07","basis":"planned","metric":"power_capacity","note":"Dempa reported 10 MW of total initial receiving power; SoftBank's own release describes the first stage as a 50 MW-scale data center, and the reason for the difference was not found.","phase_label":"Initial receiving capacity (trade press)","power_scope":"grid_connection","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":10},{"applies_to":"campus","as_of":"2023-11-07","basis":"planned","metric":"power_capacity","note":"Projected future receiving capacity; SoftBank's 2025 groundbreaking article repeats a capacity expected to exceed 300 MW.","power_scope":"grid_connection","qualifier":"more_than","source_ids":["s1","s2","s3"],"unit":"MW","value":300},{"applies_to":"campus","as_of":"2023-11-07","basis":"reported","metric":"investment","note":"Total project cost reported by trade press at the subsidy announcement; the government subsidy covers about half.","qualifier":"more_than","source_ids":["s2"],"unit":"JPY","value":65000000000},{"applies_to":"campus","as_of":"2025-04-30","basis":"reported","metric":"investment","qualifier":"approximately","source_ids":["s5"],"unit":"JPY","value":65000000000},{"applies_to":"campus","as_of":"2025-05-01","basis":"planned","metric":"land_area","note":"Reported as about 700,000 square meters at full build-out.","qualifier":"approximately","source_ids":["s1","s3","s4"],"unit":"hectares","value":70}],"milestones":[{"date":"2023-11-07","event":"announced","kind":"actual","note":"Plan announced as SoftBank and IDC Frontier were selected for the government subsidy.","source_ids":["s1","s2"]},{"date":"2025-04-15","event":"construction_started","kind":"actual","note":"Groundbreaking ceremony.","source_ids":["s4","s5"]},{"date":"2027-03","event":"first_operational","kind":"planned","note":"SoftBank targets opening in fiscal 2026, which ends in March 2027; the date shown is the end of that window.","source_ids":["s1","s4","s6"]}],"name":"SoftBank Hokkaido Tomakomai AI Data Center","parties":[{"name":"SoftBank Corp.","role":"developer","source_ids":["s1","s4","s6","s7"]},{"name":"IDC Frontier Inc.","note":"SoftBank subsidiary; co-selected with SoftBank as development operator under the subsidy program and named as co-builder at groundbreaking.","role":"developer","source_ids":["s1","s4"]},{"name":"Ministry of Economy, Trade and Industry (Japan)","note":"Provides a subsidy under its FY2023 regional data center program; trade press reported a maximum of 30 billion yen, about half the project cost.","role":"government","source_ids":["s2","s5","s6"]},{"name":"SB Power Corp.","role":"power_supplier","source_ids":["s1"]},{"name":"Hokkaido Electric Power Company","role":"power_supplier","source_ids":["s1"]}],"power_sources":[{"description":"Electricity to be supplied through SoftBank's retail subsidiary SB Power and Hokkaido Electric Power.","source_ids":["s1"],"type":"grid"},{"description":"SoftBank plans to run the facility on 100% renewable electricity procured within Hokkaido.","source_ids":["s1","s3","s4"],"type":"other"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260926175912/https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/","id":"s1","published":"2023-11-07","publisher":"SoftBank Corp.","title":"次世代社会インフラ構想の要となる大規模な計算基盤を備えたデータセンター「Core Brain」を構築","type":"company","url":"https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/"},{"accessed":"2026-10-09","id":"s2","published":"2023-11-07","publisher":"Dempa Digital (Dempa Shimbun)","title":"経産省、北海道苫小牧市のデータセンターに300億円補助 ソフトバンクが建設予定","type":"trade_press","url":"https://dempa-digital.com/?p=492112"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260922002656/https://www.softbank.jp/business/service/platform/datacenter/tomakomai","id":"s3","published":null,"publisher":"SoftBank Corp.","title":"北海道苫小牧データセンター","type":"company","url":"https://www.softbank.jp/business/service/platform/datacenter/tomakomai"},{"accessed":"2026-10-09","id":"s4","published":"2025-05-01","publisher":"SoftBank Corp. (SoftBank News)","title":"Laying the Foundation for the AI Era: Construction Begins on \"Hokkaido Tomakomai AI Data Center\"","type":"company","url":"https://www.softbank.jp/en/sbnews/entry/20250501_01"},{"accessed":"2026-10-09","id":"s5","published":"2025-04-30","publisher":"W.Media","title":"SoftBank breaks ground for AI data center in Hokkaido","type":"trade_press","url":"https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260806004530/https://www.softbank.jp/en/sbnews/entry/20260225_01","id":"s6","published":"2026-02-25","publisher":"SoftBank Corp. (SoftBank News)","title":"Building for the AI Era: An Inside Look at SoftBank Corp.'s Next-generation AI Data Center in Hokkaido","type":"company","url":"https://www.softbank.jp/en/sbnews/entry/20260225_01"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260922125049/https://www.softbank.jp/en/sbnews/entry/20260623_01","id":"s7","published":"2026-06-23","publisher":"SoftBank Corp. (SoftBank News)","title":"SoftBank Corp.'s 40th Annual General Meeting of Shareholders: Building on Telecommunications Foundation to Unlock Potential of AI","type":"company","url":"https://www.softbank.jp/en/sbnews/entry/20260623_01"}],"status":"under_construction","status_as_of":"2026-06-23","status_source_ids":["s6","s7"],"summary":"SoftBank Corp. and its subsidiary IDC Frontier are building a large AI data center in Tomakomai, Hokkaido, as the core site of SoftBank's Brain DataCenter concept. The plan, selected for a Japanese government regional data center subsidy in 2023, starts with a data center of about 50 MW, with receiving capacity expected to grow past 300 MW on a site of about 700,000 square meters. Ground was broken in April 2025 and SoftBank targets opening in fiscal 2026. The company intends to run the facility on renewable electricity sourced within Hokkaido.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","s2":"aff59ec7-86fe-5451-8100-89ec85a970d5","s3":"fc90dcfc-dc18-57e1-9ace-fbee124696aa","s4":"632852c2-37ac-5865-a1e0-f1dc8194b01b","s5":"7a38daa4-627c-57b8-8305-b0d22ccb8a8f","s6":"fc76f541-11a1-591d-81c9-ab51f1a96bd1","s7":"f563155b-3553-53d5-9133-c6523341f108"},"source_file":"datacenters/projects/softbank-tomakomai.json","source_record_id":"softbank-tomakomai","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"87f8282937aee10c7fce6886f9f2f9a117b38090f43f09ef236bae73fa629846"}],"evidence_ids":["5d3d9ccb-c460-5418-9031-8dd22aecca92","632852c2-37ac-5865-a1e0-f1dc8194b01b","7a38daa4-627c-57b8-8305-b0d22ccb8a8f","9b22a038-1afb-5454-9245-9d88fc5251bd","aff59ec7-86fe-5451-8100-89ec85a970d5","d00b5a09-e567-5c82-9aaf-df71b5f87d92","f563155b-3553-53d5-9133-c6523341f108","fc76f541-11a1-591d-81c9-ab51f1a96bd1","fc90dcfc-dc18-57e1-9ace-fbee124696aa"],"status_source":{"evidence_id":"9b22a038-1afb-5454-9245-9d88fc5251bd","title":"SoftBank News (October 21, 2026): woodland on the Hokkaido Tomakomai AI Data Center site certified as a nature-coexistence site","publisher":"SoftBank Corp.","kind":"company_disclosure","published_at":"2026-10-21","source_url":"https://www.softbank.jp/sbnews/entry/20261021_01","license":"all-rights-reserved","attribution":"SoftBank Corp."},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6fc591eaf0edc175a75c/#project-c4cf35bd-5452-551f-8b1c-bb88d2f2b35b","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/c4cf35bd-5452-551f-8b1c-bb88d2f2b35b.json","geometry_source":{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","title":"次世代社会インフラ構想の要となる大規模な計算基盤を備えたデータセンター「Core Brain」を構築","publisher":"SoftBank Corp.","kind":"company_disclosure","published_at":"2023-11-07","source_url":"https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/","license":"source-terms-not-recorded","attribution":"SoftBank Corp."}}],"evidence":[{"evidence_id":"fc76f541-11a1-591d-81c9-ab51f1a96bd1","roles":["imported:record","imported:status","milestone:first_operational","role:developer","role:government"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"Building for the AI Era: An Inside Look at SoftBank Corp.'s Next-generation AI Data Center in Hokkaido","source_url":"https://www.softbank.jp/en/sbnews/entry/20260225_01","publisher":"SoftBank Corp. (SoftBank News)","source_family":"www.softbank.jp","license":"source-terms-not-recorded","attribution":"SoftBank Corp. (SoftBank News)","published_at":"2026-02-25","retrieved_at":"2026-10-09","content_hash":"271fe43961156ea91376cbe4bf61fcbde647e880dbc849fc15376364f53adf33","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s6","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fc76f541-11a1-591d-81c9-ab51f1a96bd1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fc76f541-11a1-591d-81c9-ab51f1a96bd1.json","archive_url":"https://web.archive.org/web/20261009/https://www.softbank.jp/en/sbnews/entry/20260225_01"},{"evidence_id":"632852c2-37ac-5865-a1e0-f1dc8194b01b","roles":["imported:geometry","imported:record","metric:land_area","milestone:construction_started","milestone:first_operational","power_source:other","role:developer"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"Laying the Foundation for the AI Era: Construction Begins on \"Hokkaido Tomakomai AI Data Center\"","source_url":"https://www.softbank.jp/en/sbnews/entry/20250501_01","publisher":"SoftBank Corp. (SoftBank News)","source_family":"www.softbank.jp","license":"source-terms-not-recorded","attribution":"SoftBank Corp. (SoftBank News)","published_at":"2025-05-01","retrieved_at":"2026-10-09","content_hash":"72355ba32f5b328c8bee706475f5381b29d2d5713dcf208b8876247af9bc1591","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s4","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/632852c2-37ac-5865-a1e0-f1dc8194b01b.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/632852c2-37ac-5865-a1e0-f1dc8194b01b.json","archive_url":"https://web.archive.org/web/20261009/https://www.softbank.jp/en/sbnews/entry/20250501_01"},{"evidence_id":"7a38daa4-627c-57b8-8305-b0d22ccb8a8f","roles":["imported:geometry","imported:record","metric:investment","metric:power_capacity","milestone:construction_started","role:government"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"trade_press","title":"SoftBank breaks ground for AI data center in Hokkaido","source_url":"https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/","publisher":"W.Media","source_family":"w.media","license":"source-terms-not-recorded","attribution":"W.Media","published_at":"2025-04-30","retrieved_at":"2026-10-09","content_hash":"e7becffca6172d3d4b6ce53064485694e7e25aef0d5adf22ead520d25019705c","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s5","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7a38daa4-627c-57b8-8305-b0d22ccb8a8f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7a38daa4-627c-57b8-8305-b0d22ccb8a8f.json","archive_url":"https://web.archive.org/web/20261009/https://w.media/softbank-breaks-ground-for-ai-data-center-in-hokkaido/"},{"evidence_id":"f563155b-3553-53d5-9133-c6523341f108","roles":["imported:record","imported:status","role:developer"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"SoftBank Corp.'s 40th Annual General Meeting of Shareholders: Building on Telecommunications Foundation to Unlock Potential of AI","source_url":"https://www.softbank.jp/en/sbnews/entry/20260623_01","publisher":"SoftBank Corp. (SoftBank News)","source_family":"www.softbank.jp","license":"source-terms-not-recorded","attribution":"SoftBank Corp. (SoftBank News)","published_at":"2026-06-23","retrieved_at":"2026-10-09","content_hash":"d228033f8c9504b67653fcf29e33ac0402fc8380a31db5d8856b6805b7db5d68","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s7","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f563155b-3553-53d5-9133-c6523341f108.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f563155b-3553-53d5-9133-c6523341f108.json","archive_url":"https://web.archive.org/web/20261009/https://www.softbank.jp/en/sbnews/entry/20260623_01"},{"evidence_id":"9b22a038-1afb-5454-9245-9d88fc5251bd","roles":["physical_status"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"SoftBank News (October 21, 2026): woodland on the Hokkaido Tomakomai AI Data Center site certified as a nature-coexistence site","source_url":"https://www.softbank.jp/sbnews/entry/20261021_01","publisher":"SoftBank Corp.","source_family":"softbank_corp._official","license":"all-rights-reserved","attribution":"SoftBank Corp.","published_at":"2026-10-21","retrieved_at":"2026-10-22T14:31:24.151Z","content_hash":"55d90c284ce3d5d1b548e34202b7bb82cc4af03e00d9f2c60302e6f143165880","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9b22a038-1afb-5454-9245-9d88fc5251bd.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9b22a038-1afb-5454-9245-9d88fc5251bd.json","archive_url":"https://web.archive.org/web/20261022143124/https://www.softbank.jp/sbnews/entry/20261021_01"},{"evidence_id":"5d3d9ccb-c460-5418-9031-8dd22aecca92","roles":["physical_status"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"SoftBank news: Tomakomai construction progressing and nature coexistence","source_url":"https://www.softbank.jp/sbnews/entry/20260804_02","publisher":"SoftBank Corp.","source_family":"softbank_corp._official","license":"all-rights-reserved","attribution":"SoftBank Corp.","published_at":"2026-08-04","retrieved_at":"2026-10-13T17:28:28.613049+00:00","content_hash":"1682e713ba8080ad7a8a47c4e2bd4c9a802b291d8e89e858383601b8a978dd70","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5d3d9ccb-c460-5418-9031-8dd22aecca92.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5d3d9ccb-c460-5418-9031-8dd22aecca92.json","archive_url":"https://web.archive.org/web/20261013172828/https://www.softbank.jp/sbnews/entry/20260804_02"},{"evidence_id":"fc90dcfc-dc18-57e1-9ace-fbee124696aa","roles":["imported:record","metric:land_area","metric:power_capacity","power_source:other"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"北海道苫小牧データセンター","source_url":"https://www.softbank.jp/business/service/platform/datacenter/tomakomai","publisher":"SoftBank Corp.","source_family":"www.softbank.jp","license":"source-terms-not-recorded","attribution":"SoftBank Corp.","published_at":null,"retrieved_at":"2026-10-09","content_hash":"06cb4ee391bcedc7642bede6f36e155b9fc9573bb5b8ccb27ab30d2c95ace43a","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s3","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fc90dcfc-dc18-57e1-9ace-fbee124696aa.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fc90dcfc-dc18-57e1-9ace-fbee124696aa.json","archive_url":"https://web.archive.org/web/20261009/https://www.softbank.jp/business/service/platform/datacenter/tomakomai"},{"evidence_id":"d00b5a09-e567-5c82-9aaf-df71b5f87d92","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","milestone:announced","milestone:first_operational","power_source:grid","power_source:other","role:developer","role:power_supplier"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"company_disclosure","title":"次世代社会インフラ構想の要となる大規模な計算基盤を備えたデータセンター「Core Brain」を構築","source_url":"https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/","publisher":"SoftBank Corp.","source_family":"www.softbank.jp","license":"source-terms-not-recorded","attribution":"SoftBank Corp.","published_at":"2023-11-07","retrieved_at":"2026-10-09","content_hash":"db96655f695b85ec7edc705d6d31c0408d08a979110715e563946f0e1435af22","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s1","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d00b5a09-e567-5c82-9aaf-df71b5f87d92.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d00b5a09-e567-5c82-9aaf-df71b5f87d92.json","archive_url":"https://web.archive.org/web/20261009/https://www.softbank.jp/corp/news/press/sbkk/2023/20231107_01/"},{"evidence_id":"aff59ec7-86fe-5451-8100-89ec85a970d5","roles":["imported:record","metric:investment","metric:power_capacity","milestone:announced","role:government"],"project_ids":["c4cf35bd-5452-551f-8b1c-bb88d2f2b35b"],"kind":"trade_press","title":"経産省、北海道苫小牧市のデータセンターに300億円補助 ソフトバンクが建設予定","source_url":"https://dempa-digital.com/?p=492112","publisher":"Dempa Digital (Dempa Shimbun)","source_family":"dempa-digital.com","license":"source-terms-not-recorded","attribution":"Dempa Digital (Dempa Shimbun)","published_at":"2023-11-07","retrieved_at":"2026-10-09","content_hash":"e3e54ebeb8e638d6c0a011c8a5a46cb1b0f4f2022a880312d4d665c9a2fdd2a1","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"softbank-tomakomai","source_local_id":"s2","source_record_sha256":"5ac7faf40fa30f74785a70cbb690430ecb00e38dc1ebc8e64e0c190bcd91bc0d","site_ids":["vcc-site-6fc591eaf0edc175a75c"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aff59ec7-86fe-5451-8100-89ec85a970d5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aff59ec7-86fe-5451-8100-89ec85a970d5.json","archive_url":"https://web.archive.org/web/20261009/https://dempa-digital.com/?p=492112"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-6fc591eaf0edc175a75c/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-6fc591eaf0edc175a75c.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-6fc591eaf0edc175a75c","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
