{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-7311a9ab273caa85afc2","physical_site_stable_key":"curated:agricultural-bank-of-china-horinger-data-center","name":"Agricultural Bank of China Horinger Data Center (Data Centre Third Branch)","country":"China","country_iso_a2":"CN","latitude":40.536553091,"longitude":111.797867534,"geometry":{"coordinates":[111.797867534,40.536553091],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["coordinate_transform"],"geometry_methods":["official_eia_dms_point_inferred_gcj02_converted_to_wgs84"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["The campus's Data 1# 110 kV substation, which the EIA places inside the data-centre campus on its south side, west of the south main gate and about 20 m north of Yungu Heng 44 Road; converted from the printed GCJ-02-frame value. Locates the campus through on-campus power infrastructure at its south edge; not a machine-room building, entrance or parcel centroid. The Phase 1 machine-room buildings lie roughly 100-300 m north-east of the point."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated; the GCJ-02 frame is inferred from the fit of the report's site plan to independent Esri imagery of unstated accuracy and date (manual visual comparison, agreement within about 30 m), and the printed value may itself have been read from a web map. The point marks a substation at the campus's south edge. Decimal places are computational precision, not accuracy.","geometry_evidence_ids":["3e1f0a7d-0239-5f8a-921a-edae10983d29"],"project_count":1,"project_ids":["6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19"],"project_stable_keys":["curated:agricultural-bank-of-china-horinger-data-center:initial-operations"],"statuses":["operational"],"oldest_status_as_of":"2026-08-31","newest_status_as_of":"2026-08-31","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7311a9ab273caa85afc2/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7311a9ab273caa85afc2.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国农业银行股份有限公司内蒙古自治区分行"]},"projects":[{"project_id":"6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19","project_stable_key":"curated:agricultural-bank-of-china-horinger-data-center:initial-operations","site_id":"vcc-site-7311a9ab273caa85afc2","physical_site_stable_key":"curated:agricultural-bank-of-china-horinger-data-center","name":"Agricultural Bank of China Horinger Data Center — newly commissioned data-centre operations","country":"China","country_iso_a2":"CN","latitude":40.536553091,"longitude":111.797867534,"geometry":{"coordinates":[111.797867534,40.536553091],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"coordinate_transform","geometry_method":"official_eia_dms_point_inferred_gcj02_converted_to_wgs84","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"compiled_reference","geometry_use_scope":"campus_locator","geometry_precision_scope":"The campus's Data 1# 110 kV substation, which the EIA places inside the data-centre campus on its south side, west of the south main gate and about 20 m north of Yungu Heng 44 Road; converted from the printed GCJ-02-frame value. Locates the campus through on-campus power infrastructure at its south edge; not a machine-room building, entrance or parcel centroid. The Phase 1 machine-room buildings lie roughly 100-300 m north-east of the point.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated; the GCJ-02 frame is inferred from the fit of the report's site plan to independent Esri imagery of unstated accuracy and date (manual visual comparison, agreement within about 30 m), and the printed value may itself have been read from a web map. The point marks a substation at the campus's south edge. Decimal places are computational precision, not accuracy.","geometry_evidence_id":"3e1f0a7d-0239-5f8a-921a-edae10983d29","last_observed_physical_status":"operational","status_as_of":"2026-08-31","status_age_days_at_review":57,"status_method":"authoritative_physical_status_update","status_evidence_id":"828c3774-ef0a-51d4-8d50-9af047a15158","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"3e1f0a7d-0239-5f8a-921a-edae10983d29","party":"Agricultural Bank of China Limited Inner Mongolia Branch (中国农业银行股份有限公司内蒙古自治区分行)","relationship_scope":"current","role":"owner"},{"evidence_id":"828c3774-ef0a-51d4-8d50-9af047a15158","party":"Agricultural Bank of China (中国农业银行)","relationship_scope":"current","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"Agricultural Bank of China Limited Inner Mongolia Branch (中国农业银行股份有限公司内蒙古自治区分行)","operator":"Agricultural Bank of China (中国农业银行)","users":null,"tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260831_2032916.html","geometry_source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573985367377.pdf","project_details":[],"evidence_ids":["3e1f0a7d-0239-5f8a-921a-edae10983d29","758be460-90d2-525c-bd92-f2e74ac8ad7c","828c3774-ef0a-51d4-8d50-9af047a15158","d5b8a031-dfa5-5a14-b546-45757937f19a"],"status_source":{"evidence_id":"828c3774-ef0a-51d4-8d50-9af047a15158","title":"Horinger New Area news item: 'Serving new projects in advance, building a safety firewall' (靠前服务新项目 筑牢安全“防火墙”), 31 August 2026","publisher":"Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局（应急局）)","kind":"government_record","published_at":"2026-08-31","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260831_2032916.html","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区公共事业服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7311a9ab273caa85afc2/#project-6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19.json","geometry_source":{"evidence_id":"3e1f0a7d-0239-5f8a-921a-edae10983d29","title":"Environmental impact report form: Agricultural Bank of China Horinger Data Centre two 110 kV substations (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 15 March 2023)","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","kind":"government_environmental_document","published_at":"2023-03-15","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573985367377.pdf","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国农业银行股份有限公司内蒙古自治区分行"}}],"evidence":[{"evidence_id":"3e1f0a7d-0239-5f8a-921a-edae10983d29","roles":["geometry","role:owner"],"project_ids":["6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19"],"kind":"government_environmental_document","title":"Environmental impact report form: Agricultural Bank of China Horinger Data Centre two 110 kV substations (Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity, 15 March 2023)","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573985367377.pdf","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国农业银行股份有限公司内蒙古自治区分行","published_at":"2023-03-15","retrieved_at":"2026-10-26T22:48:54.198Z","content_hash":"6e3ed5a57984e82840a28dcb6420091e23373894180759646a739dd06fc6990a","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-7311a9ab273caa85afc2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3e1f0a7d-0239-5f8a-921a-edae10983d29.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3e1f0a7d-0239-5f8a-921a-edae10983d29.json","archive_url":"https://web.archive.org/web/20261026224854/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573985367377.pdf"},{"evidence_id":"d5b8a031-dfa5-5a14-b546-45757937f19a","roles":["context:identity"],"project_ids":["6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19"],"kind":"map","title":"Esri World Imagery EPSG:4326 export across the Agricultural Bank of China Horinger data-centre campus and its neighbours (111.785-111.813E, 40.531-40.545N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.785,40.531,111.813,40.545&bboxSR=4326&imageSR=4326&size=2000,1000&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"all-rights-reserved","attribution":"Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)","published_at":null,"retrieved_at":"2026-10-26T22:51:25.862Z","content_hash":"6deb33c87e683cfbebbe50345356a9d5e88ebb267ffcd429eb01623b1f414c0e","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-7311a9ab273caa85afc2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d5b8a031-dfa5-5a14-b546-45757937f19a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d5b8a031-dfa5-5a14-b546-45757937f19a.json","archive_url":"https://web.archive.org/web/20261026225125/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.785,40.531,111.813,40.545&bboxSR=4326&imageSR=4326&size=2000,1000&format=jpg&f=image"},{"evidence_id":"828c3774-ef0a-51d4-8d50-9af047a15158","roles":["physical_status","role:operator"],"project_ids":["6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19"],"kind":"government_record","title":"Horinger New Area news item: 'Serving new projects in advance, building a safety firewall' (靠前服务新项目 筑牢安全“防火墙”), 31 August 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260831_2032916.html","publisher":"Public Affairs Service Bureau (Emergency Management Bureau) of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区公共事业服务局（应急局）)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区公共事业服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-08-31","retrieved_at":"2026-10-26T22:30:31.592Z","content_hash":"c3208158aad7854cf547ffff5eef7e4b62d6ac90cb94deaad373d7babf931c0e","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-7311a9ab273caa85afc2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/828c3774-ef0a-51d4-8d50-9af047a15158.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/828c3774-ef0a-51d4-8d50-9af047a15158.json","archive_url":"https://web.archive.org/web/20261026223031/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260831_2032916.html"},{"evidence_id":"758be460-90d2-525c-bd92-f2e74ac8ad7c","roles":["context:identity"],"project_ids":["6cbf7ad8-26a6-58e3-aa0e-ad6c7a11dd19"],"kind":"government_record","title":"Inner Mongolia Department of Ecology and Environment approval of the EIA report form for the Agricultural Bank of China Horinger Data Centre two 110 kV substations (published with the approval-result publicity of 15 March 2023)","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573986832810.docx","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment","published_at":"2023-03-15","retrieved_at":"2026-10-26T22:44:41.854Z","content_hash":"20567bdc8abddf0ac2d820e7c6702fa3b6076855e1ea20a34667efa1c628e9be","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-7311a9ab273caa85afc2"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/758be460-90d2-525c-bd92-f2e74ac8ad7c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/758be460-90d2-525c-bd92-f2e74ac8ad7c.json","archive_url":"https://web.archive.org/web/20261026224441/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202303/P020230320573986832810.docx"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-7311a9ab273caa85afc2/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-7311a9ab273caa85afc2.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-7311a9ab273caa85afc2","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
