{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-78289e1b65e2284a986f","physical_site_stable_key":"curated:nextdc-m4-melbourne","name":"NEXTDC M4 Melbourne Data Center Campus","country":"Australia","country_iso_a2":"AU","latitude":-37.82870623280992,"longitude":144.91146374858133,"geometry":{"coordinates":[144.91146374858133,-37.82870623280992],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["exact_official_primary_virtual_address_point"],"geometry_methods":["preserve_Vicmap_PFI214016983_point_response_in_EPSG4326_bound_to_NEXTDC_M4_127_Todd_Road"],"geometry_scope_classes":["official_virtual_address_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Primary virtual address point for 127 Todd Road; source location descriptor PART is retained. The exact operator address and CP172440L government site record bind the campus. Not a surveyed entrance, full campus boundary, built footprint or June30 work extent; not the near-coincident non-primary entrance point."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No feature-specific quantitative positional-accuracy estimate is supplied by the selected point source. Coordinate digits are retained without asserting survey accuracy.","geometry_evidence_ids":["21e4e740-9c6e-5115-996c-3aa378a2f590","2ebacc55-15b9-5a33-b96e-3c51676e39c8","a53097c1-06e3-589b-9748-1e9a83879720","a5f4e2d6-95ca-5cc3-be57-aeb381fdf2ab","d023a91d-b0e7-5468-a30f-b28d6db4714c"],"project_count":2,"project_ids":["869dffc7-22ea-5f40-8810-13d87c696908","8715738f-39ac-5058-a01a-b62758b49831"],"project_stable_keys":["curated:nextdc-m4-melbourne:initial-early-works","imported:semiconductor-atlas:nextdc-m4-port-melbourne"],"statuses":["announced","site_preparation"],"oldest_status_as_of":"2026-01-19","newest_status_as_of":"2026-06-30","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"au","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78289e1b65e2284a986f.json","geometry_licenses":["CC-BY-4.0"],"geometry_attributions":["© State of Victoria, Department of Transport and Planning, Vicmap"]},"projects":[{"project_id":"8715738f-39ac-5058-a01a-b62758b49831","project_stable_key":"curated:nextdc-m4-melbourne:initial-early-works","site_id":"vcc-site-78289e1b65e2284a986f","physical_site_stable_key":"curated:nextdc-m4-melbourne","name":"NEXTDC M4 Initial Early Works","country":"Australia","country_iso_a2":"AU","latitude":-37.82870623280992,"longitude":144.91146374858133,"geometry":{"coordinates":[144.91146374858133,-37.82870623280992],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"exact_official_primary_virtual_address_point","geometry_method":"preserve_Vicmap_PFI214016983_point_response_in_EPSG4326_bound_to_NEXTDC_M4_127_Todd_Road","geometry_scope_class":"official_virtual_address_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Primary virtual address point for 127 Todd Road; source location descriptor PART is retained. The exact operator address and CP172440L government site record bind the campus. Not a surveyed entrance, full campus boundary, built footprint or June30 work extent; not the near-coincident non-primary entrance point.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No feature-specific quantitative positional-accuracy estimate is supplied by the selected point source. Coordinate digits are retained without asserting survey accuracy.","geometry_evidence_id":"a53097c1-06e3-589b-9748-1e9a83879720","last_observed_physical_status":"site_preparation","status_as_of":"2026-06-30","status_age_days_at_review":119,"status_method":"authoritative_physical_status_update","status_evidence_id":"c39d71f0-c36f-5942-85a8-d7c235f5ea32","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf","geometry_source_url":"https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson","project_details":[],"evidence_ids":["21e4e740-9c6e-5115-996c-3aa378a2f590","23f9086f-59d8-5e91-ac49-a0f6ab331d31","2ebacc55-15b9-5a33-b96e-3c51676e39c8","54e3a9a6-dc2e-5640-81c9-727944ee089d","8d32dcaf-9335-53a3-bb7d-11a27425b4c1","a53097c1-06e3-589b-9748-1e9a83879720","a5f4e2d6-95ca-5cc3-be57-aeb381fdf2ab","c39d71f0-c36f-5942-85a8-d7c235f5ea32","d023a91d-b0e7-5468-a30f-b28d6db4714c"],"status_source":{"evidence_id":"c39d71f0-c36f-5942-85a8-d7c235f5ea32","title":"NEXTDC FY26 announcement: named M4, GE1 and KL1 work at June 30","publisher":"NEXTDC Limited","kind":"company_disclosure","published_at":"2026-08-27","source_url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf","license":"all-rights-reserved","attribution":"NEXTDC Limited"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/#project-8715738f-39ac-5058-a01a-b62758b49831","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/8715738f-39ac-5058-a01a-b62758b49831.json","geometry_source":{"evidence_id":"a53097c1-06e3-589b-9748-1e9a83879720","title":"M4 exact primary Vicmap address point at 127 Todd Road","publisher":"Victoria Department of Transport and Planning / Vicmap","kind":"government_record","published_at":null,"source_url":"https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap"}},{"project_id":"869dffc7-22ea-5f40-8810-13d87c696908","project_stable_key":"imported:semiconductor-atlas:nextdc-m4-port-melbourne","site_id":"vcc-site-78289e1b65e2284a986f","physical_site_stable_key":"curated:nextdc-m4-melbourne","name":"NEXTDC M4 Melbourne","country":"Australia","country_iso_a2":"AU","latitude":-37.833,"longitude":144.9124,"geometry":{"coordinates":[144.9124,-37.833],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"approximate_site","geometry_authority_class":"compiled_reference","geometry_use_scope":"approximate_site_locator","geometry_precision_scope":"NEXTDC gives the address 127 Todd Road, Port Melbourne. OpenStreetMap Nominatim matched Todd Road but not the house number, so coordinates are a point on Todd Road near the site.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"822a36e0-a36b-55dc-b617-b1f6f3fdeb48","last_observed_physical_status":"announced","status_as_of":"2026-01-19","status_age_days_at_review":281,"status_method":"imported_documented_status","status_evidence_id":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"822a36e0-a36b-55dc-b617-b1f6f3fdeb48","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-m4-port-melbourne"},{"evidence_id":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-m4-port-melbourne"},{"evidence_id":"e1b7f87f-679a-5762-ad17-0fca03d9e04c","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-m4-port-melbourne"},{"evidence_id":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","notes":"Granted development approval.","party":"Victorian Government","relationship_scope":"unknown","role":"government","source_record_id":"nextdc-m4-port-melbourne"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.nextdc.com/news/m4-technology-campus-approved","geometry_source_url":"https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["approximate_locator_not_boundary","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same NEXTDC M4 campus at 127 Todd Road, Port Melbourne. Source retains the approved full campus while existing record selects June 2026 initial early works; its older announced status must not replace the observed site preparation.","source_record_id":"nextdc-m4-port-melbourne","target_physical_site_stable_key":"curated:nextdc-m4-melbourne"},"record":{"aliases":["M4 Technology Campus","Fishermans Bend AI Factory and Technology Campus"],"id":"nextdc-m4-port-melbourne","last_reviewed":"2026-10-09","location":{"admin1":"Victoria","country":"AU","lat":-37.833,"locality":"Port Melbourne","lon":144.9124,"note":"NEXTDC gives the address 127 Todd Road, Port Melbourne. OpenStreetMap Nominatim matched Todd Road but not the house number, so coordinates are a point on Todd Road near the site.","precision":"approximate_site","source_ids":["s1","s2"]},"metrics":[{"applies_to":"campus","as_of":"2025-06-12","basis":"planned","metric":"power_capacity","power_scope":"unspecified","qualifier":"up_to","source_ids":["s1"],"unit":"MW","value":150},{"applies_to":"campus","as_of":"2026-01-19","basis":"planned","metric":"power_capacity","note":"Capacity stated in NEXTDC's development approval announcement; the release does not say whether the approval itself sets a power limit or whether the figure is IT load.","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":162},{"applies_to":"campus","as_of":"2026-10","basis":"planned","metric":"power_capacity","note":"Undated facility page, viewed October 2026, gives a target of 150 MW of IT capacity and 26,400 square meters of technical space.","power_scope":"it_load","qualifier":"exact","source_ids":["s3"],"unit":"MW","value":150},{"applies_to":"campus","as_of":"2025-06-12","basis":"announced","metric":"investment","qualifier":"exact","source_ids":["s1","s2"],"unit":"AUD","value":2000000000},{"applies_to":"campus","as_of":"2025-06-12","basis":"planned","metric":"floor_area","note":"Area given for mission-critical facilities.","qualifier":"exact","source_ids":["s1"],"unit":"sq_m","value":50000}],"milestones":[{"date":"2025-06-12","event":"announced","kind":"actual","source_ids":["s1"]},{"date":"2026-01","event":"permit_approved","kind":"actual","note":"Development approval announced on 19 January 2026; the approval date itself was not stated.","source_ids":["s2"]}],"name":"NEXTDC M4 Melbourne","parties":[{"name":"NEXTDC","role":"developer","source_ids":["s1","s2","s3"]},{"name":"Victorian Government","note":"Granted development approval.","role":"government","source_ids":["s2"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-06-12","publisher":"NEXTDC","title":"NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend","type":"company","url":"https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260324052816/https://www.nextdc.com/news/m4-technology-campus-approved","id":"s2","published":"2026-01-19","publisher":"NEXTDC","title":"M4 Technology Campus Approved","type":"company","url":"https://www.nextdc.com/news/m4-technology-campus-approved"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260608053007/https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne","id":"s3","published":null,"publisher":"NEXTDC","title":"M4 Melbourne Data Centre","type":"company","url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne"}],"status":"announced","status_as_of":"2026-01-19","status_source_ids":["s2"],"summary":"NEXTDC plans an AI factory and technology campus, called M4, on the former Westgate Park printing complex at 127 Todd Road in Port Melbourne's Fishermans Bend precinct. Announced in June 2025 as an A$2 billion project of up to 150 MW, designed for very high-density Nvidia-class AI racks and linked with university, defence and research partners, it received development approval from the Victorian Government by January 2026, when NEXTDC cited 162 MW. Construction timing has not been published.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"822a36e0-a36b-55dc-b617-b1f6f3fdeb48","s2":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","s3":"e1b7f87f-679a-5762-ad17-0fca03d9e04c"},"source_file":"datacenters/projects/nextdc-m4-port-melbourne.json","source_record_id":"nextdc-m4-port-melbourne","source_record_sha256":"6f7a67858387aa588a2888e9fa9aad66fc0faa8f8058ed30c3267a013360d62e","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"1e5605f20f502c7f1a5e664d6e05704db6b4deae003c6b58f2c4736315a30533"}],"evidence_ids":["822a36e0-a36b-55dc-b617-b1f6f3fdeb48","c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","e1b7f87f-679a-5762-ad17-0fca03d9e04c"],"status_source":{"evidence_id":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","title":"M4 Technology Campus Approved","publisher":"NEXTDC","kind":"company_disclosure","published_at":"2026-01-19","source_url":"https://www.nextdc.com/news/m4-technology-campus-approved","license":"source-terms-not-recorded","attribution":"NEXTDC"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/#project-869dffc7-22ea-5f40-8810-13d87c696908","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/869dffc7-22ea-5f40-8810-13d87c696908.json","geometry_source":{"evidence_id":"822a36e0-a36b-55dc-b617-b1f6f3fdeb48","title":"NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend","publisher":"NEXTDC","kind":"company_disclosure","published_at":"2025-06-12","source_url":"https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend","license":"source-terms-not-recorded","attribution":"NEXTDC"}}],"evidence":[{"evidence_id":"2ebacc55-15b9-5a33-b96e-3c51676e39c8","roles":["context:site_distinctness","geometry"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"government_record","title":"Australian government catalogue: official Vicmap Address endpoint","source_url":"https://data.gov.au/data/api/3/action/resource_show?id=eb3cd08e-762b-4b1c-ba57-6dca4e4059f4","publisher":"Victoria Department of Transport and Planning / Vicmap","source_family":"vicmap_official_address_service","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap","published_at":null,"retrieved_at":"2026-09-08T21:12:04Z","content_hash":"1c376e0ae2aea9918a6e12640db46d0afdc0819eac0355f02a375f3d3b0f8f52","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2ebacc55-15b9-5a33-b96e-3c51676e39c8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2ebacc55-15b9-5a33-b96e-3c51676e39c8.json","archive_url":"https://web.archive.org/web/20260908211204/https://data.gov.au/data/api/3/action/resource_show?id=eb3cd08e-762b-4b1c-ba57-6dca4e4059f4"},{"evidence_id":"a53097c1-06e3-589b-9748-1e9a83879720","roles":["context:site_distinctness","geometry"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831"],"kind":"government_record","title":"M4 exact primary Vicmap address point at 127 Todd Road","source_url":"https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson","publisher":"Victoria Department of Transport and Planning / Vicmap","source_family":"vicmap_official_address_service","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap","published_at":null,"retrieved_at":"2026-09-08T21:10:14Z","content_hash":"9bcd66a2ea97aace1aa0129773fe77948a6976fbaa8018012d64f76782203cdd","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a53097c1-06e3-589b-9748-1e9a83879720.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a53097c1-06e3-589b-9748-1e9a83879720.json","archive_url":"https://web.archive.org/web/20260908211014/https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0/query?where=pfi%20IN%20%28%27214016983%27%2C%27460240432%27%29&outFields=*&outSR=4326&returnGeometry=true&f=pjson"},{"evidence_id":"e1b7f87f-679a-5762-ad17-0fca03d9e04c","roles":["imported:record","metric:power_capacity","role:developer"],"project_ids":["869dffc7-22ea-5f40-8810-13d87c696908"],"kind":"company_disclosure","title":"M4 Melbourne Data Centre","source_url":"https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":null,"retrieved_at":"2026-10-09","content_hash":"6a4d5446f781313c85cd1b9a4dc81ee8de883768de515747e8c784f9de4569b1","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"nextdc-m4-port-melbourne","source_local_id":"s3","source_record_sha256":"6f7a67858387aa588a2888e9fa9aad66fc0faa8f8058ed30c3267a013360d62e","site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e1b7f87f-679a-5762-ad17-0fca03d9e04c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e1b7f87f-679a-5762-ad17-0fca03d9e04c.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/data-centres/melbourne-data-centres/m4-melbourne"},{"evidence_id":"8d32dcaf-9335-53a3-bb7d-11a27425b4c1","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831"],"kind":"government_record","title":"M4 officer report: NEXTDC address and CP172440L parcel","source_url":"https://sftpbspomppprod01.blob.core.windows.net/applicationfiles/76685df6-baaf-f011-bbd2-6045bdc32df2_REDACTED_PA2504019%20Officer%20Report%20-%20Signed%2016-01-26.pdf","publisher":"Victoria Department of Transport and Planning","source_family":"victoria_ministerial_permit_officer_report","license":"all-rights-reserved","attribution":"Victoria Department of Transport and Planning","published_at":null,"retrieved_at":"2026-09-08T21:04:43Z","content_hash":"1006e3452d5186c0078d82f084da3592de57345486fa2acacc73fc65b3da3d46","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8d32dcaf-9335-53a3-bb7d-11a27425b4c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8d32dcaf-9335-53a3-bb7d-11a27425b4c1.json","archive_url":"https://web.archive.org/web/20260908210443/https://sftpbspomppprod01.blob.core.windows.net/applicationfiles/76685df6-baaf-f011-bbd2-6045bdc32df2_REDACTED_PA2504019%20Officer%20Report%20-%20Signed%2016-01-26.pdf"},{"evidence_id":"c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1","roles":["imported:geometry","imported:record","imported:status","metric:investment","metric:power_capacity","milestone:permit_approved","role:developer","role:government"],"project_ids":["869dffc7-22ea-5f40-8810-13d87c696908"],"kind":"company_disclosure","title":"M4 Technology Campus Approved","source_url":"https://www.nextdc.com/news/m4-technology-campus-approved","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":"2026-01-19","retrieved_at":"2026-10-09","content_hash":"07d668cadb81ba71aeed3b4c875116e837151bbc5fc6cebebdd8a726d6199758","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"nextdc-m4-port-melbourne","source_local_id":"s2","source_record_sha256":"6f7a67858387aa588a2888e9fa9aad66fc0faa8f8058ed30c3267a013360d62e","site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c035f6ad-ba8f-544f-82b5-f1fd3afa8fb1.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/news/m4-technology-campus-approved"},{"evidence_id":"822a36e0-a36b-55dc-b617-b1f6f3fdeb48","roles":["imported:geometry","imported:record","metric:floor_area","metric:investment","metric:power_capacity","milestone:announced","role:developer"],"project_ids":["869dffc7-22ea-5f40-8810-13d87c696908"],"kind":"company_disclosure","title":"NEXTDC Announces $2 Billion AI Factory and Technology Campus at Fishermans Bend","source_url":"https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":"2025-06-12","retrieved_at":"2026-10-09","content_hash":"f6fded2437f48f999ac0f53caa6923bada6ffc587252afcaa788705788efbaeb","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"nextdc-m4-port-melbourne","source_local_id":"s1","source_record_sha256":"6f7a67858387aa588a2888e9fa9aad66fc0faa8f8058ed30c3267a013360d62e","site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/822a36e0-a36b-55dc-b617-b1f6f3fdeb48.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/822a36e0-a36b-55dc-b617-b1f6f3fdeb48.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend"},{"evidence_id":"c39d71f0-c36f-5942-85a8-d7c235f5ea32","roles":["context:geometry_identity","context:site_distinctness","physical_status"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","95b33a98-a85e-57af-b18d-6811a7fd3b20","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"company_disclosure","title":"NEXTDC FY26 announcement: named M4, GE1 and KL1 work at June 30","source_url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf","publisher":"NEXTDC Limited","source_family":"nextdc_official_financial_reporting","license":"all-rights-reserved","attribution":"NEXTDC Limited","published_at":"2026-08-27","retrieved_at":"2026-09-08T20:45:47Z","content_hash":"e803bedfe822498532c9d33d194646b4cbe00eaf77e887273ce5874297dccc9c","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-355111878b17009b2503","vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c39d71f0-c36f-5942-85a8-d7c235f5ea32.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c39d71f0-c36f-5942-85a8-d7c235f5ea32.json","archive_url":"https://web.archive.org/web/20260908204547/https://www.nextdc.com/hubfs/Financial%20Reports/FY26/FY26%20Results%20Announcement.pdf"},{"evidence_id":"54e3a9a6-dc2e-5640-81c9-727944ee089d","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","95b33a98-a85e-57af-b18d-6811a7fd3b20","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"company_disclosure","title":"NEXTDC FY26 presentation: M4 early works and GE1/KL1 construction scope","source_url":"https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf","publisher":"NEXTDC Limited","source_family":"nextdc_official_financial_reporting","license":"all-rights-reserved","attribution":"NEXTDC Limited","published_at":"2026-08-27","retrieved_at":"2026-09-08T20:45:27Z","content_hash":"4cb87fe19f96f70ccd8097cc7a3ceb39e8bcfe19e87d6d674aee0e8a9369a2d4","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-355111878b17009b2503","vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/54e3a9a6-dc2e-5640-81c9-727944ee089d.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/54e3a9a6-dc2e-5640-81c9-727944ee089d.json","archive_url":"https://web.archive.org/web/20260908204527/https://www.nextdc.com/hubfs/Financial%20Reports/FY26/NEXTDC%20FY26%20Results%20Presentation.pdf"},{"evidence_id":"23f9086f-59d8-5e91-ac49-a0f6ab331d31","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831"],"kind":"company_disclosure","title":"NEXTDC M4 announcement: exact 127 Todd Road campus identity","source_url":"https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend","publisher":"NEXTDC Limited","source_family":"nextdc_official_campus_identity","license":"all-rights-reserved","attribution":"NEXTDC Limited","published_at":"2025-06-12","retrieved_at":"2026-09-08T21:01:51Z","content_hash":"f5fa90cc6d137d7db524c79ae61524491e78e3cde2ba6356e9232ce093527896","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/23f9086f-59d8-5e91-ac49-a0f6ab331d31.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/23f9086f-59d8-5e91-ac49-a0f6ab331d31.json","archive_url":"https://web.archive.org/web/20260908210151/https://www.nextdc.com/news/nextdc-announces-2-billion-ai-factory-and-technology-campus-at-fishermans-bend"},{"evidence_id":"a5f4e2d6-95ca-5cc3-be57-aeb381fdf2ab","roles":["context:site_distinctness","geometry"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"government_record","title":"Vicmap Address dictionary: virtual versus entrance points","source_url":"https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/7/query?where=1%3D1&outFields=*&f=pjson","publisher":"Victoria Department of Transport and Planning / Vicmap","source_family":"vicmap_official_address_service","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap","published_at":null,"retrieved_at":"2026-09-08T21:12:55Z","content_hash":"1c03a65ba036ecf8c9437a1e7284637316204ca7b10b4a38566b028bde15430b","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a5f4e2d6-95ca-5cc3-be57-aeb381fdf2ab.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a5f4e2d6-95ca-5cc3-be57-aeb381fdf2ab.json","archive_url":"https://web.archive.org/web/20260908211255/https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/7/query?where=1%3D1&outFields=*&f=pjson"},{"evidence_id":"21e4e740-9c6e-5115-996c-3aa378a2f590","roles":["context:site_distinctness","geometry"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"government_record","title":"Vicmap Address layer: point schema and storage spatial reference","source_url":"https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0?f=pjson","publisher":"Victoria Department of Transport and Planning / Vicmap","source_family":"vicmap_official_address_service","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap","published_at":null,"retrieved_at":"2026-09-08T21:07:49Z","content_hash":"95dec67863ee5c5ecb00924e1f74725efc226c9fd3b3ff7aa5eaf0560fc04afa","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/21e4e740-9c6e-5115-996c-3aa378a2f590.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/21e4e740-9c6e-5115-996c-3aa378a2f590.json","archive_url":"https://web.archive.org/web/20260908210749/https://services-ap1.arcgis.com/P744lA0wf4LlBZ84/arcgis/rest/services/Vicmap_Address/FeatureServer/0?f=pjson"},{"evidence_id":"d023a91d-b0e7-5468-a30f-b28d6db4714c","roles":["context:site_distinctness","geometry"],"project_ids":["8715738f-39ac-5058-a01a-b62758b49831","e39b5191-4a78-5781-8944-24efaf944aa9"],"kind":"government_record","title":"Vicmap Address service item: publisher and current data licence","source_url":"https://www.arcgis.com/sharing/rest/content/items/944561c665db48a8b0df5ca0d965d3fd?f=pjson","publisher":"Victoria Department of Transport and Planning / Vicmap","source_family":"vicmap_official_address_service","license":"CC-BY-4.0","attribution":"© State of Victoria, Department of Transport and Planning, Vicmap","published_at":null,"retrieved_at":"2026-09-08T21:08:42Z","content_hash":"f3a334b20ddf6ceb9d7953cb980068d85e1db926324d6f2a6d040f0aefe34a33","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-78289e1b65e2284a986f","vcc-site-a54941d2855e5bc71a3b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d023a91d-b0e7-5468-a30f-b28d6db4714c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d023a91d-b0e7-5468-a30f-b28d6db4714c.json","archive_url":"https://web.archive.org/web/20260908210842/https://www.arcgis.com/sharing/rest/content/items/944561c665db48a8b0df5ca0d965d3fd?f=pjson"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-78289e1b65e2284a986f/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-78289e1b65e2284a986f.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-78289e1b65e2284a986f","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
