{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-85b3549bb55293336132","physical_site_stable_key":"curated:lancium-clean-campus-abilene-ai-data-center","name":"Lancium Clean Campus Abilene AI Data Center","country":"United States","country_iso_a2":"US","latitude":32.509551980071,"longitude":-99.774790370504,"geometry":{"coordinates":[-99.774790370504,32.509551980071],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["official_address_geocode"],"geometry_methods":["census_public_ar_current_street_range_interpolation"],"geometry_scope_classes":["official_census_address_locator_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The municipal address binds Buildings 5 through 8 and the remaining campus development; the point is not any one of the six remaining building locations."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.","geometry_evidence_ids":["6600dddb-f2d8-5458-8e71-b43f77cc5e01"],"project_count":2,"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c","938feeec-a323-56e0-b6ce-2590fe58e623"],"project_stable_keys":["curated:lancium-clean-campus-abilene-ai-data-center:remaining-six-building-expansion","imported:semiconductor-atlas:openai-stargate-abilene"],"statuses":["partially_operational","under_construction"],"oldest_status_as_of":"2026-07-15","newest_status_as_of":"2026-10-05","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85b3549bb55293336132.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},"projects":[{"project_id":"938feeec-a323-56e0-b6ce-2590fe58e623","project_stable_key":"curated:lancium-clean-campus-abilene-ai-data-center:remaining-six-building-expansion","site_id":"vcc-site-85b3549bb55293336132","physical_site_stable_key":"curated:lancium-clean-campus-abilene-ai-data-center","name":"Lancium Clean Campus Abilene Remaining Six-Building Expansion","country":"United States","country_iso_a2":"US","latitude":32.509551980071,"longitude":-99.774790370504,"geometry":{"coordinates":[-99.774790370504,32.509551980071],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"official_address_geocode","geometry_method":"census_public_ar_current_street_range_interpolation","geometry_scope_class":"official_census_address_locator_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The municipal address binds Buildings 5 through 8 and the remaining campus development; the point is not any one of the six remaining building locations.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.","geometry_evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","last_observed_physical_status":"under_construction","status_as_of":"2026-07-15","status_age_days_at_review":104,"status_method":"authoritative_physical_status_update","status_evidence_id":"2659d4c4-2dad-5902-9c7e-f9365e4ac9a1","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by the v0.12 address-locator batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed project power observation selected by this batch; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.oracle.com/data-centers/","geometry_source_url":"https://geocoding.geo.census.gov/geocoder/","project_details":[],"evidence_ids":["2659d4c4-2dad-5902-9c7e-f9365e4ac9a1","6600dddb-f2d8-5458-8e71-b43f77cc5e01","76b0e3d9-4d31-5fd3-8b73-ed63f3c6bf6f","c721a602-e557-5a4d-8518-d5fce69a64d2"],"status_source":{"evidence_id":"2659d4c4-2dad-5902-9c7e-f9365e4ac9a1","title":"Oracle AI data-center locations page: dated construction media captions (captured 16 October 2026)","publisher":"Oracle","kind":"company_disclosure","published_at":null,"source_url":"https://www.oracle.com/data-centers/","license":"all-rights-reserved","attribution":"Oracle"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/#project-938feeec-a323-56e0-b6ce-2590fe58e623","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/938feeec-a323-56e0-b6ce-2590fe58e623.json","geometry_source":{"evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","title":"United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch","publisher":"United States Census Bureau","kind":"government_record","published_at":null,"source_url":"https://geocoding.geo.census.gov/geocoder/","license":"public-domain-us-government","attribution":"United States Census Bureau"}},{"project_id":"632aad8a-8c12-5a02-bd17-1138e6b03b6c","project_stable_key":"imported:semiconductor-atlas:openai-stargate-abilene","site_id":"vcc-site-85b3549bb55293336132","physical_site_stable_key":"curated:lancium-clean-campus-abilene-ai-data-center","name":"Stargate Abilene (Crusoe campus on Lancium land)","country":"United States","country_iso_a2":"US","latitude":32.4465,"longitude":-99.7476,"geometry":{"coordinates":[-99.7476,32.4465],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Abilene city centroid from an OpenStreetMap Nominatim lookup. Cited sources name the city but give no street address or parcel, so the campus itself is not pinpointed.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","last_observed_physical_status":"partially_operational","status_as_of":"2026-10-05","status_age_days_at_review":22,"status_method":"imported_documented_status","status_evidence_id":"7ac9775e-a093-54a2-a511-0434f71a2eac","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","notes":"Crusoe develops, builds and operates the campus and leases it to Oracle for OpenAI.","party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"openai-stargate-abilene"},{"evidence_id":"e9020492-72bd-51b1-b517-133f3d5fbb49","notes":"Crusoe develops, builds and operates the campus and leases it to Oracle for OpenAI.","party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"openai-stargate-abilene"},{"evidence_id":"c0aabc2c-e022-5239-b704-d8e5a8e6d769","notes":"Crusoe develops, builds and operates the campus and leases it to Oracle for OpenAI.","party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"openai-stargate-abilene"},{"evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","notes":"Co-sponsor of the $15 billion joint venture, investing through funds managed by its Real Assets platform.","party":"Blue Owl Capital","relationship_scope":"unknown","role":"investor","source_record_id":"openai-stargate-abilene"},{"evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","notes":"Co-sponsor of the joint venture funding construction.","party":"Primary Digital Infrastructure","relationship_scope":"unknown","role":"investor","source_record_id":"openai-stargate-abilene"},{"evidence_id":"c0aabc2c-e022-5239-b704-d8e5a8e6d769","notes":"Crusoe describes the Abilene campus land as Lancium-owned.","party":"Lancium","relationship_scope":"unknown","role":"owner","source_record_id":"openai-stargate-abilene"},{"evidence_id":"44f25ffe-6cc2-59fc-ba41-fcdab041c5e4","notes":"Leases the buildings and runs Oracle Cloud Infrastructure capacity there for OpenAI. Analyst Epoch AI, not a company disclosure, lists Oracle as owner of the AI chips.","party":"Oracle","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"},{"evidence_id":"e9020492-72bd-51b1-b517-133f3d5fbb49","notes":"Leases the buildings and runs Oracle Cloud Infrastructure capacity there for OpenAI. Analyst Epoch AI, not a company disclosure, lists Oracle as owner of the AI chips.","party":"Oracle","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"},{"evidence_id":"7ac9775e-a093-54a2-a511-0434f71a2eac","notes":"Leases the buildings and runs Oracle Cloud Infrastructure capacity there for OpenAI. Analyst Epoch AI, not a company disclosure, lists Oracle as owner of the AI chips.","party":"Oracle","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"},{"evidence_id":"44f25ffe-6cc2-59fc-ba41-fcdab041c5e4","notes":"End user of the compute, served through Oracle Cloud Infrastructure.","party":"OpenAI","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"},{"evidence_id":"e9020492-72bd-51b1-b517-133f3d5fbb49","notes":"End user of the compute, served through Oracle Cloud Infrastructure.","party":"OpenAI","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"},{"evidence_id":"7ac9775e-a093-54a2-a511-0434f71a2eac","notes":"End user of the compute, served through Oracle Cloud Infrastructure.","party":"OpenAI","relationship_scope":"unknown","role":"tenant","source_record_id":"openai-stargate-abilene"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"Lancium","operator":null,"users":null,"tenants":"OpenAI; Oracle","customers":null,"status_source_url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","geometry_source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same original eight-building Crusoe/Oracle/OpenAI campus on Lancium land. Source includes the first operating buildings and full 1.2 GW program; existing record selects the remaining six-building expansion. Adjacent Crusoe Microsoft campus is separate.","source_record_id":"openai-stargate-abilene","source_relations":[{"reason":"Source explicitly describes Microsoft campus as second and adjacent to original Oracle/OpenAI campus; distinct building programs and tenants.","relationship":"separate_adjacent_campuses","source_id":"crusoe-abilene-microsoft"}],"target_physical_site_stable_key":"curated:lancium-clean-campus-abilene-ai-data-center"},"record":{"aliases":["Stargate Abilene","Lancium Clean Campus","Crusoe Abilene"],"id":"openai-stargate-abilene","last_reviewed":"2026-10-09","location":{"admin1":"Texas","country":"US","lat":32.4465,"locality":"Abilene","lon":-99.7476,"note":"Abilene city centroid from an OpenStreetMap Nominatim lookup. Cited sources name the city but give no street address or parcel, so the campus itself is not pinpointed.","precision":"locality","source_ids":["s1","s3","s7"]},"metrics":[{"applies_to":"campus","as_of":"2025-05-21","basis":"planned","metric":"power_capacity","note":"Full eight-building campus. Sources do not say whether this is IT or facility power.","power_scope":"unspecified","qualifier":"approximately","source_ids":["s1","s3"],"unit":"MW","value":1200},{"applies_to":"phase","as_of":"2025-11-18","basis":"operational","metric":"power_capacity","note":"The first two buildings, reported operational since September 2025, provide more than 200 MW of IT capacity.","phase_label":"Phase 1 (buildings 1-2)","power_scope":"it_load","qualifier":"more_than","source_ids":["s3"],"unit":"MW","value":200},{"applies_to":"campus","as_of":"2026-07-28","basis":"operational","metric":"power_capacity","note":"Analyst estimate, not a company disclosure: Epoch AI's estimate of operating IT power with four buildings running, built from satellite imagery, filings and cooling models. Epoch projects about 843 MW of IT power by Q4 2026.","power_scope":"it_load","qualifier":"approximately","source_ids":["s7"],"unit":"MW","value":421},{"applies_to":"campus","as_of":"2026-04","basis":"permitted","metric":"power_capacity","note":"Analyst report, not a company disclosure: Cleanview gives this initial combined gas turbine capacity from permit documents and estimates from satellite imagery that the plant was finished in January 2026.","power_scope":"onsite_generation","qualifier":"approximately","source_ids":["s6"],"unit":"MW","value":360},{"applies_to":"phase","as_of":"2025-09-24","basis":"planned","metric":"power_capacity","note":"Announced in September 2025 as a potential expansion near the flagship site. In March 2026 Industrial Info relayed a Bloomberg report that the expansion was off; OpenAI said it put the capacity elsewhere and Oracle called the reports false.","phase_label":"Potential expansion near Abilene (reported dropped in 2026)","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":600},{"applies_to":"campus","as_of":"2025-05-21","basis":"announced","metric":"investment","note":"Size of the Crusoe, Blue Owl and Primary Digital joint venture funding the campus.","qualifier":"approximately","source_ids":["s1"],"unit":"USD","value":15000000000},{"applies_to":"campus","as_of":"2025-05-21","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s1","s3"],"unit":"count","value":8},{"applies_to":"phase","as_of":"2025-11-18","basis":"operational","metric":"floor_area","phase_label":"Phase 1 (buildings 1-2)","qualifier":"approximately","source_ids":["s3"],"unit":"sq_ft","value":980000},{"applies_to":"campus","as_of":"2025-11-18","basis":"planned","metric":"floor_area","qualifier":"approximately","source_ids":["s3"],"unit":"sq_ft","value":4000000},{"applies_to":"campus","as_of":"2025-11-18","basis":"reported","metric":"jobs_construction","note":"Workers Crusoe said come to Abilene every day to build the campus, cited at the final topping out. In May 2025 the joint venture reported about 3,000 daily workers, expected to approach 5,000.","qualifier":"approximately","source_ids":["s1","s3"],"unit":"count","value":7000}],"milestones":[{"date":"2024-06","event":"construction_started","kind":"actual","note":"Crusoe dates the start of phase 1 to June 2024; one trade article gives July 2024.","source_ids":["s1","s3","s9"]},{"date":"2025-03","event":"other","kind":"actual","note":"Construction of phase 2 (six more buildings) began.","source_ids":["s1"]},{"date":"2025-09","event":"first_operational","kind":"actual","note":"Crusoe announced the first phase live in September 2025. Analyst Epoch AI judges only building 1 fully operational then and building 2 by December 2025.","source_ids":["s3","s6","s7"]},{"date":"2025-09-23","event":"expansion_announced","kind":"actual","note":"A potential 600 MW expansion near Abilene was announced alongside five new Stargate sites.","source_ids":["s2"]},{"date":"2025-11","event":"other","kind":"actual","note":"Eighth and final building topped out.","source_ids":["s3"]},{"date":"2026-03","event":"other","kind":"actual","note":"Bloomberg reported, as relayed by Industrial Info, that plans to expand the campus were dropped; Oracle called the reports false. Analyst Epoch AI also describes OpenAI as having reversed a plan to expand the site.","source_ids":["s4","s5"]},{"date":"2026","event":"fully_operational","kind":"planned","note":"Crusoe targeted energizing phase 2 by mid-2026. Analyst Epoch AI, not a company source, projects buildings 5 to 8 operational around November 2026.","source_ids":["s1","s7"]}],"name":"Stargate Abilene (Crusoe campus on Lancium land)","notes":"Estimates of how much of the campus is live differ: an Oracle post in April 2026 said 200 MW was operating, analyst Epoch AI estimated about 0.3 GW of facility power then and about 421 MW of IT load by mid-2026, and The Tech Capital reported six buildings delivered to OpenAI in late September 2026. Epoch figures are analyst estimates, not company disclosures. Crusoe is separately building a 900 MW data center on adjacent Lancium-owned land, which Epoch links to Microsoft; it is a different project.","parties":[{"name":"Crusoe","note":"Crusoe develops, builds and operates the campus and leases it to Oracle for OpenAI.","role":"developer","source_ids":["s1","s3","s9"]},{"name":"Blue Owl Capital","note":"Co-sponsor of the $15 billion joint venture, investing through funds managed by its Real Assets platform.","role":"investor","source_ids":["s1"]},{"name":"Primary Digital Infrastructure","note":"Co-sponsor of the joint venture funding construction.","role":"investor","source_ids":["s1"]},{"name":"Lancium","note":"Crusoe describes the Abilene campus land as Lancium-owned.","role":"owner","source_ids":["s9"]},{"name":"Oracle","note":"Leases the buildings and runs Oracle Cloud Infrastructure capacity there for OpenAI. Analyst Epoch AI, not a company disclosure, lists Oracle as owner of the AI chips.","role":"tenant","source_ids":["s2","s3","s7"]},{"name":"OpenAI","note":"End user of the compute, served through Oracle Cloud Infrastructure.","role":"tenant","source_ids":["s2","s3","s7"]}],"power_sources":[{"description":"Connected to the ERCOT grid, per analyst Cleanview. Analyst Epoch AI reports a 200 MW substation serving the first buildings and a larger 1 GW substation that looked complete in July 2026 imagery.","source_ids":["s6","s7"],"type":"grid"},{"description":"On-site gas turbines, including GE Vernova LM2500XPRESS and Solar Titan 350 units, per permit records summarized by analyst Cleanview; analyst Epoch AI saw the on-site plant looking complete by March 2026.","source_ids":["s6","s7"],"type":"natural_gas_onsite"},{"description":"Crusoe cited the region's low-cost wind power as a major factor in choosing the site; analyst Epoch AI notes the grid supply includes local wind.","source_ids":["s1","s5"],"type":"wind"}],"related_ids":["crusoe-abilene-microsoft"],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-05-21","publisher":"Crusoe","title":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter Second Phase of $15 Billion Joint Venture","type":"company","url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture"},{"accessed":"2026-10-09","id":"s2","published":"2025-09-24","publisher":"SoftBank Group Corp.","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","type":"company","url":"https://group.softbank/en/news/press/20250924"},{"accessed":"2026-10-09","id":"s3","published":"2025-11-18","publisher":"W.Media","title":"Crusoe tops off final AI data center in Abilene, Texas","type":"trade_press","url":"https://w.media/crusoe-tops-off-final-ai-data-center-in-abilene-texas/"},{"accessed":"2026-10-09","id":"s4","published":"2026-03-10","publisher":"Industrial Info Resources","title":"Flagship Stargate Data Center Campus Expansion in Texas is Questioned","type":"trade_press","url":"https://www.industrialinfo.com/iirenergy/industry-news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260517184326/https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand","id":"s5","published":"2026-04-17","publisher":"Epoch AI","title":"OpenAI Stargate: where the US sites stand","type":"analyst","url":"https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand"},{"accessed":"2026-10-09","id":"s6","published":null,"publisher":"Cleanview","title":"Behind-the-meter data centers: Stargate Abilene","type":"analyst","url":"https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-abilene"},{"accessed":"2026-10-09","id":"s7","published":"2026-10-05","publisher":"Epoch AI","title":"OpenAI Stargate Abilene (AI data center directory)","type":"analyst","url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261006030644/https://thetechcapital.com/abilene-stargate-data-centre-update/","id":"s8","published":"2026-09-29","publisher":"The Tech Capital","title":"An Abilene update: What's happening at the first Stargate data centre?","type":"trade_press","url":"https://thetechcapital.com/abilene-stargate-data-centre-update/"},{"accessed":"2026-10-09","id":"s9","published":"2026-07-15","publisher":"Crusoe","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","type":"company","url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas"}],"status":"partially_operational","status_as_of":"2026-10-05","status_source_ids":["s7","s8"],"summary":"Crusoe-developed eight-building AI campus in Abilene, Texas, planned at about 1.2 GW and leased to Oracle, which runs it for OpenAI as the flagship Stargate site. Construction began in mid-2024; the first buildings came online in September 2025 and the last building was topped out in November 2025. The build is funded through a Crusoe, Blue Owl and Primary Digital joint venture on Lancium-owned land. A potential 600 MW expansion nearby was floated in 2025, but reports in March 2026 said it had been dropped, which Oracle disputed. In late September 2026 trade press reported six buildings delivered to OpenAI, and analyst Epoch AI projected all eight running by November 2026.","workloads":["ai_training","ai_inference"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"23d44bfc-7613-5581-8585-2f23cd7c0f75","s2":"44f25ffe-6cc2-59fc-ba41-fcdab041c5e4","s3":"e9020492-72bd-51b1-b517-133f3d5fbb49","s4":"70033f2a-1700-5a67-9781-3e13e4124467","s5":"21aa3998-cc7d-5a18-be05-a691da505426","s6":"ba0df664-b659-5b68-93ec-69ee62e92884","s7":"7ac9775e-a093-54a2-a511-0434f71a2eac","s8":"83d1f116-5518-5a75-833d-72a44dc2cd1c","s9":"c0aabc2c-e022-5239-b704-d8e5a8e6d769"},"source_file":"datacenters/projects/openai-stargate-abilene.json","source_record_id":"openai-stargate-abilene","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"3d5e26cae202f2c893720da67cbdf1d23c0fe50dbdafd1f787a8c1db57b23e76"}],"evidence_ids":["21aa3998-cc7d-5a18-be05-a691da505426","23d44bfc-7613-5581-8585-2f23cd7c0f75","44f25ffe-6cc2-59fc-ba41-fcdab041c5e4","70033f2a-1700-5a67-9781-3e13e4124467","7ac9775e-a093-54a2-a511-0434f71a2eac","83d1f116-5518-5a75-833d-72a44dc2cd1c","ba0df664-b659-5b68-93ec-69ee62e92884","c0aabc2c-e022-5239-b704-d8e5a8e6d769","e9020492-72bd-51b1-b517-133f3d5fbb49"],"status_source":{"evidence_id":"7ac9775e-a093-54a2-a511-0434f71a2eac","title":"OpenAI Stargate Abilene (AI data center directory)","publisher":"Epoch AI","kind":"analyst_report","published_at":"2026-10-05","source_url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","license":"source-terms-not-recorded","attribution":"Epoch AI"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/#project-632aad8a-8c12-5a02-bd17-1138e6b03b6c","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/632aad8a-8c12-5a02-bd17-1138e6b03b6c.json","geometry_source":{"evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","title":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter Second Phase of $15 Billion Joint Venture","publisher":"Crusoe","kind":"company_disclosure","published_at":"2025-05-21","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture","license":"source-terms-not-recorded","attribution":"Crusoe"}}],"evidence":[{"evidence_id":"c721a602-e557-5a4d-8518-d5fce69a64d2","roles":["physical_status"],"project_ids":["938feeec-a323-56e0-b6ce-2590fe58e623"],"kind":"company_disclosure","title":"AI Data Centers: Investing in Communities, Powering the Future","source_url":"https://www.oracle.com/data-centers/","publisher":"Oracle","source_family":"oracle_data_center_pages","license":"all-rights-reserved","attribution":"Oracle","published_at":null,"retrieved_at":"2026-07-21T06:07:08Z","content_hash":"3222773fcc16f4415692dd48c2254c15b00ea3bd5c5e4a1d4988a7a977b05e91","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c721a602-e557-5a4d-8518-d5fce69a64d2.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c721a602-e557-5a4d-8518-d5fce69a64d2.json","archive_url":"https://web.archive.org/web/20260721060708/https://www.oracle.com/data-centers/"},{"evidence_id":"83d1f116-5518-5a75-833d-72a44dc2cd1c","roles":["imported:record","imported:status"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"trade_press","title":"An Abilene update: What's happening at the first Stargate data centre?","source_url":"https://thetechcapital.com/abilene-stargate-data-centre-update/","publisher":"The Tech Capital","source_family":"thetechcapital.com","license":"source-terms-not-recorded","attribution":"The Tech Capital","published_at":"2026-09-29","retrieved_at":"2026-10-09","content_hash":"1b56faedf5d16cd981d6fb4dc08bfeef08888929c6d9f7620965b1929312a3f8","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s8","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/83d1f116-5518-5a75-833d-72a44dc2cd1c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/83d1f116-5518-5a75-833d-72a44dc2cd1c.json","archive_url":"https://web.archive.org/web/20261009/https://thetechcapital.com/abilene-stargate-data-centre-update/"},{"evidence_id":"ba0df664-b659-5b68-93ec-69ee62e92884","roles":["imported:record","metric:power_capacity","milestone:first_operational","power_source:grid","power_source:natural_gas_onsite"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"analyst_report","title":"Behind-the-meter data centers: Stargate Abilene","source_url":"https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-abilene","publisher":"Cleanview","source_family":"cleanview.co","license":"source-terms-not-recorded","attribution":"Cleanview","published_at":null,"retrieved_at":"2026-10-09","content_hash":"585c88e69c5cf0ec241bc3d5a4c0fc495030687d5f95c88f4d710dafad889020","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s6","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ba0df664-b659-5b68-93ec-69ee62e92884.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ba0df664-b659-5b68-93ec-69ee62e92884.json","archive_url":"https://web.archive.org/web/20261009/https://cleanview.co/reports/behind-the-meter-data-centers/full-report/stargate-abilene"},{"evidence_id":"76b0e3d9-4d31-5fd3-8b73-ed63f3c6bf6f","roles":["context:campus_address_identity"],"project_ids":["938feeec-a323-56e0-b6ce-2590fe58e623"],"kind":"government_record","title":"City of Abilene Planning and Development Services 2025 Second Quarter Report","source_url":"https://abilenetx.gov/DocumentCenter/View/36625/2025-Quarter-2---Quarterly-Report-PDF","publisher":"City of Abilene Planning and Development Services","source_family":"city_of_abilene_planning_reports","license":"public-government-record","attribution":"City of Abilene Planning and Development Services","published_at":null,"retrieved_at":"2026-07-21T06:07:08Z","content_hash":"181c419ff99ec07a93801da2fc43f0174040dd770ac2c02ba9f933a64db50bff","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/76b0e3d9-4d31-5fd3-8b73-ed63f3c6bf6f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/76b0e3d9-4d31-5fd3-8b73-ed63f3c6bf6f.json","archive_url":"https://web.archive.org/web/20260721060708/https://abilenetx.gov/DocumentCenter/View/36625/2025-Quarter-2---Quarterly-Report-PDF"},{"evidence_id":"c0aabc2c-e022-5239-b704-d8e5a8e6d769","roles":["imported:record","milestone:construction_started","role:developer","role:owner"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"company_disclosure","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","publisher":"Crusoe","source_family":"www.crusoe.ai","license":"source-terms-not-recorded","attribution":"Crusoe","published_at":"2026-07-15","retrieved_at":"2026-10-09","content_hash":"fa8c1eb521b71850ddf6cbd3120a42b8fac5eb4e4a5412d740d54e09224f3e73","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s9","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c0aabc2c-e022-5239-b704-d8e5a8e6d769.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c0aabc2c-e022-5239-b704-d8e5a8e6d769.json","archive_url":"https://web.archive.org/web/20261009/https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas"},{"evidence_id":"e9020492-72bd-51b1-b517-133f3d5fbb49","roles":["imported:geometry","imported:record","metric:buildings","metric:floor_area","metric:jobs_construction","metric:power_capacity","milestone:construction_started","milestone:first_operational","milestone:other","role:developer","role:tenant"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"trade_press","title":"Crusoe tops off final AI data center in Abilene, Texas","source_url":"https://w.media/crusoe-tops-off-final-ai-data-center-in-abilene-texas/","publisher":"W.Media","source_family":"w.media","license":"source-terms-not-recorded","attribution":"W.Media","published_at":"2025-11-18","retrieved_at":"2026-10-09","content_hash":"7f6d941eee79b6a7ddd1cb6e4488448b9495a42b9f65f4741a507fb4670a5007","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s3","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e9020492-72bd-51b1-b517-133f3d5fbb49.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e9020492-72bd-51b1-b517-133f3d5fbb49.json","archive_url":"https://web.archive.org/web/20261009/https://w.media/crusoe-tops-off-final-ai-data-center-in-abilene-texas/"},{"evidence_id":"23d44bfc-7613-5581-8585-2f23cd7c0f75","roles":["imported:geometry","imported:record","metric:buildings","metric:investment","metric:jobs_construction","metric:power_capacity","milestone:construction_started","milestone:fully_operational","milestone:other","power_source:wind","role:developer","role:investor"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"company_disclosure","title":"Crusoe, Blue Owl Capital and Primary Digital Infrastructure Enter Second Phase of $15 Billion Joint Venture","source_url":"https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture","publisher":"Crusoe","source_family":"www.crusoe.ai","license":"source-terms-not-recorded","attribution":"Crusoe","published_at":"2025-05-21","retrieved_at":"2026-10-09","content_hash":"8c251fe134b7418f25079e2217cb13a273f19d5a6f1966cdcc22352a2a0e483b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s1","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/23d44bfc-7613-5581-8585-2f23cd7c0f75.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/23d44bfc-7613-5581-8585-2f23cd7c0f75.json","archive_url":"https://web.archive.org/web/20261009/https://www.crusoe.ai/resources/newsroom/crusoe-blue-owl-capital-and-primary-digital-infrastructure-enter-joint-venture"},{"evidence_id":"70033f2a-1700-5a67-9781-3e13e4124467","roles":["imported:record","milestone:other"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"trade_press","title":"Flagship Stargate Data Center Campus Expansion in Texas is Questioned","source_url":"https://www.industrialinfo.com/iirenergy/industry-news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568","publisher":"Industrial Info Resources","source_family":"www.industrialinfo.com","license":"source-terms-not-recorded","attribution":"Industrial Info Resources","published_at":"2026-03-10","retrieved_at":"2026-10-09","content_hash":"a008f9e7e31e2ab242d689d216c9e7fbb7f4d3df45b038cc87ee4f9abe7d8e4b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s4","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/70033f2a-1700-5a67-9781-3e13e4124467.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/70033f2a-1700-5a67-9781-3e13e4124467.json","archive_url":"https://web.archive.org/web/20261009/https://www.industrialinfo.com/iirenergy/industry-news/article/flagship-stargate-data-center-campus-expansion-in-texas-is-questioned--354568"},{"evidence_id":"7ac9775e-a093-54a2-a511-0434f71a2eac","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","milestone:first_operational","milestone:fully_operational","power_source:grid","power_source:natural_gas_onsite","role:tenant"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"analyst_report","title":"OpenAI Stargate Abilene (AI data center directory)","source_url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","publisher":"Epoch AI","source_family":"epoch.ai","license":"source-terms-not-recorded","attribution":"Epoch AI","published_at":"2026-10-05","retrieved_at":"2026-10-09","content_hash":"6387ccc6c6ce321a0975c73503fb0fb920c74824019d6419e48905afb7a030c4","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s7","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7ac9775e-a093-54a2-a511-0434f71a2eac.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7ac9775e-a093-54a2-a511-0434f71a2eac.json","archive_url":"https://web.archive.org/web/20261009/https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene"},{"evidence_id":"21aa3998-cc7d-5a18-be05-a691da505426","roles":["imported:record","milestone:other","power_source:wind"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"analyst_report","title":"OpenAI Stargate: where the US sites stand","source_url":"https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand","publisher":"Epoch AI","source_family":"epoch.ai","license":"source-terms-not-recorded","attribution":"Epoch AI","published_at":"2026-04-17","retrieved_at":"2026-10-09","content_hash":"1d7f94716c08389e4419997f927952fbdf1a3fecb3b0d5b39c4c01ca2fdda8bc","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s5","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/21aa3998-cc7d-5a18-be05-a691da505426.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/21aa3998-cc7d-5a18-be05-a691da505426.json","archive_url":"https://web.archive.org/web/20261009/https://epoch.ai/blog/openai-stargate-where-the-us-sites-stand"},{"evidence_id":"44f25ffe-6cc2-59fc-ba41-fcdab041c5e4","roles":["imported:record","metric:power_capacity","milestone:expansion_announced","role:tenant"],"project_ids":["632aad8a-8c12-5a02-bd17-1138e6b03b6c"],"kind":"company_disclosure","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","source_url":"https://group.softbank/en/news/press/20250924","publisher":"SoftBank Group Corp.","source_family":"group.softbank","license":"source-terms-not-recorded","attribution":"SoftBank Group Corp.","published_at":"2025-09-24","retrieved_at":"2026-10-09","content_hash":"1db81e59661bc05d9f79c62a41966f02f34a6101a6d3b1187c332d51f04b3646","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"openai-stargate-abilene","source_local_id":"s2","source_record_sha256":"066c9529d28eb79b7fc21ed2ed0dd80e325c61e382e4ef4017df6b302effa713","site_ids":["vcc-site-85b3549bb55293336132"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/44f25ffe-6cc2-59fc-ba41-fcdab041c5e4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/44f25ffe-6cc2-59fc-ba41-fcdab041c5e4.json","archive_url":"https://web.archive.org/web/20261009/https://group.softbank/en/news/press/20250924"},{"evidence_id":"2659d4c4-2dad-5902-9c7e-f9365e4ac9a1","roles":["physical_status"],"project_ids":["3b636397-fbb2-5564-a352-fa1382a218b5","938feeec-a323-56e0-b6ce-2590fe58e623"],"kind":"company_disclosure","title":"Oracle AI data-center locations page: dated construction media captions (captured 16 October 2026)","source_url":"https://www.oracle.com/data-centers/","publisher":"Oracle","source_family":"oracle_data_center_pages","license":"all-rights-reserved","attribution":"Oracle","published_at":null,"retrieved_at":"2026-10-16T16:49:30.598Z","content_hash":"35da74fdde71efad4d88d252b0d91ffd7fb4f72e89dc3699afdbae1cec5e6eb7","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-85b3549bb55293336132","vcc-site-d272a722ca415c1be654"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2659d4c4-2dad-5902-9c7e-f9365e4ac9a1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2659d4c4-2dad-5902-9c7e-f9365e4ac9a1.json","archive_url":"https://web.archive.org/web/20261016164930/https://www.oracle.com/data-centers/"},{"evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","roles":["geometry"],"project_ids":["5b758548-2a2a-5643-9ebb-d8381bbd2c52","938feeec-a323-56e0-b6ce-2590fe58e623","9ddf0df3-e40c-515f-9468-ed78f063513b","b75695b9-38e3-58ec-baf2-039179ab353a","ba5ddf33-10ec-5fb8-b880-98a04df096b8"],"kind":"government_record","title":"United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch","source_url":"https://geocoding.geo.census.gov/geocoder/","publisher":"United States Census Bureau","source_family":"us_census_geocoder","license":"public-domain-us-government","attribution":"United States Census Bureau","published_at":null,"retrieved_at":"2026-08-23","content_hash":"db625d4738dc9a0eed46bd54216090509b1882f16c8b57578f43ac0fa76b0905","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-382d4c7030c7ed7c700d","vcc-site-77fa0d95d9c7ed1b2168","vcc-site-85b3549bb55293336132","vcc-site-86c96db92481ee74998d","vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6600dddb-f2d8-5458-8e71-b43f77cc5e01.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6600dddb-f2d8-5458-8e71-b43f77cc5e01.json","archive_url":"https://web.archive.org/web/20260823/https://geocoding.geo.census.gov/geocoder/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-85b3549bb55293336132/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-85b3549bb55293336132.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-85b3549bb55293336132","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
