{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-8b806f7ae4b0034de59b","physical_site_stable_key":"curated:bonc-horinger-intelligent-computing-centre","name":"BONC Horinger Intelligent Computing Centre (Industrial Internet Northern Regional Center)","country":"China","country_iso_a2":"CN","latitude":40.542011667,"longitude":111.810670278,"geometry":{"coordinates":[111.810670278,40.542011667],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA station-centre point of the campus's planned 2# 110 kV substation, which the report places in the central-east of the BONC Industrial Internet Northern Regional Center plant area (about 13.1 ha). It locates the campus through on-campus support infrastructure. It is not an operating data-centre building, a parcel centroid, an entrance or the construction extent."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No survey accuracy is stated. The datum and transcription are checked by the 1.4 m agreement with the report's CGCS2000 corner coordinates. The point marks the planned 2# substation, not the operating Phase 1 buildings; its offset from them is unknown but within the campus, which extends a few hundred metres around the point. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["48b3c190-79dd-5d90-a890-ed1758f3c681"],"project_count":1,"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"project_stable_keys":["curated:bonc-horinger-intelligent-computing-centre:existing-operations"],"statuses":["operational"],"oldest_status_as_of":"2026-08-10","newest_status_as_of":"2026-08-10","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b806f7ae4b0034de59b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8b806f7ae4b0034de59b.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)"]},"projects":[{"project_id":"8140cff8-04b3-5d90-a8bc-f5fb48f7af08","project_stable_key":"curated:bonc-horinger-intelligent-computing-centre:existing-operations","site_id":"vcc-site-8b806f7ae4b0034de59b","physical_site_stable_key":"curated:bonc-horinger-intelligent-computing-centre","name":"BONC Horinger Intelligent Computing Centre — existing operations","country":"China","country_iso_a2":"CN","latitude":40.542011667,"longitude":111.810670278,"geometry":{"coordinates":[111.810670278,40.542011667],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA station-centre point of the campus's planned 2# 110 kV substation, which the report places in the central-east of the BONC Industrial Internet Northern Regional Center plant area (about 13.1 ha). It locates the campus through on-campus support infrastructure. It is not an operating data-centre building, a parcel centroid, an entrance or the construction extent.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No survey accuracy is stated. The datum and transcription are checked by the 1.4 m agreement with the report's CGCS2000 corner coordinates. The point marks the planned 2# substation, not the operating Phase 1 buildings; its offset from them is unknown but within the campus, which extends a few hundred metres around the point. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"48b3c190-79dd-5d90-a890-ed1758f3c681","last_observed_physical_status":"operational","status_as_of":"2026-08-10","status_age_days_at_review":78,"status_method":"authoritative_physical_status_update","status_evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"48b3c190-79dd-5d90-a890-ed1758f3c681","party":"Inner Mongolia BONC Technology Co., Ltd. (内蒙古东方国信科技有限公司)","relationship_scope":"current","role":"owner"},{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","party":"BONC (东方国信; 北京东方国信科技股份有限公司)","relationship_scope":"current","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"Inner Mongolia BONC Technology Co., Ltd. (内蒙古东方国信科技有限公司)","operator":"BONC (东方国信; 北京东方国信科技股份有限公司)","users":null,"tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","geometry_source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/P020250826591746698166.pdf","project_details":[],"evidence_ids":["48b3c190-79dd-5d90-a890-ed1758f3c681","8a123398-5666-51b8-a2be-34d7409321f3","981089d7-9f0b-57fb-9255-fd58da3dc43e","aef8ca1f-7759-56cf-965e-65589da18bc8","b5152228-7680-5036-a60d-fe39da80b1c1","c40da912-d3b8-5082-a9a1-7c83aa34af28","d71fd1f2-a1e9-5a36-9f19-1c7f0039ffe5","da313433-0737-571a-850f-3c10fe2d7b66"],"status_source":{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","title":"Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区：“三看”自贸试验区里的算力“加速度”), 10 August 2026","publisher":"Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)","kind":"government_record","published_at":"2026-08-10","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b806f7ae4b0034de59b/#project-8140cff8-04b3-5d90-a8bc-f5fb48f7af08","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/8140cff8-04b3-5d90-a8bc-f5fb48f7af08.json","geometry_source":{"evidence_id":"48b3c190-79dd-5d90-a890-ed1758f3c681","title":"Environmental impact report form: BONC Industrial Internet Northern Regional Center Phase 2 2# 110 kV substation (东方国信工业互联网北方区域中心项目二期工程2#110kV变电站工程), published with the Hohhot EEB acceptance notice of 26 August 2025","publisher":"Hohhot Ecology and Environment Bureau","kind":"government_record","published_at":"2025-08-26","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/P020250826591746698166.pdf","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)"}}],"evidence":[{"evidence_id":"8a123398-5666-51b8-a2be-34d7409321f3","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"company_disclosure","title":"BONC (东方国信) corporate homepage: company introduction","source_url":"https://www.bonc.com.cn/","publisher":"BONC (东方国信; 北京东方国信科技股份有限公司)","source_family":"BONC (东方国信)","license":"all-rights-reserved","attribution":"BONC (东方国信), www.bonc.com.cn","published_at":null,"retrieved_at":"2026-10-23T01:40:55.670Z","content_hash":"843d870a750a8744e8298530ecc1a68d254653ec2119483c338d74e17833e2bc","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8a123398-5666-51b8-a2be-34d7409321f3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/8a123398-5666-51b8-a2be-34d7409321f3.json","archive_url":"https://web.archive.org/web/20261023014055/https://www.bonc.com.cn/"},{"evidence_id":"c40da912-d3b8-5082-a9a1-7c83aa34af28","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"government_record","title":"Environmental impact report form: 110 kV supply-line works for the BONC Industrial Internet Northern Regional Center project (东方国信工业互联网北方区域中心项目配套110千伏供电线路工程), published with the Hohhot EEB acceptance notice of 10 June 2025","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250611383245328713.pdf","publisher":"Hohhot Ecology and Environment Bureau","source_family":"Hohhot Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)","published_at":"2025-06-10","retrieved_at":"2026-10-23T01:37:11.590Z","content_hash":"0d8ea7f36097b81bfa2ab63858a1edfab62b3fd82d1a5337718b01fb21225d83","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c40da912-d3b8-5082-a9a1-7c83aa34af28.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c40da912-d3b8-5082-a9a1-7c83aa34af28.json","archive_url":"https://web.archive.org/web/20261023013711/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/P020250611383245328713.pdf"},{"evidence_id":"48b3c190-79dd-5d90-a890-ed1758f3c681","roles":["geometry","role:owner"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"government_record","title":"Environmental impact report form: BONC Industrial Internet Northern Regional Center Phase 2 2# 110 kV substation (东方国信工业互联网北方区域中心项目二期工程2#110kV变电站工程), published with the Hohhot EEB acceptance notice of 26 August 2025","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/P020250826591746698166.pdf","publisher":"Hohhot Ecology and Environment Bureau","source_family":"Hohhot Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)","published_at":"2025-08-26","retrieved_at":"2026-10-23T01:37:24.305Z","content_hash":"fa5305341ec1d747a0067923a8f0155d2c3ee6a2896639376211a3ac8a6d0df9","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48b3c190-79dd-5d90-a890-ed1758f3c681.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48b3c190-79dd-5d90-a890-ed1758f3c681.json","archive_url":"https://web.archive.org/web/20261023013724/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/P020250826591746698166.pdf"},{"evidence_id":"981089d7-9f0b-57fb-9255-fd58da3dc43e","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"other","title":"Esri World Imagery export: Horinger New Area Yungu area around the BONC campus (EPSG:4326, 111.800-111.822E, 40.533-40.548N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.800,40.533,111.822,40.548&bboxSR=4326&imageSR=4326&size=1400,955&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"Esri World Imagery terms of use; not redistributed","attribution":"Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)","published_at":null,"retrieved_at":"2026-10-23T01:40:28.683Z","content_hash":"13362bf7b80a7774e7fe6cb0ca29b0a9b63532f0c627e60f387fe05bc875cff8","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/981089d7-9f0b-57fb-9255-fd58da3dc43e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/981089d7-9f0b-57fb-9255-fd58da3dc43e.json","archive_url":"https://web.archive.org/web/20261023014028/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.800,40.533,111.822,40.548&bboxSR=4326&imageSR=4326&size=1400,955&format=jpg&f=image"},{"evidence_id":"aef8ca1f-7759-56cf-965e-65589da18bc8","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"government_record","title":"Hohhot EEB approval 呼环政批字〔2025〕31号 of the EIA report form for the 110 kV supply-line works of the BONC Industrial Internet Northern Regional Center project (26 June 2025)","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/jsxmhppfgs/202507/P020250703556821244637.pdf","publisher":"Hohhot Ecology and Environment Bureau","source_family":"Hohhot Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)","published_at":"2025-07-03","retrieved_at":"2026-10-23T01:35:08.269Z","content_hash":"21e60d5074dd9685fce95e6c18f9403a53b69926f2fa6b86a13d468ccb1694fa","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aef8ca1f-7759-56cf-965e-65589da18bc8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aef8ca1f-7759-56cf-965e-65589da18bc8.json","archive_url":"https://web.archive.org/web/20261023013508/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/jsxmhppfgs/202507/P020250703556821244637.pdf"},{"evidence_id":"da313433-0737-571a-850f-3c10fe2d7b66","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"government_record","title":"Hohhot EEB notice of acceptance of the EIA document for the 110 kV supply-line works of the BONC Industrial Internet Northern Regional Center project (10 June 2025)","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/t20250611_1899972.html","publisher":"Hohhot Ecology and Environment Bureau","source_family":"Hohhot Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)","published_at":"2025-06-10","retrieved_at":"2026-10-23T01:35:04.195Z","content_hash":"7fe413a1489fb95fbafe52be269c2d4c011ee023d831765e56fcb66dba018638","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/da313433-0737-571a-850f-3c10fe2d7b66.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/da313433-0737-571a-850f-3c10fe2d7b66.json","archive_url":"https://web.archive.org/web/20261023013504/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202506/t20250611_1899972.html"},{"evidence_id":"d71fd1f2-a1e9-5a36-9f19-1c7f0039ffe5","roles":["context:identity"],"project_ids":["8140cff8-04b3-5d90-a8bc-f5fb48f7af08"],"kind":"government_record","title":"Hohhot EEB notice of acceptance of the EIA document for the BONC Industrial Internet Northern Regional Center Phase 2 2# 110 kV substation (26 August 2025)","source_url":"http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/t20250826_1925590.html","publisher":"Hohhot Ecology and Environment Bureau","source_family":"Hohhot Ecology and Environment Bureau","license":"all-rights-reserved","attribution":"呼和浩特市生态环境局 (Hohhot Ecology and Environment Bureau)","published_at":"2025-08-26","retrieved_at":"2026-10-23T01:35:01.931Z","content_hash":"0ca6bb15f66376e65af7f21bfc64b02342bc0c4697ed3be2e90b2b8c5084cf2d","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-8b806f7ae4b0034de59b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d71fd1f2-a1e9-5a36-9f19-1c7f0039ffe5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/d71fd1f2-a1e9-5a36-9f19-1c7f0039ffe5.json","archive_url":"https://web.archive.org/web/20261023013501/http://sthjj.huhhot.gov.cn/ywgz/hjyxpj/xmslqk/202508/t20250826_1925590.html"},{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","roles":["context:identity","physical_status","role:operator"],"project_ids":["1dd04d18-ca1c-5a59-846b-235ebabebffa","8140cff8-04b3-5d90-a8bc-f5fb48f7af08","83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_record","title":"Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区：“三看”自贸试验区里的算力“加速度”), 10 August 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","publisher":"Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-08-10","retrieved_at":"2026-10-23T01:34:11.305Z","content_hash":"6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-23ffbb893f12f178d8d3","vcc-site-8b806f7ae4b0034de59b","vcc-site-c1888e4188c5e991f794","vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","archive_url":"https://web.archive.org/web/20261023013411/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-8b806f7ae4b0034de59b/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-8b806f7ae4b0034de59b.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-8b806f7ae4b0034de59b","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
