{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-94afbf6dc84e8a88fc00","physical_site_stable_key":"imported:semiconductor-atlas:kasi-cloud-lekki","name":"Kasi Cloud LOS campus (Lekki, Lagos)","country":"Nigeria","country_iso_a2":"NG","latitude":6.493394,"longitude":3.720668,"geometry":{"coordinates":[3.720668,6.493394],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Coordinates of Lekki from its Wikipedia article. Capacity Media places the site in the Maiyegun area of Lekki, ThisDay along the Lagos-Calabar coastal highway, and Kasi's website lists the campus in Lekki, Lagos; no exact point is published."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b"],"project_count":1,"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"project_stable_keys":["imported:semiconductor-atlas:kasi-cloud-lekki"],"statuses":["partially_operational"],"oldest_status_as_of":"2026-05-19","newest_status_as_of":"2026-05-19","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"ng","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94afbf6dc84e8a88fc00/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94afbf6dc84e8a88fc00.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Capacity Media"]},"projects":[{"project_id":"cb66229f-70db-5cfc-95b3-f5a05a3e73bc","project_stable_key":"imported:semiconductor-atlas:kasi-cloud-lekki","site_id":"vcc-site-94afbf6dc84e8a88fc00","physical_site_stable_key":"imported:semiconductor-atlas:kasi-cloud-lekki","name":"Kasi Cloud LOS campus (Lekki, Lagos)","country":"Nigeria","country_iso_a2":"NG","latitude":6.493394,"longitude":3.720668,"geometry":{"coordinates":[3.720668,6.493394],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Coordinates of Lekki from its Wikipedia article. Capacity Media places the site in the Maiyegun area of Lekki, ThisDay along the Lagos-Calabar coastal highway, and Kasi's website lists the campus in Lekki, Lagos; no exact point is published.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","last_observed_physical_status":"partially_operational","status_as_of":"2026-05-19","status_age_days_at_review":161,"status_method":"imported_documented_status","status_evidence_id":"29483830-227d-5f2c-9552-ea7a8e4a2018","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","notes":null,"party":"Kasi Cloud","relationship_scope":"unknown","role":"developer","source_record_id":"kasi-cloud-lekki"},{"evidence_id":"20040910-3ae7-5291-981e-139492623469","notes":null,"party":"Kasi Cloud","relationship_scope":"unknown","role":"developer","source_record_id":"kasi-cloud-lekki"},{"evidence_id":"29483830-227d-5f2c-9552-ea7a8e4a2018","notes":null,"party":"Kasi Cloud","relationship_scope":"unknown","role":"developer","source_record_id":"kasi-cloud-lekki"},{"evidence_id":"29483830-227d-5f2c-9552-ea7a8e4a2018","notes":null,"party":"Kasi Cloud","relationship_scope":"unknown","role":"operator","source_record_id":"kasi-cloud-lekki"},{"evidence_id":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","notes":"Capacity Media names the authority's chief executive among Kasi's key investors attending the groundbreaking.","party":"Nigeria Sovereign Investment Authority","relationship_scope":"unknown","role":"investor","source_record_id":"kasi-cloud-lekki"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":"Kasi Cloud","users":null,"tenants":null,"customers":null,"status_source_url":"https://brandspurng.com/?p=191649","geometry_source_url":"https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve Kasi Cloud LOS campus (Lekki, Lagos) as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"kasi-cloud-lekki"},"record":{"aliases":["Kasi LOS1","Kasi Cloud Lagos campus"],"id":"kasi-cloud-lekki","last_reviewed":"2026-10-09","location":{"admin1":"Lagos State","country":"NG","lat":6.493394,"locality":"Lekki","lon":3.720668,"note":"Coordinates of Lekki from its Wikipedia article. Capacity Media places the site in the Maiyegun area of Lekki, ThisDay along the Lagos-Calabar coastal highway, and Kasi's website lists the campus in Lekki, Lagos; no exact point is published.","precision":"locality","source_ids":["s1","s4","s5"]},"metrics":[{"applies_to":"campus","as_of":"2026-05-19","basis":"planned","metric":"power_capacity","note":"The dedicated substation can scale to about 100 MW of IT load; the campus is to grow progressively to this size.","power_scope":"it_load","qualifier":"approximately","source_ids":["s3"],"unit":"MW","value":100},{"applies_to":"campus","as_of":"2026-05-18","basis":"planned","metric":"power_capacity","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":100},{"applies_to":"phase","as_of":"2026-05-18","basis":"planned","metric":"power_capacity","note":"ThisDay gives 8 MW per floor and 32 MW for the four floors; Brand Spur says each floor is designed for up to 8 MW of critical load and that a single building could scale beyond 30 MW.","phase_label":"LOS1 building (four floors)","power_scope":"it_load","qualifier":"exact","source_ids":["s2","s3"],"unit":"MW","value":32},{"applies_to":"campus","as_of":"2026-05-19","basis":"announced","metric":"investment","qualifier":"approximately","source_ids":["s1","s3"],"unit":"USD","value":250000000},{"applies_to":"campus","as_of":"2022-04-20","basis":"acquired","metric":"land_area","qualifier":"approximately","source_ids":["s1"],"unit":"hectares","value":4},{"applies_to":"campus","as_of":"2026-05-18","basis":"reported","metric":"land_area","qualifier":"exact","source_ids":["s2"],"unit":"hectares","value":4.2},{"applies_to":"campus","as_of":"2026-05-18","basis":"planned","metric":"buildings","note":"LOS1 is described as the first of four facilities.","qualifier":"exact","source_ids":["s2"],"unit":"count","value":4}],"milestones":[{"date":"2022-04-19","event":"construction_started","kind":"actual","note":"Groundbreaking ceremony with the Lagos State governor as guest of honour; Capacity Media, published on 20 April 2022, dates it to the previous day.","source_ids":["s1"]},{"date":"2023-Q2","event":"other","kind":"actual","note":"Major construction works began.","source_ids":["s3"]},{"date":"2026-05","event":"first_operational","kind":"actual","note":"Brand Spur reports the first phase of LOS1 as commissioned: a 5.5 MW data hall and a 7.5 MW ecosystem floor where customers can lease from a single server to a full aisle. Kasi's website still showed the campus as coming soon in October 2026.","source_ids":["s3"]}],"name":"Kasi Cloud LOS campus (Lekki, Lagos)","notes":"Sources conflict on whether the campus is in service. Brand Spur (19 May 2026) reports that Kasi commissioned the first phase of LOS1, ThisDay (18 May 2026) only said the launch was due the next day, and Kasi's own website still listed the LOS campus (LOS1 and LOS5) under coming soon when read on 2026-10-09. The partially operational status therefore rests on a single press report. ThisDay's publication date comes from its URL. The 5.5 MW and 7.5 MW first-phase figures are kept separate and not added together.","parties":[{"name":"Kasi Cloud","role":"developer","source_ids":["s1","s2","s3"]},{"name":"Kasi Cloud","role":"operator","source_ids":["s3"]},{"name":"Nigeria Sovereign Investment Authority","note":"Capacity Media names the authority's chief executive among Kasi's key investors attending the groundbreaking.","role":"investor","source_ids":["s1"]}],"power_sources":[{"description":"Dedicated 132 kV substation for the campus.","source_ids":["s3"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2022-04-20","publisher":"Capacity Media","title":"Kasi Cloud breaks ground on first Nigeria campus","type":"trade_press","url":"https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus"},{"accessed":"2026-10-09","id":"s2","published":"2026-05-18","publisher":"ThisDay","title":"Kasi Set to Launch Hyperscale AI-ready Data Centres in Lagos","type":"news","url":"https://www.thisdaylive.com/2026/05/18/kasi-set-to-launch-hyperscale-ai-ready-data-centres-in-lagos/"},{"accessed":"2026-10-09","id":"s3","published":"2026-05-19","publisher":"Brand Spur Nigeria","title":"Kasi Cloud Commissions First Phase Of 100MW AI-Ready Hyperscale Data Centre In Lagos","type":"news","url":"https://brandspurng.com/?p=191649"},{"accessed":"2026-10-09","id":"s4","published":null,"publisher":"Kasi Cloud","title":"Kasi Cloud","type":"company","url":"https://www.kasicloud.com/"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"Wikipedia","title":"Lekki","type":"other","url":"https://en.wikipedia.org/wiki/Lekki"}],"status":"partially_operational","status_as_of":"2026-05-19","status_source_ids":["s3"],"summary":"Hyperscale, AI-ready data centre campus of Kasi Cloud on about 4 hectares in the Maiyegun area of Lekki, Lagos, Nigeria, along the Lagos-Calabar coastal highway. Kasi broke ground in April 2022 on the USD 250 million project and major construction began in the second quarter of 2023. A May 2026 press report says Kasi commissioned the first phase, a 5.5 MW data hall and a 7.5 MW shared ecosystem floor in LOS1, the first of four planned buildings, although Kasi's own website still listed the campus as coming soon in October 2026. LOS1 has four floors of up to 8 MW of critical load each, and a dedicated 132 kV substation can scale the campus to about 100 MW of IT load.","workloads":["ai_unspecified","cloud","colocation"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","s2":"20040910-3ae7-5291-981e-139492623469","s3":"29483830-227d-5f2c-9552-ea7a8e4a2018","s4":"4bdd34dc-089d-59c4-83b3-32a95d278bc3","s5":"9f45e3cb-e4f5-533b-a970-c0ebb718d877"},"source_file":"datacenters/projects/kasi-cloud-lekki.json","source_record_id":"kasi-cloud-lekki","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"994ea8e104afde12c65f813d40d155ca02a8c101e0bc1c913dc8351b5ba5abb3"}],"evidence_ids":["20040910-3ae7-5291-981e-139492623469","29483830-227d-5f2c-9552-ea7a8e4a2018","4bdd34dc-089d-59c4-83b3-32a95d278bc3","6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","9f45e3cb-e4f5-533b-a970-c0ebb718d877"],"status_source":{"evidence_id":"29483830-227d-5f2c-9552-ea7a8e4a2018","title":"Kasi Cloud Commissions First Phase Of 100MW AI-Ready Hyperscale Data Centre In Lagos","publisher":"Brand Spur Nigeria","kind":"news","published_at":"2026-05-19","source_url":"https://brandspurng.com/?p=191649","license":"source-terms-not-recorded","attribution":"Brand Spur Nigeria"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94afbf6dc84e8a88fc00/#project-cb66229f-70db-5cfc-95b3-f5a05a3e73bc","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/cb66229f-70db-5cfc-95b3-f5a05a3e73bc.json","geometry_source":{"evidence_id":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","title":"Kasi Cloud breaks ground on first Nigeria campus","publisher":"Capacity Media","kind":"trade_press","published_at":"2022-04-20","source_url":"https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus","license":"source-terms-not-recorded","attribution":"Capacity Media"}}],"evidence":[{"evidence_id":"4bdd34dc-089d-59c4-83b3-32a95d278bc3","roles":["imported:geometry","imported:record"],"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"kind":"company_disclosure","title":"Kasi Cloud","source_url":"https://www.kasicloud.com/","publisher":"Kasi Cloud","source_family":"www.kasicloud.com","license":"source-terms-not-recorded","attribution":"Kasi Cloud","published_at":null,"retrieved_at":"2026-10-09","content_hash":"92a0f0f4094898cfa424aca2a88e0aa7e465445031c5fd51a89430c28000bcb8","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"kasi-cloud-lekki","source_local_id":"s4","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","site_ids":["vcc-site-94afbf6dc84e8a88fc00"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4bdd34dc-089d-59c4-83b3-32a95d278bc3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4bdd34dc-089d-59c4-83b3-32a95d278bc3.json","archive_url":"https://web.archive.org/web/20261009/https://www.kasicloud.com/"},{"evidence_id":"6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b","roles":["imported:geometry","imported:record","metric:investment","metric:land_area","milestone:construction_started","role:developer","role:investor"],"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"kind":"trade_press","title":"Kasi Cloud breaks ground on first Nigeria campus","source_url":"https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus","publisher":"Capacity Media","source_family":"capacityglobal.com","license":"source-terms-not-recorded","attribution":"Capacity Media","published_at":"2022-04-20","retrieved_at":"2026-10-09","content_hash":"7fa916f8d457838c8ca8f8f028ef88f6821d3293b833c679b41086fe1eedee28","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"kasi-cloud-lekki","source_local_id":"s1","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","site_ids":["vcc-site-94afbf6dc84e8a88fc00"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6bd0fd8d-5b0f-51c9-a6cd-55c87d0a291b.json","archive_url":"https://web.archive.org/web/20261009/https://capacityglobal.com/article/29zq9ki6a4ua8k9zv0q9s/data-economy/kasi-cloud-breaks-ground-on-first-nigeria-campus"},{"evidence_id":"29483830-227d-5f2c-9552-ea7a8e4a2018","roles":["imported:record","imported:status","metric:investment","metric:power_capacity","milestone:first_operational","milestone:other","power_source:grid","role:developer","role:operator"],"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"kind":"news","title":"Kasi Cloud Commissions First Phase Of 100MW AI-Ready Hyperscale Data Centre In Lagos","source_url":"https://brandspurng.com/?p=191649","publisher":"Brand Spur Nigeria","source_family":"brandspurng.com","license":"source-terms-not-recorded","attribution":"Brand Spur Nigeria","published_at":"2026-05-19","retrieved_at":"2026-10-09","content_hash":"187597c18262c794fa0a61ab56a3c1fca9f3bb77500fb7b4f59353f496313429","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"kasi-cloud-lekki","source_local_id":"s3","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","site_ids":["vcc-site-94afbf6dc84e8a88fc00"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/29483830-227d-5f2c-9552-ea7a8e4a2018.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/29483830-227d-5f2c-9552-ea7a8e4a2018.json","archive_url":"https://web.archive.org/web/20261009/https://brandspurng.com/?p=191649"},{"evidence_id":"20040910-3ae7-5291-981e-139492623469","roles":["imported:record","metric:buildings","metric:land_area","metric:power_capacity","role:developer"],"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"kind":"news","title":"Kasi Set to Launch Hyperscale AI-ready Data Centres in Lagos","source_url":"https://www.thisdaylive.com/2026/05/18/kasi-set-to-launch-hyperscale-ai-ready-data-centres-in-lagos/","publisher":"ThisDay","source_family":"www.thisdaylive.com","license":"source-terms-not-recorded","attribution":"ThisDay","published_at":"2026-05-18","retrieved_at":"2026-10-09","content_hash":"5c737bbd4b4372234cb304c6f73b30616169f35a1e075b0d654c91d64c52e98e","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"kasi-cloud-lekki","source_local_id":"s2","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","site_ids":["vcc-site-94afbf6dc84e8a88fc00"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/20040910-3ae7-5291-981e-139492623469.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/20040910-3ae7-5291-981e-139492623469.json","archive_url":"https://web.archive.org/web/20261009/https://www.thisdaylive.com/2026/05/18/kasi-set-to-launch-hyperscale-ai-ready-data-centres-in-lagos/"},{"evidence_id":"9f45e3cb-e4f5-533b-a970-c0ebb718d877","roles":["imported:geometry","imported:record"],"project_ids":["cb66229f-70db-5cfc-95b3-f5a05a3e73bc"],"kind":"other","title":"Lekki","source_url":"https://en.wikipedia.org/wiki/Lekki","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"13d846862a4fe96feb6d7590d6911eb61a62a395d28993f634d6eda55feb0826","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"kasi-cloud-lekki","source_local_id":"s5","source_record_sha256":"f28323f52114c0517e3c60722514b6397a3c39996bc56c6cdaaf9597fa545f91","site_ids":["vcc-site-94afbf6dc84e8a88fc00"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f45e3cb-e4f5-533b-a970-c0ebb718d877.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9f45e3cb-e4f5-533b-a970-c0ebb718d877.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Lekki"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-94afbf6dc84e8a88fc00/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-94afbf6dc84e8a88fc00.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-94afbf6dc84e8a88fc00","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
