{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-9b9b5ef71cedda52fd47","physical_site_stable_key":"curated:coreweave-chirisa-lancaster-greenfield-road-campus","name":"CoreWeave/Chirisa Lancaster Greenfield Road Campus","country":"United States","country_iso_a2":"US","latitude":40.048690947149,"longitude":-76.25609093817,"geometry":{"coordinates":[-76.25609093817,40.048690947149],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["official_address_geocode"],"geometry_methods":["census_public_ar_current_street_range_interpolation"],"geometry_scope_classes":["official_census_address_locator_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The address identifies the adaptive-reuse property, but the Census point is not the existing shell or Phase 1 footprint."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.","geometry_evidence_ids":["6600dddb-f2d8-5458-8e71-b43f77cc5e01"],"project_count":1,"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"project_stable_keys":["curated:coreweave-chirisa-lancaster-greenfield-road-campus:phase-1-adaptive-reuse"],"statuses":["under_construction"],"oldest_status_as_of":"2026-07-22","newest_status_as_of":"2026-07-22","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b9b5ef71cedda52fd47.json","geometry_licenses":["public-domain-us-government"],"geometry_attributions":["United States Census Bureau"]},"projects":[{"project_id":"b75695b9-38e3-58ec-baf2-039179ab353a","project_stable_key":"curated:coreweave-chirisa-lancaster-greenfield-road-campus:phase-1-adaptive-reuse","site_id":"vcc-site-9b9b5ef71cedda52fd47","physical_site_stable_key":"curated:coreweave-chirisa-lancaster-greenfield-road-campus","name":"CoreWeave/Chirisa Lancaster Greenfield Phase 1 Adaptive-Reuse Project","country":"United States","country_iso_a2":"US","latitude":40.048690947149,"longitude":-76.25609093817,"geometry":{"coordinates":[-76.25609093817,40.048690947149],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"official_address_geocode","geometry_method":"census_public_ar_current_street_range_interpolation","geometry_scope_class":"official_census_address_locator_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Official Census Public_AR_Current address-match point used only to locate the source-linked parent campus. Street-range interpolation can differ from a parcel, building, entrance, or surveyed position. The address identifies the adaptive-reuse property, but the Census point is not the existing shell or Phase 1 footprint.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The captured Census match supplies no bounded horizontal-accuracy value, and a street-range interpolation point is not asserted to fall within the campus, parcel, building, or project extent.","geometry_evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","last_observed_physical_status":"under_construction","status_as_of":"2026-07-22","status_age_days_at_review":97,"status_method":"authoritative_physical_status_update","status_evidence_id":"0eb488ab-3c0c-5223-86d8-2b47a96e7476","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by the v0.12 address-locator batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed project power observation selected by this batch; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://chirisatechnologyparks.com/","geometry_source_url":"https://geocoding.geo.census.gov/geocoder/","project_details":[{"identity_decision":{"decision":"multi_site_program","flags":["administrative_locator_not_project_geometry","multiple_sites_no_single_map_point"],"rationale":"Source explicitly bundles Greenfield Road phase 1/phase 2 and a planned Harrisburg Pike site. Only the Greenfield Phase 1 adaptive-reuse project is in the current release; attach the broad source as program context, retain Harrisburg Pike as an unmapped component, and do not treat a Lancaster city centroid as either site.","related_project_stable_keys":["curated:coreweave-chirisa-lancaster-greenfield-road-campus:phase-1-adaptive-reuse"],"source_record_id":"coreweave-lancaster-pennsylvania","unmapped_components":[{"name":"1375 Harrisburg Pike planned site","reason":"Explicit separate address in source summary; not geocoded and no matching current release project."}]},"record":{"aliases":["Lancaster AI Hub","Lancaster East data center"],"id":"coreweave-lancaster-pennsylvania","last_reviewed":"2026-10-09","location":{"admin1":"Pennsylvania","admin2":"Lancaster County","country":"US","lat":40.0397,"locality":"Lancaster","lon":-76.3044,"note":"City centroid from Wikipedia (s5). Sources give addresses at 216 Greenfield Road and 1375 Harrisburg Pike, but these were not geocoded, so the point is the city centroid rather than either site.","precision":"locality","source_ids":["s1","s2","s4","s5"]},"metrics":[{"applies_to":"campus","as_of":"2025-07-15","basis":"announced","metric":"investment","note":"CoreWeave's intent to commit funds to equip the data center, as worded in its newsroom copy of the announcement.","qualifier":"more_than","source_ids":["s1"],"unit":"USD","value":6000000000},{"applies_to":"campus","as_of":"2025-07-15","basis":"announced","metric":"investment","note":"The investor-relations copy of the same July 15, 2025 announcement words the commitment as up to 6 billion US dollars rather than more than 6 billion.","qualifier":"up_to","source_ids":["s6"],"unit":"USD","value":6000000000},{"applies_to":"campus","as_of":"2025-09-16","basis":"reported","metric":"investment","note":"Joint venture funding from Blue Owl-managed funds and affiliates of Chirisa Technology Parks and Machine Investment Group.","qualifier":"exact","source_ids":["s3"],"unit":"USD","value":4000000000},{"applies_to":"campus","as_of":"2025-10-19","basis":"reported","metric":"investment","note":"Total cost of the Lancaster AI Hub across the Greenfield Road and Harrisburg Pike sites as reported by LNP.","qualifier":"exact","source_ids":["s4"],"unit":"USD","value":10000000000},{"applies_to":"phase","as_of":"2025-10-19","basis":"reported","metric":"investment","note":"Cost to build and equip, including computer equipment.","phase_label":"Phase two","qualifier":"up_to","source_ids":["s4"],"unit":"USD","value":2500000000},{"applies_to":"phase","as_of":"2025-07-15","basis":"planned","metric":"power_capacity","phase_label":"Initial capacity","power_scope":"unspecified","qualifier":"exact","source_ids":["s1"],"unit":"MW","value":100},{"applies_to":"campus","as_of":"2025-07-15","basis":"planned","metric":"power_capacity","note":"Potential expansion.","power_scope":"unspecified","qualifier":"up_to","source_ids":["s1"],"unit":"MW","value":300},{"applies_to":"phase","as_of":"2025-08-08","basis":"planned","metric":"floor_area","phase_label":"Phase one (216 Greenfield Road)","qualifier":"exact","source_ids":["s2"],"unit":"sq_ft","value":450000},{"applies_to":"phase","as_of":"2025-10-19","basis":"planned","metric":"floor_area","note":"Two-story new building.","phase_label":"Phase two","qualifier":"exact","source_ids":["s4"],"unit":"sq_ft","value":735128},{"applies_to":"campus","as_of":"2025-07-15","basis":"planned","metric":"jobs_construction","qualifier":"approximately","source_ids":["s1"],"unit":"count","value":600},{"applies_to":"campus","as_of":"2025-07-15","basis":"planned","metric":"jobs_permanent","note":"About 70 at launch, growing to about 175 over time.","qualifier":"approximately","source_ids":["s1"],"unit":"count","value":175}],"milestones":[{"date":"2025-07-15","event":"announced","kind":"actual","note":"Announced at the Pennsylvania Energy and Innovation Summit in Pittsburgh.","source_ids":["s1"]},{"date":"2025","event":"construction_started","kind":"actual","note":"Demolition at the Greenfield Road phase one site was underway by early August 2025, and phase one was described as under construction in October 2025; it needed no land development plan because it reuses an existing building footprint.","source_ids":["s2","s4"]},{"date":"2025-09-16","event":"other","kind":"actual","note":"4 billion US dollar joint venture with Blue Owl-managed funds announced.","source_ids":["s3"]},{"date":"2027","event":"first_operational","kind":"planned","note":"Phase one completion targeted for summer 2027.","source_ids":["s2"]},{"date":"2027","event":"other","kind":"planned","note":"Developer said phase two could be online by mid to late 2027, pending city planning commission land development approval.","source_ids":["s4"]}],"name":"CoreWeave Lancaster AI data center (Lancaster AI Hub)","notes":"CoreWeave's two published copies of its July 15, 2025 announcement differ: the newsroom copy says more than 6 billion US dollars and the investor-relations copy says up to 6 billion; both are recorded. LNP puts the whole Lancaster AI Hub at 10 billion US dollars, a figure that may include equipment and both sites.","parties":[{"name":"Chirisa Technology Parks","role":"developer","source_ids":["s1","s3","s4"]},{"name":"Machine Investment Group","note":"Named as co-developer in CoreWeave's announcement.","role":"developer","source_ids":["s1","s4"]},{"name":"Machine Investment Group","note":"Joint venture partner in the 4 billion US dollar funding.","role":"investor","source_ids":["s3"]},{"name":"Blue Owl Capital","note":"Funds managed by Blue Owl are joint venture partners.","role":"investor","source_ids":["s3"]},{"name":"CoreWeave","role":"tenant","source_ids":["s1","s3","s4"]},{"name":"CoreWeave","note":"Described as having invested in the campus.","role":"investor","source_ids":["s3"]},{"name":"PPL","note":"A new PPL substation and switchyard are proposed next to the phase two building.","role":"utility","source_ids":["s4"]}],"power_sources":[{"description":"Grid supply from PPL with a proposed new substation and switchyard; the developer says it is spending 200 million US dollars on grid upgrades.","source_ids":["s4"],"type":"grid"},{"description":"Backup generators for power outages, located mainly between the two Greenfield Road buildings; the fuel is not stated.","source_ids":["s4"],"type":"other"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-07-15","publisher":"CoreWeave","title":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania","type":"company","url":"https://coreweave.com/news/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania"},{"accessed":"2026-10-09","id":"s2","published":"2025-08-08","publisher":"Government Technology (LNP via Tribune Content Agency)","title":"Lancaster, Pa., Hearing to Revisit Data Center Zoning Decision","type":"news","url":"https://www.govtech.com/products/lancaster-pa-hearing-to-revisit-data-center-zoning-decision"},{"accessed":"2026-10-09","id":"s3","published":"2025-09-16","publisher":"Holland & Knight","title":"Holland & Knight Advises Chirisa Technology Parks in $4 Billion Joint Venture Partnership for Lancaster Campus","type":"other","url":"https://www.hklaw.com/en/news/pressreleases/2025/09/hk-advises-chirisa-technology-parks-in-4-billion-joint-venture"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260911180724/https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/","id":"s4","published":"2025-10-19","publisher":"WITF (LNP | LancasterOnline)","title":"Data center's second phase expected to cost up to $2.5 billion in Lancaster County","type":"news","url":"https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"Wikipedia","title":"Lancaster, Pennsylvania","type":"other","url":"https://en.wikipedia.org/wiki/Lancaster,_Pennsylvania"},{"accessed":"2026-10-09","id":"s6","published":"2025-07-15","publisher":"CoreWeave","title":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania","type":"company","url":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"}],"status":"under_construction","status_as_of":"2025-10-19","status_source_ids":["s4"],"summary":"AI data center development in Lancaster, Pennsylvania, on former LSC Communications printing plant sites, co-developed by Chirisa Technology Parks and Machine Investment Group with CoreWeave as tenant. In July 2025 CoreWeave said it intended to commit about 6 billion US dollars to equip an initial 100 MW facility expandable to 300 MW. Phase one reuses the plant at 216 Greenfield Road and was under construction by October 2025, targeting summer 2027. A new-build phase two of about 735,000 sq ft needed city land development approval; a site at 1375 Harrisburg Pike is also planned. A 4 billion US dollar joint venture with Blue Owl funds the campus.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"3d8d0c3d-24da-5903-a27e-3ace4ec4925f","s2":"5342973f-d3b5-594a-a7b3-6444d43094b8","s3":"b5d3e30a-4c1d-55a6-a4a7-fe480b54fcbd","s4":"2ddfa1d8-0a27-58a7-bc6a-1086d024ffa7","s5":"6185f0c2-f590-51d1-ab06-be2e0377a546","s6":"3055e2e6-d496-5e2a-9537-aa0e26047f25"},"source_file":"datacenters/projects/coreweave-lancaster-pennsylvania.json","source_record_id":"coreweave-lancaster-pennsylvania","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"a356ca1ca775478ada1545334dce0cb31ac058488deb6e1e43780d99e5f75f91"}],"evidence_ids":["0eb488ab-3c0c-5223-86d8-2b47a96e7476","2ddfa1d8-0a27-58a7-bc6a-1086d024ffa7","3055e2e6-d496-5e2a-9537-aa0e26047f25","3d8d0c3d-24da-5903-a27e-3ace4ec4925f","5342973f-d3b5-594a-a7b3-6444d43094b8","6185f0c2-f590-51d1-ab06-be2e0377a546","6600dddb-f2d8-5458-8e71-b43f77cc5e01","b5d3e30a-4c1d-55a6-a4a7-fe480b54fcbd"],"status_source":{"evidence_id":"0eb488ab-3c0c-5223-86d8-2b47a96e7476","title":"Chirisa Technology Parks data center locations","publisher":"Chirisa Technology Parks","kind":"company_disclosure","published_at":null,"source_url":"https://chirisatechnologyparks.com/","license":"all-rights-reserved","attribution":"Chirisa Technology Parks"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/#project-b75695b9-38e3-58ec-baf2-039179ab353a","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/b75695b9-38e3-58ec-baf2-039179ab353a.json","geometry_source":{"evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","title":"United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch","publisher":"United States Census Bureau","kind":"government_record","published_at":null,"source_url":"https://geocoding.geo.census.gov/geocoder/","license":"public-domain-us-government","attribution":"United States Census Bureau"}}],"evidence":[{"evidence_id":"0eb488ab-3c0c-5223-86d8-2b47a96e7476","roles":["context:campus_address_identity","physical_status"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"company_disclosure","title":"Chirisa Technology Parks data center locations","source_url":"https://chirisatechnologyparks.com/","publisher":"Chirisa Technology Parks","source_family":"chirisa_technology_parks_locations","license":"all-rights-reserved","attribution":"Chirisa Technology Parks","published_at":null,"retrieved_at":"2026-07-22T01:27:58Z","content_hash":"6217db82caf16b110532ddd7ef4a4888f1803a8d590d4920289394b29392cdf3","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0eb488ab-3c0c-5223-86d8-2b47a96e7476.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0eb488ab-3c0c-5223-86d8-2b47a96e7476.json","archive_url":"https://web.archive.org/web/20260722012758/https://chirisatechnologyparks.com/"},{"evidence_id":"3055e2e6-d496-5e2a-9537-aa0e26047f25","roles":["context:multi_site_program","imported:record","metric:investment"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"company_disclosure","title":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania","source_url":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx","publisher":"CoreWeave","source_family":"investors.coreweave.com","license":"source-terms-not-recorded","attribution":"CoreWeave","published_at":"2025-07-15","retrieved_at":"2026-10-09","content_hash":"193bd3bbbc77a9e72fafc48c2bd628cf4de8e3fcf39ffd47700de7e67b743ca6","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s6","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3055e2e6-d496-5e2a-9537-aa0e26047f25.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3055e2e6-d496-5e2a-9537-aa0e26047f25.json","archive_url":"https://web.archive.org/web/20261009/https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"},{"evidence_id":"3d8d0c3d-24da-5903-a27e-3ace4ec4925f","roles":["context:multi_site_program","imported:geometry","imported:record","metric:investment","metric:jobs_construction","metric:jobs_permanent","metric:power_capacity","milestone:announced","role:developer","role:tenant"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"company_disclosure","title":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania","source_url":"https://coreweave.com/news/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania","publisher":"CoreWeave","source_family":"coreweave.com","license":"source-terms-not-recorded","attribution":"CoreWeave","published_at":"2025-07-15","retrieved_at":"2026-10-09","content_hash":"3be2df33a24bd0edd66b48c068023e3c3d894e8f35b6d4fb76b41e7b722fb0d7","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s1","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3d8d0c3d-24da-5903-a27e-3ace4ec4925f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3d8d0c3d-24da-5903-a27e-3ace4ec4925f.json","archive_url":"https://web.archive.org/web/20261009/https://coreweave.com/news/coreweave-announces-multi-billion-dollar-commitment-to-ai-infrastructure-in-pennsylvania"},{"evidence_id":"2ddfa1d8-0a27-58a7-bc6a-1086d024ffa7","roles":["context:multi_site_program","imported:geometry","imported:record","imported:status","metric:floor_area","metric:investment","milestone:construction_started","milestone:other","power_source:grid","power_source:other","role:developer","role:tenant","role:utility"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"news","title":"Data center's second phase expected to cost up to $2.5 billion in Lancaster County","source_url":"https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/","publisher":"WITF (LNP | LancasterOnline)","source_family":"www.witf.org","license":"source-terms-not-recorded","attribution":"WITF (LNP | LancasterOnline)","published_at":"2025-10-19","retrieved_at":"2026-10-09","content_hash":"ec2509437e139b284b0e32f312afdddfeefe5ab9157ec4183b0855eca61a934b","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s4","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2ddfa1d8-0a27-58a7-bc6a-1086d024ffa7.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2ddfa1d8-0a27-58a7-bc6a-1086d024ffa7.json","archive_url":"https://web.archive.org/web/20261009/https://www.witf.org/2025/10/19/data-centers-second-phase-expected-to-cost-up-to-2-5-billion-in-lancaster-county/"},{"evidence_id":"b5d3e30a-4c1d-55a6-a4a7-fe480b54fcbd","roles":["context:multi_site_program","imported:record","metric:investment","milestone:other","role:developer","role:investor","role:tenant"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"other","title":"Holland & Knight Advises Chirisa Technology Parks in $4 Billion Joint Venture Partnership for Lancaster Campus","source_url":"https://www.hklaw.com/en/news/pressreleases/2025/09/hk-advises-chirisa-technology-parks-in-4-billion-joint-venture","publisher":"Holland & Knight","source_family":"www.hklaw.com","license":"source-terms-not-recorded","attribution":"Holland & Knight","published_at":"2025-09-16","retrieved_at":"2026-10-09","content_hash":"3f23f922af1ddd43e8578478c38a82e21d1e8800c2394f09a28408a26f626e3a","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s3","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5d3e30a-4c1d-55a6-a4a7-fe480b54fcbd.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5d3e30a-4c1d-55a6-a4a7-fe480b54fcbd.json","archive_url":"https://web.archive.org/web/20261009/https://www.hklaw.com/en/news/pressreleases/2025/09/hk-advises-chirisa-technology-parks-in-4-billion-joint-venture"},{"evidence_id":"5342973f-d3b5-594a-a7b3-6444d43094b8","roles":["context:multi_site_program","imported:geometry","imported:record","metric:floor_area","milestone:construction_started","milestone:first_operational"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"news","title":"Lancaster, Pa., Hearing to Revisit Data Center Zoning Decision","source_url":"https://www.govtech.com/products/lancaster-pa-hearing-to-revisit-data-center-zoning-decision","publisher":"Government Technology (LNP via Tribune Content Agency)","source_family":"www.govtech.com","license":"source-terms-not-recorded","attribution":"Government Technology (LNP via Tribune Content Agency)","published_at":"2025-08-08","retrieved_at":"2026-10-09","content_hash":"90562201b5441202e32685e3943eb976100b20781a9526eb39f7e73d597ed864","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s2","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5342973f-d3b5-594a-a7b3-6444d43094b8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5342973f-d3b5-594a-a7b3-6444d43094b8.json","archive_url":"https://web.archive.org/web/20261009/https://www.govtech.com/products/lancaster-pa-hearing-to-revisit-data-center-zoning-decision"},{"evidence_id":"6185f0c2-f590-51d1-ab06-be2e0377a546","roles":["context:multi_site_program","imported:geometry","imported:record"],"project_ids":["b75695b9-38e3-58ec-baf2-039179ab353a"],"kind":"other","title":"Lancaster, Pennsylvania","source_url":"https://en.wikipedia.org/wiki/Lancaster,_Pennsylvania","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"c53ac8935dc3976dd5177444586e9e41adf4aaafb9d688c41b861d785b3e40fc","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"coreweave-lancaster-pennsylvania","source_local_id":"s5","source_record_sha256":"3da7b985dea6aab54b6d7610b08c127892b84b6825d60e166f63e4d3b65a78de","site_ids":["vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6185f0c2-f590-51d1-ab06-be2e0377a546.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6185f0c2-f590-51d1-ab06-be2e0377a546.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Lancaster,_Pennsylvania"},{"evidence_id":"6600dddb-f2d8-5458-8e71-b43f77cc5e01","roles":["geometry"],"project_ids":["5b758548-2a2a-5643-9ebb-d8381bbd2c52","938feeec-a323-56e0-b6ce-2590fe58e623","9ddf0df3-e40c-515f-9468-ed78f063513b","b75695b9-38e3-58ec-baf2-039179ab353a","ba5ddf33-10ec-5fb8-b880-98a04df096b8"],"kind":"government_record","title":"United States Census Geocoder Public_AR_Current exact-address matches for the v0.12 locator batch","source_url":"https://geocoding.geo.census.gov/geocoder/","publisher":"United States Census Bureau","source_family":"us_census_geocoder","license":"public-domain-us-government","attribution":"United States Census Bureau","published_at":null,"retrieved_at":"2026-08-23","content_hash":"db625d4738dc9a0eed46bd54216090509b1882f16c8b57578f43ac0fa76b0905","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-382d4c7030c7ed7c700d","vcc-site-77fa0d95d9c7ed1b2168","vcc-site-85b3549bb55293336132","vcc-site-86c96db92481ee74998d","vcc-site-9b9b5ef71cedda52fd47"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6600dddb-f2d8-5458-8e71-b43f77cc5e01.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6600dddb-f2d8-5458-8e71-b43f77cc5e01.json","archive_url":"https://web.archive.org/web/20260823/https://geocoding.geo.census.gov/geocoder/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9b9b5ef71cedda52fd47/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9b9b5ef71cedda52fd47.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-9b9b5ef71cedda52fd47","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
