{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-9da1382c1df4f319ef97","physical_site_stable_key":"imported:semiconductor-atlas:google-armstrong-county-texas","name":"Google Armstrong County data center campus (Crusoe Goodnight)","country":"United States","country_iso_a2":"US","latitude":35.1081,"longitude":-101.3627,"geometry":{"coordinates":[-101.3627,35.1081],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Town centroid of Claude via Nominatim. Sources place the roughly 1,300-acre site near Claude but give no street address."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["ed446beb-064d-5891-bbfb-502f3438c893"],"project_count":1,"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"project_stable_keys":["imported:semiconductor-atlas:google-armstrong-county-texas"],"statuses":["under_construction"],"oldest_status_as_of":"2026-10-09","newest_status_as_of":"2026-10-09","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9da1382c1df4f319ef97/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9da1382c1df4f319ef97.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["ABC 7 Amarillo"]},"projects":[{"project_id":"b7d85afa-fbc0-53d6-b19c-6e00c6639642","project_stable_key":"imported:semiconductor-atlas:google-armstrong-county-texas","site_id":"vcc-site-9da1382c1df4f319ef97","physical_site_stable_key":"imported:semiconductor-atlas:google-armstrong-county-texas","name":"Google Armstrong County data center campus (Crusoe Goodnight)","country":"United States","country_iso_a2":"US","latitude":35.1081,"longitude":-101.3627,"geometry":{"coordinates":[-101.3627,35.1081],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Town centroid of Claude via Nominatim. Sources place the roughly 1,300-acre site near Claude but give no street address.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"ed446beb-064d-5891-bbfb-502f3438c893","last_observed_physical_status":"under_construction","status_as_of":"2026-10-09","status_age_days_at_review":18,"status_method":"authoritative_physical_status_update","status_evidence_id":"32c06c0b-718f-58db-9729-8c63560fb628","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"ed446beb-064d-5891-bbfb-502f3438c893","notes":null,"party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"aeea7f42-4fac-59bd-b8b4-d1450000e9bb","notes":null,"party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"4f42a20e-1e5c-5115-8ef5-df80760dabe7","notes":null,"party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"48027b42-f0c8-5325-adfe-bbb6f550e307","notes":null,"party":"Crusoe","relationship_scope":"unknown","role":"developer","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"aeea7f42-4fac-59bd-b8b4-d1450000e9bb","notes":"Crusoe affiliate listed as owner in 2026 Texas Department of Licensing and Regulation filings for two new buildings; those filings name no tenant.","party":"GN DC1 LLC","relationship_scope":"unknown","role":"owner","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"9c8656c4-0869-5925-9cac-19532dbf05b9","notes":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","party":"Google","relationship_scope":"unknown","role":"tenant","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"ed446beb-064d-5891-bbfb-502f3438c893","notes":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","party":"Google","relationship_scope":"unknown","role":"tenant","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"c405c84e-2372-5bc8-9028-a06ce4e97111","notes":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","party":"Google","relationship_scope":"unknown","role":"tenant","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"4f42a20e-1e5c-5115-8ef5-df80760dabe7","notes":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","party":"Google","relationship_scope":"unknown","role":"tenant","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"48027b42-f0c8-5325-adfe-bbb6f550e307","notes":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","party":"Google","relationship_scope":"unknown","role":"tenant","source_record_id":"google-armstrong-county-texas"},{"evidence_id":"4f42a20e-1e5c-5115-8ef5-df80760dabe7","notes":"Owner of the operating Goodnight 1 wind farm, one of the two adjacent wind farms the campus is linked to.","party":"Serena","relationship_scope":"unknown","role":"power_supplier","source_record_id":"google-armstrong-county-texas"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"GN DC1 LLC","operator":null,"users":null,"tenants":"Google","customers":null,"status_source_url":"https://www.crusoe.ai/resources/blog/building-community-in-texas","geometry_source_url":"https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve Google Armstrong County data center campus (Crusoe Goodnight) as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"google-armstrong-county-texas"},"record":{"aliases":["Goodnight campus","Project Goodnight"],"id":"google-armstrong-county-texas","last_reviewed":"2026-10-09","location":{"admin1":"Texas","admin2":"Armstrong County","country":"US","lat":35.1081,"locality":"Claude","lon":-101.3627,"note":"Town centroid of Claude via Nominatim. Sources place the roughly 1,300-acre site near Claude but give no street address.","precision":"locality","source_ids":["s2","s4"]},"metrics":[{"applies_to":"phase","as_of":"2026-07-31","basis":"planned","metric":"power_capacity","note":"From an Armstrong County tax abatement agreement, which also describes four 25 MW data halls per building.","phase_label":"Phase 1 (four buildings)","power_scope":"unspecified","qualifier":"up_to","source_ids":["s3","s4"],"unit":"MW","value":530},{"applies_to":"phase","as_of":"2025-12-15","basis":"planned","metric":"power_capacity","note":"From earlier tax abatement materials as summarized by New Project Media; newer amended filings omit project details.","phase_label":"Phase 2 (three buildings)","power_scope":"unspecified","qualifier":"exact","source_ids":["s3"],"unit":"MW","value":500},{"applies_to":"campus","as_of":"2025-12-15","basis":"planned","metric":"power_capacity","note":"Two-phase campus total from earlier tax abatement materials as summarized by New Project Media; the layout may be redrawn.","power_scope":"unspecified","qualifier":"exact","source_ids":["s3"],"unit":"MW","value":1030},{"applies_to":"campus","as_of":"2025-12-15","basis":"reported","metric":"investment","note":"Figure from earlier tax abatement materials and prior New Project Media reporting, not from the amended filings.","qualifier":"exact","source_ids":["s3"],"unit":"USD","value":29000000000},{"applies_to":"phase","as_of":"2026-07-31","basis":"reported","metric":"investment","note":"Estimated construction cost of about $500 million per building, each roughly 805,000 sq ft; estimates may change.","phase_label":"Two new buildings (Buildings 3 and 4) in 2026 state filings","qualifier":"approximately","source_ids":["s4"],"unit":"USD","value":1000000000},{"applies_to":"campus","as_of":"2026-07-31","basis":"planned","metric":"buildings","qualifier":"at_least","source_ids":["s4"],"unit":"count","value":6},{"applies_to":"campus","as_of":"2025-11-24","basis":"reported","metric":"land_area","qualifier":"approximately","source_ids":["s2"],"unit":"acres","value":1300},{"applies_to":"campus","as_of":"2025-11-24","basis":"planned","metric":"jobs_permanent","note":"The county judge said the facility is expected to employ 80 to 100 people once running.","qualifier":"range","source_ids":["s2"],"unit":"count","value":80,"value_high":100},{"applies_to":"campus","as_of":"2026-10-01","basis":"reported","metric":"jobs_construction","note":"Workers on site daily, per Crusoe.","qualifier":"more_than","source_ids":["s5"],"unit":"count","value":5500}],"milestones":[{"date":"2025-05","event":"construction_started","kind":"actual","note":"Local TV reported that Crusoe had been building since May 2025.","source_ids":["s2"]},{"date":"2025-06","event":"construction_started","kind":"actual","note":"Crusoe's account dates the groundbreaking to June 2025, a month later than the local report.","source_ids":["s5"]},{"date":"2025-11-14","event":"announced","kind":"actual","note":"Google named Armstrong County as a new campus location in its Texas investment announcement.","source_ids":["s1"]},{"date":"2026-01","event":"other","kind":"actual","note":"Permit application for a 933 MW natural gas plant to serve two buildings behind the meter; Google said it had not agreed to buy the plant's output.","source_ids":["s5"]},{"date":"2026-09-28","event":"other","kind":"actual","note":"Crusoe publicly confirmed Google as the campus end user.","source_ids":["s5"]},{"date":"2028-Q4","event":"fully_operational","kind":"planned","note":"Completion expected in late 2028 or early 2029 per the county judge.","source_ids":["s2"]}],"name":"Google Armstrong County data center campus (Crusoe Goodnight)","notes":"Google's $40 billion Texas figure runs through 2027 and covers new campuses in Armstrong and Haskell Counties among other spending; it is not recorded here as a campus investment. Phase and campus MW figures come from tax abatement materials and are not added together. One state filing gave Building 3 an August 1 completion date (year not stated, presumably 2026) and Building 4 a March 2027 date. New Project Media's article was first published for subscribers; the date used is that of its public posting.","parties":[{"name":"Crusoe","role":"developer","source_ids":["s2","s4","s5","s6"]},{"name":"GN DC1 LLC","note":"Crusoe affiliate listed as owner in 2026 Texas Department of Licensing and Regulation filings for two new buildings; those filings name no tenant.","role":"owner","source_ids":["s4"]},{"name":"Google","note":"Described as the tenant or end user. Google names Armstrong County as a new campus location in its Texas investment program. New Project Media reported that Crusoe agreed to sell the project to Google; Google did not respond and Crusoe declined to comment, so the sale is unconfirmed.","role":"tenant","source_ids":["s1","s2","s3","s5","s6"]},{"name":"Serena","note":"Owner of the operating Goodnight 1 wind farm, one of the two adjacent wind farms the campus is linked to.","role":"power_supplier","source_ids":["s5"]}],"power_sources":[{"description":"Linked to the adjacent Goodnight wind farms: Goodnight 1 (265.5 MW, operating) and Goodnight 2 (similar size, under construction), about 531 MW combined; surplus output returns to the grid.","source_ids":["s5","s6"],"type":"wind"},{"description":"Amended abatement filings added gas turbines; a January 2026 application sought a 933 MW gas plant serving two buildings without a grid tie. It is a proposal, and Google has not agreed to buy its power.","source_ids":["s3","s5"],"type":"natural_gas_onsite"},{"description":"Battery storage was added to the power plan in amended Armstrong County tax abatement filings.","source_ids":["s3"],"type":"battery_storage"},{"description":"The county judge said the data center would draw from the ERCOT grid, although the county itself is served through the Southwest Power Pool.","source_ids":["s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2025-11-14","publisher":"Google","title":"Google's investments run deep in the heart of Texas","type":"company","url":"https://blog.google/inside-google/company-announcements/google-american-innovation-texas/"},{"accessed":"2026-10-09","id":"s2","published":"2025-11-24","publisher":"ABC 7 Amarillo","title":"Google announces new data center in Armstrong County, Texas","type":"news","url":"https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260514080205/https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/","id":"s3","published":"2025-12-15","publisher":"New Project Media","title":"ORIGINATION: Crusoe adds natural gas, storage to Texas Panhandle energy mix as project shifts to Google ownership","type":"trade_press","url":"https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260927131459/https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight","id":"s4","published":"2026-07-31","publisher":"TheEnergyMag","title":"Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power","type":"trade_press","url":"https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261003152915/https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link","id":"s5","published":"2026-10-01","publisher":"Baxtel","title":"Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link","type":"trade_press","url":"https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link"},{"accessed":"2026-10-09","id":"s6","published":"2026-10-01","publisher":"The Tech Capital","title":"Google taps Crusoe for new Texas AI data centre campus","type":"trade_press","url":"https://thetechcapital.com/google-taps-crusoe-for-new-texas-ai-data-centre-campus/"}],"status":"under_construction","status_as_of":"2026-10-01","status_source_ids":["s4","s5"],"summary":"AI data center campus near Claude, Armstrong County, in the Texas Panhandle, being developed by Crusoe on about 1,300 acres beside the Goodnight wind farms. Google named Armstrong County as a new campus site in its November 2025 Texas program ($40 billion statewide through 2027), and Crusoe confirmed Google as the end user in September 2026. County tax abatement materials described a first phase of four buildings drawing up to 530 MW, within a two-phase 1,030 MW design. State filings in 2026 added two buildings of about 805,000 sq ft each, together estimated at $1 billion. Amended filings added gas turbines and battery storage, and one report says Crusoe agreed to sell the project to Google.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"9c8656c4-0869-5925-9cac-19532dbf05b9","s2":"ed446beb-064d-5891-bbfb-502f3438c893","s3":"c405c84e-2372-5bc8-9028-a06ce4e97111","s4":"aeea7f42-4fac-59bd-b8b4-d1450000e9bb","s5":"4f42a20e-1e5c-5115-8ef5-df80760dabe7","s6":"48027b42-f0c8-5325-adfe-bbb6f550e307"},"source_file":"datacenters/projects/google-armstrong-county-texas.json","source_record_id":"google-armstrong-county-texas","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"0c7f0624ec1a0b34a9cc12a70a1d339937093460edf1399776a95394fe95aa87"}],"evidence_ids":["32c06c0b-718f-58db-9729-8c63560fb628","48027b42-f0c8-5325-adfe-bbb6f550e307","4f42a20e-1e5c-5115-8ef5-df80760dabe7","9c8656c4-0869-5925-9cac-19532dbf05b9","aeea7f42-4fac-59bd-b8b4-d1450000e9bb","c405c84e-2372-5bc8-9028-a06ce4e97111","ed446beb-064d-5891-bbfb-502f3438c893"],"status_source":{"evidence_id":"32c06c0b-718f-58db-9729-8c63560fb628","title":"Building community in the Lone Star State (Crusoe blog, 9 October 2026)","publisher":"Crusoe","kind":"company_disclosure","published_at":"2026-10-09","source_url":"https://www.crusoe.ai/resources/blog/building-community-in-texas","license":"all-rights-reserved","attribution":"Crusoe"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9da1382c1df4f319ef97/#project-b7d85afa-fbc0-53d6-b19c-6e00c6639642","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/b7d85afa-fbc0-53d6-b19c-6e00c6639642.json","geometry_source":{"evidence_id":"ed446beb-064d-5891-bbfb-502f3438c893","title":"Google announces new data center in Armstrong County, Texas","publisher":"ABC 7 Amarillo","kind":"news","published_at":"2025-11-24","source_url":"https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas","license":"source-terms-not-recorded","attribution":"ABC 7 Amarillo"}}],"evidence":[{"evidence_id":"32c06c0b-718f-58db-9729-8c63560fb628","roles":["physical_status"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"company_disclosure","title":"Building community in the Lone Star State (Crusoe blog, 9 October 2026)","source_url":"https://www.crusoe.ai/resources/blog/building-community-in-texas","publisher":"Crusoe","source_family":"crusoe_official","license":"all-rights-reserved","attribution":"Crusoe","published_at":"2026-10-09","retrieved_at":"2026-10-26T19:42:05.351Z","content_hash":"e1246beb35411e2c571ea96ae81f95c342f363596840c1a191a515ab767f11b3","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/32c06c0b-718f-58db-9729-8c63560fb628.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/32c06c0b-718f-58db-9729-8c63560fb628.json","archive_url":"https://web.archive.org/web/20261026194205/https://www.crusoe.ai/resources/blog/building-community-in-texas"},{"evidence_id":"4f42a20e-1e5c-5115-8ef5-df80760dabe7","roles":["imported:record","imported:status","metric:jobs_construction","milestone:construction_started","milestone:other","power_source:natural_gas_onsite","power_source:wind","role:developer","role:power_supplier","role:tenant"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"trade_press","title":"Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link","source_url":"https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link","publisher":"Baxtel","source_family":"baxtel.com","license":"source-terms-not-recorded","attribution":"Baxtel","published_at":"2026-10-01","retrieved_at":"2026-10-09","content_hash":"e698676f3a337b69fc20144efcb4beb3704e5b34516cbe03ce27dde9167ae65a","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s5","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4f42a20e-1e5c-5115-8ef5-df80760dabe7.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4f42a20e-1e5c-5115-8ef5-df80760dabe7.json","archive_url":"https://web.archive.org/web/20261009/https://baxtel.com/news/crusoe-confirms-google-ai-campus-in-texas-with-531mw-wind-link"},{"evidence_id":"aeea7f42-4fac-59bd-b8b4-d1450000e9bb","roles":["imported:geometry","imported:record","imported:status","metric:buildings","metric:investment","metric:power_capacity","role:developer","role:owner"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"trade_press","title":"Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power","source_url":"https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight","publisher":"TheEnergyMag","source_family":"theenergymag.com","license":"source-terms-not-recorded","attribution":"TheEnergyMag","published_at":"2026-07-31","retrieved_at":"2026-10-09","content_hash":"b4629c85764717647908f59268c1104dab7dae0b080619f1bebd1d6920c6f57a","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s4","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aeea7f42-4fac-59bd-b8b4-d1450000e9bb.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/aeea7f42-4fac-59bd-b8b4-d1450000e9bb.json","archive_url":"https://web.archive.org/web/20261009/https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight"},{"evidence_id":"ed446beb-064d-5891-bbfb-502f3438c893","roles":["imported:geometry","imported:record","metric:jobs_permanent","metric:land_area","milestone:construction_started","milestone:fully_operational","power_source:grid","role:developer","role:tenant"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"news","title":"Google announces new data center in Armstrong County, Texas","source_url":"https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas","publisher":"ABC 7 Amarillo","source_family":"www.abc7amarillo.com","license":"source-terms-not-recorded","attribution":"ABC 7 Amarillo","published_at":"2025-11-24","retrieved_at":"2026-10-09","content_hash":"b25561709ea90373ee9bbf584e1ee1ed75308b6fe5ca09d22dcdaac985cd2880","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s2","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ed446beb-064d-5891-bbfb-502f3438c893.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ed446beb-064d-5891-bbfb-502f3438c893.json","archive_url":"https://web.archive.org/web/20261009/https://www.abc7amarillo.com/news/local/google-announces-new-data-center-in-armstrong-county-texas-judge-adam-ensey-crusoe-energy-ercot-southwest-power-pool-claude-texas"},{"evidence_id":"48027b42-f0c8-5325-adfe-bbb6f550e307","roles":["imported:record","power_source:wind","role:developer","role:tenant"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"trade_press","title":"Google taps Crusoe for new Texas AI data centre campus","source_url":"https://thetechcapital.com/google-taps-crusoe-for-new-texas-ai-data-centre-campus/","publisher":"The Tech Capital","source_family":"thetechcapital.com","license":"source-terms-not-recorded","attribution":"The Tech Capital","published_at":"2026-10-01","retrieved_at":"2026-10-09","content_hash":"9304bdef286c12a5633d479228ff95d9f3f9aed2da1f8a66db78668994f96c0f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s6","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48027b42-f0c8-5325-adfe-bbb6f550e307.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48027b42-f0c8-5325-adfe-bbb6f550e307.json","archive_url":"https://web.archive.org/web/20261009/https://thetechcapital.com/google-taps-crusoe-for-new-texas-ai-data-centre-campus/"},{"evidence_id":"9c8656c4-0869-5925-9cac-19532dbf05b9","roles":["imported:record","milestone:announced","role:tenant"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"company_disclosure","title":"Google's investments run deep in the heart of Texas","source_url":"https://blog.google/inside-google/company-announcements/google-american-innovation-texas/","publisher":"Google","source_family":"blog.google","license":"source-terms-not-recorded","attribution":"Google","published_at":"2025-11-14","retrieved_at":"2026-10-09","content_hash":"662c64d879837041b3d26d1a436580ed216d45abcde199b9cb8b18b1f86f5a2e","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s1","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c8656c4-0869-5925-9cac-19532dbf05b9.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c8656c4-0869-5925-9cac-19532dbf05b9.json","archive_url":"https://web.archive.org/web/20261009/https://blog.google/inside-google/company-announcements/google-american-innovation-texas/"},{"evidence_id":"c405c84e-2372-5bc8-9028-a06ce4e97111","roles":["imported:record","metric:investment","metric:power_capacity","power_source:battery_storage","power_source:natural_gas_onsite","role:tenant"],"project_ids":["b7d85afa-fbc0-53d6-b19c-6e00c6639642"],"kind":"trade_press","title":"ORIGINATION: Crusoe adds natural gas, storage to Texas Panhandle energy mix as project shifts to Google ownership","source_url":"https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/","publisher":"New Project Media","source_family":"newprojectmedia.com","license":"source-terms-not-recorded","attribution":"New Project Media","published_at":"2025-12-15","retrieved_at":"2026-10-09","content_hash":"a5e656edaec545dfa8b1b2d21b1e6e94f65967dd6462cbdff279a81824def5ec","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"google-armstrong-county-texas","source_local_id":"s3","source_record_sha256":"f55a3707ea4ac75a2f9b631f23417f0a5f6df89437b652668172d0934fa4e412","site_ids":["vcc-site-9da1382c1df4f319ef97"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c405c84e-2372-5bc8-9028-a06ce4e97111.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c405c84e-2372-5bc8-9028-a06ce4e97111.json","archive_url":"https://web.archive.org/web/20261009/https://newprojectmedia.com/origination-crusoe-adds-natural-gas-storage-to-texas-panhandle-energy-mix-as-project-shifts-to-google-ownership/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-9da1382c1df4f319ef97/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-9da1382c1df4f319ef97.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-9da1382c1df4f319ef97","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
