{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-a15d402305ed80ba8cba","physical_site_stable_key":"curated:hut8-beacon-point-ai-data-center-campus","name":"Hut 8 Beacon Point AI Data Center Campus","country":"United States","country_iso_a2":"US","latitude":27.834525,"longitude":-97.614758,"geometry":{"coordinates":[-97.614758,27.834525],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude."],"geometry_methods":["operator_published_mapbox_campus_marker"],"geometry_scope_classes":["operator_published_campus_reference_point"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.","geometry_evidence_ids":["111e4ef0-d1c4-5b87-8c40-be427705300f","649edbaf-a971-56f7-93c0-ea2569188d14","68bba6b3-26b0-50d9-929f-570e39728681","873a0c1d-1e8a-55f6-81ab-db5d75aa832e","ebef4446-a514-5896-8a6d-c9e0109c3eb4"],"project_count":2,"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"project_stable_keys":["curated:hut8-beacon-point-ai-data-center-campus:first-phase-352mw-critical-it-lease","imported:semiconductor-atlas:hut8-beacon-point"],"statuses":["under_construction"],"oldest_status_as_of":"2026-08-04","newest_status_as_of":"2026-08-04","verification_posture":"mixed_review_postures","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed","not_reviewed_for_core_preview"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a15d402305ed80ba8cba.json","geometry_licenses":["IETF-Trust-Legal-Provisions","all-rights-reserved"],"geometry_attributions":["Hut 8 Corp.","IETF Trust","Mapbox"]},"projects":[{"project_id":"86c83f59-88b9-5791-bc15-ab6c32f256a7","project_stable_key":"imported:semiconductor-atlas:hut8-beacon-point","site_id":"vcc-site-a15d402305ed80ba8cba","physical_site_stable_key":"curated:hut8-beacon-point-ai-data-center-campus","name":"Hut 8 Beacon Point AI data center campus","country":"United States","country_iso_a2":"US","latitude":27.74,"longitude":-97.52,"geometry":{"coordinates":[-97.52,27.74],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"admin2","geometry_authority_class":"compiled_reference","geometry_use_scope":"admin2_context","geometry_precision_scope":"Filings name Nueces County only, with no town, address or parcel. Coordinates are the Nueces County point from its Wikipedia article.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"782f9d8b-cff9-52ea-aa39-5c0b7f15d328","last_observed_physical_status":"under_construction","status_as_of":"2026-08-04","status_age_days_at_review":84,"status_method":"imported_documented_status","status_evidence_id":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"782f9d8b-cff9-52ea-aa39-5c0b7f15d328","notes":"Develops the campus through its wholly owned subsidiary Beacon Point DC LLC, which issued the project notes.","party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-beacon-point"},{"evidence_id":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","notes":"Develops the campus through its wholly owned subsidiary Beacon Point DC LLC, which issued the project notes.","party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-beacon-point"},{"evidence_id":"60c7066e-006c-536c-bb3c-20ae9774a0e9","notes":"Develops the campus through its wholly owned subsidiary Beacon Point DC LLC, which issued the project notes.","party":"Hut 8","relationship_scope":"unknown","role":"developer","source_record_id":"hut8-beacon-point"},{"evidence_id":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","notes":"Provides electric delivery service under the campus interconnection agreement.","party":"AEP Texas","relationship_scope":"unknown","role":"utility","source_record_id":"hut8-beacon-point"},{"evidence_id":"48d9033d-fb4b-5857-8502-f645e3889cfc","notes":"Provides electric delivery service under the campus interconnection agreement.","party":"AEP Texas","relationship_scope":"unknown","role":"utility","source_record_id":"hut8-beacon-point"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm","geometry_source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm","project_details":[{"identity_decision":{"decision":"same_site_distinct_scope","flags":["administrative_locator_not_project_geometry","campus_and_phase_scopes_must_remain_separate"],"rationale":"Same Hut 8 Beacon Point campus and shared issuer quarterly source. Source includes both 352 MW phases and 1 GW utility capacity; existing project is explicitly the first 352 MW critical-IT lease build.","source_record_id":"hut8-beacon-point","target_physical_site_stable_key":"curated:hut8-beacon-point-ai-data-center-campus"},"record":{"aliases":["Beacon Point AI Data Center Campus","Beacon Point DC"],"id":"hut8-beacon-point","last_reviewed":"2026-10-09","location":{"admin1":"Texas","admin2":"Nueces County","country":"US","lat":27.74,"lon":-97.52,"note":"Filings name Nueces County only, with no town, address or parcel. Coordinates are the Nueces County point from its Wikipedia article.","precision":"admin2","source_ids":["s1","s2","s7"]},"metrics":[{"applies_to":"campus","as_of":"2026-07-20","basis":"contracted","metric":"power_capacity","note":"Utility capacity secured under an interconnection agreement with AEP Texas; Hut 8 calls Beacon Point a 1 GW campus on this basis.","power_scope":"grid_connection","qualifier":"exact","source_ids":["s2","s4"],"unit":"MW","value":1000},{"applies_to":"campus","as_of":"2026-07-20","basis":"contracted","metric":"power_capacity","note":"IT capacity leased to the single tenant across both phases after the second lease.","power_scope":"it_load","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":704},{"applies_to":"phase","as_of":"2026-07-20","basis":"under_construction","metric":"power_capacity","note":"Critical IT capacity of the first leased data center, across six data halls. The Energy Mag reports that a redesign raised the first building from 224 MW to 352 MW without more land or utility capacity.","phase_label":"Phase 1 (six data halls)","power_scope":"it_load","qualifier":"exact","source_ids":["s1","s2","s3","s4"],"unit":"MW","value":352},{"applies_to":"phase","as_of":"2026-05-06","basis":"contracted","metric":"power_capacity","note":"Share of the 1,000 MW utility capacity supporting the first 352 MW IT phase.","phase_label":"Phase 1","power_scope":"grid_connection","qualifier":"approximately","source_ids":["s4"],"unit":"MW","value":500},{"applies_to":"phase","as_of":"2026-07-20","basis":"contracted","metric":"power_capacity","note":"Second 15-year lease with the same tenant; site preparation under way and long-lead equipment procured.","phase_label":"Phase 2","power_scope":"it_load","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":352},{"applies_to":"phase","as_of":"2026-08-04","basis":"under_construction","metric":"power_capacity","note":"Utility capacity for phase 2, which Hut 8 moved into its energy-capacity-under-construction category after 30 June 2026; it needs no capacity beyond the campus interconnection.","phase_label":"Phase 2","power_scope":"grid_connection","qualifier":"exact","source_ids":["s2","s5"],"unit":"MW","value":500},{"applies_to":"campus","as_of":"2026-06-04","basis":"reported","metric":"land_area","qualifier":"approximately","source_ids":["s1"],"unit":"acres","value":521}],"milestones":[{"date":"2026-05-06","event":"announced","kind":"actual","note":"Hut 8 announced the first 15-year, 352 MW IT lease, commercializing phase 1 of the campus.","source_ids":["s3","s4"]},{"date":"2026-06-09","event":"other","kind":"actual","note":"Hut 8 closed USD 4.25 billion of investment-grade project notes to finance construction of the Beacon Point data center.","source_ids":["s6"]},{"date":"2026-07-20","event":"expansion_announced","kind":"actual","note":"Second 352 MW IT lease signed with the existing tenant, fully committing the campus utility capacity. Hut 8 said phase 1 construction had already begun.","source_ids":["s2"]},{"date":"2027-Q1","event":"other","kind":"planned","note":"Target for initial energization of the first phase.","source_ids":["s2","s4"]},{"date":"2027-Q3","event":"first_operational","kind":"planned","note":"Target for delivery of the first data hall, as reported by The Energy Mag.","source_ids":["s4"]},{"date":"2028-Q2","event":"other","kind":"planned","note":"Target for delivery of the first phase 2 data hall.","source_ids":["s2"]}],"name":"Hut 8 Beacon Point AI data center campus","notes":"The tenant is not named; Hut 8 describes it as a high-investment-grade company (rated AA- or higher in the notes offering). Leases are triple-net with 15-year base terms worth USD 19.6 billion for the campus. Phase 1 is financed with USD 4.25 billion of non-recourse project notes issued by Beacon Point DC LLC; this is debt financing, not a disclosed project cost. The Energy Mag reports the site was first underwritten for affiliated miner American Bitcoin; Hut 8's releases opened do not say so. Hut 8 names AEP, Vertiv and Jacobs as delivery-model counterparties and an NVIDIA DSX reference design. The 1 GW label refers to utility capacity, not IT load.","parties":[{"name":"Hut 8","note":"Develops the campus through its wholly owned subsidiary Beacon Point DC LLC, which issued the project notes.","role":"developer","source_ids":["s1","s2","s3"]},{"name":"AEP Texas","note":"Provides electric delivery service under the campus interconnection agreement.","role":"utility","source_ids":["s2","s4"]}],"power_sources":[{"description":"Grid supply from AEP Texas under a 1,000 MW interconnection agreement, with a substation being built on the property as part of the phase 1 project.","source_ids":["s1","s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":"2026-06-04","publisher":"Hut 8 Corp. via SEC EDGAR","title":"Hut 8 announces pricing of $4.25 billion of investment-grade senior secured notes for Beacon Point data center project (Form 8-K, Exhibit 99.1)","type":"regulatory_filing","url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm"},{"accessed":"2026-10-09","id":"s2","published":"2026-07-20","publisher":"Hut 8 Corp. via SEC EDGAR","title":"Hut 8 fully commercializes 1 GW Beacon Point AI data center campus with second 352 MW IT lease, bringing campus-level base-term contract value to $19.6 billion (Form 8-K, Exhibit 99.1)","type":"regulatory_filing","url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm"},{"accessed":"2026-10-09","id":"s3","published":"2026-05-06","publisher":"Hut 8","title":"Hut 8 commercializes first phase of 1 GW Beacon Point AI data center campus with 15-year, 352 MW IT lease","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw"},{"accessed":"2026-10-09","id":"s4","published":"2026-05-06","publisher":"The Energy Mag","title":"Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion","type":"news","url":"https://www.theenergymag.com/news/2026-05-06/hut-ai-beacon-point"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261007015824/https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","id":"s5","published":"2026-08-04","publisher":"Hut 8","title":"Hut 8 reports second quarter 2026 results","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"accessed":"2026-10-09","id":"s6","published":"2026-06-09","publisher":"Hut 8","title":"Hut 8 closes $4.25 billion of investment-grade senior secured notes for Beacon Point data center project","type":"company","url":"https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data"},{"accessed":"2026-10-09","id":"s7","published":null,"publisher":"Wikipedia","title":"Nueces County, Texas","type":"other","url":"https://en.wikipedia.org/wiki/Nueces_County,_Texas"}],"status":"under_construction","status_as_of":"2026-08-04","status_source_ids":["s2","s5"],"summary":"Hut 8 AI data center campus on about 521 acres in Nueces County, Texas, backed by 1,000 MW of utility capacity under an AEP Texas interconnection agreement. In 2026 Hut 8 signed two 15-year leases of 352 MW of IT capacity each with one unnamed high-investment-grade tenant, for 704 MW in total, worth about USD 9.8 billion each in base-term value. Hut 8 said in July 2026 that phase 1 construction had begun and phase 2 site preparation was under way; initial energization is targeted for Q1 2027 and the first phase 2 data hall for Q2 2028.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"782f9d8b-cff9-52ea-aa39-5c0b7f15d328","s2":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","s3":"60c7066e-006c-536c-bb3c-20ae9774a0e9","s4":"48d9033d-fb4b-5857-8502-f645e3889cfc","s5":"54364762-f941-5711-a127-51429967cd42","s6":"67eec335-37c6-5d6f-a671-62c82981802a","s7":"4dbda20c-a924-5873-85a1-385bbea1f0b1"},"source_file":"datacenters/projects/hut8-beacon-point.json","source_record_id":"hut8-beacon-point","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"d8b20c31668fe64a618d09db8c4fde048f5a1629adca59b4d144c1c8b0696b70"}],"evidence_ids":["48d9033d-fb4b-5857-8502-f645e3889cfc","4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","4dbda20c-a924-5873-85a1-385bbea1f0b1","54364762-f941-5711-a127-51429967cd42","60c7066e-006c-536c-bb3c-20ae9774a0e9","67eec335-37c6-5d6f-a671-62c82981802a","782f9d8b-cff9-52ea-aa39-5c0b7f15d328"],"status_source":{"evidence_id":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","title":"Hut 8 fully commercializes 1 GW Beacon Point AI data center campus with second 352 MW IT lease, bringing campus-level base-term contract value to $19.6 billion (Form 8-K, Exhibit 99.1)","publisher":"Hut 8 Corp. via SEC EDGAR","kind":"regulatory_filing","published_at":"2026-07-20","source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm","license":"source-terms-not-recorded","attribution":"Hut 8 Corp. via SEC EDGAR"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/#project-86c83f59-88b9-5791-bc15-ab6c32f256a7","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/86c83f59-88b9-5791-bc15-ab6c32f256a7.json","geometry_source":{"evidence_id":"782f9d8b-cff9-52ea-aa39-5c0b7f15d328","title":"Hut 8 announces pricing of $4.25 billion of investment-grade senior secured notes for Beacon Point data center project (Form 8-K, Exhibit 99.1)","publisher":"Hut 8 Corp. via SEC EDGAR","kind":"regulatory_filing","published_at":"2026-06-04","source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm","license":"source-terms-not-recorded","attribution":"Hut 8 Corp. via SEC EDGAR"}},{"project_id":"9563b94b-4d68-5f38-b2b2-ce63346ebbe8","project_stable_key":"curated:hut8-beacon-point-ai-data-center-campus:first-phase-352mw-critical-it-lease","site_id":"vcc-site-a15d402305ed80ba8cba","physical_site_stable_key":"curated:hut8-beacon-point-ai-data-center-campus","name":"Hut 8 Beacon Point First Phase 352 MW Critical IT Lease","country":"United States","country_iso_a2":"US","latitude":27.834525,"longitude":-97.614758,"geometry":{"coordinates":[-97.614758,27.834525],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"Match direct campus page to the platform's same title and slug; dereference explicit geolocation fields; reproduce the site's six-decimal marker rounding; emit longitude then latitude.","geometry_method":"operator_published_mapbox_campus_marker","geometry_scope_class":"operator_published_campus_reference_point","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Exact operator-rendered named campus marker, not a survey, campus boundary, building centroid, construction footprint, or phase-specific location.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"Publisher reports no bounded horizontal positional accuracy; decimal places and deterministic rounding do not establish site accuracy.","geometry_evidence_id":"68bba6b3-26b0-50d9-929f-570e39728681","last_observed_physical_status":"under_construction","status_as_of":"2026-08-04","status_age_days_at_review":84,"status_method":"authoritative_physical_status_update","status_evidence_id":"56eddcf1-c98f-563c-9135-12ba2009edb3","verification_posture":"recent_authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed_for_core_preview","development_type":"unknown","development_type_unknown_reason":"not selected by this reviewed draft batch","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs selected; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation selected","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","geometry_source_url":"https://www.hut8.com/data-centers/beacon-point","project_details":[],"evidence_ids":["111e4ef0-d1c4-5b87-8c40-be427705300f","56eddcf1-c98f-563c-9135-12ba2009edb3","649edbaf-a971-56f7-93c0-ea2569188d14","64c55c1e-635d-5e2f-ad72-151398b719a5","68bba6b3-26b0-50d9-929f-570e39728681","873a0c1d-1e8a-55f6-81ab-db5d75aa832e","ebef4446-a514-5896-8a6d-c9e0109c3eb4"],"status_source":{"evidence_id":"56eddcf1-c98f-563c-9135-12ba2009edb3","title":"Hut 8 August 4 Beacon Point physical construction update","publisher":"Hut 8 Corp.","kind":"company_disclosure","published_at":"2026-08-04","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","license":"all-rights-reserved","attribution":"Hut 8 Corp."},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/#project-9563b94b-4d68-5f38-b2b2-ce63346ebbe8","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/9563b94b-4d68-5f38-b2b2-ce63346ebbe8.json","geometry_source":{"evidence_id":"68bba6b3-26b0-50d9-929f-570e39728681","title":"Beacon Point named operator record and coordinate","publisher":"Hut 8 Corp.","kind":"company_disclosure","published_at":null,"source_url":"https://www.hut8.com/data-centers/beacon-point","license":"all-rights-reserved","attribution":"Hut 8 Corp."}}],"evidence":[{"evidence_id":"68bba6b3-26b0-50d9-929f-570e39728681","roles":["context:geometry_identity","context:site_distinctness","geometry"],"project_ids":["9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Beacon Point named operator record and coordinate","source_url":"https://www.hut8.com/data-centers/beacon-point","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:14:35.588Z","content_hash":"3535040f7761f2494fff88da0e16b5c60cfc1d3fdfe5a092bf1d2fd56847139b","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/68bba6b3-26b0-50d9-929f-570e39728681.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/68bba6b3-26b0-50d9-929f-570e39728681.json","archive_url":"https://web.archive.org/web/20260908231435/https://www.hut8.com/data-centers/beacon-point"},{"evidence_id":"782f9d8b-cff9-52ea-aa39-5c0b7f15d328","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","power_source:grid","role:developer"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"regulatory_filing","title":"Hut 8 announces pricing of $4.25 billion of investment-grade senior secured notes for Beacon Point data center project (Form 8-K, Exhibit 99.1)","source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm","publisher":"Hut 8 Corp. via SEC EDGAR","source_family":"www.sec.gov","license":"source-terms-not-recorded","attribution":"Hut 8 Corp. via SEC EDGAR","published_at":"2026-06-04","retrieved_at":"2026-10-09","content_hash":"0bd16c56aed073725bcc665eda5a666f7ad515bb58a4bd0e0df7023c87b901cc","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s1","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/782f9d8b-cff9-52ea-aa39-5c0b7f15d328.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/782f9d8b-cff9-52ea-aa39-5c0b7f15d328.json","archive_url":"https://web.archive.org/web/20261009/https://www.sec.gov/Archives/edgar/data/1964789/000110465926070744/tm2616926d1_ex99-1.htm"},{"evidence_id":"56eddcf1-c98f-563c-9135-12ba2009edb3","roles":["context:geometry_identity","context:site_distinctness","physical_status"],"project_ids":["9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 August 4 Beacon Point physical construction update","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":"2026-08-04","retrieved_at":"2026-09-08T23:13:46.969Z","content_hash":"5dd5a6ba19bde75372b8a39ab725d97fbd8429e8369a7f1d14ad47942c3e1b58","publication_date_precision":"day","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/56eddcf1-c98f-563c-9135-12ba2009edb3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/56eddcf1-c98f-563c-9135-12ba2009edb3.json","archive_url":"https://web.archive.org/web/20260908231346/https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"evidence_id":"67eec335-37c6-5d6f-a671-62c82981802a","roles":["imported:record","milestone:other"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"company_disclosure","title":"Hut 8 closes $4.25 billion of investment-grade senior secured notes for Beacon Point data center project","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2026-06-09","retrieved_at":"2026-10-09","content_hash":"332a8901e21c2ee73688143468c3b92fb0b46898868725593e23b3361bac89d4","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s6","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/67eec335-37c6-5d6f-a671-62c82981802a.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/67eec335-37c6-5d6f-a671-62c82981802a.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-closes-usd4-25-billion-of-investment-grade-senior-secured-notes-for-beacon-point-data"},{"evidence_id":"60c7066e-006c-536c-bb3c-20ae9774a0e9","roles":["imported:record","metric:power_capacity","milestone:announced","role:developer"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"company_disclosure","title":"Hut 8 commercializes first phase of 1 GW Beacon Point AI data center campus with 15-year, 352 MW IT lease","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2026-05-06","retrieved_at":"2026-10-09","content_hash":"629055a43e5a8458098dc4817c342f489bdb959ebd0cce74741d29280cb5eec1","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s3","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/60c7066e-006c-536c-bb3c-20ae9774a0e9.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/60c7066e-006c-536c-bb3c-20ae9774a0e9.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw"},{"evidence_id":"111e4ef0-d1c4-5b87-8c40-be427705300f","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 frontend named marker derivation","source_url":"https://www.hut8.com/_nuxt/D5nZ9oDL.js","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:16:24.414Z","content_hash":"832b2a3b34eb077b91faeb7bd5d3575f884ab65d1544dfa8d741bd78f29a4d8e","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/111e4ef0-d1c4-5b87-8c40-be427705300f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/111e4ef0-d1c4-5b87-8c40-be427705300f.json","archive_url":"https://web.archive.org/web/20260908231624/https://www.hut8.com/_nuxt/D5nZ9oDL.js"},{"evidence_id":"4aa541b2-aec6-5f8e-a0e2-4026cf7bf141","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","milestone:expansion_announced","milestone:other","power_source:grid","role:developer","role:utility"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"regulatory_filing","title":"Hut 8 fully commercializes 1 GW Beacon Point AI data center campus with second 352 MW IT lease, bringing campus-level base-term contract value to $19.6 billion (Form 8-K, Exhibit 99.1)","source_url":"https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm","publisher":"Hut 8 Corp. via SEC EDGAR","source_family":"www.sec.gov","license":"source-terms-not-recorded","attribution":"Hut 8 Corp. via SEC EDGAR","published_at":"2026-07-20","retrieved_at":"2026-10-09","content_hash":"47785db84316bb58200e430420a28dbdcfa23d6975c53e2a5f72e7ba0f6d77b1","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s2","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4aa541b2-aec6-5f8e-a0e2-4026cf7bf141.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4aa541b2-aec6-5f8e-a0e2-4026cf7bf141.json","archive_url":"https://web.archive.org/web/20261009/https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm"},{"evidence_id":"649edbaf-a971-56f7-93c0-ea2569188d14","roles":["context:geometry_identity","context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 platform list binds named campuses to map locations","source_url":"https://www.hut8.com/our-platform","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:14:16.902Z","content_hash":"90ed067c4fb5f3998d9528e70a84ab1b6c24414084a00c42abfa432c855a3a19","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/649edbaf-a971-56f7-93c0-ea2569188d14.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/649edbaf-a971-56f7-93c0-ea2569188d14.json","archive_url":"https://web.archive.org/web/20260908231416/https://www.hut8.com/our-platform"},{"evidence_id":"54364762-f941-5711-a127-51429967cd42","roles":["imported:record","imported:status","metric:power_capacity"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"company_disclosure","title":"Hut 8 reports second quarter 2026 results","source_url":"https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results","publisher":"Hut 8","source_family":"www.hut8.com","license":"source-terms-not-recorded","attribution":"Hut 8","published_at":"2026-08-04","retrieved_at":"2026-10-09","content_hash":"bf5b369cdc946027876265d781defe4c5a041aa71ff59fa6714445dc42ea2d18","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s5","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/54364762-f941-5711-a127-51429967cd42.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/54364762-f941-5711-a127-51429967cd42.json","archive_url":"https://web.archive.org/web/20261009/https://www.hut8.com/news-insights/press-releases/hut-8-reports-second-quarter-2026-results"},{"evidence_id":"48d9033d-fb4b-5857-8502-f645e3889cfc","roles":["imported:record","metric:power_capacity","milestone:announced","milestone:first_operational","milestone:other","role:utility"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"news","title":"Hut 8 Surges 30% After Landing Second AI Data Center Lease Worth $9.8 Billion","source_url":"https://www.theenergymag.com/news/2026-05-06/hut-ai-beacon-point","publisher":"The Energy Mag","source_family":"www.theenergymag.com","license":"source-terms-not-recorded","attribution":"The Energy Mag","published_at":"2026-05-06","retrieved_at":"2026-10-09","content_hash":"dbc391463fcf3234348b30a149ec70034b4c82ec1d7d865a02c48ddef5f2d6f5","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s4","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48d9033d-fb4b-5857-8502-f645e3889cfc.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/48d9033d-fb4b-5857-8502-f645e3889cfc.json","archive_url":"https://web.archive.org/web/20261009/https://www.theenergymag.com/news/2026-05-06/hut-ai-beacon-point"},{"evidence_id":"64c55c1e-635d-5e2f-ad72-151398b719a5","roles":["context:geometry_identity","context:site_distinctness"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Hut 8 website rights notice","source_url":"https://www.hut8.com/terms","publisher":"Hut 8 Corp.","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Hut 8 Corp.","published_at":null,"retrieved_at":"2026-09-08T23:21:23.834Z","content_hash":"baa8e25485074c69867e1eb23cff4111b0c36a3908b332ae1134644331b03549","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/64c55c1e-635d-5e2f-ad72-151398b719a5.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/64c55c1e-635d-5e2f-ad72-151398b719a5.json","archive_url":"https://web.archive.org/web/20260908232123/https://www.hut8.com/terms"},{"evidence_id":"ebef4446-a514-5896-8a6d-c9e0109c3eb4","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"Mapbox LngLat geographic coordinate contract","source_url":"https://docs.mapbox.com/mapbox-gl-js/api/geography/","publisher":"Mapbox","source_family":"americas_round9_hut8","license":"all-rights-reserved","attribution":"Mapbox","published_at":null,"retrieved_at":"2026-09-08T23:19:42.748Z","content_hash":"65696f2eadafcb1d2e7fc7e9f7c85bb923c0a3f428fb204047e0912890312cc0","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ebef4446-a514-5896-8a6d-c9e0109c3eb4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ebef4446-a514-5896-8a6d-c9e0109c3eb4.json","archive_url":"https://web.archive.org/web/20260908231942/https://docs.mapbox.com/mapbox-gl-js/api/geography/"},{"evidence_id":"4dbda20c-a924-5873-85a1-385bbea1f0b1","roles":["imported:geometry","imported:record"],"project_ids":["86c83f59-88b9-5791-bc15-ab6c32f256a7"],"kind":"other","title":"Nueces County, Texas","source_url":"https://en.wikipedia.org/wiki/Nueces_County,_Texas","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"0ed0d7e8a77cbac2e7a7200955c8f36fa3e7d34777be3d9999dc7e5e11d8dd21","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"hut8-beacon-point","source_local_id":"s7","source_record_sha256":"e1cd61da260ce328a44132696eb80adcc8c25ff91b15c5f2cd3b9d2efba4718a","site_ids":["vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4dbda20c-a924-5873-85a1-385bbea1f0b1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4dbda20c-a924-5873-85a1-385bbea1f0b1.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Nueces_County,_Texas"},{"evidence_id":"873a0c1d-1e8a-55f6-81ab-db5d75aa832e","roles":["context:site_distinctness","geometry"],"project_ids":["3e074273-f5f7-5785-ab10-232a5ebd5c6b","9563b94b-4d68-5f38-b2b2-ce63346ebbe8"],"kind":"company_disclosure","title":"RFC 7946 GeoJSON coordinate reference system","source_url":"https://datatracker.ietf.org/doc/html/rfc7946","publisher":"IETF Trust","source_family":"americas_round9_hut8","license":"IETF-Trust-Legal-Provisions","attribution":"IETF Trust","published_at":null,"retrieved_at":"2026-09-08T23:20:45.353Z","content_hash":"bcaa061faa3f2f3eec2a5846b01e6986a6aacf7fa64c2e88f74fb02d260a1adf","publication_date_precision":"unknown","content_hash_scope":"inherited_unspecified","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-1f215e81ecc04c69b5d6","vcc-site-a15d402305ed80ba8cba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/873a0c1d-1e8a-55f6-81ab-db5d75aa832e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/873a0c1d-1e8a-55f6-81ab-db5d75aa832e.json","archive_url":"https://web.archive.org/web/20260908232045/https://datatracker.ietf.org/doc/html/rfc7946"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a15d402305ed80ba8cba/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a15d402305ed80ba8cba.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-a15d402305ed80ba8cba","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
