{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-a3b8ee51c5572c85cebc","physical_site_stable_key":"curated:china-telecom-cloud-computing-inner-mongolia-information-park","name":"China Telecom Cloud Computing Inner Mongolia Information Park (Horinger)","country":"China","country_iso_a2":"CN","latitude":40.537609444,"longitude":111.831047778,"geometry":{"coordinates":[111.831047778,40.537609444],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA centre point of the park's new (third) 220 kV substation, which the report places inside the information park's land red line at the south-east corner of its B-zone plot on the east section of Yunzhan Road. Locates the park through on-campus power infrastructure at its south side; not an operating data-centre building, entrance or parcel centroid. The park's data-centre buildings extend up to roughly 800 m west-north-west and 700 m north of the point."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The CGCS2000/WGS84 reading is supported by the report's own graticuled figure and its agreement with independent Esri imagery within about 6 m at two ground features (manual pixel picks against imagery of unstated accuracy and date). The point marks a planned on-campus substation at the park's south side, several hundred metres from most data-centre buildings. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["daa14ce7-836e-5d8c-82a7-557290f213ac"],"project_count":1,"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"project_stable_keys":["curated:china-telecom-cloud-computing-inner-mongolia-information-park:existing-operations"],"statuses":["operational"],"oldest_status_as_of":"2026-09-15","newest_status_as_of":"2026-09-15","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a3b8ee51c5572c85cebc/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a3b8ee51c5572c85cebc.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国电信股份有限公司云计算内蒙古分公司"]},"projects":[{"project_id":"20c4a224-6f33-5074-8eef-13a7b4568edc","project_stable_key":"curated:china-telecom-cloud-computing-inner-mongolia-information-park:existing-operations","site_id":"vcc-site-a3b8ee51c5572c85cebc","physical_site_stable_key":"curated:china-telecom-cloud-computing-inner-mongolia-information-park","name":"China Telecom Cloud Computing Inner Mongolia Information Park — existing data-centre operations","country":"China","country_iso_a2":"CN","latitude":40.537609444,"longitude":111.831047778,"geometry":{"coordinates":[111.831047778,40.537609444],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA centre point of the park's new (third) 220 kV substation, which the report places inside the information park's land red line at the south-east corner of its B-zone plot on the east section of Yunzhan Road. Locates the park through on-campus power infrastructure at its south side; not an operating data-centre building, entrance or parcel centroid. The park's data-centre buildings extend up to roughly 800 m west-north-west and 700 m north of the point.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The CGCS2000/WGS84 reading is supported by the report's own graticuled figure and its agreement with independent Esri imagery within about 6 m at two ground features (manual pixel picks against imagery of unstated accuracy and date). The point marks a planned on-campus substation at the park's south side, several hundred metres from most data-centre buildings. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"daa14ce7-836e-5d8c-82a7-557290f213ac","last_observed_physical_status":"operational","status_as_of":"2026-09-15","status_age_days_at_review":42,"status_method":"authoritative_physical_status_update","status_evidence_id":"7d78cba4-47ce-51a9-bbac-c9763e2a7b22","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"daa14ce7-836e-5d8c-82a7-557290f213ac","party":"China Telecom Corporation Limited Cloud Computing Inner Mongolia Branch (中国电信股份有限公司云计算内蒙古分公司)","relationship_scope":"current","role":"owner"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":"China Telecom Corporation Limited Cloud Computing Inner Mongolia Branch (中国电信股份有限公司云计算内蒙古分公司)","operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260915_2036494.html","geometry_source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597186086953.docx","project_details":[],"evidence_ids":["11b209d0-b8d7-5756-b1d5-1971d39e674f","37ffc909-2baa-5f04-a440-4b01f6b43dec","61b28ded-1721-5355-a9f6-296b8a0d9227","7d78cba4-47ce-51a9-bbac-c9763e2a7b22","daa14ce7-836e-5d8c-82a7-557290f213ac"],"status_source":{"evidence_id":"7d78cba4-47ce-51a9-bbac-c9763e2a7b22","title":"Horinger New Area news item: 'From China Cloud Valley to a green computing highland: the new compute record of Horinger New Area' (从“中国云谷”到绿色算力高地和林格尔新区的算力新答卷), 15 September 2026","publisher":"Administrative Approval and Government Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区行政审批和政务服务局)","kind":"government_record","published_at":"2026-09-15","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260915_2036494.html","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区行政审批和政务服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a3b8ee51c5572c85cebc/#project-20c4a224-6f33-5074-8eef-13a7b4568edc","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/20c4a224-6f33-5074-8eef-13a7b4568edc.json","geometry_source":{"evidence_id":"daa14ce7-836e-5d8c-82a7-557290f213ac","title":"Environmental impact report form: China Telecom Corporation Limited Cloud Computing Inner Mongolia Branch 2025 220 kV substation (Inner Mongolia Department of Ecology and Environment approval-result publicity, 7 June 2026)","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","kind":"government_environmental_document","published_at":"2026-06-07","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597186086953.docx","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国电信股份有限公司云计算内蒙古分公司"}}],"evidence":[{"evidence_id":"daa14ce7-836e-5d8c-82a7-557290f213ac","roles":["geometry","role:owner"],"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"kind":"government_environmental_document","title":"Environmental impact report form: China Telecom Corporation Limited Cloud Computing Inner Mongolia Branch 2025 220 kV substation (Inner Mongolia Department of Ecology and Environment approval-result publicity, 7 June 2026)","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597186086953.docx","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 中国电信股份有限公司云计算内蒙古分公司","published_at":"2026-06-07","retrieved_at":"2026-10-26T17:13:27.248Z","content_hash":"a520ba21bbad5fc4e235b6e21d5c6cedfeefb03708488ce20224e35a6596185b","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a3b8ee51c5572c85cebc"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/daa14ce7-836e-5d8c-82a7-557290f213ac.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/daa14ce7-836e-5d8c-82a7-557290f213ac.json","archive_url":"https://web.archive.org/web/20261026171327/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597186086953.docx"},{"evidence_id":"11b209d0-b8d7-5756-b1d5-1971d39e674f","roles":["context:identity"],"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"kind":"map","title":"Esri World Imagery EPSG:4326 export around the China Telecom Cloud Computing Inner Mongolia Information Park, Horinger (111.818-111.848E, 40.529-40.547N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.818,40.529,111.848,40.547&bboxSR=4326&imageSR=4326&size=2000,1200&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"all-rights-reserved","attribution":"Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)","published_at":null,"retrieved_at":"2026-10-26T17:16:26.575Z","content_hash":"5fc4103b07259b5b15a7955cae9f582f89355f8a492dbd8026e48d453b8094e7","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a3b8ee51c5572c85cebc"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/11b209d0-b8d7-5756-b1d5-1971d39e674f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/11b209d0-b8d7-5756-b1d5-1971d39e674f.json","archive_url":"https://web.archive.org/web/20261026171626/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.818,40.529,111.848,40.547&bboxSR=4326&imageSR=4326&size=2000,1200&format=jpg&f=image"},{"evidence_id":"37ffc909-2baa-5f04-a440-4b01f6b43dec","roles":["context:identity"],"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"kind":"government_record","title":"Horinger New Area news item: 'Ascend 950DT 10,000-card intelligent computing cluster lands' (昇腾950DT万卡智算集群落地 打造国产智算新标杆), 15 October 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261015_2043074.html","publisher":"Investment Promotion Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区招商服务局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区招商服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-10-15","retrieved_at":"2026-10-26T17:18:35.141Z","content_hash":"ffbd6d48868452956ada2210b080974a422fe6066144fd296e3192b634874ab4","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a3b8ee51c5572c85cebc"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/37ffc909-2baa-5f04-a440-4b01f6b43dec.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/37ffc909-2baa-5f04-a440-4b01f6b43dec.json","archive_url":"https://web.archive.org/web/20261026171835/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202610/t20261015_2043074.html"},{"evidence_id":"7d78cba4-47ce-51a9-bbac-c9763e2a7b22","roles":["physical_status"],"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"kind":"government_record","title":"Horinger New Area news item: 'From China Cloud Valley to a green computing highland: the new compute record of Horinger New Area' (从“中国云谷”到绿色算力高地和林格尔新区的算力新答卷), 15 September 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260915_2036494.html","publisher":"Administrative Approval and Government Services Bureau of the Hohhot Area of the Inner Mongolia Pilot Free Trade Zone and Horinger New Area (自贸试验区呼和浩特片区、和林格尔新区行政审批和政务服务局)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"自贸试验区呼和浩特片区、和林格尔新区行政审批和政务服务局, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-09-15","retrieved_at":"2026-10-26T17:18:32.468Z","content_hash":"edce43295ed6544899812f527e163ebdb5aca39bc8ab9cadb955eb4eb0946cbc","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a3b8ee51c5572c85cebc"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7d78cba4-47ce-51a9-bbac-c9763e2a7b22.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7d78cba4-47ce-51a9-bbac-c9763e2a7b22.json","archive_url":"https://web.archive.org/web/20261026171832/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202609/t20260915_2036494.html"},{"evidence_id":"61b28ded-1721-5355-a9f6-296b8a0d9227","roles":["context:identity"],"project_ids":["20c4a224-6f33-5074-8eef-13a7b4568edc"],"kind":"government_record","title":"Inner Mongolia Department of Ecology and Environment approval of the EIA report form for the China Telecom Cloud Computing Inner Mongolia Branch 2025 220 kV substation (内环表〔2026〕94号)","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597187617507.docx","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment","published_at":"2026-06-07","retrieved_at":"2026-10-26T17:10:29.903Z","content_hash":"98c78be18ba13c8d2eda21f3ad6d650329114a8f85d802cef4c8cceff8173242","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-a3b8ee51c5572c85cebc"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/61b28ded-1721-5355-a9f6-296b8a0d9227.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/61b28ded-1721-5355-a9f6-296b8a0d9227.json","archive_url":"https://web.archive.org/web/20261026171029/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202606/P020260607597187617507.docx"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-a3b8ee51c5572c85cebc/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-a3b8ee51c5572c85cebc.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-a3b8ee51c5572c85cebc","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
