{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-ab1cba1760d42b280cd1","physical_site_stable_key":"imported:semiconductor-atlas:aws-vicksburg-warren-county-mississippi","name":"AWS Vicksburg data center campus","country":"United States","country_iso_a2":"US","latitude":32.3525,"longitude":-90.8775,"geometry":{"coordinates":[-90.8775,32.3525],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable)."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["6323bbc2-696d-588a-97e0-2b98b39e0897"],"project_count":1,"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"project_stable_keys":["imported:semiconductor-atlas:aws-vicksburg-warren-county-mississippi"],"statuses":["announced"],"oldest_status_as_of":"2026-04-09","newest_status_as_of":"2026-04-09","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ab1cba1760d42b280cd1.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["Office of Governor Tate Reeves"]},"projects":[{"project_id":"077a5970-0684-5ef0-8320-65efbf78c960","project_stable_key":"imported:semiconductor-atlas:aws-vicksburg-warren-county-mississippi","site_id":"vcc-site-ab1cba1760d42b280cd1","physical_site_stable_key":"imported:semiconductor-atlas:aws-vicksburg-warren-county-mississippi","name":"AWS Vicksburg data center campus","country":"United States","country_iso_a2":"US","latitude":32.3525,"longitude":-90.8775,"geometry":{"coordinates":[-90.8775,32.3525],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable).","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","last_observed_physical_status":"announced","status_as_of":"2026-04-09","status_age_days_at_review":201,"status_method":"imported_documented_status","status_evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","notes":null,"party":"Amazon Web Services","relationship_scope":"unknown","role":"developer","source_record_id":"aws-vicksburg-warren-county-mississippi"},{"evidence_id":"c99117ac-74eb-5f84-b895-202ac7ae59fa","notes":null,"party":"Amazon Web Services","relationship_scope":"unknown","role":"developer","source_record_id":"aws-vicksburg-warren-county-mississippi"},{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","notes":null,"party":"Entergy Mississippi","relationship_scope":"unknown","role":"utility","source_record_id":"aws-vicksburg-warren-county-mississippi"},{"evidence_id":"a87ef6ff-6a94-5cf9-849a-2bad55454961","notes":null,"party":"Entergy Mississippi","relationship_scope":"unknown","role":"utility","source_record_id":"aws-vicksburg-warren-county-mississippi"},{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","notes":"The county is contributing to the project; state incentives passed for the Madison County campuses also apply.","party":"Warren County","relationship_scope":"unknown","role":"government","source_record_id":"aws-vicksburg-warren-county-mississippi"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","geometry_source_url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve AWS Vicksburg data center campus as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"aws-vicksburg-warren-county-mississippi"},"record":{"aliases":["AWS Warren County data center campus"],"id":"aws-vicksburg-warren-county-mississippi","last_reviewed":"2026-10-09","location":{"admin1":"Mississippi","admin2":"Warren County","country":"US","lat":32.3525,"locality":"Vicksburg","lon":-90.8775,"note":"No site, parcel or road has been published; coordinates are the Vicksburg city point from its Wikipedia article (Nominatim was unavailable).","precision":"locality","source_ids":["s1","s2"]},"metrics":[{"applies_to":"campus","as_of":"2025-11-20","basis":"announced","metric":"investment","qualifier":"at_least","source_ids":["s1","s4"],"unit":"USD","value":3000000000},{"applies_to":"campus","as_of":"2025-11-20","basis":"planned","metric":"jobs_permanent","note":"Officials also project more than 300 additional positions in the wider county.","qualifier":"at_least","source_ids":["s1","s2","s3"],"unit":"count","value":200}],"milestones":[{"date":"2025-11-20","event":"announced","kind":"actual","source_ids":["s1","s3"]},{"date":"2026","event":"construction_started","kind":"planned","note":"Target year given at announcement; no source opened confirms that work has begun.","source_ids":["s1","s2"]}],"name":"AWS Vicksburg data center campus","notes":"The Vicksburg mayor described a five-to-seven-year build-out at the November 2025 announcement (Mississippi Public Broadcasting). The governor's release gives $3 billion while Amazon says at least $3 billion.","parties":[{"name":"Amazon Web Services","role":"developer","source_ids":["s1","s4"]},{"name":"Entergy Mississippi","role":"utility","source_ids":["s1","s2"]},{"name":"Warren County","note":"The county is contributing to the project; state incentives passed for the Madison County campuses also apply.","role":"government","source_ids":["s1"]}],"power_sources":[{"description":"Entergy Mississippi committed to the campus's long-term power needs and is building a roughly $1.2 billion gas-fired station at the retired Baxter Wilson plant site to serve this and other industrial load.","source_ids":["s1","s2"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260909125457/https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","id":"s1","published":"2025-11-20","publisher":"Office of Governor Tate Reeves","title":"Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg","type":"government","url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260831160715/https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/","id":"s2","published":"2025-11-21","publisher":"Mississippi Public Broadcasting","title":"Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi","type":"news","url":"https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260928223038/https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/","id":"s3","published":"2025-11-20","publisher":"Mississippi Free Press","title":"Amazon to Build $3B AI Data Center in Vicksburg, as Gov. Reeves Proclaims Arrival of the 'Digital Delta'","type":"news","url":"https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/"},{"accessed":"2026-10-09","id":"s4","published":null,"publisher":"Amazon","title":"Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus","type":"company","url":"https://www.aboutamazon.com/md/news/company-news/amazon-3-billion-mississippi-data-center-investment"},{"accessed":"2026-10-09","id":"s5","published":"2026-04-09","publisher":"Office of Governor Tate Reeves","title":"Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State","type":"government","url":"https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/"}],"status":"announced","status_as_of":"2026-04-09","status_source_ids":["s1","s5"],"summary":"Amazon announced in November 2025 that it would spend at least $3 billion on a new data center campus in Vicksburg, Warren County, with at least 200 full-time jobs. Officials said construction would start in 2026 and the local mayor expected a five-to-seven-year build-out. Amazon said the campus will support AI and cloud computing. Entergy Mississippi agreed to meet its long-term power needs and is building a gas plant at the former Baxter Wilson site to serve the campus and other industrial projects. The April 2026 statewide update still listed it as planned.","workloads":["ai_unspecified","cloud"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"6323bbc2-696d-588a-97e0-2b98b39e0897","s2":"a87ef6ff-6a94-5cf9-849a-2bad55454961","s3":"1bf3f4be-636b-5f44-88bd-072d6d3a526f","s4":"c99117ac-74eb-5f84-b895-202ac7ae59fa","s5":"bbc73677-89d2-5fad-b604-8f53763caf9e"},"source_file":"datacenters/projects/aws-vicksburg-warren-county-mississippi.json","source_record_id":"aws-vicksburg-warren-county-mississippi","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"6949c11c8bd0d18cf3e974952a3984290ab3afa7d024b48705c446ff2c41ee1e"}],"evidence_ids":["1bf3f4be-636b-5f44-88bd-072d6d3a526f","6323bbc2-696d-588a-97e0-2b98b39e0897","a87ef6ff-6a94-5cf9-849a-2bad55454961","bbc73677-89d2-5fad-b604-8f53763caf9e","c99117ac-74eb-5f84-b895-202ac7ae59fa"],"status_source":{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","title":"Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg","publisher":"Office of Governor Tate Reeves","kind":"government_record","published_at":"2025-11-20","source_url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/#project-077a5970-0684-5ef0-8320-65efbf78c960","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/077a5970-0684-5ef0-8320-65efbf78c960.json","geometry_source":{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","title":"Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg","publisher":"Office of Governor Tate Reeves","kind":"government_record","published_at":"2025-11-20","source_url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves"}}],"evidence":[{"evidence_id":"bbc73677-89d2-5fad-b604-8f53763caf9e","roles":["imported:record","imported:status"],"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"kind":"government_record","title":"Amazon continues Mississippi expansion, announcing plans to invest a total of $25 billion across the Magnolia State","source_url":"https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/","publisher":"Office of Governor Tate Reeves","source_family":"governorreeves.ms.gov","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves","published_at":"2026-04-09","retrieved_at":"2026-10-09","content_hash":"25e59dbb760c81e0c500b28f67a0bbf2e9c46d216b53125c390f9cfc9beea230","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"aws-vicksburg-warren-county-mississippi","source_local_id":"s5","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","site_ids":["vcc-site-ab1cba1760d42b280cd1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bbc73677-89d2-5fad-b604-8f53763caf9e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/bbc73677-89d2-5fad-b604-8f53763caf9e.json","archive_url":"https://web.archive.org/web/20261009/https://governorreeves.ms.gov/amazon-continues-mississippi-expansion-announcing-plans-to-invest-a-total-of-25-billion-across-the-magnolia-state/"},{"evidence_id":"c99117ac-74eb-5f84-b895-202ac7ae59fa","roles":["imported:record","metric:investment","role:developer"],"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"kind":"company_disclosure","title":"Amazon plans to invest at least $3 billion in Warren County, Mississippi, for next-generation data center campus","source_url":"https://www.aboutamazon.com/md/news/company-news/amazon-3-billion-mississippi-data-center-investment","publisher":"Amazon","source_family":"www.aboutamazon.com","license":"source-terms-not-recorded","attribution":"Amazon","published_at":null,"retrieved_at":"2026-10-09","content_hash":"6bb54315180690e568dded3f483386d4fec05b4f1f65bce3e154b72dae800c21","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"aws-vicksburg-warren-county-mississippi","source_local_id":"s4","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","site_ids":["vcc-site-ab1cba1760d42b280cd1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c99117ac-74eb-5f84-b895-202ac7ae59fa.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c99117ac-74eb-5f84-b895-202ac7ae59fa.json","archive_url":"https://web.archive.org/web/20261009/https://www.aboutamazon.com/md/news/company-news/amazon-3-billion-mississippi-data-center-investment"},{"evidence_id":"a87ef6ff-6a94-5cf9-849a-2bad55454961","roles":["imported:geometry","imported:record","metric:jobs_permanent","milestone:construction_started","power_source:grid","role:utility"],"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"kind":"news","title":"Amazon to build $3 billion data center in Warren County, expanding tech footprint in Mississippi","source_url":"https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/","publisher":"Mississippi Public Broadcasting","source_family":"www.mpbonline.org","license":"source-terms-not-recorded","attribution":"Mississippi Public Broadcasting","published_at":"2025-11-21","retrieved_at":"2026-10-09","content_hash":"64bb3bff3fbc6e49a0438dfb04f123b1d26256dd3613f16ca96be2bbeeaae6d9","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"aws-vicksburg-warren-county-mississippi","source_local_id":"s2","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","site_ids":["vcc-site-ab1cba1760d42b280cd1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a87ef6ff-6a94-5cf9-849a-2bad55454961.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/a87ef6ff-6a94-5cf9-849a-2bad55454961.json","archive_url":"https://web.archive.org/web/20261009/https://www.mpbonline.org/blogs/news/amazon-web-services-to-build-3-billion-data-center-in-warren-county-expanding-tech-footprint-in-mi/"},{"evidence_id":"1bf3f4be-636b-5f44-88bd-072d6d3a526f","roles":["imported:record","metric:jobs_permanent","milestone:announced"],"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"kind":"news","title":"Amazon to Build $3B AI Data Center in Vicksburg, as Gov. Reeves Proclaims Arrival of the 'Digital Delta'","source_url":"https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/","publisher":"Mississippi Free Press","source_family":"www.mississippifreepress.org","license":"source-terms-not-recorded","attribution":"Mississippi Free Press","published_at":"2025-11-20","retrieved_at":"2026-10-09","content_hash":"293ca8c6048dd8d8d6d8718932846bbf7c6cb99bd5f72d2f44165323ecaff686","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"aws-vicksburg-warren-county-mississippi","source_local_id":"s3","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","site_ids":["vcc-site-ab1cba1760d42b280cd1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1bf3f4be-636b-5f44-88bd-072d6d3a526f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1bf3f4be-636b-5f44-88bd-072d6d3a526f.json","archive_url":"https://web.archive.org/web/20261009/https://www.mississippifreepress.org/amazon-to-build-3b-ai-data-center-in-vicksburg-as-gov-reeves-proclaims-arrival-of-the-digital-delta/"},{"evidence_id":"6323bbc2-696d-588a-97e0-2b98b39e0897","roles":["imported:geometry","imported:record","imported:status","metric:investment","metric:jobs_permanent","milestone:announced","milestone:construction_started","power_source:grid","role:developer","role:government","role:utility"],"project_ids":["077a5970-0684-5ef0-8320-65efbf78c960"],"kind":"government_record","title":"Governor Tate Reeves announces Amazon plans to invest $3 billion in Vicksburg","source_url":"https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/","publisher":"Office of Governor Tate Reeves","source_family":"governorreeves.ms.gov","license":"source-terms-not-recorded","attribution":"Office of Governor Tate Reeves","published_at":"2025-11-20","retrieved_at":"2026-10-09","content_hash":"f954f67de9aa3047474b974568d8da996e3a1f119ddaa48fb3d1810a803d18fc","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"aws-vicksburg-warren-county-mississippi","source_local_id":"s1","source_record_sha256":"e1ddd3d99fd07c52d39a039e17ead8347cc72830b536cfe7e1b763cbc216a041","site_ids":["vcc-site-ab1cba1760d42b280cd1"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6323bbc2-696d-588a-97e0-2b98b39e0897.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/6323bbc2-696d-588a-97e0-2b98b39e0897.json","archive_url":"https://web.archive.org/web/20261009/https://governorreeves.ms.gov/governor-tate-reeves-announces-amazon-plans-to-invest-3-billion-in-vicksburg/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-ab1cba1760d42b280cd1/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-ab1cba1760d42b280cd1.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-ab1cba1760d42b280cd1","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
