{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-b287b39e1341bb948cb6","physical_site_stable_key":"curated:gds-shaoguan-computing-cluster-baitu","name":"GDS Shaoguan Computing Cluster, Baitu Industrial Park, Qujiang","country":"China","country_iso_a2":"CN","latitude":24.6864239,"longitude":113.5092922,"geometry":{"coordinates":[113.5092922,24.6864239],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription_with_imagery_datum_check"],"geometry_scope_classes":["official_eia_dedicated_user_substation_centre"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["Centre of the proposed GDS I (万国I站) 220 kV user substation that the GDS project company is building to supply only the GDS Shaoguan computing cluster, printed in its October 2026 EIA. It marks the cluster through its dedicated grid intake in the Baitu industrial park; it is not a data-hall centre, parcel centroid, entrance, campus boundary or construction extent."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84 reading rests on a qualitative imagery check of a second point in the same filing (the Tanjie line end) and on agreement within 72 m with the GCJ-02-corrected point of the July grid EIA. None of the filings outlines the data-centre property, so the substation's offset from the data-centre buildings, and whether it lies inside their parcel, are unknown. Decimal places are transcription precision.","geometry_evidence_ids":["1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff"],"project_count":1,"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"project_stable_keys":["curated:gds-shaoguan-computing-cluster-baitu:campus-development"],"statuses":["announced"],"oldest_status_as_of":"2026-10-26","newest_status_as_of":"2026-10-26","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b287b39e1341bb948cb6/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b287b39e1341bb948cb6.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau"]},"projects":[{"project_id":"91de96c1-0354-5542-8abc-70cb91d3dc14","project_stable_key":"curated:gds-shaoguan-computing-cluster-baitu:campus-development","site_id":"vcc-site-b287b39e1341bb948cb6","physical_site_stable_key":"curated:gds-shaoguan-computing-cluster-baitu","name":"GDS Shaoguan Computing Cluster (韶关万国数据算力集群) — data-centre campus development","country":"China","country_iso_a2":"CN","latitude":24.6864239,"longitude":113.5092922,"geometry":{"coordinates":[113.5092922,24.6864239],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription_with_imagery_datum_check","geometry_scope_class":"official_eia_dedicated_user_substation_centre","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"Centre of the proposed GDS I (万国I站) 220 kV user substation that the GDS project company is building to supply only the GDS Shaoguan computing cluster, printed in its October 2026 EIA. It marks the cluster through its dedicated grid intake in the Baitu industrial park; it is not a data-hall centre, parcel centroid, entrance, campus boundary or construction extent.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84 reading rests on a qualitative imagery check of a second point in the same filing (the Tanjie line end) and on agreement within 72 m with the GCJ-02-corrected point of the July grid EIA. None of the filings outlines the data-centre property, so the substation's offset from the data-centre buildings, and whether it lies inside their parcel, are unknown. Decimal places are transcription precision.","geometry_evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","last_observed_physical_status":"announced","status_as_of":"2026-10-26","status_age_days_at_review":1,"status_method":"authoritative_project_announcement","status_evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","party":"GDS (万国数据)","relationship_scope":"intended","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"GDS (万国数据)","users":null,"tenants":null,"customers":null,"status_source_url":"https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf","geometry_source_url":"https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf","project_details":[],"evidence_ids":["1f15b8b4-aeb5-5487-b8e5-d76032cb2038","1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","2e0903bc-e21c-521c-941b-69680b6c5ef1","5a5cf406-c5e6-50e3-9852-e61fa41ad9c8","badd8dee-5936-523e-a81e-cb45194db457","dc5f39fd-9ef5-5f7f-96e7-ff038e93d013"],"status_source":{"evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","title":"Ecological EIA report form: 万国数据韶关220千伏输变电工程 (GDS Shaoguan 220 kV transmission project), public version, builder 韶关市万国云耀数据科技有限公司","publisher":"韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau","kind":"regulatory_filing","published_at":"2026-10-26","source_url":"https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf","license":"all-rights-reserved","attribution":"韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b287b39e1341bb948cb6/#project-91de96c1-0354-5542-8abc-70cb91d3dc14","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/91de96c1-0354-5542-8abc-70cb91d3dc14.json","geometry_source":{"evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","title":"Ecological EIA report form: 万国数据韶关220千伏输变电工程 (GDS Shaoguan 220 kV transmission project), public version, builder 韶关市万国云耀数据科技有限公司","publisher":"韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau","kind":"regulatory_filing","published_at":"2026-10-26","source_url":"https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf","license":"all-rights-reserved","attribution":"韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau"}}],"evidence":[{"evidence_id":"1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff","roles":["announcement","geometry","role:operator"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"regulatory_filing","title":"Ecological EIA report form: 万国数据韶关220千伏输变电工程 (GDS Shaoguan 220 kV transmission project), public version, builder 韶关市万国云耀数据科技有限公司","source_url":"https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf","publisher":"韶关市万国云耀数据科技有限公司 (filing builder); published by the Shaoguan Municipal Ecology and Environment Bureau","source_family":"Shaoguan Ecology and Environment Bureau EIA acceptance records","license":"all-rights-reserved","attribution":"韶关市万国云耀数据科技有限公司 (builder); report prepared by 广东韶科环保科技有限公司; published by the Shaoguan Municipal Ecology and Environment Bureau","published_at":"2026-10-26","retrieved_at":"2026-10-26T17:01:44.605Z","content_hash":"967da14da541afd53af6fa6ad228aea59057c4faf66edb7af454fe20b1b91b7a","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1f706dda-f5cf-5883-9d5c-eb9f2e90b5ff.json","archive_url":"https://web.archive.org/web/20261026170144/https://www.sg.gov.cn/attachment/0/319/319066/2890730.pdf"},{"evidence_id":"5a5cf406-c5e6-50e3-9852-e61fa41ad9c8","roles":["context:identity"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"government_environmental_document","title":"EIA report form: 韶关220千伏白土数据中心输变电工程 (Shaoguan 220 kV Baitu data-centre transmission project), public version, accepted July 2026","source_url":"https://www.sg.gov.cn/attachment/0/310/310030/2860175.pdf","publisher":"Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau","source_family":"Shaoguan Ecology and Environment Bureau EIA acceptance records","license":"all-rights-reserved","attribution":"Guangdong Power Grid Co., Ltd. Shaoguan Power Supply Bureau (builder); published by the Shaoguan Municipal Ecology and Environment Bureau","published_at":"2026-07-03","retrieved_at":"2026-10-26T17:24:40.181Z","content_hash":"dbe5d65db0cebf8b0b10d29cb32fec875fef09135f89713698ddb83936638795","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5a5cf406-c5e6-50e3-9852-e61fa41ad9c8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/5a5cf406-c5e6-50e3-9852-e61fa41ad9c8.json","archive_url":"https://web.archive.org/web/20261026172440/https://www.sg.gov.cn/attachment/0/310/310030/2860175.pdf"},{"evidence_id":"badd8dee-5936-523e-a81e-cb45194db457","roles":["context:identity"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"government_environmental_document","title":"EIA report form: 韶关万国数据算力集群项目接入系统配套工程 (GDS Shaoguan computing-cluster grid-connection works at the 220 kV Tanjie substation), public version, June 2026","source_url":"https://www.sg.gov.cn/attachment/0/309/309691/2855829.pdf","publisher":"Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局); builder Guangdong Power Grid Shaoguan Power Supply Bureau","source_family":"Shaoguan Ecology and Environment Bureau EIA acceptance records","license":"all-rights-reserved","attribution":"Guangdong Power Grid Co., Ltd. Shaoguan Power Supply Bureau (builder); published by the Shaoguan Municipal Ecology and Environment Bureau","published_at":"2026-06-15","retrieved_at":"2026-10-26T17:24:50.587Z","content_hash":"fb9ea43e840f289956e726e9e596f78fc15838148fedf88e546c07d3e9c0a74b","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/badd8dee-5936-523e-a81e-cb45194db457.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/badd8dee-5936-523e-a81e-cb45194db457.json","archive_url":"https://web.archive.org/web/20261026172450/https://www.sg.gov.cn/attachment/0/309/309691/2855829.pdf"},{"evidence_id":"dc5f39fd-9ef5-5f7f-96e7-ff038e93d013","roles":["context:identity"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"other","title":"Esri World Imagery tile z17/56256/106863 (GDS I substation point, Baitu industrial park, Qujiang)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/tile/17/56256/106863","publisher":"Esri","source_family":"Esri World Imagery","license":"Esri World Imagery terms of use; not redistributed","attribution":"Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)","published_at":null,"retrieved_at":"2026-10-26T17:05:07.938Z","content_hash":"0fa6e1c401ca3ef38dc15abddeb3baf7ce0e64d24061db0d8da679939081def4","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dc5f39fd-9ef5-5f7f-96e7-ff038e93d013.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/dc5f39fd-9ef5-5f7f-96e7-ff038e93d013.json","archive_url":"https://web.archive.org/web/20261026170507/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/tile/17/56256/106863"},{"evidence_id":"2e0903bc-e21c-521c-941b-69680b6c5ef1","roles":["context:identity"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"other","title":"Esri World Imagery tile z17/56260/106852 (220 kV Tanjie substation, Baitu, Qujiang)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/tile/17/56260/106852","publisher":"Esri","source_family":"Esri World Imagery","license":"Esri World Imagery terms of use; not redistributed","attribution":"Esri, Maxar, Earthstar Geographics, and the GIS User Community (Esri World Imagery)","published_at":null,"retrieved_at":"2026-10-26T17:15:21.788Z","content_hash":"9613fa5625acff6487cc30b62648cf21119d86e4aeb8d9a8a184ac6868aae1b8","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e0903bc-e21c-521c-941b-69680b6c5ef1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e0903bc-e21c-521c-941b-69680b6c5ef1.json","archive_url":"https://web.archive.org/web/20261026171521/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/tile/17/56260/106852"},{"evidence_id":"1f15b8b4-aeb5-5487-b8e5-d76032cb2038","roles":["context:identity"],"project_ids":["91de96c1-0354-5542-8abc-70cb91d3dc14"],"kind":"government_record","title":"Shaoguan Ecology and Environment Bureau acceptance notice for the EIA report form of the 万国数据韶关220千伏输变电工程","source_url":"https://www.sg.gov.cn/zw/zdlyxxgk/dzjg/sgssthjj/hjbhxxgk/jsxmhjyxpjxx/content/post_2890730.html","publisher":"Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局)","source_family":"Shaoguan Ecology and Environment Bureau EIA acceptance records","license":"all-rights-reserved","attribution":"Shaoguan Municipal Ecology and Environment Bureau (韶关市生态环境局), Shaoguan municipal government portal","published_at":"2026-10-26","retrieved_at":"2026-10-26T17:01:01.524Z","content_hash":"63ef99e73ce7247eac5aa0740d586ed1bf17ad670b28e6cde201c4eac1194d5c","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-b287b39e1341bb948cb6"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1f15b8b4-aeb5-5487-b8e5-d76032cb2038.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1f15b8b4-aeb5-5487-b8e5-d76032cb2038.json","archive_url":"https://web.archive.org/web/20261026170101/https://www.sg.gov.cn/zw/zdlyxxgk/dzjg/sgssthjj/hjbhxxgk/jsxmhjyxpjxx/content/post_2890730.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-b287b39e1341bb948cb6/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-b287b39e1341bb948cb6.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-b287b39e1341bb948cb6","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
