{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-bea6bf727e581e987a62","physical_site_stable_key":"curated:beacon-voltagrid-spruce-lake-saint-john","name":"Spruce Lake AI Data Centre","country":"Canada","country_iso_a2":"CA","latitude":45.1837119,"longitude":-66.1763155,"geometry":{"coordinates":[-66.1763155,45.1837119],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["coordinate_transform"],"geometry_methods":["arithmetic_mean_of_58_generator_and_boiler_stack_utm_nad83_zone19_coordinates_table_3_3_transformed_epsg26919_to_epsg4326_with_pyproj_3_7_1"],"geometry_scope_classes":["mean_of_proponent_declared_onsite_stack_coordinates_in_eia_registration"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["project_locator"],"geometry_precision_scopes":["Mean of the 58 modelled on-site stack positions (50 gas-engine and 8 boiler stacks) inside the roughly 89 ha Data Centre Project Development Area. It locates the proposed campus, not a building footprint or surveyed boundary. The stacks lie up to 459 m from this point. The point is 198 m from IAAC's stated-approximate registry marker."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The machine-readable Data Centre PDA outline was not published; the modelled stack coordinates span up to about 459 m around the mean, and no surveyed accuracy is given.","geometry_evidence_ids":["77516a5d-3986-535f-b399-26bcef45eefe"],"project_count":1,"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"project_stable_keys":["curated:beacon-voltagrid-spruce-lake-saint-john:ai-data-centre-proposal"],"statuses":["announced"],"oldest_status_as_of":"2026-09-15","newest_status_as_of":"2026-09-15","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"ca","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bea6bf727e581e987a62/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bea6bf727e581e987a62.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; NB Department of Environment and Local Government; Internet Archive"]},"projects":[{"project_id":"a1f83625-a411-5b1d-9d25-ea41862ebe9c","project_stable_key":"curated:beacon-voltagrid-spruce-lake-saint-john:ai-data-centre-proposal","site_id":"vcc-site-bea6bf727e581e987a62","physical_site_stable_key":"curated:beacon-voltagrid-spruce-lake-saint-john","name":"Spruce Lake AI Data Centre — proposed campus and on-site generation","country":"Canada","country_iso_a2":"CA","latitude":45.1837119,"longitude":-66.1763155,"geometry":{"coordinates":[-66.1763155,45.1837119],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"coordinate_transform","geometry_method":"arithmetic_mean_of_58_generator_and_boiler_stack_utm_nad83_zone19_coordinates_table_3_3_transformed_epsg26919_to_epsg4326_with_pyproj_3_7_1","geometry_scope_class":"mean_of_proponent_declared_onsite_stack_coordinates_in_eia_registration","geometry_authority_class":"compiled_reference","geometry_use_scope":"project_locator","geometry_precision_scope":"Mean of the 58 modelled on-site stack positions (50 gas-engine and 8 boiler stacks) inside the roughly 89 ha Data Centre Project Development Area. It locates the proposed campus, not a building footprint or surveyed boundary. The stacks lie up to 459 m from this point. The point is 198 m from IAAC's stated-approximate registry marker.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The machine-readable Data Centre PDA outline was not published; the modelled stack coordinates span up to about 459 m around the mean, and no surveyed accuracy is given.","geometry_evidence_id":"77516a5d-3986-535f-b399-26bcef45eefe","last_observed_physical_status":"announced","status_as_of":"2026-09-15","status_age_days_at_review":42,"status_method":"authoritative_project_announcement","status_evidence_id":"cd0229a4-0ac6-518b-a256-a68a6fc81e89","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"77516a5d-3986-535f-b399-26bcef45eefe","party":"Beacon New Brunswick Inc. (Beacon AI Centers)","relationship_scope":"intended","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"Beacon New Brunswick Inc. (Beacon AI Centers)","users":null,"tenants":null,"customers":null,"status_source_url":"https://iaac-aeic.gc.ca/050/evaluations/proj/90762","geometry_source_url":"https://web.archive.org/web/20260918123956id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-registration.pdf","project_details":[],"evidence_ids":["4e9fbef7-65c9-5334-be7a-74d5a6c4a335","77516a5d-3986-535f-b399-26bcef45eefe","9c2bda05-cb9f-5537-bf9f-4910cac97c53","cd0229a4-0ac6-518b-a256-a68a6fc81e89","e6ff5ff2-7388-5faa-bf5c-c90c79898a60"],"status_source":{"evidence_id":"cd0229a4-0ac6-518b-a256-a68a6fc81e89","title":"Canadian Impact Assessment Registry: Spruce Lake AI Data Centre Project (reference 90762)","publisher":"Impact Assessment Agency of Canada","kind":"government_record","published_at":"2026-09-15","source_url":"https://iaac-aeic.gc.ca/050/evaluations/proj/90762","license":"Crown copyright; Canada.ca terms and conditions","attribution":"Impact Assessment Agency of Canada"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bea6bf727e581e987a62/#project-a1f83625-a411-5b1d-9d25-ea41862ebe9c","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/a1f83625-a411-5b1d-9d25-ea41862ebe9c.json","geometry_source":{"evidence_id":"77516a5d-3986-535f-b399-26bcef45eefe","title":"Spruce Lake AI Data Centre Project — EIA Registration (NB project 1663), Internet Archive copy of 18 September 2026","publisher":"Beacon New Brunswick Inc. and VoltaGrid LLC (prepared by Stantec), filed with NB Department of Environment and Local Government","kind":"regulatory_filing","published_at":"2026-04-14","source_url":"https://web.archive.org/web/20260918123956id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-registration.pdf","license":"all-rights-reserved","attribution":"Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; NB Department of Environment and Local Government; Internet Archive"}}],"evidence":[{"evidence_id":"cd0229a4-0ac6-518b-a256-a68a6fc81e89","roles":["announcement"],"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"kind":"government_record","title":"Canadian Impact Assessment Registry: Spruce Lake AI Data Centre Project (reference 90762)","source_url":"https://iaac-aeic.gc.ca/050/evaluations/proj/90762","publisher":"Impact Assessment Agency of Canada","source_family":"Canadian Impact Assessment Registry","license":"Crown copyright; Canada.ca terms and conditions","attribution":"Impact Assessment Agency of Canada","published_at":"2026-09-15","retrieved_at":"2026-10-16T18:16:55.101Z","content_hash":"5e818d883f3404453c6fe06de508c0d1f6c9b2ce85ec7810d1ec71f01bc1b32f","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-bea6bf727e581e987a62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/cd0229a4-0ac6-518b-a256-a68a6fc81e89.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/cd0229a4-0ac6-518b-a256-a68a6fc81e89.json","archive_url":"https://web.archive.org/web/20261016181655/https://iaac-aeic.gc.ca/050/evaluations/proj/90762"},{"evidence_id":"4e9fbef7-65c9-5334-be7a-74d5a6c4a335","roles":["context:identity"],"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"kind":"government_record","title":"New Brunswick EIA registrations and determinations (1657–most recent), Internet Archive copy of 30 September 2026","source_url":"https://web.archive.org/web/20260930162509id_/https://www.gnb.ca/en/topic/environment-resources/environmental-assessment/registrations-determinations/1657-most-recent.html","publisher":"New Brunswick Department of Environment and Local Government","source_family":"New Brunswick EIA registrations","license":"all-rights-reserved","attribution":"New Brunswick Department of Environment and Local Government; Internet Archive","published_at":null,"retrieved_at":"2026-10-16T18:23:19.716Z","content_hash":"27ff0c6ba98206331f4e194dfe89da3293ef53c68c9545321d88d23d0167332b","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-bea6bf727e581e987a62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4e9fbef7-65c9-5334-be7a-74d5a6c4a335.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4e9fbef7-65c9-5334-be7a-74d5a6c4a335.json","archive_url":"https://web.archive.org/web/20261016182319/https://web.archive.org/web/20260930162509id_/https://www.gnb.ca/en/topic/environment-resources/environmental-assessment/registrations-determinations/1657-most-recent.html"},{"evidence_id":"9c2bda05-cb9f-5537-bf9f-4910cac97c53","roles":["context:identity"],"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"kind":"regulatory_filing","title":"Request for designation of the Spruce Lake AI Data Centre Project (IAAC registry document 1)","source_url":"https://iaac-aeic.gc.ca/050/documents/p90762/167915E.pdf","publisher":"Impact Assessment Agency of Canada (registry copy of a public request)","source_family":"Canadian Impact Assessment Registry","license":"Crown copyright registry copy of third-party content; Canada.ca terms and conditions","attribution":"Impact Assessment Agency of Canada; requester","published_at":"2026-08-16","retrieved_at":"2026-10-16T18:17:46.689Z","content_hash":"ac50e9782a8100093618bb83a49e7e2cb74f87f15e1f228c1bebcace00e43210","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-bea6bf727e581e987a62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c2bda05-cb9f-5537-bf9f-4910cac97c53.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/9c2bda05-cb9f-5537-bf9f-4910cac97c53.json","archive_url":"https://web.archive.org/web/20261016181746/https://iaac-aeic.gc.ca/050/documents/p90762/167915E.pdf"},{"evidence_id":"77516a5d-3986-535f-b399-26bcef45eefe","roles":["geometry","role:operator"],"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"kind":"regulatory_filing","title":"Spruce Lake AI Data Centre Project — EIA Registration (NB project 1663), Internet Archive copy of 18 September 2026","source_url":"https://web.archive.org/web/20260918123956id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-registration.pdf","publisher":"Beacon New Brunswick Inc. and VoltaGrid LLC (prepared by Stantec), filed with NB Department of Environment and Local Government","source_family":"New Brunswick EIA registrations","license":"all-rights-reserved","attribution":"Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; NB Department of Environment and Local Government; Internet Archive","published_at":"2026-04-14","retrieved_at":"2026-10-16T18:22:27.208Z","content_hash":"0eae875d14f01ffc17370e9a67accb9144a53606a18c5b9954d84a6bd6080543","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-bea6bf727e581e987a62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/77516a5d-3986-535f-b399-26bcef45eefe.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/77516a5d-3986-535f-b399-26bcef45eefe.json","archive_url":"https://web.archive.org/web/20261016182227/https://web.archive.org/web/20260918123956id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-registration.pdf"},{"evidence_id":"e6ff5ff2-7388-5faa-bf5c-c90c79898a60","roles":["context:identity"],"project_ids":["a1f83625-a411-5b1d-9d25-ea41862ebe9c"],"kind":"regulatory_filing","title":"Spruce Lake AI Data Centre — Updated Site Plans and Alternate Pipeline Route (EIA 1663 addendum, 28 April 2026), Internet Archive copy","source_url":"https://web.archive.org/web/20260918124028id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-update-plan.pdf","publisher":"Beacon New Brunswick Inc. and VoltaGrid LLC (prepared by Stantec)","source_family":"New Brunswick EIA registrations","license":"all-rights-reserved","attribution":"Beacon New Brunswick Inc.; VoltaGrid LLC; Stantec; Internet Archive","published_at":"2026-04-28","retrieved_at":"2026-10-16T18:24:09.663Z","content_hash":"7451a12ff25299f91f5f32a1cf75b7b06e4cd8a47a1158a0a02a8f719ecaf35d","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-bea6bf727e581e987a62"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e6ff5ff2-7388-5faa-bf5c-c90c79898a60.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/e6ff5ff2-7388-5faa-bf5c-c90c79898a60.json","archive_url":"https://web.archive.org/web/20261016182409/https://web.archive.org/web/20260918124028id_/https://www.gnb.ca/content/dam/GNB3/t/enr-ern/eia/docs/registrations-enregistrements/1657-/1663-update-plan.pdf"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-bea6bf727e581e987a62/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-bea6bf727e581e987a62.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-bea6bf727e581e987a62","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
