{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-c1888e4188c5e991f794","physical_site_stable_key":"curated:paratera-inner-mongolia-new-computing-base-horinger","name":"Paratera Inner Mongolia New Computing Base (Horinger)","country":"China","country_iso_a2":"CN","latitude":40.541793611,"longitude":111.841965833,"geometry":{"coordinates":[111.841965833,40.541793611],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["campus"],"geometry_derivations":["direct_geometry"],"geometry_methods":["official_eia_geographic_dms_point_transcription"],"geometry_scope_classes":["official_eia_on_campus_substation_locator"],"geometry_authority_classes":["official_source"],"geometry_use_scopes":["campus_locator"],"geometry_precision_scopes":["EIA station-site centre of the compute base's Phase 2 110 kV substation, which the report places inside the Phase 2 land on the east side of the base, adjoining the Phase 1 works to the west. Locates the Phase 1-2 campus of the Paratera Inner Mongolia New Computing Base through on-campus power infrastructure at its east end; not a data-hall footprint, parcel centroid or entrance. The base's main data-centre buildings lie about 200-300 m west-south-west of the point; later phases located elsewhere, if any, are not covered."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84/CGCS2000 reading rests on the report's neighbour description, its figures and agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, about 10-20 m between the point and the visible east-end building). The point marks the base's Phase 2 substation area at its east end, up to a few hundred metres from the data halls. Decimal places are transcription precision, not accuracy.","geometry_evidence_ids":["b62436b3-706b-5909-8d0b-7395e77bbc48"],"project_count":1,"project_ids":["cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"project_stable_keys":["curated:paratera-inner-mongolia-new-computing-base-horinger:existing-operations"],"statuses":["operational"],"oldest_status_as_of":"2026-08-10","newest_status_as_of":"2026-08-10","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"cn","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1888e4188c5e991f794.json","geometry_licenses":["all-rights-reserved"],"geometry_attributions":["Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司"]},"projects":[{"project_id":"cd72f11f-e9b0-52ab-9b08-2e45abd3a43d","project_stable_key":"curated:paratera-inner-mongolia-new-computing-base-horinger:existing-operations","site_id":"vcc-site-c1888e4188c5e991f794","physical_site_stable_key":"curated:paratera-inner-mongolia-new-computing-base-horinger","name":"Paratera Inner Mongolia New Computing Base — existing compute-base operations","country":"China","country_iso_a2":"CN","latitude":40.541793611,"longitude":111.841965833,"geometry":{"coordinates":[111.841965833,40.541793611],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"campus","geometry_derivation":"direct_geometry","geometry_method":"official_eia_geographic_dms_point_transcription","geometry_scope_class":"official_eia_on_campus_substation_locator","geometry_authority_class":"official_source","geometry_use_scope":"campus_locator","geometry_precision_scope":"EIA station-site centre of the compute base's Phase 2 110 kV substation, which the report places inside the Phase 2 land on the east side of the base, adjoining the Phase 1 works to the west. Locates the Phase 1-2 campus of the Paratera Inner Mongolia New Computing Base through on-campus power infrastructure at its east end; not a data-hall footprint, parcel centroid or entrance. The base's main data-centre buildings lie about 200-300 m west-south-west of the point; later phases located elsewhere, if any, are not covered.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"No datum or positional accuracy is stated. The WGS84/CGCS2000 reading rests on the report's neighbour description, its figures and agreement with independent Esri imagery of unstated accuracy and date (manual visual comparison, about 10-20 m between the point and the visible east-end building). The point marks the base's Phase 2 substation area at its east end, up to a few hundred metres from the data halls. Decimal places are transcription precision, not accuracy.","geometry_evidence_id":"b62436b3-706b-5909-8d0b-7395e77bbc48","last_observed_physical_status":"operational","status_as_of":"2026-08-10","status_age_days_at_review":78,"status_method":"authoritative_physical_status_update","status_evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","verification_posture":"authoritative_physical_observation_plus_reviewed_site_locator","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"not established by selected evidence","operating_model":"unknown","operating_model_unknown_reason":"not established by selected evidence","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"not established by selected evidence","role_claims":[{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","party":"Paratera (并行科技)","relationship_scope":"current","role":"operator"}],"power_observations":[],"power_unknown_reason":"no typed power observation selected; not estimated","annual_energy_observations":[],"annual_energy_unknown_reason":"no scoped annual-energy inputs; not estimated","efficiency_observations":[],"efficiency_unknown_reason":"no scoped PUE or WUE observation","owner":null,"operator":"Paratera (并行科技)","users":null,"tenants":null,"customers":null,"status_source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","geometry_source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/P020240714525829149017.pdf","project_details":[],"evidence_ids":["7342aa71-7128-5fca-a610-9ccc7ba54747","91a8c972-5a1b-56f6-9066-906b26d089c3","b5152228-7680-5036-a60d-fe39da80b1c1","b62436b3-706b-5909-8d0b-7395e77bbc48","fbcb5c8d-7c87-596c-9e82-77ae8f2910cd"],"status_source":{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","title":"Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区：“三看”自贸试验区里的算力“加速度”), 10 August 2026","publisher":"Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)","kind":"government_record","published_at":"2026-08-10","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/#project-cd72f11f-e9b0-52ab-9b08-2e45abd3a43d","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/cd72f11f-e9b0-52ab-9b08-2e45abd3a43d.json","geometry_source":{"evidence_id":"b62436b3-706b-5909-8d0b-7395e77bbc48","title":"Environmental impact report form: Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation (并行科技算力基地二期110kV变电站（报批）), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 14 July 2024","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","kind":"government_environmental_document","published_at":"2024-07-14","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/P020240714525829149017.pdf","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司"}}],"evidence":[{"evidence_id":"fbcb5c8d-7c87-596c-9e82-77ae8f2910cd","roles":["context:identity"],"project_ids":["cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_environmental_document","title":"Environmental impact report form (revised, supplementing the original approval): Paratera Inner Mongolia New Computing Base 110 kV substation (并行科技内蒙古新型算力基地110kV变电站工程（报批-补充原环评批复）), Inner Mongolia Department of Ecology and Environment approval-result publicity of 20 January 2025","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202501/P020250120533508912907.docx","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限责任公司","published_at":"2025-01-20","retrieved_at":"2026-10-27T03:57:12.679Z","content_hash":"14c9ab49307f23f651a83c63e064a3ef680f0fafb6a51714c169f894cf0a0d91","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-c1888e4188c5e991f794"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fbcb5c8d-7c87-596c-9e82-77ae8f2910cd.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/fbcb5c8d-7c87-596c-9e82-77ae8f2910cd.json","archive_url":"https://web.archive.org/web/20261027035712/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202501/P020250120533508912907.docx"},{"evidence_id":"b62436b3-706b-5909-8d0b-7395e77bbc48","roles":["geometry"],"project_ids":["cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_environmental_document","title":"Environmental impact report form: Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation (并行科技算力基地二期110kV变电站（报批）), Inner Mongolia Department of Ecology and Environment radiation-EIA approval-result publicity of 14 July 2024","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/P020240714525829149017.pdf","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment; report form prepared for 内蒙古新东吉泰科技有限公司","published_at":"2024-07-14","retrieved_at":"2026-10-27T03:55:37.552Z","content_hash":"c02eeacfb8edff608c6862ab82fa88c55cdfec2f225256f8a30320adf9c08e39","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-c1888e4188c5e991f794"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b62436b3-706b-5909-8d0b-7395e77bbc48.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b62436b3-706b-5909-8d0b-7395e77bbc48.json","archive_url":"https://web.archive.org/web/20261027035537/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/P020240714525829149017.pdf"},{"evidence_id":"91a8c972-5a1b-56f6-9066-906b26d089c3","roles":["context:identity"],"project_ids":["cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"map","title":"Esri World Imagery EPSG:4326 export around the Paratera Inner Mongolia New Computing Base, Horinger (request bbox 111.8340-111.8480E, 40.5375-40.5455N)","source_url":"https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.8340,40.5375,111.8480,40.5455&bboxSR=4326&imageSR=4326&size=1600,1205&format=jpg&f=image","publisher":"Esri","source_family":"Esri World Imagery","license":"all-rights-reserved","attribution":"Esri, Maxar, Earthstar Geographics and the GIS user community (World Imagery)","published_at":null,"retrieved_at":"2026-10-27T03:59:34.440Z","content_hash":"e04cf114d99af5a5ebefb4c627f253f4424a0b3ec2611a2cc41dc2fd65eafed0","publication_date_precision":"unknown","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-c1888e4188c5e991f794"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/91a8c972-5a1b-56f6-9066-906b26d089c3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/91a8c972-5a1b-56f6-9066-906b26d089c3.json","archive_url":"https://web.archive.org/web/20261027035934/https://server.arcgisonline.com/ArcGIS/rest/services/World_Imagery/MapServer/export?bbox=111.8340,40.5375,111.8480,40.5455&bboxSR=4326&imageSR=4326&size=1600,1205&format=jpg&f=image"},{"evidence_id":"b5152228-7680-5036-a60d-fe39da80b1c1","roles":["context:identity","physical_status","role:operator"],"project_ids":["1dd04d18-ca1c-5a59-846b-235ebabebffa","8140cff8-04b3-5d90-a8bc-f5fb48f7af08","83d24ae4-38df-5b1f-9d3c-ea679f7c21d0","cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_record","title":"Horinger New Area news item: 'From WAIC to Inner Mongolia Horinger New Area: three looks at the compute acceleration in the free trade zone' (从WAIC到内蒙古和林格尔新区：“三看”自贸试验区里的算力“加速度”), 10 August 2026","source_url":"http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html","publisher":"Inner Mongolia Horinger New Area Party-Mass Service Center (内蒙古和林格尔新区党群服务中心)","source_family":"China (Inner Mongolia) Pilot Free Trade Zone Hohhot Area / Inner Mongolia Horinger New Area Management Committee","license":"all-rights-reserved","attribution":"内蒙古和林格尔新区党群服务中心, via the Horinger New Area Management Committee website (hlgena.huhhot.gov.cn)","published_at":"2026-08-10","retrieved_at":"2026-10-23T01:34:11.305Z","content_hash":"6cccbcc8c8de9c82f37e7af13ba3a6ae74ba5c35b18905bc478a8d386d81ff15","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-23ffbb893f12f178d8d3","vcc-site-8b806f7ae4b0034de59b","vcc-site-c1888e4188c5e991f794","vcc-site-f59d2f5037e6cf9243dd"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b5152228-7680-5036-a60d-fe39da80b1c1.json","archive_url":"https://web.archive.org/web/20261023013411/http://hlgena.huhhot.gov.cn/zxzx/xqdt/202608/t20260810_2027824.html"},{"evidence_id":"7342aa71-7128-5fca-a610-9ccc7ba54747","roles":["context:identity"],"project_ids":["cd72f11f-e9b0-52ab-9b08-2e45abd3a43d"],"kind":"government_record","title":"Inner Mongolia Department of Ecology and Environment approval-result publicity for the radiation-category EIA of the Paratera Inner Mongolia New Computing Base Phase 2 project 110 kV substation, 14 July 2024","source_url":"https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/t20240714_2542235.html","publisher":"Inner Mongolia Autonomous Region Department of Ecology and Environment","source_family":"Inner Mongolia Department of Ecology and Environment environmental assessment records","license":"all-rights-reserved","attribution":"Inner Mongolia Autonomous Region Department of Ecology and Environment","published_at":"2024-07-14","retrieved_at":"2026-10-27T03:50:57.432Z","content_hash":"f0c24e1bcdd13ea9508c0b61f10f937efc7d024896355ff37fd3c5b6c7d540c6","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_http_response_body_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-c1888e4188c5e991f794"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7342aa71-7128-5fca-a610-9ccc7ba54747.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7342aa71-7128-5fca-a610-9ccc7ba54747.json","archive_url":"https://web.archive.org/web/20261027035057/https://sthjt.nmg.gov.cn/xxgk/sthjzdlyxxgk/wrfzhssxg/hyfshjjg/202407/t20240714_2542235.html"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-c1888e4188c5e991f794/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-c1888e4188c5e991f794.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-c1888e4188c5e991f794","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
