{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-cb8ab0ad35bb603ea3ba","physical_site_stable_key":"imported:semiconductor-atlas:meta-mesa-arizona","name":"Meta Mesa Data Center","country":"United States","country_iso_a2":"US","latitude":33.4222,"longitude":-111.8228,"geometry":{"coordinates":[-111.8228,33.4222],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["Coordinates are the Mesa city coordinates from its Wikipedia page, not the site. Sources give the street address (3841 S. Ellsworth Road, at the southeast corner of Elliot and Ellsworth Roads), but it was not converted to coordinates because no geocoder was used."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["f2e0aa56-e925-51e3-94a6-43ac3a38be1c"],"project_count":1,"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"project_stable_keys":["imported:semiconductor-atlas:meta-mesa-arizona"],"statuses":["expansion"],"oldest_status_as_of":"2026-10-20","newest_status_as_of":"2026-10-20","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb8ab0ad35bb603ea3ba/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cb8ab0ad35bb603ea3ba.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["KTAR News"]},"projects":[{"project_id":"8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f","project_stable_key":"imported:semiconductor-atlas:meta-mesa-arizona","site_id":"vcc-site-cb8ab0ad35bb603ea3ba","physical_site_stable_key":"imported:semiconductor-atlas:meta-mesa-arizona","name":"Meta Mesa Data Center","country":"United States","country_iso_a2":"US","latitude":33.4222,"longitude":-111.8228,"geometry":{"coordinates":[-111.8228,33.4222],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"Coordinates are the Mesa city coordinates from its Wikipedia page, not the site. Sources give the street address (3841 S. Ellsworth Road, at the southeast corner of Elliot and Ellsworth Roads), but it was not converted to coordinates because no geocoder was used.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","last_observed_physical_status":"expansion","status_as_of":"2026-10-20","status_age_days_at_review":7,"status_method":"authoritative_physical_status_update","status_evidence_id":"cb457039-0afa-5d57-a4ef-771a97485bfb","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"90c086dc-2fb1-531c-b7de-c5482be9c676","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"developer","source_record_id":"meta-mesa-arizona"},{"evidence_id":"98c5d27d-61ea-54ae-a5a9-e821ce87858e","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"developer","source_record_id":"meta-mesa-arizona"},{"evidence_id":"2e1d8fdc-f473-5df8-9053-04a2a58431d3","notes":null,"party":"Meta Platforms","relationship_scope":"unknown","role":"operator","source_record_id":"meta-mesa-arizona"},{"evidence_id":"16e36e46-4aa0-575e-b78d-bf6521024466","notes":null,"party":"DPR Construction","relationship_scope":"unknown","role":"builder","source_record_id":"meta-mesa-arizona"},{"evidence_id":"90c086dc-2fb1-531c-b7de-c5482be9c676","notes":null,"party":"Salt River Project","relationship_scope":"unknown","role":"utility","source_record_id":"meta-mesa-arizona"},{"evidence_id":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","notes":null,"party":"Salt River Project","relationship_scope":"unknown","role":"utility","source_record_id":"meta-mesa-arizona"},{"evidence_id":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","notes":"Partner with Salt River Project on the Brittlebush solar plant, whose entire output is dedicated to the Mesa data center.","party":"EDP Renewables North America","relationship_scope":"unknown","role":"power_supplier","source_record_id":"meta-mesa-arizona"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":"Meta Platforms","users":null,"tenants":null,"customers":null,"status_source_url":"https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$select=permit_number,inspection_id,inspection_type,inspection_status,result_type,request_date,scheduled_date,inspection_completed_date,address_line1,latitude,longitude&$where=permit_number%20in('PMT26-03021','PMT25-19703','PMT26-10697')&$order=inspection_completed_date&$limit=5000","geometry_source_url":"https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve Meta Mesa Data Center as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"meta-mesa-arizona"},"record":{"aliases":["Mesa Data Center"],"id":"meta-mesa-arizona","last_reviewed":"2026-10-09","location":{"admin1":"Arizona","admin2":"Maricopa County","country":"US","lat":33.4222,"locality":"Mesa","lon":-111.8228,"note":"Coordinates are the Mesa city coordinates from its Wikipedia page, not the site. Sources give the street address (3841 S. Ellsworth Road, at the southeast corner of Elliot and Ellsworth Roads), but it was not converted to coordinates because no geocoder was used.","precision":"locality","source_ids":["s4","s5","s6"]},"metrics":[{"applies_to":"campus","as_of":"2021","basis":"announced","metric":"investment","note":"Original two-building plan.","qualifier":"exact","source_ids":["s2","s4"],"unit":"USD","value":800000000},{"applies_to":"campus","as_of":"2022-05-06","basis":"announced","metric":"investment","note":"After the expansion to five buildings.","qualifier":"more_than","source_ids":["s2","s3","s4"],"unit":"USD","value":1000000000},{"applies_to":"campus","as_of":"2026-10-09","basis":"announced","metric":"investment","note":"Figure on Meta's current fact sheet, given as investment in Arizona.","qualifier":"exact","source_ids":["s1"],"unit":"USD","value":1200000000},{"applies_to":"campus","as_of":"2025-01-31","basis":"acquired","metric":"land_area","qualifier":"exact","source_ids":["s4","s5"],"unit":"acres","value":396},{"applies_to":"campus","as_of":"2023-12-06","basis":"planned","metric":"floor_area","note":"About 2.5 million sq ft after the 2022 expansion; Construction Dive gives more than 2.5 million sq ft of data center and administrative space across five buildings.","qualifier":"approximately","source_ids":["s2","s3"],"unit":"sq_ft","value":2500000},{"applies_to":"campus","as_of":"2023-12-06","basis":"planned","metric":"buildings","qualifier":"exact","source_ids":["s3","s5"],"unit":"count","value":5},{"applies_to":"phase","as_of":"2025-01-31","basis":"operational","metric":"buildings","phase_label":"Phase 1","qualifier":"exact","source_ids":["s5"],"unit":"count","value":2},{"applies_to":"campus","as_of":"2026-10-09","basis":"reported","metric":"jobs_construction","note":"Skilled trade workers on site at peak construction, per Meta's fact sheet.","qualifier":"exact","source_ids":["s1"],"unit":"count","value":2000},{"applies_to":"campus","as_of":"2026-10-09","basis":"planned","metric":"jobs_permanent","note":"Operational jobs once the campus is complete.","qualifier":"more_than","source_ids":["s1"],"unit":"count","value":200}],"milestones":[{"date":"2021","event":"site_acquired","kind":"actual","source_ids":["s5"]},{"date":"2021-08","event":"construction_started","kind":"actual","note":"Groundbreaking in August 2021.","source_ids":["s1","s2"]},{"date":"2022-05","event":"expansion_announced","kind":"actual","note":"Three buildings added to the original two.","source_ids":["s2"]},{"date":"2025-01-30","event":"first_operational","kind":"actual","note":"Meta announced that the first two buildings were serving traffic.","source_ids":["s5"]},{"date":"2026","event":"fully_operational","kind":"planned","note":"Builder DPR targeted completion in 2026, and Meta said the second phase would likely open that year.","source_ids":["s3","s5"]}],"name":"Meta Mesa Data Center","notes":"No 2026 report was found confirming that buildings three to five are in service; Meta's fact sheet (s1) says the data center went online in 2025 but gives no building status. The fact sheet shows no publication date (embedded file creation date 2026-09-02), so figures that rest on it alone are dated to the access date, 2026-10-09. Meta bought the 396-acre site in 2021 for USD 123.2 million.","parties":[{"name":"Meta Platforms","role":"developer","source_ids":["s1","s2"]},{"name":"Meta Platforms","role":"operator","source_ids":["s5"]},{"name":"DPR Construction","role":"builder","source_ids":["s3"]},{"name":"Salt River Project","role":"utility","source_ids":["s1","s4"]},{"name":"EDP Renewables North America","note":"Partner with Salt River Project on the Brittlebush solar plant, whose entire output is dedicated to the Mesa data center.","role":"power_supplier","source_ids":["s4"]}],"power_sources":[{"description":"Supplied by Salt River Project; Meta says it planned its energy needs with the utility and pays the full cost of the energy it uses.","source_ids":["s1"],"type":"grid"},{"description":"The 200 MW Brittlebush Solar Park near Coolidge in Pinal County, a Salt River Project collaboration with EDP Renewables North America, has all of its capacity dedicated to the Mesa data center.","source_ids":["s4"],"type":"solar"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":null,"publisher":"Meta Platforms","title":"Meta Mesa Data Center fact sheet","type":"company","url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Mesa-Data-Center.pdf"},{"accessed":"2026-10-09","id":"s2","published":"2022-05-06","publisher":"Data Center Knowledge","title":"Meta Is Adding Three Data Centers to Already Massive Mesa Campus","type":"trade_press","url":"https://www.datacenterknowledge.com/hyperscalers/meta-is-adding-three-data-centers-to-already-massive-mesa-campus"},{"accessed":"2026-10-09","id":"s3","published":"2023-12-06","publisher":"Construction Dive","title":"Meta selects DPR for $1B Arizona data center","type":"trade_press","url":"https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/"},{"accessed":"2026-10-09","id":"s4","published":"2024-08-04","publisher":"KTAR News","title":"New SRP solar facility to provide power for Meta data center in Mesa","type":"news","url":"https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa"},{"accessed":"2026-10-09","id":"s5","published":"2025-01-31","publisher":"KTAR News","title":"First phase of Meta's Mesa data center project open; more under construction","type":"news","url":"https://ktar.com/arizona-news/mesa-data-center-mesa"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261004044024/https://en.wikipedia.org/wiki/Mesa,_Arizona","id":"s6","published":null,"publisher":"Wikipedia","title":"Mesa, Arizona","type":"other","url":"https://en.wikipedia.org/wiki/Mesa,_Arizona"}],"status":"partially_operational","status_as_of":"2025-01-31","status_source_ids":["s5"],"summary":"Five-building Meta campus on 396 acres at the southeast corner of Elliot and Ellsworth Roads in Mesa, Arizona (3841 S. Ellsworth Road). Meta broke ground in August 2021 on a USD 800 million, two-building plan; in May 2022 it added three buildings, taking the campus to about 2.5 million sq ft and more than USD 1 billion. DPR Construction is the builder. The first two buildings went live in January 2025, with the rest expected around 2026, and Meta now cites a USD 1.2 billion investment. Salt River Project's 200 MW Brittlebush solar plant dedicates its full output to the campus.","workloads":[]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"90c086dc-2fb1-531c-b7de-c5482be9c676","s2":"98c5d27d-61ea-54ae-a5a9-e821ce87858e","s3":"16e36e46-4aa0-575e-b78d-bf6521024466","s4":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","s5":"2e1d8fdc-f473-5df8-9053-04a2a58431d3","s6":"0c2462c8-8407-550b-8c6a-a49848f1c879"},"source_file":"datacenters/projects/meta-mesa-arizona.json","source_record_id":"meta-mesa-arizona","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"bd117cd7cdcf6360cf8e778d8064cf2b9baaf689dc24bf195152b3752916351d"}],"evidence_ids":["0c2462c8-8407-550b-8c6a-a49848f1c879","16e36e46-4aa0-575e-b78d-bf6521024466","2e1d8fdc-f473-5df8-9053-04a2a58431d3","90c086dc-2fb1-531c-b7de-c5482be9c676","98c5d27d-61ea-54ae-a5a9-e821ce87858e","cb457039-0afa-5d57-a4ef-771a97485bfb","f2e0aa56-e925-51e3-94a6-43ac3a38be1c"],"status_source":{"evidence_id":"cb457039-0afa-5d57-a4ef-771a97485bfb","title":"City of Mesa Building Inspections - Public (cu25-6qwx): inspections on Meta Mesa MAZ7 permits PMT26-03021 (Building 17), PMT25-19703 and PMT26-10697 at 3841 S Ellsworth Rd","publisher":"City of Mesa, Arizona (Development Services)","kind":"government_record","published_at":"2026-10-24","source_url":"https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$select=permit_number,inspection_id,inspection_type,inspection_status,result_type,request_date,scheduled_date,inspection_completed_date,address_line1,latitude,longitude&$where=permit_number%20in('PMT26-03021','PMT25-19703','PMT26-10697')&$order=inspection_completed_date&$limit=5000","license":"public-record-source-terms","attribution":"City of Mesa, Arizona — Development Services building inspections open data (Building Inspections - Public)"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb8ab0ad35bb603ea3ba/#project-8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f.json","geometry_source":{"evidence_id":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","title":"New SRP solar facility to provide power for Meta data center in Mesa","publisher":"KTAR News","kind":"news","published_at":"2024-08-04","source_url":"https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa","license":"source-terms-not-recorded","attribution":"KTAR News"}}],"evidence":[{"evidence_id":"cb457039-0afa-5d57-a4ef-771a97485bfb","roles":["physical_status"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"government_record","title":"City of Mesa Building Inspections - Public (cu25-6qwx): inspections on Meta Mesa MAZ7 permits PMT26-03021 (Building 17), PMT25-19703 and PMT26-10697 at 3841 S Ellsworth Rd","source_url":"https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$select=permit_number,inspection_id,inspection_type,inspection_status,result_type,request_date,scheduled_date,inspection_completed_date,address_line1,latitude,longitude&$where=permit_number%20in('PMT26-03021','PMT25-19703','PMT26-10697')&$order=inspection_completed_date&$limit=5000","publisher":"City of Mesa, Arizona (Development Services)","source_family":"city_of_mesa_open_data","license":"public-record-source-terms","attribution":"City of Mesa, Arizona — Development Services building inspections open data (Building Inspections - Public)","published_at":"2026-10-24","retrieved_at":"2026-10-26T14:55:11.065Z","content_hash":"3b1fddb681891d0997fdbfa330ba74b094963bba9d8def5b9dd940f580ee7361","publication_date_precision":"day","content_hash_scope":"sha256_exact_content_decoded_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/cb457039-0afa-5d57-a4ef-771a97485bfb.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/cb457039-0afa-5d57-a4ef-771a97485bfb.json","archive_url":"https://web.archive.org/web/20261026145511/https://citydata.mesaaz.gov/resource/cu25-6qwx.json?$select=permit_number,inspection_id,inspection_type,inspection_status,result_type,request_date,scheduled_date,inspection_completed_date,address_line1,latitude,longitude&$where=permit_number%20in('PMT26-03021','PMT25-19703','PMT26-10697')&$order=inspection_completed_date&$limit=5000"},{"evidence_id":"2e1d8fdc-f473-5df8-9053-04a2a58431d3","roles":["imported:geometry","imported:record","imported:status","metric:buildings","metric:land_area","milestone:first_operational","milestone:fully_operational","milestone:site_acquired","role:operator"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"news","title":"First phase of Meta's Mesa data center project open; more under construction","source_url":"https://ktar.com/arizona-news/mesa-data-center-mesa","publisher":"KTAR News","source_family":"ktar.com","license":"source-terms-not-recorded","attribution":"KTAR News","published_at":"2025-01-31","retrieved_at":"2026-10-09","content_hash":"b4ddaee95726a15b394d36df32272b9c62c805c45a4771aacace536e66426ab8","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s5","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e1d8fdc-f473-5df8-9053-04a2a58431d3.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/2e1d8fdc-f473-5df8-9053-04a2a58431d3.json","archive_url":"https://web.archive.org/web/20261009/https://ktar.com/arizona-news/mesa-data-center-mesa"},{"evidence_id":"0c2462c8-8407-550b-8c6a-a49848f1c879","roles":["imported:geometry","imported:record"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"other","title":"Mesa, Arizona","source_url":"https://en.wikipedia.org/wiki/Mesa,_Arizona","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"1e9742c3285ff879bc6c36994eae7d57d386905de7432d34f12918d5ee27b7bf","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s6","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0c2462c8-8407-550b-8c6a-a49848f1c879.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0c2462c8-8407-550b-8c6a-a49848f1c879.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Mesa,_Arizona"},{"evidence_id":"98c5d27d-61ea-54ae-a5a9-e821ce87858e","roles":["imported:record","metric:floor_area","metric:investment","milestone:construction_started","milestone:expansion_announced","role:developer"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"trade_press","title":"Meta Is Adding Three Data Centers to Already Massive Mesa Campus","source_url":"https://www.datacenterknowledge.com/hyperscalers/meta-is-adding-three-data-centers-to-already-massive-mesa-campus","publisher":"Data Center Knowledge","source_family":"www.datacenterknowledge.com","license":"source-terms-not-recorded","attribution":"Data Center Knowledge","published_at":"2022-05-06","retrieved_at":"2026-10-09","content_hash":"9ba8c40ffae779237a086f8de9eef297cdde5d26849120ec0ce9d21eba8368d0","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s2","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/98c5d27d-61ea-54ae-a5a9-e821ce87858e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/98c5d27d-61ea-54ae-a5a9-e821ce87858e.json","archive_url":"https://web.archive.org/web/20261009/https://www.datacenterknowledge.com/hyperscalers/meta-is-adding-three-data-centers-to-already-massive-mesa-campus"},{"evidence_id":"90c086dc-2fb1-531c-b7de-c5482be9c676","roles":["imported:record","metric:investment","metric:jobs_construction","metric:jobs_permanent","milestone:construction_started","power_source:grid","role:developer","role:utility"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"company_disclosure","title":"Meta Mesa Data Center fact sheet","source_url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Mesa-Data-Center.pdf","publisher":"Meta Platforms","source_family":"datacenters.atmeta.com","license":"source-terms-not-recorded","attribution":"Meta Platforms","published_at":null,"retrieved_at":"2026-10-09","content_hash":"8c61ac9cfeaf4986b6f78e5f36d67c93fa10f12d5b55840fa27c5519a6900a63","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s1","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/90c086dc-2fb1-531c-b7de-c5482be9c676.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/90c086dc-2fb1-531c-b7de-c5482be9c676.json","archive_url":"https://web.archive.org/web/20261009/https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Mesa-Data-Center.pdf"},{"evidence_id":"16e36e46-4aa0-575e-b78d-bf6521024466","roles":["imported:record","metric:buildings","metric:floor_area","metric:investment","milestone:fully_operational","role:builder"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"trade_press","title":"Meta selects DPR for $1B Arizona data center","source_url":"https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/","publisher":"Construction Dive","source_family":"www.constructiondive.com","license":"source-terms-not-recorded","attribution":"Construction Dive","published_at":"2023-12-06","retrieved_at":"2026-10-09","content_hash":"a49828a572bb2edaab83b39dc6efbe49eb130fb89e45ce92d9186461099a3e0e","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s3","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/16e36e46-4aa0-575e-b78d-bf6521024466.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/16e36e46-4aa0-575e-b78d-bf6521024466.json","archive_url":"https://web.archive.org/web/20261009/https://www.constructiondive.com/news/meta-dpr-arizona-data-center-mesa-phoenix/701776/"},{"evidence_id":"f2e0aa56-e925-51e3-94a6-43ac3a38be1c","roles":["imported:geometry","imported:record","metric:investment","metric:land_area","power_source:solar","role:power_supplier","role:utility"],"project_ids":["8d3985c2-7777-5c6b-9a7f-fcab6c9b6a4f"],"kind":"news","title":"New SRP solar facility to provide power for Meta data center in Mesa","source_url":"https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa","publisher":"KTAR News","source_family":"ktar.com","license":"source-terms-not-recorded","attribution":"KTAR News","published_at":"2024-08-04","retrieved_at":"2026-10-09","content_hash":"41df4f5eaf30563fd3c891ec0de8841757f5b89cb2cd164d0599ecba319de11f","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"meta-mesa-arizona","source_local_id":"s4","source_record_sha256":"690a5d65866311037933f9ddd4b78f9f474ed7fab8310573de902132c5585030","site_ids":["vcc-site-cb8ab0ad35bb603ea3ba"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f2e0aa56-e925-51e3-94a6-43ac3a38be1c.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/f2e0aa56-e925-51e3-94a6-43ac3a38be1c.json","archive_url":"https://web.archive.org/web/20261009/https://ktar.com/arizona-news/new-srp-solar-facility-to-provide-power-for-meta-data-center-in-mesa"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-cb8ab0ad35bb603ea3ba/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-cb8ab0ad35bb603ea3ba.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-cb8ab0ad35bb603ea3ba","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
