{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-d3117bafca6bdcc5007e","physical_site_stable_key":"imported:semiconductor-atlas:airtrunk-tok1-inzai","name":"AirTrunk TOK1 Tokyo East","country":"Japan","country_iso_a2":"JP","latitude":35.8323,"longitude":140.1453,"geometry":{"coordinates":[140.1453,35.8323],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["AirTrunk's TOK1 page places the campus in Inzai's data center hub without an address; coordinates are the OpenStreetMap Nominatim centroid of Inzai City."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["4e36cb9c-336f-526e-bf8a-2fadaa356951"],"project_count":1,"project_ids":["3fe8297a-147b-56fe-a5a6-6ae165798506"],"project_stable_keys":["imported:semiconductor-atlas:airtrunk-tok1-inzai"],"statuses":["partially_operational"],"oldest_status_as_of":"2026-03-10","newest_status_as_of":"2026-03-10","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"jp","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3117bafca6bdcc5007e/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d3117bafca6bdcc5007e.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["AirTrunk"]},"projects":[{"project_id":"3fe8297a-147b-56fe-a5a6-6ae165798506","project_stable_key":"imported:semiconductor-atlas:airtrunk-tok1-inzai","site_id":"vcc-site-d3117bafca6bdcc5007e","physical_site_stable_key":"imported:semiconductor-atlas:airtrunk-tok1-inzai","name":"AirTrunk TOK1 Tokyo East","country":"Japan","country_iso_a2":"JP","latitude":35.8323,"longitude":140.1453,"geometry":{"coordinates":[140.1453,35.8323],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"AirTrunk's TOK1 page places the campus in Inzai's data center hub without an address; coordinates are the OpenStreetMap Nominatim centroid of Inzai City.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","last_observed_physical_status":"partially_operational","status_as_of":"2026-03-10","status_age_days_at_review":231,"status_method":"imported_documented_status","status_evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"developer","source_record_id":"airtrunk-tok1-inzai"},{"evidence_id":"b9680dc4-43e8-590a-947f-77574a2c9c27","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"developer","source_record_id":"airtrunk-tok1-inzai"},{"evidence_id":"3144acd5-1519-555c-941d-ba0e49895219","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"developer","source_record_id":"airtrunk-tok1-inzai"},{"evidence_id":"1c3bcbbc-7232-5a74-a3c0-c9c32a460a20","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"developer","source_record_id":"airtrunk-tok1-inzai"},{"evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"operator","source_record_id":"airtrunk-tok1-inzai"},{"evidence_id":"1c3bcbbc-7232-5a74-a3c0-c9c32a460a20","notes":null,"party":"AirTrunk","relationship_scope":"unknown","role":"operator","source_record_id":"airtrunk-tok1-inzai"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":null,"operator":"AirTrunk","users":null,"tenants":null,"customers":null,"status_source_url":"https://airtrunk.com/data-centres/tok1/","geometry_source_url":"https://airtrunk.com/data-centres/tok1/","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve AirTrunk TOK1 Tokyo East as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"airtrunk-tok1-inzai"},"record":{"aliases":["TOK1"],"id":"airtrunk-tok1-inzai","last_reviewed":"2026-10-09","location":{"admin1":"Chiba Prefecture","country":"JP","lat":35.8323,"locality":"Inzai","lon":140.1453,"note":"AirTrunk's TOK1 page places the campus in Inzai's data center hub without an address; coordinates are the OpenStreetMap Nominatim centroid of Inzai City.","precision":"locality","source_ids":["s1"]},"metrics":[{"applies_to":"campus","as_of":"2026-03-10","basis":"planned","metric":"power_capacity","note":"AirTrunk calls this total campus capacity without saying whether it is IT load.","power_scope":"unspecified","qualifier":"more_than","source_ids":["s1","s2","s3","s4"],"unit":"MW","value":300},{"applies_to":"phase","as_of":"2024-08-14","basis":"under_construction","metric":"power_capacity","note":"Topping out expected in August 2024.","phase_label":"Phase 3","power_scope":"unspecified","qualifier":"exact","source_ids":["s2"],"unit":"MW","value":50},{"applies_to":"phase","as_of":"2025-06-19","basis":"under_construction","metric":"power_capacity","phase_label":"Phase begun June 2025","power_scope":"unspecified","qualifier":"more_than","source_ids":["s3"],"unit":"MW","value":40},{"applies_to":"phase","as_of":"2026-03-10","basis":"under_construction","metric":"power_capacity","note":"May overlap with the phase that broke ground in June 2025; AirTrunk does not reconcile the two figures.","phase_label":"Next phases under construction in 2026","power_scope":"it_load","qualifier":"more_than","source_ids":["s4"],"unit":"MW","value":100},{"applies_to":"campus","as_of":"2026-10","basis":"reported","metric":"land_area","note":"Undated facility page viewed October 2026.","qualifier":"exact","source_ids":["s1"],"unit":"hectares","value":13},{"applies_to":"campus","as_of":"2026-10","basis":"planned","metric":"floor_area","note":"Data hall area across 102 data halls, per the undated facility page; excludes 9,600 square meters of office and storage space.","qualifier":"exact","source_ids":["s1"],"unit":"sq_m","value":80000}],"milestones":[{"date":"2024-08","event":"other","kind":"actual","note":"Phase 3 (50 MW) reported on schedule and topping out.","source_ids":["s2"]},{"date":"2025-06","event":"other","kind":"actual","note":"Groundbreaking on a 40 MW-plus phase announced 19 June 2025; earlier phases had already been built, so this is not the campus construction start.","source_ids":["s3"]},{"date":"2026-03-10","event":"other","kind":"actual","note":"JPY 191.6 billion (about US$1.24 billion) green loan closed to refinance existing TOK1 facilities and fund development of the next phases.","source_ids":["s4"]}],"name":"AirTrunk TOK1 Tokyo East","parties":[{"name":"AirTrunk","role":"developer","source_ids":["s1","s2","s3","s4"]},{"name":"AirTrunk","role":"operator","source_ids":["s1","s4"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","id":"s1","published":null,"publisher":"AirTrunk","title":"TOK1 Tokyo East","type":"company","url":"https://airtrunk.com/data-centres/tok1/"},{"accessed":"2026-10-09","id":"s2","published":"2024-08-14","publisher":"AirTrunk","title":"AirTrunk TOK1 Phase 3 progressing at speed","type":"company","url":"https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/"},{"accessed":"2026-10-09","id":"s3","published":"2025-06-19","publisher":"AirTrunk","title":"AirTrunk breaks ground on 40+MW phase of TOK1, Japan's largest hyperscale data centre campus.","type":"company","url":"https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260420024816/https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/","id":"s4","published":"2026-03-10","publisher":"AirTrunk","title":"AirTrunk secures largest financing for a data centre in Japan with US$1.2 billion green loan","type":"company","url":"https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/"}],"status":"partially_operational","status_as_of":"2026-03-10","status_source_ids":["s1","s4"],"summary":"TOK1 is AirTrunk's flagship hyperscale campus in the Inzai data center hub east of Tokyo, which AirTrunk bills as the biggest hyperscale campus in Japan measured in megawatts. The 13-hectare campus is scalable to more than 300 MW and already has facilities in service. In August 2024 AirTrunk said a 50 MW third phase was on schedule and topping out; it broke ground on a further 40 MW-plus phase in June 2025, and in March 2026 said it had recently begun building over 100 MW of additional IT load. That month it closed a JPY 191.6 billion green loan to refinance existing TOK1 facilities and fund the next phases.","workloads":["cloud"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"4e36cb9c-336f-526e-bf8a-2fadaa356951","s2":"b9680dc4-43e8-590a-947f-77574a2c9c27","s3":"3144acd5-1519-555c-941d-ba0e49895219","s4":"1c3bcbbc-7232-5a74-a3c0-c9c32a460a20"},"source_file":"datacenters/projects/airtrunk-tok1-inzai.json","source_record_id":"airtrunk-tok1-inzai","source_record_sha256":"4c28605b649ccf51780503b5829856089f31072a900b71c243bb8f4e88762814","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"34d989830b304f3052a15d3c5eacb4540ee9112e50b3d3dbdca7af3d32398cc8"}],"evidence_ids":["1c3bcbbc-7232-5a74-a3c0-c9c32a460a20","3144acd5-1519-555c-941d-ba0e49895219","4e36cb9c-336f-526e-bf8a-2fadaa356951","b9680dc4-43e8-590a-947f-77574a2c9c27"],"status_source":{"evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","title":"TOK1 Tokyo East","publisher":"AirTrunk","kind":"company_disclosure","published_at":null,"source_url":"https://airtrunk.com/data-centres/tok1/","license":"source-terms-not-recorded","attribution":"AirTrunk"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3117bafca6bdcc5007e/#project-3fe8297a-147b-56fe-a5a6-6ae165798506","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/3fe8297a-147b-56fe-a5a6-6ae165798506.json","geometry_source":{"evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","title":"TOK1 Tokyo East","publisher":"AirTrunk","kind":"company_disclosure","published_at":null,"source_url":"https://airtrunk.com/data-centres/tok1/","license":"source-terms-not-recorded","attribution":"AirTrunk"}}],"evidence":[{"evidence_id":"3144acd5-1519-555c-941d-ba0e49895219","roles":["imported:record","metric:power_capacity","milestone:other","role:developer"],"project_ids":["3fe8297a-147b-56fe-a5a6-6ae165798506"],"kind":"company_disclosure","title":"AirTrunk breaks ground on 40+MW phase of TOK1, Japan's largest hyperscale data centre campus.","source_url":"https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/","publisher":"AirTrunk","source_family":"airtrunk.com","license":"source-terms-not-recorded","attribution":"AirTrunk","published_at":"2025-06-19","retrieved_at":"2026-10-09","content_hash":"64b01f11061b6de2f05d85ac1c73b5662c5be94f770c61cc8d5248c416675317","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"airtrunk-tok1-inzai","source_local_id":"s3","source_record_sha256":"4c28605b649ccf51780503b5829856089f31072a900b71c243bb8f4e88762814","site_ids":["vcc-site-d3117bafca6bdcc5007e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3144acd5-1519-555c-941d-ba0e49895219.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/3144acd5-1519-555c-941d-ba0e49895219.json","archive_url":"https://web.archive.org/web/20261009/https://airtrunk.com/airtrunk-breaks-ground-on-40mw-phase-of-tok1-japans-largest-hyperscale-data-centre-campus/"},{"evidence_id":"1c3bcbbc-7232-5a74-a3c0-c9c32a460a20","roles":["imported:record","imported:status","metric:power_capacity","milestone:other","role:developer","role:operator"],"project_ids":["3fe8297a-147b-56fe-a5a6-6ae165798506"],"kind":"company_disclosure","title":"AirTrunk secures largest financing for a data centre in Japan with US$1.2 billion green loan","source_url":"https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/","publisher":"AirTrunk","source_family":"airtrunk.com","license":"source-terms-not-recorded","attribution":"AirTrunk","published_at":"2026-03-10","retrieved_at":"2026-10-09","content_hash":"bb0a2b703bd9534a205a82fd3e42aac7bfcc3436228fc618b233bb85323b0797","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"airtrunk-tok1-inzai","source_local_id":"s4","source_record_sha256":"4c28605b649ccf51780503b5829856089f31072a900b71c243bb8f4e88762814","site_ids":["vcc-site-d3117bafca6bdcc5007e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1c3bcbbc-7232-5a74-a3c0-c9c32a460a20.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/1c3bcbbc-7232-5a74-a3c0-c9c32a460a20.json","archive_url":"https://web.archive.org/web/20261009/https://airtrunk.com/airtrunk-secures-largest-financing-for-a-data-centre-in-japan-with-us1-2-billion-green-loan-for-its-flagship-tokyo-campus/"},{"evidence_id":"b9680dc4-43e8-590a-947f-77574a2c9c27","roles":["imported:record","metric:power_capacity","milestone:other","role:developer"],"project_ids":["3fe8297a-147b-56fe-a5a6-6ae165798506"],"kind":"company_disclosure","title":"AirTrunk TOK1 Phase 3 progressing at speed","source_url":"https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/","publisher":"AirTrunk","source_family":"airtrunk.com","license":"source-terms-not-recorded","attribution":"AirTrunk","published_at":"2024-08-14","retrieved_at":"2026-10-09","content_hash":"e90326bfc19bbcdb040d9ed65358a8d5c36d5b768259c3b987bde265fe7f8b82","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"airtrunk-tok1-inzai","source_local_id":"s2","source_record_sha256":"4c28605b649ccf51780503b5829856089f31072a900b71c243bb8f4e88762814","site_ids":["vcc-site-d3117bafca6bdcc5007e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b9680dc4-43e8-590a-947f-77574a2c9c27.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/b9680dc4-43e8-590a-947f-77574a2c9c27.json","archive_url":"https://web.archive.org/web/20261009/https://airtrunk.com/airtrunk-tok1-phase-3-progressing-at-speed/"},{"evidence_id":"4e36cb9c-336f-526e-bf8a-2fadaa356951","roles":["imported:geometry","imported:record","imported:status","metric:floor_area","metric:land_area","metric:power_capacity","role:developer","role:operator"],"project_ids":["3fe8297a-147b-56fe-a5a6-6ae165798506"],"kind":"company_disclosure","title":"TOK1 Tokyo East","source_url":"https://airtrunk.com/data-centres/tok1/","publisher":"AirTrunk","source_family":"airtrunk.com","license":"source-terms-not-recorded","attribution":"AirTrunk","published_at":null,"retrieved_at":"2026-10-09","content_hash":"5940e0e83cc052066f6c13eda380c9ed6bffd042046e055d04aaf667d0b0bff5","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"airtrunk-tok1-inzai","source_local_id":"s1","source_record_sha256":"4c28605b649ccf51780503b5829856089f31072a900b71c243bb8f4e88762814","site_ids":["vcc-site-d3117bafca6bdcc5007e"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4e36cb9c-336f-526e-bf8a-2fadaa356951.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/4e36cb9c-336f-526e-bf8a-2fadaa356951.json","archive_url":"https://web.archive.org/web/20261009/https://airtrunk.com/data-centres/tok1/"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-d3117bafca6bdcc5007e/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-d3117bafca6bdcc5007e.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-d3117bafca6bdcc5007e","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}