{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-dbe568d910290db51ead","physical_site_stable_key":"imported:semiconductor-atlas:terawulf-justified-data-hawesville","name":"TeraWulf Justified Data campus (Hawesville)","country":"United States","country_iso_a2":"US","latitude":37.9011,"longitude":-86.7494,"geometry":{"coordinates":[-86.7494,37.9011],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["30a8faac-6bf4-5f82-80b3-159eed56720e"],"project_count":1,"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"project_stable_keys":["imported:semiconductor-atlas:terawulf-justified-data-hawesville"],"statuses":["announced"],"oldest_status_as_of":"2026-08-24","newest_status_as_of":"2026-08-24","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"us","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dbe568d910290db51ead.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["TeraWulf"]},"projects":[{"project_id":"9dbfd718-7b41-58b1-bb46-0138b96aeca8","project_stable_key":"imported:semiconductor-atlas:terawulf-justified-data-hawesville","site_id":"vcc-site-dbe568d910290db51ead","physical_site_stable_key":"imported:semiconductor-atlas:terawulf-justified-data-hawesville","name":"TeraWulf Justified Data campus (Hawesville)","country":"United States","country_iso_a2":"US","latitude":37.9011,"longitude":-86.7494,"geometry":{"coordinates":[-86.7494,37.9011],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"30a8faac-6bf4-5f82-80b3-159eed56720e","last_observed_physical_status":"announced","status_as_of":"2026-08-24","status_age_days_at_review":64,"status_method":"imported_documented_status","status_evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","verification_posture":"imported_source_record","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"30a8faac-6bf4-5f82-80b3-159eed56720e","notes":null,"party":"TeraWulf","relationship_scope":"unknown","role":"developer","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"7765458b-3843-5a7a-b6c0-6188e7ae143f","notes":null,"party":"TeraWulf","relationship_scope":"unknown","role":"developer","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","notes":null,"party":"TeraWulf","relationship_scope":"unknown","role":"developer","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"30a8faac-6bf4-5f82-80b3-159eed56720e","notes":"Announced on February 2, 2026 that it had acquired the site.","party":"TeraWulf","relationship_scope":"unknown","role":"owner","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"7765458b-3843-5a7a-b6c0-6188e7ae143f","notes":"20-year lease for about 401 MW of critical IT load signed in July 2026.","party":"Anthropic","relationship_scope":"unknown","role":"tenant","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"83a7245e-347c-5b30-a1ed-04dfa6146efb","notes":"20-year lease for about 401 MW of critical IT load signed in July 2026.","party":"Anthropic","relationship_scope":"unknown","role":"tenant","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","notes":"The Kentucky PSC authorized Big Rivers and Kenergy to implement the retail electric service agreement for the campus.","party":"Big Rivers Electric Corporation","relationship_scope":"unknown","role":"utility","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","notes":"The Kentucky PSC authorized Kenergy and Big Rivers to implement the retail electric service agreement for the campus.","party":"Kenergy Corp.","relationship_scope":"unknown","role":"utility","source_record_id":"terawulf-justified-data-hawesville"},{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","notes":"Approved the retail electric service agreement in an order dated August 21, 2026.","party":"Kentucky Public Service Commission","relationship_scope":"unknown","role":"government","source_record_id":"terawulf-justified-data-hawesville"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"TeraWulf","operator":null,"users":null,"tenants":"Anthropic","customers":null,"status_source_url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","geometry_source_url":"https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve TeraWulf Justified Data campus (Hawesville) as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"terawulf-justified-data-hawesville"},"record":{"aliases":["Justified Data Campus"],"id":"terawulf-justified-data-hawesville","last_reviewed":"2026-10-09","location":{"admin1":"Kentucky","admin2":"Hancock County","country":"US","lat":37.9011,"locality":"Hawesville","lon":-86.7494,"note":"City coordinates from Wikipedia. TeraWulf places the campus at the former Century Aluminum Hawesville facility in Hancock County, whose exact position is not given in the sources.","precision":"locality","source_ids":["s1","s4","s5"]},"metrics":[{"applies_to":"campus","as_of":"2026-07-06","basis":"contracted","metric":"power_capacity","power_scope":"it_load","qualifier":"approximately","source_ids":["s2","s3"],"unit":"MW","value":401},{"applies_to":"campus","as_of":"2026-08-21","basis":"contracted","metric":"power_capacity","note":"Electric service under the agreement approved by the Kentucky PSC; TeraWulf earlier described about 480 MW of existing power availability at the site.","power_scope":"grid_connection","qualifier":"up_to","source_ids":["s4"],"unit":"MW","value":482},{"applies_to":"phase","as_of":"2026-08-24","basis":"announced","metric":"investment","note":"TeraWulf estimate based on $10 million to $12 million per MW of critical IT load; excludes customer investment in computing equipment.","phase_label":"Site development and initial data halls","qualifier":"range","source_ids":["s4"],"unit":"USD","value":4000000000,"value_high":4500000000},{"applies_to":"campus","as_of":"2026-02-02","basis":"acquired","metric":"land_area","note":"Buildable acres.","qualifier":"more_than","source_ids":["s1","s3"],"unit":"acres","value":250}],"milestones":[{"date":"2026-02","event":"site_acquired","kind":"actual","note":"TeraWulf announced on February 2, 2026 that it had acquired the Hawesville site.","source_ids":["s1"]},{"date":"2026-07-06","event":"other","kind":"actual","note":"Anthropic lease announced.","source_ids":["s2"]},{"date":"2026-08-21","event":"other","kind":"actual","note":"Kentucky PSC approved the up-to-482 MW retail electric service agreement.","source_ids":["s4"]},{"date":"2027-H2","event":"first_operational","kind":"planned","note":"Initial capacity expected in service.","source_ids":["s2","s3"]},{"date":"2028-H1","event":"fully_operational","kind":"planned","note":"TeraWulf expects the full 401 MW by early 2028.","source_ids":["s2","s3"]}],"name":"TeraWulf Justified Data campus (Hawesville)","parties":[{"name":"TeraWulf","role":"developer","source_ids":["s1","s2","s4"]},{"name":"TeraWulf","note":"Announced on February 2, 2026 that it had acquired the site.","role":"owner","source_ids":["s1"]},{"name":"Anthropic","note":"20-year lease for about 401 MW of critical IT load signed in July 2026.","role":"tenant","source_ids":["s2","s3"]},{"name":"Big Rivers Electric Corporation","note":"The Kentucky PSC authorized Big Rivers and Kenergy to implement the retail electric service agreement for the campus.","role":"utility","source_ids":["s4"]},{"name":"Kenergy Corp.","note":"The Kentucky PSC authorized Kenergy and Big Rivers to implement the retail electric service agreement for the campus.","role":"utility","source_ids":["s4"]},{"name":"Kentucky Public Service Commission","note":"Approved the retail electric service agreement in an order dated August 21, 2026.","role":"government","source_ids":["s4"]}],"power_sources":[{"description":"Up to 482 MW of retail electric service under a PSC-approved agreement implemented by Kenergy and Big Rivers, using the site's energized on-site substation and existing high-voltage transmission lines.","source_ids":["s1","s4"],"type":"grid"}],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260901033739/https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","id":"s1","published":"2026-02-02","publisher":"TeraWulf","title":"TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland","type":"company","url":"https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland"},{"accessed":"2026-10-09","id":"s2","published":"2026-07-06","publisher":"TeraWulf","title":"TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack","type":"company","url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"},{"accessed":"2026-10-09","id":"s3","published":"2026-08-05","publisher":"TeraWulf","title":"TeraWulf Reports Second Quarter 2026 Results","type":"company","url":"https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20261004051014/https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","id":"s4","published":"2026-08-24","publisher":"TeraWulf","title":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","type":"company","url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus"},{"accessed":"2026-10-09","id":"s5","published":null,"publisher":"Wikipedia","title":"Hawesville, Kentucky","type":"other","url":"https://en.wikipedia.org/wiki/Hawesville,_Kentucky"}],"status":"announced","status_as_of":"2026-08-24","status_source_ids":["s4","s2"],"summary":"TeraWulf is redeveloping the former Century Aluminum facility at Hawesville, Kentucky, acquired in early 2026, into an AI data center campus with more than 250 buildable acres, an energized on-site substation and about 480 MW of available power. In July 2026 Anthropic signed a 20-year lease for about 401 MW of critical IT load, expected to bring about $19 billion of rent over the initial term. Kentucky regulators approved a retail electric service agreement of up to 482 MW in August 2026. TeraWulf targets initial capacity in the second half of 2027 and the full 401 MW by early 2028.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"30a8faac-6bf4-5f82-80b3-159eed56720e","s2":"7765458b-3843-5a7a-b6c0-6188e7ae143f","s3":"83a7245e-347c-5b30-a1ed-04dfa6146efb","s4":"01b458cf-d4e4-5032-bd65-3afdc46856b8","s5":"c55d4b60-b32e-5e6a-af0d-2caee573d40e"},"source_file":"datacenters/projects/terawulf-justified-data-hawesville.json","source_record_id":"terawulf-justified-data-hawesville","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"27278e58daf1a0c3569e9dbb95f6fd7bc301c50777ef215c520c7574637006a7"}],"evidence_ids":["01b458cf-d4e4-5032-bd65-3afdc46856b8","30a8faac-6bf4-5f82-80b3-159eed56720e","7765458b-3843-5a7a-b6c0-6188e7ae143f","83a7245e-347c-5b30-a1ed-04dfa6146efb","c55d4b60-b32e-5e6a-af0d-2caee573d40e"],"status_source":{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","title":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","publisher":"TeraWulf","kind":"company_disclosure","published_at":"2026-08-24","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","license":"source-terms-not-recorded","attribution":"TeraWulf"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/#project-9dbfd718-7b41-58b1-bb46-0138b96aeca8","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/9dbfd718-7b41-58b1-bb46-0138b96aeca8.json","geometry_source":{"evidence_id":"30a8faac-6bf4-5f82-80b3-159eed56720e","title":"TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland","publisher":"TeraWulf","kind":"company_disclosure","published_at":"2026-02-02","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","license":"source-terms-not-recorded","attribution":"TeraWulf"}}],"evidence":[{"evidence_id":"c55d4b60-b32e-5e6a-af0d-2caee573d40e","roles":["imported:geometry","imported:record"],"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"kind":"other","title":"Hawesville, Kentucky","source_url":"https://en.wikipedia.org/wiki/Hawesville,_Kentucky","publisher":"Wikipedia","source_family":"en.wikipedia.org","license":"source-terms-not-recorded","attribution":"Wikipedia","published_at":null,"retrieved_at":"2026-10-09","content_hash":"26df9ae29d5224ff67ab5797dda14fca284708b1746aeadf8feafa84e147d82b","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"terawulf-justified-data-hawesville","source_local_id":"s5","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","site_ids":["vcc-site-dbe568d910290db51ead"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c55d4b60-b32e-5e6a-af0d-2caee573d40e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/c55d4b60-b32e-5e6a-af0d-2caee573d40e.json","archive_url":"https://web.archive.org/web/20261009/https://en.wikipedia.org/wiki/Hawesville,_Kentucky"},{"evidence_id":"01b458cf-d4e4-5032-bd65-3afdc46856b8","roles":["imported:geometry","imported:record","imported:status","metric:investment","metric:power_capacity","milestone:other","power_source:grid","role:developer","role:government","role:utility"],"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"kind":"company_disclosure","title":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus","publisher":"TeraWulf","source_family":"investors.terawulf.com","license":"source-terms-not-recorded","attribution":"TeraWulf","published_at":"2026-08-24","retrieved_at":"2026-10-09","content_hash":"3d07d65f0b1f48a1dd73eec327d3c1a80aabf310eca034d6425f9f7621978db5","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"terawulf-justified-data-hawesville","source_local_id":"s4","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","site_ids":["vcc-site-dbe568d910290db51ead"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/01b458cf-d4e4-5032-bd65-3afdc46856b8.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/01b458cf-d4e4-5032-bd65-3afdc46856b8.json","archive_url":"https://web.archive.org/web/20261009/https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus"},{"evidence_id":"7765458b-3843-5a7a-b6c0-6188e7ae143f","roles":["imported:record","imported:status","metric:power_capacity","milestone:first_operational","milestone:fully_operational","milestone:other","role:developer","role:tenant"],"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"kind":"company_disclosure","title":"TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","publisher":"TeraWulf","source_family":"investors.terawulf.com","license":"source-terms-not-recorded","attribution":"TeraWulf","published_at":"2026-07-06","retrieved_at":"2026-10-09","content_hash":"8f3ba7efba6877c06ba9debd32310b140fbcc2d62d7867f65acc057410237bb1","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"terawulf-justified-data-hawesville","source_local_id":"s2","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","site_ids":["vcc-site-dbe568d910290db51ead"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7765458b-3843-5a7a-b6c0-6188e7ae143f.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/7765458b-3843-5a7a-b6c0-6188e7ae143f.json","archive_url":"https://web.archive.org/web/20261009/https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"},{"evidence_id":"30a8faac-6bf4-5f82-80b3-159eed56720e","roles":["imported:geometry","imported:record","metric:land_area","milestone:site_acquired","power_source:grid","role:developer","role:owner"],"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"kind":"company_disclosure","title":"TeraWulf Expands Digital and Power Infrastructure Portfolio with Strategic Acquisitions in Kentucky and Maryland","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland","publisher":"TeraWulf","source_family":"investors.terawulf.com","license":"source-terms-not-recorded","attribution":"TeraWulf","published_at":"2026-02-02","retrieved_at":"2026-10-09","content_hash":"794aa7ac7eee14a2147b480adfd8d58d37b6c2820061b4b72a658a708fa7064d","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"terawulf-justified-data-hawesville","source_local_id":"s1","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","site_ids":["vcc-site-dbe568d910290db51ead"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/30a8faac-6bf4-5f82-80b3-159eed56720e.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/30a8faac-6bf4-5f82-80b3-159eed56720e.json","archive_url":"https://web.archive.org/web/20261009/https://investors.terawulf.com/news-events/press-releases/detail/129/terawulf-expands-digital-and-power-infrastructure-portfolio-with-strategic-acquisitions-in-kentucky-and-maryland"},{"evidence_id":"83a7245e-347c-5b30-a1ed-04dfa6146efb","roles":["imported:record","metric:land_area","metric:power_capacity","milestone:first_operational","milestone:fully_operational","role:tenant"],"project_ids":["9dbfd718-7b41-58b1-bb46-0138b96aeca8"],"kind":"company_disclosure","title":"TeraWulf Reports Second Quarter 2026 Results","source_url":"https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results","publisher":"TeraWulf","source_family":"investors.terawulf.com","license":"source-terms-not-recorded","attribution":"TeraWulf","published_at":"2026-08-05","retrieved_at":"2026-10-09","content_hash":"0c3004f18a62bca4ae621d7f5be9526fb5c45eaab01faa0a89bc27ac68917046","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"terawulf-justified-data-hawesville","source_local_id":"s3","source_record_sha256":"7db40d44894208f4e792a562ea9403ac682100e2515b0c7715e1d07e0ca4a4e7","site_ids":["vcc-site-dbe568d910290db51ead"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/83a7245e-347c-5b30-a1ed-04dfa6146efb.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/83a7245e-347c-5b30-a1ed-04dfa6146efb.json","archive_url":"https://web.archive.org/web/20261009/https://investors.terawulf.com/news-events/press-releases/detail/144/terawulf-reports-second-quarter-2026-results"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dbe568d910290db51ead/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dbe568d910290db51ead.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-dbe568d910290db51ead","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
