{"api_version":"1","dataset":{"id":"2026-10-27-research-hundredsecond","label":"2026-10-27 · 838 sites","release_status":"published","publishable_as_final":true,"checkpoint_date":"2026-10-27","lifecycle_reference_date":"2026-10-27","updated_at":"2026-10-27","observation_window_start":"2024-08-06","observation_window_end":"2026-10-27"},"site":{"site_id":"vcc-site-dd0f231b23c8dd96495b","physical_site_stable_key":"imported:semiconductor-atlas:nextdc-s7-eastern-creek","name":"NEXTDC S7 Sydney","country":"Australia","country_iso_a2":"AU","latitude":-33.8059,"longitude":150.85,"geometry":{"coordinates":[150.85,-33.8059],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kinds":["project"],"geometry_derivations":["imported_reference_point"],"geometry_methods":["imported_reference_point"],"geometry_scope_classes":["locality"],"geometry_authority_classes":["compiled_reference"],"geometry_use_scopes":["locality_context"],"geometry_precision_scopes":["NEXTDC names the suburb of Eastern Creek, about 45 km west of the Sydney CBD, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the suburb."],"horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_ids":["22e3e100-6fac-50ab-ac5c-44d1960cfbf1"],"project_count":1,"project_ids":["688df4a2-dc56-5cde-901a-87c87a08137e"],"project_stable_keys":["imported:semiconductor-atlas:nextdc-s7-eastern-creek"],"statuses":["announced"],"oldest_status_as_of":"2026-08-31","newest_status_as_of":"2026-08-31","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcomes":["not_reviewed"],"official_boundary":false,"country_slug":"au","url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd0f231b23c8dd96495b/","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd0f231b23c8dd96495b.json","geometry_licenses":["source-terms-not-recorded"],"geometry_attributions":["NEXTDC"]},"projects":[{"project_id":"688df4a2-dc56-5cde-901a-87c87a08137e","project_stable_key":"imported:semiconductor-atlas:nextdc-s7-eastern-creek","site_id":"vcc-site-dd0f231b23c8dd96495b","physical_site_stable_key":"imported:semiconductor-atlas:nextdc-s7-eastern-creek","name":"NEXTDC S7 Sydney","country":"Australia","country_iso_a2":"AU","latitude":-33.8059,"longitude":150.85,"geometry":{"coordinates":[150.85,-33.8059],"type":"Point"},"geometry_type":"Point","geometry_source_entity_kind":"project","geometry_derivation":"imported_reference_point","geometry_method":"imported_reference_point","geometry_scope_class":"locality","geometry_authority_class":"compiled_reference","geometry_use_scope":"locality_context","geometry_precision_scope":"NEXTDC names the suburb of Eastern Creek, about 45 km west of the Sydney CBD, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the suburb.","horizontal_uncertainty_metres":null,"horizontal_uncertainty_unknown_reason":"The source record provides no measured horizontal uncertainty; original coordinate precision and note are preserved.","geometry_evidence_id":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","last_observed_physical_status":"announced","status_as_of":"2026-08-31","status_age_days_at_review":57,"status_method":"authoritative_project_announcement","status_evidence_id":"0857cf0b-1e12-5d38-879b-09b93a544148","verification_posture":"authoritative_project_record_plus_scoped_location","independent_imagery_verification":false,"imagery_review_outcome":"not_reviewed","development_type":"unknown","development_type_unknown_reason":"Not normalized from imported source record.","operating_model":"unknown","operating_model_unknown_reason":"Not normalized from imported source record.","operating_model_evidence_id":null,"workloads":[],"workload_unknown_reason":"Original workload labels are retained in project_details without inventing deployment scope or per-label source support.","role_claims":[{"evidence_id":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-s7-eastern-creek"},{"evidence_id":"ba2d3717-6fc9-5378-b316-250d91634f00","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-s7-eastern-creek"},{"evidence_id":"50c32be3-6305-56c1-aac1-5ae7c2897ec4","notes":null,"party":"NEXTDC","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-s7-eastern-creek"},{"evidence_id":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","notes":"Agreed in October 2024 to buy the land for about A$353 million before taxes and costs, with parcels to settle progressively across FY25; the December 2025 release refers to it as NEXTDC's S7 site.","party":"NEXTDC","relationship_scope":"unknown","role":"owner","source_record_id":"nextdc-s7-eastern-creek"},{"evidence_id":"ba2d3717-6fc9-5378-b316-250d91634f00","notes":"Agreed in October 2024 to buy the land for about A$353 million before taxes and costs, with parcels to settle progressively across FY25; the December 2025 release refers to it as NEXTDC's S7 site.","party":"NEXTDC","relationship_scope":"unknown","role":"owner","source_record_id":"nextdc-s7-eastern-creek"},{"evidence_id":"ba2d3717-6fc9-5378-b316-250d91634f00","notes":"Under a December 2025 memorandum of understanding, OpenAI and NEXTDC would collaborate on planning, developing and operating the campus and a GPU supercluster; the release does not describe a definitive agreement.","party":"OpenAI","relationship_scope":"unknown","role":"developer","source_record_id":"nextdc-s7-eastern-creek"}],"power_observations":[],"power_unknown_reason":"Original power metrics are retained in project_details with their units, qualifiers, phases and scopes; no unscoped or additive capacity is inferred.","annual_energy_observations":[],"annual_energy_unknown_reason":"No scoped annual-energy observation selected; not estimated.","efficiency_observations":[],"efficiency_unknown_reason":"No scoped efficiency observation selected; not estimated.","owner":"NEXTDC","operator":null,"users":null,"tenants":null,"customers":null,"status_source_url":"https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-113934740%2120260831T070615.862+GMT","geometry_source_url":"https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7","project_details":[{"identity_decision":{"decision":"unique_site","flags":["administrative_locator_not_project_geometry"],"rationale":"No matching named development in the 201-project release. Preserve NEXTDC S7 Sydney as an independent source record; its locality locator does not itself establish a surveyed physical site.","source_record_id":"nextdc-s7-eastern-creek"},"record":{"aliases":["S7 Sydney","S7 Eastern Creek"],"id":"nextdc-s7-eastern-creek","last_reviewed":"2026-10-09","location":{"admin1":"New South Wales","country":"AU","lat":-33.8059,"locality":"Eastern Creek","lon":150.85,"note":"NEXTDC names the suburb of Eastern Creek, about 45 km west of the Sydney CBD, without a street address; coordinates are the OpenStreetMap Nominatim centroid of the suburb.","precision":"locality","source_ids":["s1","s2","s3"]},"metrics":[{"applies_to":"campus","as_of":"2024-10-17","basis":"planned","metric":"power_capacity","note":"Subject to development approval.","power_scope":"unspecified","qualifier":"approximately","source_ids":["s1"],"unit":"MW","value":550},{"applies_to":"campus","as_of":"2026-10","basis":"planned","metric":"power_capacity","note":"Undated NEXTDC facility page, viewed October 2026, lists 550MW+ of IT capacity.","power_scope":"it_load","qualifier":"at_least","source_ids":["s3"],"unit":"MW","value":550},{"applies_to":"campus","as_of":"2024-10-17","basis":"acquired","metric":"land_area","note":"Reported as about 258,000 square meters of developable land.","qualifier":"approximately","source_ids":["s1"],"unit":"hectares","value":25.8}],"milestones":[{"date":"2024-10-17","event":"site_acquired","kind":"actual","note":"Purchase agreement announced at about A$353 million before taxes and costs, with land parcels to settle progressively across FY25 subject to conditions.","source_ids":["s1"]},{"date":"2025-12-05","event":"other","kind":"actual","note":"NEXTDC and OpenAI signed a memorandum of understanding for the S7 campus and a GPU supercluster.","source_ids":["s2"]},{"date":"2027-H2","event":"first_operational","kind":"planned","note":"First phase expected in the second half of calendar 2027, subject to approvals.","source_ids":["s2"]}],"name":"NEXTDC S7 Sydney","parties":[{"name":"NEXTDC","role":"developer","source_ids":["s1","s2","s3"]},{"name":"NEXTDC","note":"Agreed in October 2024 to buy the land for about A$353 million before taxes and costs, with parcels to settle progressively across FY25; the December 2025 release refers to it as NEXTDC's S7 site.","role":"owner","source_ids":["s1","s2"]},{"name":"OpenAI","note":"Under a December 2025 memorandum of understanding, OpenAI and NEXTDC would collaborate on planning, developing and operating the campus and a GPU supercluster; the release does not describe a definitive agreement.","role":"developer","source_ids":["s2"]}],"power_sources":[],"schema_version":"1.0","sources":[{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260608052956/https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7","id":"s1","published":"2024-10-17","publisher":"NEXTDC","title":"NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney","type":"company","url":"https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260912152241/https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia","id":"s2","published":"2025-12-05","publisher":"NEXTDC","title":"NEXTDC to Join OpenAI in Australia as an Infrastructure Partner","type":"company","url":"https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia"},{"accessed":"2026-10-09","archived_url":"https://web.archive.org/web/20260929101338/https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney","id":"s3","published":null,"publisher":"NEXTDC","title":"S7 Sydney Data Centre","type":"company","url":"https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney"}],"status":"announced","status_as_of":"2025-12-05","status_source_ids":["s2","s3"],"summary":"NEXTDC plans a hyperscale data center campus of about 550 MW on roughly 258,000 square meters of land it agreed to buy in Eastern Creek, western Sydney, in October 2024, subject to development approval. In December 2025 NEXTDC signed a memorandum of understanding with OpenAI to collaborate on planning, developing and operating the S7 campus and a large GPU supercluster as part of OpenAI's program for countries, with a first phase expected in the second half of 2027 if approvals are secured. NEXTDC's site still lists S7 as in planning.","workloads":["ai_unspecified"]},"source_dataset":"semiconductor_atlas","source_evidence_ids":{"s1":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","s2":"ba2d3717-6fc9-5378-b316-250d91634f00","s3":"50c32be3-6305-56c1-aac1-5ae7c2897ec4"},"source_file":"datacenters/projects/nextdc-s7-eastern-creek.json","source_record_id":"nextdc-s7-eastern-creek","source_record_sha256":"9785caf78f3771cd71892e9d6971b50ee7bad038bc1e48b3298d25779be39e15","source_repository_commit":"3d1d3434e4799ae8f9cf8ec9e7804ca1826f9c02","source_sha256":"8bf5c57e463069295572989c14e27565e89723b7cdefb27f1e9daa04a7847d72"}],"evidence_ids":["0857cf0b-1e12-5d38-879b-09b93a544148","22e3e100-6fac-50ab-ac5c-44d1960cfbf1","50c32be3-6305-56c1-aac1-5ae7c2897ec4","ba2d3717-6fc9-5378-b316-250d91634f00"],"status_source":{"evidence_id":"0857cf0b-1e12-5d38-879b-09b93a544148","title":"NSW Planning Secretary’s additional SEARs: NEXTDC S7 Data Centre, Eastern Creek (SSD-113934740)","publisher":"NSW Department of Planning, Housing and Infrastructure","kind":"government_record","published_at":"2026-08-31","source_url":"https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-113934740%2120260831T070615.862+GMT","license":"CC-BY-4.0","attribution":"© State of New South Wales and Department of Planning, Housing and Infrastructure 2026"},"url":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd0f231b23c8dd96495b/#project-688df4a2-dc56-5cde-901a-87c87a08137e","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/projects/688df4a2-dc56-5cde-901a-87c87a08137e.json","geometry_source":{"evidence_id":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","title":"NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney","publisher":"NEXTDC","kind":"company_disclosure","published_at":"2024-10-17","source_url":"https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7","license":"source-terms-not-recorded","attribution":"NEXTDC"}}],"evidence":[{"evidence_id":"22e3e100-6fac-50ab-ac5c-44d1960cfbf1","roles":["imported:geometry","imported:record","metric:land_area","metric:power_capacity","milestone:site_acquired","role:developer","role:owner"],"project_ids":["688df4a2-dc56-5cde-901a-87c87a08137e"],"kind":"company_disclosure","title":"NEXTDC Announces Massive Expansion Plans with Acquisition of S7 Data Centre Site in Sydney","source_url":"https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":"2024-10-17","retrieved_at":"2026-10-09","content_hash":"0e600b1765421eb9cf36b2a978312fda75124f75a23e88bd575c4ae5a1cc4925","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"nextdc-s7-eastern-creek","source_local_id":"s1","source_record_sha256":"9785caf78f3771cd71892e9d6971b50ee7bad038bc1e48b3298d25779be39e15","site_ids":["vcc-site-dd0f231b23c8dd96495b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/22e3e100-6fac-50ab-ac5c-44d1960cfbf1.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/22e3e100-6fac-50ab-ac5c-44d1960cfbf1.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/news/nextdc-acquires-new-sydney-data-centre-s7"},{"evidence_id":"ba2d3717-6fc9-5378-b316-250d91634f00","roles":["imported:geometry","imported:record","imported:status","milestone:first_operational","milestone:other","role:developer","role:owner"],"project_ids":["688df4a2-dc56-5cde-901a-87c87a08137e"],"kind":"company_disclosure","title":"NEXTDC to Join OpenAI in Australia as an Infrastructure Partner","source_url":"https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":"2025-12-05","retrieved_at":"2026-10-09","content_hash":"30493bbbc20752eb499523e6183d3ff04f8392eb7bcc2e34318bd7f6f127b704","publication_date_precision":"day","content_hash_scope":"source_record_projection","source_record_id":"nextdc-s7-eastern-creek","source_local_id":"s2","source_record_sha256":"9785caf78f3771cd71892e9d6971b50ee7bad038bc1e48b3298d25779be39e15","site_ids":["vcc-site-dd0f231b23c8dd96495b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ba2d3717-6fc9-5378-b316-250d91634f00.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/ba2d3717-6fc9-5378-b316-250d91634f00.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/news/building-the-next-generation-of-sovereign-ai-infrastructure-in-australia"},{"evidence_id":"0857cf0b-1e12-5d38-879b-09b93a544148","roles":["announcement"],"project_ids":["688df4a2-dc56-5cde-901a-87c87a08137e"],"kind":"government_record","title":"NSW Planning Secretary’s additional SEARs: NEXTDC S7 Data Centre, Eastern Creek (SSD-113934740)","source_url":"https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-113934740%2120260831T070615.862+GMT","publisher":"NSW Department of Planning, Housing and Infrastructure","source_family":"NSW Major Projects","license":"CC-BY-4.0","attribution":"© State of New South Wales and Department of Planning, Housing and Infrastructure 2026","published_at":"2026-08-31","retrieved_at":"2026-10-16T18:02:41.293Z","content_hash":"b3459295eb0a10fd5e34fc84fed4c2bd056ac3c61fb9543c75758d9a40cce3ef","publication_date_precision":"day","content_hash_scope":"sha256_exact_response_bytes","source_record_id":null,"source_local_id":null,"source_record_sha256":null,"site_ids":["vcc-site-dd0f231b23c8dd96495b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0857cf0b-1e12-5d38-879b-09b93a544148.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/0857cf0b-1e12-5d38-879b-09b93a544148.json","archive_url":"https://web.archive.org/web/20261016180241/https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=SSD-113934740%2120260831T070615.862+GMT"},{"evidence_id":"50c32be3-6305-56c1-aac1-5ae7c2897ec4","roles":["imported:geometry","imported:record","imported:status","metric:power_capacity","role:developer"],"project_ids":["688df4a2-dc56-5cde-901a-87c87a08137e"],"kind":"company_disclosure","title":"S7 Sydney Data Centre","source_url":"https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney","publisher":"NEXTDC","source_family":"www.nextdc.com","license":"source-terms-not-recorded","attribution":"NEXTDC","published_at":null,"retrieved_at":"2026-10-09","content_hash":"c56ff6d8c73949ebab0fc1b4dcea56018e68fc0304b6c3b6aafcb35fb8837d4f","publication_date_precision":"unknown","content_hash_scope":"source_record_projection","source_record_id":"nextdc-s7-eastern-creek","source_local_id":"s3","source_record_sha256":"9785caf78f3771cd71892e9d6971b50ee7bad038bc1e48b3298d25779be39e15","site_ids":["vcc-site-dd0f231b23c8dd96495b"],"url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/50c32be3-6305-56c1-aac1-5ae7c2897ec4.json","api_url":"https://kiankyars.github.io/datacenter-atlas/api/v1/evidence/50c32be3-6305-56c1-aac1-5ae7c2897ec4.json","archive_url":"https://web.archive.org/web/20261009/https://www.nextdc.com/data-centres/sydney-data-centres/s7-sydney"}],"links":{"html":"https://kiankyars.github.io/datacenter-atlas/sites/vcc-site-dd0f231b23c8dd96495b/","sites":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites.json","dataset_download":"https://github.com/kiankyars/datacenter-atlas/releases/download/data-2026-10-27-research-hundredsecond/datacenter-atlas-2026-10-27-research-hundredsecond.zip","geojson":"https://kiankyars.github.io/datacenter-atlas/api/v1/sites/vcc-site-dd0f231b23c8dd96495b.geojson","explorer":"https://kiankyars.github.io/datacenter-atlas/#site=vcc-site-dd0f231b23c8dd96495b","dataset_files":"https://kiankyars.github.io/datacenter-atlas/downloads/2026-10-27-research-hundredsecond/","latest_download":"https://kiankyars.github.io/datacenter-atlas/downloads/latest/datacenter-atlas-latest.zip","citation":"https://kiankyars.github.io/datacenter-atlas/api/v1/citation.json"}}
